2 Brevard County Utility Services Department April 3, 2018 Jim Helmer, Department Director Brian Sorensen, W/WW Manager 1

3 Utility Services Department 9 TREATMENT PLANTS 6 WASTEWATER, 3 WATER 163 EMPLOYEES COUNTYWIDE APPROXIMATELY 59,000 SEWER CUSTOMERS, 1,345 IN MIMS APPROXIMATELY 8,400 WATER CUSTOMERS, 3,182 IN MIMS 2

4 Capital Improvements IN 2013 AN INTERNAL AUDIT INDICATED DEPARTMENT REVENUE WAS INSUFFICIENT TO MAINTAIN THE INFRASTRUCTURE. ASSETS WERE REACHING THEIR LIFE EXPECTANCY MOST ASSETS WERE 40 TO 50 YEARS OLD LAST RATE ADUSTMENT WAS IN

5 Infrastructure Asset Evaluation EVALUATION OF SYSTEM INFRASTRUCTURE WAS INITIATED SIX ENGINEERING FIRMS INSPECTED THE WATER & WASTEWATER SYSTEMS COUNTYWIDE AN INFRASTRUCTURE ASSET EVALUATION INDICATED APPROXIMATELY $134 MILLION IN ASSET REHABILITATION WAS REQUIRED OVER THE NEXT 10 YEARS A REVENUE SUFFICIENCY ANALYSIS WAS COMPLETED TO DETERMINE FUNDING REQUIREMENTS FOR THE DEPARTMENT RATE ADJUSTMENTS WERE INITIATED 4

6 Capital Improvements PROJECTS COMPLETED IN THE SOUTH BEACHES AREA IN 2017 Several Plant improvements to the S. Beaches Plant: Polymer Feed system Melbourne Beach 2 filter back wash tanks- Melbourne Beach $375, $566, MGD Aeration Basin rebuilds- Melbourne Beach $494, Indian Harbour Beach Yard (New Building) $402,

7 Lining Completed 2017 B-01 - Melbourne B-07 Partial 30 line 5,000 ft. Melbourne Beach S-10 50% of basin (Lift Station collection area) Indian Harbour Beach Some critical lining Total Lining: $950,

8 Lift Stations Completed 2017 S-20 Replacement Satellite Beach $421, B-13 Rehabilitation Melbourne $273, B-08 Replacement - Melbourne Beach $439, B-11 Replacement Melbourne Beach $398, S-15 & S-09 Replacement - Indian Harbour Beach $1,205,

9 Projects to be Completed 2018 South Patrick Drive 20 force main replacement $3,800, MGD Clarifier & Chemical Feed System, Melbourne Beach $1,497, Reuse pumps, Melbourne Beach $396,

10 Lining to be Completed 2018 By the end of the fiscal year 2018 we should have approximately 11 more basins completed S-10 2 nd half Indian Harbor Beach B-20 Indian Harbor Beach S-08 Satellite Beach S-13 Indian Harbor Beach S-18 Indian Harbor Beach S-22 Indian Harbor Beach S-25 Satellite Beach B-16 Melbourne S-16 Indian Harbor Beach S-14 Indian Harbor Beach B-08 Melbourne Beach Total $3,436,

11 Lift Stations to be Completed 2018 S-17 Indian Harbour Beach $531, B-10 Melbourne Beach $183, S-08 Satellite Beach $486, S-05 South Patrick Shores $467, B-02 Melbourne $347,

12 Utility Services Department QUESTIONS 11

13 Satellite Beach Water System Presentation April 3, 2018

14 City of Melbourne Population of approximately 81,000 Approximately 58,000 accounts Equivalent population of 170,000 in water service area Average day demand 16.6 MGD Maximum Day Demand 19.5 MGD Peak Hour Demand 24.8 MGD

15 Water Production Facilities Two treatment facilities: MGD Surface WTP (Actiflo) MGD Reverse Osmosis WTP Four (4) Booster Pump Stations Six (6) Ground Storage Tanks One (1) Elevated Storage Tank Total Storage Capacity = 15.0 MG

16 Water Distribution System Overall Approximately 150 miles of transmission mains Approximately 730 miles of distribution mains In Satellite Beach Approximately 5 miles of transmission mains Approximately 52 miles of distribution mains

17

18 Planned Projects Central Satellite Beach WM Replacement Phase 1A Interconnections to US Hwy A1A Water Main to begin in April 2018 Central Satellite Beach WM Replacement Phase 1 - $1.8M total project cost (under design, construction expected to start in the summer of 2018) Central Satellite Beach WM Replacement Phases 2, 3 & 4 - $2.2M total project cost (design funds budgeted for FY19, construction funds budgeted for FY21 2-Inch Galvanized WM Replacement - Bonnie Ct., Hedgecock Ct. Colonial Ct., Debra Ct. (2018) - $50,000

19

20 Other Planned Projects Canova Beach Booster Pump Station Emergency Generator/Transfer Switch - $331k (design/build under way, completion expected in Spring 2018) Ocean Boulevard WM Replacement - $800k Annual Fire Hydrant Maintenance Program (ongoing) Annual Valve Exercising/Maintenance Program (ongoing) Annual Pipe Replacement Program (ongoing)

21 Other Planned Projects Pineda Causeway WM Construction approximately $12M (under design, construction funds requested for FY19-20)

22 Recently Completed Projects Ocean Spray Boulevard 6 HDPE Kale St. to A1A, $200,000 New 16 Isolation Valve on Ocean Spray and A1A - $100,000 2 Galvanized replaced on Charles Ct, Jason Ct, Carol Ct, Price Ct. - $50,000 Roosevelt Avenue Water Main Relocations due to Drainage Conflicts

23 Precautionary Boil Water Advisories Recent Events February 2018 October 2017 July 2017 October 2016 Caused By 12 Cast Iron WM Break Water Production facility valve failure Valve failure in distribution system Hurricane Matthew Notification Process Door knockers, news media, CodeRed and government agency notifications

24 CodeRED Registration Residents can sign up for CodeRED emergency notifications on the City s website or call the ECO Division at

25 Thank You! Any questions?

26 City of Satellite Beach Stormwater Management System

27 The System (insert map) (describe general lay of the land) Primarily City owned, operated and funded System includes pipes/culverts, ditches, swales ponds, inlets, structures, baffle boxes, etc miles or 94,141 feet of pipe ranging from 6 to equivalent 8 diameter along with 791 inlets and structures Replacement value of pipe is $14,168,212 Much of system was built by developers that had different goals and regulations to abide by

