1 Platte West Well Field A Protective Modeling Approach Presented to: 2007 Eastern South Dakota Water Conference / 52 nd Annual Midwest Ground Water Conference June 25, 2007 Presented by: Luca DeAngelis, P.E., P.G. Layne Christensen Co-authors: Glenn Dostal, P.E. (HDR), Kevin Tobin, P.E. (MUD)

2 Overview Project Location Saunders and Douglas Counties, Nebraska Project Objectives Primary - Provide additional water supply to Omaha Metro Area Meet demand estimates for year 2030 Secondary - Increase system reliability Omaha currently gets 70% of drinking water from Missouri River

3 Omaha - Water Supply Sources mgd mgd Florence Florence Surface Surface Water Water mgd mgd Platte Platte West West Wells Wells mgd mgd Peak Peak shaving shaving Bedrock Bedrock Wells Wells Study Study Area Area 60 mgd Platte South Wells

4 Major Project Components Well Field 42 vertical wells with groundwater designation Direct recharge from the Platte River Combination of river and storage wells 2 48-inch diameter pipes crossing Platte River Compliance with Clean Water Act Section 404 Permit 100 million gallon per day (mgd) water treatment plant

5 EW-8 EW-11 EW-10 EW-9 EW-7 EW-6 EW-5 EW-4 EW-3 EW-2 EW-1 Unique Project Setting Ithaca Mead Superfund Superfund Site Site Yutan Venice Wann Platte Platte West West Well Well Field Field Platte West well field located: Three miles from a Superfund Site Five miles from the City of Lincoln, NE well field Memphis Lincoln Lincoln Well Well Field Field Ashland

6 Role of Groundwater Modeling Purpose Ensure compliance with Clean Water Act Section 404 Permit Evaluate impact of well field operation on other users Impact on Superfund Site Impact on Lincoln well field Develop contingencies for Platte River Low flow conditions River contamination scenarios

7 404 Permit Overview Clean Water Act Section 404 Permit Responsible agencies United States Army Corps of Engineers (USACE) United States Environmental Protection Agency (EPA) Restricts well field pumping Annual average of 52 mgd Maximum daily rate 104 mgd Specifies no impact on Superfund Site No impact on existing containment system No impact on contaminant transport

8 Protective Modeling Concept All groundwater modeling involves professional judgment Protective modeling: Develop a model framed with real world data Use model input parameters that will overestimate impact from operation of Platte West well field Provide realistic (probable) estimates for system response Ensure that any errors are conservative or protective to desired outcome Be protective of Superfund site cleanup efforts and Lincoln well field water rights Integrate groundwater and surface water Review historical streamflow record Establish low flow quantiles Review historical groundwater data Review groundwater/surface water interaction

9 Protective Model Scenarios Flow (cfs) Platte River Flow Frequency Curve Leshara Gauge Ave. Ave. flow flow = 4,600 4,600 cubic cubic feet feet per per second second (cfs) (cfs) 100 0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100% Exceedance Frequency (%) Streamflow Average October 2003 Mar-05 Period of Record 1990 to % 99% flow flow = cfs cfs Develop reasonable worst case scenarios Groundwater systems near rivers are most stressed in the summer High water demand Low surface water flow Protective simulations should reproduce summer conditions Platte River simulate summer flows at 99% exceedance (100 year return period) Simulate highest well field flow 75 mgd for July and August Include pumping from other well fields Include crop irrigation (over 500 wells 150 mgd!)

10 Hydrogeologic Setting GW Flow Shaded Relief Map of Study Area GW Flow Platte River Alluvial Aquifer Todd Valley: Ancestral stream valley of Platte River. Not connected to present day Platte River.

11 Modeling Procedure Desktop Study Develop conceptual model Extend computer model to physical boundaries!!! Collect Field Measurements Head targets October 2003 and March 2005 Flux targets Seven United States Geological Survey (USGS) stream Construct model and calibrate to steady-state state Model constructed using MODFLOW (flow model) and MODPATH (particle tracking model) codes Conduct a sensitivity analysis of calibration Use ASTM standard as guidance (279 model simulations) Predictive simulations Steady State simulations Transient simulations Six year flow field Predictive Sensitivity Analysis Approximately 60 model simulations!

12 Model Construction Colon Wahoo Cedar Bluff Sweadeburg Ithaca Mead Mercer Leshara Memphis Yutan Ashland 31 6 Valley Venice Wann Elk City Waterloo Model grid smallest cells 100 ft x 100 ft Model Area 650 Square Miles Model Boundaries River Cell No Flow Cell General Head Boundary Cell Agricultural Drain Tile Cell

13 NWann SWann Model Calibration Cedar Bluff Wahoo Colon Sweadeburg Ithaca Mead Mercer Leshara Yutan Valley Venice Elk City Waterloo Memphis Ashland Wann Calibration or History Matching A demonstration that the model is capable of reproducing measured heads, flows, and response to stress as observed in the real world Monitoring Well/ Calibration Target 107 monitoring well locations

14 Goals for Calibration - History Matching Key to transition of model from conceptual to predictive 1. Exhibit a calibration error between simulated and observed water levels of less than 5% 2. Visual match Observed groundwater flow direction and gradients Superfund Site plume movement 3. Coherence with expected values for streamflow Baseflow values in creeks, less than or equal to 10 percentile of measured flow in creek 4. Exhibit less than a 1% difference in water mass balance

15 Calibration Results Numerical Calibration NRMS = 1.4% ARM = 2.1 feet Scattergram: Shows random distribution of error Conclusion Excellent statistical calibration with random error

16 Calibration - History Match to Superfund Plume MW63B year MW40B MW41B10 year MW55B MW53B MW56B 20 year MW30B MW43B MW31B MW33B MW64B 15 year MW52BMW54B 25 year year MW42B MW44B Particles Particles released released in in and and tracked tracked forwards forwards under under no-pumping no-pumping scenario scenario Model Model predicts predicts TCE TCE in in Johnson Johnson Creek Creek between between USACE USACE reports reports TCE TCE detections detections in in Johnson Johnson Creek Creek in in (maximum (maximum concentration concentration detected detected at at location location indicated). indicated). MW29B MW32B MW34B MW45B MW46B MW-39A Wann MW36B MW35B MW-38A Platte River MW62B MW37B

