Enhancing hydrological data management and exchange procedures
|
|
- Barbara Tucker
- 5 years ago
- Views:
Transcription
1 Enhancing hydrological data management and exchange procedures The Sava River Hydraulic Model Dr Mark R Jourdan, PE Research Hydraulic Engineer U.S. Army Engineer Research and Development Center Vicksburg, MS US Army Corps of Engineers
2 Sava River Watershed Site Map
3 Study Goals Utilize best available data to produce an HEC-RAS steady flow model that could be handed off to the ISRBC for further development Develop a methodology for inundation mapping tied to the hydraulic modeling
4 Study Goals Workshop SEP 2010 Train ISRBC on modeling and mapping software (HEC products) Demonstrate how to use these products Train what information and what steps need to be taken to improve these products Demonstrate various flood risk programs in the US FEMA Flood Insurance Program (DFIRM) Modeling, Mapping, and Consequences Production Center FEMA RiskMAP Discuss the future of floodplain risk management in the Sava River
5 Hydraulic Modeling (HEC-RAS) Approach Model Sava River using a steady flow HEC- RAS Model Extend XSs provided by ISRBC using DEM to transect the entire floodplain Levee stations added to represent levee locations and overtopping elevations Allow flow to be contained within the levee stations until overtopping of the levees Conceptually, this approach does not work w Floodplains are too wide. When overtopping of the levees occur steady flow solution becomes invalid w Gate structure is difficult to simulate in steady flow model
6 BUILDING STRONG
7 Hydraulic Modeling (HEC-RAS) Approach Ultimately, A steady flow HEC-RAS model, An HEC-HMS model, and An unsteady flow HEC-RAS model was developed using the approach of modeling the Sava River with the gated flow diversion structures in the Central Posavina flood protection system Major Limitation: Flooding information can not be developed outside of the levee system except in the area of the Central Posavina flood protection
8 Hydraulic Modeling (HEC-RAS) HEC-RAS Model Development Cross section geometry Developed using DEM in HEC-GeoRAS ISRBC cross sectional data merged into the XSs cut from DEM Storage Areas Originally, storage curves derived from DEM Post-workshop, storage curves provided by ISRBC were used for the Central Posavina flood protection system storage areas Bridges Only a single bridge added as an example Determined that most bridges on the Sava River do not cause major backwater effects
9 BUILDING STRONG
10 Hydraulic Modeling (HEC-RAS) HEC-RAS Model Development Levees Most difficult component to model 4 Sources for Levee Information w Levee centerline shapefile provided by ISRBC Provided location of levee w XS data from ISRBC HEC-RAS model Provided location and elevation w Aerial Imagery w DEM Provided location Provided location and elevation Sources did not always match Engineering judgment necessary
11 BUILDING STRONG
12 Hydraulic Modeling (HEC-RAS) HEC-RAS Model Development Central Posavina Flood Protection System Important from a modeling standpoint to correctly account for flow diversion during high flow events Incorporates a system of levees, diversion channels and storage areas Difficult to model conceptually not having the opportunity to visit the site
13 BUILDING STRONG
14 Hydraulic Modeling (HEC-RAS) HEC-RAS Model Results Calibration Calibrated to the DEC 2009 and SEP 2010 flood events Calibration at the lower end is reasonable Unsatisfactory calibration in the region around the Central Posavina Flood Protection System. w Poor calibration could be due to several issues Incorrect stream flow inputs based on the observed discharge gages. Gages do not align with confluences of major tributaries Incorrect representation of the Central Posavina Flood Protection System w The modeling approach to simulating the flood protection system needs to be re-evaluated
15 140 Sava 6 Sava River Model December 2009 Event Croatia/Slovenia Border 120 Central Posavina FPS Elevation (m) 100 Belgrade Sremska Mitrovica Slavonski Brod Sremska Mitrovic Raca Jamena Brcko Zupanja Slavonski Brod Srbac Davor Main Channel Distance (m) Mackovac Ustava Stara Gradiska Jasenovac Trebez Sava Gusce Crnac Dubrovak Prevlaka Sava Rugvica Zagreb Preljev Jankomr Jessenice Na Dol
16 September 2010 Event Croatia/Slovenia Border Central Posavina FPS Belgrade Sremska Mitrovica Slavonski Brod
17 Hydraulic Modeling (HEC-RAS) Inundation Mapping Developed inundation mapping for the DEC 2009 and SEP 2010 flood events Poor quality DEM prohibits the development of usable inundation mapping New LiDAR or other DEM could greatly benefit the development of inundation mapping and hydraulic model geometry Examples
18 BUILDING STRONG
19 BUILDING STRONG
20 BUILDING STRONG
21 Modeling Limitations Levee Information Very difficult to determine proper location and elevations of levees Central Posavina Flood Protection System Difficult to conceptualize without seeing the system Unclear on operational plan for the system DEM Probably the most critical limitation of the modeling Very expensive to have the necessary area flown for the Sava River and its tributaries
