GENERAL OPERATING PROCEDURES FINLAND(GOP)

Size: px
Start display at page:

Download "GENERAL OPERATING PROCEDURES FINLAND(GOP)"

Transcription

1 [Nyckelord] 2013 GENERAL OPERATING PROCEDURES FINLAND(GOP)

2 General operating procedures (GOP) ACC 1 Introduction This document includes general operating procedures for ACC in. A good understanding of these general procedures is essential to understand the local procedures (LOP). 2 General FIR/UIR Finnish airspace is divided into FIR and UIR. FIR covers airspace up to FL285 and UIR airspace above FL285. Airspace Classification Flight information and area control service ACC handles area control service for every flight in CTA/UTA and gives Flight information service for flights in uncontrolled airspace on request. 1

3 3 General procedures ACC Separation Minimum vertical separation Minimum vertical separation below FL290 (FL410 for RVSM-approved aircraft) is 1000 ft (300 m). Minimum vertical separation above FL290 (FL410 for RVSM-approved aircraft) is 2000 ft (600 m). Radar separation Minimum radar separation in CTA/UTA below FL500 is 5 NM. Minimum radar separation above FL500 is 10 NM. Separation during transfer of control between ACC - sectors If not mentioned in LOP or coordinated between sectors, transfer of control shall be done between ACC sectors with latest coordinated flight level. Flight levels shall be assigned as table below. If not mentioned in LOP, transfer of control on same flight level is allowed without further coordination, if lateral separation is minimum 10 NM, constant or increasing. If separation is achieved through speed restriction, pilot shall be instructed to report assigned speed to receiving sector. Alternatively assigned speed can be noted in tag with ASP. Separation during transfer of control between TWR/APP ACC Transfer of control between TWR/APP to ACC and vice versa shall have lateral separation minimum 5 NM constant or increasing, if not other is mentioned in LOP or coordinated. Speed control Speed control is a useful tool to separate traffic with similar speed characteristics. A problem on VATSIM is still that aircraft can have different winds depending on the weather generator they are using, which sometimes makes speed control impossible to use. Mach/IAS Speed restrictions are given in intervals of 0.01 Mach above FL245 and in intervals of 10 kt below FL Mach is about 6 kt in lower levels. TAS for a given IAS/Mach increases with higher level. A rule of thumb is that TAS increases by about 6 kt for every 1000 ft in height, or with 0.01 Mach for every ft increase in height. Example: - Aircraft on FL240 has IAS 280 kt. This is about the same as IAS 262 kt on FL Aircraft on FL290 has Mach This is about the same as Mach 0.83 on FL370. 2

4 Minimum speed Lower speeds than the following are not assigned without pilot approval. Departure: Jet 230 kt, turboprop and prop 150 kt. Enroute or arrival, above FL245: Enroute or arrival, below FL245: Jet 250 kt or corresponding Mach number, turboprop and prop 170 kt. Jet 160 kt, turboprop or prop 150 kt, alternatively for all aircraft minimum clean speed. Climb For a speed restriction during climb, a reduced speed normally gives a higher climb rate. This can be handy to get an aircraft behind to climb above aircraft in front, but could be problematic if the aircraft have same cruise level or the aircraft behind has a lower cruise level. In these cases horizontal separation or radar vectoring is preferable to achieve separation. Cruise During cruise speed restriction should be avoided, to allow traffic to operate with optimal speed. Speed control should not be used as a separation method if the speed difference between aircraft (before usage) is more than 0.03 Mach or 20 kt. Use vertical separation instead. Examples: - Preceding aircraft Mach 0.76 and following aircraft Mach 0.80 change flight level for following aircraft (or preceding aircraft if it facilitates the traffic flow) - Preceding aircraft Mach 0.77 and following aircraft Mach 0.79 instruct preceding aircraft Mach 0.78 or greater and following aircraft Mach 0.78 or less Descent During descent speed control is usually used to sequence arriving traffic before transfer of control to APP. During descent there are greater flexibilities in using speed control; generally you are able to assign to jet aircraft speeds between 250 kt and 300 kt IAS. Assigning flight levels During transfer of control between ACC- sectors, all traffic shall keep assigned flight level according to the table below, unless otherwise coordinated or stated in LOP. 3

5 Magnetic track Magnetic track even FL FL40 FL60 FL80 FL100 FL120 FL140 FL160 FL180 FL200 FL220 FL240 FL260 FL280 FL300 FL320 FL340 FL360 FL380 FL400 FL430 FL470 FL510 etc. odd FL FL30 FL50 FL70 FL90 FL110 FL130 FL150 FL170 FL190 FL210 FL230 FL250 FL270 FL290 FL310 FL330 FL350 FL370 FL390 FL410 FL450 FL490 etc. VFR traffic VFR traffic inside controlled airspace is coordinated and handed over like IFR traffic. Workload permitting, also VFR traffic in uncontrolled airspace is coordinated and handed over, unless otherwise stated in LOP. 4

6 4 Coordination General Good working coordination is essential for a good traffic flow between different controller responsible airspace. Generally coordination should be used in all situations which are not mentioned in LOP or where procedures that are stated in LOP are not able to be used. Methods for coordination Coordination is done either verbally (in VATSIM through Intercom, Skype, GVCCS, TeamSpeak or text chat) or via the system (system coordination SYSCO). Following essential information is coordinated between EuroScope users: Cleared flight level CFL Planned entry level PEL Exit flight level XFL Entry coordination point COPN Exit coordination point COPX Assigned heading AHDG Assigned speed ASP Cleared point OP-TEXT (Scratchpad text) It is essential that these fields are kept updated with correct information. SYSCO works for coordination of PEL, XFL, COPN and COPX between EuroScope users. To coordinate for example XFL, change XFL; the new value is shown in white in own sector and receiving sector. The receiving sector can either accept/refuse/change. If the new XFL is accepted the value will resume normal color (black for the sector that are handling the aircraft and blue in receiving sector). Alternatively the receiving sector can select change and choose a new value. The sector that initiated the coordination can then choose accept/refuse for the new value. If refuse has been chosen, the value will return to original and be shown in yellow and manual coordination has to be initiated. To coordinate ASP, AHDG or direct, or to show to the next sector that an aircraft is released, the function Handover Proposal (HOP) can be used. Instead of choosing Transfer during handoff, the transferring sector selects HOP. Sector Indicator (SI) will then change to white with the transferring sector, while the receiving sector will have callsign become white. Also ASP, AHDG and direct 5

