1 Design and Construction of the Lake St. Martin Emergency Outlet
2 Background 2011 was the largest flood event experienced in the last 200 years Flood Fighting required some difficult decisions by the Manitoba Government Assiniboine River runoff was high in peak flow rates and unprecedented in volume and duration All Assiniboine River flows greater than 18,000 cfs had to be diverted into Lake Manitoba to prevent disastrous flooding between Portage la Prairie and Headingley Resulted in unprecedented volumes diverted into Lake Manitoba through the Portage Diversion and highest levels in over 100 years Page 2
3 Flood Protection Works in Manitoba Page 3
4 Page 4
5 Resulting 2011 Water Levels Lake Manitoba Crested at ft (249.1m) 4.7 ft (1.43m) above the desirable range of ft to ft Lake St. Martin, Crested at ft (245.4m) 5.5 feet (1.68m) above the desirable range of 797 to 800 ft Page 5
6 Project Objective (from MIT mid-june 2011): Identify: Emergency flood relief options from Lake St. Martin and Lake Manitoba Required flow rates to significantly reduce water levels Required earthwork volumes and construction costs Biophysical and socio-economic impacts The recommended options were presented to Manitoba within 5 weeks Page 6
7
8
9
10 Summary of Options Examined Page 10
11 Recommendations KGS & AECOM recommended the following course of action to Manitoba: Begin immediate construction of an additional emergency channel from Lake St. Martin to address the hydraulic flow restrictions in the Dauphin River and accommodate additional Lake Manitoba outflows over the winter; and Allow unrestricted outflow of water from Lake Manitoba through the Fairford River Water Control Structure through the winter of 2011/2012, allowing several times more outflow than past winters. If in service by of the Fall 2011, both lakes could be 2 to 3 feet lower by spring than without emergency channel Page 11
12 Lake St. Martin to Lake Winnipeg Channel Context Page 12
13 Lake St. Martin Emergency Outlet Channel Channel construction from Lake St. Martin approximately 6 km northeast towards Big Buffalo Lake Flow allowed to follow natural flow path to Buffalo Creek which re-enters the Dauphin River approximately 4.5 km upstream of the river mouth June/July 2011: Route investigations, survey, seismic investigations August 2011: Site preparation, layout, securing tugs and barges, developing barge access etc. September 2011: Channel construction, under difficult construction conditions (1.0 to 1.5m wet peat underlain by hard basal till) Page 13
14 Lake St. Martin Emergency Outlet Channel Construction of Outlet Channel: Presented significant timing and constructability challenges Extremely wet and isolated conditions Remote construction access Page 14
15 LSM Outlet Channel Early Access Page 15
16 LSM Outlet Channel Construction Excavating Barge Channel Page 16
17 LSM Outlet Channel Transportation Challenges Page 17
18
19 At its peak the project had: Over 100 pieces of heavy equipment 3 construction camps 3 tugs, 4 barges, 10 support boats 2 helicopters 2 AECOM field offices and A multitude of AECOM personnel for office and field duties Page 19
20 Channel & Spoil Pile Section Illustration Lake St. Martin Channel Construction Page 20
21 Outlet Control Section approx location Page 21
22 Outlet Control Structure 2-D Velocity Model Outlet Control Structure Barge Channel Page 22
23 Lake St. Martin Emergency Outlet Channel Looking North Page 23
24 Lake St. Martin Emergency Outlet Channel Staff and Construction Equipment Over 100 pieces of Equipment Over 150 Construction Staff Over 50 AECOM Staff worked on project 41 from Manitoba Page 24
25 Lake St. Martin Emergency Outlet Channel Approach Channel Construction Page 25
26 Lake St. Martin Emergency Outlet Channel Approach Channel Page 26
27 Lake St. Martin Emergency Outlet Channel Approach Channel Page 27
28 Lake St. Martin Emergency Outlet Channel Big Buffalo Lake Page 28
29 Lake St. Martin Emergency Outlet Channel Big Buffalo Lake Page 29
30 Lake St. Martin Emergency Outlet Channel Big Buffalo Lake Page 30
31 Resulting Water Levels Page 31
32 Lake St. Martin Outlet Channel Looking Downstream Page 32
33 Questions?? Page 33
Lake Manitoba Lake St. Martin
Lake Manitoba Lake St. Martin Outlet Channels Public Information Session June 29, 2017 July 13, 2017 Background & History 2011 Spring Flood Event High flows recorded on most streams and rivers in the Assiniboine
More informationNatural Factors Affecting the Level of Osoyoos Lake
Natural Factors Affecting the Level of Osoyoos Lake Background Osoyoos Lake is operated under conditions prescribed by the International Joint Commission (IJC) and Figure 1 shows the ranges within which
More informationObserving Subtleties: Traditional Knowledge and Optimal Water Management of Lake St. Martin
Observing Subtleties: Traditional Knowledge and Optimal Water Management of Lake St. Martin Myrle Traverse and Richard Baydack Abstract Lake St. Martin First Nation is an Anishinaabe community situated
More informationHydrology Input for West Souris River IWMP
Hydrology Input for West Souris River IWMP Prepared by: Mark Lee Manitoba Water Stewardship 1 1 1 Overall view of: drainage area watershed characteristics gauging stations meteorological stations Runoff
More informationInternational Osoyoos Lake Board of Control Annual Report to the International Joint Commission
International Osoyoos Lake Board of Control 2010 Annual Report to the International Joint Commission TABLE OF CONTENTS ACTIVITIES OF THE BOARD... 1 HYDROLOGIC CONDITIONS IN 2010... 2 Drought Criteria...