22 Model Improvements and Uses Further geometry improvement and calibration of the base HEC-HMS and HEC-RAS model using the updated models since the Phase 1 model development Calibrate to more historic events and a flood frequency based analysis Additional Tributary Modeling Focus on tributaries with adequate available data Utilize HEC-HMS model for flow input Improved inundation mapping using better digital terrain information If not available, demonstrate inundation mapping capability in a pilot area 2-D Modeling using the new 2-D features in HEC- RAS or another 2-D modeling software Depends on better DTM and release of HEC-RAS
23 Model Improvements and Uses (continued) Consequence Estimation Utilizing HEC-FIA Depends on better DTM and development of a structure database with necessary information Flood Warning Products Based on scenario or statistically-based events Link to stream gage elevations Depends on better DTM Flood Forecasting using a system HEC-HMS and HEC-RAS model. Dam Failure Breach Analysis Develop mapping and emergency action plans
24 BUILDING STRONG
25 BUILDING STRONG
26 BUILDING STRONG
27 BUILDING STRONG
28 Conclusions Overall the goal of developing a base hydraulic model that can be improved upon by the ISRBC was accomplished Included was a base HEC-HMS and unsteady flow HEC-RAS model However, the modeling is incomplete at this point and requires more refinement Focusing on developing a robust HEC-HMS model Using HEC-HMS flow hydrographs as input into the HEC-RAS model With additional effort, an HEC-HMS model could be calibrated and utilized to develop discharge inputs to the HEC-RAS model Develop a process for HEC-DSSVue to digest the stage, flow and precip information from each country The flow inputs from a calibrated HEC-HMS model could allow for more detailed calibration of the HEC-RAS model A system for creating inundation mapping was not achieved primarily due to low quality DEM In the future, the modeling of the tributaries to the Sava River could be more critical than the Sava River in terms of evaluating flood risk considering the tributaries have less extensive levee system and more channel-floodplain interaction
29 Thank you
ACTIVITIES ON FLOOD RISK MANAGEMENT AND CLIMATE CHANGE ADAPTATION IN THE SAVA RIVER BASIN
ACTIVITIES ON FLOOD RISK MANAGEMENT AND CLIMATE CHANGE ADAPTATION IN THE SAVA RIVER BASIN Workshop on WATER-FOOD-ENERGY-ECOSYSTEMS NEXUS ASSESSMENT IN THE SAVA RIVER BASIN 4-6 March 2014, Zagreb Vasiljka
More informationJasna Plavsic. WATER-FOOD-ENERGY-ECOSYSTEMS NEXUS ASSESSMENT IN THE SAVA RIVER BASIN Zagreb, 6 March 2014
WATER-FOOD-ENERGY-ECOSYSTEMS NEXUS ASSESSMENT IN Zagreb, 6 March 214 Water and Climate Adaptation Plan (WATCAP) for the Sava River Basin: Climate Change Predictions for the Sava River Basin Jasna Plavsic
More informationInternational Sava River Basin Commission
International Sava River Basin Commission Pilot project on climate change: Building the link between the Flood Risk Management planning and climate change assessment in the Sava River Basin climate change
More informationFLOW REDUCTION IMPACTS ALONG RIVER NILE IN EGYPT
FLOW REDUCTION IMPACTS ALONG RIVER NILE IN EGYPT Sherine S. Ismail Prof., Head of Lake Nasser studies department, Nile Research Institute, E-mail:sherine_shawky@yahoo.com ABSTRACT Nile water discharges
More informationHYDRAULIC DESIGN OF THE TOURISTIC BERTHING IN ASWAN CITY
HYDRAULIC DESIGN OF THE TOURISTIC BERTHING IN ASWAN CITY Dr. Hossam El-Sersawy Researcher, Nile Research Institute (NRI), National Water Research Center (NWRC), Egypt E-mail: h_sersawy@hotmail.com Dr.
More information12th Sava PEG FP Meeting REPORT 1 Zagreb, Croatia October 20-21, 2009
Ref. No.: 30916/32 Zagreb, October 21, 2009 12th Sava PEG FP Meeting REPORT 1 Zagreb, Croatia October 2021, 2009 1 Final version reviewed and accepted by the PEG FP Agenda of the Meeting 1. Opening of
More informationIntroduction. Background MEMORANDUM
MEMORANDUM Date: July 22, 2014 To: H&H Technical Committee From: Bob Elliot and Larry Karpack, Watershed Science & Engineering Cc: Bob Montgomery, Anchor QEA Re: Chehalis Basin Strategy: Reducing Flood
More informationThirteenth International Water Technology Conference, IWTC , Hurghada, Egypt 1249
Thirteenth International Water Technology Conference, IWTC 13 2009, Hurghada, Egypt 1249 EVALUATION OF LOCAL SCOUR AROUND BRIDGE PIERS (RIVER NILE BRIDGES AS CASE STUDY) Sherine Ismail Assoc. Prof., Survey
More informationNational and Regional Activities, Needs and Expectations
National and Regional Activities, Needs and Expectations The perspective from the International Sava River Basin Commission International collaboration in the forecasting of river flows within the Sava
More informationInternational Sava River Basin Commission
International Sava River Basin Commission Pilot project on climate change: Building the link between the Flood Risk Management planning and climate change assessment in the Sava River Basin - climate change
More information"Transboundary coordination according to the FD Directive in the shared river basins of Greece
Workshop on Transboundary Issues Budapest March 31st April 1st "Transboundary coordination according to the FD Directive in the shared river basins of Greece Katerina Triantafyllou, ECOS Consulting S.A.
