Welcome KROSNO CREEK DIVERSION PROJECT CLASS ENVIRONMENTAL ASSESSMENT

Size: px
Start display at page:

Download "Welcome KROSNO CREEK DIVERSION PROJECT CLASS ENVIRONMENTAL ASSESSMENT"

Transcription

1 Welcome KROSNO CREEK DIVERSION PROJECT PUBLIC INFORMATION CENTRE # 1 Tonight s Presentation Study Overview Background Existing Conditions Alternative Solutions Preliminary Preferred Solution Next Steps For more information, contact either of the following Mr. Tom Dole, P.Eng. Water Resources Engineer City of Pickering One The Esplanade Pickering, ON L1V 6K7 Tel: (905) Ext: tdole@pickering.ca Mr. Steve Hollingworth, M.A.Sc., P.Eng. Consultant Project Manager TMIG The Municipal Infrastructure Group Ltd Dufferin Street, Suite 200 Vaughan, ON L4K 0C5 Tel: (905) Ext shollingworth@tmig.ca 1

2 Background Krosno Creek replaced with storm sewers during development of the area north of Highway 401. South of Highway 401, Krosno Creek is confined to a narrow concrete channel for a considerable distance In its current form, Krosno Creek cannot safely convey the flow from severe storms There was a considerable amount of flooding during a severe storm in August 2005 There continue to be risks for flooding and erosion along Krosno Creek 2

3 Background The Frenchman s Bay Stormwater Management Master Plan (FBSWMMP) was completed in 2009 The FBSWMMP looked at all of the watersheds draining into Frenchman s Bay, including Krosno Creek Recommendations from the FBSWMMP included a sewer north of Highway 401 to divert the flow from Krosno Creek to Pine Creek The Krosno Creek Diversion Study was initiated to investigate the causes of flooding and assess alternatives to reduce the risk of flooding in more detail 3

4 Municipal Class EA Process We are here 4

5 Natural Environment 5

6 Hydrologic and Hydraulic Model A SWMM5 computer model of the Krosno Creek watershed was created. Storm sewers, overland flow routes and the open channels are represented in the model The model was calibrated and verified against observed water levels and flow rates at the streamflow gauge located south of Alyssum Street 6

7 Existing Level of Service: Flooding The culverts under Highway 401 and the CNR significantly reduce the peak flow rates in the downstream sections of Krosno Creek The culvert at Reytan Blvd is a significant bottleneck in the system Few buildings are at risk of flooding downstream of the concrete lined section of Krosno Creek 7

8 Existing Level of Service: Flooding Storm Event Buildings Impacted Estimated Flood Damages* 2 4 $130, $493, $1,685, $1,685, $1,866, $1,932,700 Average Annual Estimated Damages $390,931 *Damages Estimated as 10% of the MPAC assessed value of all properties where buildings are partially or entirely within the flood plain 8

9 Alternative Solutions Channel Improvements A wide, natural corridor could safely convey the runoff from severe storms, even if the Highway 401/CNR culverts were enlarged in the future The wide, naturalized corridor would improve fish and wildlife habitat and provide recreational opportunities Up to 46 properties would need to be acquired to implement the channel Total Cost: $24.4 Million 9

10 Alternative Solutions Enhanced SWM Controls The Pickering City Centre is planned for redevelopment and intensification New and re-development will adhere to modern stormwater management practices and criteria When fully built out, average annual flood damages will be reduced from $390,000/year to $240,000/year, with negligible costs for the City. Water quality and erosion in Krosno Creek will also be improved It will take a long time for full build-out of the plan 10

11 Alternative Solutions Culvert Improvements The existing culverts at Morden Lane, Reytan Boulevard and Alyssum Street are bottlenecks in the system. The corrugated steel pipe-arch culverts at these three crossings could potentially be replaced with twin 3 m wide concrete box culverts The culvert replacements could be constructed relatively quickly and easily The culvert replacements could reduce average annual flood damages from $390,000/year to $46,000/year Total Cost: $1.4 Million The culverts are not in good condition, and will require replacement in the near future regardless 11

12 Alternative Solutions Diversion to Pine Creek This was recommended in the Frenchman s Bay Stormwater Management Master Plan A large sewer would convey all of the flow from Krosno Creek to Pine Creek north of Highway 401 Pine Creek Improvements to Pine Creek would be needed to mitigate flooding impacts along Pine Creek If combined with culvert improvements on Krosno Creek, no buildings would be flooding during even the most severe storms, and even if the Highway 401 / CNR culverts were enlarged Total Cost: $30.4 Million 12

13 Alternative Solutions Krosno Boulevard Relief Sewer This relief sewer would divert a portion of the flow in Krosno Creek away from the most flood prone area and return the flow to Krosno Creek below Alyssum Street A 3.0 m wide x 1.5 m high concrete box sewer could be installed, though construction might be difficult The culvert replacements could reduce average annual flood damages from $390,000/year to $32,000/year, but would not significantly reduce flooding during the most severe storms Total Cost: $5.8 Million 13

14 Alternative Solutions Flood Proofing Rather than reducing the frequency or severity of flooding, flood proofing measures prevent floodwater from entering buildings Flood proofing measures could include re-grading or berming to prevent water from reaching buildings, or installing water-tight doors and windows on buildings likely to be exposed to flood water These measures are very difficult to implement, and it is very difficult to ensure they are maintained and remain effective following future home renovations Cost: $10,000 per flood prone property, on average ($640,000 to protect all 64 flood prone buildings) 14

