1 Stone Harbor Maintenance Dredging Stone Harbor, NJ Weather Low Reports No. Project No. Report Date: Day of Week: High /8/6 Thursday Daily Precipitation. Weather Conditions: Overcast 2 Progress Report Copyright 25, Sevenson Environmental Services, Inc. All Rights Reserved. Sennebogen loading a scow in Pleasure Bay Tender boat assisting the PC-4 with a move PC-4 longfront dredging in the Access Channel Sennebogen removing material in Pleasure Bay Tug boat pushing a scow full of dredge material PC-4 dredging material inside of moon pool of 5

2 Weekly Summary Date Dredge QTY (CY) Disposal QTY (Tns) - Continued communication with residents regarding residential slip 2/5/6 Mon 662,62 dredging - Continued survey of resident boat slips 2/6/6 Tue 69,27 - Continued blending dredge material with Portland Cement 2/7/6 Wed, Continued staging blended dredge material in anticipation of 2/8/6 Thu disposal 2/9/6 Fri Continued noise level monitoring activities - Continued dust monitoring activities 2//6 Sat Continued 43 #### dredging in the Access Channel 2//6 Sun Continued 43 #### dredging in Pleasure Bay Weekly Totals 3,54 CY 3,28 Tns - Sennebogen removed 72 cy from Pleasure Bay Safety Remarks - PC 4LF removed 62 cy from the Access Channel - No accidents or incidents observed or reported. - Conducted daily safety meeting: PPE Work Performed by Sevenson Work Performed by Subcontractors Remarks/Verbal Directives - None Planned Activities - Continue survey of residential slips for residential slip dredging - Continue load out of dredge material - Continue dredging in the Access Channel - Continue dredging in Pleasure Bay Equipment/Materials Delivered to Site - FOR A LIST OF EQUIPMENT RECEIVED TODAY PLEASE SEE PAGE 3 Other Information Production Tables Disposal Kinsley Today Previous Total 4,667 4,667 Cape Mining 33,82 33,82 Beach Other Other Total 37,849 37,849 Unit Tons Tons Tons Dredging Available Pay Dredged Today Dredged To Date Quantity Data Source (CY) (CY) (CY) % Complete South Basin Snug Harbor Shelter Haven Entrance Stone Harbor Pleasure Bay Carnival Bay Sanctuary Bay Paradise Bay Access Channel Stone Harbor Hole Tuxedo Cove Residential Dredging *** Fire Boat Slip TOTALS 4,862 9,445,834 4,878,84 5,874 6,39,57 2,875 2,552, , AD Survey 26 AD Survey 26 AD Survey 26 AD Survey 26 AD Survey 26 BD Survey Fire Boat AD Survey ,385 6,53, ,278 % % % % 2% % % % 37% % % 2% 39% 3% * Volumes include Required and Allowable Pay Overdepth **% Complete when approved by Owner *** Change Order 2 of 5

3 Sevenson Equipment List SES Equipment # Heavy Equipment Make/Model Description Date Onsite Hrs Qty 773-E 848-E E E 85-E E 5-E Buckets Cat 336E Ex Komatsu PC 35 Ex Komatsu PC 4 LF Sennebogen 86 Sennebogen 86 Cat 95 Loader Cat 966 Loader Komatsu 45 Loader JCB Lodall JCB 9 Skid Steer Cat Excavator PC 35 Excavator PC 4 LF Excavator Material Handler Material Handler Cat 95 Front End Loader Cat 966 Front End Loader Komatsu 45-3MC Loader Telescoping Forklift Rubber Tire Skid Steer /2/26 9/2/26 //26 9/3/26 9/6/26 9/4/26 9/2/26 /2/26 9/3/26 9/5/ B HC-25 Anvil Bucket Anvil Bucket Anvil Bucket 4. CY Clamshell Bucket 3.5 CY Clamshell Bucket 3.5 CY Clamshell w/ Teeth 9/3/26 /3/26 /8/ Cablearm Bucket 5CY Cablearm Clamshell Bucket /6/26 Compressor / Generator / Power Pack 835-E 44-E 9-E s IR 85 Compressor XQ6 Generator Hydraulic Power Pack Air Compressor 85 Generator XQ6 Power Pack 9/5/26 9/5/26 9/5/26 26-E 67-E 999-E 29-E 943-E Terex RL 4 Light Terex RL 4 Light Terex RL 4 Light Terex RL 4 Light Terex RL 4 Light Terex RL 4 Light Terex RL 4 Light Terex RL 4 Light Terex RL 4 Light 9/2/26 9/2/26 9/2/26 //26 //26 //26 /2/26 /2/26 /2/26 Seabox BB2442 Seabox Seabox Seabox Seabox Vehicles 3-66 Ford F25 Pickup Pickup 3-63 Street Sweeper International Sweeper Truck Water Treatment System 458-E Bag Filter Housing Bag Filter Housing 76-E Bag Filter Housing Bag Filter Housing 673-E Bag Filter Housing Bag Filter Housing 78-E Bag Filter Housing Bag Filter Housing 674-E Bag Filter Housing Bag Filter Housing 762-E Bag Filter Housing Bag Filter Housing Boats Hydraulic Push Boat Hydraulic Push Boat Yamaha Twin Outboard Push Boat 872-E Bumblebee Boat Push Boat 76-E Tugboat Shirley Tugboat Tugboat 7 Bells Tugboat 657-E Dredge Tender DSC Dredge Tender 38-E Triumph 2' Boat Boat Rake Ends / Spuds RAKE ENDS BARGE RAKE ENDS BARGE RAKE ENDS Poseidon 5' Spud SP 2433 Poseidon Spud 9/3/26 9/5/26 /6/26 //26 9/2/26 9/2/26 9/2/26 9/2/26 9/2/26 9/2/26 /2/26 /24/26 9/4/26 9/5/26 /6/26 9/23/26 9/2/26 9/23/26 /6/ of 5