More informationOverview. Sava River Basin. Sava River Basin. Sava River Basin
Overview Introduction on the Framework Agreement on the a basis for sustainable development of the region Framework Agreement on the (FASRB) and the International Commission (ISRBC) Approach to Sustainable
More informationTowards practical Guidance for Sustainable Sediment Management using the Sava River as a showcase
UNIVERSITY OF ZAGREB FACULTY OF CIVIL ENGINEERING WATER RESEARCH DEPARTMENT Towards practical Guidance for Sustainable Sediment Management using the Sava River as a showcase Damir Bekić, Ph.D., M.Sc.,
More information2014 floods in Serbia
16 th Meeting of WGF, Rim, 9-10 October 2014 2014 floods in Serbia Radovanka Pavlović Ministry of Agriculture and Environmental Protection Republic Water Direcrorate, Belgrade, Serbia Specific cyclone
More informationRegional Cooperation on Flood Management in the Sava River Basin
Regional Cooperation on Flood Management in the Sava River Basin Flood Risk Management Plans: international experiences by comparison Mirza Sarač ISRBC Secretariat Content Introduction Sava River Basin
More informationDevelopment of a MIKE11 Model of the Danube, Tisa and Sava Rivers in Serbia
Development of a MIKE11 Model of the Danube, Tisa and Sava Rivers in Serbia Vasiljka KOLAROV*, Marina BABIĆ MLADENOVIĆ*, Zoran KNEŽEVIĆ*, Martin MIŠIK** * Jaroslav Černi Institute, Department for River
More informationInternational Sava River Basin Commission - An example of EU/non EU country cooperation in water management
International Sava River Basin Commission - An example of EU/non EU country cooperation in water management Improvement and co-operation possibilities in the water sector with non-eu countries Ulm, 29
More informationWaukegan & Calumet Rivers. All Hands Meeting
Waukegan & Calumet Rivers 516(e) Update All Hands Meeting David F. Bucaro, P.E. Chief, Economic Formulation & Analysis Section, Planning Branch May 18 th, 2011 Kensington Court Ann Arbor, MI 1 2 Waukegan
More informationInternational Osoyoos Lake Board of Control Annual Report to the International Joint Commission
International Osoyoos Lake Board of Control 2010 Annual Report to the International Joint Commission TABLE OF CONTENTS ACTIVITIES OF THE BOARD... 1 HYDROLOGIC CONDITIONS IN 2010... 2 Drought Criteria...
More informationSava Commission Activities. DANUBE SKILLS KICK OFF EVENT, February 21, 2017, Bucharest
Sava Commission Activities DANUBE SKILLS KICK OFF EVENT, February 21, 2017, Bucharest 1 Establishment of the ISRBC 2 Decay of SFRY a challenge to WRM in the Sava river basin Sava river used to be the biggest
More informationBudi Hadi Narendra Harris Herman Siringoringo Chairil Anwar Siregar. Research and Development Center for Forest
Budi Hadi Narendra Harris Herman Siringoringo Chairil Anwar Siregar Research and Development Center for Forest Background Coastal management should be wisely done as a part of watershed management. Typologically,
More informationFlood History. Floodplain Descriptions
Flood History The worst flooding in the area took place in 1966, 1969, 1971, 1995 and 1998. The storms in 1966 and 1969 caused considerable damage throughout the area due to flooding, erosion and debris
More informationHidrološki model za potrebe analize klimatskih scenarija u slivu rijeke Save
Hidrološki model za potrebe analize klimatskih scenarija u slivu rijeke Save Razvoj modela i osnovni rezultati Projekt: Strategija prilagodbe klimatskim promjenama Radionica br. 8/10: HIDROLOGIJA I UPRAVLJANJE
More informationPlatte West Well Field A Protective Modeling Approach
Platte West Well Field A Protective Modeling Approach Presented to: 2007 Eastern South Dakota Water Conference / 52 nd Annual Midwest Ground Water Conference June 25, 2007 Presented by: Luca DeAngelis,
More information28 th Meeting of the Permanent Expert Group for Flood Protection REPORT FROM THE MEETING Zagreb, January 2016
Ref. No.: 3-16-1/3-2 Zagreb, 27 January 2016 28 th Meeting of the Permanent Epert Group for Flood Protection REPORT FROM THE MEETING Zagreb, 26-27 January 2016 Venue: Premises of the International Sava
More informationDuncan Hastie, P.E. Dewberry
FEMA s Riverine High Water Marks for Atlanta s September 2009 Flood Event Duncan Hastie, P.E. Dewberry Background High Water Mark Recovery Performed Through FEMA s Hazard Mitigation Technical Assistance
More informationHydraulic Report. Trail 5 Snowmobile Trail Over Mulligan Creek. Prepared By: COLEMAN ENGINEERING COMPANY Karisa V. Falls, P.E.
