NATA 2018 AGM & CONFERENCE
|
|
- Elfrieda Pearson
- 5 years ago
- Views:
Transcription
1 NATA 2018 AGM & CONFERENCE Tracy Beeman A / VP, Stakeholder and Commercial Relations Jeff Cochrane Director, Navigation and Airspace
2 TOPICS NAV CANADA Corporate Update Navigation and Airspace NAVAID Modernization Plan Performance Based Navigation (PBN) Working Group Level of Service Projects Instrument Flight Procedures in the North ADS-B Canadian ADS-B Out Performance Requirement Mandate Aireon Space-Based ADS-B Aviation Weather Services Operations and Aeronautical Information Air Traffic Services Update Electronic Publications (Future of Paper Charts) Aviation Weather Services 2
3 NAV CANADA CORPORATE UPDATE Traffic Growth 3
4 NAV CANADA CORPORATE UPDATE Collaboration With Customers and Stakeholders Imperative to our business Goal to balance efficiency, GHG emissions, and noise Customer Survey Program Results remain positive We ll be reaching out to mid-size domestic carriers this year 4
5 NAV CANADA CORPORATE UPDATE Corporate Social Responsibility Report Service Charge Invoicing Feedback Survey Survey URL: 5
6 NAVAID MODERNIZATION PLAN The ANS is in transition The Aeronautical Study Implementation 6
7 NAVAID MODERNIZATION PLAN Ground-based NAVAIDs and non-gnss surveillance Current Proposed 7
8 PBN WORKING GROUP Major Activities Cold temperature correction / compensation issues Analysis of DME coverage to support RNAV 1 Arranging trial of RNP 2 routes Improving STAR educational text in TC AIM Concept of Operations for GBAS Landing System (GLS) for low visibility operations Operations Plan Edition # 2 published June 2017 Available on website 8
9 PBN WORKING GROUP Good news from Transport Canada TCCA released a new Flight Test Guide for Aeroplane Instrument Rating Groups 1, 2 & 3: Candidates for the test will now have to demonstrate one RNP APCH procedure [charted in Canada as an RNAV(GNSS) approach] 9
10 PBN WORKING GROUP Performance-Based Aviation Action Team (CPAAT) Membership includes TC, DND, NAV CANADA, and stakeholder representatives Proposal of interest to NATA under consideration for submission: In northern Canada, amend the minimum 100 NM between destination and alternate aerodromes when GNSS is planned at both 10
11 LEVEL OF SERVICE PROJECTS Cartwright CWO Arctic Radio Communication Service ADIZ Boundary Change 11
12 LEVEL OF SERVICE PROJECTS ADIZ Boundary Change Changes are taking places on May 24, 2018 Notice of Change and AIC 2/18 on NAV CANADA Website Existing Boundary: Red New boundary: Green 12
13 NORTHERN INSTRUMENT APPROACHES AIM S Internal Mandate AIM s capacity will flex to demand by September
14 GNSS PROGRAM STATUS (LNAV) 14
15 GNSS PROGRAM STATUS (LPV) 15
16 ADS-B OUT MANDATE Requirement for a mandate? Scope The Aeronautical Study Implementation 16
17 ADS-B OUT MANDATE Aeronautical study process Terms of reference The Terms of Reference encompasses all classes of Canadian airspace proposing a phased approach: Class A, B and FL600 and Above (Class E). Class C, Class D Control Zones and Class E Control Zones. All other controlled airspace. The Aeronautical Study through consultation is drafting recommendations on implementation Final review has been completed and the report is being drafted 17
18 ADS-B OUT MANDATE Equipage (performance) requirements GNSS Define the positioning requirement to achieve the target surveillance levels for mandated airspace. Transponder version Define based on consultation and assessment of versions that meet the target performance for the service to be offered. Current operations accommodate the use of all three versions of ADS-B Out transponders. Required message set must be defined as well as the transponder version. Antenna placement Performance requirement to meet the service provision may result in antenna diversity. May not be a requirement in all airspace classifications, type of flight (IFR or VFR), or service provided (surveillance separation, traffic advisory, search and rescue). 18
19 AIREON SPACE-BASED ADS-B 19
20 CANADIAN DOMESTIC AIRSPACE Northern CDA Space-Based Expanded Coverage ~110 Thousand Flights/Year Central CDA ~550 Thousand Flights/Year Southern CDA ~2.3 Million Flights/Year 20
21 AIREON SPACE-BASED ADS-B Edmonton FIR Day 1 Readiness (Fall 2018) Where VHF DCPC is available, 5 NM ATS surveillance separation NAV CANADA Day 1 of ASEPS trial EG Fall 2018 Advanced Surveillance Enabled Procedural Separation
