1 06/10/10 Bear Creek Habitat Improvement Project El Paso County, Colorado Pike National Forest and Colorado Springs Utilities Owned Land Report prepared by: Eric Billmeyer Executive Director Rocky Mountain Field Institute 3310 W. Colorado Avenue Colorado Springs, Colorado
2 CONTENTS A. INTRODUCTION 3 B. PROJECT AREA Zone Details 5 1) Zone A USFS Lands 5 2) Zone B CSU Lands 8 3) Zone C CSU Lands 10 4) Zone D CSU Lands 12 5) Zone E USFS Lands 16 C. BUDGET FOR ALL PROJECT ZONES AND TIME REQUIRED 19 2
3 A. INTRODUCTION The Bear Creek Watershed lies just west of the City of Colorado Springs along the eastern flank of the Pikes Peak Massif (Lat ' 15" N, Long ' 30" W). Encompassing both National Forest lands administered by the Pike National Forest and private lands owned by Colorado Springs Utilities, a community owned company, the Watershed is extremely important for its recreational opportunities, its value as a water resource, and as vital habitat for the threatened Colorado greenback cutthroat trout (Oncorhynchus clarki stomias). The Bear Creek Habitat Improvement Project will enhance and protect greenback cutthroat habitat within the Bear Creek drainage by reducing sedimentation and erosion impacts from 3.9 miles of the Pike National Forest system trail #667 which runs adjacent to upper Bear Creek. The #667 trail provides connections to over a hundred miles of additional trails in both the Pikes National Forest and Colorado Springs Open Space and Park lands. The trail is very popular for hiking, camping, mountain biking, and off-highway vehicles (motorcycles). Impacts due to the heavy recreational use of the trail are exacerbated by the highly erodible soils made up of decomposing Pikes Peak Granite. This has resulted in sections of the outslope of the trail failing, and severe over-steepening and vegetation loss on many cutslope sections. In addition, the trail crosses the creek eight times, has poorly designed drainage, and trail segments that are within a foot of the stream channel. The Bear Creek Habitat Improvement Project will focus on eliminating sediment influx from erosion off the trail into Bear Creek through the use of erosion control structures, retaining walls, the reconstruction of eroded banks, construction of bridges, rerouting portions of the trail and restoring closed sections, and applying re-vegetation techniques to eroded banks and slopes. Completion of erosion control, stabilization, and restoration work through the Bear Creek Habitat Improvement Project will provide the following benefits: Substantial reduction in the amount of sediment that is transported off trail during storm events into Bear Creek through the reconstruction of 48 drainage ditches to include rock check dams to attenuate runoff and trap sediment. An additional 16 new drainages and water control structures will also be installed. Stabilization of outslope banks that are currently eroding into the creek through the construction of 188 linear feet of retaining wall and 1500 sq feet of re-vegetation prescriptions including native seed and erosion control matting on the banks. 3
4 Stabilization of severely eroding cutslope banks through the construction of 290 linear feet of retaining wall and 2800 sq feet of re-vegetation prescriptions including native seed and erosion control matting on the slopes. Construction of 800 feet of new trail that is out of the riparian zone of the creek and that is built to current Forest Service standards. Over 535 feet of old trail will be closed and restored to provide the creek additional protection from sedimentation sources. Reconstruction of 30 feet of eroded banks where the trail crosses the creek to prevent water from flowing down the trail during high flow events and to provide sustainable platforms for the construction of new bridges across the creek. This report details the habitat improvement actions that are recommended as well as a budget for completing all work within each project zone. 4
5 B. PROJECT AREA ZONE DETAILS This section details the habitat improvement work identified through site visits to the project during 2009 and For the construction of all structures listed below (except the bridge) it is proposed that natural materials found within the project area be utilized. Most areas have abundant rock that can be used to construct check dams, retaining, walls, and rock culverts. Revegetation of slopes will use a seed mix approved by specialists from the Pike Ranger District. Erosion control matting consisting of Aspen shavings and a biodegradable net will also be used. Willow plantings will come from existing stock along the Bear Creek drainage. 1) Zone A- USFS Lands This zone encompasses the furthest distal reach of the Bear Creek Habitat Improvement Project. The northwest boundary of the zone lies approximately 1.5 miles east of a South Slope Watershed access road and 2.7 miles northwest of the first bridge crossing on the #667 Trail. The length of trail included in this zone is just under a half mile. 5
6 Work proposed for this zone is to close and rehabilitate the existing Trail #667 dead-end spur from the junction with Trail #701 to just after the Bear Creek crossing (200 feet) and reopen an old trail running to the northeast of the creek (475 feet) with the following improvements: - Construct new bridge crossing over Bear Creek along main trail corridor for Trail #667 before junction with dead-end spur and Trail #701 (Fig. 1). - Install French drain where small tributary crosses trail (Fig. 2). - Install 12 rock check dams within existing trail drainage channels (one per drainage) to attenuate storm flow (Fig. 3). - Transplant willows along two 150 square foot reaches just below trail. - Close and rehabilitate 200 feet of the existing Trail #667 dead-end spur (this would include the Forest Service closing off the entrance to the existing trail with fencing) (Fig. 4 and 5). - Reopen 475 feet of the old trail running to the northeast of the creek to where it joins the existing Trail #667 dead-end spur just above the creek crossing (Fig. 6). I. Photos Fig. 1. New bridge over creek crossing. Fig. 2. French Drain location. Fig. 3. Example of drainage needing check dam Fig. 4. Head of trail to be closed off 6