15 Evaluation of Alternatives Alternative Do Nothing Natural Environment Social/Cultural Environment Technical Environment Overall Impacts Benefits Challenges Performance Impact Cumulative Impacts Benefits Cumulative Benefit No impacts, as no works are Continued erosion and No impacts, as no works are No benefits, as no works are No challenges, as no works No reduction in the frequency proposed impaired water quality in proposed proposed are proposed and severity of flooding NOT RECOMMENDED Krosno Creek Does not reduce flooding, other alternatives exist with acceptable impacts Financial Environment No direct costs Average annual flood damages: $390 Thousand Creek Improvements to Convey the Regulatory Flow Impacts to existing channel and riparian vegetation during construction Replacement of the concrete lined channel with a natural channel and wide, vegetated valley corridor Approximately 45 homes will need to be purchased/ expropriated and demolished to create channel corridor Creation of new, natural public open space, could incorporate a trail system in reconstructed valley corridor Will be challenging to secure property for channel, significant construction effort to create channel, construct bridges and relocate utilities Flooding will be contained in corridor, no flood damages even if 401/CNR culverts enlarged NOT RECOMMENDED Significant costs to implement, challenges to secure property and significant impacts to owners of 45 homes to be purchased and demolished for construction of the channel $24.4 Million Average annual flood damages: $0 Enhanced SWM Negligible impacts, as works will be located in existing developed sites and road right-of-ways Potential improvements in water quality and erosion in Krosno Creek Negligible additional impacts anticipated during redevelopment and infrastructure replacement Promotion of low-impact and sustainable development practices Will be incorporated into new developments, but will take a long time for widespread implementation Small reduction in the severity of flooding downstream of Bayly Street for large storm events RECOMMENDED Not recommended as a stand-alone solution to address flooding, but recommended to enhance water quality and erosion in Krosno Creek Minimal additional direct costs to the City for infrastructure renewal projects Average annual flood damages: $240 Thousand Culvert Improvements Limited, temporary impacts to Krosno Creek during construction Fish passage enhanced through replacement of perched culvert at Alyssum Street Short term impacts during construction No benefits anticipated Standard construction practices, will need to bypass flow around the work areas Significant reduction in the frequency and severity of flooding, will be considered in Regulation mapping RECOMMENDED Cost effective solution, few environmental impacts, will be recognized by the TRCA in future flood plain mapping updates $1.4 Million Average annual flood damages: $46 Thousand Complete Diversion to Pine Creek with Krosno Creek Culvert Improvements Impacts to open space north of Highway 401 for storage creation, increased erosion in Pine Creek, limited, temporary impacts to Krosno Creek during construction Potential improvements in water quality and erosion in Krosno Creek Short term impacts during construction, potential impacts to archaeological resources 1 Could incorporate a public trail system in the Pine Creek valley Requires tunnelling under Liverpool Road, significant challenges to mitigate impacts on flooding in Pine Creek (i.e. Highway 401 Culvert replacement) No flood damages in Krosno Creek, even if 401/CNR culverts enlarged NOT RECOMMENDED Significant costs and potential impacts to Pine Creek $30.4 Million Average annual flood damages: $0 Krosno Boulevard Relief Sewer Limited impacts to Krosno Creek at the inlet and outlet locations Continued erosion and impaired water quality in Krosno Creek Short term impacts during construction, easements may be required for inlet, outlet No benefits anticipated Potential conflicts with sanitary service connections, susceptible to freezing Significant reduction in the frequency and severity of flooding NOT RECOMMENDED Significant reduction in flooding with few environmental impacts, but not as cost effective as Culvert Improvements $5.8 Million Average annual flood damages: : $32 Thousand Flood Proofing No impacts, as all works will be within existing residential lots Continued erosion and impaired water quality in Krosno Creek Requires homeowners to install and maintain flood proof doors and windows No benefits anticipated Significant challenges to implement and maintain flood proofing retrofits to private homes Flood damages should be prevented, but flood levels in Krosno Creek will not be reduced NOT RECOMMENDED Frequency and severity of flooding is not reduced, difficulties in implementing and ensuring long term effectiveness of flood proofing measures $660 Thousand Average annual flood damages: $0 Least Impact / Greatest Benefit Greatest Impact / Least Benefit 1 A Stage 2 Archaeological Assessment would be needed to confirm the presence or absence of archaeological resources in the area east of Pine Creek 15

16 Preliminary Preferred Solution Culvert Improvements Replace the existing corrugated steel pipe-arch culverts at Morden Lane, Reytan Boulevard and Alyssum Street with twin 3 m wide x 1.8 m high concrete box culverts The combined effect of the preliminary preferred alternative is a reduction in average estimated flood damages from $390,000 per year to $46,000 per year, to be achieved with a capital cost of approximately $1.4 Million The planned re-development in the Pickering City Centre area, with the recommended stormwater management controls, will further reduce flooding in Krosno Creek Up to 8 homes will remain at risk of flooding in a 100 year storm after the culvert replacements are constructed. The feasibility of site specific solutions for these homes, such as flood proofing, will be explored during subsequent phases of this study 16

17 Next Steps NOW Re-evaluate the alternative solutions based on feedback received tonight Spring 2014 Prepare preliminary designs for culvert replacements Spring 2014 Present preliminary culvert designs at PIC # 2 Summer 2014 Prepare Environmental Study Report and post for 30 day review Fall 2014 Prepare detailed designs for culvert replacements 2015 Funding to be considered in Capital Budget for 2015 Construction 17

18 Things You Can Do to Prevent Flooding Clear the gutters and catchbasins on the street near your house Don t blow yard waste (leaves, grass clippings) into the street or watercourses Ensure that your downspouts discharge onto your lawn, and consider installing a rain barrel Keep Debris out of the Creeks Alert City Staff to debris (garbage, tree branches, ice) that may be blocking the flow in culverts and channels Call (905) to report debris or obstructions 18

Project Management, Environmental Assessment, Stormwater Management. Hydrologic Modelling. Natural Heritage. Fluvial Geomorphology

Project Management, Environmental Assessment, Stormwater Management. Hydrologic Modelling. Natural Heritage. Fluvial Geomorphology Welcome PUBLIC INFORMATION CENTRE # 1 KROSNO CREEK DIVERSION PROJECT February 19, 2014 6:30 p.m. to 8:30 p.m. Please sign in on the sheet provided. Then feel free to walk around and view the displays.

More information

Agenda Report. Spruce Street Outlet Drainage Improvements Tower Road Relief Sewer

Agenda Report. Spruce Street Outlet Drainage Improvements Tower Road Relief Sewer Agenda Report Subject: Prepared By: Spruce Street Outlet Drainage Improvements Tower Road Relief Sewer Steven M. Saunders, Director of Public Works/Village Engineer Date: August 12, 2012 On March 8, 2012

More information

2016 Regional Transportation Alternatives Program (TAP) Grant Application

2016 Regional Transportation Alternatives Program (TAP) Grant Application 2016 Regional Transportation Alternatives Program (TAP) Grant Application PROJECT TITLE: Yelm-Tenino Trail Extension Feasibility Study TRPC use only GENERAL PROJECT INFORMATION Agency or Organization City

More information

Introduction. The System. Model Limitations, Assumptions, and Parameters. Optional Services Tech Memo

Introduction. The System. Model Limitations, Assumptions, and Parameters. Optional Services Tech Memo Optional Services Tech Memo Introduction This technical memo evaluates the impact of a tide gate to be installed at the confluence of the Left Bank Tributary of Thalia Creek and Lake Windsor. Specifically,