22 AIREON SPACE-BASED ADS-B Gander Domestic FIR Day 1 Readiness (Fall 2018) Where VHF DCPC is available, 5 NM ATS surveillance separation SB ADS-B future application
23 AIREON SPACE-BASED ADS-B Gander Oceanic FIR (March 2019) Approved Longitudinal and Lateral procedural minima using ATS surveillance. Controller/Pilot Data Link Communication (CPDLC) is the method of communication that supports the application of these minima. Variable Mach Tactical application based on current traffic availability +/-.02 Mach Organized Track System (OTS) to be all ½ degree separation
24 AVIATION WEATHER SERVICES Weather Cameras Updated guidelines Phase II: 127 total sites 2018: Aklavik, Trout Lake, Gamètì, Paulatuk, Gjoa Haven, Braeburn Phase III planned for 2019 Includes 16 sites identified by NATA Laser Ceilometers Project nearing end with ten northern sites remaining Six sites in NT and NU scheduled for 2018 Yukon and Quebec already complete 24
25 AVIATION WEATHER SERVICES Precipitation Sensors Measured rate of fall More accurate data No manual data collection Data is recorded Installations starting soon 22 northern sites planned for
26 AIR TRAFFIC SERVICES UPDATE SATvoice Deployed at Edmonton ACC in January 2018 Initiation of ground-to-air communication by controller Air-to-ground capability planned for later this year 26
27 ELECTRONIC PUBLICATIONS Background Customers are not satisfied with size and format of aeronautical printed products Paper printing is a risk to reliability and a limiting factor in the timeliness of information Paper publications limit ability to transition from a 56-day to 28- day publication cycle 27
28 ELECTRONIC PUBLICATIONS Approach being considered Continue print of large-format charts Enroute and VNC/VTA Discontinue printing (PDF still available): Canada Air Pilot (CAP) Canada Flight Supplement (CFS) Water Aerodrome Supplement (WAS) Restricted Canada Air Pilot (RCAP) CD AIP CD epub CD (under consideration) Continue to be available through apps (Jeppesen, ForeFlight, etc.) 28
29 ELECTRONIC PUBLICATIONS Next steps Defining concept Internal Hazard Identification and Risk Assessment Consultations with stakeholders starting in August 2018 No change expected to products before
30 THANK YOU
ADS-B Implementation and Regulation Meeting for the NAM/CAR/SAM Regions 26 to 30 November 2018 Mexico City, Mexico
ADS-B Implementation and Regulation Meeting for the NAM/CAR/SAM Regions 26 to 30 November 2018 Mexico City, Mexico INTEGRATION OF SPACE-BASED (SB ADSB) TECHNOLOGY INTO THE CANADIAN AIR NAVIGATION SYSTEM
More informationFIT FOR PURPOSE: A Guide to Using NAV CANADA Aeronautical Publications SECTION B PUBLICATION SPECIFIC FIT FOR PURPOSE INFORMATION
FIT FOR : A Guide to Using NAV CANADA Aeronautical Publications SECTION B PUBLICATION SPECIFIC FIT FOR INFORMATION I TABLE OF CONTENTS SECTION A: GENERAL MATERIAL 2 SECTION B: PUBLICATION SPECIFIC FIT
More informationIMPLEMENTATION OF ADS-B BY NAV CANADA
IMPLEMENTATION OF ADS-B BY NAV CANADA Carole Stewart-Green Manager, ATS Regulatory Coordination ABOUT NAV CANADA Private, non-share capital company Second largest ANSP in the world 12 million aircraft
More informationAUSTRALIA AERONAUTICAL INFORMATION SERVICE AIRSERVICES AUSTRALIA GPO BOX 367 CANBERRA ACT 2601 CESSATION OF NAVIGATION APPROVALS UNDER CAO 20.
TELEPHONE: 1300-306-630 (local call - Aust wide, except from mobile phone) FAX: 02 6268 5111 1. INTRODUCTION 1.1 This AIP SUP amends AIP to remove navigation approvals that are no longer able to be used
More informationPBN Performance. Based Navigation. - PBN & Airspace Concepts - ICAO PBN Seminar Introduction to PBN
PBN Performance Based Navigation - PBN & Airspace Concepts - Introduction to PBN 1 Learning Objectives PBN Concept within the context of an Airspace (Operational) Concept. Introduction to PBN 2/37 Components
More informationInternational Civil Aviation Organization. PBN Airspace Concept. Victor Hernandez
International Civil Aviation Organization PBN Airspace Concept Victor Hernandez Overview Learning Objective: at the end of this presentation you should Understand principles of PBN Airspace Concept 2 Gate
More informationUSE AND APPLICATION OF GNSS IN THE IMPLEMENTATION OF NAVIGATION BASED ON PERFORMANCE IN ECUADOR
BACKGROUND OF GNSS USE The guidelines for the transition to the use of the Global Navigation Satellite System GNSS in the CAR / SAM Regions were issued by ICAO at the Eleventh World Air Navigation Conference
More informationAERONAUTICAL INFORMATION CIRCULAR 33/17