7 Fig. 5. Rehabilitate 200 of trail. Fig. 6. Reopen 475 of old trail. II. Budget Zone A This budget includes RMFI completing all the work previously described. The bridge will be constructed to specifications already approved and in use in the Bear Creek Watershed. The work will require 9 days of labor utilizing volunteers with three staff. This section will require the crew to camp for 8 nights. Total cost would be: ITEM BUDGET Personnel 4,832 Direct Expenses 2,406 Indirect Expenses 1,592 Total $8,830 7
8 2) Zone B- CSU Lands This zone is of a high priority as it includes two stream crossing as well as one major tributary crossing. The length of trail included in this zone is approximately ¾ of a mile. Proposed work to be completed in this zone of the habitat improvement project includes: - Installation of 16 rock check dams within existing trail drainage channels (one per drainage) to attenuate storm flow (Fig. 1). - Construction of a 10 bank built w/ large boulder that then grades down to existing trail at a 3% slope. A new bridge crossing will then be constructed and put into place by spring 2010 (bridge construction is being completed by separate contractor) (Fig. 2 and 3). - Install rock culvert where major tributary to Bear Creek crosses trail (Fig. 4). - Transplant willows along a 250 square foot reach adjacent to Bear Creek to minimize sediment transport from trail corridor. - Installation of a bridge where the trail crosses Bear Creek at the southeastern end of this zone (bridge construction is being completed by separate contractor) (Fig. 5). 8
9 I. Photos Fig. 1. Example of drainage needing Fig. 2 and 3. Re-construct bank and install bridge. check dam in Zone B. Fig. 4. Install rock culver at trib crossing. Fig. 5. Install new bridge. II. Budget Zone B This budget includes RMFI completing all the work previously described. Work will require 6 days of labor utilizing volunteers with three staff. This section will require the crew to camp for 5 nights. Total cost would be: ITEM BUDGET Personnel 3,198 Direct Expenses 1,680 Indirect Expenses 1,073 Total $5,951 9
10 3) Zone C- CSU Lands This zone lies in the middle of the greater project area. Trail 720-A comes in from the southwest, increasing recreational impacts within this zone. The length of trail included in this zone is just over a half mile on the #667 Trail and 836 feet on Trail 720-A. Proposed work to be completed in this zone of the habitat improvement project includes: - Installation of 5 rock check dams within existing trail drainage channels (one per drainage) to attenuate storm flow (Fig. 1). - Construction of 2 retaining walls to protect the outside slope of the trail and reduce sediment transport into the stream. Each wall would be 2 x10. - Install rock culvert where major tributary to Bear Creek crosses the 720-A Trail (Fig. 2). - Transplant willows along a 300 square foot reach adjacent to Bear Creek to minimize sediment transport from trail corridor. - Install a French drain at the minor tributary in the southeastern portion of the drainage and direct drainage back into original channel (Fig. 3). - Rehabilitate 60 linear feet of closed trail near minor tributary. The old trail is conveying a substantial amount of sediment into the main trail corridor (Fig. 4). 10
11 I. Photos Fig. 1. Example of drainage needing Fig. 2. Install rock check dam where 720-A crosses tributary. check dam in Zone C. Fig. 3. Install French drain at trib crossing. Fig. 4. Rehab closed trail. II. Budget Zone C This budget includes RMFI completing all the work previously described. Work will require 5 days of labor utilizing volunteers with three staff. This section will require the crew to camp for 4 nights. Total cost would be: ITEM BUDGET Personnel 2,696 Direct Expenses 1,320 Indirect Expenses 883 Total $4,899 11
12 4) Zone D- CSU Lands This zone encompasses the last section of the Bear Creek trail on CSU lands. The trail in this section is heavily eroded and will require substantial work to ensure the trail does not continue to negatively impact Bear Creek s water quality. This section is of the highest priority to complete. The length of trail included in this zone is approximately ¾ of a mile. Preferred Reroute Option Work proposed for this zone includes the following improvements: - Installation of one rock check dam within an existing trail drainage channel to attenuate storm flow. - Construction of 3 retaining walls to protect the outside slope of the trail and reduce sediment transport into the stream. In total, 98 linear feet of retaining wall 2-3 high needs to be built into the outslope (Fig. 1 and 2). - Install a rock culvert where tributary to Bear Creek crosses trail at western boundary of zone (Fig. 3). 12
13 - Revegetate two major areas (1500 sq ft total) with seed mix and place erosion control matting to minimize sediment transport from trail corridor into the creek (Fig. 4). - Install a French drain where a minor spring is feeding water onto the trail (Fig. 5). - Remove two water bars currently placed in trail that are conveying large amounts of sediment into the creek. The sediment by staying on the trail will help fill low erosion spots within the trail itself. Due to the porous nature of the trail bed, any water within this section of trail will seep into the ground relatively quickly and not affect the trail bed surface (Fig. 6 and 7). - Use boulders to narrow the trail and keep users from treading on the outslope where the trail is becoming unstable (Fig. 8). - Complete a 335 trail reroute utilizing an old trail (Fig. 9) In addition, the closed portion of the existing trail will be rehabilitated. The reroute will remove the existing trail away from Bear Creek in this section (Fig. 10). - Use rock to armor an extremely downcut portion of trail (Fig. 11). I. Photos Fig. 1 and 2. Examples of areas needing retaining walls in Zone D. Fig. 3. Install rock culvert at tributary crossing. Fig. 4. Revegetate barren slopes. 13