17 Predicative Simulations Steady State Annual average conditions Pumping rate of 52 MGD per permit Transient Pumping rate changes every 2 months (41 to 75 MGD) Seasonal river flow/stage Annual average (50% exceedance) - all months except 99% exceedance for months of July August and December- January Includes spatially distributed irrigation wells

18 Seasonal River Flows 2002 Drought Conditions Photos from Ashland, NE Normal Flow Drought < 1,000 cfs July to August

19 Impact of Irrigation Pseudo Steady State Monitoring Well August 2006 to August 2007 Hydrograph Water Level Elevation (ft msl) Irrigation Impact /1/2006 9/1/ /2/ /2/ /3/2006 1/3/2007 2/3/2007 3/6/2007 4/6/2007 5/7/2007 6/7/2007 7/8/2007 8/8/2007 Date

20 Predictive Steady State Model Predicted Drawdown Wahoo Colon Sweadeburg Ithaca Leshara Mead Yutan Memphis PLATTE Ashland Valley RIVER Venice Wann Waterloo Steady State Conditions Drawdown Contour (feet) Platte West Former Nebraska Ordnance Plant (Superfund Site) Ashland Well Field (City of Lincoln)

21 Predictive - Transient Cedar Bluff Wahoo Colon Sweadeburg Ithaca Mead Mercer Leshara Memphis Yutan Ashland Valley Venice Wann Elk City Waterloo Platte River Platte River Transient Irrigation Wells 550 wells 150 mgd Irrigators typically consist of center pivot systems (1,000 gpm plus)

22 Comparison of Transient vs. Steady State Drawdown (feet) Red Steady State Green Transient Transient Cone Larger Lower river flows Concentrated irrigation pumping

23 Identify Source of Water to Wells Summary: 71% - Direct Depletion 84 % - Direct or Indirect Depletion

24 Reverse Particle Tracking Waterloo Mead Yutan Venice Particles Tracked Backwards 20 yrs Identifies Source Water to Wells Wann Memphis

25 Impact on Superfund Site Yutan Venice Wann Procedure: Particles start outside of known contaminant extents Particles tracked under no Platte West pumping conditions Particles are tracked with Platte West pumping at 52 mgd Particle travel path is measured Result is predicted movement under Protective model scenario

26 Model Review Detailed Review Provided by Several Agencies: USACE Omaha District Kansas City District HTRW Center of Expertise EPA Region 7 Center for Subsurface Modeling Support (CSMoS) Nebraska Department of Environmental Quality (NDEQ) Lower Plate North Natural Resource District (LPNNRD) Public Comments

27 Model Uses Develop hydraulic and chemical monitoring programs Develop hydraulic monitoring well priority structure Develop predicted operational water level range for 17 hydraulic monitoring wells Hydraulic wells equipped with transducers

28 Hydraulic Monitoring Network Priority One Wells Priority Two Wells Priority Three Wells

29 Example Monitoring Well Operational Range (Priority One Well)

30 Future Work Model Post Audit Evaluate accuracy of model predictions Compare to real world data Annual 404 Permit Report Simulate previous 6 months pumping perform Post Audit Predict impact of next 6 months pumping Hydraulic and Chemical Monitoring Field Test to Estimate Conductance Better quantify connection with Platte River

31 Conclusions MODEL REPRODUCES KNOWN REAL WORLD CONDITIONS Platte West Well Field Obtains Approximately 85% of Flow from Depletion (Direct or Indirect) of Platte River Well Field Reaches Steady State Approximately 1.5 Years Steady State Simulations are a Reasonable Approximation of Transient Simulations Platte West operations will not impact Superfund Containment/City of Lincoln System Protective Modeling Approach Help develop monitoring programs Planned model updates should improve predictive capabilities

32 THANK YOU ARE THERE ANY QUESTIONS?

Enhancing hydrological data management and exchange procedures

Enhancing hydrological data management and exchange procedures Enhancing hydrological data management and exchange procedures The Sava River Hydraulic Model Dr Mark R Jourdan, PE Research Hydraulic Engineer U.S. Army Engineer Research and Development Center Vicksburg,

More information

Hydrological study for the operation of Aposelemis reservoir Extended abstract

Hydrological study for the operation of Aposelemis reservoir Extended abstract Hydrological study for the operation of Aposelemis Extended abstract Scope and contents of the study The scope of the study was the analytic and systematic approach of the Aposelemis operation, based on

More information

3.0 OVERVIEW OF HUECO BOLSON

3.0 OVERVIEW OF HUECO BOLSON 3.0 OVERVIEW OF HUECO BOLSON The Hueco Bolson covers about 2,500 square miles, or 1.6 million acres in New Mexico, Texas, and Chihuahua (Figure 3-1). In Texas, the Hueco overlies portions of El Paso and

More information

SECTION 3 GENERAL DESCRIPTION OF THE RIVER BASIN

SECTION 3 GENERAL DESCRIPTION OF THE RIVER BASIN SECTION 3 GENERAL DESCRIPTION OF THE RIVER BASIN SECTION 3 GENERAL DESCRIPTION OF THE RIVER BASIN River basin description. A general description of the river basin or subbasin, as appropriate, in which

More information

HYDRAULIC DESIGN OF THE TOURISTIC BERTHING IN ASWAN CITY

HYDRAULIC DESIGN OF THE TOURISTIC BERTHING IN ASWAN CITY HYDRAULIC DESIGN OF THE TOURISTIC BERTHING IN ASWAN CITY Dr. Hossam El-Sersawy Researcher, Nile Research Institute (NRI), National Water Research Center (NWRC), Egypt E-mail: h_sersawy@hotmail.com Dr.