Prepared for: Prepared by: Marquette County Road Commission Coleman Engineering Company Marquette, Michigan Iron Mountain, MI December 2011 Hydraulic Report Trail 5 Snowmobile Trail Over Mulligan Creek
More informationHydrological study for the operation of Aposelemis reservoir Extended abstract
Hydrological study for the operation of Aposelemis Extended abstract Scope and contents of the study The scope of the study was the analytic and systematic approach of the Aposelemis operation, based on
More informationSava Commission Activities. KICK-OFF MEETING DANTE, February 17, 2017, Budapest
Sava Commission Activities KICK-OFF MEETING DANTE, February 17, 2017, Budapest 1 Establishment of the ISRBC 2 Decay of SFRY a challenge to WRM in the Sava river basin Sava river used to be the biggest
More informationHow to develop resilient infrastructure (Global SDG9)
How to develop resilient infrastructure (Global SDG9) 16-17 November 2017, Ljubljana, Slovenia Development of resilient rail infrastructure, practices in the Republic of Macedonia Darko Miceski Viktorija
More informationWhen the preventative evacuation of Orléans can be decided on before a flood?
When the preventative evacuation of Orléans can be decided on before a flood? GOUTX David (et al.) Loire flood-forecasting service 1/25 Major floods: a major issue for the Loire valley 2/25 Major floods:
More informationGarmin GNC 420 GPS Navigator with VHF COM
Cirrus Design Section 9 Pilot s Operating Handbook and FAA Approved Airplane Flight Manual Supplement for Garmin GNC 420 GPS Navigator with VHF COM When a GARMIN GNC 420 GPS Navigator with VHF COM is installed
More informationMINUTES. Additional Stakeholders including CU, CDOT, Town of Erie, and Weld County have been contacted and invited to the recurring progress meetings.
PROGRESS MEETING BOULDER CREEK MASTER PLAN UDFCD, BOULDER COUNTY, CITIES OF BOULDER & LONGMONT JANUARY 13, 2015 AT 1:00 PM MINUTES 1) ATTENDEES Craig Jacobson, ICON Engineering, Inc. Brian LeDoux, ICON
More informationWilts & Berks Canal. Appendix E: Hydrology and Hydraulics CONTENTS 1. INTRODUCTION 2 2. HYDROLOGY 2 3. HYDRAULIC MODEL 2 4.
Wilts & Berks Canal Melksham River Route Study Appendix E: Hydrology and Hydraulics CONTENTS 1. INTRODUCTION 2 2. HYDROLOGY 2 3. HYDRAULIC MODEL 2 4. CANAL OPERATION 3 5. WEIR DESIGN 4 6. FLOOD RISK 5
More informationCofferdam Performance Hurricanes Harvey & Irma
Cofferdam Performance Hurricanes Harvey & Irma - 2017 Greg Hammer Senior Geotechnical Engineer CELRH-DSPC-GS DSMMCX Third Workshop on Case Histories in Dam Safety Risk-Informed Decision Making 2018 USSD
More informationRehabilitation and development of navigation on the Sava river
Rehabilitation and development of navigation on the Sava river 3rd Joint Statement Implementation Meeting, Vienna, April 5-6, 2011 Background of the project Recognized as a priority project in the framework
More informationREPORT on implementation of the FRAMEWORK AGREEMENT ON THE SAVA RIVER BASIN and work of International Sava River Basin Commission in the period April
REPORT on implementation of the FRAMEWORK AGREEMENT ON THE SAVA RIVER BASIN and work of International Sava River Basin Commission in the period April 01, 2016 March 31, 2018 7 th Meeting of the Parties
More informationEXECUTIVE SUMMARY COMMONWEALTH OF PUERTO RICO FY 2004-FY2009 MAP MODERNIZATION BUSINESS PLAN. Page i
EXECUTIVE SUMMARY I. Introduction The Commonwealth of Puerto Rico will support the Federal Emergency Management Agency s (FEMA s) Multi-Hazard Flood Map Modernization Program (MHFMMP) by contributing to
More informationPhoenix Habitat Restoration Projects
Phoenix Habitat Restoration Projects Spur Cross Ranch Cave Creek (Estergard) Regional Tree and Shade Summit March 9, 2010 Desert Riparian Ecosystems Healthy riparian areas like this once existed along