More informationHydraulic Report. Trail 5 Snowmobile Trail Over Mulligan Creek. Prepared By: COLEMAN ENGINEERING COMPANY Karisa V. Falls, P.E.
Prepared for: Prepared by: Marquette County Road Commission Coleman Engineering Company Marquette, Michigan Iron Mountain, MI December 2011 Hydraulic Report Trail 5 Snowmobile Trail Over Mulligan Creek
More informationWelcome KROSNO CREEK DIVERSION PROJECT CLASS ENVIRONMENTAL ASSESSMENT
Welcome KROSNO CREEK DIVERSION PROJECT PUBLIC INFORMATION CENTRE # 1 Tonight s Presentation Study Overview Background Existing Conditions Alternative Solutions Preliminary Preferred Solution Next Steps
More informationTriangle Land Conservancy Conservation Area Monitoring Report Carolina North
Triangle Land Conservancy Conservation Area Monitoring Report Carolina North Property Name: Bolin Creek West Conservation Area Date of visit: March 16, 2017 County: Orange Property Type: Restrictive Covenants
More informationKeeyask Generation Project. Project Description. Supporting Volume. Environmental Impact Statement
Keeyask Generation Project Environmental Impact Statement Supporting Volume Project Description June 2012 B Size Lan dsca pe BT B - DEC 20 11 Look ing G - 1 O'NEIL BA Y Back Creek G - 3 N - 6 N - 5 N -
More informationCofferdam Performance Hurricanes Harvey & Irma
Cofferdam Performance Hurricanes Harvey & Irma - 2017 Greg Hammer Senior Geotechnical Engineer CELRH-DSPC-GS DSMMCX Third Workshop on Case Histories in Dam Safety Risk-Informed Decision Making 2018 USSD
More informationCommon Ground Drainage Channel Diversion. Design Report
Common Ground Drainage Channel Diversion Design Report Resource Management International Inc Consulting Engineers May 2017 COMMON GROUND DRAINAGE CHANNEL DIVERSION PREPARED FOR: QUILL LAKES WATERSHED NO.
More information4/28/17. Clicker Question. Clicker Question. #37 Floods IV (Case Histories-Mississippi River Flood, 1993; Red River of North Flood, 1997)
GEOL 118 Final Exam Format similar to exams 1 and 2 Covers Lectures #27 40 (Global Climate Change I - Meteorite Impacts III) Web Exercise #6 - Due by 1 pm, Monday (5/1) 8:00 AM, Thursday, May 11 th Location
More informationApplication for a Special Flight Operations Certificate
Application for a Special Flight Operations Certificate for a Large Unmanned High Altitude Balloon by Shaftesbury High School Shaftesbury High Altitude Robotics Project SHARP Date: November 1, 2013 Prepared
More informationTenders. Manitoba Infrastructure
Tenders Manitoba Heavy Construction Association Unit 3-1680 Ellice Ave. Winnipeg, MB R3H 0Z2 Tel: (204) 947-1379 Fax: (204) 943-2279 www.mhca.mb.ca Email: jocelyn@mhca.mb.ca Manitoba Infrastructure Reference
More informationIntroduction. The System. Model Limitations, Assumptions, and Parameters. Optional Services Tech Memo
Optional Services Tech Memo Introduction This technical memo evaluates the impact of a tide gate to be installed at the confluence of the Left Bank Tributary of Thalia Creek and Lake Windsor. Specifically,
More informationBridges and Structures
Bridges and Structures Commitment: $2. million over five years Manitoba Infrastructure and Transportation has a five-year plan to invest $2 billion in Manitoba s road system. Of this, $.2 billion is for
More informationInternational Osoyoos Lake Board of Control Annual Report to the International Joint Commission
International Osoyoos Lake Board of Control 2015 Annual Report to the International Joint Commission Cover: Northern extent of Osoyoos Lake, where the Okanagan River enters the lake, 2015. View is to the
More informationGARFIELD BRIDGE. Building A Bridge to No-Where