4 Sevenson Equipment List Rental Equipment Barges Make/Model Description Date Onsite Hrs Qty PF7-27RCT PF7-79QCT 247B8 PF7-28RCT 99EC 997 J--E 99EJ ER PF273QC PF2732QCT 227B6 227B33 247B34 247C34 P4Q 99Ea EB 996EG Scows Poseidon Barge 4' Poseidon Barge 4' Poseidon Barge 4' Poseidon Barge 4' Shakerton Barge 4' Shakerton Barge 4' Shakerton Barge 4' Shakerton Barge 4' Shakerton Barge 4' Shakerton Barge 4' Poseidon Barge 2' Poseidon Barge 2' Poseidon Barge 2' Poseidon Barge 2' Poseidon Barge 4' Poseidon Barge 4' Poseidon Barge 4' Shakerton Barge 4' Shakerton Barge 4' Shakerton Barge 4' Shakerton Barge 4' Shakerton Barge 2' Shakerton Barge 2' Shakerton Barge 2' Shakerton Barge 2' Shakerton Barge 4'x'x7' Barge 4'x'x7' Barge 4'x'x7' Barge 4'x'x7' Barge 4'x'x5' Barge 4'x'x5' Barge 4'x'x5' Barge 4'x'x5' Barge 4'x'x5' Barge 4'x'x5' Barge 2'x'x5' Barge 2'x'x5' Barge 2'x'x5' Barge 2'x'x5' Barge 4'x'x7' Barge 4'x'x7' Barge 4'x'x5' Barge 4'x'x5' Barge 4'x'x5' Barge 4'x'x5' Barge 4'x'x5' Barge 4'x'x5' Barge 4'x'x5' Barge 4'x'x5' Barge 4'x'x5' Barge 4' x ' x 5' Barge 9/4/26 9/4/26 9/4/26 9/4/26 9/4/26 9/4/26 9/4/26 9/4/26 9/4/26 9/4/26 9/5/26 9/5/26 9/5/26 9/5/26 9/5/26 9/5/26 9/5/26 9/5/26 9/5/26 9/5/26 9/5/26 9/5/26 9/5/26 9/5/26 9/5/26 /6/ /28/26 /6/26 /6/26 /6/26 /6/26 /6/26 /6/26 /28/26 /28/26 /28/26 Rental Equipment Frac Tank Adler Adler Open Top Weir Tank 9/6/26 Frac Tank Adler 2K Gal Frac Tank 9/6/26 Roll Off Adler Adler Roll Off Geotube Box 9/2/ B Anvil 3.5CY Clamshell Bucket 9/4/26 Anvil 3.5CY Clamshell Bucket - DEMO /4/26 Roll Off Container H4 Roll Off Container 9/2/26 Roll Off Container H4 Roll Off Container 9/2/26 Break Trailer Modspace Break Trailer 9/2/26 Office Trailer Modspace Office Trailer 9/23/26 Barge Floats Northstar Marine Flexi Floats /4/26 s Sunbelt Rentals s //26 Noise Meter Pine Environmental Pine Environmental Noise Meter 9/26/26 5 gal fuel tank Taylor Oil Gas Tank 9/2/26 5 gal fuel tank Taylor OIl Off Road Diesel Tank 9/2/ of 5

5 Labor SES Personnel SES Subcontractor Personnel Shift: Day Hrs Shift: Day Hrs Day Shift General Superintendent. Hydrographic Surveys Employees 3 Project Manager 8. Sitech Northeast 8 2 Project Superintendent 2. Measutronics 8 Night Shift Timekeeper 8. 2 Trimble 6 Employees QA/QC Manager. 2 Surveyor 2. Daily Total Mechanic 8. Employees 3 Health and Safety. 2 SES Foreman 8. Labor Foreman 72/ Laborer 72/ Operator Licensed Boat Op Day Shift Hours 27. Mate Deckhand Night Shift Dredge Op Hours. Today's Man Hours Totals Totals 32. SES Personnel SES Subcontractor Personnel Shift: Night Hrs Shift: Day Hrs Total Man Hours to Date. 3,4. Total Man Hours Since Lost Time Incident 3,4. Lost Time Incidents To-Date - Last Lost Time Incident - N/a Totals. Totals. 5 of 5

6

Progress Report Copyright 2005, Sevenson Environmental Services, Inc. All Rights Reserved.

Progress Report Copyright 2005, Sevenson Environmental Services, Inc. All Rights Reserved. Stone Harbor Maintenance Dredging Stone Harbor, NJ Weather Low Reports No. Project No. Report Date: Day of Week: High 55 45 99 45 2/7/7 Tuesday Daily Precipitation. Weather Conditions: Clear Progress Report

More information

Progress Report Copyright 2005, Sevenson Environmental Services, Inc. All Rights Reserved.

Progress Report Copyright 2005, Sevenson Environmental Services, Inc. All Rights Reserved. Stone Harbor Maintenance Dredging Stone Harbor, NJ Weather Low Reports No. Project No. Report Date: Day of Week: High 4 33 83 45 /7/7 Tuesday Daily Precipitation.25" Weather Conditions: Rain Progress Report

More information

Progress Report Copyright 2005, Sevenson Environmental Services, Inc. All Rights Reserved.

Progress Report Copyright 2005, Sevenson Environmental Services, Inc. All Rights Reserved. Stone Harbor Maintenance Dredging Stone Harbor, NJ Weather Low Reports No. Project No. Report Date: Day of Week: High 64 5 2 45 /2/6 Wednesday Daily Precipitation. Weather Conditions: Clear 2 Progress

More information

U.S. Coast Guard - American Waterways Operators Annual Safety Report

U.S. Coast Guard - American Waterways Operators Annual Safety Report American Waterways Operators U.S. Coast Guard - American Waterways Operators Annual Safety Report National Quality Steering Committee Meeting December 12, 2017 Established Safety Metrics For 17 years,

More information

CORPS OF ENGINEERS ALASKA DISTRICT Dredging Projects. Michael Tencza, PE Operations Project Manager November 4, 2015

CORPS OF ENGINEERS ALASKA DISTRICT Dredging Projects. Michael Tencza, PE Operations Project Manager November 4, 2015 CORPS OF ENGINEERS ALASKA DISTRICT 2016 Dredging Projects Michael Tencza, PE Operations Project Manager November 4, 2015 US Army Corps of Engineers Building and Preserving Alaska s Future AWARDED CONTRACTS

More information

Kissimmee DAYS February 6th- 9am 80% ABSOULTE

Kissimmee DAYS February 6th- 9am 80% ABSOULTE 80% ABSOULTE Sale Site: 651 West Southport Road Kissimmee, Florida, USA, 34746 T: +1 407.396.6060 F: +1 407.396.8181 6 DAYS February 6th- 11th @ 9am Kissimmee 2017 Unused Caterpillar 320FL - choice of