More information

Thirteenth International Water Technology Conference, IWTC , Hurghada, Egypt 1249

Thirteenth International Water Technology Conference, IWTC , Hurghada, Egypt 1249 Thirteenth International Water Technology Conference, IWTC 13 2009, Hurghada, Egypt 1249 EVALUATION OF LOCAL SCOUR AROUND BRIDGE PIERS (RIVER NILE BRIDGES AS CASE STUDY) Sherine Ismail Assoc. Prof., Survey

More information

USGS Methods of Collecting High Water Marks (HWMs)

USGS Methods of Collecting High Water Marks (HWMs) USGS Methods of Collecting High Water Marks (HWMs) A. Thomas Ruby III Supervisory Hydrologist Indiana-Kentucky Water Science Center U.S. Department of the Interior U.S. Geological Survey Outline: Overview

More information

Managing water supply resources in karstic environment (temperate climate)

Managing water supply resources in karstic environment (temperate climate) UNESCO WORKSHOP Integrated Urban Water Management in TC Temperate Climates Belgrade 15-16 May 2006 Managing water supply resources in karstic environment (temperate climate) E. Rozos, D. Koutsoyiannis

More information

Runway Roughness Evaluation- Boeing Bump Methodology

Runway Roughness Evaluation- Boeing Bump Methodology FLIGHT SERVICES Runway Roughness Evaluation- Boeing Bump Methodology Michael Roginski, PE, Principal Engineer Boeing Airport Compatibility Engineering ALACPA XI Seminar, Santiago, Chile September 1-5,

More information

FLOW REDUCTION IMPACTS ALONG RIVER NILE IN EGYPT

FLOW REDUCTION IMPACTS ALONG RIVER NILE IN EGYPT FLOW REDUCTION IMPACTS ALONG RIVER NILE IN EGYPT Sherine S. Ismail Prof., Head of Lake Nasser studies department, Nile Research Institute, E-mail:sherine_shawky@yahoo.com ABSTRACT Nile water discharges

More information

Simulation of disturbances and modelling of expected train passenger delays

Simulation of disturbances and modelling of expected train passenger delays Computers in Railways X 521 Simulation of disturbances and modelling of expected train passenger delays A. Landex & O. A. Nielsen Centre for Traffic and Transport, Technical University of Denmark, Denmark

More information

Duncan Hastie, P.E. Dewberry

Duncan Hastie, P.E. Dewberry FEMA s Riverine High Water Marks for Atlanta s September 2009 Flood Event Duncan Hastie, P.E. Dewberry Background High Water Mark Recovery Performed Through FEMA s Hazard Mitigation Technical Assistance

More information

Water Quality Trends for Patchogue Bay

Water Quality Trends for Patchogue Bay Water Quality Trends for Patchogue Bay 2018 This report summarizes water quality data for fecal coliform and total coliform in Patchogue Bay for the years 2003-2017. Prepared by: Brian M. McCaffrey Stormwater

More information

Blocking Sea Intrusion in Brackish Karstic Springs

Blocking Sea Intrusion in Brackish Karstic Springs European Water 1/2: 17-23, 3. 3 E.W. Publications Blocking Sea Intrusion in Brackish Karstic Springs The Case of Almiros Spring at Heraklion Crete, Greece A. Maramathas, Z. Maroulis, D. Marinos-Kouris

More information

4. Hydrology of the Olentangy River Watershed

4. Hydrology of the Olentangy River Watershed 4. Hydrology of the Olentangy River Watershed The Hydrologic Cycle Water on Planet Earth is dynamic constantly being recycled from the land to the atmosphere to the ocean. Rivers and streams are just a

More information

> Aircraft Noise. Bankstown Airport Master Plan 2004/05 > 96

> Aircraft Noise. Bankstown Airport Master Plan 2004/05 > 96 Bankstown Airport Master Plan 2004/05 > 96 24.1 Why Is Aircraft Noise Modelled? Modelling of the noise impact of aircraft operations has been undertaken as part of this MP. Such modelling is undertaken

More information

EL PASO S DESALINATION EFFORTS

EL PASO S DESALINATION EFFORTS El Paso s Desalination Efforts WATER DESALINATION AND REUSE STRATEGIES FOR NEW MEXICO SEPTEMBER NEW MEXICO WATER RESOURCES RESEARCH INSTITUTE 2004 Bill Hutchison has more than 20 years of experience as

More information

Roadmapping Breakout Session Overview

Roadmapping Breakout Session Overview Roadmapping Breakout Session Overview Ken Goodrich October 22, 2015 Definition Roadmap: a specialized type of strategic plan that outlines activities an organization can undertake over specified time frames

More information

International Osoyoos Lake Board of Control Annual Report to the International Joint Commission

International Osoyoos Lake Board of Control Annual Report to the International Joint Commission International Osoyoos Lake Board of Control 2013 Annual Report to the International Joint Commission TABLE OF CONTENTS ACTIVITIES OF THE BOARD... 1 HYDROLOGIC CONDITIONS IN 2013... 2 Drought Criteria...

More information

Water Quality Trends for Conscience Bay

Water Quality Trends for Conscience Bay Water Quality Trends for Conscience Bay 2018 This report summarizes water quality data for fecal coliform and total coliform in Conscience Bay for the years 1998-2018. Prepared by: Brian M. McCaffrey Stormwater

More information

International Osoyoos Lake Board of Control Annual Report to the International Joint Commission

International Osoyoos Lake Board of Control Annual Report to the International Joint Commission International Osoyoos Lake Board of Control 2010 Annual Report to the International Joint Commission TABLE OF CONTENTS ACTIVITIES OF THE BOARD... 1 HYDROLOGIC CONDITIONS IN 2010... 2 Drought Criteria...

More information

U-Park Wyatt Street Temporary Event Space

U-Park Wyatt Street Temporary Event Space Adelaide City Council 26-May-2015 Doc No. 60427502-A15E01RP U-Park Wyatt Street Temporary Event Space Music Noise Assessment U-Park Wyatt Street Temporary Event Space Music Noise Assessment Client: Adelaide

More information

Mercer SCOOT Adaptive Signal Control. Karl Typolt, Transpo Group PSRC RTOC July 6th, 2017

Mercer SCOOT Adaptive Signal Control. Karl Typolt, Transpo Group PSRC RTOC July 6th, 2017 Mercer SCOOT Adaptive Signal Control Karl Typolt, Transpo Group PSRC RTOC July 6th, 2017 Our mission, vision, and core values Mission: deliver a high-quality transportation system for Seattle Vision: connected

More information

Runway Roughness Evaluation- Boeing Bump Methodology

Runway Roughness Evaluation- Boeing Bump Methodology FLIGHT SERVICES Runway Roughness Evaluation- Boeing Bump Methodology Michael Roginski, PE, Principal Engineer Boeing Airport Compatibility Engineering ALACPA X Seminar, Mexico City, Mexico September 30-