GARFIELD BRIDGE Building A Bridge to No-Where OCEANA COUNTY LOCATION Garfield Road leads to Stony Lake Outlet, a Benona Township park and popular Lake Michigan access GARFIELD BRIDGE OVER STONY CREEK
More informationFinal Drainage Letter Pikes Peak Community College Downtown Parking Lot Colorado Springs, Colorado
Final Drainage Letter Pikes Peak Community College Downtown Parking Lot Colorado Springs, Colorado Prepared for: Pikes Peak Community College 5775 South Academy Boulevard Colorado Springs, CO 80906-5422
More informationLondon Borough of Barnet Traffic & Development Design Team
London Borough of Barnet Traffic & Development Design Team AERODROME ROAD PEDESTRIAN FACILITY AND BUS STOP INTRODUCTION FEASIBILITY REPORT Job Number: 60668 Doc Ref: S106/12-13/60668 Author: Manoj Kalair
More informationHILLSBOROUGH COUNTY, FLORIDA AND INCORPORATED AREAS
VOLUME 2 OF 5 HILLSBOROUGH COUNTY, FLORIDA AND INCORPORATED AREAS Hillsborough County COMMUNITY NAME COMMUNITY NUMBER HILLSBOROUGH COUNTY (UNINCORPORATED AREAS) 120112 PLANT CITY, CITY OF 120113 TAMPA,
More informationAgenda Report. Spruce Street Outlet Drainage Improvements Tower Road Relief Sewer
Agenda Report Subject: Prepared By: Spruce Street Outlet Drainage Improvements Tower Road Relief Sewer Steven M. Saunders, Director of Public Works/Village Engineer Date: August 12, 2012 On March 8, 2012
More informationPresentation Overview
DON NARROWS Historical and Existing Conditions March 29, 2008 Presentation Overview 1. Project Location and Background 2. Historical Context How did the Don Narrows Come to Be? 3. The Today 4. Next Steps
More informationGuadalupe Delta Log Jam History & GBRA Operations in the Lower Basin. March 23, 2017
Guadalupe Delta Log Jam History & GBRA Operations in the Lower Basin March 23, 2017 Guadalupe Watershed Geographic Regions Guadalupe Watershed Geographic Regions Flat Delta Geomorphology Upper Delta Middle
More informationHydrological study for the operation of Aposelemis reservoir Extended abstract
Hydrological study for the operation of Aposelemis Extended abstract Scope and contents of the study The scope of the study was the analytic and systematic approach of the Aposelemis operation, based on
More informationApril 4, McKinney Airport Advisory Committee Airport Master Plan Update.
McKinney Airport Advisory Committee Airport Master Plan Update http://mckinney.airportstudy.com/project-documents April 4, 2017 Paul Hendricks phendricks@fairviewtexas.org McKinney National Airport (TKI)
More informationWatchorn Provincial Park. Management Plan
Watchorn Provincial Park Management Plan 2 Watchorn Provincial Park Table of Contents 1. Introduction... 3 2. Park History... 3 3. Park Attributes... 3 3.1 Natural... 4 3.2 Recreational... 4 3.3 Additional
More informationPortage Spillway Provincial Park. Draft Management Plan
Portage Spillway Provincial Park Draft Management Plan 2 Portage Spillway Provincial Park Table of Contents 1. Introduction... 3 2. Park History... 3 3. Park Attributes... 4 3.1 Natural... 4 3.2 Recreational...
More informationEquitable Water Apportionment on the Canadian Prairies
Equitable Water Apportionment on the Canadian Prairies The Master Agreement on Apportionment 1969 & The Prairie Provinces Water Board October, 2017 Alberta - Saskatchewan - Manitoba - Canada 1 Early agreements
More informationInternational Osoyoos Lake Board of Control Annual Report to the International Joint Commission
International Osoyoos Lake Board of Control 2013 Annual Report to the International Joint Commission TABLE OF CONTENTS ACTIVITIES OF THE BOARD... 1 HYDROLOGIC CONDITIONS IN 2013... 2 Drought Criteria...