14 Fig. 5. Install French drain at spring/seep crossing.. Fig. 6. First water bar to be removed (view down trail). Fig. 7. Second water bar to be removed (view down trail). Figure 8. Trail to be narrowed on outslope with boulders Fig. 9. Example of the old trail to be re-opened. 14
15 Fig. 10. Portion of trail to be restored. Fig. 11. Gullied section on existing trail that would be hardened. II. Budget Zone D This budget includes RMFI completing all the work previously described. Work will require 7 days of labor utilizing volunteers with three staff. This section will require the crew to camp for 6 nights. Total cost would be: ITEM BUDGET Personnel 3,700 Direct Expenses 1,930 Indirect Expenses 1,239 Total $6,869 5) Zone E- USFS Lands This zone is the furthest east zone in the project area and is where the proper Bear Creek trail (#666) joins with Trail 667. The Bear Creek trail is non-motorized. The length of trail included in this zone is just over 1300 feet on Trail #667 heading up the Bear Creek drainage and 328 feet #667 heading toward High Drive. 15
16 Proposed work to be completed in this zone of the habitat improvement project includes: - Installation of 2 rock check dams within existing trail drainage channels (one per drainage) to attenuate storm flow (Fig. 1). - Construction of an 18 long, 2 high bank to separate the trail and creek just upstream of the bridge crossing (Fig. 2). - Construction of 2 retaining walls to protect the outside slope of the trail and reduce sediment transport into the stream. One wall will be 2 by 28, with the other 3 by 12 (Fig. 3 and 4). - Install French drain where minor tributary to Bear Creek crosses the (Fig. 5). - Revegetate five areas (2800 sq ft total) with seed mix and place erosion control matting to minimize sediment transport from trail corridor into the creek (Fig. 6). - Install or repair 8 water bars on #667 trail heading back towards High Drive (Fig. 7 and 8). - Construction of 40 linear feet of retaining wall 2-3 high needs to be built into the inslope of the major switchback on #
17 I. Photos Fig. 1. Example of drainage needing Fig. 2. Construct 18 bank to separate trail from creek channel. check dam in Zone E. Fig. 3. Install 12 retaining wall with drain and check dam Fig. 4. Install 28 Cutslope retaining wall to stabilize slope Fig. 5. Install French drain at trib crossing Fig. 6. Example of slope area needing revegetation. 17
18 Fig. 7 and 8. Section of Trail #667 coming from High Drive that needs water bars installed or repaired (view down trail). II. Budget Zone E Work would require 6 days of labor utilizing volunteers with three staff. The crew could hike in each day or camp in Zone D for 5 nights. Total cost would be: ITEM BUDGET Personnel 3,198 Direct Expenses 1,680 Indirect Expenses 1,073 Total $5,951 18
19 C. BUDGET FOR ALL PROJECT ZONES AND TIME REQUIRED The following summarizes the cost to complete the required habitat improvements in each of the 5 zones. Each budget includes all staff project planning, preparation, and implementation time, all volunteer outreach, coordination, and supervision, all tools and equipment, all restoration supplies, and all camping supplies. Due to the length of time estimated to complete the entire project, utilizing our Earth Corps program for college students would be the most appropriate. The program is 30 days in length and would provide for the majority of the project work to be completed. The remaining work can be completed through our Wildlands Environmental Stewardship Program for community volunteers. These programs are 2 to 4 days in length for up to 20 volunteers. Zone Budget Time Allotted Zone A $8,830 9 days Zone B $5,951 6 days Zone C $4,899 5 days Zone D $6,869 7 days Zone E $5,951 6 days Total all zones- $32, days 19
Trail Assessment Report
Trail Assessment Report Trail Options for the Bear Creek Canyon located in Pikes Peak Ranger District, Pike National Forest and on Colorado Springs Utility Lands Due to the presence of a unique species
More informationBear Creek Watershed Restoration Project Final Project Report December 21, 2016
Bear Creek Watershed Restoration Project Final Project Report December 21, 2016 Dedicated to the conservation and stewardship of public lands in Southern Colorado Rocky Mountain Field Institute 815 South
More informationKit Carson-Challenger Ridge Trail Project
Kit Carson-Challenger Ridge Trail Project Project Accomplishments Report-USFS December 15, 2015 Photo courtesy of Justin Peterson 815 South 25 th Street, Suite 101 Colorado Springs, CO 80904 Dedicated
More informationAppendix C. Tenderfoot Mountain Trail System. Road and Trail Rehabilitation Plan
Appendix C Tenderfoot Mountain Trail System Road and Trail Rehabilitation Plan All rehabilitation work would be under the direction of the District Fisheries Biologist, the Forest Hydrologist, and/or the
More informationDixon Trail Construction - From the Top of the Mountain 2016 Interim Report Friends of Cheyenne Mountain State Park September 2 nd, 2016
- Dixon Trail Construction - From the Top of the Mountain 2016 Interim Report Friends of Cheyenne Mountain State Park September 2 nd, 2016 Prepared by: Andy Riter, Program Coordinator, and Joe Lavorini,
More informationBear Creek Watershed Restoration Project Final Project Report December 21, 2017
Bear Creek Watershed Restoration Project 2017 Report 1 Bear Creek Watershed Restoration Project Final Project Report December 21, 2017 Dedicated to the conservation and stewardship of public lands in Southern
