UNCLASSIFIED. FY 2017 Base FY 2017 OCO FY 2017 OCO. FY 2017 Base
|
|
- August Hutchinson
- 5 years ago
- Views:
Transcription
1 Exhibit P-40, Budget Line Item Justification: PB 2017 Air Force Date: February F: Aircraft Procurement, Air Force / BA 05: Modification of Inservice Aircraft / BSA 5: Other Aircraft ID Code (A=Service Ready, B=Not Service Ready): B Program Elements for Code B Items: F, F Other Related Program Elements: F, F Line Item MDAP/MAIS Code: None Resource Summary Item MDAP/MAIS Code(s): N/A Prior Years FY 2015 FY 2016 Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) , Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) , Plus CY Advance Procurement ($ in Millions) Obligation Authority ($ in Millions) , (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) Flyaway Unit Cost ($ in Millions) Gross/Weapon System Unit Cost ($ in Millions) Description: This line item funds modifications to the HH-60G helicopter. The HH-60G currently supports the Air Force's core function of Personnel Recovery. The primary mission of the HH-60G is to conduct day / night / marginal weather Combat Search and Rescue (CSAR) in order to recover isolated personnel in hostile or permissive environments. Other mission areas include casualty evacuation (CASEVAC), medical evacuation (MEDEVAC), non-combatant evacuation operations, civil search and rescue, international aid, disaster humanitarian relief, and insertion/extraction of combat forces. There are currently 97 aircraft, at 24 years average age, remaining of the original 112 HH-60Gs. The modification efforts budgeted in FY17 provide predictive maintenance analysis, safety/survivability upgrades, mission avionics upgrades, operational loss replacement mission modifications, and addresses obsolescence issues. FY16 funding totals include $39.3M for Overseas Contingency Operations. Funding for this exhibit is contained in PE F and PE F. The FY17 funding request was reduced by $9.7M to account for the availability of prior year execution balances. In accordance with Section 1815 of the FY 2008 National Defense Authorization Act (P.L ), this item is necessary for use by the active and reserve components of the Armed Forces for homeland defense missions, domestic emergency responses, and providing military support to civil authorities. AF AFNG Secondary Distribution FY 2015 FY 2016 Obligation Authority Obligation Authority Air Force Page 1 of 21 P-1 Line #54 Volume 2-329
2 Exhibit P-40, Budget Line Item Justification: PB 2017 Air Force Date: February F: Aircraft Procurement, Air Force / BA 05: Modification of Inservice Aircraft / BSA 5: Other Aircraft ID Code (A=Service Ready, B=Not Service Ready): B Program Elements for Code B Items: F, F Other Related Program Elements: F, F Line Item MDAP/MAIS Code: None AFR : Secondary Distribution Item MDAP/MAIS Code(s): N/A Secondary Distribution FY 2015 FY 2016 Obligation Authority Obligation Authority Air Force Page 2 of 21 P-1 Line #54 Volume 2-330
3 Exhibit P-40, Budget Line Item Justification: PB 2017 Air Force Date: February F: Aircraft Procurement, Air Force / BA 05: Modification of Inservice Aircraft / BSA 5: Other Aircraft ID Code (A=Service Ready, B=Not Service Ready): B Program Elements for Code B Items: F, F Other Related Program Elements: F, F Line Item MDAP/MAIS Code: None Item MDAP/MAIS Code(s): N/A Exhibits Schedule Prior Years FY 2015 FY 2016 Exhibit Type Title* Subexhibits P-40a*** ID CD Quantity / Cost Quantity / Cost Quantity / Cost Quantity / Cost Quantity / Cost Quantity / Cost 8254 / ALTITUDE HOLD AND HOVER SYSTEM (AHHS) (Capability Improvement) - / / / / / - - / P-40a*** 8496 / KIRTLAND SIM UPGRADES (Other) - / / - - / - - / - - / - - / - P-40a*** 8560 / SERVICE LIFE EXTENSION PROGRAM (Service Life Extension) - / / - - / - - / - - / - - / - P-40a*** 8563 / LIGHTWEIGHT AIRBORNE RECOVERY SYSTEM V12 UPGRADE (Capability Improvement) - / / / / - - / - - / - P-40a*** 8564 / Control Display Unit (CDU) (Capability Improvement) - / / / / / - - / P-40a*** 8565 / Navigation System Upgrade (NSU) (Capability Improvement) - / / / / / - - / P-40a*** 8840 / Vibration Monitoring System (VMS) (Reliability & Maintainability) - / / / / / - - / P-40a*** 8841 / Situation Awareness Data-Link (Capability Improvement) - / / - - / - - / - - / - - / - P-40a*** 8844 / Multi-function Color Display (Capability Improvement) - / / / / / - - / P-40a*** 8852 / CSAR Avionics/Electrical Upgrade (Capability Improvement) - / / / / / - - / P-40a*** 8853 / DEFENSIVE SYSTEM UPGRADE (Capability Improvement) - / / / - - / / - - / P-40a*** 8855 / Ballistic Protection Enhancement (Capability Improvement) - / / / - - / - - / - - / - P-40a*** 8856 / Block 162 (Service Life Extension) - / - - / - - / / / - - / P-40a*** 8857 / Rotor Brake (Capability Improvement) - / - - / - - / / / - - / P-40a*** 99999S / SERVICE BULLETINS (Other) - / / - - / - - / - - / - - / - P-40a*** 99999X / Low Cost Modifications (Other) - / / / / / - - / P-3a 8850 / MODE 5 (Capability Improvement) - / / / / / - - / P-3a 8851 / Gun Replacement (Reliability & Maintainability) - / / / - - / / - - / P-3a 8854 / HH-60 OLR Mission Modifications (Other) - / / / / / - - / P-3a 8859 / DVE Sensor (Capability Improvement) - / - - / - - / - - / / - - / P-40 Gross/Weapon System Cost - / / / / / - - / Exhibits Schedule FY 2018 FY 2019 FY 2020 FY 2021 Exhibit Type Title* Subexhibits P-40a*** ID CD Quantity / Cost Quantity / Cost Quantity / Cost Quantity / Cost Quantity / Cost Quantity / Cost 8254 / ALTITUDE HOLD AND HOVER SYSTEM (AHHS) (Capability Improvement) - / - - / - - / - - / - - / - - / P-40a*** 8496 / KIRTLAND SIM UPGRADES (Other) - / - - / - - / - - / - - / - - / P-40a*** 8560 / SERVICE LIFE EXTENSION PROGRAM (Service Life Extension) - / - - / - - / - - / - - / - - / P-40a*** 8563 / LIGHTWEIGHT AIRBORNE RECOVERY SYSTEM V12 UPGRADE (Capability Improvement) - / - - / - - / - - / - - / - - / P-40a*** 8564 / Control Display Unit (CDU) (Capability Improvement) - / / - - / - - / - - / - - / P-40a*** 8565 / Navigation System Upgrade (NSU) (Capability Improvement) - / / / - - / - - / - - / P-40a*** 8840 / Vibration Monitoring System (VMS) (Reliability & Maintainability) - / - - / - - / - - / - - / - - / P-40a*** 8841 / Situation Awareness Data-Link (Capability Improvement) - / - - / - - / - - / - - / - - / Air Force Page 3 of 21 P-1 Line #54 Volume 2-331
4 Exhibit P-40, Budget Line Item Justification: PB 2017 Air Force Date: February F: Aircraft Procurement, Air Force / BA 05: Modification of Inservice Aircraft / BSA 5: Other Aircraft ID Code (A=Service Ready, B=Not Service Ready): B Program Elements for Code B Items: F, F Other Related Program Elements: F, F Line Item MDAP/MAIS Code: None Item MDAP/MAIS Code(s): N/A Exhibits Schedule FY 2018 FY 2019 FY 2020 FY 2021 Exhibit Type Title* Subexhibits ID CD Quantity / Cost Quantity / Cost Quantity / Cost Quantity / Cost Quantity / Cost Quantity / Cost P-40a*** 8844 / Multi-function Color Display (Capability Improvement) - / / - - / - - / - - / - - / P-40a*** 8852 / CSAR Avionics/Electrical Upgrade (Capability Improvement) - / / - - / - - / - - / - - / P-40a*** 8853 / DEFENSIVE SYSTEM UPGRADE (Capability Improvement) - / - - / - - / - - / - - / - - / P-40a*** 8855 / Ballistic Protection Enhancement (Capability Improvement) - / - - / - - / - - / - - / - - / P-40a*** 8856 / Block 162 (Service Life Extension) - / / / / / / P-40a*** 8857 / Rotor Brake (Capability Improvement) - / - - / - - / - - / - - / - - / P-40a*** 99999S / SERVICE BULLETINS (Other) - / - - / - - / - - / - - / - - / P-40a*** 99999X / Low Cost Modifications (Other) - / / / / / - - / P-3a 8850 / MODE 5 (Capability Improvement) - / / / - - / - - / - - / P-3a 8851 / Gun Replacement (Reliability & Maintainability) - / / - - / - - / - - / - - / P-3a 8854 / HH-60 OLR Mission Modifications (Other) - / / / / / - - / P-3a 8859 / DVE Sensor (Capability Improvement) - / / / / / - - / P-40 Gross/Weapon System Cost - / / / / / / 1, *** Although this is an Exhibit P-40a item, the actual exhibit is not included since all of the required information for this item is already being shown here. *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: s in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: Where applicable, justification for individual modifications is provided in the P-3A exhibits. Air Force Page 4 of 21 P-1 Line #54 Volume 2-332