7 become white if there are values in these fields. The receiving sector can choose assume or refuse as in ordinary handoff and if assume is chosen it is interpreted that the receiving sector accepts all the coordinated values (ASP/AHDG/direct). If no values are filled in those fields, a HOP means that the aircraft is released. OP-TEXT (scratchpad) can also be used to transfer information to next sector. Release A release is an approval given to the receiving sector to climb, descend or turn an aircraft before the transfer of control (turn max 45 ). The transferring sector remains responsible for separation within his area of responsibility unless otherwise coordinated. Example: An aircraft is transferred from sector A to sector B released for descent and turn. This means that sector B is allowed to descend and turn the aircraft before it has passed the sector boundary (turn max 45 unless otherwise coordinated). Release during transfer of control between ACC and TWR/APP If not otherwise stated in the LOP for the respective sector, TWR/APP shall climb traffic on the flight plan route to the planned flight level. When this has not been possible, traffic is released to ACC for further climb, unless otherwise stated. If not otherwise stated in the LOP, ACC will descend arriving traffic to FL100. The traffic is released to TWR/APP for descent, turn and speed control, unless otherwise stated. If some of above mentioned can t be used, coordination between ACC and TWR/APP has to be done. 5 ACC-sectors on VATSIM General The airspace covered by a certain ATC -position in VATSIM depends in large on how many and which other controllers are online. If EFES_2_CTR (EFES_CTR) alone is online, the sector will normally cover all Finnish airspace, including all APP-, TWR- and AFIS-positions, for example. It is important to know which airspace each sector is covering in any situation and also as important to be familiar with the airports and other ATC-positions that will included in your airspace. In the description for every ACC-sector there is a list of airports that the sector is responsible for when no APP, TWR or AFIS are online. Also described are coordination procedures that are valid with the respective APP/TWR/AFIS-unit when online. 6

8 Revision history Date Amendment published unknown Finnish text 7

THE AREA CONTROL CENTRE (CTR) POSITION

THE AREA CONTROL CENTRE (CTR) POSITION THE AREA CONTROL CENTRE (CTR) POSITION 1. Introduction The Area Control Centre (ACC) also known as en-route controller and called CTR on IVAO, has the responsibility of ensuring Air Traffic Control (ATC)

More information

LETTER OF AGREEMENT BETWEEN POLISH VACC AND SWEDEN FIR

LETTER OF AGREEMENT BETWEEN POLISH VACC AND SWEDEN FIR 2016 LETTER OF AGREEMENT BETWEEN POLISH VACC AND SWEDEN FIR Polish VACC and VATSIM Scandinavia 31 March 2016 1 General 1.1 Purpose The purpose of this Letter of Agreement (LoA) is to define the coordination

More information

International Virtual Aviation Organisation. Letter of Agreement. between. and. Effective: 15/05/2017 Edition: 1

International Virtual Aviation Organisation. Letter of Agreement. between. and. Effective: 15/05/2017 Edition: 1 Wien ACC (LOVV) IVAO Austria Letter of Agreement between and Effective: 15/05/2017 Edition: 1 Zagreb ACC (LDZO) IVAO Croatia 1 1. Purpose The purpose of this Letter of Agreement is to define the coordination

More information

LETTER OF AGREEMENT BETWEEN DENMARK FIR AND SWEDEN FIR. VATSIM Scandinavia 4 April 2013

LETTER OF AGREEMENT BETWEEN DENMARK FIR AND SWEDEN FIR. VATSIM Scandinavia 4 April 2013 2013 LETTER OF AGREEMENT BETWEEN DENMARK FIR AND SWEDEN FIR VATSIM Scandinavia 4 April 2013 1 General 1.1 Purpose The purpose of this Letter of Agreement (LoA) is to define the coordination procedures

More information

International Virtual Aviation Organisation. Letter of Agreement. between. and. Effective: 15/05/2017 Edition: 2

International Virtual Aviation Organisation. Letter of Agreement. between. and. Effective: 15/05/2017 Edition: 2 Brindisi ACC (LIBB) IVAO Italy Letter of Agreement between and Effective: 15/05/2017 Edition: 2 Zagreb ACC (LDZO) IVAO Croatia 1 1. Purpose The purpose of this Letter of Agreement is to define the coordination

More information

SECTION 6 - SEPARATION STANDARDS

SECTION 6 - SEPARATION STANDARDS SECTION 6 - SEPARATION STANDARDS CHAPTER 1 - PROVISION OF STANDARD SEPARATION 1.1 Standard vertical or horizontal separation shall be provided between: a) All flights in Class A airspace. b) IFR flights

More information

IVAO Flight Operations Department Indonesia (ID) Division Procedures

IVAO Flight Operations Department Indonesia (ID) Division Procedures IVAO Flight Operations Department Indonesia (ID) Division Procedures Revised April 12 rd, 2010 Please consult also the local application of common procedures on http://www.ivao.web.id 1. General 1.1 In

More information

VATUSA-VATNZ-VATPAC OCEANIC PARTNERSHIP OAKLAND OCEANIC FSS GENERAL SOP 1 OCT 2012

VATUSA-VATNZ-VATPAC OCEANIC PARTNERSHIP OAKLAND OCEANIC FSS GENERAL SOP 1 OCT 2012 VATUSA-VATNZ-VATPAC OCEANIC PARTNERSHIP EFFECTIVE OAKLAND OCEANIC FSS GENERAL SOP 1 OCT 2012 I. PURPOSE With the establishment of the VATNZ division of the Oceania Region on 1 January 2007, the Oakland

More information

IVAO XG Division IVAC2 Human Machine Interface (HMI) Handbook Version /05/2017

IVAO XG Division IVAC2 Human Machine Interface (HMI) Handbook Version /05/2017 IVAO XG Division IVAC2 Human Machine Interface (HMI) Handbook Version 1.0 28/05/2017 Welcome to IVAC2! Here you can find all required information, tutorial what you need to be familiar with the new interface.