More informationArlington County Board Meeting Project Briefing. October 20, 2015
Arlington County Board Meeting Project Briefing October 20, 2015 Project Map 2 Project Context Only Interstate in the Country limited to HOV only traffic during rush hours Stoplight at the end of I-66
More informationMiner & Silverstein Appraisal Company Division of Miner & Silverstein, LLP
Miner & Silverstein Appraisal Company Division of Miner & Silverstein, LLP Marina Market Analysis Upper Connecticut River Marina Market Study Winter 2005-2006 The following presents a winter 2005-06 market
More informationPrinciple Causes of Dam Failures. Structural failure. Cracking. Stability failure. BIA Summer Water Resources Training Dam Safety Inspections
BIA Summer Water Resources Training Dam Safety Inspections Principle Causes of Dam Failures Part 2 Dam Failures July 28, 2012 Presented by Michael Johnson, Ph.D., P.E. Overtopping Structural failure Stability
More informationTriangle Land Conservancy Conservation Area Monitoring Report Carolina North
Triangle Land Conservancy Conservation Area Monitoring Report Carolina North Property Name: Bolin Creek East Conservation Area Date of visit: March 16, 2017 County: Orange Property Type: Restrictive Covenants
More informationChapter 10. Damage to Ports and Coastal Facilities
Chapter 10 Damage to Ports and Coastal Facilities 10.1 Area Investigated Tsunami induced heavy damage to ports and coastal facilities along the west and north coast of Sumatra Island. Figure 10.1 shows
More informationJanuary 14,2010. Ms. Linda Bassi Colorado Water Conservation Board 1313 Sherman Street, Room 723 Denver, CO Dear Linda,
STATE OF COLORADO Bill Ritter, Jr., Governor DEPARTMENT OF NATURAL RESOURCES DIVISION OF WILDLIFE AN EQUAL OPPORTUNITY EMPLOYER Thomas E. Remington, Director 6060 Broadway Denver, Colorado 80216 Telephone:
More informationHYDROLOGY OF GLACIAL LAKES, FORT SISSETON AREA
PROC. S.D. ACAD. SCI., VOL. 77 (1998) 59 HYDROLOGY OF GLACIAL LAKES, FORT SISSETON AREA Perry H. Rahn Department of Geology & Geological Engineering South Dakota School of Mines and Technology Rapid City,
More informationAlberta Urban Municipalities Association November 23. Tom Sampson Chief, Calgary Emergency Management Agency Commander, Canada Task Force 2
Alberta Urban Municipalities Association 2017 November 23 Tom Sampson Chief, Calgary Emergency Management Agency Commander, Canada Task Force 2 ISC: Unrestricted 1 Canada Task Force 2 2 3 What is our role
More informationPort McNeill - Alert Bay Alternate Service Tug & Barge Service Proposed Port McNeill Ramp
Port McNeill - Alert Bay Alternate Tug & Barge Proposed Port McNeill Ramp Ba Dates: April 8th to April 26th Fer c ei ry S Sointula e rry Fe Tu g& Ba rg es er vic e & Tug rge Proposed Alert Bay Ramp Tug
More informationPOST-IMPLEMENTATION COMMUNITY IMPACT REVIEW
POST-IMPLEMENTATION COMMUNITY IMPACT REVIEW RNAV STAR updates and RNP AR approaches at Winnipeg James Armstrong Richardson International Airport NAV CANADA 77 Metcalfe Street Ottawa, Ontario K1P 5L6 November
More information4180 acre-feet minimum conservation pool
MEMORANDUM Subject: Bear River Basin Plan SULPHUR CREEK RESERVOIR Date: July 20, 2000 Location: Section 34, Township 14N, Range 119W. Located on Sulphur Creek, tributary to the Bear River. Located approximately
More informationNeso Lake. Classification: Landscape Description: Park Purpose: Recreation Park
Neso Lake Classification: Recreation Park Landscape Description: This small recreation park provides access to Neso Lake and the Mistik Creek canoe route. It is located in the Churchill River Upland portion
More informationGOOSENECK SWAMP INFORMATION DAY - Saturday 14 th December 2013
GOOSENECK SWAMP INFORMATION DAY - Saturday 14 th December 2013 Progress of a restoration trial at Gooseneck Swamp - Grampians National Park, Victoria Gooseneck Swamp is situated at the far south-eastern
More informationUSGS Methods of Collecting High Water Marks (HWMs)
USGS Methods of Collecting High Water Marks (HWMs) A. Thomas Ruby III Supervisory Hydrologist Indiana-Kentucky Water Science Center U.S. Department of the Interior U.S. Geological Survey Outline: Overview
More informationII. THE BOULDER CREEK DRAINAGE BASIN
II. THE BOULDER CREEK DRAINAGE BASIN This section provides an overview of the watersheds and flood hazards associated with Boulder Creek and South Boulder Creek including descriptions of the drainage basins,
More informationLITTLE LOST MAN CREEK (LLM) (formerly USGS Gaging Station No )
LITTLE LOST MAN CREEK (LLM) (formerly USGS Gaging Station No. 11482468) LOCATION: In Redwood National and State Park approximately 0.8 miles upstream from confluence with Prairie Creek and 3.2 miles northeast
More information2018 SPRING ROAD RESTRICTIONS (SRR) ORDER # 1 RESPECTING THE OPERATION OF VEHICLES ON HIGHWAYS IN THE PROVINCE OF MANITOBA
2018 SPRING ROAD RESTRICTIONS (SRR) ORDER # 1 RESPECTING THE OPERATION OF VEHICLES ON HIGHWAYS IN THE PROVINCE OF MANITOBA Pursuant to subsections 86(1), 86(2) and 86(3), The Highway Traffic Act (C.C.S.M.