28 What is Stormwater Management? Operation of facilities (pipes, inlets, ditches, ponds, etc.) Maintenance of facilities Renewal and replacement of facilities Compliance with evolving State and Federal regulations NPDES MS4 Permit Indian River/Banana River Lagoon BMAP Compliance with City Comprehensive Plan Goals/Objectives Addressing environmental changes Sea level rise

29 Near Future Concerns/Needs Renewal and replacement Large portion of existing pipe was installed in 1960 s/1970 s Much of this pipe has reached its useful life BMAP compliance Established in January 2013 Allocated City pollutant load reductions 15 year compliance Flood alleviation Sea level rise of up to 8 inches by 2040 and 13 inches by 2070 More intense and frequent large rainfall events

30 Current Stormwater Masterplan Update Update of 2001 Masterplan Incorporating 2013 Stormwater Quality Master Plan Inventory and condition assessment of faciliites Update of facility mapping Computer modeling of storm events (existing condition, future conditions and proposed improvements) Existing Conditions 2040 Sea Level Rise (8") 2070 Sea Level Rise (13") Cassia Basin - Ocean Spray and Willow (Roadway elevation +/- 4.0) Mean Annual Oct. 1, Year Hurricane Irma, " in 7.39" in 9.5" in 12.9" in 24 hours 3 hours 24 hours 90 hours T.S. Fay, Year 22.6" in 13" in 120 hours 24 hours

31 Funding - Revenue City stormwater utility fee Established in 1997 Currently $104 per year per ERU or $2.89 per 1,000 SF of impervious per month $512,000 in revenue per year Average rate in Florida is currently $2.78 per 1,000 SF of impervious per month, average rate in Brevard County is $1.92 Rates for barrier island cities generally higher due to low elevations, limited available land and tidal impacts Loans Grants

32 Funding Expenditures $160K debt service through 2020 Recommended five year renewal/replacements of $700K or $140K per year BMAP compliance previously estimated at $566K per year through 2028 Flood alleviation/capacity improvements can usually be accomplished concurrently with renewal/replacement and treatment projects Assuming 25% grant funding for treatment projects, $423K per year is needed Typical large scale project like Desoto or Cassia costs $1M to $2M

Capital Improvement Program Fiscal Year

Capital Improvement Program Fiscal Year Capital Improvement Program Fiscal Year 2013-2014 Tustin City Council Mayor Al Murray Mayor Pro Tem Charles E. Chuck Puckett Council Members John Nielsen Rebecca Beckie Gomez Allan Bernstein CITY OF TUSTIN

More information

Lower St. Johns River Tributaries Fecal Coliform Basin Management Action Plan Jacksonville Environmental Symposium

Lower St. Johns River Tributaries Fecal Coliform Basin Management Action Plan Jacksonville Environmental Symposium Lower St. Johns River Tributaries Fecal Coliform Basin Management Action Plan Jacksonville Environmental Symposium WBIDs Addressed in This BMAP This BMAP includes 10 of the 75 (cycle 2) fecal coliform

More information

Towns of Clifton and Fine Consolidation Study Water, Sewer & Lighting 7/22/15

Towns of Clifton and Fine Consolidation Study Water, Sewer & Lighting 7/22/15 Towns of Clifton and Fine Consolidation Study Water, Sewer & Lighting 7/22/15 Visit the website: www.danc.org/operations/engineering/clifton-fine-efficiencyconsolidation-study 1 Water & Sewer Districts

More information

Village of Lombard, Illinois Capital Improvement Plan FUNDING SOURCE SUMMARY

Village of Lombard, Illinois Capital Improvement Plan FUNDING SOURCE SUMMARY Village of Lombard, Illinois Capital Improvement Plan FY 15 FY 24 thru FUNDING SOURCE SUMMARY Source FY 15 FY 16 FY 17 FY 18 FY 19 FY 20 FY 21 FY 22 FY 23 FY 24 Construction Fund 6,318,700 2,354,800 2,430,800

More information

2015 Annual Water Report. City of Revelstoke Engineering and Public Works Department

2015 Annual Water Report. City of Revelstoke Engineering and Public Works Department 2015 Annual Water Report City of Revelstoke Engineering and Public Works Department P a g e 1 Table of Contents Introduction... 3 Revelstoke Water Distribution System... 3 Greeley Creek Water Treatment

More information

2013 Regional Water System Improvements Program Public Hearing March 14, 2013

2013 Regional Water System Improvements Program Public Hearing March 14, 2013 In support of Illinois Environmental Protection Agency State Revolving Fund Loan Application 2013 Regional Water System Improvements Program Public Hearing March 14, 2013 Village of Oak Lawn Customer Communities:

More information

Business Plan INTRODUCTION AIRPORT ENTERPRISE FUND OVERVIEW. Master Plan Guiding Principles

Business Plan INTRODUCTION AIRPORT ENTERPRISE FUND OVERVIEW. Master Plan Guiding Principles 5 Business Plan INTRODUCTION Just as previous chapters have outlined plans for the airport s physical development, this chapter outlines a plan for the airport s financial development. More specifically,

More information

Sewerage and Water Board of New Orleans Page 1

Sewerage and Water Board of New Orleans Page 1 Sewerage and Water Board of New Orleans Page 1 Statement of Budgeted Revenues and Expenses By Funds For 2005 Operations: Enterprise Water Sewerage Drainage Fund Net Revenue from Charges $55,832,400 $85,445,200

More information

Project Purpose: Project History and Status:

Project Purpose: Project History and Status: Plant Unit Substation Improvements Project Purpose: The purpose of this project is to ensure that the portions of the Nine Springs Wastewater Treatment Plant powered by Unit Substations U11, U12, and U13

More information

2017 Appropriation Budget Table of Contents Board Approved August 19, 2016

2017 Appropriation Budget Table of Contents Board Approved August 19, 2016 INDIANAPOLIS AIRPORT AUTHORITY 2017 APPROPRIATION BUDGET ORDINANCE NO. 2-2016 BOARD APPROVED AUGUST 19, 2016 2017 Appropriation Budget Table of Contents Board Approved August 19, 2016 1 Appropriation Summary

More information

Weymouth & Hingham (ARAWH) Draft Report: Weymouth Water Supply & Regulatory Review

Weymouth & Hingham (ARAWH) Draft Report: Weymouth Water Supply & Regulatory Review Advocates of Rockland, Abington, Weymouth & Hingham (ARAWH) Draft Report: Weymouth Water Supply & Regulatory Review Technical Assistance Services for Communities 2010 Thursday, November 4, 7:00 8:45 p.m.

