UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 18 P-1 Line #56
|
|
- Rose Evans
- 5 years ago
- Views:
Transcription
1 Exhibit P-40, Budget Line Item Justification: PB 2016 Air Force Date: February F: Aircraft Procurement, Air Force / BA 05: Modification of Inservice Aircraft / BSA 5: Other Aircraft ID Code (A=Service Ready, B=Not Service Ready) : Program Elements for Code B Items: F Other Related Program Elements: F Line Item MDAP/MAIS Code: None Resource Summary Item MDAP/MAIS Code(s): Prior Years FY 2014 FY 2015 Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) , Less PY Advance Procurement ($ in Millions) Net Procurement (P1) ($ in Millions) , Plus CY Advance Procurement ($ in Millions) tal Obligation Authority ($ in Millions) , (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) Flyaway Unit Cost ($ in Millions) Gross/Weapon System Unit Cost ($ in Millions) Description: This line item funds modifications to the HH-60G helicopter. The HH-60G currently supports the Air Force's core function of Personnel Recovery. The primary mission of the HH-60G is to conduct day / night / marginal weather Combat Search and Rescue (CSAR) in order to recover isolated personnel in hostile or permissive environments. Other mission areas include casualty evacuation (CASEVAC), medical evacuation (MEDEVAC), non-combatant evacuation operations, civil search and rescue, international aid, disaster humanitarian relief, and insertion/extraction of combat forces. There are currently 97 aircraft, at 24 years average age, remaining of the original 112 HH-60Gs. The modification efforts budgeted in FY16 provide predictive maintenance analysis, safety/survivability upgrades, mission avionics upgrades, operational loss replacement mission modifications, and addresses obsolescence issues. A proponderance of the FY16 funds ($36.3M) will be used to replace the HH-60G over the horizon communication system. This replacement is necessary to ensure command and control connectivity and operational effectiveness in the evolving and isolated areas of operations of AFRICOM, CENTCOM, and PACOM. While this is a looming obsolescence issues, existing capability has experienced rapid inventory depletion rates from operating in these harsh environments. The remaining $3M completes rotor brake system modifications required for afloat staging and shipboard operations within AFRICOM, CENTCOM, and PACOM. The FY2016 funding request was reduced by $ million to account for the availability of prior execution balances. Funding for this exhibit contained in PE F. In accordance with Section 1815 of the FY 2008 National Defense Authorization Act (P.L ), this item is necessary for use by the active and reserve components of the Armed Forces for homeland defense missions, domestic emergency responses, and providing military support to civil authorities. tal Air Force Page 1 of 18 P-1 Line #56 Volume 2-327
2 Exhibit P-40, Budget Line Item Justification: PB 2016 Air Force Date: February F: Aircraft Procurement, Air Force / BA 05: Modification of Inservice Aircraft / BSA 5: Other Aircraft ID Code (A=Service Ready, B=Not Service Ready) : Program Elements for Code B Items: F Other Related Program Elements: F Line Item MDAP/MAIS Code: None AF AFNG AFR tal: Secondary Distribution Item MDAP/MAIS Code(s): Secondary Distribution FY 2014 FY 2015 tal Obligation Authority tal Obligation Authority tal Obligation Authority tal Obligation Authority Air Force Page 2 of 18 P-1 Line #56 Volume 2-328
3 Exhibit P-40, Budget Line Item Justification: PB 2016 Air Force Date: February F: Aircraft Procurement, Air Force / BA 05: Modification of Inservice Aircraft / BSA 5: Other Aircraft ID Code (A=Service Ready, B=Not Service Ready) : Program Elements for Code B Items: F Other Related Program Elements: F Line Item MDAP/MAIS Code: None Item MDAP/MAIS Code(s): Exhibits Schedule Prior Years FY 2014 FY 2015 tal Title* Exhibits ID CD Quantity / tal Cost Quantity / tal Cost Quantity / tal Cost Quantity / tal Cost Quantity / tal Cost Quantity / tal Cost 1 / ALTITUDE HOLD AND HOVER SYSTEM (AHHS) (Capability Improvement) P-40a*** - / / / / / - - / / KIRTLAND SIM UPGRADES (Other) P-40a*** - / / - - / - - / - - / - - / - 3 / SERVICE LIFE EXTENSION PROGRAM (Service Life Extension) P-40a*** - / / - - / - - / - - / - - / - 4 / LIGHTWEIGHT AIRBORNE RECOVERY SYSTEM V12 UPGRADE (Capability Improvement) P-40a*** - / / / / / - - / / Control Display Unit (CDU) (Capability Improvement) P-40a*** - / / / / / - - / / Navigation System Upgrade (NSU) (Capability Improvement) P-40a*** - / / / / / - - / / Vibration Monitoring System (VMS) (Reliablity & Maintainability) P-40a*** - / / / / / - - / / Situation Awareness Data-Link (Capability Improvement) P-40a*** - / / - - / - - / - - / - - / - 9 / Multi-function Color Display (Capability Improvement) P-40a*** - / / / / / - - / / MODE 5 (Capability Improvement) P-40a*** - / / / / / - - / / Gun Replacement (Reliablity & Maintainability) P-40a*** - / / / / / - - / / CSAR Avionics/Electrical Upgrade (Capability Improvement) P-40a*** - / / / / / - - / / DEFENSIVE SYSTEM UPGRADE (Capability Improvement) P-40a*** - / / / / - - / - - / - 14 / Ballistic Protection Enhancement (Capability Improvement) P-40a*** - / / / / - - / - - / - 15 / SERVICE BULLETINS (Other) P-40a*** - / / - - / - - / - - / - - / - 16 / LOW COST MODIFICATIONS (Other) P-40a*** - / / / / / - - / / HH-60 OLR Mission Modifications (Other) P-3a - / / / / / - - / / Block 162 (Service Life Extension) P-3a - / - - / - - / - - / / / / Rotor Brake (Capability Improvement) P-3a - / - - / - - / - - / - - / / tal Gross/Weapon System Cost - / / / / / / Exhibits Schedule FY 2017 FY 2018 FY 2019 FY 2020 tal Title* Exhibits ID CD Quantity / tal Cost Quantity / tal Cost Quantity / tal Cost Quantity / tal Cost Quantity / tal Cost Quantity / tal Cost 1 / ALTITUDE HOLD AND HOVER SYSTEM (AHHS) (Capability Improvement) P-40a*** - / / / - - / - - / - - / / KIRTLAND SIM UPGRADES (Other) P-40a*** - / - - / - - / - - / - - / - - / / SERVICE LIFE EXTENSION PROGRAM (Service Life Extension) P-40a*** - / - - / - - / - - / - - / - - / / LIGHTWEIGHT AIRBORNE RECOVERY SYSTEM V12 UPGRADE (Capability Improvement) P-40a*** - / / / - - / - - / - - / / Control Display Unit (CDU) (Capability Improvement) P-40a*** - / - - / - - / - - / - - / - - / / Navigation System Upgrade (NSU) (Capability Improvement) P-40a*** - / / / / - - / - - / / Vibration Monitoring System (VMS) (Reliablity & Maintainability) P-40a*** - / / / - - / - - / - - / / Situation Awareness Data-Link (Capability Improvement) P-40a*** - / - - / - - / - - / - - / - - / / Multi-function Color Display (Capability Improvement) P-40a*** - / / / - - / - - / - - / Air Force Page 3 of 18 P-1 Line #56 Volume 2-329