More information

EAST DON TRAIL ENVIRONMENTAL ASSESSMENT. Community Liaison Committee Meeting #3 July 15, :30 to 8:30 pm Flemingdon Park Library

EAST DON TRAIL ENVIRONMENTAL ASSESSMENT. Community Liaison Committee Meeting #3 July 15, :30 to 8:30 pm Flemingdon Park Library EAST DON TRAIL ENVIRONMENTAL ASSESSMENT Community Liaison Committee Meeting #3 July 15, 2013 6:30 to 8:30 pm Flemingdon Park Library Agenda 1. Welcome 2. Housekeeping and Updates a) Housekeeping b) CLC

More information

Rule Governing the Designation and Establishment of All-Terrain Vehicle Use Trails on State Land

Rule Governing the Designation and Establishment of All-Terrain Vehicle Use Trails on State Land Rule Governing the Designation and Establishment of All-Terrain Vehicle Use Trails on State Land 1.0 Authority 1.1 This rule is promulgated pursuant to 23 V.S.A. 3506. Section 3506 (b)(4) states that an

More information

DRAFT. Dorabelle Campground Rehabilitation

DRAFT. Dorabelle Campground Rehabilitation DRAFT Dorabelle Campground Rehabilitation September 2012 1.1 REGIONAL SETTING AND PROJECT LOCATION The Dorabelle Campground is located on the western shore of Shaver Lake in Fresno County, California (Section

More information

Bear Creek Habitat Improvement Project

Bear Creek Habitat Improvement Project 06/10/10 Bear Creek Habitat Improvement Project El Paso County, Colorado Pike National Forest and Colorado Springs Utilities Owned Land Report prepared by: Eric Billmeyer Executive Director Rocky Mountain

More information

VI. ALTERNATIVES TO THE MASTER PLAN C. RENOVATED EAST BUILDING ALTERNATIVE

VI. ALTERNATIVES TO THE MASTER PLAN C. RENOVATED EAST BUILDING ALTERNATIVE VI. ALTERNATIVES TO THE MASTER PLAN C. RENOVATED EAST BUILDING ALTERNATIVE INTRODUCTION The Renovated East Building Alternative would include the continued use of the renovated West Building and the renovation

More information

Finn Creek Park. Management Direction Statement Amendment

Finn Creek Park. Management Direction Statement Amendment Finn Creek Park Management Direction Statement Amendment November 2013 Management Direction Statement Amendment Approved by: Jeff Leahy Regional Director, Thompson Cariboo BC Parks November 12, 2013 Date

More information

1 PROJECT STATUS UPDATE 2 ND CONCESSION FROM BRISTOL ROAD TO DOANE ROAD TOWNS OF EAST GWILLIMBURY AND NEWMARKET

1 PROJECT STATUS UPDATE 2 ND CONCESSION FROM BRISTOL ROAD TO DOANE ROAD TOWNS OF EAST GWILLIMBURY AND NEWMARKET Report No. 3 of the Regional Council Meeting of March 28, 2013 1 PROJECT STATUS UPDATE 2 ND CONCESSION FROM BRISTOL ROAD TO DOANE ROAD TOWNS OF EAST GWILLIMBURY AND NEWMARKET The recommends: 1. Receipt

More information

Waukegan & Calumet Rivers. All Hands Meeting

Waukegan & Calumet Rivers. All Hands Meeting Waukegan & Calumet Rivers 516(e) Update All Hands Meeting David F. Bucaro, P.E. Chief, Economic Formulation & Analysis Section, Planning Branch May 18 th, 2011 Kensington Court Ann Arbor, MI 1 2 Waukegan

More information

GILBERT & WEST TOWN INTERCOUNTY DRAIN Windsor Township, Eaton County and City of Lansing, Delhi Township, Ingham County, Michigan

GILBERT & WEST TOWN INTERCOUNTY DRAIN Windsor Township, Eaton County and City of Lansing, Delhi Township, Ingham County, Michigan GILBERT & WEST TOWN INTERCOUNTY DRAIN Windsor Township, Eaton County and City of Lansing, Delhi Township, Ingham County, Michigan PRELIMINARY ENGINEERING REPORT Abigail Eaton, Chair Intercounty Drains

More information

With the first portion of this process complete, we anticipate the general timeline for the remainder of the process to be:

With the first portion of this process complete, we anticipate the general timeline for the remainder of the process to be: THE CITY OF FIRE RESCUE E D M O N T O N FIRE RESCUE SERVICES 10351 96 Street Edmonton, Alberta T5H 2H5 April 19, 2013 Dear Rossdale residents: As many of you know, Fire Rescue Services is currently in

More information

Common Ground Drainage Channel Diversion. Design Report

Common Ground Drainage Channel Diversion. Design Report Common Ground Drainage Channel Diversion Design Report Resource Management International Inc Consulting Engineers May 2017 COMMON GROUND DRAINAGE CHANNEL DIVERSION PREPARED FOR: QUILL LAKES WATERSHED NO.

More information

Business Item No XXX. Proposed Action That the Metropolitan Council approve the Coon Creek Regional Trail Master Plan.

Business Item No XXX. Proposed Action That the Metropolitan Council approve the Coon Creek Regional Trail Master Plan. Business Item No. 2015-XXX Metropolitan Parks and Open Space Commission Meeting date: July 7, 2015 For the Community Development Committee meeting of July 20, 2015 For the Metropolitan Council meeting

More information

APPENDIX F List of Commitments

APPENDIX F List of Commitments APPENDIX F List of Commitments s Table F.1 Standard Mitigation Measures Mitigation Measure MnDOT Specification Number Status Update Description Status Update Utilities Provide early notice to utility operators

More information

Final Drainage Letter Pikes Peak Community College Downtown Parking Lot Colorado Springs, Colorado

Final Drainage Letter Pikes Peak Community College Downtown Parking Lot Colorado Springs, Colorado Final Drainage Letter Pikes Peak Community College Downtown Parking Lot Colorado Springs, Colorado Prepared for: Pikes Peak Community College 5775 South Academy Boulevard Colorado Springs, CO 80906-5422

More information

12, 14 and 16 York Street - Amendments to Section 16 Agreement and Road Closure Authorization

12, 14 and 16 York Street - Amendments to Section 16 Agreement and Road Closure Authorization REPORT FOR ACTION 12, 14 and 16 York Street - Amendments to Section 16 Agreement and Road Closure Authorization Date: April 27, 2018 To: Toronto and East York Community Council From: Senior Strategic Director,

More information

Parkland County Municipal Development Plan Amendment Acheson Industrial Area Structure Plan