More informationNon-motorized Trail Plan & Proposal. August 8, 2014
Town of Star Valley Ranch, Wyoming and the Star Valley Ranch Association in partnership with the USDA Forest Service, Bridger-Teton National Forest, Greys River Ranger District Non-motorized Trail Plan
More informationKit Carson-Challenger Ridge Trail Project Annual Performance Report-2014 October 22, 2014
1 Kit Carson-Challenger Ridge Trail Project Annual Performance Report-2014 October 22, 2014 Willow Lake and Kit Carson Peak 2 SUMMARY The Rocky Mountain Field Institute began Phase 1 of a multi-phase,
More informationAPPENDIX D: SUSTAINABLE TRAIL DESIGN. APPENDICES Town of Chili Parks and Recreation Master Plan Update
APPENDIX D: SUSTAINABLE TRAIL DESIGN APPENDICES Town of Chili Parks and Recreation Master Plan Update Sustainable Trail Construction Sustainable trails are defined by the US Forest Service as trails having
More informationDecision Memo for Desolation Trail: Mill D to Desolation Lake Trail Relocation
for Salt Lake County, Utah Uinta-Wasatch-Cache National Forest Salt Lake Ranger District 1. Background The present location of the Desolation Trail (#1159) between Mill D and Desolation Lake follows old
More informationBradley Brook Relocation Project. Scoping Notice. Saco Ranger District. United States Department of Agriculture Forest Service
Bradley Brook Relocation Project United States Department of Agriculture Forest Service Scoping Notice White Mountain National Forest February 2011 For Information Contact: Jenny Burnett White Mountain
More informationDECISION MEMO. Rawhide Trail #7073 Maintenance and Reconstruction
Page 1 of 6 Background DECISION MEMO USDA Forest Service Jefferson Ranger District Jefferson County, Montana Rawhide Trail #7073 is located in the Elkhorn Mountain Range approximately 10 miles east of
More informationAppendix A Appendix A (Project Specifications) Auk Auk / Black Diamond (Trail 44) Reroute
Appendix A (Project Specifications) Auk Auk / Black Diamond (Trail 44) Reroute I. Proposed Action: This project proposes to reroute approximately 1,800 feet of a 50 inch wide trail, off of private property
More informationRocky Mountain Field Institute
Rocky Mountain Field Institute Palmer Park Stewardship Project 2016 Annual Project Report December 20, 2016 Report prepared by: Andy Riter, Program Coordinator and Alex Hladkyj, Field Instructor 815 South
More informationCultural Resource Management Report Deer Valley 4wd Restoration and Blue Lakes Road Maintenance Project R
Cultural Resource Management Report R2015-05-03-10005 Undertaking Description: The proposes to perform road maintenance and meadow restoration on the Deer Valley 4wd trail and road maintenance on the Blue
More informationFinn Creek Park. Management Direction Statement Amendment
Finn Creek Park Management Direction Statement Amendment November 2013 Management Direction Statement Amendment Approved by: Jeff Leahy Regional Director, Thompson Cariboo BC Parks November 12, 2013 Date
More informationDECISION MEMO North Zone (Legacy Trails) Trail Stabilization Project
DECISION MEMO North Zone (Legacy Trails) Trail Stabilization Project USDA FOREST SERVICE Rocky Mountain Region (R2) Shoshone National Forest Wapiti and Greybull Ranger District Park County, Wyoming Background
More informationApril 10, Mark Stiles San Juan Public Lands Center Manager 15 Burnett Court Durango, CO Dear Mark,
Mark Stiles San Juan Public Lands Center Manager 15 Burnett Court Durango, CO 81301 Dear Mark, We are pleased to offer the following comments on the draft San Juan Public Lands Center management plans
More informationCOMMUNITY MEETING NOVEMBER 1, Wheaton Regional Park Pine Lake Trail
COMMUNITY MEETING NOVEMBER 1, 2012 MEETING AGENDA I. Introduction of Project Team II. Trail Renovation Process III. Wheaton Regional Park IV. Pine Lake Trail Renovation Project V. Comments and Questions
More informationTrail Phasing Plan. Note: Trails in the Clear Creek Canyon area (Segments will be finalized in the future to minimize wildlife impacts
Note: Trails in the Clear Creek Canyon area (Segments 2 5 and a future JCOS connection) will be finalized in the future to minimize wildlife impacts Trail Phasing Plan P Parking 3 Easy Trail Intermediate
More informationFinal Drainage Letter Pikes Peak Community College Downtown Parking Lot Colorado Springs, Colorado
Final Drainage Letter Pikes Peak Community College Downtown Parking Lot Colorado Springs, Colorado Prepared for: Pikes Peak Community College 5775 South Academy Boulevard Colorado Springs, CO 80906-5422
More informationUnderstanding user expectations And planning for long term sustainability 1
Understanding user expectations And planning for long term sustainability 1 What is a natural surface trail? It can be as simple has a mineral soil, mulched or graveled pathway, or as developed as elevated
More informationColorado Mountain Club 2015 Stewardship Team Program Accomplishments
Summary In 2015, CMC launched a new Stewardship Team program and hired a crew of young (25 and under), natural resource professionals to increase capacity of public land management agencies and coordinate
More informationNational Forests and Grasslands in Texas
United States Department of Agriculture Forest Service National Forests and Grasslands in Texas Sam Houston NF 394 FM 1375 West New Waverly, Texas 77358 Phone 936-344-6205 Dear Friends, File Code: 1950
More informationUS Forest Service Bears Ears Trail - NFST 1144 California Park to Hole in Wall Creek. Good (1) 2 3
Trail Maintenance Endowment Fund Trail Criteria Form The Trail Maintenance Endowment Fund (TMEF) grant criteria form is used in determining the use of funds available on an annual basis. Decisions on how
More informationGreat Pond Mountain Conservation Trust Request for Bids Wildlands Hillside Trail Relocation and Restoration Project