More informationSTUDY OVERVIEW MASTER PLAN GOALS AND OBJECTIVES
INTRODUCTION An Airport Master Plan provides an evalua on of the airport s avia on demand and an overview of the systema c airport development that will best meet those demands. The Master Plan establishes
More informationMARINA BOLADO PENAGOS A METHODOLOGY TO ASSESS THE ROLE OF THE RIVER DISCHARGES TO THE GULF OF CADIZ ON THE NUTRIENT SUPPLY TO THE ALBORAN SEA
MARINA BOLADO PENAGOS A METHODOLOGY TO ASSESS THE ROLE OF THE RIVER DISCHARGES TO THE GULF OF CADIZ ON THE NUTRIENT SUPPLY TO THE ALBORAN SEA INTRODUCTION General MEGAN Project Case Study Guadalquivir
More informationChapter 4.0 Alternatives Analysis
Chapter 4.0 Alternatives Analysis Chapter 1 accumulated the baseline of existing airport data, Chapter 2 presented the outlook for the future in terms of operational activity, Chapter 3 defined the facilities
More informationConnecting Sava River. Tihomir L. Divjak
Connecting Sava River Tihomir L. Divjak Baseline Sava River Basin is an unstable hydrological system Smart and sustainable development of Sava River Basin must be provided Definitions are given in the
More informationFramework Agreement on the Sava River Basin and its implementation
Framework Agreement on the Sava River Basin and its implementation Dejan Komatina, Ph.D. Civ. Eng., Secretary, ISRBC Samo Grošelj, Deputy Secretary Overview Introduction on the Sava river basin Establishment
More informationUNMANNED AIRCRAFT SYSTEMS (UAS) IN UTILITIES
UNMANNED AIRCRAFT SYSTEMS (UAS) IN UTILITIES Presented by: Dan Carbone Avion Unmanned Why Drones? Why Drones? Cost Effective Entire cost of a UAS program can be recouped in first-year man-hour savings
More informationII. THE BOULDER CREEK DRAINAGE BASIN
II. THE BOULDER CREEK DRAINAGE BASIN This section provides an overview of the watersheds and flood hazards associated with Boulder Creek and South Boulder Creek including descriptions of the drainage basins,
More informationStability Pact for SEE. Working Table II. Sava River Basin Initiative
Stability Pact for SEE Working Table II Sava River Basin Initiative Background Prior to disintegration of former Yugoslavia, the Sava was a river basin of national interest Now, it belongs to four countries:
More informationIntroduction. The System. Model Limitations, Assumptions, and Parameters. Optional Services Tech Memo
Optional Services Tech Memo Introduction This technical memo evaluates the impact of a tide gate to be installed at the confluence of the Left Bank Tributary of Thalia Creek and Lake Windsor. Specifically,
More informationMississippi River & Tributaries Project History & Overview
Mississippi River & Tributaries Project History & Overview Watershed Division Mississippi Valley Division 17 June 2015 US Army Corps of Engineers BUILDING STRONG Lake Texoma Spillway Tulsa Little Rock
More informationUAV Flight Services Company. What We Do. What Sets us Apart
UAV Flight Services Company A dedicated team of aviators, technologists, and engineers. What We Do UAV flight services for data collection, mapping, and inspection What Sets us Apart Extensive field experience,
More informationMANAGING FRESHWATER INFLOWS TO ESTUARIES
MANAGING FRESHWATER INFLOWS TO ESTUARIES Yuna River Hydrologic Characterization A. Warner Warner, A. (2005). Yuna River Hydrologic Characterization. University Park, Pennsylvania: The Nature Conservancy.
More informationACTION PLAN FOR THE PERIOD concerning the STRATEGY ON IMPLEMENTATION OF THE FRAMEWORK AGREEMENT ON THE SAVA RIVER BASIN
Doc. 1S-26-O-11-5/1-2 ACTION PLAN FOR THE PERIOD 2011-2015 concerning the STRATEGY ON IMPLEMENTATION OF THE FRAMEWORK AGREEMENT ON THE SAVA RIVER BASIN April 2011 Table of Contents INTRODUCTION... 5 1.
