1 Optional Services Tech Memo Introduction This technical memo evaluates the impact of a tide gate to be installed at the confluence of the Left Bank Tributary of Thalia Creek and Lake Windsor. Specifically, it analyzes the effect of pumping the stormwater flow from the lake into the creek on the Windsor Woods drainage area, Lake Windsor, and the Left Bank Tributary of Thalia Creek. The memo is an addendum to the draft report on Princess Anne Plaza Watershed Study and expands the study to include this additional scenario. Thalia Creek is a tidal creek hydraulically connected to Lake Windsor by a weir like opening that is approximately 83 feet at normal lake levels. Since Thalia Creek is tidal, it makes Lake Windsor and the Windsor Woods Canal a tidal system. The system is adequate to drain normal rainfall events during normal tides, but heavy rainfall coupled with high tides can overwhelm the system resulting in frequent flooding of this area. The draft reports Princess Anne Plaza Watershed Study and Windsor Woods Pump Station Preliminary Engineering Report discuss the impact of a 30 cfs pump station at South Blvd, and a tide gate at the triple culverts under I-26, respectively. This technical memo discusses the impact of a pump station with the tide gate at the confluence of Thalia Creek and Lake Windsor on the stormwater and drainage system. In order to determine the impacts of the stormwater pump station and location of the tide gate on the drainage system in Windsor Woods and Thalia Creek, the Watershed 1D stormwater model EPASWMM 5.0 that was developed for the Princess Anne Plaza Watershed Study was exported into a 1D XPSWMM version The XPSWMM model was validated with field data and pictures for 3 storms: Ernesto, Sandy, and a small storm on July 12, 2013, and culvert data was compared with the culvert program HY-8. This report also determines the optimal pumping rate of a pump station if a tide gate is installed at the Thalia Creek and Lake Windsor confluence, and computes the peak water surface elevations in Thalia Creek, Lake Windsor, Windsor Woods Canal, and Rosemont Road. The System As described in the draft report Princess Anne Plaza Watershed Study, the Windsor Woods drainage system is not adequate to convey the 10-year storm. Because of the intensity and extremely low elevations, the system can not to convey the 10-year storm without flooding or significant land use changes for storage and flood plain development. However, dredging the main stem of the drainage system, the Windsor Woods Canal, and pumping can significantly reduce the duration of flooding during high intensity storms and high tidal events. Model Limitations, Assumptions, and Parameters The XPSWMM model was used to analyze existing and proposed conditions in this technical memo. The EPA SWMM 5.0 model that was developed for Watershed in the original Princess Anne Watershed Study was imported into XPSWMM for its capability to show streets as conveyance channels during flooding. Because the XPSWMM model developed was originally in the EPASWMM 5.0 format, the infiltration method and storm distribution is the same as that in the EPA Model. Other node and conduit parameters such as length, inverts, and manning s coefficient are also the same. In order to visualize and compare the flooding in the watershed, the streets were modeled as stormwater conveyance channels in the XPSWMM model. 1
2 Optional Services Tech Memo Similar to EPA SWMM, one major assumption in the 1D model is that all flows from a catchment enter the outlet node. While XPSWMM does have the ability to enter the inlet capacity, this level of detail was not included in this XPSWMM model. As such, the assumption is that all runoff from a catchment enters the outlet node, and does not bypass to another node. Similar to the EPA SWMM model, the total run-time is 8 hours to allow the constant tail water elevation simulating tidal effects on the system to normalize before the rainfall is introduced into the system. Model Results The XPSWMM model was run for () storms with a tide level of.7 feet to compare the impacts of different pumping rates on the Left Tributary of Thalia Creek, Lake Windsor, the Windsor Woods Canal, the culverts under I-26, and the Windsor Woods neighborhood. Water surface elevations were noted at several points along Thalia Creek and the Windsor Woods Canal. Water surface elevations on the Presidential Blvd and South Rosemont Road were compared along with approximate length of time of flooding. The 10-year storm was also seen with a 6 foot tide. Plan views, profile views, and dynamic long section views for the system, Lake Windsor, and the canals for each storm are depicted in Appendices A1-A. Water surface elevations for each scenario calculated by the XPSWMM program is listed in Appendix B1-B3. Tables 1-2 show a summary of average water surface elevations at each system trunk calculated by the model for the 10- year storm and the 25- year storm with a tidal event of.7 feet. 2
3 Optional Services Tech Memo Table 1. Summary of average water surface elevations at each system trunk calculated by XPSWMM for 10-year storm.7 ft tide Scenario Culverts under I-26 Storm Year: 10 year -.7 ft tide WSE (ft) Left Trib Left Trib Thalia Thalia Creek Creek st North of S Plaza Lake Crossing Trashmore Conduit name Link 78 L_805 Link 137 Lake Windsor Node 730LW Windsor Woods Canal at Presidential Blvd Rosemont Road L_755A Link 279 existing Conditions Tide Gate at I Tide Gate at confluence with 30 cfs maxpump Tide Gate at confluence with 90 cfs maxpump Tide Gate at confluence with 60 cfs maxpump hour(s) flooded Table 2. Summary of average water surface elevations at each system trunk calculated by XPSWMM for 25-year storm.7 ft tide Scenario Culverts under I-26 Storm Year: 25 year -.7 ft tide WSE (ft) Left Trib Left Trib Thalia Thalia Creek Creek st North of S Plaza Lake Crossing Trashmore Conduit name Link 78 L_805 Link 137 Lake Windsor Node 730LW Windsor Woods Canal at Presidential Blvd Rosemont Road L_755A Link 279 hour(s) flooded existing Conditions Tide Gate at I Tide Gate at confluence with 90 cfs maxpump Tide Gate at confluence with 60 cfs maxpump
4 Optional Services Tech Memo Discussion As mentioned previously, the drainage system is not adequate to convey the 10 year storm. The model was run for a 2 year storm with a 1 foot tide, and the system showed flooding in some areas (Figure 1). Figure 1. Plan view of a 2 year storm with 1 foot tide shows flooding in sections of Windsor Woods When the tide gate is installed at the culverts under I-26, it prohibits the tide from flowing into the drainage system during high tidal events. Rainfall runoff discharge into Thalia Creek is routed into Lake Windsor from where it is pumped out. As a result, the water surface elevation (WSE) in the canal and the Left Tributary of Thalia Creek is kept low as rainfall runoff is discharged into the lake. When the tide gate is positioned at the confluence of Thalia Creek and Lake Windsor, the tide is allowed to continue up Thalia Creek as it currently does (existing conditions). However, the WSE will be higher in the creek than existing conditions because of the additional flows pumping from Lake Windsor into the canal. A graph depicting the WSE of the Left Tributary of Thalia Creek with respect to the maximum pumping rate is shown in Figure 2.