More information

ES Aircraft Deicing Document Identification Number Date: March 15, ) Activity Description:

ES Aircraft Deicing Document Identification Number Date: March 15, ) Activity Description: ES-301-1.06 Aircraft Deicing Document Identification Number ES-301-1.06 Date: March 15, 2018 Document Owner: Keith Pass 1) Activity Description: Aircraft deicing is the application of aircraft deicing

More information

RESOLUTION No APPROVAL OF WAYNE COUNTY AIRPORT AUTHORITY FISCAL YEAR 2018 BUDGET. By Board Member Mark Ouimet

RESOLUTION No APPROVAL OF WAYNE COUNTY AIRPORT AUTHORITY FISCAL YEAR 2018 BUDGET. By Board Member Mark Ouimet RESOLUTION 17-87 APPROVAL OF WAYNE COUNTY AIRPORT AUTHORITY FISCAL YEAR 2018 BUDGET By Board Member Mark Ouimet WHEREAS, the Wayne County Airport Authority (the Authority ), pursuant to the Aeronautics

More information

Agenda Report. Spruce Street Outlet Drainage Improvements Tower Road Relief Sewer

Agenda Report. Spruce Street Outlet Drainage Improvements Tower Road Relief Sewer Agenda Report Subject: Prepared By: Spruce Street Outlet Drainage Improvements Tower Road Relief Sewer Steven M. Saunders, Director of Public Works/Village Engineer Date: August 12, 2012 On March 8, 2012

More information

AGENDA ITEM _C2 TAMPA WATER. Completion Date

AGENDA ITEM _C2 TAMPA WATER. Completion Date TAMPA WATER Supply'mfl Water To The Region AGENDA ITEM _C2 DATE: February 6, 2007 TO: J err y L. Maxwell, General Manager FROM: Donald J. Polmann, Director of Science and Engineering SUBJECT: New Water

More information

CITY OF COACHELLA CAPITAL IMPROVEMENT PROGRAM TOTAL PROJECTS REVENUE SUMMARY TABLE ES-1

CITY OF COACHELLA CAPITAL IMPROVEMENT PROGRAM TOTAL PROJECTS REVENUE SUMMARY TABLE ES-1 Funding Prior Years Expenditures to 6-30-10 Total Project Cost Estimated Expenditures for FY 2006 Non- Taxable Non- Housing RDA Bonds Bond Proceeds 2005 Prop. 1B USDA Loans/ Grants Dev Impact Fees TUMF

More information

City of Olathe, Kansas Capital Improvement Plan Projects 2016 thru 2020

City of Olathe, Kansas Capital Improvement Plan Projects 2016 thru 2020 Capital Improvement Plan Projects ECONOMIC VIABILITY PROJECTS 2016 2017 2018 2019 Page Coffee Creek Regional Detention 20905B 1,688,005 - - - - 1,688,005 31 Hedge Lane Relocation - Olathe Schools 3-B-080-13

More information

FROM: Donald J. Polmann, Director of Science and Engineering ( New Water Plan - Quarterly Report - Approve Submittal to SWFWMD

FROM: Donald J. Polmann, Director of Science and Engineering ( New Water Plan - Quarterly Report - Approve Submittal to SWFWMD TAMPA WATER Supplying Water To The Region DATE: February 1,2008 TO: J err y L. Maxwell, General Manager AGENDA ITEM C18 FROM: Donald J. Polmann, Director of Science and Engineering ( SUBJECT: New Water

More information

Completion: August 2011 LS #321 Design LS #8

Completion: August 2011 LS #321 Design LS #8 1 CIPNumber c350406 2 c350302 3 c350902 LEGEND PERMITTING/ BIDDING CHARLOTTE COUNTY UTILITIES Burnt Store Water Reclamation Facility (Expansion to 0.75 MGD) East Port Expansion Water Reclamation Facility

More information

MEMORANDUM VILLAGE OF NORTHBROOK

MEMORANDUM VILLAGE OF NORTHBROOK MEMORANDUM VILLAGE OF NORTHBROOK TO: Staff COPY: Village President & Board of Trustees Department Heads FROM: Richard Nahrstadt, Village Manager DATE: April 29, 2016 SUBJECT: STAFF BRIEFING WEEK OF April

More information

Recommendations for Funding Water, Sewer and Drainage Systems. Presentation to the Citizens and Businesses of New Orleans January 2012

Recommendations for Funding Water, Sewer and Drainage Systems. Presentation to the Citizens and Businesses of New Orleans January 2012 Recommendations for Funding Water, Sewer and Drainage Systems Presentation to the Citizens and Businesses of New Orleans January 2012 Sewerage & Water Board of New Orleans www.swbno.org 2 Agenda Opening

More information

Canada and New Brunswick fund 74 projects to improve water and wastewater systems across the province

Canada and New Brunswick fund 74 projects to improve water and wastewater systems across the province Backgrounder Canada and New Brunswick fund 74 projects to improve water and wastewater systems across the province Investment of more than $57.1 million Clean Water and Wastewater Fund (CWWF) Under this

More information

2016 Comprehensive Master Plan and CIP JULY A comprehensive plan shall not constitute zoning regulations or establish zoning district boundaries

2016 Comprehensive Master Plan and CIP JULY A comprehensive plan shall not constitute zoning regulations or establish zoning district boundaries 01 Comprehensive Master Plan and CIP JULY 01 A comprehensive plan shall not constitute zoning regulations or establish zoning district boundaries TABLE OF CONTENTS PAGE NO. Executive Summary 1 I. Population

More information

CITY OF BROOKFIELD Capital Improvement Fund Budget

CITY OF BROOKFIELD Capital Improvement Fund Budget CITY OF BROOKFIELD Capital Improvement Fund Budget The City adopts an annual capital improvement budget, based on a five-year capital improvement program (CIP). The annual budget and CIP are prepared by

More information

Fiscal Year

Fiscal Year Fiscal Year 2017-2018 Workshop May 2, 2017 CIP Overview Based on Board Priorities Based on Board Priorities Balanced, Generally on a Pay-as-You-Go Basis FY17-18 Closely Mirrors this Year s Approved Plan

More information

Water, Sewer and Stormwater General Facilities & Connection Charges

Water, Sewer and Stormwater General Facilities & Connection Charges City of Snoqualmie Water, Sewer and Stormwater General Facilities & Connection Charges City Council Meeting March 9, 2015 Presented by: Sergey Tarasov, Project Manager Presentation Overview New customer