More information

BRIDGE SPAN 'X28'X6', 35 OF 108 DROPS SINGLE CONCRETE BRIDGE SPAN, 5 SINGLE CONCRETE BRIDGE SPAN, 6

BRIDGE SPAN 'X28'X6', 35 OF 108 DROPS SINGLE CONCRETE BRIDGE SPAN, 5 SINGLE CONCRETE BRIDGE SPAN, 6 A B C D E F G H I 1 2 3 4 REEFNAME MATERIAL1 MATERIAL2 TONS LORAN1 LORAN2 LATITUDE LONGITUDE DESCRIPTION ST GEORGE ISLAND BRIDGE PILINGS 40 BRIDGE PILINGS, BRIDGE REEF-WEST END (40) 80.00 2930.052 8449.937

More information

HARBOR INFRASTRUCTURE INVENTORIES Cleveland Harbor, OH

HARBOR INFRASTRUCTURE INVENTORIES Cleveland Harbor, OH HARBOR INFRASTRUCTURE INVENTORIES Cleveland Harbor, OH Harbor Location: Cleveland Harbor is located at the mouth of the Cuyahoga River on the southern shore of Lake Erie in the city of Cleveland, OH. Authority:

More information

Welcome to the City of Ketchikan Port & Harbors

Welcome to the City of Ketchikan Port & Harbors Effective Sept 1, 2017 Welcome to the City of Ketchikan Port & Harbors The City of Ketchikan operates five public boat harbors in the Ketchikan area. Harbor regulations and user fees are established by

More information

Sunken Barge ARTHUR J & Tug MADISON Case Study. LCDR Chico Knight, DBA, M.S.

Sunken Barge ARTHUR J & Tug MADISON Case Study. LCDR Chico Knight, DBA, M.S. Sunken Barge ARTHUR J & Tug MADISON Case Study by LCDR Chico Knight, DBA, M.S. July 19, 2012 Background On 19JUL, Sector Detroit was notified by the tug DRUMMOND ISLANDER II that the 110 dredge barge ARTHUR

More information

U.S. Coast Guard - American Waterways Operators Safety Report National Quality Steering Committee

U.S. Coast Guard - American Waterways Operators Safety Report National Quality Steering Committee Am erican Waterways Operators August 05, 2015 Established Safety Metrics U.S. Coast Guard - American Waterways Operators Safety Report National Quality Steering Committee Towing Industry Safety Statistics

More information

EUR BAM A/c up to 25 tons MTOW 11,00 22,00. A/c over 25 tons MTOW 14,00 27,00

EUR BAM A/c up to 25 tons MTOW 11,00 22,00. A/c over 25 tons MTOW 14,00 27,00 1. LANDING per ton MTOW EUR BAM A/c up to 25 tons MTOW 11,00 22,00 A/c over 25 tons MTOW 14,00 27,00 2. RUNWAY LIGHTING 40% of landing charge 3. PARKING Per ton/24 hours 2,55 5,00 4. PASSANGER SERVICE

More information

U.S. Coast Guard - American Waterways Operators Annual Safety Report

U.S. Coast Guard - American Waterways Operators Annual Safety Report American Waterways Operators U.S. Coast Guard - American Waterways Operators Annual Safety Report National Quality Steering Committee Meeting August 3, 216 Established Safety Metrics For 16 years, the

More information

Lincoln, NE November 9, 2018 (Friday)

Lincoln, NE November 9, 2018 (Friday) Lincoln, NE November 9, 2018 (Friday) Unreserved public auction Caterpillar D6N XL 1 of 2 John Deere 770D Caterpillar 627F 2011 Case 550 QuadTrac Caterpillar 963D 2016 Smithco SX3-46-36 46 Ft ACCEPTING

More information

Investigation Report Worker Fatality March 31, 2014

Investigation Report Worker Fatality March 31, 2014 Investigation Report Worker Fatality March 31, 2014 Report No- F-OHS-062228-389D3 March 2015 Page 1 of 6 The contents of this report This document reports s (OHS ) investigation of a worker fatality in

More information

TENTATIVE SCHEDULE

TENTATIVE SCHEDULE TENTATIVE SCHEDULE 20-2015 Facility Dredge Depth (- ft MLLW) 20 Spring Early Summer 20/2012 2012/2013 HWRP/ HWRP/ HWRP/ SFDODS SF- MWP Upland SFDODS SF- MWP upland SFDODS SF- MWP upland SFDODS SF- 2013/2014

More information

January 25, House Select Committee on Strategic Transportation Planning and Long Term Funding Solutions

January 25, House Select Committee on Strategic Transportation Planning and Long Term Funding Solutions House Select Committee on Strategic Planning and Long Term Funding Solutions January 25, 2016 Sterling Baker, P.E. Multimodal Special Projects Engineer Key Items Ferry System Overview System wide Summary

More information

KISSIMMEE. Wednesday, Oct 25 th 08:30am. Florida - USA CALL NOW TO CONSIGN QUALITY EQUIPMENT

KISSIMMEE. Wednesday, Oct 25 th 08:30am.   Florida - USA CALL NOW TO CONSIGN QUALITY EQUIPMENT License Number: AU-C003078 KISSIMMEE Florida - USA Wednesday, Oct 25 th 2017 @ 08:30am 2006 John Deere 670D 13-14 Caterpillar 320EL - choice CALL NOW TO CONSIGN QUALITY EQUIPMENT +1 419-865-3990 www.yoderandfrey.com

More information

Plan to Provide for the Deplanement of Passengers Following Excessive Tarmac Delays

Plan to Provide for the Deplanement of Passengers Following Excessive Tarmac Delays BURLINGTON INTERNATIONAL AIRPORT EMERGENCY CONTINGENCY PLAN Burlington International Airport has prepared this pursuant to 42301 of the FAA Modernization and Reform Act of 2012. Questions regarding this

More information

J. P. MEĐUNARODNI AERODROM "SARAJEVO" D.O.O.

J. P. MEĐUNARODNI AERODROM SARAJEVO D.O.O. 1 od 14 U ovom dokumentu sve strane imaju istu reviziju! 0 22.12.2008. I. Budimlić E. Šćeta B. Karahasanović Rev Datum Izradio (Ime, Potpis) Verifikovao (Ime, Potpis) Odobrio (Ime, Potpis) Status REVIZIJE

More information

Agency on Bay Management Gulfstream Phase IV Expansion

Agency on Bay Management Gulfstream Phase IV Expansion Agency on Bay Management Gulfstream Phase IV Expansion July 13, 2006 Al Taylor Vice President, Operations 1 Company Overview - Introduction Placed into service in May 2002, Gulfstream is a stateof-the-art

