1 : February 216 Exhibit R2, RDT&E Budget Item Justification: PB : Research, Development, Test & Evaluation, / BA 5: System Development & Demonstration (SDD) COST ($ in Millions) FY 215 Program Element C97: ACFT Avionics VU3: Networking And Mission Planning FY R1 Program Element (Number/Name) PE 6421A / Aircraft Avionics FY FY 219 FY 22 To FY Continuing Continuing Continuing Continuing Continuing Continuing A. Mission Description and Budget Item Justification The Fiscal Year (FY) 217 budget request funds the development of Aircraft Avionics systems required to horizontally and vertically integrate the battlefield and the integration of those systems into aircraft. Tasks in this Program Element support research, development, and test efforts in the Engineering and Manufacturing Development phases of these systems. The Airborne Maritime FixedAviation (AMFA) is the transformational system that provides Aviation interoperability capability for Future Force and Joint Force operations. The AMFA integration effort provides for the nonrecurring engineering required to integrate and qualify the AMFA certified radios with Link 16 and/or other advanced networking waveforms into the Apache AH64E and Unmanned Aircraft Systems (UAS). Specifically, the PRC152A radio will be incorporated into the Shadow UAS Communications Relay Payload mission equipment package. The Doppler Global Positioning System Navigation Set (DGNS) Upgrade program completes system engineering trade studies to reduce space, weight, and power with the introduction of new navigation support capabilities such as inertial sensor, MILSTD1553 interface card, and Instrument Flight Rules map display. It also prepares Engineering Change Proposals (ECP) to the existing DGNS ASN128D Line Replaceable Units (LRU) as a result of those trade studies. The effort also derives DGNS compliance matrices for current and planned Global Air Traffic Management (GATM) capabilities for the upcoming decade. The DGNS upgrade continues with execution of NonRecurring Engineering for Computer Display Unit (CDU) and Signal Data Converter LRU ECP packages. The ASN128D CDU upgrade replaces the current CDU faceplate with a touch screen display, provides a moving navigation map capability and optimizes pilot interface to augment existing Instrument Flight Rules capability promoting safer flight operations. The CDU upgrade will support AssuredPosition Navigation and Time (APNT) operations in conjunction with additional system LRU upgrades and supports Department of Defense (DoD) and 's requirement to maintain APNT throughout operations. This will require assessment and followon upgrade to the DGNS navigation system. The CDU upgrade will perform an assessment of APNT assurance levels to understand system performance, associated PNT capability gaps, and evaluate candidate solutions to cover any identified gaps. The Enhanced Aviation GATM Localizer Performance with Vertical Guidance (LPV) Embedded GPS Inertial (EGI) Navigation System (EAGLE) APNT integration program assesses current capabilities in identified operational PNT environment levels and tests identified upgrades to existing EGI hardware in order to accommodate APNT in identified operational environments and incorporates MCode. It supports DoD and 's requirement to maintain APNT throughout operations and requires assessment and followon upgrade to the EGI navigation system. The EAGLE upgrade will perform an assessment of APNT assurance levels to understand system performance, associated PNT capability gaps, and evaluate candidate solutions to cover any identified gaps. PE 6421A: Aircraft Avionics Page 1 of 19 R1 Line #74 1