5 Water Sruface Elevation Optional Services Tech Memo year storm.7 foot tide 3 LAKE W THALIA Pmp CFS Figure 2. Relationship between maximum pumping rates and WSE in Thalia Creek when a tide gate is installed at the confluence of Thalia Creek and Lake Windsor According to GIS information, most homes along Thalia Creek are situated beyond the 8 foot contour. A WSE of 7.6 feet when there is a tide of.7 feet and a 10- year storm event results in the creek rising up into many yards and causing the residents to be alarmed. A high tide of 6 feet coupled with a 10- year storm causes the WSE to approximately 8 feet. According to the model, the size of the pump station affects the water level of the lake, but does not significantly affect the peak WSE of the Windsor Woods canal or the piped system feeding the canal. It does reduce the amount of time the streets remain flooded from several hours to ½ hour. These calculations are based on a constant tailwater elevation simulating a high tide event, and do not take into account the normal ebb and flow of tides. As such, the optimal pumping rate is calculated to be 60 cfs (3 pumps with a rate 20 cfs each) which lowers the lake level adequately to allow the system to drain, and does not significantly increase the WSE of Thalia Creek. Conclusion A pump station at the confluence of Thalia Creek and Lake Windsor will not eliminate flooding in the streets of Windsor Woods completely, but will decrease the total time of flooding. As storms become more intense and tides become higher as predicted by studies on sea level rise, some residents along Thalia Creek who will claim to have never seen water levels as high as previously may perceive that the new pump station to be the cause. Though the presence of a 60 cfs pump station increases the WSE at Thalia Creek, it is not a significant increase. Nonetheless, the pump station construction and presence may create an expectation of improvement in the 5
6 Optional Services Tech Memo existing conditions. When this improvement is not forthcoming for their particular area, and in fact appears to be worse, residents in this area may perceive that the pump station is the cause. Moreover, residents in Windsor Woods will expect major improvements, and for the most part a pump station in Lake Windsor will improve the drainage in the Windsor Woods neighborhoods, but flooding will still occur, albeit not as long or as much. 6
7 JUNCTION NODE " ) LINK " ) " ) I 26 L_695A L_268/Pres2 L_620801/Rose3 Link LW Fire Station " ) Lake Windsor L_805 ^ L_301 L_237/Pres10 L_755A Windsor Woods C an al " ) Tr l mont R d Lake Trashmore Silina L_137 Old F org 178 e S Rose a S Pl az L_885b # Link279 " ) L_c Bow Cre e # k Bo w ,80 Feet WINDSOR WOODS WATERSHED STUDY XP SWMM LINKS AND NODES Bow Creek Cr ee k
8 Optional Services Tech Memo Appendix A1 Plan Views, Profile Views, and Dynamic Long Section Views for 2-year Storm
9 Appendix A1-2 year.7 foot tide PLAN VIEWS Existing Conditions Tide gates at I-26 1
10 Appendix A1-2 year.7 foot tide Tide gates at confluence of Thalia Creek and Windsor (Max Pump Rate = 60 cfs) 2
11 Flow (cfs) Hydrology Rates Appendix A1-2 year.7 foot tide Node [Max Flow = ] Rainfall Total Flow Thu Jul AM 6AM 9AM 12PM 3PM 6PM 9PM 12 Fri 3AM 6AM 9AM 12PM 3PM 6PM 9PM 13 Sat Rainfall Distribution for 2 year storm 3
12 Stage (ft) Overflow (ft^3) Appendix A1-2 year.7 foot tide PROFILE PLOTS LAKE WINDSOR Existing Conditions Node - 730LW [Max Stage = 0.316][Max Overflow = ] Stage Overflow Thu Jul AM 6AM 9AM 12PM 3PM 6PM 9PM 12 Fri 3AM 6AM 9AM 12PM 3PM 6PM 9PM 13 Sat
13 Stage (ft) Overflow (ft^3) Appendix A1-2 year.7 foot tide Tide gates at I-26 Node - 730LW [Max Stage = 0.828][Max Overflow = ] Stage Overflow Thu Jul AM 6AM 9AM 12PM 3PM 6PM 9PM 12 Fri 3AM 6AM 9AM 12PM 3PM 6PM 9PM 13 Sat Tide gates at confluence of Thalia Creek and Windsor Lake (MAX PUMP RATE = 60 cfs) 5
14 Appendix A1-2 year.7 foot tide DYNAMIC LONG SECTION VIEWS THALIA CREEK Existing Conditions I-26 Culverts Tide gates at I-26 (MAX PUMP RATE = 360) 6
15 Appendix A1-2 year.7 foot tide Tide gates at confluence of Thalia Creek and Windsor Lake (MAX PUMP RATE = 60 cfs) WINDSOR WOODS CANAL Existing Conditions Tide gates at I-26 (MAX PUMP RATE = 360 cfs) 7
16 Appendix A1-2 year.7 foot tide Tide gates at confluence of Thalia Creek and Windsor Lake (MAX PUMP RATE = 60 cfs) 8
17 Optional Services Tech Memo Appendix A2 Plan Views, Profile Views, and Dynamic Long Section Views for 10-year Storm
18 Appendix A2-10 year.7 foot tide PLAN VIEWS Existing Conditions Tide gates at I-26 1
19 Flow (cfs) Hydrology Rates Appendix A2-10 year.7 foot tide Tide gates at confluence of Thalia Creek and Windsor Node [Max Flow = ] 0 Rainfall Total Flow Thu Jul AM 6AM 9AM 12PM 3PM 6PM 9PM 12 Fri 3AM 6AM 9AM 12PM 3PM 6PM 9PM 13 Sat Rainfall Distribution for 10 year storm 2
20 Stage (ft) Stage (ft) Overflow (ft^3) Overflow (ft^3) Appendix A2-10 year.7 foot tide PROFILE PLOTS LAKE WINDSOR Node - 730LW [Max Stage = 7.15][Max Overflow = ] Stage Overflow Thu Jul AM 6AM 9AM 12PM 3PM 6PM 9PM 12 Fri 3AM 6AM 9AM 12PM 3PM 6PM 9PM 13 Sat Existing Conditions Node - 730LW [Max Stage = 3.795][Max Overflow = ] Stage Overflow Thu Jul AM 6AM 9AM 12PM 3PM 6PM 9PM 12 Fri 3AM 6AM 9AM 12PM 3PM 6PM 9PM 13 Sat Tide gates at I-26 3
21 Stage (ft) Stage (ft) Overflow (ft^3) Overflow (ft^3) Appendix A2-10 year.7 foot tide Node - 730LW [Max Stage = 3.563][Max Overflow = ] Stage Overflow Thu Jul AM 6AM 9AM 12PM 3PM 6PM 9PM 12 Fri 3AM 6AM 9AM 12PM 3PM 6PM 9PM 13 Sat Tide gates at confluence of Thalia Creek and Windsor Lake (MAX PUMP RATE = 60 cfs) Node - 730LW [Max Stage = 3.087][Max Overflow = ] Stage Overflow Thu Jul AM 6AM 9AM 12PM 3PM 6PM 9PM 12 Fri 3AM 6AM 9AM 12PM 3PM 6PM 9PM 13 Sat Tide gates at confluence of Thalia Creek and Windsor Lake (MAX PUMP RATE = 90 cfs)
