Safety and Airspace Regulation Group. 31 May Policy Statement STANDARD INSTRUMENT DEPARTURE TRUNCATION POLICY.

Size: px
Start display at page:

Download "Safety and Airspace Regulation Group. 31 May Policy Statement STANDARD INSTRUMENT DEPARTURE TRUNCATION POLICY."

Transcription

1 Safety and Airspace Regulation Group 31 May 2018 Policy Statement STANDARD INSTRUMENT DEPARTURE TRUNCATION POLICY 1 Introduction 1.1 This Policy Statement (PS) presents CAA policy and guidance to Air Navigation Service Providers (ANSPs) on action required to truncate existing conventional and certain RNAV1 Standard Instrument Departure (SID) procedures where an ANSP determines environmental benefits (flight plan enabled fuel benefits) can be achieved by reducing the length of a SID without change to the existing track over the ground or SID vertical profiles. This should alleviate aircraft operators flight planning for unnecessary fuel uplift when departing airports with current lengthy SIDs. 1.2 SID truncations requiring a new ATS route designator should have a saving of at least 10NM to justify the acquisition/utilisation of a new route designator or 5LNC and the time taken to process the application. 1.3 Changes to SIDs are conducted in accordance with the Airspace Change Process and its supporting guidance (CAP 1616: Airspace Design: Guidance on the regulatory process for changing airspace design including community engagement requirements). Specific technical requirements for SID truncation are contained in this policy document and should be used in conjunction with the process described in CAP Background 2.1 Many SIDs within the UK FIR are lengthy in their design and terminate at a typically low altitude. It is believed the establishment of SIDs has previously been associated with a variety of reasons including ATC tactical planning, reduced workload on the RT, and direct routings to significant waypoints on departure routes. 2.2 Fuel uplift planning has become more critical in recent years, and whilst continuing to comply with operating rules 1 it has become clear that some airline operators consider the full length and final end altitude of a SID whilst others do not. This results in unnecessary fuel carriage when aircraft are routinely climbed to a FL well above the SID (e.g. a SID of 70 NM ending at 5000ft). Except for recent new SID designs constrained by existing ATM tactical requirements, SIDs have been designed like this from their inception and were no doubt predicated upon the performance profiles of the aircraft in operation at the time and ATM requirements of the ANSP. 3 Policy Applicability 3.1 This policy applies when it is proposed that: the end segment of a SID is replaced by a new RNAV ATS route; or 1 See Regulation (EU) 965/2012 paragraphs CAT.OP.MPA.150, CAT.OP.MPA.151 and associated Acceptable Means of Compliance. 31 May 2018 Page 1 of 3

2 where the end segment of a SID is already aligned with an existing ATS route; and there is no change to the track over the ground or vertical profiles; and the SID is truncated at, or after, the final altitude/level attainment point is first reached and terrain clearance remains assured with the establishment of any ATS routes incorporated to replace the truncated section. 3.2 If sponsors wish to truncate a SID prior to the final end altitude, or when a truncation would affect the lateral profile, a full SID re-design is required. In this case, standard procedures for SID designs in CAP 778 and CAP 785 apply. 4 CAP Scalability of SID Truncation Proposals 4.1 CAP 1616 sets out the specific requirements for airspace change proposals, scaled to the appropriate level of the change. As a SID truncation involves no changes to aircraft track over the ground and vertical profile, and results in replacing the end of a SID with an ATS route segment, the application of CAP 1616 will be scaled to the appropriate level, normally 2C. The template at Appendix 1 to Annex A has therefore been tailored to suit the nature of a Level 2C change and comply with CAP SID Truncation Proposal Submission 5.1 SID truncation proposals should adhere to the requirements set out in Annex A. Notification of a proposal must be submitted to the CAA via a DAP 1916 in accordance with CAP Following the Assessment Meeting, details of the proposed SID Truncation Request should be submitted to SARG Airspace (airspace@caa.co.uk) in accordance with Annex A. 6 CAP 778 Requirements 6.1 There are no changes to CAP 778 requirements 6.2 The use of 5LNCs should be limited to the essential required as 5LNC resource is scarce. Consideration should be given to the possibility of cancelling extant 5LNCs to offset the establishment of new points. 7 CAP 785 Requirements 7.1 There is no need for a formal design proposal to be submitted by an Approved Procedure Designer providing the truncation only results in the removal of straight line segments at the end section of a SID which, other than the truncation, does not involve any change in design of the SID or replacement ATS routes. Any new waypoints and track and distance between waypoints must be checked for navigation infrastructure coverage 2 and be verified by SARG prior to formal approval. Notwithstanding the above, sponsors should also provide confirmation that the retained portion of the truncated SID remains fit for purpose. If this is not the case, further action is to be determined on a case by case basis. 8 Impact on NPRs 8.1 Sponsors must confirm there is no impact to NPRs. Where changes to SID designators require a textual amendment, i.e. a name change to Aerodrome Noise Abatement procedures, these details are to be included in the draft AIP amendments. 8.2 When proposals involve SID truncations to any airports designated by the Secretary of State, the CAA Case Officer is to advise the DfT of the SID designator change and that the 2 DEMETR is appropriate for DME/DME procedures. 31 May 2018 Page 2 of 3

3 proposal is nothing more in practice than a nomenclature change, with confirmation from the CAA that tracks or the shape and size of the NPR are not being affected in any way. 9 Impact on Adjacent SIDs 9.1 Sponsors must confirm that truncating a SID will have no impact on the vertical profile of adjacent SIDs from other airports. 10 Environmental Analysis Requirements for a SID Truncation Request 10.1 Details of the estimated enabled flight planned fuel saving and CO2 are the only environmental requirement to be included 11 Consultation 11.1 A SID truncation proposal must include evidence to indicate that the appropriate airport operator, the airport ANSP and appropriate Area Control Centre (ACC) have agreed to the change and that appropriate adaptation and flight planning requirements have been considered and changes can be accommodated on the AIRAC date required. Annex: A. SID Truncation Submission Process. 31 May 2018 Page 3 of 3

4 Annex A SID TRUNCATION SUBMISSION REQUESTS - GUIDANCE ON APPLICATION PROCESS 1. The sponsor must submit the DAP 1916 by to SARG Airspace (airspace@caa.co.uk) with a Statement of Need. 2. SARG Airspace will acknowledge the DAP 1916 and confirm that the application falls under the requirements of CAP 1616 and this policy. Once a Case Officer has been assigned to the task, the proposal as outlined in Appendix 1 is to be submitted directly to airspace@caa.co.uk which is to include the details as described below. 3. Proposals to truncate SIDs must have joint sponsorship from the ANSP and the Airport associated with the SID. 4. Sponsor to complete Appendix 1 NEW SID DESIGNATOR AND 5LNC REQUESTS 5. A request for a new SID designator, any new associated 5-Letter Name Codes (5LNCs) and ATS route designators (if applicable), are to be included with this request (5LNCs should be reserved beforehand using the normal ICARD process). CAA policy statement Significant Point Name Codes (5LNC) and ATS Route Designators 3 Section 2 provides further details concerning the reservation of ATS Route Designators via the ICAO EUR/NAT Region coordinator in Paris May 2018 Page A1 of 10