2 : February 216 Exhibit R2, RDT&E Budget Item Justification: PB 217 R1 Program Element (Number/Name) 24: Research, Development, Test & Evaluation, / BA 5: System PE 6421A / Aircraft Avionics Development & Demonstration (SDD) The Brownout Rotorcraft Enhancement System (BORES) addresses tactical operations and training missions within Degraded Visual Environments (DVE) which restricts or severely reduces the aircrew's visibility due to atmospheric obscurants. BORES will initiate the use of DVE as a tactical advantage for Aviation. In addition, BORES will improve safety, reduce risk and add flexibility to aviation units by enhancing aircrew situational awareness through realtime detection and warning of terrain, obstacles and hazards. BORES will consist of integrated rotorcraft pilotage augmentation systems, sensor(s), software, software related fireware, and pilot to system interfaces and cueing devices. BORES will combine obscurant penetrating sensor(s) with aircraft state data via a fusion/synthetic vision system to provide an initial capability for ground taxi, hover, takeoff and landing modes of flight during brownout conditions. The Aviation Data Exploitation Capability (ADEC) is an aviation automated information system program providing specific capabilities needed at the aviation unit level to implement and support improvements within aviation operations, safety, and training to increase operational effectiveness and situational awareness at all command echelons. ADEC provides a common and interoperable capability required to implement the DoD mandated Military Flight Operations Quality Assurance processes. ADEC will standardize flight scheduling/management, risk management, mission approval, and flight data analysis and visualization. ADEC provides interfaces to Centralized Aviation Flight Records System (CAFRS) to reduce data entry and the information technology footprint while enabling disconnected and split based operations. The Aircraft Notebook (ACN) is an aviation automated information system program required to streamline the completion of aviation maintenance activities and the documentation required to maintain airworthiness for all aircraft. ACN implements The Maintenance Management System Aviation (TAMMSA) digital logbook functionality and integrates with CAFRS to reduce manual entries and increase data accuracy. ACN reduces the information technology footprint within an aviation unit by integrating multiple software applications such as platform software applications, interactive electronic technical manuals, and condition based maintenance plus tools onto one hardware platform. The Aviation Logistics Enterprise Platform (ALEP) is the single logistics information system for all of aviation and serves as an extension to Global Combat Support System (GCSS). ALEP replaces the Unit Level Logistics SystemAviation (Enhanced) (ULLSA[E]) and the Unmanned Aviation SystemsInitiative (UASI) systems. ALEP provides necessary interfaces to GCSS and other enterprise systems at Logistics Support Activity, Aviation and Missile Command, and Program Executive Office Aviation. ALEP interfaces with the ACN and ADEC at the unit level to maintain continuous airworthiness and aircraft historical records and provides the maintenance/readiness posture to the commander. PE 6421A: Aircraft Avionics Page 2 of 19 R1 Line #74 2

3 : February 216 Exhibit R2, RDT&E Budget Item Justification: PB : Research, Development, Test & Evaluation, / BA 5: System Development & Demonstration (SDD) FY 215 B. Program Change Summary ($ in Millions) Previous President's Budget Current President's Budget Adjustments Congressional General Reductions Congressional Directed Reductions Congressional Rescissions Congressional Adds Congressional Directed Transfers Reprogrammings SBIR/STTR Transfer Adjustments to Budget R1 Program Element (Number/Name) PE 6421A / Aircraft Avionics FY Change Summary Explanation FY16: $15,K Congressional increase for DVE $9,3K requested transfer of ALEP funding to Global Combat Support System FY17: $81,38K Increase for BORES/DVE development PE 6421A: Aircraft Avionics Page 3 of 19 R1 Line #74 3

4 : February 216 Exhibit R2A, RDT&E Project Justification: PB / 5 COST ($ in Millions) R1 Program Element (Number/Name) PE 6421A / Aircraft Avionics FY 215 C97: ACFT Avionics Quantity of RDT&E Articles FY FY C97 / ACFT Avionics FY 219 FY To FY Continuing Continuing A. Mission Description and Budget Item Justification The Fiscal Year (FY) 217 budget request funds the development of Aircraft Avionics systems required to horizontally and vertically integrate the battlefield and the integration of those systems into aircraft. Tasks in this Project support research, development, and test efforts in the Engineering and Manufacturing Development phases of these systems. The Airborne Maritime FixedAviation (AMFA) is the transformational system that provides Aviation interoperability capability for Future Force and Joint Force operations. The AMFA integration effort provides for the nonrecurring engineering required to integrate and qualify the AMFA certified radios with Link 16 and/or other advanced networking waveforms into the Apache AH64E and Unmanned Aircraft Systems (UAS). Specifically, the PRC152A radio will be incorporated into the Shadow UAS Communications Relay Payload mission equipment package. The Doppler Global Positioning System Navigation Set (DGNS) Upgrade program completes system engineering trade studies to reduce space, weight, and power with the introduction of new navigation support capabilities such as inertial sensor, MILSTD1553 interface card, and Instrument Flight Rules map display. It also prepares Engineering Change Proposals (ECP) to the existing DGNS ASN128D Line Replaceable Units (LRU) as a result of those trade studies. The effort also derives DGNS compliance matrices for current and planned Global Air Traffic Management (GATM) capabilities for the upcoming decade. The DGNS upgrade continues with execution of NonRecurring Engineering for Computer Display Unit (CDU) and Signal Data Converter LRU ECP packages. The ASN128D CDU upgrade replaces the current CDU faceplate with a touch screen display, provides a moving navigation map capability and optimizes pilot interface to augment existing Instrument Flight Rules capability promoting safer flight operations. The CDU upgrade will support AssuredPosition Navigation and Time (APNT) operations in conjunction with additional system LRU upgrades and supports Department of Defense (DoD) and 's requirement to maintain APNT throughout operations. This will require assessment and followon upgrade to the DGNS navigation system. The CDU upgrade will perform an assessment of APNT assurance levels to understand system performance, associated PNT capability gaps, and evaluate candidate solutions to cover any identified gaps. The Enhanced Aviation GATM Localizer Performance with Vertical Guidance (LPV) Embedded Global Positioning System (GPS) Inertial (EGI) Navigation System (EAGLE) APNT integration program assesses current capabilities in identified operational PNT environment levels and tests identified upgrades to existing EGI hardware to accommodate APNT in identified operational environments and incorporates MCode. It supports DoD and 's requirement to maintain APNT throughout operations and requires assessment and followon upgrade to the EGI navigation system. The EAGLE upgrade will perform an assessment of APNT assurance levels to understand system performance, associated PNT capability gaps, and evaluate candidate solutions to cover any identified gaps. B. Accomplishments/Planned Programs ($ in Millions) Title: Airborne Maritime Fixed (AMFA) integration and qualification for Apache AH64E and PRC152A Radio for UAS platforms. PE 6421A: Aircraft Avionics Page 4 of 19 R1 Line #74 FY FY