More informationDatum Issues in the Red River of the North Basin ----
Datum Issues in the Red River of the North Basin ---- Scoping Document May 1999 Russell E. Harkness, Hydrologist United States Geological Survey Water Resources Division 2 EXECUTIVE SUMMARY Two datum issues
More informationFLIGHT PATH FOR THE FUTURE OF MOBILITY
FLIGHT PATH FOR THE FUTURE OF MOBILITY Building the flight path for the future of mobility takes more than imagination. Success relies on the proven ability to transform vision into reality for the betterment
More informationNEW YORK-NEW JERSEY HARBOR AND TRIBUTARIES NEW YORK DISTRICT. Interim Report Economics Appendix
NEW YORK-NEW JERSEY HARBOR AND TRIBUTARIES NEW YORK DISTRICT Interim Report Economics Appendix New York New Jersey Harbor and Tributaries Coastal Storm Risk Management Feasibility Study Interim Report
More informationTrail Assessment Report
Trail Assessment Report Trail Options for the Bear Creek Canyon located in Pikes Peak Ranger District, Pike National Forest and on Colorado Springs Utility Lands Due to the presence of a unique species
More informationAdvanced Flight Control System Failure States Airworthiness Requirements and Verification
Available online at www.sciencedirect.com ScienceDirect Procedia Engineering 80 (2014 ) 431 436 3 rd International Symposium on Aircraft Airworthiness, ISAA 2013 Advanced Flight Control System Failure
More informationTRINITY RIVER CORRIDOR
TRINITY RIVER CORRIDOR MODIFIED DALLAS FLOODWAY PROJECT UPDATE May 12, 2015 Jon Loxley Project Manager Dallas Floodway Project Fort Worth District U.S. Army Corps of Engineers US Army Corps of Engineers
More informationEstimating the Risk of a New Launch Vehicle Using Historical Design Element Data
International Journal of Performability Engineering, Vol. 9, No. 6, November 2013, pp. 599-608. RAMS Consultants Printed in India Estimating the Risk of a New Launch Vehicle Using Historical Design Element
More informationSurveillance and Broadcast Services
Surveillance and Broadcast Services Benefits Analysis Overview August 2007 Final Investment Decision Baseline January 3, 2012 Program Status: Investment Decisions September 9, 2005 initial investment decision:
More informationInternational Osoyoos Lake Board of Control Annual Report to the International Joint Commission
International Osoyoos Lake Board of Control 2013 Annual Report to the International Joint Commission TABLE OF CONTENTS ACTIVITIES OF THE BOARD... 1 HYDROLOGIC CONDITIONS IN 2013... 2 Drought Criteria...
More informationGlass Cockpits in General Aviation Aircraft. Consequences for training and simulators. Fred Abbink
Glass Cockpits in General Aviation Aircraft. Consequences for training and simulators Fred Abbink Content Development of Air transport cockpits, avionics, automation and safety Pre World War 2 Post World
More informationQuality Assurance. Introduction Need for quality assurance Answer to the need of quality assurance Details on quality assurance Conclusion A B C D E
Quality Assurance 1 A B C D E Introduction Need for quality assurance Answer to the need of quality assurance Details on quality assurance Conclusion 2 1 Introduction 3 Introduction The implementation
More informationManaging water supply resources in karstic environment (temperate climate)
UNESCO WORKSHOP Integrated Urban Water Management in TC Temperate Climates Belgrade 15-16 May 2006 Managing water supply resources in karstic environment (temperate climate) E. Rozos, D. Koutsoyiannis
More informationRecommendations for Northbound Aircraft Departure Concerns over South Minneapolis
Recommendations for Northbound Aircraft Departure Concerns over South Minneapolis March 21, 2012 Noise Oversight Committee Agenda Item #4 Minneapolis Council Member John Quincy Background Summer of 2011
More informationREPORT from the 47 th Session of the International Sava River Basin Commission
Doc. No: 1S-47-M-17-1/1-3 REPORT from the 47 th Session of the International Sava River Basin Commission Zagreb, 10-11 October 2017 Venue: Premises of the International Sava River Basin Commission, Kneza
More informationSMS HAZARD ANALYSIS AT A UNIVERSITY FLIGHT SCHOOL
SMS HAZARD ANALYSIS AT A UNIVERSITY FLIGHT SCHOOL Don Crews Middle Tennessee State University Murfreesboro, Tennessee Wendy Beckman Middle Tennessee State University Murfreesboro, Tennessee For the last
More informationUpdate on FLOODS in Nigeria
EUROPEAN COMMISSION JOINT RESEARCH CENTRE Update on FLOODS in Nigeria JRC Emergency Report #021 Nigeria, 19th of September 2018 Executive Summary The National Emergency Management Agency (NEMA) informs
More informationSensitivity Analysis for the Integrated Safety Assessment Model (ISAM) John Shortle George Mason University May 28, 2015
Sensitivity Analysis for the Integrated Safety Assessment Model (ISAM) John Shortle George Mason University May 28, 2015 Acknowledgments Sherry Borener, FAA Alan Durston, Brian Hjelle, Saab Sensis Seungwon
More informationFORECASTING FUTURE ACTIVITY
EXECUTIVE SUMMARY The Eagle County Regional Airport (EGE) is known as a gateway into the heart of the Colorado Rocky Mountains, providing access to some of the nation s top ski resort towns (Vail, Beaver
More informationCitrus County, FL Map Modernization Scoping Meeting
Citrus County, FL Map Modernization Scoping Meeting Lecanto Government Complex April 26, 2007 Definition Flood A general and temporary condition of partial or complete inundation of two or more acres of
More informationSummary of Committee Discussion/Questions Metropolitan Transportation Services Senior Planner Russ Owen presented this item.