More information

City of Doral Flood Warning and Response Plan

City of Doral Flood Warning and Response Plan City of Doral Flood Warning and Response Plan Prepared by: City of Doral Public Works Department Stormwater Division City of Doral Flood Warning and Response Plan Flood events tend to pose a variety of

More information

CITY OF LYNDEN STORMWATER MANAGEMENT PROGRAM REPORT MARCH 1, 2016

CITY OF LYNDEN STORMWATER MANAGEMENT PROGRAM REPORT MARCH 1, 2016 CITY OF LYNDEN STORMWATER MANAGEMENT PROGRAM 2015 WATER QUALITY MONITORING REPORT CITY OF LYNDEN 300 4 TH STREET LYNDEN, WASHINGTON 98264 PHONE (360) 354-3446 MARCH 1, 2016 This document serves as an attachment

More information

June 2013: Capital Improvements Update. through $ 126,196,202 Available Funding through 2018 $ 149,783,656. Staff s Recommendation

June 2013: Capital Improvements Update. through $ 126,196,202 Available Funding through 2018 $ 149,783,656. Staff s Recommendation Capital Improvements Update June 2013: Pl dp j t Planned Projects through 2018 - $ 126,196,202 Available Funding through 2018 $ 149,783,656 pp p,, Un-appropriated - $ 23,587,454 Staff s Recommendation

More information

The Mercer Island E. coli Event PNWS AWWA Spring Conference Bellevue Washington 2015

The Mercer Island E. coli Event PNWS AWWA Spring Conference Bellevue Washington 2015 The Mercer Island E. coli Event PNWS AWWA Spring Conference Bellevue Washington 2015 Steve Deem, PE & Bob James, PE Office of Drinking Water Washington State Department of Health Office of Drinking Water

More information

THREE MILE PLAN TOWN OF SUPERIOR COLORADO

THREE MILE PLAN TOWN OF SUPERIOR COLORADO THREE MILE PLAN TOWN OF SUPERIOR COLORADO February 23, 2015 INTRODUCTION This document has been prepared by the Town of Superior, Colorado, to address the existing and proposed land uses within an approximate

More information

NC Dredge Studies NCBIWA Spring Conference April 23, 2018

NC Dredge Studies NCBIWA Spring Conference April 23, 2018 NC Dredge Studies Study of the Use and Efficiency of the Dredge Manteo Study of Acquisition of Dedicated Dredging Capacity Study of Dredging Services Cost-Benefit Analysis 2018 NCBIWA Spring Conference

More information

DISTRICT EXPRESS LANES ANNUAL REPORT FISCAL YEAR 2017 JULY 1, 2016 JUNE 30, FloridaExpressLanes.com

DISTRICT EXPRESS LANES ANNUAL REPORT FISCAL YEAR 2017 JULY 1, 2016 JUNE 30, FloridaExpressLanes.com DISTRICT EXPRESS LANES ANNUAL REPORT FISCAL YEAR 2017 JULY 1, 2016 JUNE 30, 2017 FloridaExpressLanes.com This page intentionally left blank. TABLE OF CONTENTS List of Figures... ii List of Tables.... ii

More information

Welcome KROSNO CREEK DIVERSION PROJECT CLASS ENVIRONMENTAL ASSESSMENT

Welcome KROSNO CREEK DIVERSION PROJECT CLASS ENVIRONMENTAL ASSESSMENT Welcome KROSNO CREEK DIVERSION PROJECT PUBLIC INFORMATION CENTRE # 1 Tonight s Presentation Study Overview Background Existing Conditions Alternative Solutions Preliminary Preferred Solution Next Steps

More information

Action Recommendation: Budget Impact:

Action Recommendation: Budget Impact: City of Fayetteville Staff Review Form 20190120 Legistar File ID 3/5/2019 City Council Meeting Date Agenda Item Only N/A for NonAgenda Item Tim Nyander 2/13/2019 WATER SEWER (720) Submitted By Submitted

More information

Welcome to the. EBC Breakfast Meeting. The CSO Program Update Frederick A. Laskey Executive Director Massachusetts Water Resources Authority

Welcome to the. EBC Breakfast Meeting. The CSO Program Update Frederick A. Laskey Executive Director Massachusetts Water Resources Authority Welcome to the EBC Breakfast Meeting The CSO Program Update Frederick A. Laskey Executive Director Massachusetts Water Resources Authority Massachusetts Water Resources Authority Presentation to the Environmental

More information

Nassau County Bridge Authority (N.Y. Public Authorities Law 651) 2007 Annual Report

Nassau County Bridge Authority (N.Y. Public Authorities Law 651) 2007 Annual Report Nassau County Bridge Authority (N.Y. Public Authorities Law 651) 2007 Annual Report The Nassau County Bridge Authority is a public benefit corporation created by the New York State Legislature in 1945

More information

Capital Improvement Plan

Capital Improvement Plan PROGRAM DESCRIPTION: The represents City Council approved projects and includes each of the project's total costs and the estimated funding requirements for the next five years. Projects are funded by

More information

Fuller/Fuller Heights Road Improvements

Fuller/Fuller Heights Road Improvements Fuller/Fuller Heights Road Improvements Total Project Cost - $4.4M Project Description This project will construct a mini-roundabout at the intersection of Fuller Heights Road and Old Triangle Road to

More information

VI. ALTERNATIVES TO THE MASTER PLAN C. RENOVATED EAST BUILDING ALTERNATIVE

VI. ALTERNATIVES TO THE MASTER PLAN C. RENOVATED EAST BUILDING ALTERNATIVE VI. ALTERNATIVES TO THE MASTER PLAN C. RENOVATED EAST BUILDING ALTERNATIVE INTRODUCTION The Renovated East Building Alternative would include the continued use of the renovated West Building and the renovation

More information

DRAFT. Dorabelle Campground Rehabilitation

DRAFT. Dorabelle Campground Rehabilitation DRAFT Dorabelle Campground Rehabilitation September 2012 1.1 REGIONAL SETTING AND PROJECT LOCATION The Dorabelle Campground is located on the western shore of Shaver Lake in Fresno County, California (Section

More information

COMPANY INFORMATION DATA

COMPANY INFORMATION DATA COMPANY INFORMATION DATA Company Name: Eubank Construction Co., Inc. Address: 2011 North Second Street Booneville, MS 38829 Phone: 662-728-2046 Fax: 662-728-5182 E-mail: kevin.eubank@ecc-inc.net Date of

More information

Treats 2,271,000 gallons of greywater from the water park using the constructed lagoon and wetland, saving $8,539 in sewer charges annually.