NAV CANADA 07 DEC 17 AERONAUTICAL INFORMATION CIRCULAR 33/17 Introduction NOTICE OF PLANNED EXPANSION OF THE TRIAL IMPLEMENTATION OF 25 NAUTICAL MILE LATERAL SEPARATION MINIMUM IN THE INTERNATIONAL CIVIL
More informationSpace Based ADS-B. ICAO SAT meeting - June 2016 AIREON LLC PROPRIETARY INFORMATION
Space Based ADS-B ICAO SAT meeting - June 2016 1 Options to Detect an Aircraft Position Position Accuracy / Update Interval Voice Position Reporting ADS-C Position Reporting Radar Surveillance / MLAT Space
More informationAPAC PBN UPDATE Slide 1 of xx
APAC PBN UPDATE Slide 1 of xx Ian Mallett FREE OFFERS! CASA Training DVDs GNSS ADS-B More available from CASA Safety Management System (SMS) Booklet CASA Shop Items www.casa.gov.au Slide 2 of xx Slide
More informationAERONAUTICAL INFORMATION CIRCULAR 11/16
NAV CANADA 26 MAY 16 AERONAUTICAL INFORMATION CIRCULAR 11/16 Introduction DEPICTION OF FIVE-NAUTICAL-MILE BUFFERS AROUND SPECIAL USE AIRSPACE CONTAINED WITHIN CANADIAN FLIGHT INFORMATION REGIONS (Supersedes
More information(RN R A N V A V & & RN R P N
PBN (RNAV & RNP) 1 What is the Perfect Flight? 2 Conventional Navigation [1920s] Ground-based navigation aids (NAVAIDs) Aircraft Overfly NAVAID or Intersection Display Accuracy is a Function of Distance
More informationSeychelles Civil Aviation Authority. Telecomm & Information Services Unit
Seychelles Civil Aviation Authority Telecomm & Information Services Unit 12/15/2010 SCAA 1 WORKSHOP EXERCISE Workshop on the development of National Performance Framework 6 10 Dec 2010 10/12/2010 SCAA
More informationADS-B via Low Earth Orbiting Satellites Benefits Assessment
ADS-B via Low Earth Orbiting Satellites Benefits Assessment Jeff Dawson Director, Operational Support NAM/CAR ANI/WG/1 July 2013 Aireon LLC is a joint venture between NAV CANADA and Iridium to finance,
More informationLearning Objectives. By the end of this presentation you should understand:
Designing Routes 1 Learning Objectives By the end of this presentation you should understand: Benefits of RNAV Considerations when designing airspace routes The basic principles behind route spacing The
More informationPerformance Based Navigation (PBN) Implementation Plan. The Gambia
Performance Based Navigation (PBN) Implementation Plan The Gambia Version 1.0 Table of contents 1. Executive summary.. 2 2. Introduction. 2 3. The need for PBN implementation 2 4. Benifit of PBN implementation
More informationTERMS OF REFERENCE FREDERICTON AIRSPACE REVIEW
TERMS OF REFERENCE FREDERICTON AIRSPACE REVIEW NAV CANADA Level of Service & Aeronautical Studies 77 Metcalfe Street, 5th Floor Ottawa, Ontario K1P 5L6 April, 2013 The information and diagrams contained
More informationSOUTH AFRICA PBN NEAR TERM IMPLEMENTATION PLAN PROJECT
PRE-PLANNING PHASE Nomination of the State Focal Point of Contact Appointment of the South Africa PBN Project Manager and Team Define the goals and objectives of Project Define the Terms of Reference for
More informationIATA User Requirements for Air Traffic Services (URATS) NAVIGATION. MIDANPIRG PBN SG/3 Meeting Cairo, Egypt, February 2018
IATA User Requirements for Air Traffic Services (URATS) NAVIGATION MIDANPIRG PBN SG/3 Meeting Cairo, Egypt, 11 13 February 2018 IATA at 30,000 ft Mission to represent, lead and serve the airline industry
More informationNEW FPL Transition Phase & Implementation Stages
International Civil Aviation Organization NEW FPL 2012 Transition Phase & Implementation Stages Victor Hernandez RO ATM/SAR New FPL implementation & Switchover Review the New FPL Strategy & Implementation
More informationOpen Questions & Collecting Lessons Learned
Open Questions & Collecting Lessons Learned 2nd joint ICAO EUR PBN TF EUROCONTROL RAiSG meeting Rick Farnworth EUROCONTROL 12-14 March 2014 Summary Objective List of Open Questions Options for making Information
More informationCombined ASIOACG and INSPIRE Working Group Meeting, 2013 Dubai, UAE, 11 th to 14 th December 2013
IP/2 Combined ASIOACG and INSPIRE Working Group Meeting, 2013 Dubai, UAE, 11 th to 14 th December 2013 Agenda Item 2: Action Item from ASIOACG/7 Indian Ocean RNP4 (Presented by Airservices Australia) SUMMARY
More informationNAV CANADA and DATA LINK IMPLEMENTATION. Shelley Bailey NAV CANADA May 2016 Sint Maarten
NAV CANADA and DATA LINK IMPLEMENTATION Shelley Bailey NAV CANADA May 2016 Sint Maarten OPDWLG Operational Data Link Working Group 5 members here today representing ANSPs, manufacturers and regulators
More informationThe NAT OPS Bulletin Checklist is available at & NAT Documents, NAT Documents, then NAT Ops Bulletins.