22 Stage (ft) Overflow (ft^3) Appendix A2-10 year.7 foot tide Node - 730LW [Max Stage = 1.259][Max Overflow = ] Stage Overflow Thu Jul AM 6AM 9AM 12PM 3PM 6PM 9PM 12 Fri 3AM 6AM 9AM 12PM 3PM 6PM 9PM 13 Sat Tide gates at confluence of Thalia Creek and Windsor Lake (MAX PUMP RATE = 360 cfs) 5
23 Appendix A2-10 year.7 foot tide DYNAMIC LONG SECTION VIEWS THALIA CREEK Existing Conditions I-26 Culverts Tide gates at I-26 (MAX PUMP RATE = 360) 6
24 Appendix A2-10 year.7 foot tide Tide gates at confluence of Thalia Creek and Windsor Lake (MAX PUMP RATE = 60 cfs) Tide gates at confluence of Thalia Creek and Windsor Lake (MAX PUMP RATE = 90 cfs) Tide gates at confluence of Thalia Creek and Windsor Lake (MAX PUMP RATE = 360 cfs) 7
25 Appendix A2-10 year.7 foot tide WINDSOR WOODS CANAL Existing Conditions Tide gates at I-26 (MAX PUMP RATE = 360 cfs) Tide gates at confluence of Thalia Creek and Windsor Lake (MAX PUMP RATE = 60 cfs) 8
26 Appendix A2-10 year.7 foot tide Tide gates at confluence of Thalia Creek and Windsor Lake (MAX PUMP RATE = 90 cfs) Tide gates at confluence of Thalia Creek and Windsor Lake (MAX PUMP RATE = 360 cfs) 9
27 Optional Services Tech Memo Appendix A3 Plan Views, Profile Views, and Dynamic Long Section Views for 25-year Storm
28 Appendix A3-25 year.7 foot tide PLAN VIEWS Existing Conditions Tide gates at I-26 1
29 Appendix A3-25 year.7 foot tide Tide gates at confluence of Thalia Creek and Windsor (Max Pump Rate = 60cfs) Tide gates at confluence of Thalia Creek and Windsor (Max Pump Rate = 90cfs) 2
30 Flow (cfs) Hydrology Rates Appendix A3-25 year.7 foot tide Node [Max Flow = ] Rainfall Total Flow Thu Jul AM 6AM 9AM 12PM 3PM 6PM 9PM 12 Fri 3AM 6AM 9AM 12PM 3PM 6PM 9PM 13 Sat Rainfall Distribution for 10 year storm 3
31 Stage (ft) Stage (ft) Overflow (ft^3) Overflow (ft^3) Appendix A3-25 year.7 foot tide PROFILE PLOTS LAKE WINDSOR Node - 730LW [Max Stage = 7.67][Max Overflow = ] 8 Stage Overflow Thu Jul AM 6AM 9AM 12PM 3PM 6PM 9PM 12 Fri 3AM 6AM 9AM 12PM 3PM 6PM 9PM 13 Sat Existing Conditions Node - 730LW [Max Stage = 6.037][Max Overflow = ] Stage Overflow Thu Jul AM 6AM 9AM 12PM 3PM 6PM 9PM 12 Fri 3AM 6AM 9AM 12PM 3PM 6PM 9PM 13 Sat Tide gates at I-26
32 Stage (ft) Stage (ft) Overflow (ft^3) Overflow (ft^3) Appendix A3-25 year.7 foot tide Node - 730LW [Max Stage = 5.518][Max Overflow = ] Stage Overflow Thu Jul AM 6AM 9AM 12PM 3PM 6PM 9PM 12 Fri 3AM 6AM 9AM 12PM 3PM 6PM 9PM 13 Sat Tide gates at confluence of Thalia Creek and Windsor Lake (MAX PUMP RATE = 60 cfs) Node - 730LW [Max Stage =.966][Max Overflow = ] Stage Overflow Thu Jul AM 6AM 9AM 12PM 3PM 6PM 9PM 12 Fri 3AM 6AM 9AM 12PM 3PM 6PM 9PM 13 Sat Tide gates at confluence of Thalia Creek and Windsor Lake (MAX PUMP RATE = 90 cfs) 5
33 Appendix A3-25 year.7 foot tide DYNAMIC LONG SECTION VIEWS THALIA CREEK Existing Conditions I-26 Culverts Tide gates at I-26 (MAX PUMP RATE = 360) 6
34 Appendix A3-25 year.7 foot tide Tide gates at confluence of Thalia Creek and Windsor Lake (MAX PUMP RATE = 60 cfs) Tide gates at confluence of Thalia Creek and Windsor Lake (MAX PUMP RATE = 90 cfs) 7
35 Appendix A3-25 year.7 foot tide WINDSOR WOODS CANAL Existing Conditions Tide gates at I-26 (MAX PUMP RATE = 360 cfs) Tide gates at confluence of Thalia Creek and Windsor Lake (MAX PUMP RATE = 60 cfs) 8
36 Appendix A3-25 year.7 foot tide Tide gates at confluence of Thalia Creek and Windsor Lake (MAX PUMP RATE = 90 cfs) 9
37 Optional Services Tech Memo Appendix A Plan Views, Profile Views, and Dynamic Long Section Views for 50-year Storm
38 Appendix A- 50 year.7 foot tide PLAN VIEWS Existing Conditions Tide gates at I-26 1
39 Flow (cfs) Hydrology Rates Appendix A- 50 year.7 foot tide Tide gates at confluence of Thalia Creek and Windsor (Max Pump Rate = 60 cfs) Node [Max Flow = ] Rainfall Total Flow 0 11 Thu Jul AM 6AM 9AM 12PM 3PM 6PM 9PM 12 Fri 3AM 6AM 9AM 12PM 3PM 6PM 9PM 13 Sat Rainfall Distribution for 50 year storm 2
40 Stage (ft) Stage (ft) Overflow (ft^3) Overflow (ft^3) Appendix A- 50 year.7 foot tide PROFILE PLOTS LAKE WINDSOR Node - 730LW [Max Stage = 8.028][Max Overflow = ] 8 Stage Overflow Crown Elevation = Thu Jul AM 6AM 9AM 12PM 3PM 6PM 9PM 12 Fri 3AM 6AM 9AM 12PM 3PM 6PM 9PM 13 Sat Existing Conditions Node - 730LW [Max Stage = 7.07][Max Overflow = ] Stage Overflow Thu Jul AM 6AM 9AM 12PM 3PM 6PM 9PM 12 Fri 3AM 6AM 9AM 12PM 3PM 6PM 9PM 13 Sat Tide gates at I-26 3
41 Stage (ft) Overflow (ft^3) Appendix A- 50 year.7 foot tide Node - 730LW [Max Stage = 6.92][Max Overflow = ] 7 Stage Overflow Thu Jul AM 6AM 9AM 12PM 3PM 6PM 9PM 12 Fri 3AM 6AM 9AM 12PM 3PM 6PM 9PM 13 Sat Tide gates at confluence of Thalia Creek and Windsor Lake (MAX PUMP RATE = 60 cfs)
42 Appendix A- 50 year.7 foot tide DYNAMIC LONG SECTION VIEWS THALIA CREEK Existing Conditions I-26 Culverts Tide gates at I-26 (MAX PUMP RATE = 360) 5
43 Appendix A- 50 year.7 foot tide Tide gates at confluence of Thalia Creek and Windsor Lake (MAX PUMP RATE = 60 cfs) 6
44 Appendix A- 50 year.7 foot tide WINDSOR WOODS CANAL Existing Conditions Tide gates at I-26 (MAX PUMP RATE = 360 cfs) Tide gates at confluence of Thalia Creek and Windsor Lake (MAX PUMP RATE = 60 cfs) 7
45 Optional Services Tech Memo Appendix B1 Water Surface Elevations for 2-year Storm
46 Table 1. Water surface elevations at each system trunk calculated by XPSWMM for 2-year storm 2 year.7 ft tide 2 year 3 ft tide 2 year 1 ft tide Model Used (XP) WWB2yrPExist WWB_2yrSOUTH_p80 WWB_2yrX2_p20 WWB2yrPExist WWB2yrPExist Exist Phase1/2 (I-26) Phase1/2 Confluence Exist with 3 ft tide Exist with 1 ft tide Link Flow (cfs) WSE (ft) Flooded Flow (cfs) WSE (ft) Flooded Flow (cfs) WSE (ft) Flooded Flow (cfs) WSE (ft) Flooded Flow (cfs) WSE (ft) Flooded TCN -L_695A Culverts Link TCM-L_ b L_ TCS-Lc LW-node730LW WWCW-L_ WWCE-L_755A L237/Pres L_268/Pres hr min min min DS Rose-Link hr hr hr hr hr. US Rose- L620801/Rose3 PUMPS hr hr min min min 80cfs 3 20 cfs