Treats 2,271,000 gallons of greywater from the water park using the constructed lagoon and wetland, saving $8,539 in sewer charges annually. Carmel, IN Methodology for Landscape Performance Benefits Prepared by: Research Fellow: M. Elen Deming, Professor, University of Illinois Research Assistant: Paul Littleton, MLA Candidate, University of

More information

NC Dredge Studies. Sterling Baker, P.E. NCDOT James Gregson NCDEQ April 5, 2018

NC Dredge Studies. Sterling Baker, P.E. NCDOT James Gregson NCDEQ April 5, 2018 NC Dredge Studies Study of the Use and Efficiency of the Dredge Manteo Study of Acquisition of Dedicated Dredging Capacity Study of Dredging Services Cost-Benefit Analysis Sterling Baker, P.E. NCDOT James

More information

PUBLIC WORKS DEPARTMENT

PUBLIC WORKS DEPARTMENT PUBLIC WORKS DEPARTMENT Monthly Report Kevin D. Blayton, PE Director ENGINEERING DIVISION Engineering Manager UTILITY DIVISION Ralph Norris, Operations Manager STREET & DRAINAGE DIVISION Robert Turner,

More information

LRTP Ref. Type of Work. Detailed Project Description. Cruise Terminal H Improvements C-6 $13,050 $13,050

LRTP Ref. Type of Work. Detailed Project Description. Cruise Terminal H Improvements C-6 $13,050 $13,050 (All s are located at the Seaport, unless otherwise noted) Facility/ Name Detailed Description SP20000000 01 Cruise Terminal H Improv. Cruise Terminal H Improvements $13,050 $13,050 2016 Upgrade Terminal

More information

Water & Wastewater Project Activity Report

Water & Wastewater Project Activity Report Water & Wastewater Project Activity Report A. Project Activity - Construction Phase MUNICIPALITY DESCRIPTION OR RN.08-32 Fort Erie Nigh Road Sewage PS Odour Control CRL Campbell Construction & Drainage

More information

5-Year Capital Improvement Plan FY 19 through FY23. Executive Summary

5-Year Capital Improvement Plan FY 19 through FY23. Executive Summary 5-Year Capital Improvement Plan FY 19 through FY23 Executive Summary Executive Summary The Renewable Water Resources (ReWa) Capital Improvement Plan (CIP) is a five-year outlook that projects the Utility

More information

General Fund. Parks, Recreation, and Community Services. Fiscal Year 2017

General Fund. Parks, Recreation, and Community Services. Fiscal Year 2017 Parks, Recreation, and Community Services Mission: The mission of the City of Rio Rancho s Department of Parks, Recreation, & Community Services is to create and maintain spaces and activities that grow

More information

PUBLIC WORKS DEPARTMENT

PUBLIC WORKS DEPARTMENT PUBLIC WORKS DEPARTMENT Monthly Report Kevin D. Blayton, PE Director ENGINEERING DIVISION Engineering Manager UTILITY DIVISION Ralph Norris, Operations Manager STREET & DRAINAGE DIVISION Robert Turner,

More information

The north half of Section 18, Township 37 North, Range 6 East, Second Principal Meridian, Jefferson Township, Elkhart County, Indiana; also,

The north half of Section 18, Township 37 North, Range 6 East, Second Principal Meridian, Jefferson Township, Elkhart County, Indiana; also, The north half of Section 18, Township 37 North, Range 6 East, Second Principal Meridian, Jefferson Township, Elkhart County, Indiana; also, The east half of Sections 21, 28, and 33, Township 37 North,

More information

Ross Young Executive Director Water Services Association of Australia

Ross Young Executive Director Water Services Association of Australia 72 nd Annual Victorian Water Industry Engineers and Operators Conference Bendigo Ross Young Executive Director Water Services Association of Australia Current Storage Levels Adelaide 79.0% Canberra 45.5%

More information

Colombia (South America) Water use and drainage in Colombia. Case Study: The Stormwater Challenge in Barranquilla. Humberto Avila.

Colombia (South America) Water use and drainage in Colombia. Case Study: The Stormwater Challenge in Barranquilla. Humberto Avila. Colombia (South America) Water use and drainage in Colombia Location: Case Study: The Stormwater Challenge in Barranquilla Source: Wikipedia The University of Alabama February 25, 2008 Population: 45 million

More information

Port Everglades 2014 Master/Vision Plan Update

Port Everglades 2014 Master/Vision Plan Update 1 Port Everglades 2014 Master/Vision Plan Update Public Meeting May 28, 2014 2 Agenda Port Everglades Mission Project Background 2014 Master/Vision Plan Update Process Status of 2009 5-Year Master Plan

More information

Why are the underground fuel tanks being removed and replaced with above ground tanks?

Why are the underground fuel tanks being removed and replaced with above ground tanks? AIRPORT/CITIZEN FAQ This list of Frequently Asked Questions (FAQs) with responses are provided to share information related to airport topics with the Citizens of Georgetown. The questions / responses

More information

PATRIOTS POINT DEVELOPMENT AUTHORITY THREE YEAR BUSINESS PLAN FY 2016 THROUGH FY 2019

PATRIOTS POINT DEVELOPMENT AUTHORITY THREE YEAR BUSINESS PLAN FY 2016 THROUGH FY 2019 PATRIOTS POINT DEVELOPMENT AUTHORITY THREE YEAR BUSINESS PLAN FY 2016 THROUGH FY 2019 MAY 22, 2015 PRIORITY GOALS OF THE THREE YEAR BUSINESS PLAN 1 GENERATE SUFFICIENT OPERATIONAL INCOME TO ALLOW ALL LEASE

More information

Introduction. The System. Model Limitations, Assumptions, and Parameters. Optional Services Tech Memo

Introduction. The System. Model Limitations, Assumptions, and Parameters. Optional Services Tech Memo Optional Services Tech Memo Introduction This technical memo evaluates the impact of a tide gate to be installed at the confluence of the Left Bank Tributary of Thalia Creek and Lake Windsor. Specifically,

More information

COUNTY SANITATION DISTRICT NO. 8 SERVICE CHARGE REPORT FOR FISCAL YEAR

COUNTY SANITATION DISTRICT NO. 8 SERVICE CHARGE REPORT FOR FISCAL YEAR COUNTY SANITATION DISTRICT NO. 8 SERVICE CHARGE REPORT FOR FISCAL YEAR 2017-18 INTRODUCTION County Sanitation District No. 8 of Los Angeles County encompasses all or portions of the cities of Carson, Compton,

More information

Port of Long Beach 2012 Capital Program Update. G.J. Cardamone, PE, FCMAA Director of Construction Management

Port of Long Beach 2012 Capital Program Update. G.J. Cardamone, PE, FCMAA Director of Construction Management Port of Long Beach 2012 Capital Program Update G.J. Cardamone, PE, FCMAA Director of Construction Management Who We Are 3,500 acres of land 4,600 acres of water 6 container terminals 66 Ship-to-Shore cranes

More information

City of Redding. Redding Police Facility. Enough study! Just do it!