Parkland County Municipal Development Plan Amendment Acheson Industrial Area Structure Plan Parkland County Municipal Development Plan Amendment Acheson Industrial Area Structure Plan New Plan Acheson Industrial Area Structure Plan Amendment Parkland County Municipal Development Plan Board Reference

More information

Update Report - Etobicoke Creek and South Mimico Creek Trails

Update Report - Etobicoke Creek and South Mimico Creek Trails REPORT FOR ACTION Update Report - Etobicoke Creek and South Mimico Creek Trails Date: October 23, 2017 To: Etobicoke York Community Council From: General Manager, Parks Forestry and Recreation Wards: Ward

More information

Flood History. Floodplain Descriptions

Flood History. Floodplain Descriptions Flood History The worst flooding in the area took place in 1966, 1969, 1971, 1995 and 1998. The storms in 1966 and 1969 caused considerable damage throughout the area due to flooding, erosion and debris

More information

Presentation Overview

Presentation Overview DON NARROWS Historical and Existing Conditions March 29, 2008 Presentation Overview 1. Project Location and Background 2. Historical Context How did the Don Narrows Come to Be? 3. The Today 4. Next Steps

More information

LAS VARAS RANCH CA COASTAL TRAIL PROPOSED ALIGNMENT

LAS VARAS RANCH CA COASTAL TRAIL PROPOSED ALIGNMENT LAS VARAS RANCH CA COASTAL TRAIL PROPOSED ALIGNMENT Santa Barbara Trails Council * Prepared by Ray Ford February 1,2012 The following notes accompany the Santa Barbara Trails Council map for the Las Varas

More information

EXECUTIVE SUMMARY FALL Introduction. Findings

EXECUTIVE SUMMARY FALL Introduction. Findings EXECUTIVE SUMMARY FALL 2004 Introduction Trails are one of the most popular and highly desirable recreational resources in communities of all sizes throughout the country. In addition to providing a safe

More information

Daisy Dean Trail 628/619 ATV Trail Construction

Daisy Dean Trail 628/619 ATV Trail Construction Background and Purpose and Need The Daisy Dean ATV Trail Construction Project is located in the Little Belt Mountains, Musselshell Ranger District, Lewis and Clark National Forest approximately 32 miles

More information

Committee Report. Community Development Committee For the Metropolitan Council meeting of August 12, Business Item No.

Committee Report. Community Development Committee For the Metropolitan Council meeting of August 12, Business Item No. Committee Report Business Item No. 2015-168 Community Development Committee For the Metropolitan Council meeting of August 12, 2015 Subject: Coon Creek Regional Trail Master Plan, Anoka County Proposed

More information

City of Madison, Buckeye Road Monona Drive to Stoughton Road County AB Dane County Public Involvement Meeting

City of Madison, Buckeye Road Monona Drive to Stoughton Road County AB Dane County Public Involvement Meeting City of Madison, Buckeye Road Monona Drive to Stoughton Road County AB Dane County Public Involvement Meeting Wednesday, May 31, 2017 6:30 to 8 P.M. Frank Allis Elementary School 4201 Buckeye Road Madison,

More information

Chapter 4.0 Alternatives Analysis

Chapter 4.0 Alternatives Analysis Chapter 4.0 Alternatives Analysis Chapter 1 accumulated the baseline of existing airport data, Chapter 2 presented the outlook for the future in terms of operational activity, Chapter 3 defined the facilities

More information

Public Notice ISSUED: December 10, 2018 EXPIRES: January 9, 2019

Public Notice ISSUED: December 10, 2018 EXPIRES: January 9, 2019 APPLICANT: REFER TO: St. Louis and Lake Counties Regional Rail Authority 2018-01942-ARC Public Notice ISSUED: December 10, 2018 EXPIRES: January 9, 2019 SECTION:404 - Clean Water Act 1. APPLICATION FOR

More information

Appendix A Appendix A (Project Specifications) Auk Auk / Black Diamond (Trail 44) Reroute

Appendix A Appendix A (Project Specifications) Auk Auk / Black Diamond (Trail 44) Reroute Appendix A (Project Specifications) Auk Auk / Black Diamond (Trail 44) Reroute I. Proposed Action: This project proposes to reroute approximately 1,800 feet of a 50 inch wide trail, off of private property

More information

PORTISHEAD BRANCH LINE PRELIMINARY ENVIRONMENTAL INFORMATION REPORT VOLUME 4 APPENDIX Water Receptors

PORTISHEAD BRANCH LINE PRELIMINARY ENVIRONMENTAL INFORMATION REPORT VOLUME 4 APPENDIX Water Receptors PORTISHEAD BRANCH LINE PRELIMINARY ENVIRONMENTAL INFORMATION REPORT APPENDIX 17. 3 Water Receptors Contents Section Page 1 Water Receptors... 1-1 1.1 Surface Water Features/Receptors in the Study Area

More information

Stage 2 ION: Light Rail Transit (LRT) from Kitchener to Cambridge

Stage 2 ION: Light Rail Transit (LRT) from Kitchener to Cambridge Stage 2 ION: Light Rail Transit (LRT) from Kitchener to Cambridge Public Consultation Centre (PCC) No. 3 Please Sign-in Cambridge City Hall November 21, 2017 2:00 to 8:00pm Preston Memorial Auditorium

More information

Decision Memo for Desolation Trail: Mill D to Desolation Lake Trail Relocation

Decision Memo for Desolation Trail: Mill D to Desolation Lake Trail Relocation for Salt Lake County, Utah Uinta-Wasatch-Cache National Forest Salt Lake Ranger District 1. Background The present location of the Desolation Trail (#1159) between Mill D and Desolation Lake follows old

More information

MEETING OF THE METROPOLITAN PARKS AND OPEN SPACE COMMISSION Tuesday, April 4, 2017

MEETING OF THE METROPOLITAN PARKS AND OPEN SPACE COMMISSION Tuesday, April 4, 2017 Minutes of the MEETING OF THE METROPOLITAN PARKS AND OPEN SPACE COMMISSION Tuesday, April 4, 2017 Committee Members Present: Tony Yarusso, Rick Theisen, Robert Moeller, Todd Kemery, Sarah Hietpas, Margie

More information

SUMMER VILLAGE OF SILVER SANDS. Municipal Development Plan

SUMMER VILLAGE OF SILVER SANDS. Municipal Development Plan SUMMER VILLAGE OF SILVER SANDS Municipal Development Plan Bylaw 253-2014 Adopted August 22, 2014 Summer Village of Silver Sands Municipal Development Plan Bylaw No. 253-2014 Page 2 1 INTRODUCTION 1.1 SETTING