Serial Number: 2017_003 Subject: RLatSM Phase 2 AIC Originator: NAT SPG Issued: 15 December 2017 Effective: 15 December 2017 The purpose of North Atlantic Operations Bulletin 2017-003 is to provide guidance
More informationTABLE OF CONTENTS 1.0 INTRODUCTION...
Advisory Circular Subject: Changes to Air Operator Certificates and Private Operator Registration Documents Issuing Office: Civil Aviation, Standards Document No.: AC 700-043 File Classification No.: Z
More informationOperational implementation of new ATM automated systems and integration of the existing systems ADS-B IMPLEMENTATION IN GUYANA. (Presented by Guyana)
International Civil Aviation Organization SAM/IG/22-IP/19 South American Regional Office 12/11/2018 Twenty Second Workshop/Meeting of the SAM Implementation Group (SAM/IG/22) - Regional Project RLA/06/901
More informationThis Bulletin may be updated, as necessary, as progress is made toward the start date for Phase 2b of the NAT DLM.
Serial Number: 2017_001_Rev 02 1 Subject: NAT common DLM AIC Originator: NAT SPG Issued: 19 July 2017 Effective: 21 July 2017 The purpose of North Atlantic Operations Bulletin 2017_001_Rev 02 is to provide
More informationFlight Procedure Design and Cartography
Flight Procedure Design and Cartography ATNS Air Traffic Management Division INDEX About ATNS What is Flight Procedure Design and Cartography? Features of Flight Procedure Design and Cartography Benefits
More informationPBN IMPLEMENTATION IN INDONESIA
PBN IMPLEMENTATION IN INDONESIA Program For The PBN Workshop For ATC I Wayan Sudiartha Head of the Standardization and Certification Division Profile of AirNav Indonesia Establishment : o Declared by Government
More informationGestão de Tráfego Aéreo 2015/2016 Exam Name Student ID Number. I (5.5/20, 0.5 each)
Gestão de Tráfego Aéreo 2015/2016 Exam 2016.01.04 Name Student ID Number I (5.5/20, 0.5 each) What is each contracting state of ICAO required to provide? [ ] Modern radio navigation facilities for aeroplanes
More informationADS-B Implementation Update 2011 CNS/ATM Conference
ADS-B Implementation Update 2011 CNS/ATM Conference Prepared by Jeff Cochrane Manager, CNS Service Design June 2011 Briefing Overview Canadian ADS-B Implementation Review of Requirements for ADS-B surveillance
More informationFLIGHT STANDARDS SERVICE LESSON PLAN
FLIGHT STANDARDS SERVICE LESSON PLAN Template Version: Word 2010 Course Number: Course Title: Oceanic and International Operations Lesson Number: 23 Lesson Title: Current and Future Initiatives for Oceanic
More informationPBN Operational Approval Oceanic and Remote En Route Navigation Specifications
PBN Operational Approval Oceanic and Remote En Route Navigation Specifications Navigation Specifications Applicable to Oceanic/Remote RNAV 10 (RNP 10) RNP 4 RNP 2 A-RNP 2 Prior Guidance Material RNP 10
More informationOverview of Worldwide Data Link Equipage Mandates
Overview of Worldwide Data Link Equipage Mandates Wednesday, November 18, 2015 3:00 to 4:30 pm PRESENTED BY: Tom Kraft, FAA CPDLC and ADS-C Data Link Mandates (and Incentives) FAA Airborne Data Link Recording
More informationAERONAUTICAL SERVICES ADVISORY MEMORANDUM (ASAM) Focal Point: Gen
Page 1 of 6 1 INTRODUCTION Each route shall be assigned a designator that is unique for that aerodrome. The designator shall be defined in accordance with Annex 11, Appendix 3. In addition, the first 4
More informationAdvisory Circular. En Route Area Navigation Operations RNAV 5 (Formerly B-RNAV) Aviation Safety Regulatory Framework Document No.