5 Resource Summary Prior Years FY 2015 FY / MODE 5 Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Obligation Authority ($ in Millions) (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) Gross/Weapon System Unit Cost ($ in Millions) Description: A modification proposal (AF Form 1067, ACC ) has been approved to install an improved IFF system on the HH-60G offering Mode S. The HH-60G Mode S modification program executes an OSD mandated upgrade to all DoD aircraft IFF systems--the primary means of aircraft identification during Air Defense operations. It provides the HH-60G with a system that uses modern modulation, coding, and cryptographic techniques to overcome performance and security limitations in the current systems, and provides expanded data handling capabilities to securely pass GPS position and other data. FY12 Kit purchases were cut back to 41ea. Remaining 56 kits will be purchased when Milestone C is reached. Program schedule was delayed by 24 months by HQ ACC direction due to other testing priorities. Production installations will be a combination of Depot and Depot Field Teams to maximize Air Force resources and minimize downtime. FY17 funding procures the remaining 56 kits and funds Production Installs and Program Management Activities. Milestone/Development Status RDT&E is not a component of this effort. After delays due to test asset prioritization, trial kit install and ground & flight testing began 1QFY16, leading to a Milestone C decision planned for 3QFY16. AF AFNG AFR : Secondary Distribution Secondary Distribution FY 2015 FY 2016 Obligation Authority Obligation Authority Obligation Authority Obligation Authority Air Force Page 5 of 21 P-1 Line #54 Volume 2-333
6 8850 / MODE 5 Models of Systems Affected: HH-60G Modification Type: Capability Improvement Related RDT&E PEs: F RDT&E PE # Financial Plan Prior Years FY 2015 FY F - / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / Procurement Modification Item 1 of 1: Mode 5 Kit A Kits Recurring Mode 5 Kit:INSTALL KITS Group A (Active) 65 / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 65 / Mode 5 Kit:INSTALL KITS Group A (Guard) 17 / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 17 / Mode 5 Kit:INSTALL KITS Group A (Reserve) 15 / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 15 / Subtotal: Recurring - / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / B Kits Recurring Mode 5 Kit:EQUIPMENT Group B (Active) 27 / / - - / - 38 / / - 38 / / - - / - - / - - / - - / - 65 / Mode 5 Kit:EQUIPMENT Group B (Guard) 7 / / - - / - 10 / / - 10 / / - - / - - / - - / - - / - 17 / Mode 5 Kit:EQUIPMENT Group B (Reserve) 7 / / - - / - 8 / / - 8 / / - - / - - / - - / - - / - 15 / Subtotal: Recurring - / / - - / - - / / - - / / - - / - - / - - / - - / - - / Subtotal: Mode 5 Kit - / / - - / - - / / - - / / - - / - - / - - / - - / - - / Subtotal: Procurement, All Modification Items - / / - - / - - / / - - / / - - / - - / - - / - - / - - / Support (All Modification Items) GROUP A: TOTAL NONRECURRING - / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / GROUP B: TOTAL NONRECURRING - / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / Data - / - - / / - - / - - / - - / - - / - - / - - / - - / - - / - - / SIM/TRAINER 3 / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 3 / OTHER GOVT - / / / - - / - - / - - / - - / - - / - - / - - / - - / - - / OTHER GOVT (1) - / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / PMA - Contractor Services - / / / / / - - / / / - - / - - / - - / - - / PMA - Other Gov't Costs - / - - / / / / - - / / / - - / - - / - - / - - / Subtotal: Support 3 / / / / / - - / / / - - / - - / - - / - 3 / Installation Modification Item 1 of 1: Mode 5 Kit - / - - / - 19 / / / - 45 / / / / - - / - - / - 97 / Subtotal: Installation - / - - / - 19 / / / - 45 / / / / - - / - - / - 97 / Air Force Page 6 of 21 P-1 Line #54 Volume 2-334
7 8850 / MODE 5 Models of Systems Affected: HH-60G Modification Type: Capability Improvement Related RDT&E PEs: F Financial Plan Prior Years FY 2015 FY 2016 Cost (Procurement + Support + Installation) Air Force Page 7 of 21 P-1 Line #54 Volume 2-335
8 Modification Item 1 of 1: Mode 5 Kit Manufacturer Information Manufacturer Name: Raytheon Manufacturer Location: Waltham MA Administrative Leadtime (in Months): 1 Production Leadtime (in Months): / MODE 5 Dates FY 2015 FY 2016 FY 2018 FY 2019 FY 2020 FY 2021 Contract Dates Nov 2016 Delivery Dates Mar 2017 Installation Information Method of Implementation: Depot Field Team Installation Cost Prior Years FY 2015 FY 2016 Prior Years - / - - / - 19 / / / - 22 / / - - / - - / - - / - - / - 41 / FY / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 23 / / - 23 / / / / - - / - - / - 56 / FY / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 19 / / / - 45 / / / / - - / - - / - 97 / Installation Schedule FY 2015 FY 2016 FY 2018 FY 2019 FY 2020 FY 2021 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC t In Out Air Force Page 8 of 21 P-1 Line #54 Volume 2-336
9 Resource Summary Prior Years FY 2015 FY / Gun Replacement Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Obligation Authority ($ in Millions) (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) Gross/Weapon System Unit Cost ($ in Millions) Description: This program is executed in response to AF 1067, SOC This program will execute congressionally added funds for a replacement to the aging GAU-18,.50 caliber machine gun. A.50 caliber machine gun can be mounted on the left and right side weapon mounts of the HH-60G Pavehawk for use as a crew served, or pilot operated, defensive gun system in hostile environments. The funded replacement gun system (GAU-21) will incorporate increased reliability and enhanced safety features to eliminate accidental weapons discharge from cook-offs (overheating of the gun itself). A gun system consists of the gun itself, a cradle, and a weapon's mount for attachment to the helicopter. Two guns are to be fielded on each helicopter. Gun systems are organic and intermediate level installs. Guns will be installed based on aircraft availability. Funds will be utilized to execute integration of gun replacement, kit proof, trial installation, and procurement of 112 gun systems (99 installs/13 spares). Kit includes 2 weapons and associated mounting hardware. During initial testing, it was discovered that the Electronic Control Unit (ECU) used in the existing GAU-18 installation was inadequate to support the GAU-21, and procurement of a modified ECU is required to retain fixed-forward firing (pilot-operated) capability with the GAU-21 installed. ECU kits each contain 2 ECUs, and the total quantity of ECU kits reflects the additional aircraft entering the fleet in FY16 from the Operational Loss Replacement program. Design and fabrication of the gun mounts and associated ammunition feed hardware is performed organically by the US Naval Surface Warfare Center-Crane, Indiana (NSWC-Crane). Funds budgeted as "Other Government" in FY17 and FY18 will cover costs of tasking NSWC-Crane to implement any design changes identified during testing planned for FY16, such as revision of the ammunition can. FY16 funding was reduced by a Congressional mark. FY17 funding provides for procurement of Electronic Control Units necessary to retain forward-fire capability with the GAU-21 gun installed, and Program Management Activities. Milestone/Development Status RDT&E funding is not a component of this effort. Trial install and testing are scheduled for FY16, using prior-year funding. AF AFNG Secondary Distribution FY 2015 FY 2016 Obligation Authority Obligation Authority AFR Air Force Page 9 of 21 P-1 Line #54 Volume 2-337