5 APPENDIX 1 INSTRUCTIONS FOR COMPLETION. 1. Stage In Appendix 1 paragraph 1, the sponsor is to complete the details as shown. 2. Stage In Appendix 1 paragraph 2, the sponsor is to state if any other options were considered and whether they were discounted and why. As options for SID truncations are merely limited to the position where the SID may be truncated an options appraisal is likewise limited. 2.2 In the SID truncation proposal analysis, the Case Officer will confirm the option appraisal (including any safety assessment) and design principles which are constrained by the nature of the proposal, are appropriate and will confirm the appropriate scaling level of the proposal. 3. Stage Consultation may be limited to the appropriate airport operator. Evidence is required to be submitted that the appropriate airport operator and ANSPs have agreed to the change. In Appendix 1 paragraph 3.1 a statement to confirm that consultation has been conducted with the relevant aerodrome authority is to be provided, together with the aerodrome s agreement to the proposal. 3.2 No consultation material is required. 3.3 The final options appraisal and safety assessment must be included with the submission as shown in Appendix In the SID truncation analysis, the Case Officer will confirm the options and safety assessment, and consultation with the appropriate airport authority has been completed. 4. Stage In paragraph 4.1 of Appendix 1, the following details are required for the revised truncated SID: The specific SID Truncation details together with co-ordinate and ATS route details in an accompanying WGS 84 spreadsheet and the draft AIP amendment as attachments to the Appendix. Revised SID designator (see CAA policy statement The Designation of Standard Instrument Departures (SIDs) and Standard Approach Procedures (STARs) in the UK Flight Information Regions 4. The position at which the SID will be truncated. This should also be indicated on the existing SID Chart and attached as an Attachment for subsequent UK AIP amendment (clearly annotated PDF copies of existing charts are acceptable). Note: If approved, SARG will advise the sponsor to submit this chart to AIS using the Formal Change Request to the UK AIP May 2018 Page A2 of 10

6 When a new waypoint is required, a validation check of co-ordinates is required in accordance with CAA policy statement Significant Point Name Codes (5LNC) and ATS Route Designators 5. This validation request is to be submitted in the WGS84 spreadsheet to be provided with the SID Truncation application. If the truncation is at a newly established position, the new 5LNC of the truncation point or, if appropriate, the established position at the truncation point, will become the new SID designator. The SID designator is to be confirmed with SARG. Changes to associated distance to truncation point from previous waypoint; details are to be indicated on the AIP chart to be amended (comments in Adobe PDFs are acceptable). Note: sponsors must confirm appropriate navaid infrastructure is available to support the revised SID termination position. The remaining portion of the existing SID subjected to truncation (from the truncation position) to the original termination position will become the new ATS route if there is no existing ATS route established. 4.2 A safety assessment is to be provided which is to cover the following details: Confirmation that any interacting ATS routes / procedures are not affected. Confirmation that extant RCF procedures have been examined and that either the current RCF procedures remain suitable and do not require revision, or if required, a revised RCF procedure is proposed. In the event of the latter, the proposed draft revision to RCF for the relevant UK AIP Aerodrome s AD 2.22 Flight Procedures entry is to be included. The following action is specifically required for the SID Truncation submission prior to submitting the request. The sponsor is to ensure that the extant RCF procedure is reviewed and that the impact of truncating a SID is assessed with regard to the extant RCF procedure in order to determine whether change to the RCF may be required. This is to ensure that aircraft experiencing RCF would not commence a climb to the flight planned cruising levels earlier than desirable, given the potential to cause a conflict with other interacting procedures which, as a result of the SID truncation, could otherwise potentially occur earlier compared to the extant SID (this is entirely dependent on the RCF procedures described in the UK AIP Aerodrome AD 2.22 section and when a climb to flight planned cruising level is initiated either as described in the relevant AD 2.22 section or in accordance with the national procedures). Confirmation that the SID truncation will be contained within controlled airspace. Adaption and Flight Planning Implications. Proposals are additionally to demonstrate that appropriate adaptation and flight planning requirements have been considered and changes can be effected on the AIRAC date required. Confirmation there is no change to NPRs. Details of any name changes to details in NPR tables; where applicable the detail are to be provided with the draft AIP amendment May 2018 Page A3 of 10

7 Changes to SID chart should be shown in an attached AIP chart detailing all the relevant changes. 4.3 In paragraph 4.2, the following details are required for a new ATS Route: An appropriate ATS Route designator assigned to the route (note above requirement to reserve the route designator). New or revised ATS route details are to be provided in the WGS84 spreadsheet format (i.e. the complete AIP amendment) and are to be attached to the submission request. 4.4 Final Options Appraisal The sponsor must include a Final Options Appraisal including the details listed at CAP 1616 Table E2 of the environmental impacts including CO2 emission and fuel burn see P161 CAP 1616 and controller interactions. 5. Stage The Case Officer will complete a full analysis of the proposal as soon as possible after it is received and will present a recommendation to the Gateway Panel at the first available gateway meeting. Given the nature of the proposal, the CAA is prepared to permit a SID Truncation Proposal to be sequentially assessed under more than one Gateway in the same Gateway Meeting. 5.2 On receipt of the truncation submission proposal, SARG Airspace will verify truncation position co-ordinates (if not at existing waypoint), verify remaining track and distance associated with the new ATS route and check navaid infrastructure. 6 Stage Once verification is complete, the Case Officer will confirm approval of the SID truncation proposal to the sponsor and will authorise that the appropriate AIP amendments and AIS change request may be submitted to AIS. This will include a copy of the completed application form The sponsor is to copy the AIS change request to the appropriate SARG Case Officer. 7 Stage As the SID Truncation proposals result in no changes to track over the ground or vertical profile, as this is a nomenclature change, there are no Post Implementation Requirements to be met, therefore no post implementation action is required. 31 May 2018 Page A4 of 10

8 Appendix 1 to Annex A SID TRUNCATION REQUEST SUBMISSION DATE: (INSERT DATE) Existing SID: Airport ICAO identifier plus SID designator: Proposed SID: Airport ICAO identifier plus SID designator: SID Truncation Sponsor Details: Unit EN-ROUTE ANSP Unit AIRPORT ANSP Name Name Contact details Phone: E mail: Contact details Phone: E mail: 1. Stage Statement of Need For completeness and ease of reference, insert details from DAP Date of Assessment Meeting/Teleconference/E mail Confirmation that proposal may be submitted (insert date). 1.3 Design Principles. The SID Truncation Design Principles are listed below. Design Principles: 31 May 2018 Page A5 of 10

9 2. Stage Options Appraisal. The option proposed and options discounted (where applicable) are detailed below. Options: Options proposed and why: Options discounted and why: 3. Stage Consultation and Sponsor Confirmation Statement This proposal has been submitted following consultation with the aerodrome authority. As sponsor/co-sponsor we confirm that that there is no change to track over the ground, no change to vertical profiles, no change to NPRs and no effect on adjacent SIDs. NERL Aerodrome Name Name 4. Stage SID Truncation Change Submission Details Requirements Details To Be Submitted by Sponsor New SID Designator (To be Co-ordinated with SARG) New 5LNC(s) (if applicable) Truncation Position Co-ordinates of Truncation Position (include validation request see Annex A paragraph 10) 31 May 2018 Page A6 of 10

10 Revised Track / Distance to Truncation Position To be provided on proposed SID chart amendment. Include any amended radials and distances from appropriate navaids. Navaid coverage (to ensure position is definable) Safety Assessment Details Confirmation interacting ATS Routes/SIDs not affected. RCF Implications: (1) Describe impacts of proposed change on extant RCF procedures (confirmation that they have been examined and remain fit for purpose, or (2) If revised RCF procedures are required, state why, and provide the proposed details with the draft AIP amendment. Airspace Containment confirmation. Adaptation and AIRAC implementation confirmation provide confirmation that changes have been co-ordinated with the aerodrome for the date proposed. AIP Amendments Confirmation there is no impact to NPRs. Name change to NPR tables in Aerodrome AD 2.21 Where applicable, change is detailed in the draft AIP amendment. SID Chart Amendments Revisions to chart Include as Attachment May 2018 Page A7 of 10