47 Optional Services Tech Memo Appendix B2 Water Surface Elevations for 10-year Storm
48 Table 1. Water surface elevations at each system trunk calculated by XPSWMM for 10-year storm.7 ft tide 10 year.7 ft tide Model Used (XP) WWC10YRPEXIST WWB_10YRSouth_P80 WWB_10yrX2_p30 WWC10YR X2_p20 WWB_10yrX2_p80 Exist Phase1/2 (I-26) Phase1/2 Confluence Phase1/2 Confluence Phase1/2 Confluence Link Flow (cfs) WSE (ft) Flooded (h) Flow (cfs) WSE (ft) Flooded (h) Flow (cfs) WSE (ft) Flooded (h) Flow (cfs) WSE (ft) Flooded (h) TCN -L_695A Flow (cfs) WSE (ft) Flooded (h) Culverts Link TCM-L_ b L_ TCS-Lc LW-node730LW WWCW-L_ WWCE-L_755A L237/Pres L_268/Pres DS Rose-Link US Rose- L620801/Rose3 PUMPS Max 3 cfs 85 cfs 3 30 cfs 3 20 cfs 85 cfs
49 Table 2. Water surface elevations at each system trunk calculated by XPSWMM for 10-year storm 6 ft tide 10 year 6 ft tide Model Used (XP) WWC10YRPEXIST WWB_10YRSouth_P80 WWB_10yrX2_p30 WWC10YRPEXIST Exist Phase1/2 (I-26) Phase1/2 Confluence Phase1/2 Confluence Link Flow (cfs) WSE (ft) Flooded (h) Flow (cfs) WSE (ft) Flooded (h) Flow (cfs) WSE (ft) Flooded (h) Culverts Link Flow (cfs) WSE (ft) Flooded (h) L_ LW-node730LW WWCE-L_755A DS Rose-Link PUMPS Max 3 cfs 85 cfs 3 30 cfs 3 20 cfs
50 Optional Services Tech Memo Appendix B3 Water Surface Elevations for 25-year Storm
51 Table 1. Water surface elevations at each system trunk calculated by XPSWMM for 25-year storm.7 ft tide 25 year.7 ft tide Model Used (XP) WWB_25YRpeXIST WWB_25yrSOUTH_P80 WWB_25yrX2_P30 WWB_25yrX2_P20 Exist Phase1/2 (I-26) Phase1/2 Confluence Phase1/2 Confluence Link Flow (cfs) WSE (ft) Flooded (h) Flow (cfs) WSE (ft) Flooded (h) Flow (cfs) WSE (ft) Flooded (h) TCN -L_695A Flow (cfs) WSE (ft) Flooded (h) Culverts Link TCM-L_ b L_ TCS-Lc LW-node730LW WWCW-L_ WWCE-L_755A L237/Pres L_268/Pres DS Rose-Link US Rose- L620801/Rose3 PUMPS Max 3 cfs 85 cfs 3 30 cfs 3 20 cfs
Agenda Report. Spruce Street Outlet Drainage Improvements Tower Road Relief Sewer
Agenda Report Subject: Prepared By: Spruce Street Outlet Drainage Improvements Tower Road Relief Sewer Steven M. Saunders, Director of Public Works/Village Engineer Date: August 12, 2012 On March 8, 2012
More informationWaukegan & Calumet Rivers. All Hands Meeting
Waukegan & Calumet Rivers 516(e) Update All Hands Meeting David F. Bucaro, P.E. Chief, Economic Formulation & Analysis Section, Planning Branch May 18 th, 2011 Kensington Court Ann Arbor, MI 1 2 Waukegan
More informationWelcome KROSNO CREEK DIVERSION PROJECT CLASS ENVIRONMENTAL ASSESSMENT
Welcome KROSNO CREEK DIVERSION PROJECT PUBLIC INFORMATION CENTRE # 1 Tonight s Presentation Study Overview Background Existing Conditions Alternative Solutions Preliminary Preferred Solution Next Steps
More informationFinal Drainage Letter Pikes Peak Community College Downtown Parking Lot Colorado Springs, Colorado
Final Drainage Letter Pikes Peak Community College Downtown Parking Lot Colorado Springs, Colorado Prepared for: Pikes Peak Community College 5775 South Academy Boulevard Colorado Springs, CO 80906-5422
More informationHydrological study for the operation of Aposelemis reservoir Extended abstract
Hydrological study for the operation of Aposelemis Extended abstract Scope and contents of the study The scope of the study was the analytic and systematic approach of the Aposelemis operation, based on
More informationHydraulic Report. Trail 5 Snowmobile Trail Over Mulligan Creek. Prepared By: COLEMAN ENGINEERING COMPANY Karisa V. Falls, P.E.
Prepared for: Prepared by: Marquette County Road Commission Coleman Engineering Company Marquette, Michigan Iron Mountain, MI December 2011 Hydraulic Report Trail 5 Snowmobile Trail Over Mulligan Creek
More informationNatural Factors Affecting the Level of Osoyoos Lake
Natural Factors Affecting the Level of Osoyoos Lake Background Osoyoos Lake is operated under conditions prescribed by the International Joint Commission (IJC) and Figure 1 shows the ranges within which
More informationInvestigation of River Stage Simulation Before and After Bengoh Dam Construction: Case Study of Sarawak River Basin Malaysia
International Journal of Science and Engineering Investigations vol. 4, issue 42, July 2015 ISSN: 2251-8843 Investigation of River Stage Simulation Before and After Bengoh Dam Construction: Case Study
More informationInternational Osoyoos Lake Board of Control Annual Report to the International Joint Commission
International Osoyoos Lake Board of Control 2013 Annual Report to the International Joint Commission TABLE OF CONTENTS ACTIVITIES OF THE BOARD... 1 HYDROLOGIC CONDITIONS IN 2013... 2 Drought Criteria...
More informationFECAL COLIFORM MONITORING IN GRAYS HARBOR COUNTY: SUMMARY REPORT OF MONITORING RESULTS FOR
Chehalis Basin Partnership Fecal Coliform Monitoring in Grays Harbor County: Summary Report of Monitoring Results for 2000-2003 Draft June 30, 2003 Prepared by Tetra Tech/KCM, Inc. 1917 First Avenue, Seattle,
More informationHydrology Input for West Souris River IWMP
Hydrology Input for West Souris River IWMP Prepared by: Mark Lee Manitoba Water Stewardship 1 1 1 Overall view of: drainage area watershed characteristics gauging stations meteorological stations Runoff
More informationProject Management, Environmental Assessment, Stormwater Management. Hydrologic Modelling. Natural Heritage. Fluvial Geomorphology
Welcome PUBLIC INFORMATION CENTRE # 1 KROSNO CREEK DIVERSION PROJECT February 19, 2014 6:30 p.m. to 8:30 p.m. Please sign in on the sheet provided. Then feel free to walk around and view the displays.