Great Pond Mountain Conservation Trust Request for Bids Wildlands Hillside Trail Relocation and Restoration Project Project Description: Great Pond Mountain Conservation Trust (GPMCT), a nonprofit land
More informationRocky Mountain Field Institute Garden of the Gods Community Restoration Program 2017 Annual Project Report
1 Garden of the Gods Community Restoration Program 2017 Annual Project Report December 21, 2017 Report prepared by: Kelly Kaufmann, Senior Field Coordinator 815 South 25 th Street, Suite 101 Colorado Springs,
More informationVolunteer Project Trip Report Yosemite National Park May 16-20, 2012
Conservation Volunteers International Program 120 Village Square #9 Orinda, California 94563 USA www.conservationvip.org A Non-Profit 501c3 Tax Exempt Organization CST 2089890-40 Volunteer Project Trip
More informationROAD AND TRAIL PROJECT APPROVAL
ROAD AND TRAIL PROJECT APPROVAL www.marincountyparks.org Marin County Parks, 3501 Civic Center Dr, Suite 260, San Rafael, CA 94903 DATE: July 12, 2017 PRESERVE: Gary Giacomini Open Space Preserve PROJECT:
More informationSECTION 3 GENERAL DESCRIPTION OF THE RIVER BASIN
SECTION 3 GENERAL DESCRIPTION OF THE RIVER BASIN SECTION 3 GENERAL DESCRIPTION OF THE RIVER BASIN River basin description. A general description of the river basin or subbasin, as appropriate, in which
More informationAppendix A. Tenderfoot Mountain Motorcycle Trail System. Maintenance and Construction Plan (6/13/13)
Appendix A Tenderfoot Mountain Motorcycle Trail System Maintenance and Construction Plan (6/13/13) If the decision to implement the project as approved, grant funding would be pursued to fund construction
More informationDaisy Dean Trail 628/619 ATV Trail Construction
Background and Purpose and Need The Daisy Dean ATV Trail Construction Project is located in the Little Belt Mountains, Musselshell Ranger District, Lewis and Clark National Forest approximately 32 miles
More information2017 Project Report: Priority 1 Trail Repairs - Boulder Ranger District Boulder Mountainbike Alliance
2017 Project Report: Priority 1 Trail Repairs - Boulder Ranger District Boulder Mountainbike Alliance BMA partnered with the USFS Boulder Ranger District (USFS), to repair two flood-damaged trails (Sourdough
More informationPublic Notice ISSUED: December 10, 2018 EXPIRES: January 9, 2019
APPLICANT: REFER TO: St. Louis and Lake Counties Regional Rail Authority 2018-01942-ARC Public Notice ISSUED: December 10, 2018 EXPIRES: January 9, 2019 SECTION:404 - Clean Water Act 1. APPLICATION FOR
More informationMt. Hood National Forest
United States Department of Agriculture Forest Service Mt. Hood National Forest Zigzag Ranger District 70220 E. Highway 26 Zigzag, OR 97049 503-622-3191 Fax: 503-622-5622 File Code: 1950-1 Date: June 29,
More informationShelf Road Recreation Area 2015 BLM Annual Report of Rocky Mountain Field Institute Stewardship Under BLM Agreement L12AC20483 November 19, 2015
Summary Shelf Road Recreation Area 2015 BLM Annual Report of Rocky Mountain Field Institute Stewardship Under BLM Agreement L12AC20483 November 19, 2015 Managed by the BLM Royal Gorge Field Office, Shelf
More informationMORGAN CREEK GREENWAY Final Report APPENDICES
APPENDICES MORGAN CREEK GREENWAY Appendix A Photos of Existing Conditions in Trail Corridor Photos of existing conditions Main trail corridor - February 2009 Photos of existing conditions south bank Morgan
More informationDescription of the Proposed Action for the Big Creek / Yellow Pine Travel Plan (Snow-free Season) and Big Creek Ford Project
Description of the Proposed Action for the Big Creek / Yellow Pine Travel Plan (Snow-free Season) and Big Creek Ford Project Payette National Forest Krassel Ranger District Valley and Idaho Counties, Idaho
More information2. STAKEHOLDER FEEDBACK // What We Heard
1. QUARRY ROAD TRAIL // Welcome to the Information Session PROJECT DESCRIPTION WHY WE ARE HERE Quarry Road Trail is a popular commuter trail and recreational area for Calgarians. 1. To report citizen feedback
More informationUSDA Forest Service Deschutes National Forest DECISION MEMO. Round Lake Christian Camp Master Plan for Reconstruction and New Facilities
USDA Forest Service Deschutes National Forest DECISION MEMO Round Lake Christian Camp Master Plan for Reconstruction and New Facilities Jefferson County, Oregon T. 13 S., R. 8 E., Section 16, W.M. Background:
More informationSeptember 14, Comments of the Colorado Trail Foundation On the USFS Scoping Notice of August 13, 2010 RE: the relocation of the CDNST/CT Page 1
THE COLORADO TRAIL FOUNDATION Comments on the U.S. Forest Service Scoping Notice of August 13, 2010 Regarding the Relocation of THE COLORADO TRAIL AND CONTINENTAL DIVIDE NATIONAL SCENIC TRAIL From La Garita
More informationRocky Mountain Field Institute Garden of the Gods Community Restoration Program 2015 Annual Project Report
Garden of the Gods Community Restoration Program 2015 Annual Project Report December 18 th, 2015 Report prepared by: Mark Tatro, Field Instructor 815 South 25 th Street, Suite 101 Colorado Springs, CO
More informationSEGMENT ASSESSMENT REPORT
2017 SEGMENT ASSESSMENT REPORT SEGMENT 3: MT ROSE / TAHOE MEADOWS TO SPOONER SUMMIT REPORT SUMMARY This report is a compilation of information collected on the Tahoe Rim Trail during assessments performed
More informationMP : Snowy Range Road and the Hoop Creek Bridge
MP 246 247: Snowy Range Road and the Hoop Creek Bridge This section of U. S. Highway 40 contains a Colorado treasure, a great photo op, and a historical landmark all at one stop. It s the Hoop Creek Stone
More informationPacifiCorp North Umpqua Hydroelectric Project FERC Project No VOLUME 1 EXHIBITS
PacifiCorp North Umpqua Hydroelectric Project FERC Project No. 1927 A VOLUME 1 EXHIBITS TMP and SA Implementation Summary B Settlement Agreement (Section 15) C D E F G H I J K L M N O P Q R S T U Rolling
More informationApril 19-21, See below for Course Descriptions. Columbia Cascades Trail Skills College Cascades Locks, Oregon.