More information

Madagascar. Ports description

Madagascar. Ports description Madagascar Ports description Toamasina (Tamatave) Access Specification Map reference number and Description 1 Mole A - General cargo Length (m) Draught (m) East 110 6.50 Head 59 7.5 West 192 5 Remarks

More information

WELCOME TO DAMEN SONG CAM

WELCOME TO DAMEN SONG CAM WELCOME TO DAMEN SONG CAM HISTORY 2002 - Damen starts building ships with Song Cam Shipyard March 20, 2014 - Damen Song Cam grand opening ceremony As from 2015 - Damen Song Cam starts building series of

More information

JOHN GLENN COLUMBUS INTERNATIONAL AIRPORT

JOHN GLENN COLUMBUS INTERNATIONAL AIRPORT JOHN GLENN COLUMBUS INTERNATIONAL AIRPORT Signatory Airlines Landing Fee: (Net of GAC & SAC = $2.06 / 1,000 lbs) $3.32 / 1,000 lbs. Apron Fees: Square Foot Rate Landed Weight Rate $1.91 / sq. ft. $0.41

More information

Panama Canal Stakeholder Working Group Meeting

Panama Canal Stakeholder Working Group Meeting Panama Canal Stakeholder Working Group Meeting POHA, Bayport Container Terminal, Houston, Texas August 27, 2012 TOTAL ECONOMIC IMPACT 9,749 Texas jobs are in some way related to the Port Of the 9,749

More information

HARBOR INFRASTRUCTURE INVENTORIES Erie Harbor, PA

HARBOR INFRASTRUCTURE INVENTORIES Erie Harbor, PA HARBOR INFRASTRUCTURE INVENTORIES Erie Harbor, PA Harbor Location: Erie Harbor is located on the southern shore of Lake Erie in the City of Erie, PA about 98 Miles southwest of Buffalo. Authority: River

More information

JOHN GLENN COLUMBUS INTERNATIONAL AIRPORT

JOHN GLENN COLUMBUS INTERNATIONAL AIRPORT JOHN GLENN COLUMBUS INTERNATIONAL AIRPORT Signatory Airlines Landing Fee: (Net of General Airline Credit = $1.91 / 1,000 lbs) $3.17 / 1,000 lbs. Apron Fees: Square Foot Rate Landed Weight Rate $1.78 /

More information

TITAN Fuel Tanks. INSTALLATION INSTRUCTIONS G e n e r a t i o n V

TITAN Fuel Tanks. INSTALLATION INSTRUCTIONS G e n e r a t i o n V TITAN pt. no.: 02 0000 0128 Important: Please read these instructions carefully and completely before starting the installation. TITAN Fuel Tanks INSTALLATION INSTRUCTIONS G e n e r a t i o n V Extended

More information

Marine. endry. Our History. Our Busines.s HENDRYMARINE.COM

Marine. endry. Our History. Our Busines.s HENDRYMARINE.COM endry Marine HENDRYMARINE.COM Our Busines.s Hendry Marine Industries, Inc. (HMI) consists of a diverse range of maritime businesses, including commercial and government ship repair, marine environmental

More information

Capital Planning City of Ocean City 1

Capital Planning City of Ocean City 1 City of Ocean City Capital Planning 2015-2019 City of Ocean City 1 Road Improvements Project Completion Date 2012 Fall Road Improvement Spring, 2014 Program - (Paving 7 th Street, 8 th Street, 800 Block

More information

Register free at Hillhead.com. Come and visit our team on stand RB14 registration area June Hillhead Quarry Buxton Derbyshire UK

Register free at Hillhead.com. Come and visit our team on stand RB14 registration area June Hillhead Quarry Buxton Derbyshire UK 26 28 June Hillhead Quarry Buxton Derbyshire UK Register free at Hillhead.com #Hillhead18 Three days of live demonstrations, 500 exhibitors and thousands of products for the quarrying, construction and

More information

M/Y LIGAYA 38m. Year 2002/Refit 2008

M/Y LIGAYA 38m. Year 2002/Refit 2008 M/Y LIGAYA 38m Year 2002/Refit 2008 Ligaya meaning joy, happiness, serenity and pleasure, perfect defines this beautiful yacht. With her graceful profile and classic lines she will take your breath away.

More information

Genting Dream Ex Singapore

Genting Dream Ex Singapore Genting Dream Ex Singapore 5N CRUISE (SUN SAILING) Singapore-High Seas-Surabaya-North Bali DAY PORT ETA ETD Jan: 13 Mar: 17 Mon High Seas -- -- Tue Surabaya 0800 (0700) 1700 (1600) Wed North Bali (Celukan

More information

2010 CHICAGO YACHT CLUB RACE TO MACKINAC LAKE MICHIGAN HARBOR CONTACT INFORMATION

2010 CHICAGO YACHT CLUB RACE TO MACKINAC LAKE MICHIGAN HARBOR CONTACT INFORMATION 2010 CHICAGO YACHT CLUB RACE TO MACKINAC LAKE MICHIGAN HARBOR CONTACT INFORMATION On your return trip from Mackinac Island, you will likely want to go at a more leisurely pace, stopping in different harbors

More information

PRESS RELEASE WRECK REMOVAL OPERATION OF M/V GOODFAITH, ANDROS ISL. GREECE

PRESS RELEASE WRECK REMOVAL OPERATION OF M/V GOODFAITH, ANDROS ISL. GREECE PRESS RELEASE September 28, 2015 WRECK REMOVAL OPERATION OF M/V GOODFAITH, ANDROS ISL. GREECE On February 10 th, M/V GOODFAITH amid severe weather run aground on the north coast of Andros. Bulk Carrier

More information

www.mastershipyard.co.in State-of-the-art facilities at Kochi and Honavar Master Shipyard Pvt. Ltd., is one of India's premier builders of barges, passenger vessels, yachts and seagoing & inland vessels.