10 : Secondary Distribution Secondary Distribution FY 2015 FY / Gun Replacement Obligation Authority Obligation Authority Air Force Page 10 of 21 P-1 Line #54 Volume 2-338
11 8851 / Gun Replacement Models of Systems Affected: HH-60G Modification Type: Reliability & Maintainability Related RDT&E PEs: F Procurement Financial Plan Modification Item 1 of 2: Electronic Control Unit A Kits Recurring Prior Years FY 2015 FY 2016 Electronic Control Unit:INSTALL KITS Group A (Active) - / - - / - - / - 86 / / - 86 / / - - / - - / - - / - - / - 86 / Electronic Control Unit:INSTALL KITS Group A (Guard) - / - - / - - / - 17 / / - 17 / / - - / - - / - - / - - / - 17 / Electronic Control Unit:INSTALL KITS Group A (Reserve) - / - - / - - / - 15 / / - 15 / / - - / - - / - - / - - / - 15 / Subtotal: Recurring - / - - / - - / - - / / - - / / - - / - - / - - / - - / - - / Subtotal: Electronic Control Unit - / - - / - - / - - / / - - / / - - / - - / - - / - - / - - / Modification Item 2 of 2: GAU21 Kit A Kits Recurring GAU21 Kit:INSTALL KITS Group A (Active) 65 / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 65 / GAU21 Kit:INSTALL KITS Group A (Guard) 17 / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 17 / GAU21 Kit:INSTALL KITS Group A (Reserve) 15 / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 15 / Subtotal: Recurring - / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / B Kits Recurring GAU21 Kit:EQUIPMENT Group B (Active) 67 / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 67 / GAU21 Kit:EQUIPMENT Group B (Guard) 17 / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 17 / GAU21 Kit:EQUIPMENT Group B (Reserve) 15 / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 15 / Subtotal: Recurring - / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / Subtotal: GAU21 Kit - / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / Subtotal: Procurement, All Modification Items - / / - - / - - / / - - / / - - / - - / - - / - - / - - / Support (All Modification Items) GROUP A: TOTAL NONRECURRING - / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / GROUP B: TOTAL NONRECURRING - / - - / / - - / - - / - - / - - / - - / - - / - - / - - / - - / Data - / / / - - / - - / - - / - - / - - / - - / - - / - - / - - / SIM/TRAINER 3 / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 3 / SUPPORT-EQUIP - / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / PMA - Contractor Services - / / / - - / / - - / / / - - / - - / - - / - - / PMA - Other Gov't Costs - / / / - - / / - - / / / - - / - - / - - / - - / OTHER GOVT - / / / - - / / - - / / / - - / - - / - - / - - / Air Force Page 11 of 21 P-1 Line #54 Volume 2-339
12 8851 / Gun Replacement Models of Systems Affected: HH-60G Modification Type: Reliability & Maintainability Related RDT&E PEs: F Financial Plan Prior Years FY 2015 FY 2016 OTHER GOVT (1) - / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / PMA - Contractor Services (1) - / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / Subtotal: Support 3 / / / - - / / - - / / / - - / - - / - - / - 3 / Installation Subtotal: Installation - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - Cost (Procurement + Support + Installation) Air Force Page 12 of 21 P-1 Line #54 Volume 2-340
13 Modification Item 1 of 2: Electronic Control Unit Manufacturer Information Manufacturer Name: TBD Manufacturer Location: TBD Administrative Leadtime (in Months): 3 Production Leadtime (in Months): / Gun Replacement Dates FY 2015 FY 2016 FY 2018 FY 2019 FY 2020 FY 2021 Contract Dates Jan 2017 Delivery Dates Jul 2017 Installation Information Method of Implementation (Organic): Org/Intermediate Installation Quantity: 118 Air Force Page 13 of 21 P-1 Line #54 Volume 2-341
14 Modification Item 2 of 2: GAU21 Kit Manufacturer Information Manufacturer Name: Naval Surface Warfare Center Crane Manufacturer Location: Crane, Indiana Administrative Leadtime (in Months): 12 Production Leadtime (in Months): 12 Contract Dates Delivery Dates 8851 / Gun Replacement Dates FY 2015 FY 2016 FY 2018 FY 2019 FY 2020 FY 2021 Installation Information Method of Implementation (Organic): Org/Intermediate Installation Quantity: 99 Air Force Page 14 of 21 P-1 Line #54 Volume 2-342
15 Resource Summary Prior Years FY 2015 FY / HH-60 OLR Mission Modifications Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Obligation Authority ($ in Millions) (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) Gross/Weapon System Unit Cost ($ in Millions) Description: A Program Management Directive (PMD), dated 17 Jul 09 directed AFLCMC/WIU to accomplish the HH-60 Operational Loss Replacement (OLR) Mission Modification Program. The OLR program upgrades 21 Army UH-60L aircraft to the current Air Force HH-60G configuration, creating the Block 162 configuration. One OLR mission modification kit, made up of individual components for each system, will be installed per aircraft, for a total of 21 kits. This will require Non-Recurring Engineering (NRE) to develop a consolidated engineering package for installation. Two kits will be installed during this NRE and trial install effort. Long lead items will be procured as required to ensure they are available when needed. Long lead items include Group B Equipment such as: the avionics components, air refueling probes, and various specialized structures including, but not limited to, Color Weather RADAR (CWR) and Forward Looking Infrared (FLIR) fairings. Required NRE, Prototype, Trial Install Kit Proof, Technical Data Updated and Modernization, and Software Lab support will be accomplished through existing US Army contracts where able. Additionally, reports will be requested in support of this effort that include but are not limited to: economic service life, aircraft system specification, information support and aircraft modernization. The aircraft modification installation will be accomplished using a contractor facility. As a result of the age of the current aircraft, obsolescence is a major concern. Initial estimates indicate there are specific mission systems that need to be replaced including, but not limited to; CWR, Symbol Generator, ARC-210 Radios, and the APR-39(B)V2 Radar Warning Receiver. Replacements have been identified for many of these components; however, some NRE may be required for aircraft integration. Additional NRE may be required for other obsolete systems/components that are identified during the effort. New components will require a software development node in order to modify the existing HH-60 software to accommodate the new aircraft components without impacting the legacy fleet. Qualification flight testing will be necessary to ensure the design for the new hardware and software is compatible with existing aircraft systems. Available program funding will be utilized to ensure the configuration remains common across the fleet. Finally, additional effort will be necessary to create modification instructions separate from the OLR Mission Modification Effort. FY17 funding provides for production installs, program management oversight, and PMA. Production installs will be conducted via a contract to be awarded by the US Army Logistics Support Facility and are scheduled to begin in 4QFY installs are currently funded. Additional funding will be required for the remaining 3 installs. Milestone/Development Status As part of the Operation Loss Replacement (OLR) Program, the HH-60G System Program Office (SPO) will convert 21 Army UH-60L aircraft to the current Air Force HH-60G Pave Hawk configuration. For the NRE/Prototype/Trial Install/Kit-proof, an existing Army Logistics Support Facility (LSF) Indefinite Delivery Indefinite Quantity (IDIQ) contract was awarded. The majority of these one-time contract costs are captured in the "OTHER GOVT" category. The SPO will acquire the long lead items and a follow-on LSF contract that was awarded to acquire and assemble the modification kits. Air Force Page 15 of 21 P-1 Line #54 Volume 2-343
16 AF AFNG : Secondary Distribution Secondary Distribution FY 2015 FY / HH-60 OLR Mission Modifications Obligation Authority Obligation Authority Obligation Authority Air Force Page 16 of 21 P-1 Line #54 Volume 2-344