Columbia Cascades Trail Skills College Cascades Locks, Oregon April 19-21, 2013 Friday, April 19 198, 199 First Aid and CPR 300 Basic Rock Work 302 Water Crossings and Seeps 398 Working with Pack Stock
More informationII. THE BOULDER CREEK DRAINAGE BASIN
II. THE BOULDER CREEK DRAINAGE BASIN This section provides an overview of the watersheds and flood hazards associated with Boulder Creek and South Boulder Creek including descriptions of the drainage basins,
More informationHUNT CAMP TRAIL IMPROVEMENT PROJECT PROJECT DESCRIPTION PREPARED BY
HUNT CAMP TRAIL IMPROVEMENT PROJECT PROJECT DESCRIPTION PREPARED BY Marin County Open Space District April 2017 Project Title Lead Agency Name and Address Marin County Open Space District (MCOSD) 3501
More informationDRAFT. Dorabelle Campground Rehabilitation
DRAFT Dorabelle Campground Rehabilitation September 2012 1.1 REGIONAL SETTING AND PROJECT LOCATION The Dorabelle Campground is located on the western shore of Shaver Lake in Fresno County, California (Section
More informationRocky Mountain Field Institute City of Colorado Springs Open Space Stewardship Services (TOPS) Contract #C Annual Project Report
City of Colorado Springs Open Space Stewardship Services (TOPS) Contract #C008169 2017 Annual Project Report January 4, 2018 Report prepared by: Hannah Millsap, Field Instructor 815 South 25th Street,
More informationGeneral Implementation
Features 1 General Implementation Allow vehicle travel for the purposes of dispersed camping within 300 feet of designated Forest roads and motorized trails except for the fen areas identified above, and
More informationRED MOUNTAIN HISTORIC DISTRICT ENHANCEMENT Grand Mesa, Uncompahgre, Gunnison National Forests Ouray Ranger District
RED MOUNTAIN HISTORIC DISTRICT ENHANCEMENT Grand Mesa, Uncompahgre, Gunnison National Forests Ouray Ranger District Project Summary The Red Mountain President s Initiative Project proposes a comprehensive
More informationBOULDER CREEK CATTLE FENCING FOR KOKANEE HABITAT ENHANCEMENT 2010
BOULDER CREEK CATTLE FENCING FOR KOKANEE HABITAT ENHANCEMENT 2010 Prepared for the: FISH & WILDLIFE COMPENSATION PROGRAM, NELSON, B.C. Prepared by: Marc André Beaucher CRESTON VALLEY WILDLIFE MANAGEMENT
More informationKP Lasnaya 1 River
KP 370.2 Lasnaya 1 River The Lasnaya 1 River crossing is protected by Reno mattings and a gabion wall on the north bank (Photo 1). The south bank consists of natural river gravel deposits on top of Reno
More informationKennesaw Mountain Trail Club. Trail Skills Workshop ~ Dips and Drains. Presented by: Jay M Dement
Kennesaw Mountain Trail Club Trail Skills Workshop ~ Dips and Drains Presented by: Jay M Dement KEY CONCEPTS: Control Erosion and Users Where Do Trails Come From, and How Do They Work: Concept of trail
More informationKENNESAW MOUNTAIN TRAIL CLUB WORKDAY
WORKDAY 2-10-18 1 Trail ambassadors or others see next page. 1 work sites TOOLS 15 1 3 1 2 SCHEDULE: 7:15 Start load tools; Send registration stuff out 8:00 Send tools to grassy area near trail head. 8:15
More informationPiedra River Protection Workgroup Meeting #5 Feb. 21, 2012 Ross Aragon Community Center, Pagosa Springs
Piedra River Protection Workgroup Meeting #5 Feb. 21, 2012 Ross Aragon Community Center, Pagosa Springs What happened at this meeting? - Identified conservation easements - Discussed In-stream Flows -
More informationSilver Creek Plunge Campground Reconstruction
Silver Creek Plunge Campground Reconstruction PROPOSED ACTION REPORT Emmett Ranger District Boise National Forest 1805 Highway 16, Room 5 Emmett, Idaho 83617 November 2009 Silver Creek Plunge Campground
More informationDECISION NOTICE FINDING OF NO SIGNIFICANT IMPACT US FOREST SERVICE TONGASS NATIONAL FOREST JUNEAU RANGER DISTRICT
DECISION NOTICE FINDING OF NO SIGNIFICANT IMPACT US FOREST SERVICE TONGASS NATIONAL FOREST JUNEAU RANGER DISTRICT Trail of Time Adjacent Area Trails and Mendenhall Glacier Visitor Center Improvements Project
More informationPhoenix Habitat Restoration Projects
Phoenix Habitat Restoration Projects Spur Cross Ranch Cave Creek (Estergard) Regional Tree and Shade Summit March 9, 2010 Desert Riparian Ecosystems Healthy riparian areas like this once existed along
More informationWelcome KROSNO CREEK DIVERSION PROJECT CLASS ENVIRONMENTAL ASSESSMENT
Welcome KROSNO CREEK DIVERSION PROJECT PUBLIC INFORMATION CENTRE # 1 Tonight s Presentation Study Overview Background Existing Conditions Alternative Solutions Preliminary Preferred Solution Next Steps
More informationAPPENDIX F List of Commitments
APPENDIX F List of Commitments s Table F.1 Standard Mitigation Measures Mitigation Measure MnDOT Specification Number Status Update Description Status Update Utilities Provide early notice to utility operators
More informationBACKCOUNTRY TRAIL FLOOD REHABILITATION PROGRAM
BACKCOUNTRY TRAIL FLOOD REHABILITATION PROGRAM Backcountry Trail Flood Rehabilitation A June 2013 Flood Recovery Program Summary In June 2013, parts of Southern Alberta were devastated from significant
More informationAmerican Conservation Experience
ACE Project Report For Tonto National Forest, Arizona Trail Association and Arizona State Parks Title of Project: 4 Peaks Trail Maintenance Award Contract Number: ASP NM11021 Project Partner: Paul Burghard
More informationINTRODUCTION. Mailing address: Burke County Community Development Attn: Tim Johnson P. O. Box 219 Morganton, NC
REQUEST FOR QUALIFICATIONS: PROFESSIONAL, EXPERIENCED TRAIL BUILDERS FOR THE CONSTRUCTION OF THE FONTA FLORA STATE TRAIL LAKE JAMES SECTION BURKE COUNTY COMMUNITY DEVELOPMENT INTRODUCTION Burke County
More informationRule Governing the Designation and Establishment of All-Terrain Vehicle Use Trails on State Land
Rule Governing the Designation and Establishment of All-Terrain Vehicle Use Trails on State Land 1.0 Authority 1.1 This rule is promulgated pursuant to 23 V.S.A. 3506. Section 3506 (b)(4) states that an
More informationCourse 205. Tread Re-Construction
PCTA Trail Skills College Curriculum Instructor Planning Guide This course goes beyond a triage approach covered in Course 203 Waterbars and Checks because reconstruction indicates a more thorough restoration
More informationM.J. Milne & Associates Ltd.