More informationLondon Borough of Barnet Traffic & Development Design Team
London Borough of Barnet Traffic & Development Design Team AERODROME ROAD PEDESTRIAN FACILITY AND BUS STOP INTRODUCTION FEASIBILITY REPORT Job Number: 60668 Doc Ref: S106/12-13/60668 Author: Manoj Kalair
More informationHYDRAULIC DESIGN OF THE TOURISTIC BERTHING IN ASWAN CITY
HYDRAULIC DESIGN OF THE TOURISTIC BERTHING IN ASWAN CITY Dr. Hossam El-Sersawy Researcher, Nile Research Institute (NRI), National Water Research Center (NWRC), Egypt E-mail: h_sersawy@hotmail.com Dr.
More informationWatershed Runoff Analysis
CREATING SOLUTIONS FOR A CHANGING WORLD Watershed Runoff Analysis April 18, 2017 John Melack, UCSB Ed Beighley & Dongmei Feng, Northeastern University Study Workflow Civil and Environmental Engineering
More informationHILLSBOROUGH COUNTY, FLORIDA AND INCORPORATED AREAS
VOLUME 2 OF 5 HILLSBOROUGH COUNTY, FLORIDA AND INCORPORATED AREAS Hillsborough County COMMUNITY NAME COMMUNITY NUMBER HILLSBOROUGH COUNTY (UNINCORPORATED AREAS) 120112 PLANT CITY, CITY OF 120113 TAMPA,
More informationAppendix E. System Issues
Appendix E System Contents Page System... E-1 E.1 Introduction...E-1 E.2 Existing Model - System...E-2 E.2.1 Location: Country Ridge Collector, at Queensgate Drive...E-2 E.3 Committed Model - System...E-3
More informationColombia (South America) Water use and drainage in Colombia. Case Study: The Stormwater Challenge in Barranquilla. Humberto Avila.
Colombia (South America) Water use and drainage in Colombia Location: Case Study: The Stormwater Challenge in Barranquilla Source: Wikipedia The University of Alabama February 25, 2008 Population: 45 million
More informationCommon Ground Drainage Channel Diversion. Design Report
Common Ground Drainage Channel Diversion Design Report Resource Management International Inc Consulting Engineers May 2017 COMMON GROUND DRAINAGE CHANNEL DIVERSION PREPARED FOR: QUILL LAKES WATERSHED NO.
More informationThe Problem.. SuDS: Controlling the Flow. LANDF RM Technical delivery of SuDS 15/10/2013. Bridget Woods Ballard HR Wallingford 1.
SuDS: Controlling the Flow 15th October 2013 Bridget Woods Ballard The Problem.. Page 2 Bridget Woods Ballard HR Wallingford 1 15th October 2013 Landform Event Page 3 HR Wallingford 2013 The Aim of SuDS.
More informationCITY OF LYNDEN STORMWATER MANAGEMENT PROGRAM REPORT MARCH 1, 2016
CITY OF LYNDEN STORMWATER MANAGEMENT PROGRAM 2015 WATER QUALITY MONITORING REPORT CITY OF LYNDEN 300 4 TH STREET LYNDEN, WASHINGTON 98264 PHONE (360) 354-3446 MARCH 1, 2016 This document serves as an attachment
More informationRunway Length Analysis Prescott Municipal Airport
APPENDIX 2 Runway Length Analysis Prescott Municipal Airport May 11, 2009 Version 2 (draft) Table of Contents Introduction... 1-1 Section 1 Purpose & Need... 1-2 Section 2 Design Standards...1-3 Section
More informationInternational Osoyoos Lake Board of Control Annual Report to the International Joint Commission
International Osoyoos Lake Board of Control 2010 Annual Report to the International Joint Commission TABLE OF CONTENTS ACTIVITIES OF THE BOARD... 1 HYDROLOGIC CONDITIONS IN 2010... 2 Drought Criteria...
More informationWelcome to the. EBC Breakfast Meeting. The CSO Program Update Frederick A. Laskey Executive Director Massachusetts Water Resources Authority
Welcome to the EBC Breakfast Meeting The CSO Program Update Frederick A. Laskey Executive Director Massachusetts Water Resources Authority Massachusetts Water Resources Authority Presentation to the Environmental
More informationWater resources cycle in karst (feasibility studies and engineering design; case studies)
Water resources cycle in karst (feasibility studies and engineering design; case studies) Prof. emeritus Ognjen Bonacci Faculty of Civil Engineering, Architecture and Geodesy, Split University E-mail:
More informationWilts & Berks Canal. Appendix E: Hydrology and Hydraulics CONTENTS 1. INTRODUCTION 2 2. HYDROLOGY 2 3. HYDRAULIC MODEL 2 4.
Wilts & Berks Canal Melksham River Route Study Appendix E: Hydrology and Hydraulics CONTENTS 1. INTRODUCTION 2 2. HYDROLOGY 2 3. HYDRAULIC MODEL 2 4. CANAL OPERATION 3 5. WEIR DESIGN 4 6. FLOOD RISK 5
More informationASSESSMENT OF FECAL COLIFORM IN LITTLE RABBIT CREEK AND LITTLE SURVIVAL CREEK
ASSESSMENT OF FECAL COLIFORM IN LITTLE RABBIT CREEK AND LITTLE SURVIVAL CREEK FINAL REPORT Prepared for: Alaska Department of Environmental Conservation 555 Cordova Street Anchorage, Alaska 99501 Prepared
More informationCity of Peoria Clean Water Efforts. Governor s s Conference on the Management of the Illinois River October 4, 2007
City of Peoria Clean Water Efforts Governor s s Conference on the Management of the Illinois River October 4, 2007 1 What do you call dinner and a movie with an unemployed guy? An unfunded man-date! 2
More informationInitial OPW Designation APSR AFRR IRR Co-ordinates Easting: Northing: River / Catchment / Sub-catchment Type of Flooding / Flood Risk
Location: Shannon International Airport, Co. Clare Unique ID: 275484 (from PFRA database) Initial OPW Designation APSR AFRR IRR Co-ordinates Easting: 137674 Northing: 161045 River / Catchment / Sub-catchment
More informationHISTORICAL FLOOD LEVELS
5.36 5.02 3.58 3.59 3.68 3.67 3.21 2.87 3.01 2.91 2.8 3.78 2.42 4.02 2.4 2.37 2.35 2.06 2.41 2.39 2.39 2.37 2.39 2.4 2.39 2.14 2.06 2.39 2.41 2.42 2.31 2.14 2.3 1.5 2.38 2.16 2.43 1.5 2.43 1.91 4.93 4.63
More informationLESOTHO HIGHLANDS DEVELOPMENT AUTHORITY
LESOTHO HIGHLANDS DEVELOPMENT AUTHORITY ANNUAL FLOW RELEASES INSTREAM FLOW REQUIREMENT (IFR) IMPLEMENTATION AND MONITORING (October 2004 to September 2005) TOWER ON MALIBAMATŠO RIVER @ KAO REPORT N0.6
More informationIntroduction. Background MEMORANDUM
MEMORANDUM Date: July 22, 2014 To: H&H Technical Committee From: Bob Elliot and Larry Karpack, Watershed Science & Engineering Cc: Bob Montgomery, Anchor QEA Re: Chehalis Basin Strategy: Reducing Flood
More informationFlood History. Floodplain Descriptions
Flood History The worst flooding in the area took place in 1966, 1969, 1971, 1995 and 1998. The storms in 1966 and 1969 caused considerable damage throughout the area due to flooding, erosion and debris
More informationPERFORMANCE MEASURE INFORMATION SHEET #16
PERFORMANCE MEASURE INFORMATION SHEET #16 ARROW LAKES RESERVOIR: RECREATION Objective / Location Recreation/Arrow Lakes Reservoir Performance Measure Access Days Units Description MSIC 1) # Access Days
More informationADDENDUM 2 APPENDIX D STANDARD DRAWINGS
ADDENDUM 2 APPENDIX D STANDARD DRAWINGS Overview This Addendum to Appendix D Standard Drawings replaces Standard Drawing Figures 001 to 020 with new Standard Drawings EDCM 301 to EDCM 704 - as listed below.