4 Exhibit P-40, Budget Line Item Justification: PB 2016 Air Force Date: February F: Aircraft Procurement, Air Force / BA 05: Modification of Inservice Aircraft / BSA 5: Other Aircraft ID Code (A=Service Ready, B=Not Service Ready) : Program Elements for Code B Items: F Other Related Program Elements: F Line Item MDAP/MAIS Code: None Item MDAP/MAIS Code(s): Exhibits Schedule FY 2017 FY 2018 FY 2019 FY 2020 tal Title* Exhibits ID CD Quantity / tal Cost Quantity / tal Cost Quantity / tal Cost Quantity / tal Cost Quantity / tal Cost Quantity / tal Cost 10 / MODE 5 (Capability Improvement) P-40a*** - / / / / - - / - - / / Gun Replacement (Reliablity & Maintainability) P-40a*** - / / / - - / - - / - - / / CSAR Avionics/Electrical Upgrade (Capability Improvement) P-40a*** - / / / / / - - / / DEFENSIVE SYSTEM UPGRADE (Capability Improvement) P-40a*** - / - - / - - / - - / - - / - - / / Ballistic Protection Enhancement (Capability Improvement) P-40a*** - / - - / - - / - - / - - / - - / / SERVICE BULLETINS (Other) P-40a*** - / - - / - - / - - / - - / - - / / LOW COST MODIFICATIONS (Other) P-40a*** - / / / / / - - / / HH-60 OLR Mission Modifications (Other) P-3a - / / / - - / - - / - - / / Block 162 (Service Life Extension) P-3a - / / / / / - - / / Rotor Brake (Capability Improvement) P-3a - / - - / - - / - - / - - / - - / tal Gross/Weapon System Cost - / / / / / - - / 1, *** Although this is an Exhibit P-40a item, the actual exhibit is not included since all of the required information for this item is already being shown here. *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: tals in this Exhibit P-40 set may not be exact or add due to rounding. Justification: Where applicable, justification for individual modifications is provided in the P-3A exhibits. Air Force Page 4 of 18 P-1 Line #56 Volume 2-330
5 Resource Summary Prior Years FY 2014 FY / HH-60 OLR Mission Modifications Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) tal Obligation Authority ($ in Millions) (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) Gross/Weapon System Unit Cost ($ in Millions) tal Description: The HH-60 Operational Loss Replacement (OLR) Mission Modification Program upgrades 21 Army UH-60L aircraft to the current Air Force HH-60G configuration, creating the Block 162 configuration. One OLR mission modification kit, made up of individual components for each system, will be installed per aircraft, for a total of 21 kits. This will require Non-Recurring Engineering (NRE) to develop a consolidated engineering package for installation. Two kits will be installed during this NRE and trial install effort. Long lead items will be procured as required to ensure they are available when needed. Long lead items include Group B Equipment such as: the avionics components, air refueling probes, and various specialized structures including, but not limited to, Color Weather RADAR (CWR) and Forward Looking Infrared (FLIR) fairings. Required NRE, Prototype, Trial Install Kit Proof, Technical Data Updated and Modernization, and Software Lab support will be accomplished through existing US Army contracts where able. Additionally, reports will be requested in support of this effort that include but are not limited to: economic service life, aircraft system specification, information support and aircraft modernization. The aircraft modification installation will be accomplished using a hybrid approach. This hybrid approach uses a combination of the existing H-60 organic depot sources and contractor resources. Due to the urgency of this requirement, this approach maintains our inherent organic capabilities, but also minimizes the resource constraint impacts on existing aircraft workload and the OLR deliveries. Aircraft modification time will be reduced by establishing modification capabilities, providing specialized tooling required for the modification installs, at multiple depot locations which include Naval Air Station North Island, Corpus Christi Army Depot, Naval Air Station Jacksonville and Coast Guard Station Elizabeth City. As a result of the age of the current aircraft, obsolescence is a major concern. Initial estimates indicate there are specific mission systems that need to be replaced including, but not limited to; CWR, Symbol Generator, ARC-210 Radios, and the APR-39(B)V2 Radar Warning Receiver. Replacements have been identified for many of these components; however, some NRE may be required for aircraft integration. Additional NRE may be required for other obsolete systems/components that are identified during the effort. New components will require a software development node in order to modify the existing HH-60 software to accommodate the new aircraft components without impacting the legacy fleet. Qualification flight testing will be necessary to ensure the design for the new hardware and software is compatible with existing aircraft systems. Available program funding will be utilized to ensure the configuration remains common across the fleet. Finally, additional effort will be necessary to create modification instructions separate from the OLR Mission Modification Effort. FY16 funding provides for program management oversight, PMA, and production installs. Milestone/Development Status As part of the Operation Loss Replacement (OLR) Program, the HH-60G System Program Office (SPO) will convert 21 Army UH-60L aircraft to the current Air Force HH-60G Pave Hawk configuration. For the NRE/Prototype/Trial Install/Kit-proof, an existing Army Logistics Support Facility (LSF) Indefinite Delivery Indefinite Quantity(IDIQ) contract will be used. The majority of these one-time contract costs are captured in the "OTHER GOVT" category. The SPO will acquire the long lead items and the follow-on LSF contract will be used to acquire and assemble the remaining kits. Production installs will be performed at various depots. RDT&E is not a component of this effort. Air Force Page 5 of 18 P-1 Line #56 Volume 2-331
6 AF tal: Secondary Distribution Secondary Distribution FY 2014 FY / HH-60 OLR Mission Modifications tal Obligation Authority tal Obligation Authority Air Force Page 6 of 18 P-1 Line #56 Volume 2-332
7 Models of Systems Affected: HH-60G Modification Type: Other Related RDT&E PEs: Procurement Financial Plan Modification Item 1 of 1: L2G KIT A Kits Recurring Prior Years FY 2014 FY 2015 tal Cost ($ M) tal Cost ($ M) tal Cost ($ M) tal Cost ($ M) tal Cost ($ M) tal Cost ($ M) tal Cost ($ M) tal Cost ($ M) 8854 / HH-60 OLR Mission Modifications tal Cost ($ M) tal Cost ($ M) tal Cost ($ M) tal tal Cost ($ M) L2G KIT:INSTALL KITS Group A (Active) 19 / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 19 / Subtotal: Recurring - / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / B Kits Recurring L2G KIT:EQUIPMENT Group B (Active) 19 / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 19 / Subtotal: Recurring - / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / Subtotal: L2G KIT - / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / Subtotal: Procurement, All Modification Items - / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / Support (All Modification Items) GROUP A: TOTAL NONRECURRING - / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / GROUP B: TOTAL NONRECURRING - / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / Change Orders 1 / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 1 / Data 1 / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 1 / SIM/TRAINER 3 / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 3 / SUPPORT-EQUIP 1 / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 1 / PMA - Contractor Services - / / / / / - - / / / - - / - - / - - / - - / PMA - Other Gov't Costs - / / / / / - - / / / - - / - - / - - / - - / PMA - Contractor Services (1) - / - - / - - / / / - - / / / / - - / - - / - - / Subtotal: Support 6 / / / / / - - / / / / - - / - - / - 6 / Installation Modification Item 1 of 1: L2G KIT - / - - / - 8 / / / - 3 / / / / - - / - - / - 19 / Subtotal: Installation - / - - / - 8 / / / - 3 / / / / - - / - - / - 19 / tal tal Cost (Procurement + Support + Installation) Air Force Page 7 of 18 P-1 Line #56 Volume 2-333