M.J. Milne & Associates Ltd. March, 29 Tolko Industries Ltd. 6 Yellowhead Highway RR#, Site, C Kamloops, BC V2C K Attention: Mr. Michael Bragg, R.P.F. Dear Sir: Re: Risk Rating Evaluation Non-status Roads
More informationCHAPTER III: TRAIL DESIGN STANDARDS, SPECIFICATIONS & PERMITS
CHAPTER III Trail Design Standards, Specifications & Permits This chapter discusses trail standards, preferred surface types for different activities, permits, and other requirements one must consider
More informationProject Planning, Compliance, and Funding
Project Planning, Compliance, and Funding The plans above offer high level guidance to ensure that the A.T. is managed effectively as a whole unit in a decentralized management structure. Cooperative management
More informationSibley LUPA. Board Executive Committee Meeting December 7, 2017
Sibley LUPA Board Executive Committee Meeting December 7, 2017 Project Location & Project Area 1,318-acre Robert Sibley Volcanic Regional Preserve Project Area Purpose Project Purpose & Goals Append the
More informationProposed Project 1: Kimble Loop East Horse Trail Reroute (1). Horse Trail Reroute: March 14, 2012
Proposed Project 1: Kimble Loop East Horse Trail Reroute The Ironton District Ranger requests your comments on proposed trail project on National Forest System lands. (1). Horse Trail Reroute: The proposed
More informationLake Wissota Access Locations within the LaFayette Township. By Chad Martin
Lake Wissota Access Locations within the LaFayette Township By Chad Martin Anson/ Wissota Access Point # 1 Road: 195 th St. Associated Fire Numbers: 13294 Defining Characteristics: Forested from road
More informationTRANSMITTAL. Please contact me with any questions. 7 Spruce Road, Freeport, ME T: (207)
BAKER DESIGN CONSULTANTS Civil, Marine and Structural Engineering To: Alex Jaegerman FAICP Director of Planning & Development Town of Yarmouth 200 Main Street PO Box 907 Yarmouth, ME 04096 From: Barney
More informationGarden of the Gods Restoration Report
Garden of the Gods Restoration Report Implementation Guide Prepared for the Parks & Recreation Department City of Colorado Springs, Colorado by Rocky Mountain Field Institute Bruce Byers, Jim Ebersole,
More informationRIO VISTA MUNICIPAL AIRPORT
DRAINAGE TECHNICAL MEMORANDUM RIO VISTA MUNICIPAL AIRPORT RIO VISTA, CALIFORNIA Prepared for: City of Rio Vista 1 Main Street Rio Vista, CA 94571 (707) 374-5337 Prepared by: August 2012 Copyright 2012
More informationMargaret N. Rees University of Nevada, Las Vegas,
Get Outdoors Nevada Public Lands Institute 6-30-2011 Nevada Interagency Volunteer Program: Helping Hands Across Public Lands Phase II: Quarterly Progress Report, Period Covering April 1, 2011-June 30,
More informationDecision Notice and Finding of No Significant Impact
Decision Notice and Finding of No Significant Impact Steamboat Ski Area Summer Trails Project USDA Forest Service Medicine Bow-Routt National Forests Hahns Peak/Bears Ears Ranger District Routt County,
More informationKelly Motorized Trails Project Proposed Action
Kelly Motorized Trails Project Proposed Action November 28, 2011 The Flagstaff Ranger District of the Coconino National Forest is seeking public input on the proposed Kelly Motorized Trails Project (formerly
More informationCHAPTER 2: DESCRIPTION OF ALTERNATIVES
CHAPTER 2: DESCRIPTION OF ALTERNATIVES This chapter includes a description of the no-action alternative and two action alternatives for trail designation for the Dry Bay area of Glacier Bay National Preserve.