17 Models of Systems Affected: HH-60G Modification Type: Other Related RDT&E PEs: Procurement Financial Plan Modification Item 1 of 1: L2G KIT A Kits Recurring Prior Years FY 2015 FY / HH-60 OLR Mission Modifications L2G KIT:INSTALL KITS Group A (Active) 14 / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 14 / L2G KIT:INSTALL KITS Group A (Guard) 5 / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 5 / Subtotal: Recurring - / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / B Kits Recurring L2G KIT:EQUIPMENT Group B (Active) 14 / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 14 / L2G KIT:EQUIPMENT Group B (Guard) 5 / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 5 / Subtotal: Recurring - / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / Subtotal: L2G KIT - / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / Subtotal: Procurement, All Modification Items - / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / Support (All Modification Items) GROUP A: TOTAL NONRECURRING - / / / - - / - - / - - / - - / - - / - - / - - / - - / - - / GROUP B: TOTAL NONRECURRING - / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / Change Orders - / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / Data - / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / SIM/TRAINER 3 / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 3 / SUPPORT-EQUIP - / / - - / - - / / - - / / - - / - - / - - / - - / - - / PMA - Contractor Services - / / / / / - - / / / - - / - - / - - / - - / PMA - Other Gov't Costs - / / / / / - - / / / - - / - - / - - / - - / OTHER GOVT - / - - / / / / - - / / / / / / - - / ICS-Labor - / - - / / - - / - - / - - / - - / / / / / - - / ICS-Material - / - - / / - - / - - / - - / - - / / / / / - - / Subtotal: Support 3 / / / / / - - / / / / / / - 3 / Installation Modification Item 1 of 1: L2G KIT - / - 5 / / - 8 / / - 8 / / / - - / - - / - - / - 16 / Subtotal: Installation - / - 5 / / - 8 / / - 8 / / / - - / - - / - - / - 16 / Cost (Procurement + Support + Installation) Air Force Page 17 of 21 P-1 Line #54 Volume 2-345
18 Modification Item 1 of 1: L2G KIT Manufacturer Information Manufacturer Name: Science and Engineering Inc Manufacturer Location: AL Administrative Leadtime (in Months): 8 Production Leadtime (in Months): 30 Contract Dates Delivery Dates 8854 / HH-60 OLR Mission Modifications Dates FY 2015 FY 2016 FY 2018 FY 2019 FY 2020 FY 2021 Installation Information Method of Implementation: Contractor Facility Installation Cost Prior Years FY 2015 FY 2016 Prior Years - / - 5 / / / / - 8 / / / - - / - - / - - / - 16 / FY / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 5 / / - 8 / / - 8 / / / - - / - - / - - / - 16 / Installation Schedule FY 2015 FY 2016 FY 2018 FY 2019 FY 2020 FY 2021 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC t In Out Air Force Page 18 of 21 P-1 Line #54 Volume 2-346
19 Resource Summary Prior Years FY 2015 FY / DVE Sensor Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Obligation Authority ($ in Millions) (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) Gross/Weapon System Unit Cost ($ in Millions) Description: This program, P-3A Mod 8859, DVE Sensor, is a new start. A modification proposal (AF Form 1067, ACC ) was received to install Degraded Visual Environment (DVE)/Terrain Awareness and Warning System (TAWS)on HH-60G. The DVE program will add new capability to the HH-60G, increasing mission capability and enhancing safety by providing adequate situational awareness of uncharted terrain/obstacles for safe flight operations in Degraded Visual Environments (DVE). 58% of helicopter losses and 52% of fatalities during Operation Iraqi Freedom, Operation Enduring Freedom are attributable to Control Flight into terrain, wire/object strikes, or hard landings in DVE conditions. The systems integrated and installed by this program will greatly minimize the hazards of DVE ops, preventing mishaps and fatalities. Initiated and validated by AF 1067, the DVE system shall provide aircraft navigation in day and night DVE conditions en-route and in the take-off and landing area with a real time sensor. Aircrew should be able to easily identify hazards such as terrain, antennas, wires, and poles traveling to and from the take-off and landing areas. Aircrew should be able to easily identify take-off and landing area hazards such as poles, vehicles, fence posts, wires, ditches, berms, holes, and large rocks. Milestone/Development Status The system will integrate with existing HH-60G optical sensor, display, navigation, and flight management systems to the maximum extent practical. The system shall be composed of line replaceable units that will be supported through the Air Force supply system and replaceable at the organizational level. This effort will eventually modify all 118 (97 current HH-60Gs and 21 aircraft in the OLR Mission Modifications Program) aircraft with DVE sensors. FY17 efforts will initiate an integration phase of this program, adapting non-developmental sensor systems such as Millimeter Waver Radar (MMW) to the HH-60G platform. The current program is adequate to procure and install DVE systems on 70 aircraft; additional funds will be needed to equip the entire 118-aircraft fleet. FY17 funds will procure a limited number of kits to facilitate trial installation, flight test, and kit proof. Subsequent years funding will procure and install production kits. AF AFNG AFR : Secondary Distribution Secondary Distribution FY 2015 FY 2016 Obligation Authority Obligation Authority Obligation Authority Obligation Authority Air Force Page 19 of 21 P-1 Line #54 Volume 2-347
20 8859 / DVE Sensor Models of Systems Affected: HH-60G Modification Type: Capability Improvement Related RDT&E PEs: F Procurement Financial Plan Modification Item 1 of 1: DVE A Kits Recurring Prior Years FY 2015 FY 2016 DVE:INSTALL KITS Group A (Active) - / - - / - - / - 2 / / - 2 / / / / / - - / - 38 / DVE:INSTALL KITS Group A (Guard) - / - - / - - / - - / - - / - - / - 6 / / / / - - / - 17 / DVE:INSTALL KITS Group A (Reserve) - / - - / - - / - - / - - / - - / - 5 / / / / - - / - 15 / Subtotal: Recurring - / - - / - - / - - / / - - / / / / / - - / - - / B Kits Recurring DVE:EQUIPMENT Group B (Active) - / - - / - - / - 2 / / - 2 / / / / / - - / - 38 / DVE:EQUIPMENT Group B (Guard) - / - - / - - / - - / - - / - - / - 6 / / / / - - / - 17 / DVE:EQUIPMENT Group B (Reserve) - / - - / - - / - - / - - / - - / - 5 / / / / - - / - 15 / Subtotal: Recurring - / - - / - - / - - / / - - / / / / / - - / - - / Subtotal: DVE - / - - / - - / - - / / - - / / / / / - - / - - / Subtotal: Procurement, All Modification Items - / - - / - - / - - / / - - / / / / / - - / - - / Support (All Modification Items) GROUP A: TOTAL NONRECURRING - / - - / - - / - - / / - - / / - - / - - / - - / - - / - - / GROUP B: TOTAL NONRECURRING - / - - / - - / - - / / - - / / - - / - - / - - / - - / - - / SUPPORT-EQUIP - / - - / - - / - - / - - / - - / - - / - - / - - / / - - / - - / SIM/TRAINER - / - - / - - / - - / - - / - - / - - / - 3 / / - - / - - / - 3 / OTHER GOVT - / - - / - - / - - / / - - / / / / / / - - / Data - / - - / - - / - - / - - / - - / - - / - - / - - / - - / / - - / PMA - Other Gov't Costs - / - - / - - / - - / / - - / / / / / - - / - - / PMA - Contractor Services - / - - / - - / - - / / - - / / / / / / - - / Subtotal: Support - / - - / - - / - - / / - - / / / / / / - 3 / Installation Modification Item 1 of 1: DVE - / - - / - - / - - / - - / - - / - 2 / - - / - 34 / / / - 70 / Subtotal: Installation - / - - / - - / - - / - - / - - / - 2 / - - / - 34 / / / - 70 / Cost (Procurement + Support + Installation) Air Force Page 20 of 21 P-1 Line #54 Volume 2-348