More information

Standard Operating Procedures (SOPs) for UAE Centre (OMAE)

Standard Operating Procedures (SOPs) for UAE Centre (OMAE) Standard Operation Procedures for UAE Centre (OMAE) Pag.1 of 10 Standard Operating Procedures (SOPs) for UAE Centre (OMAE) Standard Operation Procedures for UAE Centre (OMAE) Pag.2 of 10 Index 1. Foreword...

More information

Denmark FIR and Sweden FIR

Denmark FIR and Sweden FIR Letter of Agreement between VACCSCA December 2010 Version 2 1 General 1.1 Purpose The purpose of this Letter of Agreement (LoA) is to define the coordination procedures to be applied between when providing

More information

LETTER OF AGREEMENT. between. and

LETTER OF AGREEMENT. between. and LETTER OF AGREEMENT between and Effective: 15 th June 2017 Version: 0.1 1 General 1.1 Purpose The purpose of this Letter of Agreement (LoA) is to define the co-ordination procedures to be applied between

More information

CHAPTER 5 SEPARATION METHODS AND MINIMA

CHAPTER 5 SEPARATION METHODS AND MINIMA CHAPTER 5 SEPARATION METHODS AND MINIMA 5.1 Provision for the separation of controlled traffic 5.1.1 Vertical or horizontal separation shall be provided: a) between IFR flights in Class D and E airspaces

More information

LETTER OF AGREEMENT. Between

LETTER OF AGREEMENT. Between LETTER OF AGREEMENT Between Romania vacc and Moldova vacc Bucharest FIR Chisinau FIR Effective: 01/12/2015 Version: 1.0 Purpose: The purpose of this Letter of Agreement is to define the coordination procedures

More information

ERIE ATCT STANDARD OPERATING PROCEDURES

ERIE ATCT STANDARD OPERATING PROCEDURES ORDER ERI ATCT 7110.10I ERIE ATCT STANDARD OPERATING PROCEDURES August 1, 2014 VATUSA CLEVELAND ARTCC VIRTUAL AIR TRAFFIC SIMULATION NETWORK VIRTUAL AIR TRAFFIC SIMULATE NETWORK UNITED STATES DIVISION

More information

IVAO Switzerland Division

IVAO Switzerland Division IVAO ATC Operations Zurich Tower Date Updated by Update description 08.01.2016 CH-TC Document Creation 30.10.2017 CH-AOC Document Revision 1 Contents 1-Objective... 3 2-Zurich Tower LSZH_TWR... 4 3-Operating

More information

Albany ATCT Standard Operating Procedures

Albany ATCT Standard Operating Procedures Albany ATCT Standard Operating Procedures This air traffic control procedural document is provided for virtual air traffic control in the ZBW ARTCC of the VATSIM network only. It is not for real-world

More information

Burlington ATCT Standard Operating Procedures

Burlington ATCT Standard Operating Procedures This air traffic control procedural document is provided for virtual air traffic control in the ZBW ARTCC of the VATSIM network only. It is not for real-world ATC use. These procedures are approved for

More information

FLIGHT STRIP MANAGEMENT - APPROACH LEVEL

FLIGHT STRIP MANAGEMENT - APPROACH LEVEL FLIGHT STRIP MANAGEMENT - APPROACH LEVEL 1. Introduction The flight strip management for ATC is an important point in order to ensure aircraft management and improve safety when controlling. In real aviation,

More information

SECTION 4 - APPROACH CONTROL PROCEDURES

SECTION 4 - APPROACH CONTROL PROCEDURES SECTION 4 - APPROACH CONTROL PROCEDURES CHAPTER 1 - PROVISION OF SERVICES 1.1 An approach control unit shall provide:- a) Approach control service. b) Flight Information service. c) Alerting service. RESPONSIBILITIES

More information

ZTL ARTCC. Augusta Regional

ZTL ARTCC. Augusta Regional ZTL ARTCC Augusta Regional Air Traffic Control Tower Standard Operating Procedures AGS 7110.65B Effective: May 1, 2011 1 CHAPTER 1. GENERAL CONTROL SECTION 1. EQUIPMENT 1-1-1. Callsign Usage and Frequency

More information

AIP PORTUGAL ENR NOV-2007

AIP PORTUGAL ENR NOV-2007 AIP PORTUGAL ENR 1.6-1 ENR 1.6 RADAR SERVICES AND PROCEDURES PROVISION OF RADAR SERVICES WITHIN LISBOA AND SANTA MARIA FIR / UIR Introduction Air Traffic Control Services within Lisboa and Santa Maria

More information

LETTER OF AGREEMENT BETWEEN NORWAY FIR AND SWEDEN FIR

LETTER OF AGREEMENT BETWEEN NORWAY FIR AND SWEDEN FIR 2014 LETTER OF AGREEMENT BETWEEN NORWAY FIR AND SWEDEN FIR VATSIM Scandinavia 11/12/2014 1 General 1.1 Purpose The purpose of this Letter of Agreement (LoA) is to define the coordination procedures to

More information

1.2 An Approach Control Unit Shall Provide the following services: c) Alerting Service and assistance to organizations involved in SAR Actions;

1.2 An Approach Control Unit Shall Provide the following services: c) Alerting Service and assistance to organizations involved in SAR Actions; Section 4 Chapter 1 Approach Control Services Approach Control Note: This section should be read in conjunction with Section 2 (General ATS), Section 6 (Separation Methods and Minima) and Section 7 (ATS

More information

VATUSA PHOENIX TRACON and VATUSA PHOENIX ATCT LETTER OF AGREEMENT. SUBJECT: Interfacility Coordination Procedures

VATUSA PHOENIX TRACON and VATUSA PHOENIX ATCT LETTER OF AGREEMENT. SUBJECT: Interfacility Coordination Procedures VATUSA PHOENIX TRACON and VATUSA PHOENIX ATCT LETTER OF AGREEMENT EFFECTIVE: 01/08/08 SUBJECT: Interfacility Coordination Procedures 1. PURPOSE. This Letter of Agreement establishes procedures for coordinating

More information

ZTL ARTCC. Asheville Regional. Air Traffic Control Tower. Standard Operating Procedures AVL B. Effective: May 1, 2011