More information

Runway Roughness Evaluation- Boeing Bump Methodology

Runway Roughness Evaluation- Boeing Bump Methodology FLIGHT SERVICES Runway Roughness Evaluation- Boeing Bump Methodology Michael Roginski, PE, Principal Engineer Boeing Airport Compatibility Engineering ALACPA X Seminar, Mexico City, Mexico September 3-

More information

ASSESSMENT OF FECAL COLIFORM IN LITTLE RABBIT CREEK AND LITTLE SURVIVAL CREEK

ASSESSMENT OF FECAL COLIFORM IN LITTLE RABBIT CREEK AND LITTLE SURVIVAL CREEK ASSESSMENT OF FECAL COLIFORM IN LITTLE RABBIT CREEK AND LITTLE SURVIVAL CREEK FINAL REPORT Prepared for: Alaska Department of Environmental Conservation 555 Cordova Street Anchorage, Alaska 99501 Prepared

More information

NOISE ABATEMENT PROCEDURES

NOISE ABATEMENT PROCEDURES 1. Introduction NOISE ABATEMENT PROCEDURES Many airports today impose restrictions on aircraft movements. These include: Curfew time Maximum permitted noise levels Noise surcharges Engine run up restrictions

More information

PERFORMANCE MEASURE INFORMATION SHEET #16

PERFORMANCE MEASURE INFORMATION SHEET #16 PERFORMANCE MEASURE INFORMATION SHEET #16 ARROW LAKES RESERVOIR: RECREATION Objective / Location Recreation/Arrow Lakes Reservoir Performance Measure Access Days Units Description MSIC 1) # Access Days

More information

VI. ALTERNATIVES TO THE MASTER PLAN C. RENOVATED EAST BUILDING ALTERNATIVE

VI. ALTERNATIVES TO THE MASTER PLAN C. RENOVATED EAST BUILDING ALTERNATIVE VI. ALTERNATIVES TO THE MASTER PLAN C. RENOVATED EAST BUILDING ALTERNATIVE INTRODUCTION The Renovated East Building Alternative would include the continued use of the renovated West Building and the renovation

More information

APA NOISE REPORT. August 2018

APA NOISE REPORT. August 2018 August 2018 [Grab your reader s attention with a great quote from the document or use this space to emphasize a key point. To place this text box anywhere on the page, just drag it.] APA NOISE REPORT 1

More information

APA NOISE REPORT. January 2018

APA NOISE REPORT. January 2018 January 2018 [Grab your reader s attention with a great quote from the document or use this space to emphasize a key point. To place this text box anywhere on the page, just drag it.] APA NOISE REPORT

More information

PRELIMINARY WEB DOCUMENT

PRELIMINARY WEB DOCUMENT APA NOISE REPORT May 2018 [Grab your reader s attention with a great quote from the document or use this space to emphasize a key point. To place this text box anywhere on the page, just drag it.] 1 TABLE

More information

Hydraulic Report. Trail 5 Snowmobile Trail Over Mulligan Creek. Prepared By: COLEMAN ENGINEERING COMPANY Karisa V. Falls, P.E.

Hydraulic Report. Trail 5 Snowmobile Trail Over Mulligan Creek. Prepared By: COLEMAN ENGINEERING COMPANY Karisa V. Falls, P.E. Prepared for: Prepared by: Marquette County Road Commission Coleman Engineering Company Marquette, Michigan Iron Mountain, MI December 2011 Hydraulic Report Trail 5 Snowmobile Trail Over Mulligan Creek

More information

Agenda Report. Spruce Street Outlet Drainage Improvements Tower Road Relief Sewer

Agenda Report. Spruce Street Outlet Drainage Improvements Tower Road Relief Sewer Agenda Report Subject: Prepared By: Spruce Street Outlet Drainage Improvements Tower Road Relief Sewer Steven M. Saunders, Director of Public Works/Village Engineer Date: August 12, 2012 On March 8, 2012

More information

Watershed Runoff Analysis

Watershed Runoff Analysis CREATING SOLUTIONS FOR A CHANGING WORLD Watershed Runoff Analysis April 18, 2017 John Melack, UCSB Ed Beighley & Dongmei Feng, Northeastern University Study Workflow Civil and Environmental Engineering

More information

APA NOISE REPORT. August 2017

APA NOISE REPORT. August 2017 August 2017 [Grab your reader s attention with a great quote from the document or use this space to emphasize a key point. To place this text box anywhere on the page, just drag it.] APA NOISE REPORT 1

More information

Perth Noise Abatement Procedures - Change to Preferred Runways

Perth Noise Abatement Procedures - Change to Preferred Runways Environmental Analysis Summary Preferred Runways Perth Perth Airport Perth Noise Abatement Procedures - Change to Preferred Runways Environmental Analysis Summary April 2016 1 of 10 Environment Analysis

More information

UAS to GIS Utilizing a low-cost Unmanned Aerial System (UAS) for Coastal Erosion Monitoring

UAS to GIS Utilizing a low-cost Unmanned Aerial System (UAS) for Coastal Erosion Monitoring UAS to GIS Utilizing a low-cost Unmanned Aerial System (UAS) for Coastal Erosion Monitoring Agenda Scope of today s presentation Demonstration Objectives Wrightsville Beach Test Area Masonboro Inlet Jetties

More information

Oak Ridges Moraine: Southern Ontario's Sponge

Oak Ridges Moraine: Southern Ontario's Sponge Oak Ridges Moraine: Southern Ontario's Sponge Lesson Overview Students will examine the location and the importance of the Oak Ridges Moraine and investigate ongoing conflicts concerning its development.

More information

$6.60 NEW SOUTH WALES. Both METRIC and Feet and Inches TIMES: am/pm Sunrise/Sunset Moon Phases Moon Rise/Set DIARY NOTES.