More information

State of the Waterway 2017

State of the Waterway 2017 State of the Waterway 2017 Steven W. Nerheim Director VTS Houston/Galveston Lone Star Harbor Safety Committee 2 FEBRUARY 2018 U.S. Port Rankings 2015 1 South Louisiana, LA, Port of 259.1-3.07% 15 Texas

More information

SYSTEM BRIEF DAILY SUMMARY

SYSTEM BRIEF DAILY SUMMARY SYSTEM BRIEF SUMMARY * ANNUAL (PEAK HOURS 7:00 AM TO 10:00 PM MON-SAT) MaxTemp NEL (MWH) Hr Ending Hr Ending LOAD ENERGY (MWH) INCREMENTAL COST DAY DATE Civic TOTAL MAXIMUM @Max MINIMUM @Min FACTOR ON

More information

Carnival Elation (EL)

Carnival Elation (EL) Carnival Elation (EL) Itineraries listed by Embarkation Home Port, in order of duration. Embarkation Home Port: Charleston, South Carolina Carnival Elation 4 Day Bahamas from Jacksonville, FL Freeport,

More information

NEW TECHNOLOGIES AND THEIR IMPACT ON PORT DEVELOPMENT IN JAMAICA. Christopher Hamilton May

NEW TECHNOLOGIES AND THEIR IMPACT ON PORT DEVELOPMENT IN JAMAICA. Christopher Hamilton May Organization Of American States Second Hemispheric Conference On Inland Ports, Waterways & Dredging NEW TECHNOLOGIES AND THEIR IMPACT ON PORT DEVELOPMENT IN JAMAICA Christopher Hamilton May 18 2017 2.83

More information

October 17, Sandy Related Project Update From June 2013

October 17, Sandy Related Project Update From June 2013 October 17, 2013 Sandy Related Project Update From June 2013 BEACH North End Beach Fill Completed South End Sand Berm Completed Sand Fence, and Beach Grass Installation underway ADA Beach Paths constructed

More information

NC Dredge Studies. Sterling Baker, P.E. NCDOT James Gregson NCDEQ April 5, 2018

NC Dredge Studies. Sterling Baker, P.E. NCDOT James Gregson NCDEQ April 5, 2018 NC Dredge Studies Study of the Use and Efficiency of the Dredge Manteo Study of Acquisition of Dedicated Dredging Capacity Study of Dredging Services Cost-Benefit Analysis Sterling Baker, P.E. NCDOT James

More information

REPORT INTO THE FIRE AND SUBSEQUENT GROUNDING OF THE MV "PATRIARCH" ON 1ST SEPTEMBER, 2004

REPORT INTO THE FIRE AND SUBSEQUENT GROUNDING OF THE MV PATRIARCH ON 1ST SEPTEMBER, 2004 REPORT INTO THE FIRE AND SUBSEQUENT GROUNDING OF THE MV "PATRIARCH" ON 1ST SEPTEMBER, 2004 The Marine Casualty Investigation Board was established on the 25 th March, 2003 under The Merchant Shipping (Investigation

More information

WELCOME TO DAMEN SONG CAM

WELCOME TO DAMEN SONG CAM WELCOME TO DAMEN SONG CAM HISTORY 2002 Damen starts building ships with Song Cam Shipyard March 20, 2014 Damen Song Cam grand opening ceremony As from 2015 Damen Song Cam starts building series of tugs

More information

Floating Crane. operation with capacity. Height Lifting capacity 100 tons on 10. meters. our berths, Hatch. Floating. 200 tons. is R=0.

Floating Crane. operation with capacity. Height Lifting capacity 100 tons on 10. meters. our berths, Hatch. Floating. 200 tons. is R=0. Beşiktaş Shipyard 2013 / New Layout In addition to Yard s two docks, another panamax size floating dock is in operation with an additional pier. Besiktas Shipyard has recently purchased neighboring yard

More information

MOVE IN/OUT & SHIPPING Exhibit Installation Exhibit Removal Freight Shipping Procedures Shipping Labels Move In Schedules Truck Route

MOVE IN/OUT & SHIPPING Exhibit Installation Exhibit Removal Freight Shipping Procedures Shipping Labels Move In Schedules Truck Route EXHIBITOR MANUAL GENERAL INFORMATION Deadlines and Checklist SHOW RULES & REGULATIONS Character & Conduct Rules and Regulations Security Precautions Limits of Liability & Responsibility Playing of Music

More information

GENERAL TARIFF PROVISIONS :

GENERAL TARIFF PROVISIONS : GENERAL TARIFF PROVISIONS : a) Overtime working hours are considered from 22.00 hrs to 06.00 hrs of the next day, and from 22.00 hrs on Friday to 06.00 on Monday as well as during holidays. b) Service

More information

18 Sep 07 Oct 2018 $ 5998

18 Sep 07 Oct 2018 $ 5998 Dream Maker Travel (Australia) Pty Ltd Metropol Shopping Centre, 742 Creek Road, Carindale QLD 4152 Tel: 07 3343 5422 Fax: 07 3849 5770 Email: info@dreammakertravel.com.au Web Site: www.dreammakertravel.com.au

More information

BURLINGTON INTERNATIONAL AIRPORT EMERGENCY CONTINGENCY PLAN

BURLINGTON INTERNATIONAL AIRPORT EMERGENCY CONTINGENCY PLAN BURLINGTON INTERNATIONAL AIRPORT EMERGENCY CONTINGENCY PLAN Burlington International Airport has prepared this pursuant to 42301 of the FAA Modernization and Reform Act of 2012. Questions regarding this

More information

Design and Construction of the Lake St. Martin Emergency Outlet

Design and Construction of the Lake St. Martin Emergency Outlet Design and Construction of the Lake St. Martin Emergency Outlet Background 2011 was the largest flood event experienced in the last 200 years Flood Fighting required some difficult decisions by the Manitoba

More information

ACCEPTING CONSIGNMENTS, CONTACT US NOW

ACCEPTING CONSIGNMENTS, CONTACT US NOW Las Vegas, NV April 20, 2018 (Friday) Unreserved public auction 2014 Komatsu D375A-6 2015 Komatsu WA380-7 7 of 8 2012 Volvo A40F 6x6 2016 Komatsu PC390LC-11 2010 Peterbilt 389 Heavy Haul ACCEPTING CONSIGNMENTS,

More information

Aid to Local Ports FY19 Requests

Aid to Local Ports FY19 Requests City Accomack- Greenbackville Harbor Phase III Accomack-Quinby Harbor Bulkhead Cape Charles- Installation of 4 th breakwater Total Project Cost Amount Requested Proposed Allocation Carryover Request $260,000.00

More information

Teddy Bear BBQ & Music Festival Arts & Crafts rental spaces August

Teddy Bear BBQ & Music Festival Arts & Crafts rental spaces August Arts & Crafts rental spaces August 12-13-14 2016 10 X 10 Rental space only $40.00 10 X 20 Rental space only $50.00 10 X 30 Rental space only $60.00 10 X 40 Rental space only $70.00 10 X 50 Rental space

More information

2013 IQA Young Members Network Study Tour Hong Kong / China

2013 IQA Young Members Network Study Tour Hong Kong / China 2013 IQA Young Members Network Study Tour Hong Kong / China Introduction IQA Young Members Network (YMN) Alliance Construction Materials Hong Kong Sponsor 5 Quarries 1. Anderson Road Quarry 2. Lam Tei