ZTL ARTCC. Asheville Regional. Air Traffic Control Tower. Standard Operating Procedures AVL B. Effective: May 1, 2011 ZTL ARTCC Asheville Regional Air Traffic Control Tower Standard Operating Procedures AVL 7110.65B Effective: May 1, 2011 CHAPTER 1. GENERAL CONTROL SECTION 1. EQUIPMENT 1 1-1-1. Callsign Usage and Frequency

More information

ATC Training Syllabus Philippines vacc Version 1.1 September 25, 2016

ATC Training Syllabus Philippines vacc Version 1.1 September 25, 2016 ATC Training Syllabus Philippines vacc Version 1.1 Intor Distribution and Scope This document outlines the training that will be undergone by students within the Philippines vacc and shall be used by both

More information

Standard Operating Procedures (SOPs) for Arabian Control (OGCC)

Standard Operating Procedures (SOPs) for Arabian Control (OGCC) Standard Operation Procedures for Arabian Control (OGCC) Pag.1 of 12 Standard Operating Procedures (SOPs) for Arabian Control (OGCC) Standard Operation Procedures for Arabian Control (OGCC) Pag.2 of 12

More information

RELEASE RECORD. Version Date Author Notes Dec 2006 SK Initial Release

RELEASE RECORD. Version Date Author Notes Dec 2006 SK Initial Release BOSTON ARTCC (vzbw) STANDARD OPERATING PROCEDURE BOSTON ARTCC (ZBW) RELEASE RECORD Version Date Author Notes 1.0 10 Dec 2006 SK Initial Release 2.0 01 Oct 2011 DO Major update, transformed from more of

More information

LETTER OF AGREEMENT BETWEEN NORWAY FIR AND DENMARK FIR

LETTER OF AGREEMENT BETWEEN NORWAY FIR AND DENMARK FIR 2012 LETTER OF AGREEMENT BETWEEN NORWAY FIR AND DENMARK FIR VATSIM Scandinavia June 2012 Version 1 1 General 1.1 Purpose The purpose of this Letter of Agreement (LoA) is to define the coordination procedures

More information

Greenville Spartanburg International

Greenville Spartanburg International ZTL ARTCC Greenville Spartanburg International Airport Traffic Control Tower Standard Operating Procedures GSP 7110.65B Effective: May 1, 2011 1 CHAPTER 1. GENERAL CONTROL SECTION 1. EQUIPMENT 2-1-1. Callsign

More information

Piedmont Triad International Airport

Piedmont Triad International Airport ZTL ARTCC Piedmont Triad International Airport Airport Traffic Control Tower Standard Operating Procedures GSO 7110.65B Effective: May 1, 2011 1 CHAPTER 1. GENERAL CONTROL SECTION 1. EQUIPMENT 1-1-1. Callsign

More information

IFR SEPARATION USING RADAR

IFR SEPARATION USING RADAR IFR SEPARATION USING RADAR 1. Introduction When flying IFR inside controlled airspace, air traffic controllers either providing a service to an aircraft under their control or to another controller s traffic,

More information

Object: LoA between the Barcelona FIR (LECB) and the Bordeaux FIR (LFBB)

Object: LoA between the Barcelona FIR (LECB) and the Bordeaux FIR (LFBB) Letter of Agreement IVAO Spain & France Divisions Name: LOA-LECB-LFBB_EN Date: May the 12 th 2016 Version: v1 Validity: permanent Contrib.: ES-AOC, ES-AOAC, FR-AOC, FR-AOAC, LECB-CH, LECB-CHA1, LFBB-CH,

More information

Providence ATCT Standard Operating Procedures

Providence ATCT Standard Operating Procedures This air traffic control procedural document is provided for virtual air traffic control in the ZBW ARTCC of the VATSIM network only. It is not for real-world ATC use. These procedures are approved for

More information

Standard Operating Procedures (SOPs) for BAGHDAD (ORBI)

Standard Operating Procedures (SOPs) for BAGHDAD (ORBI) Pag.1 of 11 Standard Operating Procedures (SOPs) for BAGHDAD (ORBI) Index 1. FOREWORD... 3 2. ATC UNITS... 3 3. RECOMMENDATIONS... 3 3.1. TRANSITION ALTITUDE/LEVEL... 3 3.2. SEMI-CIRCULAR FLIGHT LEVEL

More information

Virtual Air Traffic Simulation Network (VATSIM) United States Division Fort Worth vartcc (ZFW)

Virtual Air Traffic Simulation Network (VATSIM) United States Division Fort Worth vartcc (ZFW) Virtual Air Traffic Simulation Network (VATSIM) United States Division Fort Worth vartcc (ZFW) KDAL Dallas Love International Airport ATCT Standard Operating Procedures Rev. December 17, 2014 Approved:

More information

LETTER OF AGREEMENT BETWEEN NORWAY FIR AND DENMARK FIR

LETTER OF AGREEMENT BETWEEN NORWAY FIR AND DENMARK FIR 2014 LETTER OF AGREEMENT BETWEEN NORWAY FIR AND DENMARK FIR VATSIM Scandinavia 11/12/2014 Version 3 1 General 1.1 Purpose The purpose of this Letter of Agreement (LoA) is to define the coordination procedures

More information

USE OF RADAR IN THE APPROACH CONTROL SERVICE

USE OF RADAR IN THE APPROACH CONTROL SERVICE USE OF RADAR IN THE APPROACH CONTROL SERVICE 1. Introduction The indications presented on the ATS surveillance system named radar may be used to perform the aerodrome, approach and en-route control service:

More information

IFR SEPARATION WITHOUT RADAR

IFR SEPARATION WITHOUT RADAR 1. Introduction IFR SEPARATION WITHOUT RADAR When flying IFR inside controlled airspace, air traffic controllers either providing a service to an aircraft under their control or to another controller s

More information

Denver ARTCC Colorado Springs ATCT & TRACON STANDARD OPERATING PROCEDURES

Denver ARTCC Colorado Springs ATCT & TRACON STANDARD OPERATING PROCEDURES Denver ARTCC Colorado Springs ATCT & TRACON STANDARD OPERATING PROCEDURES OCTOBER 7, 2018 Definition of Airspace Colorado Springs Class C airspace is defined as show in Appendix 1. Definition of Positions