More informationKeeyask Generation Project. Project Description. Supporting Volume. Environmental Impact Statement
Keeyask Generation Project Environmental Impact Statement Supporting Volume Project Description June 2012 Vertical Shaft Turbine Powerhouse Cross Section Bulb Turbine Powerhouse Cross Section Crane Trashracks
More informationENLOE HYDROELECTRIC PROJECT FERC PROJECT NO PUBLIC SAFETY PLAN. Final
ENLOE HYDROELECTRIC PROJECT FERC PROJECT NO. 12569 PUBLIC SAFETY PLAN Final November 18, 2013 Okanogan Public Utility District 1331 2nd Ave N PO Box 912 Okanogan, WA 98840 ENLOE HYDROELECTRIC PROJECT FERC
More informationHISTORICAL FLOOD LEVELS
5.36 5.02 3.58 3.59 3.68 3.67 3.21 2.87 3.01 2.91 2.8 3.78 2.42 4.02 2.4 2.37 2.35 2.06 2.41 2.39 2.39 2.37 2.39 2.4 2.39 2.14 2.06 2.39 2.41 2.42 2.31 2.14 2.3 1.5 2.38 2.16 2.43 1.5 2.43 1.91 4.93 4.63
More information4. Hydrology of the Olentangy River Watershed
4. Hydrology of the Olentangy River Watershed The Hydrologic Cycle Water on Planet Earth is dynamic constantly being recycled from the land to the atmosphere to the ocean. Rivers and streams are just a
More informationAir Traffic Flow Management (ATFM) in the SAM Region METHODOLOGY ADOPTED BY BRAZIL TO CALCULATE THE CONTROL CAPACITY OF ACC OF BRAZILIAN FIR
International Civil Aviation Organization SAM/IG/6-IP/03 South American Regional Office 21/09/10 Sixth Workshop/Meeting of the SAM Implementation Group (SAM/IG/6) - Regional Project RLA/06/901 Lima, Peru,
More informationAnnual Report to the. International Joint Commission. from the. International Osoyoos Lake Board of Control for
Annual Report to the International Joint Commission from the International Osoyoos Lake Board of Control for Calendar Year 2005 INTERNATIONAL JOINT COMMISSION International Osoyoos Lake Board of Control
More informationNote that the steepest 8 direction pour point model slope in direction 64 is: 10.0
GIS in Water Resources Exercise #3 Solution Part 1. 1.1 Hand Calculations (i) The standard ESRI surface slope function Grid size 10 m Diagonal distance= 14.142 m 47.5 48 47.7 50.6 48.3 dz/dx= -0.125 45.1
More informationStudy 7 (Part 1): Demonstration of Factors that Govern Osoyoos Lake Levels During High Water Periods
Study 7 (Part 1): Demonstration of Factors that Govern Osoyoos Lake Levels During High Water Periods International Joint Commission March 2010 EXECUTIVE SUMMARY Introduction The operation of Zozel Dam
More informationBeaver Creek Provincial Park. Management Plan
Beaver Creek Provincial Park Management Plan 2 Beaver Creek Provincial Park Table of Contents 1. Introduction... 3 2. Park History... 3 3. Park Attributes... 4 3.1 Natural... 4 3.2 Recreational... 4 4.
More informationFelixstowe Branch Line FAQ
Felixstowe Branch Line FAQ How was the location of the track doubling work decided? We undertook a study to identify how to meet the freight demand along the Felixstowe Branch Line by modelling the route.
More informationNumaykoos Lake Provincial Park. Management Plan
Numaykoos Lake Provincial Park Management Plan 2 Numaykoos Lake Provincial Park Table of Contents 1. Introduction... 3 2. Background... 3 3. Park Purpose... 5 4. Park Management Guidelines... 6 Appendix...