More information

18 Sep 07 Oct 2018 $ 5998

18 Sep 07 Oct 2018 $ 5998 Dream Maker Travel (Australia) Pty Ltd Metropol Shopping Centre, 742 Creek Road, Carindale QLD 4152 Tel: 07 3343 5422 Fax: 07 3849 5770 Email: info@dreammakertravel.com.au Web Site: www.dreammakertravel.com.au

More information

Port Columbus International Airport

Port Columbus International Airport Port Columbus International Airport Signatory Airlines Landing Fee: (Net of General Airline Credit = $2.77 / 1,000 lbs) $4.13 / 1,000 lbs Apron Fees: Square Foot Rate Landed Weight Rate $2.28 / sq. ft

More information

22 Days Escorted Tour Fly & Cruise Scandinavia Celebrity Host Ian Healy Denmark, Sweden, Russia Finland

22 Days Escorted Tour Fly & Cruise Scandinavia Celebrity Host Ian Healy Denmark, Sweden, Russia Finland Dream Maker Travel (Australia) Pty Ltd METROPOL SHOPPING CENTRE 742 Creek Road (Cnr Creek Rd & Pine Mountain Rd) MOUNT GRAVATT EAST QLD 4122 Tel: 07 3343 5422 Fax: 07 3849 5770 Email: info@dreammakertravel.com.au

More information

SFO Construction and Maintenance Schedule 2013

SFO Construction and Maintenance Schedule 2013 Mon SUN MONDAY 01/06/2014 Ops. Construction (650)821-3341 2 2 1 1 1 1 SFO P&G - Power Wash 0130-0430 PM Crew will power wash various areas around Boarding Area C. 12 Woolpert/SFO Surveyors - AGIS Survey

More information

ATTACHMENT C CITY OF FEDERAL WAY 2018 ASPHALT OVERLAY PROJECT BID SCHEDULE

ATTACHMENT C CITY OF FEDERAL WAY 2018 ASPHALT OVERLAY PROJECT BID SCHEDULE ATTACHMENT C CITY OF FEDERAL WAY ASPHALT OVERLAY PROJECT SCHEDULE NOTE: Unit Prices for all items, all extensions, and the total amount of the bid must be shown. Show unit prices in legible figures. Where

More information

YMA TRAINING CATALOG 2017

YMA TRAINING CATALOG 2017 E Learning Solutions Centum VP Virtual Operator Trainer Process, Safety and basic Engineering courses Safe System of Work Range Safety Awareness range Environmental Range Process Operation and technology

More information

Proposal from Crowne Plaza Memphis Downtown 300 North Second Street, Memphis, Tennessee, 38105, USA

Proposal from Crowne Plaza Memphis Downtown 300 North Second Street, Memphis, Tennessee, 38105, USA PROPOSAL DETAILS RFP Name RFP Code Event Name Sept 2017-ALRP FZNKPLGJF69 Sept 2017-ALRP Response Date Mon, 13-Mar-2017 2:19 PM Proposal Status Cancelled Supplier Name Crowne Plaza Memphis Downtown Supplier

More information

HERMAN EIJKELENBOOM. Suite K 5 th Floor East Hope Plaza 1777 Century Avenue Pudong Shanghai, P.R. China

HERMAN EIJKELENBOOM. Suite K 5 th Floor East Hope Plaza 1777 Century Avenue Pudong Shanghai, P.R. China Marine Engineer Office Location Brookes Bell LLP Brookes Bell Shanghai Suite K 5 th Floor East Hope Plaza 1777 Century Avenue Pudong Shanghai, 200122 P.R. China Telephone +86 21 5860 2868 E-mail he@brookesbell.com

More information

SFO Construction and Maintenance Schedule 2013

SFO Construction and Maintenance Schedule 2013 Mon SUN MONDAY 08/05/2013 Ops. Construction (650)821-3341 Item # Activity/Contractor Time 1 SFO P&G - Crack Seal RWY 10R/28L 0000-0600 4 6 Clean Harbors/Superior Drilling/SFIA Water Treatment - Excavation/Cleaning

More information

ALASKA RRT. Arctic & Western Alaska Area Committee Brief March 5, 2019

ALASKA RRT. Arctic & Western Alaska Area Committee Brief March 5, 2019 ALASKA RRT Arctic & Western Alaska Area Committee Brief March 5, 2019 AREA COMMITTEE UPDATE Notable Events within Area Committee: 5 Subcommittees met and began work on OSC tasking Workgroups formed underneath

More information

KEEL MARINE LTD Naval Architects, Marine Engineers and Surveyors

KEEL MARINE LTD Naval Architects, Marine Engineers and Surveyors 2473 (2012) Driveline 30m Hopper Barge Design 2462 (2011) Land & Water Land & Water 8.0m River Tug 2454 (2011) Hopper Barge 2444 (2011) Abwood Marine Abwood Marine Pontoon 2443 (2011) Abwood Marine Abwood

More information

Presented to: City of Petaluma City Council

Presented to: City of Petaluma City Council Agenda Item #1.A REVISED Presented to: City of Petaluma City Council Presented By: Dan St. John, F.ASCE, Director Jason Beatty, P.E., Senior Engineer James 'Jody' Boyette, USACE Project Manager November

More information

The Corps of Engineers Dredges on the West Coast

The Corps of Engineers Dredges on the West Coast The Corps of Engineers Dredges on the West Coast Presented To California Marine Affairs and Navigation Conference Sheryl Carrubba Operations Manager, Channels & Harbors Portland District November 8, 2011

More information

PARK PERMIT APPLICATION

PARK PERMIT APPLICATION Park Requested: Byrd Park Dean Park Museum Lawn Nelson Park Stonewall Park Please call or check the online calendar for availability. CITY OF MANASSAS Please send completed registration form with payment

More information

SERVICES & CHARGES 2019

SERVICES & CHARGES 2019 SERVICES & CHARGES 2019 MARINA BERTHING All of our marina contracts include A fully serviced berth afloat or ashore at any time during the contract period Membership of our partnership marina arrangements

More information

NC Dredge Studies NCBIWA Spring Conference April 23, 2018

NC Dredge Studies NCBIWA Spring Conference April 23, 2018 NC Dredge Studies Study of the Use and Efficiency of the Dredge Manteo Study of Acquisition of Dedicated Dredging Capacity Study of Dredging Services Cost-Benefit Analysis 2018 NCBIWA Spring Conference