More information

Letter of Agreement. IVAO Switzerland & France Divisions. 1. Purpose. 2. General procedures

Letter of Agreement. IVAO Switzerland & France Divisions. 1. Purpose. 2. General procedures Letter of Agreement IVAO Switzerland & France Divisions Number: LOA-FR-LFFF-LSAG_N Date: 27 th March 2018 Version: v3 Validity: permanent Contrib.: FR-AOC, FR-AOAC, CH-AOC, CH-AOAC LFMM-CH, LFMM-ACH, LSAG-CH

More information

LETTER OF AGREEMENT BETWEEN NORWAY FIR AND DENMARK FIR

LETTER OF AGREEMENT BETWEEN NORWAY FIR AND DENMARK FIR 2013 LETTER OF AGREEMENT BETWEEN NORWAY FIR AND DENMARK FIR VATSIM Scandinavia July 2013 Version 2 1 General 1.1 Purpose The purpose of this Letter of Agreement (LoA) is to define the coordination procedures

More information

San Juan CERAP. Standard Operation Procedures. Version 2.2 May 5th, Welcome to San Juan CERAP (ZSU ARTCC, TJZS FIR)

San Juan CERAP. Standard Operation Procedures. Version 2.2 May 5th, Welcome to San Juan CERAP (ZSU ARTCC, TJZS FIR) San Juan CERAP Standard Operation Procedures Version 2.2 May 5th, 2013 Welcome to San Juan CERAP (ZSU ARTCC, TJZS FIR) You are entering one of the most fascinating Combined Enroute Radar Approach Control

More information

LETTER OF AGREEMENT BETWEEN BODØ FIR AND MURMANSK FIR

LETTER OF AGREEMENT BETWEEN BODØ FIR AND MURMANSK FIR 2011 LETTER OF AGREEMENT BETWEEN BODØ FIR AND MURMANSK FIR VATSIM Scandinavia February 2011 Version 1 1 General 1.1 Purpose The purpose of this Letter of Agreement is to define the coordination procedures

More information

Pilot RVSM Training Guidance Material

Pilot RVSM Training Guidance Material Pilot RVSM Training Guidance Material Captain Souhaiel DALLEL IFALPA RVP AFI WEST RVSM Pilot Procedures ICAO requires states to establish for flight crews specific: Initial training programs and Recurrent

More information

Letter of Agreement (LOA)

Letter of Agreement (LOA) Page 1 of 8 Letter of Agreement (LOA) Between Sanya FIR (ZJSA), People s Republic of China Division (VATPRC) and Hong Kong FIR (VHHK), Southeast Asia Division (VATSEA) Revision: New Release Effective Date:

More information

ATMM. Air Traffic Management Manual. Air Traffic Management Manual VACC AUSTRIA LOVV ATMM Air Traffic Management Manual

ATMM. Air Traffic Management Manual. Air Traffic Management Manual VACC AUSTRIA LOVV ATMM Air Traffic Management Manual ATMM Version 2.2 Issued at 2013-07-01 Effective from 2013-07-05 page 1/15 NOT FOR REAL NAVIGATION 2013-07-01 / PH Content 0. Updates 4 0.1. New items 4 0.2. Updated items 4 0.3. Deleted items 4 1. LOWW_GND

More information

INDICE. 1. Purpose 2 2. General procedures 2 3. ATC units description 2 4. Coordination procedures En-route coordination 6

INDICE. 1. Purpose 2 2. General procedures 2 3. ATC units description 2 4. Coordination procedures En-route coordination 6 Letter of Agreement IVAO Spain & France Divisions Name: LOALECMLFRR_EN Date: May the 28 th 2016 Version: v1 Validity: permanent Contrib.: ESAOC, ESAOAC, FRAOC, FRAOAC, LECMCH, LECMACH, LECMCH1, LECGCH,

More information

REPUBLIC OF SEYCHELLES CIVIL AVIATION AUTHORITY AERONAUTICAL INFORMATION SERVICE P.O.BOX 181, VICTORIA SEYCHELLES

REPUBLIC OF SEYCHELLES CIVIL AVIATION AUTHORITY AERONAUTICAL INFORMATION SERVICE P.O.BOX 181, VICTORIA SEYCHELLES Phone: 248-384000 AFS: FSIAYNYX FAX: 248-384030 Email: sezais@scaa.sc REPUBLIC OF SEYCHELLES CIVIL AVIATION AUTHORITY AERONAUTICAL INFORMATION SERVICE P.O.BOX 181, VICTORIA SEYCHELLES AIP SUPPLEMENT S02/09

More information

c) Advisory service to IFR flights operating within advisory airspace.

c) Advisory service to IFR flights operating within advisory airspace. Section 5 Chapter 1 Area Services Area Control Service Note: This section should be read in conjunction with Section 2 (General ATS), Section 6 (Separation Methods and Minima) and Section 7(ATS Surveillance

More information

Letter of Agreement. between. and. Effective: 01-OCT-2016 / 1610 Edition: 3.0

Letter of Agreement. between. and. Effective: 01-OCT-2016 / 1610 Edition: 3.0 Langen FIR (EDGG) IVAO Germany Letter of Agreement between and Amsterdam FIR (EHAA) IVAO Netherlands Effective: 01-OCT-2016 / 1610 Edition: 3.0 1 Document purpose The purpose of this Letter of Agreement

More information

11/21/2008 ZDC-ZTL LOA Version 1. Letter of Agreement

11/21/2008 ZDC-ZTL LOA Version 1. Letter of Agreement Letter of Agreement Atlanta ARTCC Washington ARTCC SUBJECT: INTER-CENTER COORDINATION PROCEDURES 1) PURPOSE This Agreement between the Virtual Atlanta ARTCC (vztl) and Virtual Washington ARTCC (vzdc) covers

More information

VIRTUAL AIR TRAFFIC SIMULATION NETWORK NORTH AMERICA REGION - USA DIVISION vzkc KANSAS CITY ARTCC

VIRTUAL AIR TRAFFIC SIMULATION NETWORK NORTH AMERICA REGION - USA DIVISION vzkc KANSAS CITY ARTCC VIRTUAL AIR TRAFFIC SIMULATION NETWORK NORTH AMERICA REGION - USA DIVISION vzkc KANSAS CITY ARTCC ZKC ORDER 01.110A Effective Date: March 18, 2017 SUBJECT: ZKC Center Standard Operating Procedures This