More information

Mt. Hood National Forest

Mt. Hood National Forest United States Department of Agriculture Forest Service Mt. Hood National Forest Zigzag Ranger District 70220 E. Highway 26 Zigzag, OR 97049 503-622-3191 Fax: 503-622-5622 File Code: 1950-1 Date: June 29,

More information

Airport Master Plan Update June 15, 2017

Airport Master Plan Update June 15, 2017 Airport Master Plan Update June 15, 2017 www.harveyfield.com The Master Plan is a 20-year plan to understand the needs of current and future users of the Airport. This is important to ensure that safe

More information

Airport Master Plan Update June 15, 2017

Airport Master Plan Update June 15, 2017 Airport Master Plan Update June 15, 2017 www.harveyfield.com The Master Plan is a 20-year plan to understand the needs of current and future users of the Airport. This is important to ensure that safe

More information

PROPOSED ACTION South 3000 East Salt Lake City, UT United States Department of Agriculture

PROPOSED ACTION South 3000 East Salt Lake City, UT United States Department of Agriculture United States Department of Agriculture Forest Service Uinta-Wasatch-Cache National Forest Salt Lake Ranger District 6944 South 3000 East Salt Lake City, UT 84121 801-733-2660 File Code: 1950/2300 Date:

More information

26 APPLICATION FOR APPROVAL TO EXPROPRIATE WIDENING AND RECONSTRUCTION OF ST. JOHN'S SIDEROAD PROJECT 97100, TOWN OF AURORA

26 APPLICATION FOR APPROVAL TO EXPROPRIATE WIDENING AND RECONSTRUCTION OF ST. JOHN'S SIDEROAD PROJECT 97100, TOWN OF AURORA Clause No. 26 in Report No. 12 of the was adopted, without amendment, by the Council of The Regional Municipality of York at its meeting held on June 26, 2014. 26 APPLICATION FOR APPROVAL TO EXPROPRIATE

More information

Lake Manitoba Lake St. Martin

Lake Manitoba Lake St. Martin Lake Manitoba Lake St. Martin Outlet Channels Public Information Session June 29, 2017 July 13, 2017 Background & History 2011 Spring Flood Event High flows recorded on most streams and rivers in the Assiniboine

More information

Oak Ridges Moraine: Southern Ontario's Sponge

Oak Ridges Moraine: Southern Ontario's Sponge Oak Ridges Moraine: Southern Ontario's Sponge Lesson Overview Students will examine the location and the importance of the Oak Ridges Moraine and investigate ongoing conflicts concerning its development.

More information

SECTION 3 GENERAL DESCRIPTION OF THE RIVER BASIN

SECTION 3 GENERAL DESCRIPTION OF THE RIVER BASIN SECTION 3 GENERAL DESCRIPTION OF THE RIVER BASIN SECTION 3 GENERAL DESCRIPTION OF THE RIVER BASIN River basin description. A general description of the river basin or subbasin, as appropriate, in which

More information

The combined Planning and Zoning and Council Meeting was called to order at 7:00 p.m.

The combined Planning and Zoning and Council Meeting was called to order at 7:00 p.m. Lake Remediation Master Plan The combined Planning and Zoning and Council Meeting was called to order at 7:00 p.m. Roll Call: Councilman Joe Curl, Councilwoman Tiffany Hughes, Councilwoman Lori Howard,

More information

Northern Rail Extension, Phase One

Northern Rail Extension, Phase One General Project and Funding 1. Where does Phase One start? The rail line for Phase One begins roughly at the northern boundary of the former Bradbury property, but also includes work along Tom Bear Trail

More information

A. CONCLUSIONS OF THE FGEIS

A. CONCLUSIONS OF THE FGEIS Chapter 11: Traffic and Parking A. CONCLUSIONS OF THE FGEIS The FGEIS found that the Approved Plan will generate a substantial volume of vehicular and pedestrian activity, including an estimated 1,300

More information

ES Aircraft Deicing Document Identification Number Date: March 15, ) Activity Description:

ES Aircraft Deicing Document Identification Number Date: March 15, ) Activity Description: ES-301-1.06 Aircraft Deicing Document Identification Number ES-301-1.06 Date: March 15, 2018 Document Owner: Keith Pass 1) Activity Description: Aircraft deicing is the application of aircraft deicing

More information

MORGAN CREEK GREENWAY Final Report APPENDICES

MORGAN CREEK GREENWAY Final Report APPENDICES APPENDICES MORGAN CREEK GREENWAY Appendix A Photos of Existing Conditions in Trail Corridor Photos of existing conditions Main trail corridor - February 2009 Photos of existing conditions south bank Morgan

More information

White Mountain National Forest. Campton Day Use Area Development Project. Scoping Report. Prepared by the Pemigewasset Ranger District May 2013

White Mountain National Forest. Campton Day Use Area Development Project. Scoping Report. Prepared by the Pemigewasset Ranger District May 2013 White Mountain National Forest Campton Day Use Area Development Project United States Department of Agriculture Forest Service Eastern Region Towns of Thornton and Campton, Grafton County, NH Scoping Report

More information

RIO VISTA MUNICIPAL AIRPORT

RIO VISTA MUNICIPAL AIRPORT DRAINAGE TECHNICAL MEMORANDUM RIO VISTA MUNICIPAL AIRPORT RIO VISTA, CALIFORNIA Prepared for: City of Rio Vista 1 Main Street Rio Vista, CA 94571 (707) 374-5337 Prepared by: August 2012 Copyright 2012

More information

Chuckanut Ridge Fairhaven Highlands EIS Scoping Concerns

Chuckanut Ridge Fairhaven Highlands EIS Scoping Concerns Chuckanut Ridge Fairhaven Highlands EIS Scoping Concerns Coalition of Southside Neighborhoods CSN Comments for Fairhaven Highlands EIS Scope Hearing, Jan 16, 2008 1 Chuckanut Ridge Hilly Terrain: Potential

More information

At the time, the portion of the line through Eagle County remains wholly under the ownership of Union Pacific Railroad (UP).