More informationDIDYMO SURVEY, LOWER FRYINGPAN RIVER, BASALT, COLORADO 2015
DIDYMO SURVEY, LOWER FRYINGPAN RIVER, BASALT, COLORADO 2015 Second Annual Report PREPARED FOR: ROARING FORK CONSERVANCY PREPARED BY: COLORADO MOUNTAIN COLLEGE NATURAL RESOURCE MANAGEMENT PROGRAM TIMBERLINE
More informationBrevard County Utility Services Department
Brevard County Utility Services Department April 3, 2018 Jim Helmer, Department Director Brian Sorensen, W/WW Manager 1 Utility Services Department 9 TREATMENT PLANTS 6 WASTEWATER, 3 WATER 163 EMPLOYEES
More informationII. THE BOULDER CREEK DRAINAGE BASIN
II. THE BOULDER CREEK DRAINAGE BASIN This section provides an overview of the watersheds and flood hazards associated with Boulder Creek and South Boulder Creek including descriptions of the drainage basins,
More informationBear Creek Habitat Improvement Project
06/10/10 Bear Creek Habitat Improvement Project El Paso County, Colorado Pike National Forest and Colorado Springs Utilities Owned Land Report prepared by: Eric Billmeyer Executive Director Rocky Mountain
More informationAPPENDIX D: Open Water Strata and Land Site Locations and Descriptions
APPENDIX D: Open Water Strata and Land Site Locations and Descriptions Open Water Strata: Marine Waters W1 St. Joseph Sound W3 Clearwater Harbor south W5 Long Bayou/Cross Bayou W7 Boca Ciega Bay central
More informationManaging water supply resources in karstic environment (temperate climate)
UNESCO WORKSHOP Integrated Urban Water Management in TC Temperate Climates Belgrade 15-16 May 2006 Managing water supply resources in karstic environment (temperate climate) E. Rozos, D. Koutsoyiannis
More informationTaste and Odor Relationships in North Texas Reservoirs. Jennifer Owens Tarrant Regional Water District
Taste and Odor Relationships in North Texas Reservoirs Jennifer Owens Tarrant Regional Water District Tarrant Regional Water District Reservoir System Reservoir Facts Lake Arlington Benbrook Lake Cedar
More informationStriving for resilience in the face of climate change
Striving for resilience in the face of climate change Three years and eight months have elapsed since the country suffered one of its worst flooding events, affecting a couple of districts mainly in east-south
More informationComposite CN Value Based on Hydrologic Soil Group and Estimated Future Land Cover
Composite CN Value Based on Hydrologic Soil Group and Estimated Future Land Cover Village of Milan, Mirabal Park /5/016 DEVELOPED LAND AREAS** Basin Basin HSG "B" HSG "C" HSG "D" Basin Basin Area Area
More informationSECTION 3 GENERAL DESCRIPTION OF THE RIVER BASIN
SECTION 3 GENERAL DESCRIPTION OF THE RIVER BASIN SECTION 3 GENERAL DESCRIPTION OF THE RIVER BASIN River basin description. A general description of the river basin or subbasin, as appropriate, in which
More informationNoise Abatement Arrival Procedures at Louisville International Airport. Prof. John-Paul Clarke Georgia Institute of Technology
Noise Abatement Arrival Procedures at Louisville International Airport Prof. John-Paul Clarke Georgia Institute of Technology The Team Noise Abatement Procedures Working Group (NAPWG) has the following
More informationVI. ALTERNATIVES TO THE MASTER PLAN C. RENOVATED EAST BUILDING ALTERNATIVE
VI. ALTERNATIVES TO THE MASTER PLAN C. RENOVATED EAST BUILDING ALTERNATIVE INTRODUCTION The Renovated East Building Alternative would include the continued use of the renovated West Building and the renovation
More informationDEPARTMENT OF NATURAL RESOURCE PROTECTION TECHNICAL REPORT SERIES TR: 95-02
DEPARTMENT OF NATURAL RESOURCE PROTECTION TECHNICAL REPORT SERIES TR: 95-02 SUMMARY OF BACTERIOLOGICAL TESTING IN THE LAS OLAS ISLES AUGUST 1994 THROUGH AUGUST 1995 ENVIRONMENTAL MONITORING DIVISION WATER
More informationPORTISHEAD BRANCH LINE PRELIMINARY ENVIRONMENTAL INFORMATION REPORT VOLUME 4 APPENDIX Water Receptors
PORTISHEAD BRANCH LINE PRELIMINARY ENVIRONMENTAL INFORMATION REPORT APPENDIX 17. 3 Water Receptors Contents Section Page 1 Water Receptors... 1-1 1.1 Surface Water Features/Receptors in the Study Area
More informationDesign and Construction of the Lake St. Martin Emergency Outlet
Design and Construction of the Lake St. Martin Emergency Outlet Background 2011 was the largest flood event experienced in the last 200 years Flood Fighting required some difficult decisions by the Manitoba
More informationCOMMONWEALTH OF THE BAHAMAS MINISTRY OF PUBLIC WORKS & TRANSPORT NASSAU HARBOUR PORT IMPROVEMENT PROJECT. Nassau Harbour Port Improvement Project
COMMONWEALTH OF THE BAHAMAS MINISTRY OF PUBLIC WORKS & TRANSPORT NASSAU HARBOUR PORT IMPROVEMENT PROJECT AUGUST 2009 OVERALL VIEW OF NASSAU HARBOUR AERIAL VIEW OF NASSAU HARBOUR PROJECT HISTORY 1960 s
More informationStatistical Evaluation of BMP Effectiveness in Reducing Fecal Coliform Impairment in Mermentau River Basin
Statistical Evaluation of BMP Effectiveness in Reducing Fecal Coliform Impairment in Mermentau River Basin Z.-Q. Deng 1 and H. Chowdhary 2 1 Assistant Professor, Department of Civil and Environmental Engineering,
More information01T_ODD2_DCH 01T_ODD3_ARN
01T_ODD2_DCH Duck Pond Agricultural Drains / Mugu Drain / Oxnard Drain No. 2. The monitoring site is located on an agricultural drain just south of Hueneme Road near the Duck Ponds. Flow from this drain
More informationMANAGING FRESHWATER INFLOWS TO ESTUARIES
MANAGING FRESHWATER INFLOWS TO ESTUARIES Yuna River Hydrologic Characterization A. Warner Warner, A. (2005). Yuna River Hydrologic Characterization. University Park, Pennsylvania: The Nature Conservancy.