More information

AIP ENR JORDAN 12 DEC 2013 RADAR SERVICES AND PROCEDURES

AIP ENR JORDAN 12 DEC 2013 RADAR SERVICES AND PROCEDURES AIP ENR 1.6-1 JORDAN 12 DEC 2013 ENR 1.6 RADAR SERVICES AND PROCEDURES 1. GENERAL 1.1 SERVICES a) Radar units in the Amman FIR operate as integral parts of the ATS system and provide Radar Control Service

More information

Eastern Caribbean PIARCO Virtual FIR. PIARCO Control Zone (CTR)

Eastern Caribbean PIARCO Virtual FIR. PIARCO Control Zone (CTR) PIARCO Control Zone (CTR) Eastern Caribbean PIARCO Virtual FIR NOT TO BE USED FOR REAL WORLD AVIATION, STRICTLY FOR USE ON THE VATSIM VIRTUAL ATC NETWORK. 1. Introduction 1.1 Objective of this SOP is to

More information

VATSIM MINNEAPOLIS ARTCC MINNEAPOLIS TRACON LETTER OF AGREEMENT

VATSIM MINNEAPOLIS ARTCC MINNEAPOLIS TRACON LETTER OF AGREEMENT VATSIM MINNEAPOLIS ARTCC MINNEAPOLIS TRACON LETTER OF AGREEMENT SUBJECT: TERMINAL AREA CONTROL SERVICE EFFECTIVE: September 1, 2016 1. PURPOSE. This agreement delegates authority and establishes procedures

More information

RALEIGH-DURHAM ATCT/TRACON STANDARD OPERATING PROCEDURES

RALEIGH-DURHAM ATCT/TRACON STANDARD OPERATING PROCEDURES RALEIGH-DURHAM ATCT/TRACON STANDARD OPERATING PROCEDURES January 3, 2017 BULLETIN NUMBER RECORD OF CHANGES SUBJECT AUTHORIZED BY DATE ENTERED DATE REMOVED 7110.100 Initial RR 1/3/17 3/25/17 7110.101 Added

More information

Standard Operational Procedures

Standard Operational Procedures Standard Operational Procedures Aerodrome Ostrava Mošnov VERSION 1.2 CHANGES AND UPDATES Effective Version Change 24 JUN 09 1.1 LVP added. 12 FEB 11 1.2 General text revision. NOTES Official scenery and

More information

THE TOWER CONTROL POSITION (TWR)

THE TOWER CONTROL POSITION (TWR) 1. Introduction THE TOWER CONTROL POSITION (TWR) The Aerodrome Local Control, or Tower (called TWR) controller has the responsibility of ensuring Air Traffic Control (ATC) Services within a restricted

More information

Virtual Jacksonville Air Route Traffic Control Center Tallahassee ATCT Standard Operating Procedures

Virtual Jacksonville Air Route Traffic Control Center Tallahassee ATCT Standard Operating Procedures Virtual Jacksonville Air Route Traffic Control Center Tallahassee ATCT Standard Operating Procedures TLH 7110.65 Effective Date: May 11, 2015 Chapter 1. General 1 1. General Information obtained in this

More information

Pilot ATC RT Phraseology

Pilot ATC RT Phraseology Pilot ATC RT Phraseology An Introduction to ATC Pilot Communications 6/1/2016 Pakistan vacc Introduction: This document will give you a brief introduction to the calls/conversation taking place on the

More information

CHAPTER 4 AIR TRAFFIC SERVICES

CHAPTER 4 AIR TRAFFIC SERVICES CHAPTER 4 AIR TRAFFIC SERVICES 4.1 Objectives of the air traffic services 4.1.1 The objectives of the air traffic services shall be to: a) prevent collisions between aircraft; b) prevent collisions between

More information

Traffic shall be handed over as soon as practical and, whenever possible, at latest 3000 ft before reaching the cleared flight level.

Traffic shall be handed over as soon as practical and, whenever possible, at latest 3000 ft before reaching the cleared flight level. Letter of Agreement IVAO Division France Name: LOAFRLFBBLFRR_EN Date: July the 29 th 2016 Version: v2 Validity: permanent Contributors: FRAOC, FRAOAC LFBBCH, LFBBACH, LFRRCH, LFRRACH Contact: fraoc@ivao.aero

More information

BOSTON ARTCC (vzbw) STANDARD OPERATING PROCEDURE KALB) ALBANY APPROACH (ALB

BOSTON ARTCC (vzbw) STANDARD OPERATING PROCEDURE KALB) ALBANY APPROACH (ALB BOSTON ARTCC (vzbw) STANDARD OPERATING PROCEDURE ALBANY ATCT (KALB( KALB) ALBANY APPROACH (ALB APP) RELEASE RECORD Version Date Author Notes 1.0 24 April 2009 Initial Release 1.1 30 Jan 2015 BN Match ALB5

More information

ENR 1.7 ALTIMETER SETTING PROCEDURES

ENR 1.7 ALTIMETER SETTING PROCEDURES AIP LEBANON ENR 1.7-1 11 APR 2008 ENR 1.7 ALTIMETER SETTING PROCEDURES 1. Introduction: 1.1 The procedures herein describe the method used in providing adequate vertical separation between aircraft and

More information

ALTIMETER SETTING PROCEDURES

ALTIMETER SETTING PROCEDURES AIP New Zealand ENR 1.7-1 ENR 1.7 ALTIMETER SETTING PROCEDURES 1 INTRODUCTION 1.1 General 1.1.1 The requirements for altimeter setting are detailed in CAR Part 91. The requirements are summarised in this

More information

Chapter 6. Airports Authority of India Manual of Air Traffic Services Part 1

Chapter 6. Airports Authority of India Manual of Air Traffic Services Part 1 Chapter 6 6.1 ESSENTIAL LOCAL TRAFFIC 6.1.1 Information on essential local traffic known to the controller shall be transmitted without delay to departing and arriving aircraft concerned. Note 1. Essential

More information

CLEARANCE INSTRUCTION READ BACK

CLEARANCE INSTRUCTION READ BACK CLEARANCE INSTRUCTION READ BACK 1. Introduction An ATC clearance or an instruction constitutes authority for an aircraft to proceed only in so far as known air traffic is concerned and is based solely

More information

- Updated formatting - Re-drawn airspace delegation diagram

- Updated formatting - Re-drawn airspace delegation diagram Z D C A R T C C - Updated formatting - Re-drawn airspace delegation diagram Change Log... 2 Table of Contents... 3 Chapter 1. Positions... 4 Chapter 2. Clearance Delivery... 5 Chapter 3. Ground Control...