Advisory Circular Subject: En Route Area Navigation Operations RNAV 5 (Formerly B-RNAV) Issuing Office: PAA Sub Activity Area: File Classification No.: Civil Aviation Aviation Safety Regulatory Framework
More informationTHE DEVELOPMENT OF NATIONAL PERFORMANCE FRAMEWORK FOR AIR NAVIGATION SYSTEMS MAURITIUS
THE DEVELOPMENT OF NATIONAL PERFORMANCE FRAMEWORK FOR AIR NAVIGATION SYSTEMS MAURITIUS 2011-2015 Presented by Ahmed Mosaheb Chief Officer ATM MAURITIUS Characteristics of the Industry FIR- 9,000,000 sq
More informationICAO PBN CONCEPTS, BENEFITS, AND OBJECTIVES
AFCAC/ICAO Joint Workshop Walter White ICAO PBN CONCEPTS, BENEFITS, AND OBJECTIVES 24 JUNE 2014 Airbus ProSky Corporate Presentation 29/06/2014 PERFORMANCE-BASED NAVIGATION The implementation of Performance-Based
More informationPBN Syllabus Aeroplane. Learning Objective. phase Theoretical PBN concept. in ICAO Doc 9613)
PBN Syllabus Aeroplane Training Topic phase Theoretical PBN concept training (as described in ICAO Doc 9613) PBN principles PBN components PBN scope Navigation specifications RNAV and RNP Navigation functional
More informationPBN ROUTE SPACING AND CNS REQUIREMENTS (Presented by Secretariat)
International Civil Aviation Organization The First Meeting of South China Sea Major Traffic Flow Review Group (SCS-MTFRG/1) Kuala Lumpur, Malaysia, 19-20 January 2015 Agenda Item 5: Discuss strategy for
More informationPBN Syllabus Helicopter. Learning Objective. phase Theoretical PBN concept. in ICAO Doc 9613)
PBN Syllabus Helicopter Training Topic phase Theoretical PBN concept training (as described in ICAO Doc 9613) PBN principles PBN components PBN scope Navigation specifications RNAV and RNP Navigation functional
More informationPBN Performance. Based Navigation. Days 1, 2 & 3. ICAO PBN Seminar Seminar Case Studies Days 1,2,3. Seminar Case Studies
PBN Performance Based Navigation Seminar Case Studies Days 1, 2 & 3 1 Overview 2 Case Study - Day 1 Case Study - Day 2 Case Study - Day 3 3 Case Study - Day 1 Learning Objectives Identify navigation performance
More informationAIM and PBN Airport Community Benefits. IAAE Saskatoon, May 2013
AIM and PBN Airport Community Benefits IAAE Saskatoon, May 2013 1 AIM Fit for Purpose Information Chain Business Plan PBN Overview Implementation 2 AIM to IM FIT FOR PURPOSE Aeronautical Terrain and Obstacles
More informationDesign Airspace (Routes, Approaches and Holds) Module 11 Activity 7. European Airspace Concept Workshops for PBN Implementation
Design Airspace (Routes, Approaches and Holds) Module 11 Activity 7 European Airspace Concept Workshops for PBN Implementation Design in Context TFC Where does the traffic come from? And when? RWY Which
More informationTítulo ponencia: Introduction to the PBN concept
Título ponencia: Introduction to the PBN concept Organizado por: Index Introduction Background PBN Concept PBN Operations Conclusions Introduction Subject This presentation addresses the Performance-Based
More informationNorth Atlantic Initiatives
North Atlantic Initiatives Monday, 17 March 2014; Session 4 (3:30 5:00) PRESENTED BY: Terry Cecil FAA International Operators Conference Tampa, FL March 17 20, 2014 Briefing Objective North Atlantic Initiatives
More informationAD 2. AERODROMES. For the ICAO location indicators used for Canadian aerodromes, refer to the following publications:
AIP CANADA (ICAO) PART 3 AERODROMES (AD) AD 2. AERODROMES AD 2.1 Aerodrome Location Indicator and Name For the ICAO location indicators used for Canadian aerodromes, refer to the following publications:
More informationTHIS BULLETIN REPLACES BULLETIN WHICH IS NO LONGER CURRENT AND HAS BEEN WITHDRAWN.
IBAC Bulletin 16-03 THIS BULLETIN REPLACES BULLETIN 16-01 WHICH IS NO LONGER CURRENT AND HAS BEEN WITHDRAWN. Subject: Performance-based Navigation in Australian airspace - General guidance on the GNSS
More informationPerformance Based Navigation Implementation of Procedures
Performance Based Navigation Implementation of Procedures Dr. Daniel Schaad Head of Instrument Flight Procedures (ATM/IFP) Minsk, April 10th, 2015 DIESER TEXT DIENT DER NAVIGATION First of all thank you
More information34 th Airline/ATS Safety Forum
34 th Airline/ATS Safety Forum Colleen Kitson, Senior ATS Specialist Outline RNP1 - including Albury Future applications Workshop Background ICAO Global Air Navigation Plan specifies PBN as the highest
More informationSubject: Automatic Dependent Surveillance-Broadcast (ADS-B) Operations and Operational Authorization
OC NO 17 OF 2014 Date: 14 th October 2014 File No AV 22024/30/2014-FSD GOVERNMENT OF INDIA CIVIL AVIATION DEPARTMENT DIRECTOR GENERAL OF CIVIL AVIATION OPERATIONS CIRCULAR Subject: Automatic Dependent
More informationPBN Airspace Concept. ATS requirements
INTERNATIONAL CIVIL AVIATION ORGANIZATION PBN Airspace Concept ATS requirements Victor Hernandez RO ATM/SAR ICAO North America, Central America and Caribbean Regional Office 1 Gate to Gate concept Phases
More informationRegulative Baseline for the Implementation of IFR Operations at Uncontrolled Aerodromes in the Czech Republic / CZCAA IFR Study.