11 Any other amendments to SID Chart (include PDF copy of chart showing changes required) 4.2. ATS Route Details Submit details for New ATS Route in AIP Format at Attachment 2. Brief details of route to be included here i.e.: Route designator. Start and end position. Note: Change sponsor to provide the draft AIP amendment in the WGS84 Excel Spreadsheet format with the change submission. 5. Options Appraisal Insert details. When complete, please return with safety assessment and supporting maps attached to 31 May 2018 Page A8 of 10

12 SARG Airspace Regulatory Approval use only. Serial Design Check Design Approved / Not Approved Verified By 1a SID revised track and distance. 1b 1c Co-ordinates verified. If errors evident, SID revised track and distance entered below. 2a ATS Route track and distance. 2b ATS Route terrain clearance assured. 2c If errors evident, ATS Route revised track and distance entered below. 3 Navaid infrastructure (adequate coverage for new termination point). 4 RCF procedures. 5 Interacting procedures. 6 Airspace Containment. 7 SID chart proposed changes. 8 SID chart proof from AIS. 9 Final Options Appraisal. 10 Safety Assessment. 11 NPR Tables proposed changes (if applicable). 12 SID truncation proposal confirmed as a Level Zero change. 13 DfT advised if changes made to SIDs at designated airports. (following approval) 31 May 2018 Page A9 of 10

13 Change recommended by: Name... Date... Change referred back to sponsor for the following reason (insert details) Change approved by: Name... Appointment Date May 2018 Page A10 of 10

4.1 This document outlines when a proposal for a SID Truncation may be submitted and details the submission requirements.

4.1 This document outlines when a proposal for a SID Truncation may be submitted and details the submission requirements. Safety and Airspace Regulation Group 13 May 2014 Policy Statement STANDARD INSTRUMENT DEPARTURE TRUNCATION POLICY 1 Introduction 1.1 This Policy Statement (PS) is intended to provide guidance to ANSPs

More information

CONTROLLED AIRSPACE CONTAINMENT POLICY

CONTROLLED AIRSPACE CONTAINMENT POLICY Safety and Airspace Regulation Group (SARG) 17 January 2014 Policy Statement 1 Overview CONTROLLED AIRSPACE CONTAINMENT POLICY 1.1 UK airspace design policy for ATS Routes, SIDs and STARs is based upon

More information

TANZANIA CIVIL AVIATION AUTHORITY AIR NAVIGATION SERVICES INSPECTORATE. Title: CONSTRUCTION OF VISUAL AND INSTRUMENT FLIGHT PROCEDURES

TANZANIA CIVIL AVIATION AUTHORITY AIR NAVIGATION SERVICES INSPECTORATE. Title: CONSTRUCTION OF VISUAL AND INSTRUMENT FLIGHT PROCEDURES Page 1 of 8 1. PURPOSE 1.1. This Advisory Circular provides guidance to personnel involved in construction of instrument and visual flight procedures for publication in the Aeronautical Information Publication.

More information

AERONAUTICAL SERVICES ADVISORY MEMORANDUM (ASAM) Focal Point: Gen

AERONAUTICAL SERVICES ADVISORY MEMORANDUM (ASAM) Focal Point: Gen Page 1 of 6 1 INTRODUCTION Each route shall be assigned a designator that is unique for that aerodrome. The designator shall be defined in accordance with Annex 11, Appendix 3. In addition, the first 4

More information

FASI(N) IoM/Antrim Systemisation Airspace Change Decision

FASI(N) IoM/Antrim Systemisation Airspace Change Decision Safety and Airspace Regulation Group FASI(N) IoM/Antrim Systemisation Airspace Change Decision CAP 1584 Contents Published by the Civil Aviation Authority, August 2017 Civil Aviation Authority, Aviation

More information

ATC PROCEDURES WORKING GROUP. Transition Level

ATC PROCEDURES WORKING GROUP. Transition Level SAFETY & AIRSPACE REGULATION GROUP ATC PROCEDURES WORKING GROUP Transition Introduction 1 In 2013, ICAO adopted a proposal by the European Air Navigation Planning Group to amend the method of determining

More information

REGULATION No. 10/2011 ON APPROVAL OF FLIGHT PROCEDURES INCLUDING SID-s AND STAR-s. Article 1 Scope of Application

REGULATION No. 10/2011 ON APPROVAL OF FLIGHT PROCEDURES INCLUDING SID-s AND STAR-s. Article 1 Scope of Application Republika e Kosovës Republika Kosovo Republic of Kosovo Autoriteti i Aviacionit Civil i Kosovës Autoritet Civilnog Vazduhoplovstva Kosova Civil Aviation Authority of Kosovo Director General of Civil Aviation

More information

CAA DECISION LETTER. LUTON RUNWAY 26 BROOKMANS PARK RNAV1 SIDs AIRSPACE CHANGE PROPOSAL

CAA DECISION LETTER. LUTON RUNWAY 26 BROOKMANS PARK RNAV1 SIDs AIRSPACE CHANGE PROPOSAL Safety and Airspace Regulation Group All NATMAC Representatives 13 August 2015 CAA DECISION LETTER LUTON RUNWAY 26 BROOKMANS PARK RNAV1 SIDs AIRSPACE CHANGE PROPOSAL 1. INTRODUCTION 1.1 For over 10 years

More information

FLIGHT OPERATIONS PANEL (FLTOPSP)

FLIGHT OPERATIONS PANEL (FLTOPSP) International Civil Aviation Organization FLTOPSP/1-WP/3 7/10/14 WORKING PAPER FLIGHT OPERATIONS PANEL (FLTOPSP) FIRST MEETING Montréal, 27 to 31 October 2014 Agenda Item 4: Active work programme items

More information

Safety and Airspace Regulation Group

Safety and Airspace Regulation Group Safety and Airspace Regulation Group 24 August 2015 Policy Statement POLICY FOR POINT MERGE AND TROMBONE TRANSITION PROCEDURES 1 Introduction 1.1 The Point Merge transition procedure is an Area Navigation

More information

CIVIL AVIATION AUTHORITY, PAKISTAN OPERATIONAL CONTROL SYSTEMS CONTENTS

CIVIL AVIATION AUTHORITY, PAKISTAN OPERATIONAL CONTROL SYSTEMS CONTENTS CIVIL AVIATION AUTHORITY, PAKISTAN Air Navigation Order No. : 91-0004 Date : 7 th April, 2010 Issue : Two OPERATIONAL CONTROL SYSTEMS CONTENTS SECTIONS 1. Authority 2. Purpose 3. Scope 4. Operational Control

More information

THIS BULLETIN REPLACES BULLETIN WHICH IS NO LONGER CURRENT AND HAS BEEN WITHDRAWN.

THIS BULLETIN REPLACES BULLETIN WHICH IS NO LONGER CURRENT AND HAS BEEN WITHDRAWN. IBAC Bulletin 16-03 THIS BULLETIN REPLACES BULLETIN 16-01 WHICH IS NO LONGER CURRENT AND HAS BEEN WITHDRAWN. Subject: Performance-based Navigation in Australian airspace - General guidance on the GNSS

More information

NATS. SAIP AD3 Jersey Interface Change Stage 1 Assessment Meeting. Friday 2 nd February x NATS presenters.