More information

THE PLUS INDUSTRIAL MANUFACTURING EMPLOYER OF THE YEAR USACE BUFFALO DISTRICT BARGES MILLER BOAT LINE FERRY WILLIAM MARKET RYBA MARINE BARGES & TUG

THE PLUS INDUSTRIAL MANUFACTURING EMPLOYER OF THE YEAR USACE BUFFALO DISTRICT BARGES MILLER BOAT LINE FERRY WILLIAM MARKET RYBA MARINE BARGES & TUG THE DECEMBER 2015 VOLUME 1 ISSUE 11 A LEGACY OF GREATNESS, INNOVATING FOR THE FUTURE CUYAHOGA COMMUNITY COLLEGE INDUSTRIAL MANUFACTURING EMPLOYER OF THE YEAR USACE BUFFALO DISTRICT BARGES DRYDOCKING CONTRACT

More information

Dredging 101. Why, Who, How and So What! 2015 WAMSI Research Conference. 30 March 2015

Dredging 101. Why, Who, How and So What! 2015 WAMSI Research Conference. 30 March 2015 Dredging 101 Why, Who, How and So What! 2015 WAMSI Research Conference 30 March 2015 Presentation Contents Quick Oversight on Why we need to Dredge and Who Carries it out Global Context of some of our

More information

OUTDOOR RECREATION RENTAL GUIDE

OUTDOOR RECREATION RENTAL GUIDE OUTDOOR RECREATION RENTAL GUIDE Hours Of Operation Monday, Tuesday, Thursday, and Friday: 8:30 a.m. to 5 p.m. Wednesday, Saturday, Sunday, and Holidays: CLOSED Prices current as of October 2017. All prices

More information

OPEN CELL SHEET PILE TECHNOLOGY. Presentation to Alaska State Legislature, House Finance Committee

OPEN CELL SHEET PILE TECHNOLOGY. Presentation to Alaska State Legislature, House Finance Committee OPEN CELL SHEET PILE TECHNOLOGY Presentation to Alaska State Legislature, House Finance Committee OPEN CELL SHEET PILE Technology Retaining Wall System Patents Obtained by PND Engineers ARRC Dock, Seward,

More information

Carnival Sensation (SE)

Carnival Sensation (SE) Carnival Sensation (SE) Itineraries listed in order of duration. Carnival Sensation 4 Day Western Caribbean from Miami, FL Key West, Florida 7:30am 1:30pm Cozumel, Mexico Sat 12:00pm 10:00pm Mon 8:00am

More information

Amended Maintenance Dredge Spoil Management Plan. Shute Harbour Marina Resort

Amended Maintenance Dredge Spoil Management Plan. Shute Harbour Marina Resort Amended Maintenance Dredge Spoil Management Plan Shute Harbour Marina Resort Amended Maintenance Dredge Spoil Management Plan Quality Information Document Ref Amended Maintenance Dredge and Spoil Maintenance

More information

Work Zone. Steve Hubbard: Lane Construction Safety Training Manager. Michael Grey: Rea Contracting Project Superintendent

Work Zone. Steve Hubbard: Lane Construction Safety Training Manager. Michael Grey: Rea Contracting Project Superintendent Access and Egress Into the Work Zone Steve Hubbard: Lane Construction Safety Training Manager Michael Grey: Rea Contracting Project Superintendent Access and Egress Into the Work Zone THE TYPICAL INTERSTATE

More information

Prices are Starting From MARINER OF THE SEAS VOYAGER CLASS TONNAGE :

Prices are Starting From MARINER OF THE SEAS VOYAGER CLASS TONNAGE : MARINER OF THE SEAS SAILING ON MARCH 2018 1-Mar-18 5-Mar-18 9-Mar-18 12-Mar-18 16-Mar-18 19-Mar-18 29-Mar-18 2-Apr-18 6-Apr-18 4 NIGHTS 4 NIGHTS 3 NIGHTS 4 NIGHTS 3 NIGHTS 3 NIGHTS 4 NIGHTS 4 NIGHTS 3

More information

Job Demands Analysis NEEDLE RECOVERY (PARK BOARD)

Job Demands Analysis NEEDLE RECOVERY (PARK BOARD) Purpose Job Demands Analysis NEEDLE RECOVERY (PARK BOARD) The purpose of the job of a Needle Recovery Employee working for the City of Vancouver s Parks & Recreation Department is to pick up needles in

More information

Pollution Incident Response Management Plan

Pollution Incident Response Management Plan Baines Masonary Blocks Pty Ltd (Baines Masonry) 900 Wilton Rd, Appin, NSW 2560 Pollution Incident Response Management Plan Page 1 of 7 Table of Contents 1. Purpose and Scope 3 2. Process 3 3. Definition

More information

Mr. Jeff Keever Deputy Executive Director Virginia Port Authority May 2, 2012

Mr. Jeff Keever Deputy Executive Director Virginia Port Authority May 2, 2012 Management of Dredged Materials: Challenges and Opportunities Mr. Jeff Keever Deputy Executive Director Virginia Port Authority May 2, 2012 1 Craney Island Eastward Expansion and Marine Terminal NNMT Hampton

More information

Ensign Ship Brokers. Proudly Presents. NAMASTE Bering 65

Ensign Ship Brokers. Proudly Presents. NAMASTE Bering 65 Ensign Ship Brokers Proudly Presents NAMASTE Bering 65 Main dimensions Length Overall (LOA)63 3 (19.30 m) Deck Length (LOD)60 0 (18.30 m) Waterline Length (LWL)58 0 (17.70 m) Beam 20 0 (6.00 m) Bridge

More information

Investigation Report. Identification. Factual information. German Federal Bureau of Aircraft Accidents Investigation. TX002-0/07 September 2008

Investigation Report. Identification. Factual information. German Federal Bureau of Aircraft Accidents Investigation. TX002-0/07 September 2008 German Federal Bureau of Aircraft Accidents Investigation Investigation Report TX002-0/07 September 2008 Identification Type of incident: Incident Date: 12 January 2007 Place: Aircraft: Manufacturer /

More information

FOR SALE Willamette Pass Inn & Chalets Crescent Lake, OR

FOR SALE Willamette Pass Inn & Chalets Crescent Lake, OR Located in the High ated in Cascades of Central Oregon FOR SALE Willamette Pass Inn & Chalets Crescent Lake, OR PRICE REDUCED! 19821 HWY 58 Crescent Lake, OR 97733 Combination of 13 rooms in the Inn and