Committee Report Business Item No. 2017-191 Transportation Committee For the Metropolitan Council meeting of September 13, 2017 Subject: Final Crystal Airport 2035 Long Term Comprehensive Plan (LTCP) Proposed
More informationApplicability / Compatibility of STPA with FAA Regulations & Guidance. First STAMP/STPA Workshop. Federal Aviation Administration
Applicability / Compatibility of STPA with FAA Regulations & Guidance First STAMP/STPA Workshop Presented by: Peter Skaves, FAA Chief Scientific and Technical Advisor for Advanced Avionics Briefing Objectives
More informationFEDERAL AVIATION ADMINISTRATION
FEDERAL AVIATION ADMINISTRATION FLIGHT OPERATIONS, SIMULATION, and ANALYSIS BRANCH, AFS-440 Oklahoma City, OK, USA November 12, 2003 Dr. David N. Lankford (FAA/AFS-440) Shahar Ladecky (ATSI) Airspace Simulation
More informationUS 380 FEASIBILITY STUDY
US 380 FEASIBILITY STUDY Denton County CSJ(s): 0135-10-061, 0135-10-062 Public Meeting(s): January 15 & 22, 2019 WELCOME US 380 Denton County Feasibility Study DALLAS DISTRICT PUBLIC MEETING January 15
More informationAgenda Report. Spruce Street Outlet Drainage Improvements Tower Road Relief Sewer
Agenda Report Subject: Prepared By: Spruce Street Outlet Drainage Improvements Tower Road Relief Sewer Steven M. Saunders, Director of Public Works/Village Engineer Date: August 12, 2012 On March 8, 2012
More informationATTACHMENT TO LETTER TO SOLANO COUNTY Part A -8 pages PAGE 1
ATTACHMENT TO LETTER TO SOLANO COUNTY 3-13-2012 Part A -8 pages PAGE 1 1. Why is Solano County using incorrect flood data regarding Ryer Island? Note the map from the presentation slide in 2011, And the
More informationPERFORMANCE MEASURE INFORMATION SHEET #16
PERFORMANCE MEASURE INFORMATION SHEET #16 ARROW LAKES RESERVOIR: RECREATION Objective / Location Recreation/Arrow Lakes Reservoir Performance Measure Access Days Units Description MSIC 1) # Access Days
More informationMarch 2016 Safety Meeting
March 2016 Safety Meeting AC 61 98C Subject: Currency Requirements and Guidance for the Flight Review and Instrument Proficiency Check Date: 11/20/15 AC No: 61-98C Initiated by: AFS-800 Supercedes: AC
More informationProject Data Sheet BASIC PROJECT DATA. Rehabilitation and Development of Transport and Navigation on the Sava River Waterway. Full project title:
BASIC PROJECT DATA Full project title: Short project title: (acronym) Rehabilitation and Development of Transport and Navigation on the Sava River Waterway Project logo: Project website: www.savacommission.org
More informationOngoing and planned activities of the Sava Commission related to the scope of EUSDR PA5
Ongoing and planned activities of the Sava Commission related to the scope of EUSDR PA5 11 TH PA5 STEERING GROUP MEETING 27 January 2017, Budapest Mirza Sarač, International Sava River Basin Commission
More informationAn experimental habitat enhancement effort for a sandy river: San Rafael River restoration project
An experimental habitat enhancement effort for a sandy river: San Rafael River restoration project Samuel Lyster Department of Watershed Sciences, Utah State University Brian G. Laub Department of Watershed
More informationFLIGHT OPERATIONS PANEL (FLTOPSP)
International Civil Aviation Organization FLTOPSP/1-WP/3 7/10/14 WORKING PAPER FLIGHT OPERATIONS PANEL (FLTOPSP) FIRST MEETING Montréal, 27 to 31 October 2014 Agenda Item 4: Active work programme items
More informationOutline. The main objectives. The main objectives. Distribution of stable isotopes in the Sava River in Serbia
Distribution of stable isotopes in the Sava River in Serbia N. MILJEVIĆ 1, D. GOLOBOČANIN 1, M. NADEŽDI DIĆ, N. OGRINC 3 1 Vinča a Institute of Nuclear Sciences, POB 5, 11001 Belgrade, Serbia Republic
More informationGOOSENECK SWAMP INFORMATION DAY - Saturday 14 th December 2013
GOOSENECK SWAMP INFORMATION DAY - Saturday 14 th December 2013 Progress of a restoration trial at Gooseneck Swamp - Grampians National Park, Victoria Gooseneck Swamp is situated at the far south-eastern
More informationAll-Weather Operations Training Programme
GOVERNMENT OF INDIA CIVIL AVIATION DEPARTMENT DIRECTOR GENERAL OF CIVIL AVIATION OC NO 3 OF 2014 Date: OPERATIONS CIRCULAR Subject: All-Weather Operations Training Programme 1. INTRODUCTION In order to