Change History Version Status Date Affected Pages Author Cause and Summary of the Change 00.01 draft 2017-01-22 all M. Mlynarik New document 00.02 draft 2017-01-29 all M. Mlynarik Internal reviews 00.03
More informationPBN and airspace concept
PBN and airspace concept 07 10 April 2015 Global Concepts Global ATM Operational Concept Provides the ICAO vision of seamless, global ATM system Endorsed by AN Conf 11 Aircraft operate as close as possible
More informationRNP AR Experience. Phil Rakena PBN Project Manager February 2015
RNP AR Experience Phil Rakena PBN Project Manager February 2015 1 What is PBN? Area navigation, using on-board systems to provide position and confirm navigation performance. PBN represents a shift from
More informationPilot Procedures Photographic Survey Flights Flight Planning, Coordination, and Control
Pilot Procedures Photographic Survey Flights Flight Planning, Coordination, and Control 2017-01-31 2017 NAV CANADA All rights reserved. No part of this document may be reproduced in any form, including
More informationManual on Monitoring the Application of Performance-based Horizontal Separation Minima
Manual on Monitoring the Application of Performance-based Horizontal Separation Minima (PBHSM Manual) Presented to: 2 nd NAT PBCS Workshop By: Christine Falk Date: 17-19 June 2015 Overview Why a PBHSM
More informationPerformance Based Navigation Implementation Plan SINGAPORE. December Published by Civil Aviation Authority of Singapore
Performance Based Navigation Implementation Plan SINGAPORE December 2016 Published by Civil Aviation Authority of Singapore i TABLE OF CONTENTS Summary of Amendments... iii Executive Summary... 1 Glossary
More informationOverview of Evolution to Performance Based Navigation. ICAO PBN Seminar Overview of Evolution to Performance Based Navigation
Overview of Evolution to Performance Based Navigation 1 Overview Learning Objectives: at the end of this presentation you should: Understand what are the two main elements of Performance Based Navigation
More informationICAO Changes to the Present Flight Plan Form. Amendment 1 to the PANS-ATM Fifteenth Edition (PANS-ATM, Doc 4444) Tom Brady ICAO HQ
ICAO Changes to the Present Flight Plan Form Amendment 1 to the PANS-ATM Fifteenth Edition (PANS-ATM, Doc 4444) Tom Brady ICAO HQ Introduction to FPL 2012 Background ICAO 2012 Timeline ICAO 2012 Impacts
More informationBits to Blocks Aviation System Block Upgrades (ASBU)
Bits to Blocks Aviation System Block Upgrades (ASBU) A.K. Dutta General Manager (ATM) Airports Authority of India 21 st October, 2011 We are here... Bits Russia Canada Australia India China 2 We Can make
More informationPROJECT: EUR/SAM CORRIDOR AIRSPACE CONCEPT
SAT/20 WP/10 Attachement A PROJECT: EUR/SAM CORRIDOR AIRSPACE CONCEPT SAT Region PROJECT DESCRIPTION (PD) Title of the Project Starting date Ending date Meetings on The Improvement of Air Traffic Services
More informationSERVICE DEVELOPMENT ROADMAP
NAT DOC 009 SERVICE DEVELOPMENT ROADMAP North Atlantic Region First Edition - 2013 Prepared by the ICAO European and North Atlantic Office on behalf of the North Atlantic Systems Planning Group (NAT SPG)
More informationAERONAUTICAL INFORMATION DIGITAL DATBASES INTERGATION AND QUALITY MANAGED MIGRATION
AIM SG/5 (Egypt, Cairo, 22 24 January 2019) AERONAUTICAL INFORMATION DIGITAL DATBASES INTERGATION AND QUALITY MANAGED MIGRATION Presentation contents : 1. NG Aviation company overview 2. New documentation
More informationTWELFTH AIR NAVIGATION CONFERENCE
International Civil Aviation Organization AN-Conf/12-WP/6 7/5/12 WORKING PAPER TWELFTH AIR NAVIGATION CONFERENCE Agenda Item 2: Aerodrome operations improving airport performance 2.2: Performance-based
More informationRECOMMENDED GUIDANCE FOR FPL AND RELATED ATS MESSAGES
RECOMMENDED GUIDANCE FOR FPL AND RELATED ATS MESSAGES Abbreviations ACI ADS ADS-B ADS-C AFTN AIDC AIP ANSP AMHS APAC APANPIRG ASBU ASIOACG ATFM ATM ATS AUSEP CHG CNL CPDLC CPL DARP DLA EOBT FAA FIR FIRBX
More informationFrench DSNA approach to CNS rationalization & evolution
French DSNA approach to CNS rationalization & evolution Jean-Marc LOSCOS Senior expert on European Programs DSNA Toulouse CONTEXT: EUROPEAN ATM MASTER PLAN 2015 AND SINGLE EUROPEAN SKY (SES) The Single
More informationRNP OPERATIONS. We will now explain the key concepts that should not be mixed up and that are commonly not precisely understood.