21 Modification Item 1 of 1: DVE Manufacturer Information Manufacturer Name: Manufacturer TBD Manufacturer Location: TBD Administrative Leadtime (in Months): 3 Production Leadtime (in Months): / DVE Sensor Dates FY 2015 FY 2016 FY 2018 FY 2019 FY 2020 FY 2021 Contract Dates Jan 2017 Jan 2018 Jan 2019 Jan 2020 Delivery Dates May 2017 May 2018 May 2019 May 2020 Installation Information Method of Implementation: Depot Field Team Installation Cost Prior Years FY 2015 FY 2016 Prior Years - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 2 / - - / - - / - - / - - / - 2 / - FY / - - / - - / - - / - - / - - / - - / - - / - 28 / / - - / - 28 / FY / - - / - - / - - / - - / - - / - - / - - / - 6 / / / - 27 / FY / - - / - - / - - / - - / - - / - - / - - / - - / - 13 / / - 13 / FY / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 2 / - - / - 34 / / / - 70 / Installation Schedule FY 2015 FY 2016 FY 2018 FY 2019 FY 2020 FY 2021 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC t In Out Air Force Page 21 of 21 P-1 Line #54 Volume 2-349
UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 18 P-1 Line #56
Exhibit P-40, Budget Line Item Justification: PB 2016 Air Force Date: February 2015 3010F: Aircraft Procurement, Air Force / BA 05: Modification of Inservice Aircraft / BSA 5: Other Aircraft ID Code (A=Service
More informationUNCLASSIFIED. FY 2017 Base FY 2017 OCO FY 2017 OCO. FY 2017 Base
Exhibit P-40, Budget Line Item Justification: PB 2017 Air Force Date: February 2016 3010F: Aircraft Procurement, Air Force / BA 05: Modification of Inservice Aircraft / BSA 2: Tactical Aircraft ID Code
More informationUNCLASSIFIED FY 2016 OCO. FY 2016 Base
Exhibit P-40, Budget Line Item Justification: PB 2016 Air Force Date: February 2015 3010F: Aircraft Procurement, Air Force / BA 05: Modification of Inservice Aircraft / BSA 5: Other Aircraft ID Code (A=Service
More informationUNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 5 P-1 Line #35
Exhibit P-40, Budget Line Item Justification: PB 2017 Air Force Date: February 2016 3010F: Aircraft Procurement, Air Force / BA 05: Modification of Inservice Aircraft / BSA 4: Trainer Aircraft ID Code
More informationUNCLASSIFIED FY 2015 FY 2015 OCO. FY 2015 Base FY 2015 FY Base
Exhibit P-40, Budget Line Item Justification: PB 2015 Air Force Date: March 2014 3010F: Aircraft Procurement, Air Force / BA 05: Modification of Inservice Aircraft / BSA 5: Other Aircraft ID Code (A=Service
More informationUNCLASSIFIED. FY 2017 Base FY 2017 OCO FY 2017 OCO. FY 2017 Base
Exhibit P-40, Budget Line Item Justification: PB 2017 Air Force Date: February 2016 3010F: Aircraft Procurement, Air Force / BA 05: Modification of Inservice Aircraft / BSA 2: Tactical Aircraft ID Code
More informationUNCLASSIFIED. FY 2016 Base FY 2016 OCO FY 2016 OCO. FY 2016 Base
Exhibit P-40, Budget Line Item Justification: PB 2016 Air Force Date: February 2015 3010F: Aircraft Procurement, Air Force / BA 05: Modification of Inservice Aircraft / BSA 2: Tactical Aircraft ID Code
More informationUNCLASSIFIED. FY 2017 Base FY 2017 OCO
Exhibit P-40, Budget Line Item Justification: PB 2017 Air Force Date: February 2016 3010F: Aircraft Procurement, Air Force / BA 05: Modification of Inservice Aircraft / BSA 5: Other Aircraft ID Code (A=Service
More informationUNCLASSIFIED. FY 2017 Base FY 2017 OCO. FY 2017 Base FY 2017 OCO
Exhibit P-40, Budget Line Item Justification: PB 2017 Air Force Date: February 2016 3010F: Aircraft Procurement, Air Force / BA 05: Modification of Inservice Aircraft / BSA 3: Airlift Aircraft ID Code
More informationUNCLASSIFIED FY 2016 OCO. FY 2016 Base
Exhibit P-40, Budget Line Item Justification: PB 2016 Air Force Date: February 2015 3010F: Aircraft Procurement, Air Force / BA 05: Modification of Inservice Aircraft / BSA 5: Other Aircraft ID Code (A=Service
More informationUNCLASSIFIED. UNCLASSIFIED United States Special Operations Command Page 1 of 6 P-1 Line #53
Exhibit P-40, Budget Line Item Justification: PB 2017 United States Special Operations Command : February 2016 0300D: Procurement, Defense-Wide / BA 02: Special Operations Command / BSA 1: Aviation Programs
More informationUNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 10 P-1 Line #47
Exhibit P-40, Budget Line Item Justification: PB 2016 Air Force Date: February 2015 3010F: Aircraft Procurement, Air Force / BA 05: Modification of Inservice Aircraft / BSA 5: Other Aircraft ID Code (A=Service
More informationUNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 5 P-1 Line #55
Exhibit P-40, Budget Line Item Justification: PB 2016 Air Force Date: February 2015 3010F: Aircraft Procurement, Air Force / BA 05: Modification of Inservice Aircraft / BSA 5: Other Aircraft ID Code (A=Service
More informationUNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 18 P-1 Line #12
Exhibit P-40, Budget Line Item Justification: PB 2017 Navy Date: February 2016 1810N: Other Procurement, Navy / BA 01: Ships Support Equipment / BSA 9: Other Shipboard Equipment ID Code (A=Service Ready,
More informationUNCLASSIFIED. FY 2016 Base FY 2016 OCO FY 2016 OCO. FY 2016 Base
Exhibit P-40, Budget Line Item Justification: PB 2016 Army Date: February 2015 2031A: Aircraft Procurement, Army / BA 02: Modification of Aircraft / BSA 10: Modification of Aircraft ID Code (A=Service
More informationUNCLASSIFIED. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018
Exhibit P-40, Budget Item Justification Sheet: PB 2014 Navy Date: April 2013 Aircraft / BSA 1: Modification Of Aircraft ID Code (A=Service Ready, B=Not Service Ready) : A Program Elements for Code B Items:
More informationUNCLASSIFIED FY 2016 OCO. FY 2016 Base. FY 2016 Base FY 2016 OCO
Exhibit P-40, Budget Line Item Justification: PB 2016 Army Date: February 2015 2033A: Procurement of W&TCV, Army / BA 01: Tracked Combat Vehicles / BSA 20: Modification of Tracked Combat Vehicles ID Code
More informationUNCLASSIFIED. UNCLASSIFIED Army Page 1 of 23 P-1 Line #27
Exhibit P-40, Budget Line Item Justification: PB 2015 Army Date: March 2014 2031A: Aircraft Procurement, Army / BA 02: Modification of Aircraft / BSA 10: Modification of Aircraft ID Code (A=Service Ready,
More informationUNCLASSIFIED FY Exhibits Schedule Prior Years FY 2013 FY 2014 FY 2015 Base FY 2015 OCO FY 2015 Total. Total Cost ($ M)
Exhibit P-40, Budget Line Item Justification: PB 2015 Army Date: March 2014 2033A: Procurement of W&TCV, Army / BA 01: Tracked Combat Vehicles / BSA 20: Modification of Tracked Combat Vehicles ID Code
More informationUNCLASSIFIED. FY 2014 Base. OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018
Exhibit P-40, Budget Item Justification Sheet: PB 2014 Air Force Date: April 2013 Inservice Missiles / BSA 1: Class IV ID Code (A=Service Ready, B=Not Service Ready) : A Program Elements for Code B Items:
More informationUNCLASSIFIED FY 2017 OCO. FY 2017 Base
Exhibit P-40, Budget Line Item Justification: PB 2017 Air Force Date: February 2016 3021F: Space Procurement, Air Force / BA 01: Space Procurement, Air Force / BSA 1: Space Programs ID Code (A=Service
More informationUNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 16 P-1 Line #57
Exhibit P-40, Budget Line Item Justification: PB 2017 Navy Date: February 2016 1506N: Aircraft Procurement, Navy / BA 05: Modification of Aircraft / BSA 1: Modification of Aircraft ID Code (A=Service Ready,
More informationUNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 24 P-1 Line #55
Exhibit P-40, Budget Line Item Justification: PB 2016 Navy Date: February 2015 1506N: Aircraft Procurement, Navy / BA 05: Modification of Aircraft / BSA 1: Modification of Aircraft ID Code (A=Service Ready,
More informationUNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 17 P-1 Line #55
Exhibit P-40, Budget Line Item Justification: PB 2017 Air Force Date: February 2016 3010F: Aircraft Procurement, Air Force / BA 05: Modification of Inservice Aircraft / BSA 5: Other Aircraft ID Code (A=Service
More informationUNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 31 P-1 Line #41
Exhibit P-40, Budget Line Item Justification: PB 2017 Navy Date: February 2016 1810N: Other Procurement, Navy / BA 01: Ships Support Equipment / BSA 16: Logistic Support ID Code (A=Service Ready, B=Not
More informationUNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 21 P-1 Line #19