More informationD DAVID PUBLISHING. Development and Achievement of the T-50 Flight Control s Consolidated OFP. 1. Introduction. 2. Consolidated OFP s Needs
Journal of Aerospace Science and Technology 1 (2015) 67-72 doi: 10.17265/2332-8258/2015.02.003 D DAVID PUBLISHING Development and Achievement of the T-50 Flight Control s Consolidated OFP Soon Ryong Jang,
More informationFeasibility Study Federal Inspection Service Facility at Long Beach Airport
Feasibility Study Federal Inspection Service Facility at Long Beach Airport 13 December 2016 Long Beach City Council PLEASE NOTE: The information, analysis, assessments and opinions contained in this presentation
More informationIPA Project Building Resilience to Disasters in Western Balkans and Turkey. Enhancing hydrological data management and exchange procedures
IPA Project Building Resilience to Disasters in Western Balkans and Turkey Enhancing hydrological data management and exchange procedures Banja Luka, 15-16 April 2014 MEETING REPORT 1. Introduction In
More informationHydrology Input for West Souris River IWMP
Hydrology Input for West Souris River IWMP Prepared by: Mark Lee Manitoba Water Stewardship 1 1 1 Overall view of: drainage area watershed characteristics gauging stations meteorological stations Runoff
More informationPROGRAM FOR DEVELOPMENT OF FLOOD RISK MANAGEMENT PLAN IN THE SAVA RIVER BASIN. Draft 8
PROGRAM FOR DEVELOPMENT OF FLOOD RISK MANAGEMENT PLAN IN THE SAVA RIVER BASIN Draft 8 May 2016 Date Document revision history Document author/ reviser 17 April 2014 Draft 1 sent to as document for 24 th
More informationInvestigation of River Stage Simulation Before and After Bengoh Dam Construction: Case Study of Sarawak River Basin Malaysia
International Journal of Science and Engineering Investigations vol. 4, issue 42, July 2015 ISSN: 2251-8843 Investigation of River Stage Simulation Before and After Bengoh Dam Construction: Case Study
More informationFLOOD RISK MANAGEMENT PLAN FOR THE SAVA RIVER BASIN DRAFT
Flood Risk Management Plan for the Sava River Basin FLOOD RISK MANAGEMENT PLAN FOR THE SAVA RIVER BASIN DRAFT OCTOBER 2018 Version 2.0 FLOOD RISK MANAGEMENT PLAN FOR THE SAVA RIVER BASIN Document title:
More informationGeospatial Data Collection for the FAA Airports GIS Program
Geospatial Data Collection for the FAA Airports GIS Program A Change in Direction Dr. Michael T. McNerney, P.E. FAA Office of Airports Office of Airport Safety and Standards Assistant Manager, Airport
More informationFigure 3.1. Foreign Airport Assessment Aid
01 oauu-t.d Foreign Airport Assessment Aid: Date of Assessment: Assessment Conducted by: Airport ICAO/IATA Identification: Hours of Operation: Figure 3.1. Foreign Airport Assessment Aid [ Airport Name:
More informationEAST DON TRAIL ENVIRONMENTAL ASSESSMENT. Community Liaison Committee Meeting #3 July 15, :30 to 8:30 pm Flemingdon Park Library
EAST DON TRAIL ENVIRONMENTAL ASSESSMENT Community Liaison Committee Meeting #3 July 15, 2013 6:30 to 8:30 pm Flemingdon Park Library Agenda 1. Welcome 2. Housekeeping and Updates a) Housekeeping b) CLC
More informationFlying Cloud Airport (FCM) Zoning Process: Informing a Mn/DOT Path Forward
: Informing a Mn/DOT Path Forward A Review of the Flying Cloud Airport (FCM) Joint Airport Zoning Board (JAZB) Process and the Draft Airport Zoning Ordinance B A RPZ RPZ A B C Zone Chad E. Leqve Director
More informationRunway Roughness Evaluation- Boeing Bump Methodology
FLIGHT SERVICES Runway Roughness Evaluation- Boeing Bump Methodology Michael Roginski, PE, Principal Engineer Boeing Airport Compatibility Engineering ALACPA XI Seminar, Santiago, Chile September 1-5,
More informationRegional Air Navigation Plan - Planning Methodologies and Tools. H. Sudarshan
International Civil Aviation Organization SIP/2012/ASBU/Dakar-WP/30 Regional Air Navigation Plan - Planning Methodologies and Tools H. Sudarshan Workshop on preparations for ANConf/12 ASBU methodology
More informationA GIS Assessment of Erosion Vulnerability for Unofficial Trails in the Columbia River Gorge
A GIS Assessment of Erosion Vulnerability for Unofficial Trails in the Columbia River Gorge Sachi Arakawa Geog 593 Digital Terrain Analysis Fall 2017 Abstract The city of North Bonneville, located along
More information