8 Modification Item 1 of 1: L2G KIT Manufacturer Information Manufacturer Name: Science and Engineering Inc Manufacturer Location: AL Administrative Leadtime (in Months): 8 Production Leadtime (in Months): 30 Contract Dates Delivery Dates 8854 / HH-60 OLR Mission Modifications Dates FY 2014 FY 2015 FY 2017 FY 2018 FY 2019 FY 2020 Installation Information Method of Implementation: Depot Installation Cost Prior Years FY 2014 FY 2015 tal Cost ($ M) tal Cost ($ M) tal Cost ($ M) tal Cost ($ M) tal Cost ($ M) tal Cost ($ M) tal Cost ($ M) tal Cost ($ M) tal Cost ($ M) tal Cost ($ M) tal Cost ($ M) tal tal Cost ($ M) Prior Years - / - - / - 8 / / / - 3 / / / / - - / - - / - 19 / FY / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - tal - / - - / - 8 / / / - 3 / / / / - - / - - / - 19 / Installation Schedule FY 2014 FY 2015 FY 2017 FY 2018 FY 2019 FY 2020 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC t In Out Air Force Page 8 of 18 P-1 Line #56 Volume 2-334
9 Resource Summary Prior Years FY 2014 FY / Block 162 Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) tal Obligation Authority ($ in Millions) (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) Gross/Weapon System Unit Cost ($ in Millions) tal Description: Block 162 is a new start modification effort for the HH-60G. The Block 162 Modification Program synchronizes 97 legacy HH-60G aircraft with aircraft modified as part of the Ops Loss Replacement (OLR) effort. In the course of completing the OLR program, certain systems were identified as obsolete. The scope of this modification addresses the obsolete systems identified by the OLR program and is divided into the following three parts: Avionics Communications Suite Upgrade (ACSU), Electronic Fuel Quantity Indicator (EFQI), and the Obsolescence Kit (UH-60L to HH-60G), The effort begins with conformance of the HH-60G to a baseline with the installation of the Aircraft Communications Suite Upgrade (ACSU) and EFQI kit. The ACSU kit includes the removal of the Automatic Direction Finder (ADF), radio retransmit, and the V/UHF Direction Finder. The ACSU is installed on 32 Air National Guard (ANG) and Air Force Reserve (AFRES) to meet communication and impending obsolescent waveform requirements. As such, kits purchased for ACSU will be of sufficient quantity to cover the remaining 65 aircraft. The EFQI kit will need to be applied to all HH-60G aircraft currently in the inventory, 97. This kit only replaces the existing EFQI as an obsolescent item. After these two mods are installed the Obsolescence kit can be applied to 97 aircraft. The Obsolescence Kit consists of the following components: color weather radar, Tactical Air Navigation (TACAN), Digital Symbol Generator Unit (SGU), and Digital Intercommunications System (ICS). Long lead items include, but are not limited to the color weather radar, ACSU Group B components, TACAN Group B components and EFQI Group B components. Existing contracts will be used to the fullest extent possibly to procure long lead components. Modification installations will be accomplished by existing H-60 organic depot sources and contract field teams. Milestone/Development Status There is no development associated with this effort. This modification will use technical data gleaned from Mod# 8850, OLR. AF AFNG Secondary Distribution FY 2014 FY 2015 tal Obligation Authority tal Obligation Authority Air Force Page 9 of 18 P-1 Line #56 Volume 2-335
10 AFR tal: Secondary Distribution Secondary Distribution FY 2014 FY / Block 162 tal Obligation Authority tal Obligation Authority Air Force Page 10 of 18 P-1 Line #56 Volume 2-336
11 8856 / Block 162 Models of Systems Affected: HH-60G Modification Type: Service Life Extension Related RDT&E PEs: F Procurement Financial Plan Modification Item 1 of 3: ACSU Kits A Kits Recurring Prior Years FY 2014 FY 2015 tal Cost ($ M) tal Cost ($ M) tal Cost ($ M) tal Cost ($ M) tal Cost ($ M) tal Cost ($ M) tal Cost ($ M) tal Cost ($ M) tal Cost ($ M) tal Cost ($ M) tal Cost ($ M) tal tal Cost ($ M) ACSU Kits:INSTALL KITS Group A (Active) - / - - / - - / - 18 / / / / - - / - - / - - / - - / - 65 / Subtotal: Recurring - / - - / - - / - - / / / / - - / - - / - - / - - / - - / B Kits Recurring ACSU Kits:EQUIPMENT Group B (Active) - / - - / - - / - 18 / / / / - - / - - / - - / - - / - 65 / Subtotal: Recurring - / - - / - - / - - / / / / - - / - - / - - / - - / - - / Subtotal: ACSU Kits - / - - / - - / - - / / / / - - / - - / - - / - - / - - / Modification Item 2 of 3: EFQI B Kits Recurring EFQI:EQUIPMENT Group B (Active) - / - - / - - / - 65 / / - 65 / / - - / - - / - - / - - / - 65 / EFQI:EQUIPMENT Group B (Guard) - / - - / - - / - 17 / / - 17 / / - - / - - / - - / - - / - 17 / EFQI:EQUIPMENT Group B (Reserve) - / - - / - - / - 15 / / - 15 / / - - / - - / - - / - - / - 15 / Subtotal: Recurring - / - - / - - / - - / / - - / / - - / - - / - - / - - / - - / Subtotal: EFQI - / - - / - - / - - / / - - / / - - / - - / - - / - - / - - / Modification Item 3 of 3: Obsolescence Kit A Kits Recurring Obsolescence Kit:INSTALL KITS Group A (Active) - / - - / - - / - - / - - / - - / - 23 / / / / - - / - 51 / Obsolescence Kit:INSTALL KITS Group A (Guard) - / - - / - - / - - / - - / - - / - 7 / / / / - - / - 16 / Obsolescence Kit:INSTALL KITS Group A (Reserve) - / - - / - - / - - / - - / - - / - 5 / / / / - - / - 11 / Subtotal: Recurring - / - - / - - / - - / - - / - - / - - / / / / - - / - - / B Kits Recurring Obsolescence Kit:EQUIPMENT Group B (Active) - / - - / - - / - - / - - / - - / - 23 / / / / - - / - 51 / Obsolescence Kit:EQUIPMENT Group B (Guard) - / - - / - - / - - / - - / - - / - 7 / / / / - - / - 16 / Obsolescence Kit:EQUIPMENT Group B (Reserve) - / - - / - - / - - / - - / - - / - 5 / / / / - - / - 11 / Subtotal: Recurring - / - - / - - / - - / - - / - - / - - / / / / - - / - - / Subtotal: Obsolescence Kit - / - - / - - / - - / - - / - - / - - / / / / - - / - - / Air Force Page 11 of 18 P-1 Line #56 Volume 2-337