$6.60 NEW SOUTH WALES. Both METRIC and Feet and Inches TIMES: am/pm Sunrise/Sunset Moon Phases Moon Rise/Set DIARY NOTES. $6.60 (incl. GST) 2018 2014 November 28, 2013 November 23, 2017 TO to January 2, 7, 2019 2015 Both METRIC and Feet and Inches TIMES: am/pm Sunrise/Sunset Moon Phases Moon Rise/Set DIARY NOTES NEW SOUTH

More information

3. Proposed Midwest Regional Rail System

3. Proposed Midwest Regional Rail System 3. Proposed Midwest Regional Rail System 3.1 Introduction The proposed Midwest Regional Rail System (MWRRS) will operate in nine states, encompass approximately 3,000 route miles and operate on eight corridors.

More information

A Pilot s perspective

A Pilot s perspective The Challenges of Modern Approaches, from NPA/PA to 2D/3D operations airborne perspective A Pilot s perspective Stefan Fiedler IFALPA, VC German Cockpit IFALPA Position on PBN (December 2014) IFALPA welcomes

More information

Tsunami Survey Results in the NPS and Reproduction Analysis Using Tsunami Inversion

Tsunami Survey Results in the NPS and Reproduction Analysis Using Tsunami Inversion Technical Workshop on the Accident of TEPCO s Fukushima Dai-ichi NPS Tsunami Survey Results in the NPS and Reproduction Analysis Using Tsunami Inversion July 24, 2012 Tomoyuki Tani Agenda 1. Overview of

More information

Establishing a Risk-Based Separation Standard for Unmanned Aircraft Self Separation

Establishing a Risk-Based Separation Standard for Unmanned Aircraft Self Separation Establishing a Risk-Based Separation Standard for Unmanned Aircraft Self Separation Roland E. Weibel, Matthew W.M. Edwards, and Caroline S. Fernandes MIT Lincoln laboratory Surveillance Systems Group Ninth

More information

EXPERIMENTAL ANALYSIS OF THE INTEGRATION OF MIXED SURVEILLANCE FREQUENCY INTO OCEANIC ATC OPERATIONS

EXPERIMENTAL ANALYSIS OF THE INTEGRATION OF MIXED SURVEILLANCE FREQUENCY INTO OCEANIC ATC OPERATIONS EXPERIMENTAL ANALYSIS OF THE INTEGRATION OF MIXED SURVEILLANCE FREQUENCY INTO OCEANIC ATC OPERATIONS Laura Major Forest & R. John Hansman C.S. Draper Laboratory, Cambridge, MA 9 USA; lforest@draper.com

More information

Introduction. The System. Model Limitations, Assumptions, and Parameters. Optional Services Tech Memo

Introduction. The System. Model Limitations, Assumptions, and Parameters. Optional Services Tech Memo Optional Services Tech Memo Introduction This technical memo evaluates the impact of a tide gate to be installed at the confluence of the Left Bank Tributary of Thalia Creek and Lake Windsor. Specifically,

More information

ENVIRONMENT ACTION PLAN

ENVIRONMENT ACTION PLAN ENVIRONMENT ACTION PLAN 2015 16 Airservices Australia 2015 This work is copyright. Apart from any use as permitted under the Copyright Act 1968, no part may be reproduced by any process without prior written

More information

TransAction Overview. Introduction. Vision. NVTA Jurisdictions

TransAction Overview. Introduction. Vision. NVTA Jurisdictions Introduction Vision NVTA Jurisdictions In the 21 st century, Northern Virginia will develop and sustain a multimodal transportation system that enhances quality of life and supports economic growth. Investments

More information

RNP AR and Air Traffic Management

RNP AR and Air Traffic Management RNP AR and Air Traffic Management BOEING is a trademark of Boeing Management Company. Copyright 2009 Boeing. All rights reserved. Expanding the Utility of RNP AR Sheila Conway RNP AR User s Forum Wellington,

More information

DIDYMO SURVEY, LOWER FRYINGPAN RIVER, BASALT, COLORADO 2015

DIDYMO SURVEY, LOWER FRYINGPAN RIVER, BASALT, COLORADO 2015 DIDYMO SURVEY, LOWER FRYINGPAN RIVER, BASALT, COLORADO 2015 Second Annual Report PREPARED FOR: ROARING FORK CONSERVANCY PREPARED BY: COLORADO MOUNTAIN COLLEGE NATURAL RESOURCE MANAGEMENT PROGRAM TIMBERLINE

More information

$6.60 NEW SOUTH WALES. Both METRIC and Feet and Inches TIMES: am/pm Sunrise/Sunset Moon Phases Moon Rise/Set DIARY NOTES.

$6.60 NEW SOUTH WALES. Both METRIC and Feet and Inches TIMES: am/pm Sunrise/Sunset Moon Phases Moon Rise/Set DIARY NOTES. $6.60 (incl. GST) 2019 2014 November 28, 2013 November 22, 2018 TO to January 1, 7, 2020 2015 Both METRIC and Feet and Inches TIMES: am/pm Sunrise/Sunset Moon Phases Moon Rise/Set DIARY NOTES NEW SOUTH

More information

HOSE ASSEMBLY CLEANLINESS

HOSE ASSEMBLY CLEANLINESS November 18, 2002 HOSE ASSEMBLY CLEANLINESS Preface Hydraulic system cleanliness is a term used to describe the level of solid and liquid contamination found in hydraulic systems. Contamination may be

More information

NEW SOUTH WALES. Both METRIC and Feet and Inches TIMES: am/pm Sunrise/Sunset Moon Phases Moon Rise/Set DIARY NOTES.