More informationInternational Osoyoos Lake Board of Control Annual Report to the International Joint Commission
International Osoyoos Lake Board of Control 2015 Annual Report to the International Joint Commission Cover: Northern extent of Osoyoos Lake, where the Okanagan River enters the lake, 2015. View is to the
More informationEUR/SAM corridor airspace concept
TWENTYENTH MEETING ON THE IMPROVEMENT OF AIR TRAFFIC SERVICES OVER THE SOUTH ATLANTIC (SAT21) (Lisbon, Portugal, 8 to 10 June, 2016) Agenda Item 2: Air traffic management (ATM) RNP 4 IN THE EUR/SAM CORRIDOR
More informationMEMORANDUM. Open Section Background. I-66 Open Section Study Area. VDOT Northern Virginia District. I-66 Project Team. Date: November 5, 2015
MEMORANDUM To: VDOT Northern Virginia District From: I-66 Project Team Date: November 5, 2015 Subject: Open Section Background The purpose of this technical memorandum is to provide narrative and technical
More informationPRAJWAL KHADGI Department of Industrial and Systems Engineering Northern Illinois University DeKalb, Illinois, USA
SIMULATION ANALYSIS OF PASSENGER CHECK IN AND BAGGAGE SCREENING AREA AT CHICAGO-ROCKFORD INTERNATIONAL AIRPORT PRAJWAL KHADGI Department of Industrial and Systems Engineering Northern Illinois University
More informationSome Historical Aspects of Urban Water Systems
Some Historical Aspects of Urban Water Systems Robert Pitt Department of Civil and Environmental Engineering University of Alabama Tuscaloosa, AL 35487 Ancient springs at Delphi, Greece (site of Oracle)
More information2014 Colorado River Annual Operating Plan Colorado River Management Work Group (CRMWG) Final Consultation September 5, 2013
2014 Colorado River Annual Operating Plan Colorado River Management Work Group (CRMWG) Final Consultation September 5, 2013 2014 Colorado River AOP Final Consultation Meeting Welcome and Introductions
More informationHow to develop resilient infrastructure (Global SDG9)
How to develop resilient infrastructure (Global SDG9) 16-17 November 2017, Ljubljana, Slovenia Development of resilient rail infrastructure, practices in the Republic of Macedonia Darko Miceski Viktorija
More informationEnhancing hydrological data management and exchange procedures
Enhancing hydrological data management and exchange procedures The Sava River Hydraulic Model Dr Mark R Jourdan, PE Research Hydraulic Engineer U.S. Army Engineer Research and Development Center Vicksburg,
More informationAppendix B Ultimate Airport Capacity and Delay Simulation Modeling Analysis
Appendix B ULTIMATE AIRPORT CAPACITY & DELAY SIMULATION MODELING ANALYSIS B TABLE OF CONTENTS EXHIBITS TABLES B.1 Introduction... 1 B.2 Simulation Modeling Assumption and Methodology... 4 B.2.1 Runway
More informationThe Evolution of DFW Airport s Deicing Program Balancing Risks with Results MAY 20, 2015
Dallas/Fort Worth International Airport The Evolution of DFW Airport s Deicing Program Balancing Risks with Results MAY 20, 2015 DFW: Connecting The World The cities of Dallas and Fort Worth overcame politics
More informationLong term morphological analysis and simulations
Long term morphological analysis and simulations Dr.-Ing. Markus Promny Bundesanstalt für Gewässerkunde / Federal Institute of Hydrology GESINUS 2010 - Liège - 29./30.07.2010 page 1 1D-models of German
More informationContent: 1. Brief overview of CSI Ingenieros, and the water area Our clients Know how and solutions The team
1 DIFFERENT CASES APPLIED IN Content: 1. Brief overview of CSI Ingenieros, and the water area Our clients Know how and solutions The team 2. Different Stormwater projects URUGUAY 3. Carrasco Hydrodynamic
More informationMEETING OF THE METROPOLITAN PARKS AND OPEN SPACE COMMISSION Tuesday, April 4, 2017
Minutes of the MEETING OF THE METROPOLITAN PARKS AND OPEN SPACE COMMISSION Tuesday, April 4, 2017 Committee Members Present: Tony Yarusso, Rick Theisen, Robert Moeller, Todd Kemery, Sarah Hietpas, Margie
More informationAPPENDIX H MILESTONE 2 TRAFFIC OPERATIONS ANALYSIS OF THE AT-GRADE CROSSINGS
Draft Environmental Impact Statement/Environment Impact Report Appendix H Milestone 2 Traffic Operations Analysis of the At-Grade Crossings APPENDIX H MILESTONE 2 TRAFFIC OPERATIONS ANALYSIS OF THE AT-GRADE
More informationPlatte West Well Field A Protective Modeling Approach
Platte West Well Field A Protective Modeling Approach Presented to: 2007 Eastern South Dakota Water Conference / 52 nd Annual Midwest Ground Water Conference June 25, 2007 Presented by: Luca DeAngelis,
More informationProject No Brent Cross, Cricklewood London, UK Phase 1A North RMA
Project No. 431679 Brent Cross, Cricklewood London, UK Phase 1A North RMA River Overshadowing Impact Study For Waterman Energy, Environment & Design 18 th November 2014 431679 Report 2 Rel.3 1 of 23 431679rep2v3.docx
More informationEnvironmental Impact Assessment in Chile, its application in the case of glaciers. Carlos Salazar Hydro21 Consultores Ltda.
Environmental Impact Assessment in Chile, its application in the case of glaciers Carlos Salazar Hydro21 Consultores Ltda. carlos.salazar@hydro21.cl Introduction Changes in the environmental law in Chile
More informationSIMULATION MODELING AND ANALYSIS OF A NEW INTERNATIONAL TERMINAL
Proceedings of the 2000 Winter Simulation Conference J. A. Joines, R. R. Barton, K. Kang, and P. A. Fishwick, eds. SIMULATION MODELING AND ANALYSIS OF A NEW INTERNATIONAL TERMINAL Ali S. Kiran Tekin Cetinkaya
More informationVersion Isolated & Non-Waters Only 1 of 3
APPROVED JURISDICTIONAL DETERMINATION FORM U.S. Army Corps of Engineers SECTION I: BACKGROUND INFORMATION A. REPORT COMPLETION DATE FOR APPROVED JURISDICTIONAL DETERMINATION (JD): July 6, 2010. B. DISTRICT
More informationTreasure Island Supplemental Information Report Addendum
1 1 1 1 0 1 0 1 0 1 Treasure Island Supplemental Information Report Addendum Introduction Purpose The purpose of this Supplemental Information Report (SIR) Addendum is to determine if the current land
More informationFAA RECORD OF DECISION. Appendix D FINAL EIS ADDENDUM DOCUMENTS
FORT LAUDERDALE-HOLLYWOOD INTERNATIONAL AIRPORT FAA RECORD OF DECISION Appendix D FINAL EIS ADDENDUM DOCUMENTS This appendix contains information that has been identified as having been inadvertently omitted
More informationFourth Creek (Subbasin ) Yadkin-Pee Dee River Basin North Carolina
Final Total Maximum Daily Load (TMDL) for Fecal Coliform October 2001 Fourth Creek (Subbasin 03-07-06) Yadkin-Pee Dee River Basin North Carolina Prepared by: NC Department of Environment and Natural Resources
More informationMARINA BOLADO PENAGOS A METHODOLOGY TO ASSESS THE ROLE OF THE RIVER DISCHARGES TO THE GULF OF CADIZ ON THE NUTRIENT SUPPLY TO THE ALBORAN SEA