12 8856 / Block 162 Models of Systems Affected: HH-60G Modification Type: Service Life Extension Related RDT&E PEs: F Financial Plan Prior Years FY 2014 FY 2015 tal Cost ($ M) tal Cost ($ M) tal Cost ($ M) tal Cost ($ M) tal Cost ($ M) tal Cost ($ M) tal Cost ($ M) tal Cost ($ M) tal Cost ($ M) tal Cost ($ M) tal Cost ($ M) tal tal Cost ($ M) Subtotal: Procurement, All Modification Items - / - - / - - / - - / / / / / / / - - / - - / Support (All Modification Items) PMA - Contractor Services - / - - / - - / - - / / - - / / / / / / - - / OTHER GOVT - / - - / - - / - - / - - / - - / - - / / / / / - - / PMA - Other Gov't Costs - / - - / - - / - - / - - / / / - - / - - / - - / / - - / INSTALLATIONS - / - - / - - / - - / - 47 / / / - - / - - / - - / - - / - 47 / Subtotal: Support - / - - / - - / - - / / / / / / / / - 47 / Installation Modification Item 1 of 3: ACSU Kits - / - - / - - / - 11 / / - 11 / / - 18 / - - / - - / - - / - 65 / Modification Item 3 of 3: Obsolescence Kit - / - - / - - / - - / - - / - - / - - / - 35 / / / / - 78 / Subtotal: Installation - / - - / - - / - 11 / / - 11 / / - 53 / / / / / tal tal Cost (Procurement + Support + Installation) Air Force Page 12 of 18 P-1 Line #56 Volume 2-338
13 Modification Item 1 of 3: ACSU Kits Manufacturer Information Manufacturer Name: Rockwell Collins Manufacturer Location: IA Administrative Leadtime (in Months): 0 Production Leadtime (in Months): / Block 162 Dates FY 2014 FY 2015 FY 2017 FY 2018 FY 2019 FY 2020 Contract Dates Oct 2015 Oct 2016 Oct 2017 Oct 2018 Delivery Dates Jul 2016 Jul 2017 Jul 2018 Jul 2019 Installation Information Method of Implementation: Contract Field Team Installation Cost Prior Years FY 2014 FY 2015 tal Cost ($ M) tal Cost ($ M) tal Cost ($ M) tal Cost ($ M) tal Cost ($ M) tal Cost ($ M) tal Cost ($ M) tal Cost ($ M) tal Cost ($ M) tal Cost ($ M) tal Cost ($ M) tal tal Cost ($ M) Prior Years - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 11 / / - 11 / / - 18 / - - / - - / - - / - 65 / FY / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - tal - / - - / - - / - 11 / / - 11 / / - 18 / - - / - - / - - / - 65 / Installation Schedule FY 2014 FY 2015 FY 2017 FY 2018 FY 2019 FY 2020 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC t In Out Air Force Page 13 of 18 P-1 Line #56 Volume 2-339
14 Modification Item 2 of 3: EFQI Manufacturer Information Manufacturer Name: SESI Manufacturer Location: AL Administrative Leadtime (in Months): 6 Production Leadtime (in Months): / Block 162 Dates FY 2014 FY 2015 FY 2017 FY 2018 FY 2019 FY 2020 Contract Dates Apr 2016 Apr 2017 Apr 2018 Apr 2019 Delivery Dates Apr 2017 Apr 2018 Apr 2019 Apr 2020 Installation Information Method of Implementation (Organic): Org/Intermediate Installation Quantity: 97 Air Force Page 14 of 18 P-1 Line #56 Volume 2-340
15 Modification Item 3 of 3: Obsolescence Kit Manufacturer Information Manufacturer Name: Rockwell Collins Manufacturer Location: IA Administrative Leadtime (in Months): 0 Production Leadtime (in Months): / Block 162 Dates FY 2014 FY 2015 FY 2017 FY 2018 FY 2019 FY 2020 Contract Dates Jun 2016 Oct 2016 Oct 2017 Oct 2018 Delivery Dates Jun 2017 Oct 2017 Oct 2018 Oct 2019 Installation Information Method of Implementation: Depot Installation Cost Prior Years FY 2014 FY 2015 tal Cost ($ M) tal Cost ($ M) tal Cost ($ M) tal Cost ($ M) tal Cost ($ M) tal Cost ($ M) tal Cost ($ M) tal Cost ($ M) tal Cost ($ M) tal Cost ($ M) tal Cost ($ M) tal tal Cost ($ M) Prior Years - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY / - - / - - / - - / - - / - - / - - / - 35 / / - - / - - / - 35 / FY / - - / - - / - - / - - / - - / - - / - - / - 20 / / - - / - 20 / FY / - - / - - / - - / - - / - - / - - / - - / - - / - 23 / / - 23 / FY / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - tal - / - - / - - / - - / - - / - - / - - / - 35 / / / / - 78 / Installation Schedule FY 2014 FY 2015 FY 2017 FY 2018 FY 2019 FY 2020 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC t In Out Air Force Page 15 of 18 P-1 Line #56 Volume 2-341
16 Resource Summary Prior Years FY 2014 FY / Rotor Brake Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) tal Obligation Authority ($ in Millions) (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) Gross/Weapon System Unit Cost ($ in Millions) tal Description: The U.S. Air Force HH-60G PAVE HAWK helicopter's primary mission of Personnel Recovery (PR) is to pick up downed aircrew members and other isolated personnel in austere and unfriendly territory. Included in the PR mission is the requirement for shipboard operations. In order for the HH-60G to safely conduct shipboard operations, the helicopter must have rotor brakes installed. In 2008 the HH-60 Program Office issued a Time Compliance Technical Order (TCTO), 1H , which consisted of three initiatives; (1) installation of T701C engines, (2) upgrade to improved durability gear box, and (3) installation of rotor brakes. The Air Force Reserve Command (AFRC) HH-60Gs were omitted from TCTO 1H and did not receive these upgrades. The AFRC helicopters have received the new T701C engines and improved durability gear box through other forced initiatives, however the rotor brake portion of the TCTO is still required on their 15 HH-60s. The AFRC, through use of National Guard and Reserve Equipment Appropriation (NGREA) 0350 funds, have initiated contracting action for the procurement of installation kits. The purpose of this effort is to procure the installation of those kits. Milestone/Development Status There is no development required for this effort as the kits and installations will be accomplished via existing technical data. AF AFR tal: Secondary Distribution Secondary Distribution FY 2014 FY 2015 tal Obligation Authority tal Obligation Authority tal Obligation Authority Air Force Page 16 of 18 P-1 Line #56 Volume 2-342
17 Models of Systems Affected: HH-60G Modification Type: Capability Improvement Related RDT&E PEs: Procurement Financial Plan Modification Item 1 of 1: Rotor Brake A Kits Recurring Prior Years FY 2014 FY 2015 tal Cost ($ M) tal Cost ($ M) tal Cost ($ M) tal Cost ($ M) tal Cost ($ M) 8857 / Rotor Brake tal Cost ($ M) tal Cost ($ M) tal Cost ($ M) tal Cost ($ M) tal Cost ($ M) tal Cost ($ M) tal tal Cost ($ M) Rotor Brake:INSTALL KITS Group A (Reserve) - / - - / - - / - - / - 15 / - 15 / - - / - - / - - / - - / - - / - 15 / - Subtotal: Recurring - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - Subtotal: Rotor Brake - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - Subtotal: Procurement, All Modification Items - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - Support (All Modification Items) INSTALLATIONS - / - - / - - / - - / - 15 / / / - - / - - / - - / - - / - 15 / Subtotal: Support - / - - / - - / - - / - 15 / / / - - / - - / - - / - - / - 15 / Installation Modification Item 1 of 1: Rotor Brake - / - - / - - / - 15 / - - / - 15 / - - / - - / - - / - - / - - / - 15 / - Subtotal: Installation - / - - / - - / - 15 / - - / - 15 / - - / - - / - - / - - / - - / - 15 / - tal tal Cost (Procurement + Support + Installation) Air Force Page 17 of 18 P-1 Line #56 Volume 2-343