Exhibit P-40, Budget Line Item Justification: PB 2017 Navy Date: February 2016 1810N: Other Procurement, Navy / BA 01: Ships Support Equipment / BSA 9: Other Shipboard Equipment ID Code (A=Service Ready,
More informationUNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 17 P-1 Line #121
Exhibit P-40, Budget Line Item Justification: PB 2015 Navy Date: March 2014 1810N: Other Procurement, Navy / BA 04: Ordnance Support Equipment / BSA 3: Ship Missile Systems Equipment ID Code (A=Service
More informationUNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 5 P-1 Line #21
Exhibit P-40, Budget Line Item Justification: PB 2015 Navy Date: March 2014 1507N: Weapons Procurement, Navy / BA 03: Torpedoes and Related Equipment / BSA 1: Torpedoes and Related Equip ID Code (A=Service
More informationUNCLASSIFIED. FY 2017 Base FY 2017 OCO FY 2017 OCO. FY 2017 Base
Exhibit P-40, Budget Line Item Justification: PB 2017 Army Date: February 2016 2033A: Procurement of W&TCV, Army / BA 01: Tracked Combat Vehicles / BSA 20: Modification of Tracked Combat Vehicles ID Code
More informationUNCLASSIFIED. FY 2016 Base FY 2016 OCO FY 2016 OCO. FY 2016 Base
Resource Summary Prior Years FY 2014 FY 2015 Base OCO Total FY 2017 FY 2018 FY 2019 FY 2020 To Complete Procurement Quantity (Units in Each) - - - - - - - - - - - - Gross/Weapon System Cost ($ in Millions)
More informationUNCLASSIFIED. UNCLASSIFIED Army Page 1 of 16 P-1 Line #15
Exhibit P-40, Budget Line Item Justification: PB 2017 Army Date: February 2016 2031A: Aircraft Procurement, Army / BA 02: Modification of Aircraft / BSA 10: Modification of Aircraft ID Code (A=Service
More informationUNCLASSIFIED. FY 2017 Base FY 2017 OCO
Exhibit R-2, RDT&E Budget Item Justification: PB 2017 Air Force : February 2016 3600: Research, Development, Test & Evaluation, Air Force / BA 7: Operational Systems Development COST ($ in Millions) FY
More informationUNCLASSIFIED. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018
Exhibit P-40, Budget Item Justification Sheet: PB 2014 Navy : April 2013 Ammo, MC / BSA 1: Marine Corps Ammunition ID Code (A=Service Ready, B=Not Service Ready) : A Program Elements for Code B : Other
More informationUNCLASSIFIED FY Exhibits Schedule Prior Years FY 2013 FY 2014 FY 2015 Base FY 2015 OCO FY 2015 Total. Total Cost ($ M) Unit Cost ($) Qty (Each)
Exhibit P-40, Budget Line Item Justification: PB 2015 Navy Date: March 2014 1506N: Aircraft Procurement, Navy / BA 05: Modification of Aircraft / BSA 1: Modification of Aircraft ID Code (A=Service Ready,
More informationUNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 33 P-1 Line #94
Exhibit P-40, Budget Line Item Justification: PB 2017 Navy Date: February 2016 1810N: Other Procurement, Navy / BA 02: Communications & Electronics Equip / BSA 12: Submarine Communications ID Code (A=Service
More informationUNCLASSIFIED. FY 2016 Base FY 2016 OCO
Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Air Force : February 2015 3600: Research, Development, Test & Evaluation, Air Force / BA 7: Operational Systems Development COST ($ in Millions) FY
More informationUNCLASSIFIED FY 2015 FY 2015 OCO. FY 2015 Base FY 2015 FY Base
Exhibit P-40, Budget Line Item Justification: PB 2015 Army Date: March 2014 2031A: Aircraft Procurement, Army / BA 02: Modification of Aircraft / BSA 10: Modification of Aircraft ID Code (A=Service Ready,
More informationUNCLASSIFIED. FY 2017 Base FY 2017 OCO
Exhibit P-40, Budget Line Item Justification: PB 2017 Navy Date: February 2016 1506N: Aircraft Procurement, Navy / BA 05: Modification of Aircraft / BSA 1: Modification of Aircraft ID Code (A=Service Ready,
More informationUNCLASSIFIED. FY 2017 Base FY 2017 OCO. FY 2017 Base FY 2017 OCO
UNCLSSIFIED Exhibit P-40, Budget Line Item Justification: PB 2017 ir Force Date: February 2016 ppropriation / Budget ctivity / Budget Sub ctivity: 3080F: Other Procurement, ir Force / B 02: Vehicular Equipment
More informationUNCLASSIFIED FY Exhibits Schedule Prior Years FY 2013 FY 2014 FY 2015 Base FY 2015 OCO FY 2015 Total. Unit Cost ($ M) Qty (Each)
Exhibit P-40, Budget Line Item Justification: PB 2015 United States Special Operations Command Date: March 2014 0300D: Procurement, Defense-Wide / BA 02: Special Operations Command / BSA 4: Other Procurement
More informationUNCLASSIFIED FY 2017 OCO. FY 2017 Base
Exhibit P-40, Budget Line Item Justification: PB 2017 Navy Date: February 2016 1810N: Other Procurement, Navy / BA 04: Ordnance Support Equipment / BSA 7: Other Expendable Ordnance ID Code (A=Service Ready,
More informationUNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 34 P-1 Line #51
Exhibit P-40, Budget Line Item Justification: PB 2016 Navy Date: February 2015 1506N: Aircraft Procurement, Navy / BA 05: Modification of Aircraft / BSA 1: Modification of Aircraft ID Code (A=Service Ready,
More informationUNCLASSIFIED. FY 2014 Base. OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018
Exhibit P-40, Budget Item Justification Sheet: PB 2014 Army Date: April 2013 Aircraft / BSA 10: Modification Of Aircraft ID Code (A=Service Ready, B=Not Service Ready) : Program Elements for Code B Items:
More informationRDT&E BUDGET ITEM JUSTIFICATION SHEET (R-2 Exhibit)
PE NUMBER: 0604239F PE TITLE: F-22 EMD BUDGET ACTIVITY COST ($ In Thousands) Actual FY 1999 FY 2000 FY 2001 FY 2002 FY 2003 FY 2004 FY 2005 Cost to Complete Cost Advanced Tactical Fighter FSD 2,010,717
More informationUNCLASSIFIED R-1 ITEM NOMENCLATURE PE A: AIRCRAFT CERTIFICATION FY 2012 OCO
Exhibit R-2, RDT&E Budget Item Justification: PB 212 Army DATE: February 211 24: Research, Development, Test & Evaluation, Army COST ($ in Millions) FY 21 FY 211 FY 212 Base PE 6566A: AIRCRAFT CERTIFICATION
More informationUNCLASSIFIED. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018
Exhibit P-40, Budget Item Justification Sheet: PB 2014 Navy : April 2013 Ammo, MC / BSA 1: Marine Corps Ammunition ID Code (A=Service Ready, B=Not Service Ready) : A Program Elements for Code B : Other
More informationUNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 151 P-1 Line #32
Exhibit P-40, Budget Line Item Justification: PB 2017 Navy Date: February 2016 1506N: Aircraft Procurement, Navy / BA 05: Modification of Aircraft / BSA 1: Modification of Aircraft ID Code (A=Service Ready,
More informationUNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: Communication, Navigation, Surveillance/Air Traffic Management (CNS/ATM) FY 2012 OCO
Exhibit R-2, RDT&E Budget Item Justification: PB 2012 Air Force DATE: February 2011 COST ($ in Millions) FY 2010 FY 2011 FY 2013 FY 2014 FY 2015 FY 2016 To Program Element 6.754 5.708 4.604-4.604 4.549
More informationUNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 30 P-1 Line #36
Exhibit P-40, Budget Line Item Justification: PB 2016 Navy Date: February 2015 1506N: Aircraft Procurement, Navy / BA 05: Modification of Aircraft / BSA 1: Modification of Aircraft ID Code (A=Service Ready,
More informationUNCLASSIFIED FY Exhibits Schedule Prior Years FY 2013 FY 2014 FY 2015 Base FY 2015 OCO FY 2015 Total. Total Cost ($ M) Unit Cost ($) Qty (Each)
Exhibit P-40, Budget Line Item Justification: PB 2015 Navy Date: March 2014 1506N: Aircraft Procurement, Navy / BA 05: Modification of Aircraft / BSA 1: Modification of Aircraft ID Code (A=Service Ready,
More informationUNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 17 P-1 Line #13
Exhibit P-40, Budget Line Item Justification: PB 2016 Navy : February 2015 1508N: Procurement of Ammo, Navy & MC / BA 01: Proc Ammo, Navy / BSA 1: Navy Ammunition A Program Elements for Code B Items: Other
More informationCost-effective, flexible avionics for today s missions and future challenges. Flight2 integrated avionics system. UPGRADES FOR LEGACY C-130s
Cost-effective, flexible avionics for today s missions and future challenges. Flight2 integrated avionics system UPGRADES FOR LEGACY C-130s Bring cabin capability into highest definition. Flight2 integrated
More informationUNCLASSIFIED UNCLASSIFIED
: February 216 Exhibit R2, RDT&E Budget Item Justification: PB 217 24: Research, Development, Test & Evaluation, / BA 5: System Development & Demonstration (SDD) COST ($ in Millions) FY 215 Program Element