5 : February 216 Exhibit R2A, RDT&E Project Justification: PB / 5 R1 Program Element (Number/Name) PE 6421A / Aircraft Avionics C97 / ACFT Avionics B. Accomplishments/Planned Programs ($ in Millions) FY 215 FY 216 Description: The AMFA integration effort provides for the nonrecurring engineering required to integrate and qualify the PRC152A compliant radios and/or other advanced networking waveforms into the Apache AH64E and UAS platforms for both production cutin and retrofit activities. FY 215 Accomplishments: Developed a catalogue of qualified airborne AMFA antennas for use on multiple platforms. Supported multiple SALT and SANR working groups. FY 216 Plans: Continue development of AMFA antennas and associated CoSite Analysis tasks. Plans: catalogue development of AMFA antennas and associated CoSite Analysis tasks. Title: Doppler Global Positioning System Navigation Set (DGNS) Upgrade/AssuredPosition Navigation and Time (APNT) Assessment Description: The DGNS Upgrade program completes system engineering trade studies to reduce space, weight, and power with the introduction of new navigation support capabilities such as inertial sensor, MILSTD1553 interface card, and Instrument Flight Rules (IFR) map display. It also prepares ECPs to the existing DGNS ASN128D LRU as a result of those trade studies. The effort also derives DGNS compliance matrices for current and planned GATM capabilities for the upcoming decade. The DGNS upgrade continues with execution of NonRecurring Engineering for CDU and Signal Data Converter LRU ECP packages. The ASN128D CDU Upgrade replaces the current CDU faceplate with a touch screen display, provides a moving navigation map capability and optimized pilot interface to augment existing IFR capability and promote safer flight operations. It also enables CDU support for APNT operations in conjunction with additional system LRU upgrades. FY 215 Accomplishments: Continued CDU Upgrade nonrecurring engineering effort with software implementation, hardware fabrication, DGNS system integration, and full airworthiness component level qualification testing. Plans: assessments and feasibility studies performed on the CDU Upgrade equipment to identify hardware and software changes required to meet APNT requirements. Title: Enhanced Aviation GATM Localizer Performance with Vertical Guidance (LPV) Embedded GPS Inertial (EGI) Navigation System (EAGLE) PE 6421A: Aircraft Avionics Page 5 of 19 R1 Line #74 5