More informationAppendix B. Comparative Risk Assessment Form
Appendix B Comparative Risk Assessment Form B-1 SEC TRACKING No: This is the number assigned CRA Title: Title as assigned by the FAA SEC to the CRA by the FAA System Engineering Council (SEC) SYSTEM: This
More information12, 14 and 16 York Street - Amendments to Section 16 Agreement and Road Closure Authorization
REPORT FOR ACTION 12, 14 and 16 York Street - Amendments to Section 16 Agreement and Road Closure Authorization Date: April 27, 2018 To: Toronto and East York Community Council From: Senior Strategic Director,
More informationSan Antonio's River Walk Behind the scenes tour or did you know?
San Antonio's River Walk Behind the scenes tour or did you know? Robert B. Kauffman, Ph.D 7 Hill Top Drive Frostburg, MD 21532 o: (301) 687-4474 e: rkauffman@frostburg.edu All historical slides are from
More informationEON-NTM CR4 Export Cable Installation Update Update. Notice to Mariners
Dear Owners, Ships Agents, Masters, Pilots and Fishermen, Re: -.EON-NTM-00118-Installation of New Export Cable Update The layout drawing has been updated to reflect an additional 16 x 2.5-ton Delta Flipper
More informationTriangle Land Conservancy Conservation Area Monitoring Report Carolina North
Triangle Land Conservancy Conservation Area Monitoring Report Carolina North Property Name: Bolin Creek East Conservation Area Date of visit: 4/8/2015 County: Orange Property Type: Restrictive Covenants
More informationDIDYMO SURVEY, LOWER FRYINGPAN RIVER, BASALT, COLORADO 2015
DIDYMO SURVEY, LOWER FRYINGPAN RIVER, BASALT, COLORADO 2015 Second Annual Report PREPARED FOR: ROARING FORK CONSERVANCY PREPARED BY: COLORADO MOUNTAIN COLLEGE NATURAL RESOURCE MANAGEMENT PROGRAM TIMBERLINE
More informationNoise Abatement Arrival Procedures at Louisville International Airport. Prof. John-Paul Clarke Georgia Institute of Technology
Noise Abatement Arrival Procedures at Louisville International Airport Prof. John-Paul Clarke Georgia Institute of Technology The Team Noise Abatement Procedures Working Group (NAPWG) has the following
More informationChapter 2: Entire US287 Corridor
Chapter 2: Entire US287 Corridor The US287 Study Area spans four incorporated jurisdictions and two counties. Due to the length and density of infrastructure along the US287 Study Area, corridor-wide maps
More informationOpen Report on behalf of Richard Wills, Executive Director for Environment & Economy. Nettleham Village Centre - Proposed Parking Restrictions
Agenda Item 4.3 Regulatory and Other Committee Open Report on behalf of Richard Wills, Executive Director for Environment & Economy Report to: Planning & Regulation Committee Date: 16 February 2015 Subject:
More informationEvent Travel Plan. Poppies: Wave. Southend-on-Sea Borough Council
Event Travel Plan Poppies: Wave Southend-on-Sea Borough Council 1.0 Introduction 1.1 Background Southend-on-Sea has been selected as one of two locations in 2017 to host the Poppies: Wave sculpture as
More informationGIFFORD PINCHOT NATIONAL FOREST
GIFFORD PINCHOT NATIONAL FOREST 9341 Wright Meadow 93 Spencer Meadow Spencer Butte 4247' 30 30A 19 24 80 31C Lewis River Lower Falls 5 Quartz Creek 90 Taidnapam Falls Upper Falls 31 Spencer Peak 3861'
More informationLawrence Loop SWOT Analysis
Alignment: D1 (Map Color: Dark Blue) Description: This alignment connects to the north end of the Burroughs Creek Trail and continues along the west side of the Railroad to 8 th Street. Strengths: - This
More informationOriginal Report F WIN , F WIN Prepared for Northland Power and Ministry of Tourism and Culture
STAGE 2 ARCHAEOLOGICAL ASSESSMENT McLEAN S MOUNTAIN WIND FARM Part Lots 12-15, Concession 3 Geographic Township of Howland Part Lot 24, Concession 12 Geographic Township of Bidwell and Goat Island (formerly
More informationGuide to the L. F. Manis Photographs
This finding aid was produced using ArchivesSpace on February 29, 2016. English 2016 The Regents of the University of Nevada. All rights reserved. University of Nevada, Las Vegas. University Libraries.
More informationPROGRAM. presented by
S C H O O L PROGRAM 2018 presented by INTRODUCTION We invite you to learn about Fort Gibraltar s influence over the cultural development of the Red River settlement. Delve into the lore of the French Canadian
More informationColombia (South America) Water use and drainage in Colombia. Case Study: The Stormwater Challenge in Barranquilla. Humberto Avila.