18 Modification Item 1 of 1: Rotor Brake Manufacturer Information Manufacturer Name: Sikorsky Manufacturer Location: CT Administrative Leadtime (in Months): 0 Production Leadtime (in Months): / Rotor Brake Dates FY 2014 FY 2015 FY 2017 FY 2018 FY 2019 FY 2020 Contract Dates Oct 2015 Delivery Dates Jan 2016 Installation Information Method of Implementation: Contract Field Team Installation Cost Prior Years FY 2014 FY 2015 tal Cost ($ M) tal Cost ($ M) tal Cost ($ M) tal Cost ($ M) tal Cost ($ M) tal Cost ($ M) tal Cost ($ M) tal Cost ($ M) tal Cost ($ M) tal Cost ($ M) tal Cost ($ M) tal tal Cost ($ M) Prior Years - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 15 / - - / - 15 / - - / - - / - - / - - / - - / - 15 / - FY / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - tal - / - - / - - / - 15 / - - / - 15 / - - / - - / - - / - - / - - / - 15 / - Installation Schedule FY 2014 FY 2015 FY 2017 FY 2018 FY 2019 FY 2020 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC t In Out Air Force Page 18 of 18 P-1 Line #56 Volume 2-344
UNCLASSIFIED. FY 2017 Base FY 2017 OCO FY 2017 OCO. FY 2017 Base
Exhibit P-40, Budget Line Item Justification: PB 2017 Air Force Date: February 2016 3010F: Aircraft Procurement, Air Force / BA 05: Modification of Inservice Aircraft / BSA 5: Other Aircraft ID Code (A=Service
More informationUNCLASSIFIED FY 2015 FY 2015 OCO. FY 2015 Base FY 2015 FY Base
Exhibit P-40, Budget Line Item Justification: PB 2015 Air Force Date: March 2014 3010F: Aircraft Procurement, Air Force / BA 05: Modification of Inservice Aircraft / BSA 5: Other Aircraft ID Code (A=Service
More informationUNCLASSIFIED FY 2016 OCO. FY 2016 Base
Exhibit P-40, Budget Line Item Justification: PB 2016 Air Force Date: February 2015 3010F: Aircraft Procurement, Air Force / BA 05: Modification of Inservice Aircraft / BSA 5: Other Aircraft ID Code (A=Service
More informationUNCLASSIFIED. FY 2017 Base FY 2017 OCO FY 2017 OCO. FY 2017 Base
Exhibit P-40, Budget Line Item Justification: PB 2017 Air Force Date: February 2016 3010F: Aircraft Procurement, Air Force / BA 05: Modification of Inservice Aircraft / BSA 2: Tactical Aircraft ID Code
More informationUNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 5 P-1 Line #35
Exhibit P-40, Budget Line Item Justification: PB 2017 Air Force Date: February 2016 3010F: Aircraft Procurement, Air Force / BA 05: Modification of Inservice Aircraft / BSA 4: Trainer Aircraft ID Code
More informationUNCLASSIFIED. FY 2017 Base FY 2017 OCO FY 2017 OCO. FY 2017 Base
Exhibit P-40, Budget Line Item Justification: PB 2017 Air Force Date: February 2016 3010F: Aircraft Procurement, Air Force / BA 05: Modification of Inservice Aircraft / BSA 2: Tactical Aircraft ID Code
More informationUNCLASSIFIED FY 2016 OCO. FY 2016 Base
Exhibit P-40, Budget Line Item Justification: PB 2016 Air Force Date: February 2015 3010F: Aircraft Procurement, Air Force / BA 05: Modification of Inservice Aircraft / BSA 5: Other Aircraft ID Code (A=Service
More informationUNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 10 P-1 Line #47
Exhibit P-40, Budget Line Item Justification: PB 2016 Air Force Date: February 2015 3010F: Aircraft Procurement, Air Force / BA 05: Modification of Inservice Aircraft / BSA 5: Other Aircraft ID Code (A=Service
More informationUNCLASSIFIED. FY 2017 Base FY 2017 OCO
Exhibit P-40, Budget Line Item Justification: PB 2017 Air Force Date: February 2016 3010F: Aircraft Procurement, Air Force / BA 05: Modification of Inservice Aircraft / BSA 5: Other Aircraft ID Code (A=Service
More informationUNCLASSIFIED. FY 2017 Base FY 2017 OCO. FY 2017 Base FY 2017 OCO
Exhibit P-40, Budget Line Item Justification: PB 2017 Air Force Date: February 2016 3010F: Aircraft Procurement, Air Force / BA 05: Modification of Inservice Aircraft / BSA 3: Airlift Aircraft ID Code
More informationUNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 5 P-1 Line #55
Exhibit P-40, Budget Line Item Justification: PB 2016 Air Force Date: February 2015 3010F: Aircraft Procurement, Air Force / BA 05: Modification of Inservice Aircraft / BSA 5: Other Aircraft ID Code (A=Service
More informationUNCLASSIFIED. FY 2016 Base FY 2016 OCO FY 2016 OCO. FY 2016 Base
Exhibit P-40, Budget Line Item Justification: PB 2016 Army Date: February 2015 2031A: Aircraft Procurement, Army / BA 02: Modification of Aircraft / BSA 10: Modification of Aircraft ID Code (A=Service
More informationUNCLASSIFIED. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018
Exhibit P-40, Budget Item Justification Sheet: PB 2014 Navy Date: April 2013 Aircraft / BSA 1: Modification Of Aircraft ID Code (A=Service Ready, B=Not Service Ready) : A Program Elements for Code B Items:
More informationUNCLASSIFIED FY 2016 OCO. FY 2016 Base. FY 2016 Base FY 2016 OCO
Exhibit P-40, Budget Line Item Justification: PB 2016 Army Date: February 2015 2033A: Procurement of W&TCV, Army / BA 01: Tracked Combat Vehicles / BSA 20: Modification of Tracked Combat Vehicles ID Code
More informationUNCLASSIFIED. FY 2016 Base FY 2016 OCO FY 2016 OCO. FY 2016 Base
Exhibit P-40, Budget Line Item Justification: PB 2016 Air Force Date: February 2015 3010F: Aircraft Procurement, Air Force / BA 05: Modification of Inservice Aircraft / BSA 2: Tactical Aircraft ID Code
More informationUNCLASSIFIED FY Exhibits Schedule Prior Years FY 2013 FY 2014 FY 2015 Base FY 2015 OCO FY 2015 Total. Total Cost ($ M)
Exhibit P-40, Budget Line Item Justification: PB 2015 Army Date: March 2014 2033A: Procurement of W&TCV, Army / BA 01: Tracked Combat Vehicles / BSA 20: Modification of Tracked Combat Vehicles ID Code
More informationUNCLASSIFIED. UNCLASSIFIED United States Special Operations Command Page 1 of 6 P-1 Line #53
Exhibit P-40, Budget Line Item Justification: PB 2017 United States Special Operations Command : February 2016 0300D: Procurement, Defense-Wide / BA 02: Special Operations Command / BSA 1: Aviation Programs
More informationUNCLASSIFIED. FY 2014 Base. OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018
Exhibit P-40, Budget Item Justification Sheet: PB 2014 Air Force Date: April 2013 Inservice Missiles / BSA 1: Class IV ID Code (A=Service Ready, B=Not Service Ready) : A Program Elements for Code B Items:
More informationUNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 18 P-1 Line #12
Exhibit P-40, Budget Line Item Justification: PB 2017 Navy Date: February 2016 1810N: Other Procurement, Navy / BA 01: Ships Support Equipment / BSA 9: Other Shipboard Equipment ID Code (A=Service Ready,
More informationUNCLASSIFIED FY 2017 OCO. FY 2017 Base
Exhibit P-40, Budget Line Item Justification: PB 2017 Air Force Date: February 2016 3021F: Space Procurement, Air Force / BA 01: Space Procurement, Air Force / BSA 1: Space Programs ID Code (A=Service
More informationUNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 24 P-1 Line #55
Exhibit P-40, Budget Line Item Justification: PB 2016 Navy Date: February 2015 1506N: Aircraft Procurement, Navy / BA 05: Modification of Aircraft / BSA 1: Modification of Aircraft ID Code (A=Service Ready,
More informationUNCLASSIFIED. UNCLASSIFIED Army Page 1 of 23 P-1 Line #27
Exhibit P-40, Budget Line Item Justification: PB 2015 Army Date: March 2014 2031A: Aircraft Procurement, Army / BA 02: Modification of Aircraft / BSA 10: Modification of Aircraft ID Code (A=Service Ready,
More informationUNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 16 P-1 Line #57
Exhibit P-40, Budget Line Item Justification: PB 2017 Navy Date: February 2016 1506N: Aircraft Procurement, Navy / BA 05: Modification of Aircraft / BSA 1: Modification of Aircraft ID Code (A=Service Ready,
More informationUNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 17 P-1 Line #55
Exhibit P-40, Budget Line Item Justification: PB 2017 Air Force Date: February 2016 3010F: Aircraft Procurement, Air Force / BA 05: Modification of Inservice Aircraft / BSA 5: Other Aircraft ID Code (A=Service
More informationUNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 21 P-1 Line #19
Exhibit P-40, Budget Line Item Justification: PB 2017 Navy Date: February 2016 1810N: Other Procurement, Navy / BA 01: Ships Support Equipment / BSA 9: Other Shipboard Equipment ID Code (A=Service Ready,
More informationUNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 17 P-1 Line #121
Exhibit P-40, Budget Line Item Justification: PB 2015 Navy Date: March 2014 1810N: Other Procurement, Navy / BA 04: Ordnance Support Equipment / BSA 3: Ship Missile Systems Equipment ID Code (A=Service
More informationUNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 31 P-1 Line #41
Exhibit P-40, Budget Line Item Justification: PB 2017 Navy Date: February 2016 1810N: Other Procurement, Navy / BA 01: Ships Support Equipment / BSA 16: Logistic Support ID Code (A=Service Ready, B=Not
More informationUNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 5 P-1 Line #21
Exhibit P-40, Budget Line Item Justification: PB 2015 Navy Date: March 2014 1507N: Weapons Procurement, Navy / BA 03: Torpedoes and Related Equipment / BSA 1: Torpedoes and Related Equip ID Code (A=Service
More informationUNCLASSIFIED. FY 2017 Base FY 2017 OCO FY 2017 OCO. FY 2017 Base
Exhibit P-40, Budget Line Item Justification: PB 2017 Army Date: February 2016 2033A: Procurement of W&TCV, Army / BA 01: Tracked Combat Vehicles / BSA 20: Modification of Tracked Combat Vehicles ID Code
More informationUNCLASSIFIED. FY 2017 Base FY 2017 OCO
Exhibit R-2, RDT&E Budget Item Justification: PB 2017 Air Force : February 2016 3600: Research, Development, Test & Evaluation, Air Force / BA 7: Operational Systems Development COST ($ in Millions) FY
More informationUNCLASSIFIED. FY 2016 Base FY 2016 OCO FY 2016 OCO. FY 2016 Base
Resource Summary Prior Years FY 2014 FY 2015 Base OCO Total FY 2017 FY 2018 FY 2019 FY 2020 To Complete Procurement Quantity (Units in Each) - - - - - - - - - - - - Gross/Weapon System Cost ($ in Millions)
More informationUNCLASSIFIED. UNCLASSIFIED Army Page 1 of 16 P-1 Line #15
Exhibit P-40, Budget Line Item Justification: PB 2017 Army Date: February 2016 2031A: Aircraft Procurement, Army / BA 02: Modification of Aircraft / BSA 10: Modification of Aircraft ID Code (A=Service
More informationUNCLASSIFIED FY Exhibits Schedule Prior Years FY 2013 FY 2014 FY 2015 Base FY 2015 OCO FY 2015 Total. Total Cost ($ M) Unit Cost ($) Qty (Each)
Exhibit P-40, Budget Line Item Justification: PB 2015 Navy Date: March 2014 1506N: Aircraft Procurement, Navy / BA 05: Modification of Aircraft / BSA 1: Modification of Aircraft ID Code (A=Service Ready,
More informationUNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 33 P-1 Line #94
Exhibit P-40, Budget Line Item Justification: PB 2017 Navy Date: February 2016 1810N: Other Procurement, Navy / BA 02: Communications & Electronics Equip / BSA 12: Submarine Communications ID Code (A=Service
More informationUNCLASSIFIED FY 2015 FY 2015 OCO. FY 2015 Base FY 2015 FY Base
Exhibit P-40, Budget Line Item Justification: PB 2015 Army Date: March 2014 2031A: Aircraft Procurement, Army / BA 02: Modification of Aircraft / BSA 10: Modification of Aircraft ID Code (A=Service Ready,
More informationUNCLASSIFIED. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018
Exhibit P-40, Budget Item Justification Sheet: PB 2014 Navy : April 2013 Ammo, MC / BSA 1: Marine Corps Ammunition ID Code (A=Service Ready, B=Not Service Ready) : A Program Elements for Code B : Other
More informationUNCLASSIFIED. FY 2016 Base FY 2016 OCO
Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Air Force : February 2015 3600: Research, Development, Test & Evaluation, Air Force / BA 7: Operational Systems Development COST ($ in Millions) FY
More informationUNCLASSIFIED FY 2017 OCO. FY 2017 Base
Exhibit P-40, Budget Line Item Justification: PB 2017 Navy Date: February 2016 1810N: Other Procurement, Navy / BA 04: Ordnance Support Equipment / BSA 7: Other Expendable Ordnance ID Code (A=Service Ready,
More informationUNCLASSIFIED. FY 2017 Base FY 2017 OCO
Exhibit P-40, Budget Line Item Justification: PB 2017 Navy Date: February 2016 1506N: Aircraft Procurement, Navy / BA 05: Modification of Aircraft / BSA 1: Modification of Aircraft ID Code (A=Service Ready,
More informationUNCLASSIFIED. FY 2017 Base FY 2017 OCO. FY 2017 Base FY 2017 OCO
UNCLSSIFIED Exhibit P-40, Budget Line Item Justification: PB 2017 ir Force Date: February 2016 ppropriation / Budget ctivity / Budget Sub ctivity: 3080F: Other Procurement, ir Force / B 02: Vehicular Equipment
More informationUNCLASSIFIED FY Exhibits Schedule Prior Years FY 2013 FY 2014 FY 2015 Base FY 2015 OCO FY 2015 Total. Unit Cost ($ M) Qty (Each)
Exhibit P-40, Budget Line Item Justification: PB 2015 United States Special Operations Command Date: March 2014 0300D: Procurement, Defense-Wide / BA 02: Special Operations Command / BSA 4: Other Procurement
More informationUNCLASSIFIED. FY 2014 Base. OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018
Exhibit P-40, Budget Item Justification Sheet: PB 2014 Army Date: April 2013 Aircraft / BSA 10: Modification Of Aircraft ID Code (A=Service Ready, B=Not Service Ready) : Program Elements for Code B Items:
More informationUNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 151 P-1 Line #32
Exhibit P-40, Budget Line Item Justification: PB 2017 Navy Date: February 2016 1506N: Aircraft Procurement, Navy / BA 05: Modification of Aircraft / BSA 1: Modification of Aircraft ID Code (A=Service Ready,
More informationUNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 30 P-1 Line #36
Exhibit P-40, Budget Line Item Justification: PB 2016 Navy Date: February 2015 1506N: Aircraft Procurement, Navy / BA 05: Modification of Aircraft / BSA 1: Modification of Aircraft ID Code (A=Service Ready,
More informationUNCLASSIFIED R-1 ITEM NOMENCLATURE PE A: AIRCRAFT CERTIFICATION FY 2012 OCO
Exhibit R-2, RDT&E Budget Item Justification: PB 212 Army DATE: February 211 24: Research, Development, Test & Evaluation, Army COST ($ in Millions) FY 21 FY 211 FY 212 Base PE 6566A: AIRCRAFT CERTIFICATION
More informationUNCLASSIFIED FY Exhibits Schedule Prior Years FY 2013 FY 2014 FY 2015 Base FY 2015 OCO FY 2015 Total. Total Cost ($ M) Unit Cost ($) Qty (Each)
Exhibit P-40, Budget Line Item Justification: PB 2015 Navy Date: March 2014 1506N: Aircraft Procurement, Navy / BA 05: Modification of Aircraft / BSA 1: Modification of Aircraft ID Code (A=Service Ready,
More informationUNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 17 P-1 Line #13