More informationUNCLASSIFIED. UNCLASSIFIED Page 1 of 5. EXHIBIT R-2, RDT&E Budget Item Justification RESEARCH DEVELOPMENT TEST & EVALUATION, NAVY / BA-5
EXHIBIT R-2, RDT&E Budget Item Justification APPROPRIATION/BUDGET ACTIVITY RESEARCH DEVELOPMENT TEST & EVALUATION, NAVY / BA-5 R-1 ITEM NOMENCLATURE 0605430N, C/KC-130 AVIONICS MODERNIZATION PROGRAM (AMP)
More informationDepartment of Defense DIRECTIVE
Department of Defense DIRECTIVE NUMBER 5030.61 May 24, 2013 Incorporating Change 2, August 24, 2017 USD(AT&L) SUBJECT: DoD Airworthiness Policy References: See Enclosure 1 1. PURPOSE. This directive establishes
More informationGegaso Ltd. Company Presentation
Gegaso Ltd. Company Presentation This document and the information contained in it are proprietary of Gegaso Ltd. No person is allowed to use, copy, reprint, reproduce, publish or disclose to others this
More informationSafety Enhancement SE ASA Design Virtual Day-VMC Displays
Safety Enhancement SE 200.2 ASA Design Virtual Day-VMC Displays Safety Enhancement Action: Implementers: (Select all that apply) Statement of Work: Manufacturers develop and implement virtual day-visual
More informationAIRCRAFT SERVICE CHANGE
AIRCRAFT SERVICE CHANGE NUMBER 077 SUBJECT NAVIGATION (ATA 34) TCAS 7.1 INSTALLATION JUNE 12, 2012 PILOTS INFORMATION SHEET TCAS 7.1 INSTALLATION This service change upgrades TCAS 2000 or 3000SP systems
More informationUNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 27 P-1 Line #2
UNCLSSIFIED Exhibit P-40, Budget Line Item Justification: PB mended 2015 ir Force Date: June 2014 ppropriation / Budget ctivity / Budget Sub ctivity: 3011F: Procurement of mmunition, ir Force / B 01: mmunition
More informationOPNAVINST B N98 15 Apr Subj: NAVAL AVIATION POLICY FOR AIRCRAFT AVIONICS SAFETY SYSTEMS
DEPARTMENT OF THE NAVY OFFICE OF THE CHIEF OF NAVAL OPERATIONS 2000 NAVY PENTAGON WASHINGTON, DC 20350-2000 OPNAVINST 13210.1B N98 OPNAV INSTRUCTION 13210.1B From: Chief of Naval Operations Subj: NAVAL
More informationUNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 126 P-1 Line #32
Exhibit P-40, Budget Line Item Justification: PB 2016 Navy Date: February 2015 1506N: Aircraft Procurement, Navy / BA 05: Modification of Aircraft / BSA 1: Modification of Aircraft ID Code (A=Service Ready,
More informationFederal Aviation Administration Flight Plan Presented at the Canadian Aviation Safety Seminar April 20, 2004
Federal Aviation Administration Flight Plan 2004-2008 Presented at the Canadian Aviation Safety Seminar April 20, 2004 Challenges Reducing an Already Low Commercial Accident Rate Building an Air Traffic
More informationAeros 40D Sky Dragon. TYPE CERTIFIED BY: United States Federal Aviation Administration Civil Aviation Authorities: Europe and Asia
Aeros 40D Sky Dragon The Aeros 40D Sky Dragon Airship The United States Federal Aviation Administration (FAA) Type Certified Aeros 40D Sky Dragon is the most advanced non rigid airship, incorporating innovative
More informationDepartment of Legislative Services Maryland General Assembly 2009 Session
Department of Legislative Services Maryland General Assembly 2009 Session SB 650 FISCAL AND POLICY NOTE Senate Bill 650 (Senators Pipkin and Astle) Finance and Budget and Taxation Medevac Helicopter Improvement
More informationU.S. NAVY CNS/ATM Program Status
U.S. NAVY CNS/ATM Program Status 9 June 2009 Dave Staso CNS/ATM IPTL NAVAIR PMA209 (240) 925-9220 david.staso@navy.mil UNCLASSIFIED Minimum Functionality is a Requirement Amish buggies are not allowed
More informationHazard Identification Questionnaire
Hazard Identification Questionnaire OVERVIEW This questionnaire is designed to help identify potential risks and help identify areas of risk exposure. It is not an exhaustive list. This questionnaire is
More informationMilitary Aviation Fleet & MRO Forecast
Military Aviation Fleet & MRO Forecast April 6, 2016 Daniel Z. Katz Director, Defense Analysis and Data Aviation Week Intelligence and Data Services Arlington, VA Source: Aviation Week 2016 Fleet & MRO
More informationLAUNCHING YOUR UNMANNED AIRCRAFT PROGRAM
LAUNCHING YOUR UNMANNED AIRCRAFT PROGRAM THE DARTDRONES TEAM UNMANNED AIRCRAFT APPLICATIONS AERIAL INSPECTIONS AERIAL INSPECTIONS Safer and faster alternative to visual inspection by an individual Damage
More informationRaytheon Aircraft SERVICE BULLETIN MANDATORY. Beech
Beech Kit No. 36-402- Kit No. 36-402- Kit No. 36-402-2 Kit No. 36-402-3 Kit No. 36-402-3 Kit No. 02-4009- Kit No. 36-402-5 Kit No. 36-402-5 Kit No. 02-4009-3 Kit No. 36-402-7 Kit No. 36-402-7 Kit No. 02-4009-5
More informationHereafter there are some examples on how parts of a test campaign should typically be classified. In case of any doubt contact the Agency:
Hereafter there are some examples on how parts of a test campaign should typically be classified. In case of any doubt contact the Agency: Category 1 # CAT 1 Flight Test Justification (3.1. Annex XII Part
More informationUNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 31 P-1 Line #2
UNCLSSIFIED Exhibit P-40, Budget Line Item Justification: PB 2016 ir Force : February 2015 ppropriation / Budget ctivity / Budget Sub ctivity: 3011F: Procurement of mmunition, ir Force / B 01: mmunition
More informationTechnical Standard Order
Department of Transportation Federal Aviation Administration Aircraft Certification Service Washington, DC TSO-C145a Effective Date: 09/19/02 Technical Standard Order Subject: AIRBORNE NAVIGATION SENSORS
More informationFLIGHT CONTROLS - FLAP FLEX SHAFT (CABLE) ASSEMBLY INSPECTION/ REPLACEMENT
Beech SERVICE BULLETIN TITLE: FLIGHT CONTROLS - FLAP FLEX SHAFT (CABLE) ASSEMBLY INSPECTION/ REPLACEMENT 1. Planning Information A. Effectivity (1) Airplanes (a) Civil All airplanes that have complied
More informationREPORT 2014/065 INTERNAL AUDIT DIVISION. Audit of air operations in the United. Nations Assistance Mission in Afghanistan
INTERNAL AUDIT DIVISION REPORT 2014/065 Audit of air operations in the United Nations Assistance Mission in Afghanistan Overall results relating to the effective management of air operations in the United
More informationDEVELOPING AN ECOSYSTEM FOR UAS SAFETY 2017 WHITEPAPER SERIES
DEVELOPING AN ECOSYSTEM FOR UAS SAFETY 2017 1 THE ADDITION OF UNMANNED AIRCRAFT SYSTEMS (UAS) TO A CORPORATE FLIGHT DEPARTMENT The use of Unmanned Aircraft Systems (UAS) is becoming popular for varying
More informationSurveillance and Broadcast Services
Surveillance and Broadcast Services Benefits Analysis Overview August 2007 Final Investment Decision Baseline January 3, 2012 Program Status: Investment Decisions September 9, 2005 initial investment decision:
More informationFAA/HSAC PART 135 SYSTEM SAFETY RISK MANAGEMENT SAFETY ELEMENT TRAINING OF FLIGHT CREWMEMBERS JOB AID Revision 1
SAFETY ELEMENT 4.2.3 - TRAINING OF FLIGHT CREWMEMBERS JOB AID Revision 1 The Federal Aviation Administration (FAA) is proactively moving away from compliance based safety surveillance programs to Systems
More informationTDR Mode S and ADS-B Transponders
Business and Regional Systems Marketing Bulletin TDR Mode S and ADS-B Transponders Ref. No. BRS-110102.2M Pub Date 06/2012 Offering a variety of system solutions to meet Elementary/Enhanced Surveillance
More informationCOMPLIANCE WITH THIS PUBLICATION IS MANDATORY
BY ORDER OF THE SECRETARY OF THE AIR FORCE AIR FORCE INSTRUCTION 11-201 30 NOVEMBER 2018 Flying Operations FLIGHT INFORMATION PUBLICATIONS COMPLIANCE WITH THIS PUBLICATION IS MANDATORY ACCESSIBILITY: Publications
More informationSEARCH AND RESCUE DEPARTMENT
SEARCH AND RESCUE DEPARTMENT I. Mission The critical mission of Search and Rescue Department (SAR) is to maintain the well being of all North Slope Borough residents. SAR provides safe, efficient and reliable
More informationP310 VTOL UAV Operation Manual
P310 VTOL UAV Operation Manual February, 2017 1 Shanghai Huace Navigation Technology Ltd. Contents 1.1 SYMBOLS DEFINITIONS... 4 1.2 TECHNICAL SUPPORT... 5 2.1 WARNING... 5 2.2 NOTICE... 5 4.1 GENERAL SPECIFICATIONS...