City of Redding. Redding Police Facility. Enough study! Just do it! City of Redding Redding Police Facility City of Redding, 777 Cypress Ave. Redding, CA. 96001 (530) 339-7220 Enough study! Just do it! Background Since 1978 Redding Police Department (RPD) has occupied

More information

CAPITAL IMPROVEMENT PLAN FOR THE FIVE YEAR PERIOD ENDING JUNE 30, 2023 ALLOCATION OF RESOURCES. Cash - General Fund Transfer Total

CAPITAL IMPROVEMENT PLAN FOR THE FIVE YEAR PERIOD ENDING JUNE 30, 2023 ALLOCATION OF RESOURCES. Cash - General Fund Transfer Total Cash - General Fund Transfer Cash - General Fund Transfer Total - - - - - - Cash - Greenbrier TIF Intersection Improvements: Battlefield Blvd. at Volvo Pkwy. 40-230 125,000 550,000 - - - 675,000 Right

More information

Port Everglades Master/Vision Plan Update

Port Everglades Master/Vision Plan Update Port Everglades Master/Vision Plan Update Environmental Stakeholder Meeting June 15, 2009 Discussion to Focus On: Updating the 2006 Port Everglades Master Plan Issues dealing with the Turning Notch Potential

More information

PULLMAN-MOSCOW REGIONAL AIRPORT Runway Realignment Project

PULLMAN-MOSCOW REGIONAL AIRPORT Runway Realignment Project PULLMAN-MOSCOW REGIONAL AIRPORT Runway Realignment Project GENERAL AIRPORT INFORMATION AIRPORT USERS Airport ownership: Public, owned by the Pullman-Moscow Regional Airport Board Year opened: February

More information

Nassau County Bridge Authority (N.Y. Public Authorities Law 651) 2011 Annual Report

Nassau County Bridge Authority (N.Y. Public Authorities Law 651) 2011 Annual Report Nassau County Bridge Authority (N.Y. Public Authorities Law 651) 2011 Annual Report The Nassau County Bridge Authority is a public benefit corporation created by the New York State Legislature in 1945

More information

COUNTY SANITATION DISTRICT NO. 19 SERVICE CHARGE REPORT FOR FISCAL YEAR

COUNTY SANITATION DISTRICT NO. 19 SERVICE CHARGE REPORT FOR FISCAL YEAR COUNTY SANITATION DISTRICT NO. 19 SERVICE CHARGE REPORT FOR FISCAL YEAR 2017-18 INTRODUCTION County Sanitation District No. 19 of Los Angeles County encompasses all or portions of the cities of Artesia,

More information

Vista Field Airport. Master Plan Update. February, Prepared for: Port of Kennewick One Clover Island Kennewick, Washington

Vista Field Airport. Master Plan Update. February, Prepared for: Port of Kennewick One Clover Island Kennewick, Washington Vista Field Airport February, 2006 Prepared for: Port of Kennewick One Clover Island Kennewick, Washington 99336 Prepared by: J-U-B ENGINEERS, Inc. 2810 W. Clearwater Avenue, Suite 201 Kennewick, Washington

More information

Final Drainage Letter Pikes Peak Community College Downtown Parking Lot Colorado Springs, Colorado

Final Drainage Letter Pikes Peak Community College Downtown Parking Lot Colorado Springs, Colorado Final Drainage Letter Pikes Peak Community College Downtown Parking Lot Colorado Springs, Colorado Prepared for: Pikes Peak Community College 5775 South Academy Boulevard Colorado Springs, CO 80906-5422

More information

City of Fort Lauderdale. Frequently Asked Questions. Proposed Sea Wall Ordinance

City of Fort Lauderdale. Frequently Asked Questions. Proposed Sea Wall Ordinance City of Fort Lauderdale Frequently Asked Questions Proposed Sea Wall Ordinance The City of Fort Lauderdale is considering amending the Unified Land Development Regulations of the City of Fort Lauderdale

More information

COUNTY SANITATION DISTRICT NO. 21 SERVICE CHARGE REPORT FOR FISCAL YEAR

COUNTY SANITATION DISTRICT NO. 21 SERVICE CHARGE REPORT FOR FISCAL YEAR COUNTY SANITATION DISTRICT NO. 21 SERVICE CHARGE REPORT FOR FISCAL YEAR 2017-18 INTRODUCTION County Sanitation District No. 21 of Los Angeles County encompasses all or portions of the cities of Claremont,

More information

COUNTY SANITATION DISTRICT NO. 1 SERVICE CHARGE REPORT FOR FISCAL YEAR

COUNTY SANITATION DISTRICT NO. 1 SERVICE CHARGE REPORT FOR FISCAL YEAR COUNTY SANITATION DISTRICT NO. 1 SERVICE CHARGE REPORT FOR FISCAL YEAR 2017-18 INTRODUCTION County Sanitation District No. 1 of Los Angeles County encompasses all or portions of the cities of Bell, Compton,

More information

FIRE Equipment Fire Training Equipment 105, , Total of Equipment 105, ,

FIRE Equipment Fire Training Equipment 105, , Total of Equipment 105, , FIRE Equipment Fire Training Equipment 105,000-105,000 - - - - - - - - - - Total of Equipment 105,000-105,000 - - - - - - - - - - Fire Apparatus Aerial Ladder Replacement 5,320,000 1,120,000 - - 1,400,000

More information

CAPITAL IMPROVEMENT PLAN

CAPITAL IMPROVEMENT PLAN CITY OF SOLDOTNA CITY HALL 77 N BIRCH ST. SOLDOTNA, AK 99669 STEPHANIE QUEEN, AICP SOLDOTNA CITY MANAGER SQUEEN@SOLDOTNA.ORG 907.714.1240 866.593.6994 KYLE KORNELIS, P. E., PUBLIC WORKS DIRECTOR KKORNELIS@SOLDOTNA.ORG