More informationTAYLOR CANYON RANCH COLORADO - ROUTT COUNTY - STEAMBOAT SPRINGS
TAYLOR CANYON RANCH COLORADO - ROUTT COUNTY - STEAMBOAT SPRINGS Tucked up against the steep valley shaped by Mt. Pau and rising to the Routt National Forest, Taylor Canyon Ranch is an easily accessible,
More informationPUBLIC DRAF MISSION TRAILS REGIONAL PARK Mission Gorge 5-27
5.4. Mission Gorge MISSION TRAILS REGIONAL PARK The goal for the Mission Gorge area is to provide a variety of sustainable trails and other park amenities that can accommodate the high number of visitors
More informationCITY COUNCIL AGENDA ITEM CITY OF SHORELINE, WASHINGTON
Council Meeting Date: February 27, 2017 Agenda Item: 7(f) CITY COUNCIL AGENDA ITEM CITY OF SHORELINE, WASHINGTON AGENDA TITLE: Authorize the City Manager to Execute an Agreement with EarthCorps in the
More informationEvergreen Trail School
Evergreen Trail School Making Washington a Better Place to Ride Preston, WA & Tiger Mt. Sat, April 9, 2015 8-11:45am: Classroom 11:45-12:45pm: Lunch 12:45-4pm: Trail Work Classroom Agenda Introduction
More informationFossil Creek Wild & Scenic River Comprehensive River Management Plan Forest Service Proposed Action - details March 28, 2011
Fossil Creek Wild & Scenic River Comprehensive River Management Plan Forest Service Proposed Action - details March 28, 2011 Primary Goals of the Proposed Action 1. Maintain or enhance ORVs primarily by
More informationPorter Fk. #1. All unauthorized items removed as per FS & Rec Res guidelines. Footbridge may be needed for wheel chair access and for safety
APPENDIX D Lot Specific Permit Compliance & Forest Plan (FP) Requirements Porter Fork Recreation Residence Tract (Items noted were documented in compliance letter, 8/12/2005, sent to all Rec. Residence
More informationGOLDEN EARS PROVINCIAL PARK
GOLDEN EARS PROVINCIAL PARK Trail Information as of October 10 th 2015 Do not underestimate the mountainous wilderness of Golden Ears Provincial Park. The combination of rugged terrain and rapidly changing
More informationLena Beach Recreation Area Renovation. Dear National Forest User:
United States Department of Agriculture Forest Service Alaska Region Tongass National Forest Juneau Ranger District 8510 Mendenhall Loop Juneau, AK 99801 Phone: (907) 586-8800 Fax: (907) 586-8808 File
More informationUSDA Trails Strategy WRI: ENGLISH PEAK SURVEY. Theodore Mendoza San Diego State University June 6 th 2016 August 18 th Advisor: Sam Commarto
WRI: ENGLISH PEAK SURVEY Theodore Mendoza San Diego State University June 6 th 2016 August 18 th 2016 Advisor: Sam Commarto Klamath National Forest Submitted: March 21, 2017 Table of Contents Acknowledgements
More informationSkyline Drive Hogback Canon City
Skyline Drive Hogback Canon City Direction to trailhead: From US 50, turn north onto 15th Street. At the traffic circle, continue north on 15th Street until it dead ends at Washington Street (about 1.5
More informationFEASIBILITY CRITERIA
This chapter describes the methodology and criteria used to evaluate the feasibility of developing trails throughout the study areas. Land availability, habitat sensitivity, roadway crossings and on-street
More informationCITY COUNCIL AGENDA MEMORANDUM
To: Mayor and City Council From: Charles Ozaki, City and County Manager Prepared By: Kevin Standbridge, Deputy City and County Manager Katie Allen, City and County Engineer David Shinneman, Community Development
More information2016 Trails Maintenance and Operating Costs
2016 Trails Maintenance and Operating Costs Motorized Trails Maintenance for motorized trails comes from vehicle registration fees and a portion of the federal Recreation Trails Program (RTP) funds. The
More informationETOBICOKE CREEK NORTH TRAIL PROJECT. May 18, 2017 at Michael Power High School 105 Eringate Drive, Etobicoke ON M9C 3Z7
ETOBICOKE CREEK NORTH TRAIL PROJECT May 18, 2017 at Michael Power High School 105 Eringate Drive, Etobicoke ON M9C 3Z7 1 Purpose of Open House The purpose of today s open house is to present the design
More informationPROPOSED ACTION South 3000 East Salt Lake City, UT United States Department of Agriculture
United States Department of Agriculture Forest Service Uinta-Wasatch-Cache National Forest Salt Lake Ranger District 6944 South 3000 East Salt Lake City, UT 84121 801-733-2660 File Code: 1950/2300 Date:
More informationOutdoor Recreation Opportunities Management
Outdoor Recreation Opportunities Management Introduction The natural features of Height of the Rockies and Elk Lakes provincial parks provide a wide variety of outdoor recreational activities. However,
More informationSAN ANTONIO RIVER IMPROVEMENTS PROJECT. April 27, 2009
SAN ANTONIO RIVER IMPROVEMENTS PROJECT April 27, 2009 1 Project Limits 2 Project Partners City of San Antonio Provides project funding for project amenities (i.e.. Sidewalks, Landscaping, Lighting, etc.)
More information2013 Construction Accomplishments
2013 Construction Accomplishments MOA Parks & Recreation Key Accomplishments in 2013 1. Over 10 Million Dollars in MOA Park Improvements 2. A Successful Volunteer Program with over 9,000 Volunteer Hours
More informationColorado s Instream Flow Program at 40. ICWP Annual Conference October 16, 2013 Denver, Colorado
Colorado s Instream Flow Program at 40 ICWP Annual Conference October 16, 2013 Denver, Colorado ISF Program established in 1973 by Senate Bill 97 Recognized the need to correlate the activities of mankind
More informationWELCOME. Pikes Peak Summit Complex Environmental Assessment Scoping Meeting. August 25th, pm Colorado Springs, CO
WELCOME Pikes Peak Summit Complex Environmental Assessment Scoping Meeting August 25th, 2015 3-7pm Colorado Springs, CO PROCESS AND PUBLIC INVOLVEMENT Public Scoping August 21- September 21, 2015 WE ARE
More information