At the time, the portion of the line through Eagle County remains wholly under the ownership of Union Pacific Railroad (UP). Chapter 5 The Railroad Corridor as a Trail Corridor The intent of this chapter is to identify how the rail corridor, if available for lease or purchase in all or part, could be incorporated into the core

More information

Establishing a National Urban Park in the Rouge Valley

Establishing a National Urban Park in the Rouge Valley STAFF REPORT ACTION REQUIRED Establishing a National Urban Park in the Rouge Valley Date: March 29, 2012 To: From: Wards: Reference Number: Executive Committee Deputy City Manager, Cluster B All p:\2012\cluster

More information

Welcome to the future of Terwillegar Park a Unique Natural Park

Welcome to the future of Terwillegar Park a Unique Natural Park Welcome to the future of Terwillegar Park a Unique Natural Park 1 Introduction The Terwillegar Park Concept Plan study will develop an overall concept plan, management objectives and development guidelines

More information

2018 Goldwedge Mines Inc. Licence of Occupation Management Plan. Photo: xxxx. Goldwedge Mines Inc.

2018 Goldwedge Mines Inc. Licence of Occupation Management Plan. Photo: xxxx. Goldwedge Mines Inc. 2018 2018 Goldwedge Mines Inc. Licence of Occupation Management Plan Photo: xxxx Goldwedge Mines Inc. March 2018 TABLE OF CONTENTS TABLE OF CONTENTS... i Figures... i 1. Background... 2 Project Overview...

More information

Juneau Creek Alternative

Juneau Creek Alternative WELCOME Juneau Creek Alternative Introducing the Preferred Alternative for the Sterling Highway MP 45-60 Final EIS Final EIS Released Final Environmental Impact Statement And Final Section 4(f) Evaluation

More information

Colombia (South America) Water use and drainage in Colombia. Case Study: The Stormwater Challenge in Barranquilla. Humberto Avila.

Colombia (South America) Water use and drainage in Colombia. Case Study: The Stormwater Challenge in Barranquilla. Humberto Avila. Colombia (South America) Water use and drainage in Colombia Location: Case Study: The Stormwater Challenge in Barranquilla Source: Wikipedia The University of Alabama February 25, 2008 Population: 45 million

More information

Fairfax County Parkway Widening Fairfax County

Fairfax County Parkway Widening Fairfax County Get Involved VDOT representatives will review and evaluate information received as a result of this meeting. Please fill out the comment sheet provided in this brochure if you have any comments or questions.

More information

Northeast Stoney Trail In Calgary, Alberta

Northeast Stoney Trail In Calgary, Alberta aci Acoustical Consultants Inc. 5031 210 Street Edmonton, Alberta, Canada T6M 0A8 Phone: (780) 414-6373, Fax: (780) 414-6376 www.aciacoustical.com Environmental Noise Computer Modelling For Northeast Stoney

More information

2018 SPRING MELT: FLOOD PREPAREDNESS

2018 SPRING MELT: FLOOD PREPAREDNESS 018 SPRING MELT: FLOOD PREPAREDNESS A Regional District of East Kootenay Preparedness Guide Here in the East Kootenay the spring melt is underway. This seasonal preparedness bulletin will help provide

More information

2 ROADS CAPITAL CONSTRUCTION PROGRAM UPDATE

2 ROADS CAPITAL CONSTRUCTION PROGRAM UPDATE Report No. 8 of the Transportation Services Committee Regional Council Meeting of October 20, 2011 2 ROADS CAPITAL CONSTRUCTION PROGRAM UPDATE The Transportation Services Committee recommends: 1. Receipt

More information

CORNWALL WATERFRONT PLAN 2007

CORNWALL WATERFRONT PLAN 2007 CANAL LANDS CANAL LANDS Page 58 Introduction This chapter details areas of possible development or redevelopment, and lands to be protected from any form of development in the Canal Lands area. As outlined

More information

HIGHWAY 17 WILDLIFE and REGIONAL TRAIL CROSSINGS

HIGHWAY 17 WILDLIFE and REGIONAL TRAIL CROSSINGS HIGHWAY 17 WILDLIFE and REGIONAL TRAIL CROSSINGS Agenda and Meeting Format 7:00-7:15 Welcome 7:15-8:00 Presentation 8:00-8:30 Open House 8:30 Recap 9:00 Conclusion 2 Meeting Goals: Introduce the project

More information

THRESHOLD GUIDELINES FOR AVALANCHE SAFETY MEASURES

THRESHOLD GUIDELINES FOR AVALANCHE SAFETY MEASURES BRITISH COLUMBIA MINISTRY OF TRANSPORTATION & INFRASTRUCTURE AVALANCHE & WEATHER PROGRAMS THRESHOLD GUIDELINES FOR AVALANCHE SAFETY MEASURES British Columbia Ministry of Transportation & Infrastructure

More information

Stephanie Sinnott, Executive Director, Finance, Office of the City Manager

Stephanie Sinnott, Executive Director, Finance, Office of the City Manager Public Report To: From: Finance Committee Stephanie Sinnott, Executive Director, Finance, Office of the City Manager Paul D. Ralph, BES, RPP, MCIP, Commissioner, Development Services Department Report

More information

Union Station Queens Quay Transit Link Study

Union Station Queens Quay Transit Link Study Welcome Union Station in 1899. Image: City of Toronto Archives Union Station today. Image: Camil Rosiak Activity along Queens Quay. Image: Waterfront Toronto For more information or to comment, visit toronto.ca/waterfronttransit

More information

SWAN CREEK VILLAGE HOMEOWNERS ASSOCIATION. P.O. Box Bountiful, UT

SWAN CREEK VILLAGE HOMEOWNERS ASSOCIATION. P.O. Box Bountiful, UT RV PARK REQUIREMENTS SWAN CREEK VILLAGE HOMEOWNERS ASSOCIATION P.O. Box 1188 Bountiful, UT 84011-118 The following RV Park requirements were voted on and approved by the Swan Creek Village HOA Board of

More information

8 CROSS-BOUNDARY AGREEMENT WITH BRAMPTON TRANSIT

8 CROSS-BOUNDARY AGREEMENT WITH BRAMPTON TRANSIT 8 CROSS-BOUNDARY AGREEMENT WITH BRAMPTON TRANSIT The Transportation Services Committee recommends the adoption of the recommendations contained in the following report dated May 27, 2010, from the Commissioner

More information

CITY OF BROOKFIELD Capital Improvement Fund Budget

CITY OF BROOKFIELD Capital Improvement Fund Budget CITY OF BROOKFIELD Capital Improvement Fund Budget The City adopts an annual capital improvement budget, based on a five-year capital improvement program (CIP). The annual budget and CIP are prepared by

More information

Bradley Brook Relocation Project. Scoping Notice. Saco Ranger District. United States Department of Agriculture Forest Service