More information

ANNUAL REPORT DALLAS LOVE FIELD AIRPORT. March 14, 2006

ANNUAL REPORT DALLAS LOVE FIELD AIRPORT. March 14, 2006 ANNUAL REPORT DALLAS LOVE FIELD AIRPORT March 14, 2006 I. INTRODUCTION On August 20, 2001, the Texas Commission on Environmental Quality (TCEQ) signed and published the final version of the Texas Pollutant

More information

Port Everglades Master/Vision Plan Update

Port Everglades Master/Vision Plan Update 1 Port Everglades Master/Vision Plan Update 3 rd Tenant & Stakeholder Meeting November 21, 2013 2 Agenda Project Process Overview Summary of the Market Assessments October 30 th Charrette Summary Industry

More information

Safety, Infrastructure, and Tenant Improvement Project. Public Hearing Informational Brochure February 26, 2013

Safety, Infrastructure, and Tenant Improvement Project. Public Hearing Informational Brochure February 26, 2013 New York State Department of Transportation Safety, Infrastructure, and Tenant Improvement Project Public Hearing Informational Brochure February 26, 2013 This DEIS/Draft EA evaluates the potential impacts

More information

Proposed Bicycle Lanes on Yonge Street from Queens Quay to Front Street

Proposed Bicycle Lanes on Yonge Street from Queens Quay to Front Street STAFF REPORT ACTION REQUIRED Proposed Bicycle Lanes on Yonge Street from Queens Quay to Front Street Date: March 12, 2007 To: From: Toronto and East York Community Council Director, Transportation Infrastructure

More information

Appendix E. System Issues

Appendix E. System Issues Appendix E System Contents Page System... E-1 E.1 Introduction...E-1 E.2 Existing Model - System...E-2 E.2.1 Location: Country Ridge Collector, at Queensgate Drive...E-2 E.3 Committed Model - System...E-3

More information

1 PROJECT STATUS UPDATE 2 ND CONCESSION FROM BRISTOL ROAD TO DOANE ROAD TOWNS OF EAST GWILLIMBURY AND NEWMARKET

1 PROJECT STATUS UPDATE 2 ND CONCESSION FROM BRISTOL ROAD TO DOANE ROAD TOWNS OF EAST GWILLIMBURY AND NEWMARKET Report No. 3 of the Regional Council Meeting of March 28, 2013 1 PROJECT STATUS UPDATE 2 ND CONCESSION FROM BRISTOL ROAD TO DOANE ROAD TOWNS OF EAST GWILLIMBURY AND NEWMARKET The recommends: 1. Receipt

More information

MELBOURNE AIRPORT AUTHORITY B R I E F REGULAR MEETING of April 27, :30 AM MELBOURNE INTERNATIONAL AIRPORT BOARD ROOM

MELBOURNE AIRPORT AUTHORITY B R I E F REGULAR MEETING of April 27, :30 AM MELBOURNE INTERNATIONAL AIRPORT BOARD ROOM MELBOURNE AIRPORT AUTHORITY B R I E F REGULAR MEETING of April 27, 2011 8:30 AM MELBOURNE INTERNATIONAL AIRPORT BOARD ROOM Pledge of Allegiance ACTION ITEMS APPROVAL OF MINUTES of the Regular Meeting of

More information

VILLAGE OF FONTANA ON GENEVA LAKE WALWORTH COUNTY, WISCONSIN. Monthly Meeting of the Public Works Committee Friday, July 24, 2015

VILLAGE OF FONTANA ON GENEVA LAKE WALWORTH COUNTY, WISCONSIN. Monthly Meeting of the Public Works Committee Friday, July 24, 2015 VILLAGE OF FONTANA ON GENEVA LAKE WALWORTH COUNTY, WISCONSIN Monthly Meeting of the Friday, July 24, 2015 (OFFICIAL MINUTES) The public works committee meeting was called to order by Chairman Tom McGreevy

More information

COUNTY SANITATION DISTRICT NO. 18 SERVICE CHARGE REPORT FOR FISCAL YEAR

COUNTY SANITATION DISTRICT NO. 18 SERVICE CHARGE REPORT FOR FISCAL YEAR COUNTY SANITATION DISTRICT NO. 18 SERVICE CHARGE REPORT FOR FISCAL YEAR 2017-18 INTRODUCTION County Sanitation District No. 18 of Los Angeles County encompasses all or portions of the cities of Artesia,

More information

COUNTY SANITATION DISTRICT NO. 22 SERVICE CHARGE REPORT FOR FISCAL YEAR

COUNTY SANITATION DISTRICT NO. 22 SERVICE CHARGE REPORT FOR FISCAL YEAR COUNTY SANITATION DISTRICT NO. 22 SERVICE CHARGE REPORT FOR FISCAL YEAR 2017-18 INTRODUCTION County Sanitation District No. 22 of Los Angeles County encompasses all or portions of the cities of Arcadia,

More information

HI Sustainability Fund 2018

HI Sustainability Fund 2018 HI USA: A Rooftop Full of Panels Installing a solar photovoltaic system that generates 100% of HI SD Point Loma s electricity Project Summary Nestled in a neighbourhood setting in sunny San Diego, HI San

More information

Ditch flows slowly to the north

Ditch flows slowly to the north Ditch flows slowly to the north Photo 1. Wetland DE: Looking west across Wetland DE from upslope. Ponded water, mucky mineral soils, and patches of emergent vegetation observed. Wetland DE appears to be

More information

Greater Orlando Aviation Authority

Greater Orlando Aviation Authority Greater Orlando Aviation Authority Orlando International Airport & Orlando Executive Airport Budgets Fiscal Year 2017-2018 Greater Orlando Aviation Authority Orlando, Florida Greater Orlando Aviation Authority

More information

2 YORK REGION TRANSIT VEOLIA AGREEMENT AMENDMENT 91 CALDARI ROAD

2 YORK REGION TRANSIT VEOLIA AGREEMENT AMENDMENT 91 CALDARI ROAD 2 YORK REGION TRANSIT VEOLIA AGREEMENT AMENDMENT 91 CALDARI ROAD The Transit Committee recommends the following: 1. Receipt of the presentation by Rick Takagi, Manager, Operations, York Region Transit;