MARINA BOLADO PENAGOS A METHODOLOGY TO ASSESS THE ROLE OF THE RIVER DISCHARGES TO THE GULF OF CADIZ ON THE NUTRIENT SUPPLY TO THE ALBORAN SEA INTRODUCTION General MEGAN Project Case Study Guadalquivir
More informationHydrological Analysis for Simanggo-2 HEPP
Part 15 Hydrological Analysis for Simanggo-2 HEPP PART 15 HYDROLOGICAL ANALYSIS FOR SIMANGGO-2 HEPP 15.1 METEOROLOGY AND HYDROLOGY Meteorological Records and Hydrological Records are collected from Meteorological
More informationSTRATEGY FOR ADAPTING TO CLIMATE CHANGE
STRATEGY FOR ADAPTING TO CLIMATE CHANGE Strategy for adapting to climate change DATE: Oktober 2013 COPIES: 100 PRINT: Vejdirektoratet ISBN (NET): 9788770603195 ISBN: 9788770603188 COPYRIGHT: Vejdirektoratet,
More informationTRINITY RIVER CORRIDOR
TRINITY RIVER CORRIDOR MODIFIED DALLAS FLOODWAY PROJECT UPDATE May 12, 2015 Jon Loxley Project Manager Dallas Floodway Project Fort Worth District U.S. Army Corps of Engineers US Army Corps of Engineers
More informationDallas Executive Airport
648 DECLARED DISTANCE OPTION 1a DISPLACE 31 THRESHOLD BY 97 Considers RSA Limiting Factor No runway extensions 13 31 TORA 6,451 6,451 TODA 6,451 6,451 ASDA 5,958 6,451 LDA 5,958 6,354 Runway 17-35 (3,8
More informationDevelopment of SH119 BRT Route Pattern Alternatives for Tier 2 - Service Level and BRT Route Pattern Alternatives
Development of SH119 BRT Route Pattern Alternatives for Tier 2 - Service Level and BRT Route Pattern Alternatives June 1, 2018 Development of SH119 BRT Route Pattern Alternatives for Tier 2 - Service Level
More informationSupplementary airfield projects assessment
Supplementary airfield projects assessment Fast time simulations of selected PACE projects 12 January 2018 www.askhelios.com Overview The Commission for Aviation Regulation requested Helios simulate the
More informationAssessment of Pathogen Strategies
Assessment of Pathogen Strategies Bacteria levels in receiving waters are a primary concern for federal, state, and local agencies. The primary sources of bacteria are generally attributed to combined
More informationAnalyzing Risk at the FAA Flight Systems Laboratory
Analyzing Risk at the FAA Flight Systems Laboratory Presented to: Workshop By: Dr. Richard Greenhaw, FAA AFS-440 Date: 29 November, 2005 Flight Systems Laboratory Who we are How we analyze risk Airbus
More information"Transboundary coordination according to the FD Directive in the shared river basins of Greece
Workshop on Transboundary Issues Budapest March 31st April 1st "Transboundary coordination according to the FD Directive in the shared river basins of Greece Katerina Triantafyllou, ECOS Consulting S.A.
More informationHYDRAULIC STUDY OF THE NERETVA RIVER (FROM MOSTAR TO THE BORDER WITH THE REPUBLIC OF CROATIA)
HYDRAULIC STUDY OF THE NERETVA RIVER (FROM MOSTAR TO THE BORDER WITH THE REPUBLIC OF CROATIA) B.Sc. Draženka Kvesić, civ. eng. PRONING DHI d.o.o., Račkog 3, Zagreb Croatia. Email: drazenka@proning-dhi.hr.
More informationHOW TO IMPROVE HIGH-FREQUENCY BUS SERVICE RELIABILITY THROUGH SCHEDULING
HOW TO IMPROVE HIGH-FREQUENCY BUS SERVICE RELIABILITY THROUGH SCHEDULING Ms. Grace Fattouche Abstract This paper outlines a scheduling process for improving high-frequency bus service reliability based
More informationAppendix N MAINTENANCE DREDGING STATEMENT OF NEED & PERMIT COMPLIANCE. North Thousand Islands Management Plan Appendices
Appendix N MAINTENANCE DREDGING STATEMENT OF NEED & PERMIT COMPLIANCE North Thousand Islands Management Plan Appendices Maintenance Dredging Statement of Need & Permit Compliance The waterways, which consist
More informationCorriPipe. Fittings & Accessories
CorriPipe Fittings & Accessories CorriPipe JFC CorriPipe is a twinwall drainage pipe made from HDPE plastic and is manufactured by twin extrusion process in which the two layers are simultaneously extruded
More informationTHE ICs INTERNATIONAL BRISBANE AREA AQUA PARK PROPOSAL
Contacts: Mr Evan Pryor, Ph 38702756, evanpryor2002@yahoo.com.au Mr Bob Beatty, Ph 32883101, BobBeatty@BOSMIN.com Web Address: http://www.bosmin.com/ics/icharter.htm Postal Address: GPO Box 2927, Brisbane,
More informationAmended Maintenance Dredge Spoil Management Plan. Shute Harbour Marina Resort
Amended Maintenance Dredge Spoil Management Plan Shute Harbour Marina Resort Amended Maintenance Dredge Spoil Management Plan Quality Information Document Ref Amended Maintenance Dredge and Spoil Maintenance
More informationCau River. Map of River. Table of Basic Data. Vietnam 5
Cau River Map of River Table of Basic Data Name: Cau River Location: Thai Nguyen, Province, Viet Nam Area: 6,030 km 2 Origin: Mt. Phia Deng 1,527 m Outlet: Pha Lai Note: * Indicates missing data in some
More informationMerritt Island Airport
TABLE OF CONTENTS CHAPTER 1 INTRODUCTION... 1-1 INTRODUCTION AND PROJECT OVERVIEW... 1-1 General Guidelines... 1-1 Prior Planning Documentation... 1-2 Key Issues... 1-2 Goals and Objectives... 1-2 Regulatory
More informationA. CONCLUSIONS OF THE FGEIS
Chapter 11: Traffic and Parking A. CONCLUSIONS OF THE FGEIS The FGEIS found that the Approved Plan will generate a substantial volume of vehicular and pedestrian activity, including an estimated 1,300
More informationImpact of Equipage on Air Force Mission Effectiveness
Impact of Equipage on Air Force Mission Effectiveness Presentation at ICCRTS 28 September 2006 Slide 1 Background On 3 April 1996 a military version of the Boeing 737 crashed in Dubrovnik, Croatia Sec.
More informationTreats 2,271,000 gallons of greywater from the water park using the constructed lagoon and wetland, saving $8,539 in sewer charges annually.
Carmel, IN Methodology for Landscape Performance Benefits Prepared by: Research Fellow: M. Elen Deming, Professor, University of Illinois Research Assistant: Paul Littleton, MLA Candidate, University of
More informationNote that the steepest 8 direction pour point model slope in direction 64 is: 10.0
GIS in Water Resources Exercise #3 Solution Part 1. 1.1 Hand Calculations (i) The standard ESRI surface slope function Grid size 10 m Diagonal distance= 14.142 m 47.5 48 47.7 50.6 48.3 dz/dx= -0.125 45.1
More informationGILBERT & WEST TOWN INTERCOUNTY DRAIN Windsor Township, Eaton County and City of Lansing, Delhi Township, Ingham County, Michigan
GILBERT & WEST TOWN INTERCOUNTY DRAIN Windsor Township, Eaton County and City of Lansing, Delhi Township, Ingham County, Michigan PRELIMINARY ENGINEERING REPORT Abigail Eaton, Chair Intercounty Drains
More informationRegular Board Meeting August 4, 2015
Regular Board Meeting August 4, 2015 1616 Airport Circle Hailey, ID 83333 208.788.4956 PUBLIC COMMENT FY 16 Rates & Charges FY 16 Budget Approval Rates & Charges will provide the Board the ability to operate
More information