RNP OPERATIONS 1. Introduction Planes were made as a means of transport. To successfully fly from a location A to a location B, pilots were first and foremost navigators. Originally relying on visual landmarks
More informationSaint Petersburg-Clearwater International Airport. Airspace & Instrument Approach Analysis
Saint Petersburg-Clearwater International Airport Airspace & Instrument Approach Analysis February 23, 2005 Jeppesen Boeing Jeppesen Government / Military Services Group Airspace Services Division AIRSPACE
More informationIAC 2011 Cape Town, October th
Cape Town, October 05 05 th Project Partners External Supporters and Sponsors The Problem The Solution Overview S 2 BAS Concept of Operations Architecture Possible Applications Stakeholders Flight Phases
More informationPBN Implementation Plan - Fiji Version 1 19 January 2010
PBN Implementation Plan - Fiji Version 1 19 January 2010 Airports Fiji Limited and Civil Aviation Authority of the Fiji Islands Table of Contents Acronyms........ 1 Executive Summary......... 3 Introduction.......
More informationNOVEMBER 2014 UPDATE NAT ATS SURVELLANCE AIRSPACE PHASE 2 OF THE NORTH ATLANTIC REGIONAL DATA LINK MANDATE
Publication Information. The FAA Notice below will be published in the 11 December 2014 edition of FAA Notices To Airmen, Domestic/International. It will be located in Part 3, Section 2 (International
More informationApplication Form and Compliance Checklist - OPS for NAT HLA (MNPS) Approval FORM Operator:
Application Form and Compliance Checklist - OPS for NAT HLA (MNPS) Approval FORM.965.037 Operator: Adress: E-mail: AOC No: Phone no: The relevant elements defined in the mandatory part of the Operational
More informationEffective: PERFORMANCE-BASED NAVIGATION (PBN) IN AUSTRALIA
AUSTRALIA AERONAUTICAL INFORMATION SERVICE AIRSERVICES AUSTRALIA GPO BOX 367, CANBERRA ACT 2601 Phone: 02 6268 4874 Email: aim.editorial@airservicesaustralia.com Effective: AERONAUTICAL INFORMATION CIRCULAR
More informationICAO Air Navigation Panels/Study Groups Work Programme
NPF/SIP/2010-WP/24 ICAO Air Navigation Panels/Study Groups Work Programme SAULO DA SILVA International Civil Aviation Organization Workshop on the development of National Performance Framework for Air
More informationTHE DEVELOPMENT OF NATIONAL PERFORMANCE FRAMEWORK FOR ANS IN ERITREA Presented by Ghebreab Ghebremedhin Director ANS/AGA Division
THE DEVELOPMENT OF NATIONAL PERFORMANCE FRAMEWORK FOR ANS IN ERITREA 2011-2015 Presented by Ghebreab Ghebremedhin Director ANS/AGA Division DEVELOPMENT OF NATIONAL PERFORMANCE FRAMEWORK FOR AIR NAVIGATION
More informationEuropean Aviation Safety Agency
Annexes I and II to ED Decision 2018/013/R European Aviation Safety Agency Acceptable Means of Compliance and Guidance Material to Commission Regulation (EU) No 1332/2011 and Commission Implementing Regulation
More informationDIRECTORS GENERAL OF CIVIL AVIATION CONFERENCE ON A GLOBAL STRATEGY FOR AVIATION SAFETY
DGCA/06-IP/41 17/3/06 English only DIRECTORS GENERAL OF CIVIL AVIATION CONFERENCE ON A GLOBAL STRATEGY FOR AVIATION SAFETY Montréal, 20 to 22 March 2006 Theme 2: Improving aviation safety Topic 2.2: Management
More informationPOST-IMPLEMENTATION COMMUNITY IMPACT REVIEW
POST-IMPLEMENTATION COMMUNITY IMPACT REVIEW RNAV STAR updates and RNP AR approaches at Halifax Stanfield International Airport NAV CANADA 77 Metcalfe Street Ottawa, Ontario K1P 5L6 November 2017 The information
More informationPBN Implementation Plan Tonga
PBN Implementation Plan Tonga Version: 2 Date: January 2013 Executive Summary Performance Based Navigation (PBN) is a change from aircraft navigating/flying using ground based navigation aids to using
More informationUK Performance-based Navigation (PBN) Implementation Status
UK Performance-based Navigation (PBN) Implementation Status Geoff Burtenshaw Technical Advisor, Navigation Systems Directorate of Airspace Policy 1 Current Implementation of PBN in UK Airspace 2 Current
More informationAN-Conf/12-WP/162 TWELFTH THE CONFERENCE. The attached report
29/11/12 TWELFTH AIR NAVIGATION CONFERENCE Montréal, 19 to 30 November 2012 REPORT OF THE COMMITTEE TO THE CONFERENCE ON AGENDA ITEM 2 The attached report has been approved by thee Committee for submission
More informationRussian Federation ATM modernization program
Russian Federation ATM modernization program Alexander Vedernikov Deputy Director of Federal Air Transport Agency 20-21 March, 2012, Moscow Main strategic directions of Russian Air Navigation System development
More informationDraft PBN Implementation Plan Papua New Guinea
Draft PBN Implementation Plan Papua New Guinea Version 1 12 April 2011 Civil Aviation Safety Authority of Papua New Guinea Table of Contents Acronyms... 1 Executive Summary... 3 Introduction... 4 The PBN