More information

When complete, send this document to the local sanitarian and to DPHHS/FCSS, PO Box , Helena, MT

When complete, send this document to the local sanitarian and to DPHHS/FCSS, PO Box , Helena, MT Montana Department of Public Health & Human Services Food & Consumer Safety Section (406) 444-2408 Campground or Trailer Court Establishment Plan Review When complete, send this document to the local sanitarian

More information

COMMUNICATIONS DEPARTMENT (Lisa Belsanti, Director) (Joshua Schare, Public Information Officer)

COMMUNICATIONS DEPARTMENT (Lisa Belsanti, Director) (Joshua Schare, Public Information Officer) CITY COUNCIL UNFINISHED BUSINESS AUGUST 21, 2017 SUBJECT: INITIATED BY: SUNSET STRIP ENTERTAINMENT SHUTTLE - PILOT PROGRAM HUMAN SERVICES & RENT STABILIZATION DEPARTMENT (Elizabeth Savage, Director) 'fj1f'..

More information

City of Penticton: Financial Plan Reporting Structure

City of Penticton: Financial Plan Reporting Structure City of Penticton: Financial Plan Reporting Structure General Utilities Transportation Services Recreation and Culture Environmental Health Services Public Health and Safety Protective Services Environmental

More information

Nantucket Memorial Airport Commission. Master Plan Workshop. October 26, 2012

Nantucket Memorial Airport Commission. Master Plan Workshop. October 26, 2012 Nantucket Memorial Airport Commission Master Plan Workshop October 26, 2012 Agenda Introductions Master Plan 101 Airport Planning Issues Noise Abatement Activities Environmental Monitoring Public Outreach

More information

COUNTY SANITATION DISTRICT NO. 2 SERVICE CHARGE REPORT FOR FISCAL YEAR

COUNTY SANITATION DISTRICT NO. 2 SERVICE CHARGE REPORT FOR FISCAL YEAR COUNTY SANITATION DISTRICT NO. 2 SERVICE CHARGE REPORT FOR FISCAL YEAR 2017-18 INTRODUCTION County Sanitation District No. 2 of Los Angeles County encompasses all or portions of the cities of Alhambra,

More information

TOWN OF MOUNT PLEASANT, SOUTH CAROLINA PUBLIC SERVICES COMMITTEE Monday, July 2, 2018

TOWN OF MOUNT PLEASANT, SOUTH CAROLINA PUBLIC SERVICES COMMITTEE Monday, July 2, 2018 TOWN OF MOUNT PLEASANT, SOUTH CAROLINA PUBLIC SERVICES COMMITTEE Monday, Municipal Complex, Committee Meeting Room, 3 rd Floor 100 Ann Edwards Lane, Mount Pleasant, SC 29464 Minutes Members Present: Jim

More information

COMPARATIVE INDICATORS TO OTHER HAMPTON ROADS CITIES. David Bradley

COMPARATIVE INDICATORS TO OTHER HAMPTON ROADS CITIES. David Bradley COMPARATIVE INDICATORS TO OTHER HAMPTON ROADS CITIES David Bradley July 14, 2017 EXPENDITURES BY CATEGORY - FY 2015-16 ALL FUNDS 100.0% 8.1% 4.1% 7.2% 9.2% 5.8% 8.6% 6.9% 80.0% 60.0% 45.0% 49.1% 36.1%

More information

Mini-budget Workshop Coastal Projects

Mini-budget Workshop Coastal Projects Mini-budget Workshop Coastal Projects Public Works Department Coastal Division July 16, 2015 Coastal Infrastructure 99 dune walkovers 9 beachfront parks Dispersed over 35 miles of 2 inlet parks coastline.

More information

A Brief History of the Town of Palm Beach Coastal Protection Program. Beach nourishment occurred in Palm Beach as far back as the 1940s.

A Brief History of the Town of Palm Beach Coastal Protection Program. Beach nourishment occurred in Palm Beach as far back as the 1940s. A Brief History of the Town of Palm Beach Coastal Protection Program Beach nourishment occurred in Palm Beach as far back as the 1940s. The Lake Worth Inlet Sand Transfer Plant was built in the late 1950s.

More information

Comparison of Taxes, Rates and Fees in the Oak Grove/ Jennings Lodge/ N. Clackamas Areas and Adjacent Cities

Comparison of Taxes, Rates and Fees in the Oak Grove/ Jennings Lodge/ N. Clackamas Areas and Adjacent Cities Comparison of Taxes, Rates and Fees in the Oak Grove/ Jennings Lodge/ N. Clackamas Areas and Adjacent Cities Unincorporated Area Oak Grove / Jennings Lodge N. Clackamas Gladstone Happy Valley Service Provider

More information

COUNTY SANITATION DISTRICT NO. 15 SERVICE CHARGE REPORT FOR FISCAL YEAR

COUNTY SANITATION DISTRICT NO. 15 SERVICE CHARGE REPORT FOR FISCAL YEAR COUNTY SANITATION DISTRICT NO. 15 SERVICE CHARGE REPORT FOR FISCAL YEAR 2017-18 INTRODUCTION County Sanitation District No. 15 of Los Angeles County encompasses all or portions of the cities of Arcadia,

More information

Lake Tahoe Airport Master Plan Public Meeting March 16, 2015

Lake Tahoe Airport Master Plan Public Meeting March 16, 2015 Lake Tahoe Airport Master Plan Public Meeting March 16, 2015 What is an Airport Master Plan? a comprehensive study of an airport [that] usually describes the short, medium, and long term development plans

More information

2018 Appropriation Budget Table of Contents Board Approved August 18, 2017

2018 Appropriation Budget Table of Contents Board Approved August 18, 2017 INDIANAPOLIS AIRPORT AUTHORITY 2018 APPROPRIATION BUDGET ORDINANCE NO. 1-2017 BOARD APPROVED AUGUST 18, 2017 2018 Appropriation Budget Table of Contents Board Approved August 18, 2017 1 Appropriation Summary

More information

Project Management, Environmental Assessment, Stormwater Management. Hydrologic Modelling. Natural Heritage. Fluvial Geomorphology

Project Management, Environmental Assessment, Stormwater Management. Hydrologic Modelling. Natural Heritage. Fluvial Geomorphology Welcome PUBLIC INFORMATION CENTRE # 1 KROSNO CREEK DIVERSION PROJECT February 19, 2014 6:30 p.m. to 8:30 p.m. Please sign in on the sheet provided. Then feel free to walk around and view the displays.