More informationSEARCH AND RESCUE DEPARTMENT
SEARCH AND RESCUE DEPARTMENT I. Mission The Critical mission of Search and Rescue Department (SAR) is to maintain the well being of all North Slope Borough residents. SAR provides safe, efficient and reliable
More informationAEROSPACE & ELECTRONICS BRENDAN CURRAN PRESIDENT
AEROSPACE & ELECTRONICS BRENDAN CURRAN PRESIDENT Aerospace & Electronics Overview and Results Market Outlook Technological Differentiation and Growth Summary 2 Crane Aerospace & Electronics Industry Leader
More informationTRANSMITTAL SHEET. Concurrent Requirement Added G450 Customer Bulletin Number 141 (aircraft that have previously incorporated ASC 016)
TRANSMITTAL SHEET This sheet transmits Revision A, dated, to Gulfstream G450 Aircraft Service Change 016, dated August 18, 2005, titled Aircraft General (ATA 00) Maximum Takeoff Gross Weight (MTOGW) Increase.
More informationSummary. Filename: IDOC Created: July 24, 2012 Modified: May 6, 2013
Commercial Systems 400 Collins Road NE Cedar Rapids, IA 52498 Tel.319.295.5000 Fax 319.295.5064 Title: Rockwell Collins Data Link Graphical Weather Services, Single & Dual FANS, ARINC 702A AOC Messaging
More informationLANDING GEAR - REPLACEMENT OF NOSE LANDING GEAR RETRACT PLUNGER ASSEMBLY
Beechcraft TITLE: SERVICE BULLETIN LANDING GEAR - REPLACEMENT OF NOSE LANDING GEAR RETRACT PLUNGER ASSEMBLY 1. Planning Information A. Effectivity (1) Airplanes (a) Civil (i) (ii) (b) Military (i) The
More informationOVERSEAS TERRITORIES AVIATION REQUIREMENTS (OTARs)
OVERSEAS TERRITORIES AVIATION REQUIREMENTS (OTARs) Part 173 FLIGHT CHECKING ORGANISATION APPROVAL Published by Air Safety Support International Ltd Air Safety Support International Limited 2005 ISBN 0-11790-410-4
More informationNEXT GENERATION VERSATILITY
Offshore AW169 NEXT GENERATION VERSATILITY DELIVERING PERFORMANCE The AW169 is the brand new 4.5 tonnes class twin-engine helicopter. Ideally suited to the demanding Offshore mission, capable of carrying
More informationSEARCH AND RESCUE DEPARTMENT
SEARCH AND RESCUE DEPARTMENT I. Mission The Critical mission of Search and Rescue Department (SAR) is to maintain the wellbeing of all North Slope Borough residents. SAR provides safe, efficient and reliable
More informationMULTIDISCIPLINARYMEETING REGARDING GLOBAL TRACKING
International Civil Aviation Organization Global Tracking 2014-WP/1 5/5/14 WORKING PAPER MULTIDISCIPLINARYMEETING REGARDING GLOBAL TRACKING Montréal, 12 May to 13 May 2014 Agenda item 1: Explore the need
More informationYour success is our goal. Rely on our engineering.
Your success is our goal. Rely on our engineering. When it comes to aircraft engineering solutions, we are renowned for our vast expertise, outstanding experience and high quality performance. What our
More informationSERVICE BULLETIN SERIAL NUMBERS
TITLE ENGINE INDICATING - ENGINE TREND MONITOR CALIBRATION EFFECTIVITY MODEL SERIAL NUMBERS 560 (Citation Ultra) -0387, -0392, -0404, -0410, -0415, -0420, -0426, -0452, -0456, -0462, -0468, -0472, -0495,
More informationEmergency Operations Plan Annex E: Helicopter Crash
I. Introduction General Since 1987, over 265 MEDEVAC aircraft have crashed with an annual peak occurring in 2008 in which 7 crashes occurred in that year killing 28 people. Factors contributing to the
More informationUNMANNED AIRCRAFT PROVISIONS IN FAA REAUTHORIZATION BILL
UNMANNED AIRCRAFT PROVISIONS IN FAA REAUTHORIZATION BILL Section 341 Comprehensive Plan -Codifies in title 49 the requirement in the 2012 FAA reauthorization Act that a comprehensive plan to safely accelerate
More informationAircraft Controls MILITARY AIRCRAFT COMMERCIAL AIRCRAFT AFTERMARKET
Aircraft Controls MILITARY AIRCRAFT COMMERCIAL AIRCRAFT AFTERMARKET The largest of the five Moog operating segments is Aircraft Controls. Revenues from development, production and aftermarket support of
More informationAIRCRAFT SERVICE CHANGE
AIRCRAFT SERVICE CHANGE NUMBER 909 SUBJECT INDICATING / RECORDING (ATA 31) PLANEVIEW MASTER OPERATING SYSTEM SOFTWARE UPDATE DECEMBER 22, 2011 PILOTS INFORMATION SHEET PLANEVIEW MASTER OPERATING SYSTEM
More informationAIRBUS WRAPS UP ITS SUCCESSFUL 2018 SINGAPORE AIRSHOW PARTICIPATION
AIRBUS WRAPS UP ITS SUCCESSFUL 2018 SINGAPORE AIRSHOW PARTICIPATION News / Events / Festivals, Manufacturer 1 Another strong showing for Airbus at this biennial Asia-Pacific event From the digitalisation
More informationUH1H HP Modification and Upgrade Program
UH1H HP Modification and Upgrade Program The UH-1H has served the United States military for many years, setting the performance standards for all helicopters. Since the start of production, over 10,000
More informationSubj: GUIDANCE FOR THE OPERATION OF DEPARTMENT OF NAVY GROUP 1 AND 2 UNMANNED AIRCRAFT SYSTEMS
DEPARTMENT OF THE NAVY COMMANDER NAVAL AIR FORCES BOX 357051 SAN DIEGO CALIFORNIA 92135-7051 COMNAVAIRFORINST 3710.9 N45 COMNAVAIRFORINST 3710.9 From: Commander, Naval Air Forces Subj: GUIDANCE FOR THE
More informationCOVER SHEET. Reduced Vertical Separation Minimum (RVSM) Information Sheet Part 91 RVSM Letter of Authorization
COVER SHEET Reduced Vertical Separation Minimum (RVSM) Information Sheet Part 91 RVSM Letter of Authorization NOTE: FAA Advisory Circular 91-85 ( ), Authorization of Aircraft and Operators for Flight in
More information