More informationNav Specs and Procedure Design Module 12 Activities 8 and 10. European Airspace Concept Workshops for PBN Implementation
Nav Specs and Procedure Design Module 12 Activities 8 and 10 European Airspace Concept Workshops for PBN Implementation Learning Objectives By the end of this presentation you should understand: The different
More informationImplementation of PBN in Armenian airspace
Implementation of PBN in Armenian airspace PBN implementation plan, based on the specifications of the airspace of the Republic of Armenia, has been developed in accordance with Resolution A36-23, approved
More informationAny queries about the content of the attached document should be addressed to: ICAO EUR/NAT Office:
Serial Number: 2018_001 Subject: Implementation of Performance Based Separation Minima Originator: NAT SPG Issued: 06 February 2018 Effective: 29 March 2018 The purpose of this North Atlantic Operations
More informationDRAFT. AND/OR one or more of the following to indicate the serviceable COM/NAV/approach aid equipment and capabilities:
AIP ENR 1.10 Amendment ITEM 10: EQUIPMENT AND CAPABILITIES Radio Communication, Navigation and Approach Aid Equipment and Capabilities INSERT one letter as follows: N if no COM/NAV/approach aid equipment
More informationPerformance Based Navigation Operational End-State 2023
Performance Based Navigation Operational End-State 2023 A Regulatory View Organisation Civil Aviation Authority of New Zealand Date of this Document November 2018 Authored by: Primary Author: Ray Harvey,
More informationApproach Specifications
Approach Specifications RNP Approach (RNP APCH) and Baro-VNAV Approach Specifications RNP APCH and Baro-VNAV 1 Overview Learning Objectives: At the end of this presentation, you should: Understand the
More informationContents. Subpart A General 91.1 Purpose... 7
Contents Rule objective... 3 Extent of consultation... 3 Summary of comments... 4 Examination of comments... 6 Insertion of Amendments... 6 Effective date of rule... 6 Availability of rules... 6 Part 91
More informationNAV CANADA Policy Delivery of Air Navigation Services. Version 2.0
NAV CANADA Policy Delivery of Air Navigation Services Version 2.0 1 TABLE OF CONTENTS INTRODUCTION.....5 1.0 LEVEL OF SERVICE POLICY... 6 2.0 NAV CANADA PRACTICE IN THE DELIVERY OF SERVICE... 7 2.1 The
More informationINTERNATIONAL OCEANIC AIRSPACE NOTICES
Notices to Airmen International INTERNATIONAL OCEANIC AIRSPACE NOTICES INTRODUCTION The following information contains the most current notices involving airspace matters pertaining to U.S. internationally
More informationTransitioning to ICAO Flight Plan why, when, what, how
Transitioning to ICAO Flight Plan why, when, what, how Warbirds and Warriors, EQY 22 August 2017 Christophe Masiero Carolina Aero Club christophe.masiero@gmail.com 704 502 7520 Agenda Introduction Background
More informationSpace Based ADS-B. Transforming the Way you See the Sky February, 2015
Space Based ADS-B Transforming the Way you See the Sky February, 2015 The current ATM reality 2 Significant challenges for airlines High physical infrastructure costs Duplication of signals / contingency
More informationPerformance-based Navigation (PBN) Operations Plan VERSION 1.1
Performance-based Navigation (PBN) Operations Plan VERSION 1.1 Page intentionally left blank 2 Performance-based Navigation (PBN) Operations Plan Prepared/Coordinated Jeff Cochrane Manager, CNS Service
More informationIFR SEPARATION WITHOUT RADAR
1. Introduction IFR SEPARATION WITHOUT RADAR When flying IFR inside controlled airspace, air traffic controllers either providing a service to an aircraft under their control or to another controller s
More informationTerms of Reference - Review LOC/DME at CYGV, CYRJ, CYHR TERMS OF REFERENCE
TERMS OF REFERENCE Review Requirement for Localizer (LOC) & Distance Measuring Equipment (DME) at: Havre St-Pierre, Roberval, and Chevery Airports, Quebec NAV CANADA Navigation and airspace Level of Service
More informationGOVERNMENT OF INDIA OFFICE OF THE DIRECTOR GENERAL OF CIVIL AVIATION TECHNICAL CENTRE, OPP. SAFDARJUNG AIRPORT, NEW DELHI
GOVERNMENT OF INDIA OFFICE OF THE DIRECTOR GENERAL OF CIVIL AVIATION TECHNICAL CENTRE, OPP. SAFDARJUNG AIRPORT, NEW DELHI - 110003 CIVIL AVIATION REQUIREMENT SECTION 8 - AIRCRAFT OPERATIONS SERIES 'S',
More informationCAA DECISION LETTER MANSTON KENT INTERNATIONAL AIRPORT (KIA) RNAV (GNSS) HOLD AIRSPACE CHANGE PROPOSAL
Directorate of Airspace Policy NATMAC Representatives 13 July 2012 CAA DECISION LETTER MANSTON KENT INTERNATIONAL AIRPORT (KIA) RNAV (GNSS) HOLD AIRSPACE CHANGE PROPOSAL 1. INTRODUCTION 1.1 During late
More information