Exhibit P-40, Budget Line Item Justification: PB 2016 Navy : February 2015 1508N: Procurement of Ammo, Navy & MC / BA 01: Proc Ammo, Navy / BSA 1: Navy Ammunition A Program Elements for Code B Items: Other
More informationUNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 34 P-1 Line #51
Exhibit P-40, Budget Line Item Justification: PB 2016 Navy Date: February 2015 1506N: Aircraft Procurement, Navy / BA 05: Modification of Aircraft / BSA 1: Modification of Aircraft ID Code (A=Service Ready,
More informationUNCLASSIFIED. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018
Exhibit P-40, Budget Item Justification Sheet: PB 2014 Navy : April 2013 Ammo, MC / BSA 1: Marine Corps Ammunition ID Code (A=Service Ready, B=Not Service Ready) : A Program Elements for Code B : Other
More informationCost-effective, flexible avionics for today s missions and future challenges. Flight2 integrated avionics system. UPGRADES FOR LEGACY C-130s
Cost-effective, flexible avionics for today s missions and future challenges. Flight2 integrated avionics system UPGRADES FOR LEGACY C-130s Bring cabin capability into highest definition. Flight2 integrated
More informationUNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: Communication, Navigation, Surveillance/Air Traffic Management (CNS/ATM) FY 2012 OCO
Exhibit R-2, RDT&E Budget Item Justification: PB 2012 Air Force DATE: February 2011 COST ($ in Millions) FY 2010 FY 2011 FY 2013 FY 2014 FY 2015 FY 2016 To Program Element 6.754 5.708 4.604-4.604 4.549
More informationUNCLASSIFIED. UNCLASSIFIED Page 1 of 5. EXHIBIT R-2, RDT&E Budget Item Justification RESEARCH DEVELOPMENT TEST & EVALUATION, NAVY / BA-5
EXHIBIT R-2, RDT&E Budget Item Justification APPROPRIATION/BUDGET ACTIVITY RESEARCH DEVELOPMENT TEST & EVALUATION, NAVY / BA-5 R-1 ITEM NOMENCLATURE 0605430N, C/KC-130 AVIONICS MODERNIZATION PROGRAM (AMP)
More informationMilitary Aviation Fleet & MRO Forecast
Military Aviation Fleet & MRO Forecast April 6, 2016 Daniel Z. Katz Director, Defense Analysis and Data Aviation Week Intelligence and Data Services Arlington, VA Source: Aviation Week 2016 Fleet & MRO
More informationUNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 126 P-1 Line #32
Exhibit P-40, Budget Line Item Justification: PB 2016 Navy Date: February 2015 1506N: Aircraft Procurement, Navy / BA 05: Modification of Aircraft / BSA 1: Modification of Aircraft ID Code (A=Service Ready,
More informationRDT&E BUDGET ITEM JUSTIFICATION SHEET (R-2 Exhibit)
PE NUMBER: 0604239F PE TITLE: F-22 EMD BUDGET ACTIVITY COST ($ In Thousands) Actual FY 1999 FY 2000 FY 2001 FY 2002 FY 2003 FY 2004 FY 2005 Cost to Complete Cost Advanced Tactical Fighter FSD 2,010,717
More informationUNCLASSIFIED UNCLASSIFIED
: February 216 Exhibit R2, RDT&E Budget Item Justification: PB 217 24: Research, Development, Test & Evaluation, / BA 5: System Development & Demonstration (SDD) COST ($ in Millions) FY 215 Program Element
More informationUNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 27 P-1 Line #2
UNCLSSIFIED Exhibit P-40, Budget Line Item Justification: PB mended 2015 ir Force Date: June 2014 ppropriation / Budget ctivity / Budget Sub ctivity: 3011F: Procurement of mmunition, ir Force / B 01: mmunition
More informationGegaso Ltd. Company Presentation
Gegaso Ltd. Company Presentation This document and the information contained in it are proprietary of Gegaso Ltd. No person is allowed to use, copy, reprint, reproduce, publish or disclose to others this
More informationDepartment of Legislative Services Maryland General Assembly 2009 Session
Department of Legislative Services Maryland General Assembly 2009 Session SB 650 FISCAL AND POLICY NOTE Senate Bill 650 (Senators Pipkin and Astle) Finance and Budget and Taxation Medevac Helicopter Improvement
More informationCOMPLIANCE WITH THIS PUBLICATION IS MANDATORY
BY ORDER OF THE COMMANDER AIR COMBAT COMMAND AIR FORCE INSTRUCTION 21-103 AIR COMBAT COMMAND Supplement 21 SEPTEMBER 2017 MAINTENANCE EQUIPMENT INVENTORY, STATUS, AND UTILIZATION REPORTING SYSTEM F-15A/B/C/D
More informationHereafter there are some examples on how parts of a test campaign should typically be classified. In case of any doubt contact the Agency:
Hereafter there are some examples on how parts of a test campaign should typically be classified. In case of any doubt contact the Agency: Category 1 # CAT 1 Flight Test Justification (3.1. Annex XII Part
More informationUH1H HP Modification and Upgrade Program
UH1H HP Modification and Upgrade Program The UH-1H has served the United States military for many years, setting the performance standards for all helicopters. Since the start of production, over 10,000
More informationSummary. Filename: IDOC Created: July 24, 2012 Modified: May 6, 2013
Commercial Systems 400 Collins Road NE Cedar Rapids, IA 52498 Tel.319.295.5000 Fax 319.295.5064 Title: Rockwell Collins Data Link Graphical Weather Services, Single & Dual FANS, ARINC 702A AOC Messaging
More informationTDR Mode S and ADS-B Transponders
Business and Regional Systems Marketing Bulletin TDR Mode S and ADS-B Transponders Ref. No. BRS-110102.2M Pub Date 06/2012 Offering a variety of system solutions to meet Elementary/Enhanced Surveillance
More informationBRINGING THE POWER OF GARMIN TO ACEHAWK
BRINGING THE POWER OF GARMIN TO ACEHAWK CIVIL PEDIGREE TACTICAL AGILITY ACEHAWK- Seamless Integration The ACEHAWK has one of the most intuitive pilot-vehicle interfaces (PVI) available on the market. The
More informationAIRBUS WRAPS UP ITS SUCCESSFUL 2018 SINGAPORE AIRSHOW PARTICIPATION
AIRBUS WRAPS UP ITS SUCCESSFUL 2018 SINGAPORE AIRSHOW PARTICIPATION News / Events / Festivals, Manufacturer 1 Another strong showing for Airbus at this biennial Asia-Pacific event From the digitalisation
More informationFlight Inspection Services
Flight Inspection Services Overview Copyright 2013 Serbia and Montenegro Air Traffic Services (SMATSA), LLC About us SMATSA is the provider of air navigation services in the airspace of the Republic of
More informationAdvisory Circular (AC)
Advisory Circular (AC) Flight Test Considerations For The Approval Of The Design Of Aircraft Modifications File No. 5009-6-513 AC No. 513-003 RDIMS No. 528350-V3 Issue No. 01 Issuing Branch Aircraft Certification
More informationU.S. NAVY CNS/ATM Program Status
U.S. NAVY CNS/ATM Program Status 9 June 2009 Dave Staso CNS/ATM IPTL NAVAIR PMA209 (240) 925-9220 david.staso@navy.mil UNCLASSIFIED Minimum Functionality is a Requirement Amish buggies are not allowed
More informationTwo (2) Multi-Mission Sikorsky S-92 Helicopters
Two (2) Multi-Mission Sikorsky S-92 Helicopters For Lease or Purchase S-92 is a registered trademark of Sikorsky Aircraft Corporation. Used with permission. Two (2), Sikorsky S-92 Helicopters - For Lease
More informationSEARCH AND RESCUE DEPARTMENT
SEARCH AND RESCUE DEPARTMENT I. Mission The Critical mission of Search and Rescue Department (SAR) is to maintain the well being of all North Slope Borough residents. SAR provides safe, efficient and reliable
More informationANY MISSION. ANY TIME. ANY WHERE.