NATS. SAIP AD3 Jersey Interface Change Stage 1 Assessment Meeting. Friday 2 nd February x NATS presenters. NATS SAIP AD3 Jersey Interface Change Stage 1 Assessment Meeting Friday 2 nd February 2018 3x NATS presenters Agenda Revised Statement of need Background Issues and benefits arising from proposed change

More information

LAMP 2 - FASI(S) Network

LAMP 2 - FASI(S) Network Future Airspace Strategy Implementation South: ATS Route Network managed by NERL under London Airspace Management Programme 2 LAMP 2 - FASI(S) Network Stage 1 Assessment Meeting Friday 23 rd February 2018

More information

IRISH AVIATION AUTHORITY DUBLIN POINT MERGE. Presented by James O Sullivan PANS-OPS & AIRSPACE INSPECTOR Irish Aviation Authority

IRISH AVIATION AUTHORITY DUBLIN POINT MERGE. Presented by James O Sullivan PANS-OPS & AIRSPACE INSPECTOR Irish Aviation Authority IRISH AVIATION AUTHORITY DUBLIN POINT MERGE Presented by James O Sullivan PANS-OPS & AIRSPACE INSPECTOR Irish Aviation Authority 2012 Holding Holding Before Point Merge No Pilot anticipation of distance

More information

CAP 1616: Airspace Design: Guidance on the regulatory process for changing airspace design including community engagement requirements

CAP 1616: Airspace Design: Guidance on the regulatory process for changing airspace design including community engagement requirements CAP 1616: Airspace Design: Guidance on the regulatory process for changing airspace design including community engagement requirements Heathrow Community Noise Forum Wednesday 14 th March 2018 1 1 What

More information

ALTIMETER SETTING PROCEDURES

ALTIMETER SETTING PROCEDURES AIP New Zealand ENR 1.7-1 ENR 1.7 ALTIMETER SETTING PROCEDURES 1 INTRODUCTION 1.1 General 1.1.1 The requirements for altimeter setting are detailed in CAR Part 91. The requirements are summarised in this

More information

Doncaster Sheffield Airport Airspace Change Proposal for the Introduction of RNAV (GNSS) Departure and Approach Procedures ANNEX B TO PART B

Doncaster Sheffield Airport Airspace Change Proposal for the Introduction of RNAV (GNSS) Departure and Approach Procedures ANNEX B TO PART B Doncaster Sheffield Airport Airspace Change Proposal for the Introduction of RNAV (GNSS) Departure and Approach Procedures ANNEX B TO PART B ANNEX B TO PART B: Runway 20 Westerly Departure UPTON 2B 2 Contents

More information

International Civil Aviation Organization REVIEW OF STATE CONTINGENCY PLANNING REQUIREMENTS. (Presented by the Secretariat) SUMMARY

International Civil Aviation Organization REVIEW OF STATE CONTINGENCY PLANNING REQUIREMENTS. (Presented by the Secretariat) SUMMARY BBACG/16 WP/4 31/01/05 International Civil Aviation Organization The Special Coordination Meeting for the Bay of Bengal area (SCM/BOB) and The Sixteenth Meeting of the Bay of Bengal ATS Coordination Group

More information

EUROPEAN COMMISSION DIRECTORATE-GENERAL FOR MOBILITY AND TRANSPORT

EUROPEAN COMMISSION DIRECTORATE-GENERAL FOR MOBILITY AND TRANSPORT EUROPEAN COMMISSION DIRECTORATE-GENERAL FOR MOBILITY AND TRANSPORT DIRECTORATE E - Air Transport E.2 - Single sky & modernisation of air traffic control Brussels, 6 April 2011 MOVE E2/EMM D(2011) 1. TITLE

More information

CAA DECISION LETTER MANSTON KENT INTERNATIONAL AIRPORT (KIA) RNAV (GNSS) HOLD AIRSPACE CHANGE PROPOSAL

CAA DECISION LETTER MANSTON KENT INTERNATIONAL AIRPORT (KIA) RNAV (GNSS) HOLD AIRSPACE CHANGE PROPOSAL Directorate of Airspace Policy NATMAC Representatives 13 July 2012 CAA DECISION LETTER MANSTON KENT INTERNATIONAL AIRPORT (KIA) RNAV (GNSS) HOLD AIRSPACE CHANGE PROPOSAL 1. INTRODUCTION 1.1 During late

More information

GOVERNMENT OF INDIA OFFICE OF DIRECTOR GENERAL OF CIVIL AVIATION

GOVERNMENT OF INDIA OFFICE OF DIRECTOR GENERAL OF CIVIL AVIATION GOVERNMENT OF INDIA OFFICE OF DIRECTOR GENERAL OF CIVIL AVIATION ANSS AC NO. 1 of 2017 31.07. 2017 Air Space and Air Navigation Services Standard ADVISORY CIRCULAR Subject: Procedures to follow in case

More information

Proposed Changes to Inverness Airport s Airspace The Introduction of Controlled Airspace and Optimisation of Instrument Flight Procedures

Proposed Changes to Inverness Airport s Airspace The Introduction of Controlled Airspace and Optimisation of Instrument Flight Procedures Proposed Changes to Inverness Airport s Airspace The Introduction of Controlled Airspace and Optimisation of Instrument Flight Procedures What is an Airspace Change Proposal? It is a formal UK Civil Aviation

More information

UK Performance-based Navigation (PBN) Implementation Status

UK Performance-based Navigation (PBN) Implementation Status UK Performance-based Navigation (PBN) Implementation Status Geoff Burtenshaw Technical Advisor, Navigation Systems Directorate of Airspace Policy 1 Current Implementation of PBN in UK Airspace 2 Current

More information

Contents. Subpart A General 91.1 Purpose... 7

Contents. Subpart A General 91.1 Purpose... 7 Contents Rule objective... 3 Extent of consultation... 3 Summary of comments... 4 Examination of comments... 6 Insertion of Amendments... 6 Effective date of rule... 6 Availability of rules... 6 Part 91

More information

AIS Basics - NOTAM, AIP, Amendments, Supplements, Circulars, Charts, and NOTAM Putting the basics in place

AIS Basics - NOTAM, AIP, Amendments, Supplements, Circulars, Charts, and NOTAM Putting the basics in place AIS Basics - NOTAM, AIP, Amendments, Supplements, Circulars, Charts, and NOTAM Putting the basics in place Workshop for the development of AIS management and oversight for Civil Aviation Authorities CAA)

More information

Safety and Airspace Regulation Group

Safety and Airspace Regulation Group Page 1 of 11 Airspace Change Proposal - Environmental Assessment Version: 1.0/ 2016 Title of Airspace Change Proposal Change Sponsor Isle of Man/Antrim Systemisation (Revised ATS route structure over the

More information

CAA MINDED TO REJECT EDINBURGH AIRSPACE CHANGE PROPOSAL

CAA MINDED TO REJECT EDINBURGH AIRSPACE CHANGE PROPOSAL Safety & Airspace Regulation Group Airspace, Air Traffic Management and Aerodrome Division Edinburgh Airport Limited Scotland EH12 9DN 29 October 2018 CAA MINDED TO REJECT EDINBURGH AIRSPACE CHANGE PROPOSAL

More information

INTERNATIONAL CIVIL AVIATION ORGANIZATION FIRST MEETING OF DIRECTORS OF CIVIL AVIATION OF THE CARIBBEAN REGION (CAR/DCA/1)

INTERNATIONAL CIVIL AVIATION ORGANIZATION FIRST MEETING OF DIRECTORS OF CIVIL AVIATION OF THE CARIBBEAN REGION (CAR/DCA/1) CAR DCA/1 20/09/02 INTERNATIONAL CIVIL AVIATION ORGANIZATION FIRST MEETING OF DIRECTORS OF CIVIL AVIATION OF THE CARIBBEAN REGION (CAR/DCA/1) (Grand Cayman, Cayman Islands, 8-11 October 2002) Agenda Item