Bradley Brook Relocation Project. Scoping Notice. Saco Ranger District. United States Department of Agriculture Forest Service Bradley Brook Relocation Project United States Department of Agriculture Forest Service Scoping Notice White Mountain National Forest February 2011 For Information Contact: Jenny Burnett White Mountain

More information

DECISION MEMO. Rawhide Trail #7073 Maintenance and Reconstruction

DECISION MEMO. Rawhide Trail #7073 Maintenance and Reconstruction Page 1 of 6 Background DECISION MEMO USDA Forest Service Jefferson Ranger District Jefferson County, Montana Rawhide Trail #7073 is located in the Elkhorn Mountain Range approximately 10 miles east of

More information

ONONDAGA CREEKWALK PHASE II. Public Information Meeting Series 1

ONONDAGA CREEKWALK PHASE II. Public Information Meeting Series 1 ONONDAGA CREEKWALK PHASE II Public Information Meeting Series 1 Andrew Maxwell Director, Syracuse-Onondaga County Planning Agency Owen Kerney Assistant Director for City Planning Russell Houck, PE City

More information

4 VIVA PHASE 2 YONGE STREET - Y2, AND HIGHWAY 7 - H3 CORRIDORS PRELIMINARY ENGINEERING UPDATE

4 VIVA PHASE 2 YONGE STREET - Y2, AND HIGHWAY 7 - H3 CORRIDORS PRELIMINARY ENGINEERING UPDATE 4 VIVA PHASE 2 YONGE STREET - Y2, AND HIGHWAY 7 - H3 CORRIDORS PRELIMINARY ENGINEERING UPDATE The Rapid Transit Public/Private Partnership Steering Committee recommends the following: 1. The presentation

More information

Brevard County Utility Services Department

Brevard County Utility Services Department Brevard County Utility Services Department April 3, 2018 Jim Helmer, Department Director Brian Sorensen, W/WW Manager 1 Utility Services Department 9 TREATMENT PLANTS 6 WASTEWATER, 3 WATER 163 EMPLOYEES

More information

ETOBICOKE CREEK NORTH TRAIL PROJECT. May 18, 2017 at Michael Power High School 105 Eringate Drive, Etobicoke ON M9C 3Z7

ETOBICOKE CREEK NORTH TRAIL PROJECT. May 18, 2017 at Michael Power High School 105 Eringate Drive, Etobicoke ON M9C 3Z7 ETOBICOKE CREEK NORTH TRAIL PROJECT May 18, 2017 at Michael Power High School 105 Eringate Drive, Etobicoke ON M9C 3Z7 1 Purpose of Open House The purpose of today s open house is to present the design

More information

WELCOME! TSPE DFW MID-CITIES. January Chapter Meeting

WELCOME! TSPE DFW MID-CITIES. January Chapter Meeting WELCOME! TSPE DFW MID-CITIES Check-in/Networking Announcements / Lunch Service Speaker Presentation 11:30AM 12:00PM 12:00PM 12:15PM 12:15PM 1:00PM January Chapter Meeting Thank You to Our Sponsors Interested

More information

Some Historical Aspects of Urban Water Systems

Some Historical Aspects of Urban Water Systems Some Historical Aspects of Urban Water Systems Robert Pitt Department of Civil and Environmental Engineering University of Alabama Tuscaloosa, AL 35487 Ancient springs at Delphi, Greece (site of Oracle)

More information

Work in 2015 and Annual Mobility- Management Plan

Work in 2015 and Annual Mobility- Management Plan Work in 2015 and Annual Mobility- Management Plan KPH-Turcot July 14, 2015 2 Presentation Outline Division into sectors Work in 2015 without disruptions West sector Center sector East sector South sector

More information

Blue River Trail Master Plan JSA to Town Hall June 2004

Blue River Trail Master Plan JSA to Town Hall June 2004 Blue River Trail Master Plan JSA to Town Hall June 2004 Prepared for: Silverthorne Town Council Silverthorne SPORT Committee Department of Recreation and Culture Silverthorne Public Works Silverthorne

More information

Design and Construction of the Lake St. Martin Emergency Outlet

Design and Construction of the Lake St. Martin Emergency Outlet Design and Construction of the Lake St. Martin Emergency Outlet Background 2011 was the largest flood event experienced in the last 200 years Flood Fighting required some difficult decisions by the Manitoba

More information

State Project Reconstruction I-84

State Project Reconstruction I-84 State Project 151-273 Reconstruction I-84 Waterbury, Connecticut FROM WASHINGTON STREET TO PIERPONT ROAD I-84 Constructors J.V. Robert Turner Area Engineer Ken Fargnoli District Engineer John Dunham Assistant

More information

APPENDIX 3-I-B. Alternative Route Assessment Around Provincial Parks and Conservation Reserves

APPENDIX 3-I-B. Alternative Route Assessment Around Provincial Parks and Conservation Reserves EAST-WEST TIE TRANSMISSION PROJECT ENVIRONMENTAL ASSESSMENT REPORT APPENDIX 3-I-B Alternative Route Assessment Around Provincial Parks and Conservation Reserves Report No. 1536607/2000/2018 TABLE OF CONTENTS

More information

Trail Assessment Report

Trail Assessment Report Trail Assessment Report Trail Options for the Bear Creek Canyon located in Pikes Peak Ranger District, Pike National Forest and on Colorado Springs Utility Lands Due to the presence of a unique species

More information

BACKCOUNTRY TRAIL FLOOD REHABILITATION PROGRAM

BACKCOUNTRY TRAIL FLOOD REHABILITATION PROGRAM BACKCOUNTRY TRAIL FLOOD REHABILITATION PROGRAM Backcountry Trail Flood Rehabilitation A June 2013 Flood Recovery Program Summary In June 2013, parts of Southern Alberta were devastated from significant

More information

Committee Report. Community Development Committee For the Metropolitan Council meeting of April 13, Business Item No.

Committee Report. Community Development Committee For the Metropolitan Council meeting of April 13, Business Item No. Committee Report Business Item No. 2016-48 Community Development Committee For the Metropolitan Council meeting of April 13, 2016 Subject: Harriet Island-South St. Paul Regional Trail Master Plan, Saint

More information

Markham Multi-use Pathway (MUP) (16 th Avenue to Bob Hunter Memorial Park) Development Services Committee. January 27, Schollen & Company Inc.