6 : February 216 Exhibit R2A, RDT&E Project Justification: PB / 5 R1 Program Element (Number/Name) PE 6421A / Aircraft Avionics C97 / ACFT Avionics B. Accomplishments/Planned Programs ($ in Millions) FY 215 FY 216 Description: The EAGLE Navigation System APNT integration program assesses current capabilities in identified operational PNT environment levels and tests identified upgrades to existing EGI hardware to accommodate APNT in identified operational environments. Plans: Initiate assessments and feasibility studies on the current EGI and EAGLE equipment to identify hardware and software changes required to meet APNT requirements and to incorporate MCode. Accomplishments/Planned Programs Subtotals C. Other Program Funding Summary ($ in Millions) Line Item AA723: COMMS, NAV Surveillance AA74: GATM Rotary Wing Remarks FY FY FY FY FY To FY Continuing Continuing Continuing Continuing D. Acquisition Strategy This project is comprised of multiple systems supporting aircraft avionics. While the detailed acquisition strategy varies from program to program, the general strategy is for each individual program to complete the development and testing efforts in coordination with the aircraft platforms on integration issues, use the various contracts of the aircraft platforms original equipment manufacturers on integration efforts, and utilize the Aviation & Missile Research, Development, and Engineering Center for software development. This requires the use of various contract methods and types to accomplish the aircraft avionics development efforts. All required acquisition program documentation is prepared. E. Performance Metrics N/A PE 6421A: Aircraft Avionics Page 6 of 19 R1 Line #74 6

7 : February 216 Exhibit R3, RDT&E Project Analysis: PB / 5 R1 Program Element (Number/Name) PE 6421A / Aircraft Avionics Management Services ($ in Millions) Category Item Method & Type FY 215 Performing Activity & Location FY 216 PM Services (EAGLE) Allot PM AME : Redstone Arsenal, AL PM Services (DGNS Upgrade/ DGNS APNT) Allot PM AME : Redstone Arsenal, AL..63 Oct 214 PM Services (AMFA) Allot PM AME : Redstone Arsenal, AL Oct Oct Subtotal. Product Development ($ in Millions) Category Item Method & Type Performing Activity & Location AMFA Antenna Development and CoSite Analysis AMRDEC, Prototype Integration Facility/ CERDEC Flight Activity : Redstone Arsenal, AL/ Lakehurst, NJ 4.84 PRC152A Radio Shadow Communication Relay Package C/FFP AMS : Huntsville, AL DGNS Upgrade C/CPFF DGNS APNT Assessment SS/CPFF AMFA Link16 and Wide Band Networking Waveform Integration and Qualification onto AH64E.5 Mar Mar 216 To.2 Continuing Continuing Continuing Mar 217 To BAE Systems : Wayne, NJ Mar Oct 216 FY 216 BAE Systems : Wayne, NJ SS/CPFF Boeing : Mesa, AZ PE 6421A: Aircraft Avionics FY 215 AMRDEC Software Engineering Directorate : Redstone Arsenal, AL AMFA Common Radio Control Software Development C97 / ACFT Avionics Page 7 of 19.2 Feb 217 R1 Line #74.2 7

8 : February 216 Exhibit R3, RDT&E Project Analysis: PB / 5 R1 Program Element (Number/Name) PE 6421A / Aircraft Avionics Product Development ($ in Millions) Category Item EAGLE APNT Assessment Method & Type FY 215 Performing Activity & Location Honeywell : SS/CPFF Clearwater, FL Subtotal Support ($ in Millions) Category Item PEO AVN Support (AMFA). FY 216 MIPR Performing Activity & Location PEO AVN : Redstone Arsenal, AL Subtotal FY 216 To.348 Feb Continuing Continuing Continuing To Dec Project s FY 215 Method & Type C97 / ACFT Avionics FY FY To.798 Remarks PE 6421A: Aircraft Avionics Page 8 of 19 R1 Line #74 8

9 : February 216 Exhibit R4, RDT&E Schedule Profile: PB / 5 PE 6421A: Aircraft Avionics R1 Program Element (Number/Name) PE 6421A / Aircraft Avionics Page 9 of 19 C97 / ACFT Avionics R1 Line #74 9

10 : February 216 Exhibit R4A, RDT&E Schedule Details: PB / 5 R1 Program Element (Number/Name) PE 6421A / Aircraft Avionics C97 / ACFT Avionics Schedule Details Start Events AMFA AH64E Link 16 and WNW Integration Qualification AH64 End Quarter 1 Year 215 Quarter 2 Year 215 DGNS AN/ASN128D Upgrade DGNS AN/ASN128D APNT Assessment EAGLE APNT Assessment / MCode Integration AMFA Antenna Development and CoSite Analysis AMFA Common Radio Control Software Development and Qualification PRC152A Radio Shadow Communications Relay Package PE 6421A: Aircraft Avionics Page 1 of 19 R1 Line #74 1