More information

Review of the designation of Class C controlled airspace in the Mount Cook area - Consultation November 2013

Review of the designation of Class C controlled airspace in the Mount Cook area - Consultation November 2013 Review of the designation of Class C controlled airspace in the Mount Cook area - Consultation November 2013 Civil Aviation Authority Table of Contents Background... 1 Final decision... 1 The introduction

More information

Safety and Airspace Regulation Group

Safety and Airspace Regulation Group Safety and Airspace Regulation Group All NATMAC Representatives 18 August 2014 CAA DECISION LETTER 1. INTRODUCTION BRISTOL INTERNATIONAL AIRPORT (BIA) RNAV STARS 1.1 During January 2014, the Civil Aviation

More information

GENERAL REPORT. Reduced Lateral Separation Minima RLatSM Phase 2. RLatSM Phase 3

GENERAL REPORT. Reduced Lateral Separation Minima RLatSM Phase 2. RLatSM Phase 3 IBAC TECHNICAL REPORT SUMMARY Subject: NAT Operations and Air Traffic Management Meeting: North Atlantic (NAT) Procedures and Operations Group Meeting 2 Reported by Tom Young POG2 took place at the ICAO

More information

NDS Subject to NOTAM: No

NDS Subject to NOTAM: No AIRSPACE CO-ORDINATION NOTICE Safety and Airspace Regulation Group ACN Reference: Version: Date: Date of Original 2017-00-0131 1.1 29 November 2016 29 November 2016 RAF VALLEY (MONA) MSSR CALIBRATION NDS

More information

1.2 An Approach Control Unit Shall Provide the following services: c) Alerting Service and assistance to organizations involved in SAR Actions;

1.2 An Approach Control Unit Shall Provide the following services: c) Alerting Service and assistance to organizations involved in SAR Actions; Section 4 Chapter 1 Approach Control Services Approach Control Note: This section should be read in conjunction with Section 2 (General ATS), Section 6 (Separation Methods and Minima) and Section 7 (ATS

More information

IRELAND SAFETY REGULATION DIVISION

IRELAND SAFETY REGULATION DIVISION NOTICE TO AIR NAVIGATION SERVICE PROVIDERS IRELAND SAFETY REGULATION DIVISION NR S.016 ISSUE 1 DATE 03.03.10 IRISH AVIATION AUTHORITY AVIATION HOUSE HAWKINS STREET DUBLIN 2 Tel +353 1 6718655 Fax +353

More information

LETTER OF AGREEMENT. Between. and RELATING TO

LETTER OF AGREEMENT. Between. and RELATING TO LETTER OF AGREEMENT Between NATS (En Route) plc, Scottish Area Control (Prestwick) NATS (Services) Ltd, Edinburgh ATC NATS (Services) Ltd, Glasgow ATC and BRITISH GLIDING ASSOCIATION (BGA) RELATING TO

More information

Phases of a departure

Phases of a departure Phases of a departure Hours, days or even months prior, an airline will submit a flight plan to NATS requesting an air traffic routing to its destination. The filed route to be flown will include the designated

More information

GENERAL INFO NOTICE 1. BACKGROUND

GENERAL INFO NOTICE 1. BACKGROUND GENERAL INFO NOTICE 1. BACKGROUND Precision-RNAV (P-RNAV) is the natural progression from Basic RNAV (B-RNAV) which became mandatory in European Airspace in April 1998 for en-route operations. Initial

More information

SID/STAR phraseology FAQ Canadian implementation April 27, 2017

SID/STAR phraseology FAQ Canadian implementation April 27, 2017 SID/STAR phraseology FAQ Canadian implementation April 27, 2017 The International Civil Aviation Organization (ICAO) has developed harmonized phraseology for Standard Instrument Departures (SIDs) and Standard

More information

CAT E Subject to NOTAM: No

CAT E Subject to NOTAM: No AIRSPACE CO-ORDINATION NOTICE Safety and Airspace Regulation Group ACN Reference: Version: Date: Date of Original 2015-09-0091 V1.0 10 June 2016 10 June 2016 TALLA DVOR/DME CALIBRATION CAT E Subject to

More information

Airspace Structure Changes and ATC Operational Procedure Changes. Stuart Lindsey Airspace Regulation

Airspace Structure Changes and ATC Operational Procedure Changes. Stuart Lindsey Airspace Regulation Airspace Structure Changes and ATC Operational Procedure Changes Stuart Lindsey Airspace Regulation July 2015 Notified Airspace Structure Airspace Change Process Airspace Charter (CAP 724) provides

More information

SAFETYSENSE LEAFLET AIR TRAFFIC SERVICES OUTSIDE CONTROLLED AIRSPACE

SAFETYSENSE LEAFLET AIR TRAFFIC SERVICES OUTSIDE CONTROLLED AIRSPACE SAFETYSENSE LEAFLET 8e AIR TRAFFIC SERVICES OUTSIDE CONTROLLED AIRSPACE 1 INTRODUCTION 2 NON-RADAR SERVICES 3 RADAR SERVICES 4 HOW TO OBTAIN A SERVICE 5 RADAR SERVICE LIMITATIONS 1 INTRODUCTION a) In this

More information

AIRSPACE CO-ORDINATION NOTICE Safety and Airspace Regulation Group ACN Reference: Version: Date: Date of Original

AIRSPACE CO-ORDINATION NOTICE Safety and Airspace Regulation Group ACN Reference: Version: Date: Date of Original AIRSPACE CO-ORDINATION NOTICE Safety and Airspace Regulation Group ACN Reference: Version: Date: Date of Original 2016-06-0532 V2 15 June 2016 15 June 2016 BRITISH GLIDING ASSOCIATION : COMPETITIONS 2016

More information

MODULE 4: SIDs and STARs. Slide <#> of

MODULE 4: SIDs and STARs. Slide <#> of MODULE 4: SIDs and STARs Slide of OUTLINE Objective: To understand SIDs and STARs and their applications CONTENT: WHAT ARE SIDS AND STARS COMMON ELEMENTS CHARTS PROCESSING OF SIDS AND STARS VECTORING

More information

PBN Syllabus Aeroplane. Learning Objective. phase Theoretical PBN concept. in ICAO Doc 9613)

PBN Syllabus Aeroplane. Learning Objective. phase Theoretical PBN concept. in ICAO Doc 9613) PBN Syllabus Aeroplane Training Topic phase Theoretical PBN concept training (as described in ICAO Doc 9613) PBN principles PBN components PBN scope Navigation specifications RNAV and RNP Navigation functional

More information

Title: Airway Q41: Reclassify to Class G below Flight level 55. Subject Release of Controlled and Segregated Airspace

Title: Airway Q41: Reclassify to Class G below Flight level 55. Subject Release of Controlled and Segregated Airspace Title: Airway Q41: Reclassify to Class G below Flight level 55 Subject Release of Controlled and Segregated Airspace Version: V3.0 Status: Final Reference FASVIG 20161026 V3.0 Author: Publication Date:

More information

ENR 1.7 ALTIMETER SETTING PROCEDURES

ENR 1.7 ALTIMETER SETTING PROCEDURES AIP LEBANON ENR 1.7-1 11 APR 2008 ENR 1.7 ALTIMETER SETTING PROCEDURES 1. Introduction: 1.1 The procedures herein describe the method used in providing adequate vertical separation between aircraft and