NEW SOUTH WALES. Both METRIC and Feet and Inches TIMES: am/pm Sunrise/Sunset Moon Phases Moon Rise/Set DIARY NOTES. 2016 2014 November 28, 2013 November 26, 2015 TO to January 4, 7, 2017 2015 Both METRIC and Feet and Inches TIMES: am/pm Sunrise/Sunset Moon Phases Moon Rise/Set DIARY NOTES NEW SOUTH WALES Public Works

More information

A Methodology for Integrated Conceptual Design of Aircraft Configuration and Operation to Reduce Environmental Impact

A Methodology for Integrated Conceptual Design of Aircraft Configuration and Operation to Reduce Environmental Impact A Methodology for Integrated Conceptual Design of Aircraft Configuration and Operation to Reduce Environmental Impact ATIO/ANERS September 22, 2009 Andrew March Prof. Ian Waitz Prof. Karen Willcox Motivation

More information

Assessment of Pathogen Strategies

Assessment of Pathogen Strategies Assessment of Pathogen Strategies Bacteria levels in receiving waters are a primary concern for federal, state, and local agencies. The primary sources of bacteria are generally attributed to combined

More information

Get a higher Return On Investment with Wärtsilä

Get a higher Return On Investment with Wärtsilä Get a higher Return On Investment with Wärtsilä Wärtsilä reciprocating engine technology outperforms gas turbines in the ISO-NE market Joseph Ferrari www.industrialinfo.com Wärtsilä Wärtsilä Founded in

More information

SANTA MONICA AIRPORT VISIONING PROCESS: PHASE III FINDINGS AND NEXT STEP RECOMMENDATIONS APRIL 30, 2013

SANTA MONICA AIRPORT VISIONING PROCESS: PHASE III FINDINGS AND NEXT STEP RECOMMENDATIONS APRIL 30, 2013 SANTA MONICA AIRPORT VISIONING PROCESS: PHASE III FINDINGS AND NEXT STEP RECOMMENDATIONS APRIL 30, 2013 Visioning Process: Overview SMO in 1917 (Cloverfield) Grass Landing Strip WWI Pilot Training Visioning

More information

International Osoyoos Lake Board of Control Annual Report to the International Joint Commission

International Osoyoos Lake Board of Control Annual Report to the International Joint Commission International Osoyoos Lake Board of Control 2015 Annual Report to the International Joint Commission Cover: Northern extent of Osoyoos Lake, where the Okanagan River enters the lake, 2015. View is to the

More information

Challenges in Complex Procedure Design Validation

Challenges in Complex Procedure Design Validation Challenges in Complex Procedure Design Validation Frank Musmann, Aerodata AG ICAO Workshop Seminar Aug. 2016 Aerodata AG 1 Procedure Validation Any new or modified Instrument Flight Procedure is required

More information

Cruise Industry Perspective on OWS and Waste Management

Cruise Industry Perspective on OWS and Waste Management Cruise Industry Perspective on OWS and Waste Management MAX1 OWS Studies Conference Wilmington, NC, 24 June 2015 James R. Van Langen, P.E. Environmental, Safety, Quality & Sustainability Consultant Cruise

More information

Northeast Stoney Trail In Calgary, Alberta

Northeast Stoney Trail In Calgary, Alberta aci Acoustical Consultants Inc. 5031 210 Street Edmonton, Alberta, Canada T6M 0A8 Phone: (780) 414-6373, Fax: (780) 414-6376 www.aciacoustical.com Environmental Noise Computer Modelling For Northeast Stoney

More information

Reducing Garbage-In for Discrete Choice Model Estimation

Reducing Garbage-In for Discrete Choice Model Estimation Reducing Garbage-In for Discrete Choice Model Estimation David Kurth* Cambridge Systematics, Inc. 999 18th Street, Suite 3000 Denver, CO 80202 P: 303-357-4661 F: 303-446-9111 dkurth@camsys.com Marty Milkovits

More information

Figure 3.1. Foreign Airport Assessment Aid

Figure 3.1. Foreign Airport Assessment Aid 01 oauu-t.d Foreign Airport Assessment Aid: Date of Assessment: Assessment Conducted by: Airport ICAO/IATA Identification: Hours of Operation: Figure 3.1. Foreign Airport Assessment Aid [ Airport Name:

More information

Acres Monterey County, California OPEN GROUND IN SALINAS VALLEY VEGETABLE AND STRAWBERRY PROPERTY

Acres Monterey County, California OPEN GROUND IN SALINAS VALLEY VEGETABLE AND STRAWBERRY PROPERTY 324 +- Acres Monterey County, California OPEN GROUND IN SALINAS VALLEY VEGETABLE AND STRAWBERRY PROPERTY EXCLUSIVELY PRESENTED BY: Morris Garcia License 00834407 (559) 994-7453 Cell Sarah Donaldson License

More information

Depeaking Optimization of Air Traffic Systems

Depeaking Optimization of Air Traffic Systems Depeaking Optimization of Air Traffic Systems B.Stolz, T. Hanschke Technische Universität Clausthal, Institut für Mathematik, Erzstr. 1, 38678 Clausthal-Zellerfeld M. Frank, M. Mederer Deutsche Lufthansa

More information

Noise Abatement Arrival Procedures at Louisville International Airport. Prof. John-Paul Clarke Georgia Institute of Technology

Noise Abatement Arrival Procedures at Louisville International Airport. Prof. John-Paul Clarke Georgia Institute of Technology Noise Abatement Arrival Procedures at Louisville International Airport Prof. John-Paul Clarke Georgia Institute of Technology The Team Noise Abatement Procedures Working Group (NAPWG) has the following

More information

EUROCONTROL and the Airport Package

EUROCONTROL and the Airport Package European Economic and Social Committee Public Hearing Brussels, 20 February 2012 EUROCONTROL and the Airport Package François HUET EUROCONTROL Directorate Single Sky, Performance Review Unit The European

More information

Agenda: SASP SAC Meeting 3

Agenda: SASP SAC Meeting 3 Agenda: SASP SAC Meeting 3 Date: 04/12/18 Public Involvement Plan Update Defining the System Recommended Classifications Discussion Break Review current system Outreach what we heard Proposed changes Classification

More information

Saint Petersburg-Clearwater International Airport. Airspace & Instrument Approach Analysis

Saint Petersburg-Clearwater International Airport. Airspace & Instrument Approach Analysis Saint Petersburg-Clearwater International Airport Airspace & Instrument Approach Analysis February 23, 2005 Jeppesen Boeing Jeppesen Government / Military Services Group Airspace Services Division AIRSPACE

More information

SUTTER COUNTY. General Plan Update Technical Background Report

SUTTER COUNTY. General Plan Update Technical Background Report SUTTER COUNTY General Plan Update Technical Background Report February 2008 SUTTER COUNTY GENERAL PLAN UPDATE TECHNICAL BACKGROUND REPORT PREPARED FOR: SUTTER COUNTY PREPARED BY: PBS&J IN PARTNERSHIP

More information

Aircraft Noise. Why Aircraft Noise Calculations? Aircraft Noise. SoundPLAN s Aircraft Noise Module