SIKORSKY S-92 ANY MISSION. ANY TIME. ANY WHERE. 6900 Main Street, Stratford, Connecticut 06615 USA +1 (800) WINGED-S (946-4337) International +1 (203) 386-3029 www.lockheedmartin.com/sikorsky This Document
More informationUNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 31 P-1 Line #2
UNCLSSIFIED Exhibit P-40, Budget Line Item Justification: PB 2016 ir Force : February 2015 ppropriation / Budget ctivity / Budget Sub ctivity: 3011F: Procurement of mmunition, ir Force / B 01: mmunition
More informationSnohomish County Sheriff s Office Air Support Unit 2017 Budget Note Response
Snohomish County Sheriff s Office Air Support Unit 2017 Budget Note Response Investment in Current Air Ops Program Equipment Purchases 2 SCSO Helicopters Initial Purchases by County 1994 $5,500 County
More informationLANDING GEAR - REPLACEMENT OF NOSE LANDING GEAR RETRACT PLUNGER ASSEMBLY
Beechcraft TITLE: SERVICE BULLETIN LANDING GEAR - REPLACEMENT OF NOSE LANDING GEAR RETRACT PLUNGER ASSEMBLY 1. Planning Information A. Effectivity (1) Airplanes (a) Civil (i) (ii) (b) Military (i) The
More informationDepartment of Defense DIRECTIVE
Department of Defense DIRECTIVE NUMBER 5030.61 May 24, 2013 Incorporating Change 2, August 24, 2017 USD(AT&L) SUBJECT: DoD Airworthiness Policy References: See Enclosure 1 1. PURPOSE. This directive establishes
More informationSEARCH AND RESCUE DEPARTMENT
SEARCH AND RESCUE DEPARTMENT I. Mission The Critical mission of Search and Rescue Department (SAR) is to maintain the wellbeing of all North Slope Borough residents. SAR provides safe, efficient and reliable
More informationYour Trusted Special Missions Partner
SPECIAL MISSIONS Your Trusted Special Missions Partner CAPABILITY/OVERVIEW 1 Hawker Pacific Aviation s Trusted Choice Hawker Pacific is the market leader in integrated civil and military aerospace sales
More informationCOMPLIANCE WITH THIS PUBLICATION IS MANDATORY
BY ORDER OF THE SECRETARY OF THE AIR FORCE AIR FORCE POLICY DIRECTIVE 62-6 11 JUNE 2010 Developmental Engineering USAF AIRWORTHINESS COMPLIANCE WITH THIS PUBLICATION IS MANDATORY ACCESSIBILITY: Publications
More informationSEARCH AND RESCUE DEPARTMENT
SEARCH AND RESCUE DEPARTMENT I. Mission The critical mission of Search and Rescue Department (SAR) is to maintain the well being of all North Slope Borough residents. SAR provides safe, efficient and reliable
More informationInvestor Presentation
Investor Presentation Credit Suisse Global Industrials Conference December 3, 2013 2013 Rockwell Collins. All rights reserved. Safe Harbor Statement This presentation contains statements, including certain
More informationAir Force Test Center 96 TW
Air Force Test Center 96 TW USAF Airworthiness Overview and the AFTC Mr. Alan Colthorp 896 th Test Support Squadron Eglin AFB, FL I n t e g r i t y - S e r v i c e - E x c e l l e n c e Agenda USAF airworthiness
More information129 th RQW/SE P.O. Box 103, MS#1 Moffett Federal Airfield, CA
MID-AIR COLLISION AVOIDANCE (MACA) HANDBOOK 129 th RQW/SE P.O. Box 103, MS#1 Moffett Federal Airfield, CA 94035-0103 129TH RESCUE WING MOFFETT FEDERAL AIRFIELD, CA 1 NOV 2013 TABLE OF CONTENTS FLYING SAFETY
More informationUNITED STATES OF AMERICA DEPARTMENT OF TRANSPORTATION FEDERAL AVIATION ADMINISTRATION WASHINGTON, DC GRANT OF EXEMPTION
UNITED STATES OF AMERICA DEPARTMENT OF TRANSPORTATION FEDERAL AVIATION ADMINISTRATION WASHINGTON, DC 20591. In the matter of the petition of Advanced Composite Structures Florida Exemption No. 17569 Regulatory
More informationFLIGHT CONTROLS - FLAP FLEX SHAFT (CABLE) ASSEMBLY INSPECTION/ REPLACEMENT
Beech SERVICE BULLETIN TITLE: FLIGHT CONTROLS - FLAP FLEX SHAFT (CABLE) ASSEMBLY INSPECTION/ REPLACEMENT 1. Planning Information A. Effectivity (1) Airplanes (a) Civil All airplanes that have complied
More informationAIRSPACE MANAGEMENT AND COMMUNICATION
STATE OF FLORIDA D I V I S I O N O F E M E R G E N C Y M A N A G E M E N T RICK SCOTT Governor BRYAN W. KOON Director Approved: SERT Air Operations Branch Document: IRMA Airspace Plan 1.0 Effective: September
More informationSection 7 Supplements. Miodel 400A SUPPLEMENTS
Miodel 400A SUPPLEMENTS Section 7 Supplements NOTE When a new airplane is delivered from the factory, the handbook delivered with it contains either an STC (Supplement Type Certificate) Supplement or a
More informationSurveillance and Broadcast Services
Surveillance and Broadcast Services Benefits Analysis Overview August 2007 Final Investment Decision Baseline January 3, 2012 Program Status: Investment Decisions September 9, 2005 initial investment decision:
More informationGlobal Civil and Military Simulation & Training Market ( Edition) July 2017
Global Civil and Military Simulation & Training Market (2017-2021 Edition) July 2017 Global Civil and Military Simulation & Training Market Report Scope of the Report The report titled Global Civil Aviation
More informationRaytheon Aircraft SERVICE BULLETIN MANDATORY. Beech
Beech Kit No. 36-402- Kit No. 36-402- Kit No. 36-402-2 Kit No. 36-402-3 Kit No. 36-402-3 Kit No. 02-4009- Kit No. 36-402-5 Kit No. 36-402-5 Kit No. 02-4009-3 Kit No. 36-402-7 Kit No. 36-402-7 Kit No. 02-4009-5
More informationKEY FEATURES IN SHORT
KA C90/B200/350 KA C90/B200/350 It is the fixed base simulator of commercial turboprop multi-crew aircraft. The simulator meets all the requirements determined for EASA CS-FSTD(A) FNPTII +MCC level. The
More informationYour success is our goal. Rely on our engineering.
Your success is our goal. Rely on our engineering. When it comes to aircraft engineering solutions, we are renowned for our vast expertise, outstanding experience and high quality performance. What our
More informationAS532 AL+ / AS332 L1e / AS332 C1e
AS532 AL+ / AS332 L1e / AS332 C1e Avionics and Autopilot Evolution The AS532 / AS332 family: More than 4 million flight hours in 50 countries with 700 a/c delivered The AS532 AL+, the AS332 L1e and the
More informationAeros 40D Sky Dragon. TYPE CERTIFIED BY: United States Federal Aviation Administration Civil Aviation Authorities: Europe and Asia
Aeros 40D Sky Dragon The Aeros 40D Sky Dragon Airship The United States Federal Aviation Administration (FAA) Type Certified Aeros 40D Sky Dragon is the most advanced non rigid airship, incorporating innovative
More informationAIRCRAFT SERVICE CHANGE
AIRCRAFT SERVICE CHANGE NUMBER 077 SUBJECT NAVIGATION (ATA 34) TCAS 7.1 INSTALLATION JUNE 12, 2012 PILOTS INFORMATION SHEET TCAS 7.1 INSTALLATION This service change upgrades TCAS 2000 or 3000SP systems
More informationOPNAVINST B N98 15 Apr Subj: NAVAL AVIATION POLICY FOR AIRCRAFT AVIONICS SAFETY SYSTEMS
DEPARTMENT OF THE NAVY OFFICE OF THE CHIEF OF NAVAL OPERATIONS 2000 NAVY PENTAGON WASHINGTON, DC 20350-2000 OPNAVINST 13210.1B N98 OPNAV INSTRUCTION 13210.1B From: Chief of Naval Operations Subj: NAVAL
More informationREMOTE AVIONICS MODIFICATION SERVICES
Design Support Fabrication Installation Certification REMOTE AVIONICS MODIFICATION SERVICES 1 L2 Consulting Services, Inc. L2Aviation.com 512-894-3414 L2 RAMS TEAM RAMS Services History Mobile Installation
More informationNEXT GENERATION VERSATILITY
Offshore AW169 NEXT GENERATION VERSATILITY DELIVERING PERFORMANCE The AW169 is the brand new 4.5 tonnes class twin-engine helicopter. Ideally suited to the demanding Offshore mission, capable of carrying
More informationHERItAGE & PREsENCE. AIRCRAft MANAGEMENt. twenty two locations. three i. i HAwkER PACIfIC
HAWKER PACIFIC four About us six HERItAGE & PREsENCE eight why HAwkER PACIfIC ten AIRCRAft sales HAWKER PACIFIC twelve fourteen AIRCRAft support AIRCRAft supplies sixteen AIRCRAft MANAGEMENt eighteen flight
More informationMS-395 William Butler Aircraft Maintenance Collection
Collection Number: MS-395 MS-395 William Butler Aircraft Maintenance Collection Title: William Butler Aircraft Maintenance Collection Dates: 1943-2000, (bulk 1983-1990) Creator: William Butler Summary/Abstract:
More information