More information

M/Y DP MONITOR 30 mt BENETTI. Contact: Carlo Pettorosso Tel / Mob

M/Y DP MONITOR 30 mt BENETTI. Contact: Carlo Pettorosso Tel / Mob M/Y DP MONITOR 30 mt BENETTI Contact: Carlo Pettorosso Tel. + 39 081 195 664 64 / Mob. + 39 338 70 95 795 info@flyingcharter.it AT ANCHOR SIDE VIEW COCKPIT COCKPIT DINING AREA FOREDECK SALON SALON MASTER

More information

Fees & Charges from 1st April 2017 to 31st March 2018

Fees & Charges from 1st April 2017 to 31st March 2018 Fees & s from 1 st April 2017 to 31 st March 2018 Fees and s These Fees & s are subject to Bristol Airport s Conditions of Use and replace all previous editions of the Fees & s. Subject to any variations

More information

A. TARIFF SCHEDULE OF PORT SERVICES

A. TARIFF SCHEDULE OF PORT SERVICES TARIFF SCHEDULE OF PORT SERVICES AND CHARGES OF DUBROVNIK PORT AUTHORITY Contents: A. TARIFF SCHEDULE OF PORT SERVICES I II III IV V GENERAL PROVISIONS QUAYAGE DEMURRAGE QUAYAGE boats - yachts ANCHORAGE

More information

55 Meter (180ft) World Explorer motoryacht

55 Meter (180ft) World Explorer motoryacht Australia - Chile - Indonesia - Great Britain - New Zealand - Panama - Philippines - South Korea - Thailand - USA E: sales@seaboats.net (sales) - E: admin@seaboats.net (accounts) 55 Meter (180ft) World

More information

Chris LeClair Pine Glen Rd., Riverview, NB E1B 4J ; Fax

Chris LeClair Pine Glen Rd., Riverview, NB E1B 4J ; Fax Chris LeClair 2-387 Pine Glen Rd., Riverview, NB E1B 4J8 506 852-1049; 1-800-591-6034 chris.leclair@rogers.com Fax 830-1835 www.ccbustour.com Saint-Pierre et Miquelon & Newfoundland July 14-26, 2019 13

More information

Stone Harbor Municipal Public Access Plan. in accordance with N.J.A.C. 7:7E

Stone Harbor Municipal Public Access Plan. in accordance with N.J.A.C. 7:7E Stone Harbor Municipal Public Access Plan in accordance with N.J.A.C. 7:7E December 2011 Stone Harbor Municipal Public Access Plan EXECUTIVE SUMMARY In the spring of 2011, the New Jersey Department of

More information

[Owner s or Custodian s Company Name] VGP Annual Towing Vessel Inspection Report Form

[Owner s or Custodian s Company Name] VGP Annual Towing Vessel Inspection Report Form Form Vessel General Permit Compliance Instructions: (1) This form must be completed at least once every 12 months. Visually inspect all areas of the vessel affected by the requirements in the VGP that

More information

Riverside County Transportation Department Summary of Bids

Riverside County Transportation Department Summary of Bids COUNTY'S ESTIMATE HARDY & HARPER, INC. Schedule 1: Project No. B6-0472 Santa Ana, CA 92705 ITEM NO. ITEM CODE CONTRACT ITEM UNITS QUANTITY UNIT PRICE ENG ESTIMATE BID AMOUNT 1 731521 MINOR CONCRETE (SIDEWALK)

More information

Make Model Number(s) STC No: Description System Covered SA449GL

Make Model Number(s) STC No: Description System Covered SA449GL Make Model Number(s) STC No: Description Covered 200, 200C, 200CT, 200T, A200, A200CT, B200, B200C, B200CT, B200T, B300, B300C SA00754CH ADC-2000 Fuel/Airdata ARMY ADC S35, V35, V35A, V35B, 35-C33A, E33A,

More information

69' (21.20m) FERRETTI

69' (21.20m) FERRETTI Gus VIII 69' (21.20m) FERRETTI LOA: Beam: Min Draft: Max Draft: Speed: 69' 7" (21.20m) 18' 6" (5.63m) Year: Builder: Type: Price: Location: Mfg-2003 Model-2003 FERRETTI Motor Yacht Flybridge approx. ($624,986

More information

Baltimore Harbor & Channels, Maryland and Virginia

Baltimore Harbor & Channels, Maryland and Virginia FACT SHEET January 2006 Type of Project: Navigation Project Phase: Operation & Maintenance Authorization: Section 101 of the River and Harbor Act of 1958 (42-Foot Project), Section 101 of the River and

More information

Fountain Exp Cruiser LLC OWNED

Fountain Exp Cruiser LLC OWNED Fountain Exp Cruiser LLC OWNED Make: Model: Length: Fountain Exp Cruiser LLC OWNED 65 ft Price: $ 495,000 Year: 2000 Condition: Used Location: Long Beach, CA, United States Hull Material: Draft: Number

More information

Sabre Hardback Express Carina

Sabre Hardback Express Carina Sabre Hardback Express Carina Make: Sabre Boat Name: Carina Model: Hardback Express Hull Material: Fiberglass Length: 42 ft Number of Engines: 2 Price: $ 379,000 Fuel Type: Year: 2005 Diesel Condition:

More information

2.1 General Characteristics. 2.2 General Dimensions. 2.3 Ground Clearances. 2.4 Interior Arrangements. 2.5 Cabin Cross Sections

2.1 General Characteristics. 2.2 General Dimensions. 2.3 Ground Clearances. 2.4 Interior Arrangements. 2.5 Cabin Cross Sections 2.0 AIRPLANE DESCRIPTION 2.1 General Characteristics 2.2 General Dimensions 2.3 Ground Clearances 2.4 Interior Arrangements 2.5 Cabin Cross Sections 2.6 Lower Cargo Compartments 2.7 Door Clearances JUNE

More information

icleanzone A Clean Environment is A Safe Environment With icleanzone Cleaning System keeps your Workplace Clean and Safe

icleanzone A Clean Environment is A Safe Environment With icleanzone Cleaning System keeps your Workplace Clean and Safe Made in USA icleanzone.com A Clean Environment is A Safe Environment With Cleaning System keeps your Workplace Clean and Safe icleanzone.com icleanzone Removes and Contains Dirt in its Place Off your Floors!

More information

The Whitefish Trail

The Whitefish Trail The Trail - 2017 Trail Construction Specifications & Scope of Services The Lower Haskill section of Trail construction will take place on two different land ownerships: City of and Iron Horse. This section

More information