Aircraft Noise. Why Aircraft Noise Calculations? Aircraft Noise. SoundPLAN s Aircraft Noise Module Aircraft Noise Why Aircraft Noise Calculations? Aircraft Noise Aircraft noise can be measured and simulated with specialized software like SoundPLAN. Noise monitoring and measurement can only measure the

More information

Recommendations for Northbound Aircraft Departure Concerns over South Minneapolis

Recommendations for Northbound Aircraft Departure Concerns over South Minneapolis Recommendations for Northbound Aircraft Departure Concerns over South Minneapolis March 21, 2012 Noise Oversight Committee Agenda Item #4 Minneapolis Council Member John Quincy Background Summer of 2011

More information

L 342/20 Official Journal of the European Union

L 342/20 Official Journal of the European Union L 342/20 Official Journal of the European Union 24.12.2005 COMMISSION REGULATION (EC) No 2150/2005 of 23 December 2005 laying down common rules for the flexible use of airspace (Text with EEA relevance)

More information

WELCOME TO THE OPEN HOUSE

WELCOME TO THE OPEN HOUSE WELCOME TO THE OPEN HOUSE US 281 North Loop 1604 to Borgfeld Drive CSJ: 0253-04-146 & 0253-04-138 May 12, 2016 Please sign in Explore the exhibits Submit a comment form Ask questions We want to know your

More information

CITY OF LYNDEN STORMWATER MANAGEMENT PROGRAM REPORT MARCH 1, 2016

CITY OF LYNDEN STORMWATER MANAGEMENT PROGRAM REPORT MARCH 1, 2016 CITY OF LYNDEN STORMWATER MANAGEMENT PROGRAM 2015 WATER QUALITY MONITORING REPORT CITY OF LYNDEN 300 4 TH STREET LYNDEN, WASHINGTON 98264 PHONE (360) 354-3446 MARCH 1, 2016 This document serves as an attachment

More information

AEROSPACE RECOMMENDED PRACTICE

AEROSPACE RECOMMENDED PRACTICE AEROSPACE RECOMMENDED PRACTICE ARP5660 Issued 2009-06 Revised 2011-01 REV. A Deicing Facility Operational Procedures Superseding ARP5660 RATIONALE ARP5660 has been revised to include updated procedures,

More information

An Automated Airspace Concept for the Next Generation Air Traffic Control System

An Automated Airspace Concept for the Next Generation Air Traffic Control System An Automated Airspace Concept for the Next Generation Air Traffic Control System Todd Farley, David McNally, Heinz Erzberger, Russ Paielli SAE Aerospace Control & Guidance Committee Meeting Boulder, Colorado

More information

AN INTEGRATED SAFETY AND OPERATIONAL AVAILABILITY ANALYSIS SYSTEM FOR AIR TRAFFIC SYSTEMS

AN INTEGRATED SAFETY AND OPERATIONAL AVAILABILITY ANALYSIS SYSTEM FOR AIR TRAFFIC SYSTEMS 2 nd USA/EUROPE AIR TRAFFIC MANAGEMENT R&D SEMINAR Orlando,1 st - 4 th December 1998 AN INTEGRATED SAFETY AND OPERATIONAL AVAILABILITY ANALYSIS SYSTEM FOR AIR TRAFFIC SYSTEMS Peter F. Kostiuk Logistics

More information

Portland Water District Sebago Lake Monitoring Programs Lower Bay Bacteria Monitoring Presenting data from 1977 to 2018 Laurel Jackson

Portland Water District Sebago Lake Monitoring Programs Lower Bay Bacteria Monitoring Presenting data from 1977 to 2018 Laurel Jackson Portland Water District Sebago Lake Monitoring Programs Lower Bay Bacteria Monitoring Presenting data from 1977 to 2018 Laurel Jackson Introduction Sebago Lake is the primary drinking water supply for

More information

Advances for Pipelines

Advances for Pipelines Advances for Pipelines Eugene Buddy Broerman EBroerman@swri.org Jeffrey Bennett JBennett@swri.org Gas/Electric Partnership Conference 2016 Houston, T Southwest Research Institute Non-profit organization

More information

RNP AR APCH Approvals: An Operator s Perspective

RNP AR APCH Approvals: An Operator s Perspective RNP AR APCH Approvals: An Operator s Perspective Presented to: ICAO Introduction to Performance Based Navigation Seminar The statements contained herein are based on good faith assumptions and provided

More information

NOISE AND FLIGHT PATH MONITORING SYSTEM BRISBANE QUARTERLY REPORT JULY - SEPTEMBER 2011

NOISE AND FLIGHT PATH MONITORING SYSTEM BRISBANE QUARTERLY REPORT JULY - SEPTEMBER 2011 NOISE AND FLIGHT PATH MONITORING SYSTEM BRISBANE QUARTERLY REPORT JULY - SEPTEMBER 211 Date Version Comments Page 2 Foreword Airservices Australia has established a Noise and Flight Path Monitoring System

More information

Disruptive Technologies in Air Traffic Management (ATM) - Example: flight centric operations (sectorless ATM)

Disruptive Technologies in Air Traffic Management (ATM) - Example: flight centric operations (sectorless ATM) 8th Florence Air Forum Oktober 21 th 2016 Disruptive Technologies in Air Traffic Management (ATM) - Example: flight centric operations (sectorless ATM) Ralf Bertsch Director Planning and Innovation DFS

More information

NOISE AND FLIGHT PATH MONITORING SYSTEM BRISBANE QUARTERLY REPORT OCTOBER - DECEMBER 2013

NOISE AND FLIGHT PATH MONITORING SYSTEM BRISBANE QUARTERLY REPORT OCTOBER - DECEMBER 2013 NOISE AND FLIGHT PATH MONITORING SYSTEM BRISBANE QUARTERLY REPORT OCTOBER - DECEMBER 213 Date Version Comments Page 2 Foreword Airservices Australia has established a Noise and Flight Path Monitoring System

More information

THIRTEENTH AIR NAVIGATION CONFERENCE

THIRTEENTH AIR NAVIGATION CONFERENCE International Civil Aviation Organization AN-Conf/13-WP/22 14/6/18 WORKING PAPER THIRTEENTH AIR NAVIGATION CONFERENCE Agenda Item 1: Air navigation global strategy 1.4: Air navigation business cases Montréal,