More information

SULAYMANIYAH INTERNATIONAL AIRPORT MATS CHAPTER 11

SULAYMANIYAH INTERNATIONAL AIRPORT MATS CHAPTER 11 KURDISTAN REGIONAL GOVERNMENT SULAYMANIYAH INTERNATIONAL AIRPORT MATS CHAPTER 11 SEPARATION STANDARDS & APPLICATIONS International and Local Procedures ( First Edition ) April 2012 Ff Prepared By Fakhir.F.

More information

Cape Area Airports Standard Operating Procedures

Cape Area Airports Standard Operating Procedures Cape Area Airports Standard Operating Procedures This air traffic control procedural document is provided for virtual air traffic control in the ZBW ARTCC of the VATSIM network only. It is not for real-world

More information

Letter of Agreement. IVAO German & France Divisions. 1. Purpose. 2. General procedures

Letter of Agreement. IVAO German & France Divisions. 1. Purpose. 2. General procedures Letter of Agreement IVAO German & France Divisions Name: LOA-EDGG-LFEE_EN Date: 5 th September 2018 Version: v1 Validity: permanent Contrib.: LFEE-CH, LFEE-ACH, EDGG-CH, EDGG-ACH, FR-AOC, FR-AOAC, DE-AOC,

More information

LFPG / Paris-Charles de Gaulle / CDG

LFPG / Paris-Charles de Gaulle / CDG This page is intended to draw commercial and private pilots attention to the aeronautical context and main threats related to an aerodrome. They have been identified in a collaborative way by the main

More information

Pilot Briefing Document Cross The Pond 2013 Heathrow Airport EGLL/LHR

Pilot Briefing Document Cross The Pond 2013 Heathrow Airport EGLL/LHR Pilot Briefing Document Cross The Pond 2013 Heathrow Airport EGLL/LHR VATSIM-UK and the Heathrow Regional Training Scheme look forward to welcoming you into Heathrow! We ll have all our controllers briefed

More information

Letter of Agreement. IVAO United Kingdom and Ireland & France Divisions. 1. Purpose. 2. General procedures

Letter of Agreement. IVAO United Kingdom and Ireland & France Divisions. 1. Purpose. 2. General procedures Letter of Agreement IVAO United Kingdom and Ireland & France Divisions Name: LOAEGTTLFFF_EN Date: March 27 th 2018 Version: v4 Validity: permanent Contrib.: GBAOC, GBAOAC, FRAOC, FRAOAC, LFFFCH, LFFFACH

More information

VATUSA Approval 3/21/18

VATUSA Approval 3/21/18 PANC SOP beta 1.0 2/30/2018 Ted Stevens Anchorage International Airport - PANC Air Traffic Control Tower STANDARD OPERATING PROCEDURES SUBJ: PANC SOP This order provides direction and guidance for the

More information

Letter of Agreement. between. and

Letter of Agreement. between. and Munich FIR (EDMM) IVAO Germany 1 Document purpose Letter of Agreement between and Zürich FIR (LSAZ) IVAO Switzerland Effective: 02-APR-2015 Edition: 1.1 The purpose of this Letter of Agreement is to define

More information

Design Airspace (Routes, Approaches and Holds) Module 11 Activity 7. European Airspace Concept Workshops for PBN Implementation

Design Airspace (Routes, Approaches and Holds) Module 11 Activity 7. European Airspace Concept Workshops for PBN Implementation Design Airspace (Routes, Approaches and Holds) Module 11 Activity 7 European Airspace Concept Workshops for PBN Implementation Design in Context TFC Where does the traffic come from? And when? RWY Which

More information

AIR LAW AND ATC PROCEDURES

AIR LAW AND ATC PROCEDURES 1 The International Civil Aviation Organisation (ICAO) establishes: A standards and recommended international practices for contracting member states. B aeronautical standards adopted by all states. C

More information

PILOT BRIEFING GENEVA RFE 2018

PILOT BRIEFING GENEVA RFE 2018 PILOT BRIEFING GENEVA RFE 2018 Introduction The aim of this pilot briefing for the RFE is to inform pilots about local procedures and to prepare them for a lot of traffic. To be able to achieve a good

More information

ZTL ARTCC / CLT ATCT LETTER OF AGREEMENT. EFFECTIVE: July 10, SUBJECT: APPROACH CONTROL SERVICE

ZTL ARTCC / CLT ATCT LETTER OF AGREEMENT. EFFECTIVE: July 10, SUBJECT: APPROACH CONTROL SERVICE ZTL ARTCC / CLT ATCT LETTER OF AGREEMENT EFFECTIVE: July 10, 2010. SUBJECT: APPROACH CONTROL SERVICE 1. PURPOSE: To delegate authority and responsibility for approach control services in the airspace described

More information

SID/STAR phraseology FAQ Canadian implementation April 27, 2017

SID/STAR phraseology FAQ Canadian implementation April 27, 2017 SID/STAR phraseology FAQ Canadian implementation April 27, 2017 The International Civil Aviation Organization (ICAO) has developed harmonized phraseology for Standard Instrument Departures (SIDs) and Standard

More information

LETTER OF AGREEMENT. between. and

LETTER OF AGREEMENT. between. and Amsterdam FIR IVAO Netherlands Division Amsterdam ACC LETTER OF AGREEMENT between and Belgium FIR IVAO BeLux Division Brussels ACC Effective: 01/10/2016 The purpose of this Letter of Agreement is to define

More information

c) Expedite and maintain a safe and orderly flow of air traffic;

c) Expedite and maintain a safe and orderly flow of air traffic; Section 2 Chapter 1 Air Traffic Services Air Traffic Services 1 Introduction 1.1 Air traffic services within the Republic of South Africa are provided in accordance with the Civil Aviation Regulations