More information

Aerodrome Surveys. Airside Operational Instruction 17 CONTENT:- 1. INTRODUCTION 2. PROCEDURES 3. TREATMENT OF OBSTACLES APPENDIX 2

Aerodrome Surveys. Airside Operational Instruction 17 CONTENT:- 1. INTRODUCTION 2. PROCEDURES 3. TREATMENT OF OBSTACLES APPENDIX 2 Aerodrome Surveys Airside Operational Instruction 17 CONTENT:- 1. INTRODUCTION 2. PROCEDURES 3. TREATMENT OF OBSTACLES APPENDIX 1 APPENDIX 2 SURVEY ASSESSMENT FORM DECLARATION OF COMPLIANCE (SAMPLE FORM)

More information

PBN Syllabus Helicopter. Learning Objective. phase Theoretical PBN concept. in ICAO Doc 9613)

PBN Syllabus Helicopter. Learning Objective. phase Theoretical PBN concept. in ICAO Doc 9613) PBN Syllabus Helicopter Training Topic phase Theoretical PBN concept training (as described in ICAO Doc 9613) PBN principles PBN components PBN scope Navigation specifications RNAV and RNP Navigation functional

More information

NATMAC INFORMATIVE INTRODUCTION OF STANSTED TRANSPONDER MANDATORY ZONE (TMZ)

NATMAC INFORMATIVE INTRODUCTION OF STANSTED TRANSPONDER MANDATORY ZONE (TMZ) Directorate of Airspace Policy NATMAC Representatives DAP/STNTMZ 23 July 2009 NATMAC INFORMATIVE Dear Colleagues INTRODUCTION OF STANSTED TRANSPONDER MANDATORY ZONE (TMZ) INTRODUCTION 1.1 NATS issued a

More information

SUMMARY REPORT ON THE SAFETY OVERSIGHT AUDIT FOLLOW-UP OF THE DIRECTORATE GENERAL OF CIVIL AVIATION OF KUWAIT

SUMMARY REPORT ON THE SAFETY OVERSIGHT AUDIT FOLLOW-UP OF THE DIRECTORATE GENERAL OF CIVIL AVIATION OF KUWAIT ICAO Universal Safety Oversight Audit Programme SUMMARY REPORT ON THE SAFETY OVERSIGHT AUDIT FOLLOW-UP OF THE DIRECTORATE GENERAL OF CIVIL AVIATION OF KUWAIT (Kuwait, 17 to 20 September 2003) International

More information

PBN Implementation in the UK

PBN Implementation in the UK PBN Implementation in the UK Geoff Burtenshaw Technical Advisor, Navigation Systems Directorate of Airspace Policy UK Civil Aviation Authority 06 October 06 October PBN TF/3 1 Presentation Overview UK

More information

SERA AND CAP694 (THE UK FLIGHT PLANNING GUIDE) - GUIDANCE. Correct to 1 May This document is for guidance only and is subject to change.

SERA AND CAP694 (THE UK FLIGHT PLANNING GUIDE) - GUIDANCE. Correct to 1 May This document is for guidance only and is subject to change. SERA AND CAP694 (THE UK FLIGHT PLANNING GUIDE) - GUIDANCE Correct to 1 May 2015. This document is for guidance only and is subject to change. Implementing Regulation (EU) 923/2012, supporting Acceptable

More information

Meeting Ref: Project Title/No:

Meeting Ref: Project Title/No: Project Title/No: Glasgow Airport SIDs ACP Meeting Ref: CL-5170-MIN-050-V1.0 Purpose: Framework Briefing Date: 10 Feb 16 Venue: CAA House, K4 Apollo Time: 1130-1400 Attendees: CAA SARG Representatives

More information

Advisory Circular. File No.: Z U Issue No.: 01

Advisory Circular. File No.: Z U Issue No.: 01 Advisory Circular Subject: Requirements for the Timely Notification of Amendments to Aeronautical Information Issuing Office: Standards AC No.: 300-015 File No.: Z 5000-34 U Issue No.: 01 RDIMS No.: 12611990v5

More information

EASA NPA on SERA Part ENAV Response sheet. GENERAL COMMENTS ON NPA PACKAGE Note: Specific comments are provided after the General Comments

EASA NPA on SERA Part ENAV Response sheet. GENERAL COMMENTS ON NPA PACKAGE Note: Specific comments are provided after the General Comments EASA NPA on SERA Part ENAV Response sheet GENERAL COMMENTS ON NPA PACKAGE te: Specific comments are provided after the General Comments 1 SERA Parts C and D ENAV still misses clarity on the whole scope

More information

NATS Swanwick. Interface Agreement. Owners: General Manager LTC Swanwick. General Manager xxxxx Airport

NATS Swanwick. Interface Agreement. Owners: General Manager LTC Swanwick. General Manager xxxxx Airport - 1 - NATS Swanwick Interface Agreement between TERMINAL CONTROL (LTC), SWANWICK And NATS xxxxxx AIRPORT Owners: General Manager LTC Swanwick General Manager xxxxx Airport APPROVED BY Title Name Signature

More information

Air Operator Certification

Air Operator Certification Civil Aviation Rules Part 119, Amendment 15 Docket 8/CAR/1 Contents Rule objective... 4 Extent of consultation Safety Management project... 4 Summary of submissions... 5 Extent of consultation Maintenance

More information

CLEARANCE INSTRUCTION READ BACK

CLEARANCE INSTRUCTION READ BACK CLEARANCE INSTRUCTION READ BACK 1. Introduction An ATC clearance or an instruction constitutes authority for an aircraft to proceed only in so far as known air traffic is concerned and is based solely

More information

GOVERNMENT OF INDIA OFFICE OF THE DIRECTOR GENERAL OF CIVIL AVIATION TECHNICAL CENTRE, OPP. SAFDARJUNG AIRPORT, NEW DELHI

GOVERNMENT OF INDIA OFFICE OF THE DIRECTOR GENERAL OF CIVIL AVIATION TECHNICAL CENTRE, OPP. SAFDARJUNG AIRPORT, NEW DELHI GOVERNMENT OF INDIA OFFICE OF THE DIRECTOR GENERAL OF CIVIL AVIATION TECHNICAL CENTRE, OPP. SAFDARJUNG AIRPORT, NEW DELHI - 110003 CIVIL AVIATION REQUIREMENT SECTION 8 - AIRCRAFT OPERATIONS SERIES 'S',

More information

Current Rules Part 175 Aeronautical Information Service Organisations - Certification Pending Rules

Current Rules Part 175 Aeronautical Information Service Organisations - Certification Pending Rules Subpart B Certification Requirements 175.51 Personnel Requirements (a) Each applicant for the grant of an aeronautical information service certificate shall engage, employ or contract: (1) a senior person

More information

IRELAND SAFETY REGULATION DIVISION IRISH AVIATION AUTHORITY AVIATION HOUSE HAWKINS STREET DUBLIN 2 Tel Fax AFTN EIDWYOYX

IRELAND SAFETY REGULATION DIVISION IRISH AVIATION AUTHORITY AVIATION HOUSE HAWKINS STREET DUBLIN 2 Tel Fax AFTN EIDWYOYX IRELAND SAFETY REGULATION DIVISION IRISH AVIATION AUTHORITY AVIATION HOUSE HAWKINS STREET DUBLIN 2 Tel +353 1 6718655 Fax +353 1 6774068 AFTN EIDWYOYX EASA PERMIT TO FLY AERONAUTICAL NOTICE NR A.91 ISSUE