Markham Multi-use Pathway (MUP) (16 th Avenue to Bob Hunter Memorial Park) Development Services Committee. January 27, Schollen & Company Inc. Markham Multi-use Pathway (MUP) (16 th Avenue to Bob Hunter Memorial Park) January 27, 2015 Development Services Committee Mark Schollen Schollen & Company Inc. Purpose of Presentation Update Council on

More information

CITY OF PALMDALE. REPORT to the Mayor and Members of the City Council from the City Manager

CITY OF PALMDALE. REPORT to the Mayor and Members of the City Council from the City Manager CITY OF PALMDALE REPORT to the Mayor and Members of the City Council from the City Manager DATE: SUBJECT: June 4, 2014 Approval of City of Palmdale's 2014 Ten-Year Capital Improvement Plan ISSUING DEPARTMENT:

More information

Members of the Administrative Staff Committee. Award of Tender T Trans Canada Trail Extension

Members of the Administrative Staff Committee. Award of Tender T Trans Canada Trail Extension To: From: Members of the Administrative Staff Committee W.H. Jackson, Director of Utility Services Meeting Date: August 26, 2015 Subject: Report USEC15-021 Award of Tender T-54-15 - Trans Canada Trail

More information

CITY OF PEMBROKE 2004 BUDGET. July 6, 2004

CITY OF PEMBROKE 2004 BUDGET. July 6, 2004 2004 BUDGET July 6, 2004 2004 TAX RATES Municipal Education Total Residential 0.01434078 0.00296000 0.01730078 Multi-residential 0.02674555 0.00296000 0.02970555 Commercial 0.02940061 0.02268611 0.05208672

More information

INFORMATION PAPER TO THE STRATEGIC DEVELOPMENT COMMITTEE

INFORMATION PAPER TO THE STRATEGIC DEVELOPMENT COMMITTEE INFORMATION PAPER TO THE STRATEGIC DEVELOPMENT COMMITTEE BRIEFING ON RONALD REAGAN WASHINGTON NATIONAL AND WASHINGTON DULLES INTERNATIONAL AIRPORTS CAPITAL CONSTRUCTION PROGRAM APRIL 2015 2015 Use & Lease

More information

9 CONSTRUCTION OF BATHURST STREET FROM GREEN LANE WEST TO SOUTH OF HIGHWAY 11, TOWN OF EAST GWILLIMBURY AND TOWNSHIP OF KING

9 CONSTRUCTION OF BATHURST STREET FROM GREEN LANE WEST TO SOUTH OF HIGHWAY 11, TOWN OF EAST GWILLIMBURY AND TOWNSHIP OF KING Clause No. 9 in Report No. 9 of Committee of the Whole was adopted, without amendment, by the Council of The Regional Municipality of York at its meeting held on May 15, 2014. 9 CONSTRUCTION OF BATHURST

More information

Preferred Recreation Recommendations Stemilt-Squilchuck Recreation Plan March 2018

Preferred Recreation Recommendations Stemilt-Squilchuck Recreation Plan March 2018 Preferred Recreation Recommendations Stemilt-Squilchuck Recreation Plan March 2018 Below are the recommended recreation ideas and strategies that package together the various recreation concepts compiled

More information

Welcome to the. EBC Breakfast Meeting. The CSO Program Update Frederick A. Laskey Executive Director Massachusetts Water Resources Authority

Welcome to the. EBC Breakfast Meeting. The CSO Program Update Frederick A. Laskey Executive Director Massachusetts Water Resources Authority Welcome to the EBC Breakfast Meeting The CSO Program Update Frederick A. Laskey Executive Director Massachusetts Water Resources Authority Massachusetts Water Resources Authority Presentation to the Environmental

More information

To propose the demolition of the former St. Ann School Education Resource Centre building located at 2123 Hixon Street, Oakville.

To propose the demolition of the former St. Ann School Education Resource Centre building located at 2123 Hixon Street, Oakville. Regular Board Meeting Tuesday, October 20, 2015 STAFF REPORT ITEM 9.1 FORMER ST. ANN EDUCATION RESOURCE CENTRE PROPOSED BUILDING DEMOLITION PURPOSE: To propose the demolition of the former St. Ann School

More information

LESLIE BARNS & CONNECTION TRACK. Construction Liaison Group Meeting #6 January 30, 2014

LESLIE BARNS & CONNECTION TRACK. Construction Liaison Group Meeting #6 January 30, 2014 LESLIE BARNS & CONNECTION TRACK Construction Liaison Group Meeting #6 January 30, 2014 Construction Liaison Group Jan 30 2014 1 OVERVIEW HAPPY BELATED NEW YEAR Works to Date Underground Utilities Bell

More information

The original needs analysis carried out in 2001 identified three options for acquiring or leasing land for the crèche:

The original needs analysis carried out in 2001 identified three options for acquiring or leasing land for the crèche: 5. REDCLIFFS/SUMNER COMMUNITY CRÈCHE RELOCATION Officer responsible Author Property Manager Kevin Mara, DDI 941 6401 The purpose of this report is to update the Council on the status of this project, in

More information

Safety, Infrastructure, and Tenant Improvement Project. Public Hearing Informational Brochure February 26, 2013

Safety, Infrastructure, and Tenant Improvement Project. Public Hearing Informational Brochure February 26, 2013 New York State Department of Transportation Safety, Infrastructure, and Tenant Improvement Project Public Hearing Informational Brochure February 26, 2013 This DEIS/Draft EA evaluates the potential impacts

More information

Initial OPW Designation APSR AFRR IRR Co-ordinates Easting: Northing: River / Catchment / Sub-catchment Type of Flooding / Flood Risk

Initial OPW Designation APSR AFRR IRR Co-ordinates Easting: Northing: River / Catchment / Sub-catchment Type of Flooding / Flood Risk Location: Shannon International Airport, Co. Clare Unique ID: 275484 (from PFRA database) Initial OPW Designation APSR AFRR IRR Co-ordinates Easting: 137674 Northing: 161045 River / Catchment / Sub-catchment

More information

Wilts & Berks Canal. Appendix E: Hydrology and Hydraulics CONTENTS 1. INTRODUCTION 2 2. HYDROLOGY 2 3. HYDRAULIC MODEL 2 4.

Wilts & Berks Canal. Appendix E: Hydrology and Hydraulics CONTENTS 1. INTRODUCTION 2 2. HYDROLOGY 2 3. HYDRAULIC MODEL 2 4. Wilts & Berks Canal Melksham River Route Study Appendix E: Hydrology and Hydraulics CONTENTS 1. INTRODUCTION 2 2. HYDROLOGY 2 3. HYDRAULIC MODEL 2 4. CANAL OPERATION 3 5. WEIR DESIGN 4 6. FLOOD RISK 5

More information