More information

Anchorage ARTCC Phraseology Guide. Clearance Delivery Operations

Anchorage ARTCC Phraseology Guide. Clearance Delivery Operations Anchorage ARTCC Phraseology Guide Clearance Delivery Operations Initial Contact: The first time an aircraft calls you, you MUST identify your position, i.e. AWE123 Anchorage Delivery. Clearance Delivery:

More information

PITTSBURGH ATCT STANDARD OPERATING PROCEDURES

PITTSBURGH ATCT STANDARD OPERATING PROCEDURES ORDER PIT ATCT 7110.1I PITTSBURGH ATCT STANDARD OPERATING PROCEDURES August 1, 2014 VATUSA CLEVELAND ARTCC VIRTUAL AIR TRAFFIC SIMULATION NETWORK VIRTUAL AIR TRAFFIC SIMULATE NETWORK UNITED STATES DIVISION

More information

Separation Methods and Minima

Separation Methods and Minima Section 6 Chapter 1 Separation Methods and Minima General 1 Introduction 1.1 This chapter contains procedures and procedural separation minima for use in the separation of aircraft in the en route phase

More information

ATM REGIONAL CONTINGENCY PLAN FOR.. CTA/UTA/FIR

ATM REGIONAL CONTINGENCY PLAN FOR.. CTA/UTA/FIR ATM REGIONAL CONTINGENCY PLAN FOR.. CTA/UTA/FIR OBJECTIVE: This ATS Contingency plan s objective is to ensure the continued safety and supplies of air navigation services in the event of partially or total

More information

International Civil Aviation Organization COMMON FORMAT LOA BETWEEN ATS UNITS. (Presented by United Arab Emirates) SUMMARY

International Civil Aviation Organization COMMON FORMAT LOA BETWEEN ATS UNITS. (Presented by United Arab Emirates) SUMMARY International Civil Aviation Organization ATM SG/1-WP/27 28/05/2014 MIDANPIRG ATM Sub-Group First Meeting (ATM SG/1) (Cairo, Egypt, 9 12 June 2014) Agenda Item 5: Airspace Management Issues COMMON FORMAT

More information

9/23/2010 RDU B. Raleigh-Durham Air Traffic Control Tower. Standard Operating Procedures

9/23/2010 RDU B. Raleigh-Durham Air Traffic Control Tower. Standard Operating Procedures Raleigh-Durham Air Traffic Control Tower Standard Operating Procedures 1) Purpose This order defines duties and responsibilities, depicts areas of airspace, runways, and taxiways allocated to each position

More information

Cleveland ARTCC and Boston Virtual ARTCC Letter of Agreement

Cleveland ARTCC and Boston Virtual ARTCC Letter of Agreement Cleveland ARTCC and Boston Virtual ARTCC Letter of Agreement Effective: 1 Oct 2017 1. PURPOSE: This agreement defines the necessary pre-defined air traffic control procedures and coordination responsibilities

More information

Standard Operational Procedures

Standard Operational Procedures Standard Operational Procedures Aerodrome Praha Ruzyně VERSION 4.0 CHANGES AND UPDATES Effective Version Change - 3.8 Intentionally left blank. 09 JUN 11 3.9 General text revision. New design issued. 15

More information

VFR PHRASEOLOGY. The word IMMEDIATELY should only be used when immediate action is required for safety reasons.

VFR PHRASEOLOGY. The word IMMEDIATELY should only be used when immediate action is required for safety reasons. VFR PHRASEOLOGY 1. Introduction 1.1. What is phraseology? The phraseology is the way to communicate between the pilot and air traffic controller. This way is stereotyped and you shall not invent new words.

More information

Letter of Agreement by and between Jacksonville ARTCC and Miami ARTCC

Letter of Agreement by and between Jacksonville ARTCC and Miami ARTCC Letter of Agreement by and between Jacksonville ARTCC and Miami ARTCC Effective Date: 1 November 2007 0400Z I. Scope: This agreement is made by and between Miami ARTCC (herein ZMA) and Jacksonville ARTCC

More information

PBN Airspace Concept. ATS requirements

PBN Airspace Concept. ATS requirements INTERNATIONAL CIVIL AVIATION ORGANIZATION PBN Airspace Concept ATS requirements Victor Hernandez RO ATM/SAR ICAO North America, Central America and Caribbean Regional Office 1 Gate to Gate concept Phases

More information

INSTRUMENT RATING (SENIOR PRIVATE PILOT) UK FLIGHT TEST STANDARDS

INSTRUMENT RATING (SENIOR PRIVATE PILOT) UK FLIGHT TEST STANDARDS INSTRUMENT RATING (SENIOR PRIVATE PILOT) UK FLIGHT TEST STANDARDS This document applies to Senior Private Pilot exams within UK airspace only, and should not be used elsewhere as some subjects are only

More information

GENERAL INFORMATION The aerodrome consists of three runways (04L-22R, 04R-22L, 12-30) and four aprons.

GENERAL INFORMATION The aerodrome consists of three runways (04L-22R, 04R-22L, 12-30) and four aprons. GENERAL INFORMATION The aerodrome consists of three runways (04L-22R, 04R-22L, 12-30) and four aprons. The two parallel runways are about 3000 metres long while the intersecting runway (12-30) is about

More information

Standard Operating Procedures

Standard Operating Procedures Allentown TRACON Standard Operating Procedures General This document describes the standard operating procedures for controlling at any of the positions within the Allentown TRACON and the airports it

More information

VIRTUAL AIR TRAFFIC SIMULATION NETWORK UNITED STATES DIVISION. SUBJ: Phoenix (PHX) Air Traffic Control Tower (ATCT) Standard Operating Procedures

VIRTUAL AIR TRAFFIC SIMULATION NETWORK UNITED STATES DIVISION. SUBJ: Phoenix (PHX) Air Traffic Control Tower (ATCT) Standard Operating Procedures VIRTUAL AIR TRAFFIC SIMULATION NETWORK UNITED STATES DIVISION ALBUQUERQUE ARTCC ORDER PHX ATCT v7110.1a Effective Date: Sept. 18, 2014 SUBJ: Phoenix (PHX) Air Traffic Control Tower (ATCT) Standard Operating

More information