More information

APAC PBN UPDATE Slide 1 of xx

APAC PBN UPDATE Slide 1 of xx APAC PBN UPDATE Slide 1 of xx Ian Mallett FREE OFFERS! CASA Training DVDs GNSS ADS-B More available from CASA Safety Management System (SMS) Booklet CASA Shop Items www.casa.gov.au Slide 2 of xx Slide

More information

SESAR Active ECAC INF07 REG ASP MIL APO USE INT IND NM

SESAR Active ECAC INF07 REG ASP MIL APO USE INT IND NM SESAR Active ECAC INF07 REG ASP MIL APO USE INT IND NM Subject matter and scope * The extension of the applicability area to non-eu ECAC States that have not signed an aviation agreement with EU, as well

More information

Flight Operations Inspector Manual

Flight Operations Inspector Manual 1. Purpose of the job aid APPLICATION TO CONDUCT RNP APCH OPERATIONS a) To provide information on the relevant documents. b) To provide a record of the operator application, the inspector comments and

More information

OPS General Rules for Operations Manuals

OPS General Rules for Operations Manuals CAR OPS 1 Subpart P (Manuals Logs and Records) Date of audit: 20 th December 2016 Audit conducted by: Stephanie Vella Gera. Audit Ref: QM_13 Compliant Reference/Question es No Comment/Remark OPS 1.1040

More information

RNP AR APCH Approvals: An Operator s Perspective

RNP AR APCH Approvals: An Operator s Perspective RNP AR APCH Approvals: An Operator s Perspective Presented to: ICAO Introduction to Performance Based Navigation Seminar The statements contained herein are based on good faith assumptions and provided

More information

OVERSEAS TERRITORIES AVIATION REQUIREMENTS (OTARs)

OVERSEAS TERRITORIES AVIATION REQUIREMENTS (OTARs) OVERSEAS TERRITORIES AVIATION REQUIREMENTS (OTARs) Part 174 METEOROLOGICAL SERVICES FOR AVIATION Published by Air Safety Support International Ltd Air Safety Support International Limited 2017 First Issue

More information

UK MOUNTAIN WAVE FESTIVAL - TRA (G) CAIRNGORM GLIDING CLUB

UK MOUNTAIN WAVE FESTIVAL - TRA (G) CAIRNGORM GLIDING CLUB AIRSPACE CO-ORDINATION NOTICE Safety and Airspace Regulation Group ACN Reference: Version: Date: Date of Original 2016-04-0110 V2.0 05 May 2016 22 April 2016 UK MOUNTAIN WAVE FESTIVAL - TRA (G) CAIRNGORM

More information

Draft airspace design guidance consultation

Draft airspace design guidance consultation Draft airspace design guidance consultation Annex 2: CAP 1522 Published by the Civil Aviation Authority, 2017 Civil Aviation Authority Aviation House Gatwick Airport South West Sussex RH6 0YR You can copy

More information

Chapter 6. Airports Authority of India Manual of Air Traffic Services Part 1

Chapter 6. Airports Authority of India Manual of Air Traffic Services Part 1 Chapter 6 6.1 ESSENTIAL LOCAL TRAFFIC 6.1.1 Information on essential local traffic known to the controller shall be transmitted without delay to departing and arriving aircraft concerned. Note 1. Essential

More information

AIP PORTUGAL ENR NOV-2007

AIP PORTUGAL ENR NOV-2007 AIP PORTUGAL ENR 1.6-1 ENR 1.6 RADAR SERVICES AND PROCEDURES PROVISION OF RADAR SERVICES WITHIN LISBOA AND SANTA MARIA FIR / UIR Introduction Air Traffic Control Services within Lisboa and Santa Maria

More information

FIT FOR PURPOSE: A Guide to Using NAV CANADA Aeronautical Publications SECTION B PUBLICATION SPECIFIC FIT FOR PURPOSE INFORMATION

FIT FOR PURPOSE: A Guide to Using NAV CANADA Aeronautical Publications SECTION B PUBLICATION SPECIFIC FIT FOR PURPOSE INFORMATION FIT FOR : A Guide to Using NAV CANADA Aeronautical Publications SECTION B PUBLICATION SPECIFIC FIT FOR INFORMATION I TABLE OF CONTENTS SECTION A: GENERAL MATERIAL 2 SECTION B: PUBLICATION SPECIFIC FIT

More information

REVALIDATION AND VALIDATION: PROCESSES AND PROCEDURES

REVALIDATION AND VALIDATION: PROCESSES AND PROCEDURES PROCESS OVERVIEW PROCESS AIMS PROCESS STAGES PROCESS PROCEDURES STAGE 1: BUSINESS PLANNING SCHEDULE STAGE 2: OUTLINE PLANNING PERMISSION STAGE 3: FULL PROPOSAL CONSIDERATION GENERAL PROCEDURES VALIDATION

More information

OVERSEAS TERRITORIES AVIATION REQUIREMENTS (OTARs)

OVERSEAS TERRITORIES AVIATION REQUIREMENTS (OTARs) OVERSEAS TERRITORIES AVIATION REQUIREMENTS (OTARs) Part 171 AERONAUTICAL TELECOMMUNICATION SERVICES Published by Air Safety Support International Ltd Air Safety Support International Limited 2005 First

More information

Part 172 Air Traffic Service Organisations Certification, Amendment 2. Contents

Part 172 Air Traffic Service Organisations Certification, Amendment 2. Contents Contents Objective... 3 Extent of consultation... 3 Summary of comments... 4 Examination of comments... 4 Insertion of amendments... 4 Effective date of rule... 4 Availability of rules... 4 Part 172 Amendments

More information

Official Journal of the European Union L 186/27

Official Journal of the European Union L 186/27 7.7.2006 Official Journal of the European Union L 186/27 COMMISSION REGULATION (EC) No 1032/2006 of 6 July 2006 laying down requirements for automatic systems for the exchange of flight data for the purpose

More information

The NAT OPS Bulletin Checklist is available at & NAT Documents, NAT Documents, then NAT Ops Bulletins.

The NAT OPS Bulletin Checklist is available at  & NAT Documents, NAT Documents, then NAT Ops Bulletins. Serial Number: 2017_003 Subject: RLatSM Phase 2 AIC Originator: NAT SPG Issued: 15 December 2017 Effective: 15 December 2017 The purpose of North Atlantic Operations Bulletin 2017-003 is to provide guidance

More information

TANZANIA CIVIL AVIATION AUTHORITY SAFETY REGULATION. Title: Certification of Air Navigation Services Providers

TANZANIA CIVIL AVIATION AUTHORITY SAFETY REGULATION. Title: Certification of Air Navigation Services Providers Page 1 of 6 1.0 PURPOSE 1.1. This order provides direction and guidance to the Inspectors in the process of certification of ANSPs as required by the Civil Aviation (Air Navigation Services) Regulations.