Colombia (South America) Water use and drainage in Colombia Location: Case Study: The Stormwater Challenge in Barranquilla Source: Wikipedia The University of Alabama February 25, 2008 Population: 45 million
More informationGuide to the L. F. Manis Photographs
This finding aid was created by Lindsay Oden on February 27, 2018. Persistent URL for this finding aid: http://n2t.net/ark:/62930/f1vk60 2018 The Regents of the University of Nevada. All rights reserved.
More informationAN OUTLINE OF THE NILE BASIN
The Hydrology of the Nile by J. V. Sutcliffe & Y. P. Parks. IAHS Special Publication no. 5, 1999. CHAPTER 1 AN OUTLINE OF THE NILE BASIN INTRODUCTION The hydrology of the Nile basin cannot be understood
More informationLidar Imagery Reveals Maine's Land Surface in Unprecedented Detail
Maine Geologic Facts and Localities December, 2011 Lidar Imagery Reveals Maine's Land Surface in Unprecedented Detail Text by Woodrow Thompson, Department of Agriculture, Conservation & Forestry 1 Introduction
More informationLESOTHO HIGHLANDS DEVELOPMENT AUTHORITY
LESOTHO HIGHLANDS DEVELOPMENT AUTHORITY ANNUAL FLOW RELEASES INSTREAM FLOW REQUIREMENT (IFR) IMPLEMENTATION AND MONITORING (October 2005 to September 2006) REPORT N0.7 OCTOBER 2007 STRATEGIC AND CORPORATE
More informationInvestigation of River Stage Simulation Before and After Bengoh Dam Construction: Case Study of Sarawak River Basin Malaysia
International Journal of Science and Engineering Investigations vol. 4, issue 42, July 2015 ISSN: 2251-8843 Investigation of River Stage Simulation Before and After Bengoh Dam Construction: Case Study
More informationPlans and Design Calculations for the Alder Creek Diversion Fish Screen
TECHNICAL MEMORANDUM Plans and Design Calculations for the Alder Creek Diversion Fish Screen El Dorado Irrigation District 2890 Mosquito Road Placerville, CA 95667 Alder Creek Diversion Fish Screen Plans
More informationMP : Blue Hill and the Disney Avalanche Path
MP 252-253: Blue Hill and the Disney Avalanche Path This section of the Auto Tour includes a portion of the wagon road, one of Colorado s most famous avalanches and the remains of an old dam. Route Mile
More informationNORTH CASCADE SLACIER CLIMATE PROJECT Director: Dr. Mauri S. Pelto Department of Environmental Science Nichols College, Dudley MA 01571
NORTH CASCADE SLACIER CLIMATE PROJECT Director: Dr. Mauri S. Pelto Department of Environmental Science Nichols College, Dudley MA 01571 INTRODUCTION The North Cascade Glacier-Climate Project was founded
More informationHow much did the airline industry recover since September 11, 2001?
Catalogue no. 51F0009XIE Research Paper How much did the airline industry recover since September 11, 2001? by Robert Masse Transportation Division Main Building, Room 1506, Ottawa, K1A 0T6 Telephone:
More informationPLUME RISE ASSESSMENTS
Advisory Circular AC 139-5(1) NOVEMBER 2012 PLUME RISE ASSESSMENTS CONTENTS Page 1. References 1 2. Purpose 2 3. Status of this advisory circular 2 4. Acronyms 2 5. Definitions 3 6. Background 3 7. Key
More informationTriangle Land Conservancy Conservation Area Monitoring Report Carolina North
Triangle Land Conservancy Conservation Area Monitoring Report Carolina North Property Name: Crow Branch Conservation Area Date of visit: March 16, 2016 County: Orange Property Type: Restrictive Covenants
More informationSasagiu Rapids Provincial Park. Draft Management Plan
Sasagiu Rapids Provincial Park Draft Management Plan 2 Sasagiu Rapids Provincial Park Table of Contents 1. Introduction... 3 2. Background and Park Attributes... 3 2.1 Park History.... 3 2.2 Natural Features...