More information

IATA Air Carrier Self Audit Checklist Analysis Questionnaire

IATA Air Carrier Self Audit Checklist Analysis Questionnaire IATA Air Carrier Self Audit Checklist Analysis Questionnaire Purpose Runway Excursion Prevention Air Carrier Self Audit Checklist The Flight Safety Foundation (FSF) Reducing the Risk of Runway Excursions

More information

SIMULATION MODELING AND ANALYSIS OF A NEW INTERNATIONAL TERMINAL

SIMULATION MODELING AND ANALYSIS OF A NEW INTERNATIONAL TERMINAL Proceedings of the 2000 Winter Simulation Conference J. A. Joines, R. R. Barton, K. Kang, and P. A. Fishwick, eds. SIMULATION MODELING AND ANALYSIS OF A NEW INTERNATIONAL TERMINAL Ali S. Kiran Tekin Cetinkaya

More information

MANAGING FRESHWATER INFLOWS TO ESTUARIES

MANAGING FRESHWATER INFLOWS TO ESTUARIES MANAGING FRESHWATER INFLOWS TO ESTUARIES Yuna River Hydrologic Characterization A. Warner Warner, A. (2005). Yuna River Hydrologic Characterization. University Park, Pennsylvania: The Nature Conservancy.

More information

Analysis of Operational Impacts of Continuous Descent Arrivals (CDA) using runwaysimulator

Analysis of Operational Impacts of Continuous Descent Arrivals (CDA) using runwaysimulator Analysis of Operational Impacts of Continuous Descent Arrivals (CDA) using runwaysimulator Camille Shiotsuki Dr. Gene C. Lin Ed Hahn December 5, 2007 Outline Background Objective and Scope Study Approach

More information

Executive Summary. MASTER PLAN UPDATE Fort Collins-Loveland Municipal Airport

Executive Summary. MASTER PLAN UPDATE Fort Collins-Loveland Municipal Airport Executive Summary MASTER PLAN UPDATE Fort Collins-Loveland Municipal Airport As a general aviation and commercial service airport, Fort Collins- Loveland Municipal Airport serves as an important niche

More information

Welcome to Public Information Workshop 1. San Francisco International Airport FAR Part 150 Study Update Noise Exposure Map Report

Welcome to Public Information Workshop 1. San Francisco International Airport FAR Part 150 Study Update Noise Exposure Map Report Welcome to Public Information Workshop 1 Chetcuti Room, City of Milbrae 450 Poplar Avenue Milbrae, California 94030 Wednesday, June 4, 2014 5:45 p.m. to 6:45 p.m. PDT The FAA typically uses the airport

More information

Unmanned Aircraft System Loss of Link Procedure Evaluation Methodology

Unmanned Aircraft System Loss of Link Procedure Evaluation Methodology Unmanned Aircraft System Loss of Link Procedure Evaluation Methodology Sponsor: Andy Lacher (MITRE Corporation) May 11, 2011 UL2 Team Rob Dean Steve Lubkowski Rohit Paul Sahar Sadeghian Approved for Public

More information

COMMISSION OF THE EUROPEAN COMMUNITIES. Draft. COMMISSION REGULATION (EU) No /2010

COMMISSION OF THE EUROPEAN COMMUNITIES. Draft. COMMISSION REGULATION (EU) No /2010 COMMISSION OF THE EUROPEAN COMMUNITIES Brussels, XXX Draft COMMISSION REGULATION (EU) No /2010 of [ ] on safety oversight in air traffic management and air navigation services (Text with EEA relevance)

More information

AIRSERVICES AUSTRALI A

AIRSERVICES AUSTRALI A AIRSERVICES AUSTRALI A NOISE AND FLIGHT PATH MONITORING SYSTEM BRISBANE QUARTERLY REPORT JANUARY - MARCH 211 Page 2 Foreword Airservices Australia has established a Noise and Flight Path Monitoring System

More information

Lake Manitoba Lake St. Martin

Lake Manitoba Lake St. Martin Lake Manitoba Lake St. Martin Outlet Channels Public Information Session June 29, 2017 July 13, 2017 Background & History 2011 Spring Flood Event High flows recorded on most streams and rivers in the Assiniboine

More information

West Gate IAC Hearing. Review of vibration and regenerated noise from construction

West Gate IAC Hearing. Review of vibration and regenerated noise from construction West Gate IAC Hearing Review of vibration and regenerated noise from construction Heilig & Partners West Gate Tunnel August 17 1 Involvement I have reviewed the tunnel alignment and the two portals to

More information

China Creek North Park Upgrades and Glen Pump Station. Park Board Committee Meeting Monday, July 10, 2017

China Creek North Park Upgrades and Glen Pump Station. Park Board Committee Meeting Monday, July 10, 2017 China Creek North Park Upgrades and Glen Pump Station Park Board Committee Meeting Monday, July 10, 2017 Purpose The purpose of this presentation is to: Share the results of the public engagement processes;

More information

Appendix B Ultimate Airport Capacity and Delay Simulation Modeling Analysis

Appendix B Ultimate Airport Capacity and Delay Simulation Modeling Analysis Appendix B ULTIMATE AIRPORT CAPACITY & DELAY SIMULATION MODELING ANALYSIS B TABLE OF CONTENTS EXHIBITS TABLES B.1 Introduction... 1 B.2 Simulation Modeling Assumption and Methodology... 4 B.2.1 Runway

More information

Why are the underground fuel tanks being removed and replaced with above ground tanks?

Why are the underground fuel tanks being removed and replaced with above ground tanks? AIRPORT/CITIZEN FAQ This list of Frequently Asked Questions (FAQs) with responses are provided to share information related to airport topics with the Citizens of Georgetown. The questions / responses

More information

2015 Annual Water Report. City of Revelstoke Engineering and Public Works Department

2015 Annual Water Report. City of Revelstoke Engineering and Public Works Department 2015 Annual Water Report City of Revelstoke Engineering and Public Works Department P a g e 1 Table of Contents Introduction... 3 Revelstoke Water Distribution System... 3 Greeley Creek Water Treatment

More information