More information

Summary of Public Submissions Received on

Summary of Public Submissions Received on Summary of Public Submissions Received on NPRM 15-01 Omnibus 2014 Prepared by DENISE RATIETA and PAUL ELTON 17 August 2015 Table of Contents General... 1 Summary of Submissions... 1 Definition of controlled

More information

Design Airspace (Routes, Approaches and Holds) Module 11 Activity 7. European Airspace Concept Workshops for PBN Implementation

Design Airspace (Routes, Approaches and Holds) Module 11 Activity 7. European Airspace Concept Workshops for PBN Implementation Design Airspace (Routes, Approaches and Holds) Module 11 Activity 7 European Airspace Concept Workshops for PBN Implementation Design in Context TFC Where does the traffic come from? And when? RWY Which

More information

European Aviation Safety Agency

European Aviation Safety Agency Annexes I and II to ED Decision 2018/013/R European Aviation Safety Agency Acceptable Means of Compliance and Guidance Material to Commission Regulation (EU) No 1332/2011 and Commission Implementing Regulation

More information

AFI Plan Aerodromes Certification Project Workshop for ESAF Region (Nairobi, Kenya, August 2016)

AFI Plan Aerodromes Certification Project Workshop for ESAF Region (Nairobi, Kenya, August 2016) AFI Plan Aerodromes Certification Project Workshop for ESAF Region (Nairobi, Kenya, 23-26 August 2016) Aerodromes Certification- ICAO Requirements Arthemon Ndikumana RO/AGA, Nairobi 08/09/2016 AFI Plan

More information

CHAPTER 5 SEPARATION METHODS AND MINIMA

CHAPTER 5 SEPARATION METHODS AND MINIMA CHAPTER 5 SEPARATION METHODS AND MINIMA 5.1 Provision for the separation of controlled traffic 5.1.1 Vertical or horizontal separation shall be provided: a) between IFR flights in Class D and E airspaces

More information

UK Implementation of PBN

UK Implementation of PBN UK Implementation of PBN Geoff Burtenshaw Directorate of Airspace Policy UK Civil Aviation Authority 1 UK airspace context Presentation Overview Future Airspace Strategy (FAS) (FAS) Industry Implementation

More information

ATM 4 Airspace & Procedure Design

ATM 4 Airspace & Procedure Design ATM 4 Airspace & Procedure Design 1. Introduction 1.1. The proper planning and design of routes, holding patterns, airspace structure and ATC sectorisation in both terminal and en-route airspace can be

More information

AERODROME LICENCE APPLICATION PROCESS

AERODROME LICENCE APPLICATION PROCESS 0000180111 Page 2 Why is a Licence Required? An aerodrome licence is required for a site if it is intended to facilitate operations by commercial transport aircraft, other aerial work other than rotorcraft,

More information

CHANGE CONTROL PROCEDURE

CHANGE CONTROL PROCEDURE CHANGE CONTROL PROCEDURE Page - 1 - of 9 Revision Record Date Revision By Approver Description 13/02/15 V1.0 Jez Davis Jez Davis Original Issue 23/03/15 V2.0 Jez Davis Jez Davis Amended following CAA SARG

More information

Any queries about the content of the attached document should be addressed to: ICAO EUR/NAT Office:

Any queries about the content of the attached document should be addressed to: ICAO EUR/NAT Office: Serial Number: 2018_005 Subject: Special Procedures For In-Flight Contingencies in Oceanic Airspace Originator: NAT SPG Issued: 17 DEC 2018 Effective:28 MAR 2019 The purpose of this North Atlantic Operations

More information

Validation & Implementation Considerations Module 14 Activities 11 to 17

Validation & Implementation Considerations Module 14 Activities 11 to 17 Validation & Implementation Considerations Module 14 Activities 11 to 17 European Airspace Concept Workshops for PBN Implementation Objective This module provides an overview airspace and Flight Procedure

More information

Cayman Islands Aviation Circular

Cayman Islands Aviation Circular CIVIL AVIATION AUTHORITY of the Cayman Islands Cayman Islands Aviation Circular Ferry Flights and Permit to Fly CIAC 05-12 Issue 02 Date GENERAL Cayman Islands Aviation Circulars are issued to provide

More information

Policy and Guidance for the Design and Operation of Departure Procedures in UK Airspace

Policy and Guidance for the Design and Operation of Departure Procedures in UK Airspace Directorate of Airspace Policy CAP 778 Policy and Guidance for the Design and Operation of Departure Procedures in UK Airspace www.caa.co.uk Directorate of Airspace Policy CAP 778 Policy and Guidance

More information

Transition Altitude (TA) Consultation Commonly Asked Questions & Answers

Transition Altitude (TA) Consultation Commonly Asked Questions & Answers Transition Altitude (TA) Consultation Commonly Asked Questions & Answers Why am I being consulted? Why does the current system have to change? Why do you need to raise the TA? A harmonised Transition Altitude

More information

COMMISSION REGULATION (EU) No 255/2010 of 25 March 2010 laying down common rules on air traffic flow management

COMMISSION REGULATION (EU) No 255/2010 of 25 March 2010 laying down common rules on air traffic flow management L 80/10 Official Journal of the European Union 26.3.2010 COMMISSION REGULATION (EU) No 255/2010 of 25 March 2010 laying down common rules on air traffic flow management (Text with EEA relevance) THE EUROPEAN

More information

SECTION 4 - APPROACH CONTROL PROCEDURES

SECTION 4 - APPROACH CONTROL PROCEDURES SECTION 4 - APPROACH CONTROL PROCEDURES CHAPTER 1 - PROVISION OF SERVICES 1.1 An approach control unit shall provide:- a) Approach control service. b) Flight Information service. c) Alerting service. RESPONSIBILITIES

More information

Optimization of Airspace and Procedures in the Metroplex

Optimization of Airspace and Procedures in the Metroplex Optimization of Airspace and Procedures in the Metroplex Administration SoCal Metroplex Project Overview Brief To: By: Los Angeles World Airport Rob Henry, Manager SoCal Metroplex Jose Gonzalez, SoCal

More information

FINAL REPORT BOEING B777, REGISTRATION 9V-SWH LOSS OF SEPARATION EVENT 3 JULY 2014

FINAL REPORT BOEING B777, REGISTRATION 9V-SWH LOSS OF SEPARATION EVENT 3 JULY 2014 FINAL REPORT BOEING B777, REGISTRATION 9V-SWH LOSS OF SEPARATION EVENT 3 JULY 2014 AIB/AAI/CAS.109 Air Accident Investigation Bureau of Singapore Ministry of Transport Singapore 11 November 2015 The Air

More information

-and- CIVIL AVIATION AUTHORITY. -and- (1) SECRETARY OF STATE FOR TRANSPORT (2) GATWICK AIRPORT LIMITED (3) NATS EN ROUTE PLC Interested Parties

-and- CIVIL AVIATION AUTHORITY. -and- (1) SECRETARY OF STATE FOR TRANSPORT (2) GATWICK AIRPORT LIMITED (3) NATS EN ROUTE PLC Interested Parties IN THE HIGH COURT OF JUSTICE QUEEN S BENCH DIVISION ADMINISTRATIVE COURT In the matter of a claim for judicial review B E T W E E N: THE QUEEN On the application of MARTIN BARRAUD -and- Claim No. CO/1063/2015

More information

AIRPROX REPORT No Date/Time: 7 Dec Z (Saturday)

AIRPROX REPORT No Date/Time: 7 Dec Z (Saturday) AIRPROX REPORT No 2013173 Date/Time: 7 Dec 2013 1104Z (Saturday) Position: 5148N 00053W (5.8nm W Halton) Airspace: Lon FIR (Class: G) Aircraft 1 Aircraft 2 Type: Vigilant PA28 Operator: HQ Air (Trg) Civ

More information

ENR 1.1 GEN. RULES (Insert para 13 in ENR 1.1 of AIP India as follows)

ENR 1.1 GEN. RULES (Insert para 13 in ENR 1.1 of AIP India as follows) TEL: +91-11-24632950 Extn: 2219/2233 AFS: VIDDYXAX FAX: +91-11-24615508 Email: gmais@aai.aero INDIA AERONAUTICAL INFORMATION SERVICE AIRPORTS AUTHORITY OF INDIA RAJIV GANDHI BHAVAN SAFDARJUNG AIRPORT NEW

More information