More informationRequest for Proposal National Tropical Botanical Garden Lower Limahuli Preserve Emergency Stream Debris Removal
Request for Proposal National Tropical Botanical Garden Lower Limahuli Preserve Emergency Stream Debris Removal I. Summary of Work Bids are solicited for the emergency removal of debris deposited in the
More informationCONSERVATION VOLUNTEERS INTERNATIONAL PROGRAM VOLUNTEER TRIP TO TORRES DEL PAINE NATIONAL PARK, PATAGONIA, CHILE DECEMBER 2010
CONSERVATION VOLUNTEERS INTERNATIONAL PROGRAM VOLUNTEER TRIP TO TORRES DEL PAINE NATIONAL PARK, PATAGONIA, CHILE DECEMBER 2010 We, Richard and Chris Braunlich, co-leaders of the volunteer trip, met the
More informationTABLE OF CONTENTS. General Study Objectives Public Involvement Issues to Be Resolved
TABLE OF CONTENTS Description Page Number LIST OF ACRONYMS... a CHAPTER ONE INTRODUCTION General... 1-1 Study Objectives... 1-1 Public Involvement... 1-2 Issues to Be Resolved... 1-2 CHAPTER TWO EXISTING
More informationEAST SIDE TRANSPORTATION INITIATIVE APEGM SEPTEMBER 9, 2009
EAST SIDE TRANSPORTATION INITIATIVE APEGM SEPTEMBER 9, 2009 EAST SIDE TRANSPORTATION INITIATIVE AREA First Nations Northern Affairs Communities Metis Peoples PROCESSES EAST SIDE ROAD AUTHORITY (ESRA) CROWN
More informationWilts & Berks Canal. Appendix E: Hydrology and Hydraulics CONTENTS 1. INTRODUCTION 2 2. HYDROLOGY 2 3. HYDRAULIC MODEL 2 4.
Wilts & Berks Canal Melksham River Route Study Appendix E: Hydrology and Hydraulics CONTENTS 1. INTRODUCTION 2 2. HYDROLOGY 2 3. HYDRAULIC MODEL 2 4. CANAL OPERATION 3 5. WEIR DESIGN 4 6. FLOOD RISK 5
More informationChina Creek North Park Upgrades and Glen Pump Station. Park Board Committee Meeting Monday, July 10, 2017
China Creek North Park Upgrades and Glen Pump Station Park Board Committee Meeting Monday, July 10, 2017 Purpose The purpose of this presentation is to: Share the results of the public engagement processes;
More informationTriangle Land Conservancy Conservation Area Monitoring Report Carolina North
Triangle Land Conservancy Conservation Area Monitoring Report Carolina North Property Name: Crow Branch Conservation Area Date of visit: 4/8/2015 County: Orange Property Type: Restrictive Covenants Local
More informationTenders. Manitoba Heavy Construction Association Unit Ellice Ave. Winnipeg, MB R3H 0Z2 Tel: (204) Fax: (204)
Tenders Manitoba Infrastructure Manitoba Heavy Construction Association Unit 3-1680 Ellice Ave. Winnipeg, MB R3H 0Z2 Tel: (204) 947-1379 Fax: (204) 943-2279 www.mhca.mb.ca Reference No. 0000087389 SUPPLY
More informationLESOTHO HIGHLANDS DEVELOPMENT AUTHORITY
LESOTHO HIGHLANDS DEVELOPMENT AUTHORITY ANNUAL FLOW RELEASES INSTREAM FLOW REQUIREMENT (IFR) IMPLEMENTATION AND MONITORING (October 2004 to September 2005) TOWER ON MALIBAMATŠO RIVER @ KAO REPORT N0.6
More informationProgress Report Copyright 2005, Sevenson Environmental Services, Inc. All Rights Reserved.
Stone Harbor Maintenance Dredging Stone Harbor, NJ Weather Low Reports No. Project No. Report Date: Day of Week: High 42 33 63 45 2/8/6 Thursday Daily Precipitation. Weather Conditions: Overcast 2 Progress
More informationSpencer Environmental Appendix A: Alternative Analysis for Construction Access Route
Spencer Environmental Appendix A: Alternative Analysis for Construction Access Route February 2015 Valley ine-stage 1 RT EISA Update FINA REPORT Page A1 Memorandum AECOM ConnectEd Transit Partnership 10235
More informationA Little Piece of Missouri River History
John William Adcock John William Adcock was born April 8, 1867, on a farm south of Eldon, Miller County, Missouri. He began his steamboating career on the Osage and Missouri Rivers as a deckhand on the
More informationWilts and Berks Canal Trust
Wilts and Berks Canal Trust Melksham Link Waterway, Pedestrian and Off-road Cycle Routes Engineering Design Contents Background 4 Technical Design Part 1 Semington to Berryfield 5 Part 2 Berryfield to
More informationREVIEW OF PERTH AIRPORT Noise Abatement Procedures
REVIEW OF PERTH AIRPORT Noise Abatement Procedures Contents SUMMARY... 3 Summary of Review Findings... 3 BACKGROUND... 4 Noise Abatement Procedures... 4 Perth Airport Noise Abatement Procedures... 4 Noise
More information