11 : February 216 Exhibit R2A, RDT&E Project Justification: PB / 5 COST ($ in Millions) R1 Program Element (Number/Name) PE 6421A / Aircraft Avionics FY 215 VU3: Networking And Mission Planning Quantity of RDT&E Articles FY FY VU3 / Networking And Mission Planning FY 219 FY To FY Continuing Continuing Note The Aviation Logistics EnterprisePlatform (ALEP) requirement has been transferred to Program Manager Enterprise Systems Integration Program (PM AESIP) Global Combat Support System (GCSS) effective Fiscal Year (FY) 216. A. Mission Description and Budget Item Justification The Fiscal Year (FY) 217 budget request funds the development of Networking and Mission Planning systems required to horizontally and vertically integrate the battlefield and the integration of those systems into aircraft. Tasks in this Project support research, development, and test efforts in the Engineering and Manufacturing Development (EMD) phases of these systems. The Brownout Rotorcraft Enhancement System (BORES) addresses tactical operations and training missions within Degraded Visual Environment (DVE) which restricts or severely reduces the aircrew's visibility due to atmospheric obscurants. BORES will initiate the use of DVE as a tactical advantage for Aviation. In addition, BORES will improve safety, reduce risk and add flexibility to aviation units by enhancing aircrew situational awareness through realtime detection and warning of terrain, obstacles and hazards. BORES will consist of integrated rotorcraft pilotage augmentation systems, sensor(s), software, software related firmware, and pilot to system interfaces and cueing devices. BORES will combine obscurant penetrating sensor(s) with aircraft state data via a fusion/synthetic vision system to provide an initial capability for ground taxi, hover, takeoff and landing modes of flight during brownout conditions. The Aviation Data Exploitation Capability (ADEC) is an aviation automated information system program providing specific capabilities needed at the aviation unit level to implement and support improvements within aviation operations, safety, and training to increase operational effectiveness and situational awareness at all command echelons. ADEC provides a common and interoperable capability required to implement the DoD mandated Military Flight Operations Quality Assurance processes. ADEC will standardize flight scheduling/management, risk management, mission approval, and flight data analysis and visualization. ADEC provides interfaces to Centralized Aviation Flight Records System (CAFRS) to reduce data entry and the information technology footprint while enabling disconnected and split based operations. The Aircraft Notebook (ACN) is an aviation automated information system program required to streamline the completion of aviation maintenance activities and the documentation required to maintain airworthiness for all aircraft. ACN implements The Maintenance Management System Aviation (TAMMSA) digital logbook functionality and integrates with CAFRS to reduce manual entries and increase data accuracy. ACN reduces the information technology footprint within an aviation unit by integrating multiple software applications such as platform software applications, interactive electronic technical manuals, and condition based maintenance plus tools onto one hardware platform. PE 6421A: Aircraft Avionics Page 11 of 19 R1 Line #74 11

12 : February 216 Exhibit R2A, RDT&E Project Justification: PB 217 R1 Program Element (Number/Name) 24 / 5 PE 6421A / Aircraft Avionics VU3 / Networking And Mission Planning The Aviation Logistics EnterprisePlatform (ALEP) is the single logistics information system for all of aviation and serves as an extension to GCSS. ALEP replaces the Unit Level Logistics SystemAviation (Enhanced) (ULLSA[E]) and the Unmanned Aviation SystemsInitiative (UASI) systems. ALEP provides necessary interfaces to GCSS and other enterprise systems at Logistics Support Activity (LOGSA), Aviation and Missile Command (AMCOM), and Program Executive Office (PEO) Aviation. ALEP interfaces with the ACN and ADEC at the unit level to maintain continuous airworthiness and aircraft historical records and provides the maintenance/readiness posture to the commander. B. Accomplishments/Planned Programs ($ in Millions) Title: Brownout Rotorcraft System (BORES)/Degraded Visual Environment (DVE) FY FY Description: The BORES addresses tactical operations and training missions within DVE which restricts or severely reduces the aircrew's visibility due to atmospheric obscurants. BORES will initiate the use of DVE as a tactical advantage for Aviation. In addition, BORES will improve safety, reduce risk and add flexibility to aviation units by enhancing aircrew situational awareness through realtime detection and warning of terrain, obstacles and hazards. BORES will consist of integrated rotorcraft pilotage augmentation systems, sensor(s), software, software related firmware, and pilot to system interfaces and cueing devices. BORES will combine obscurant penetrating sensor(s) with aircraft state data via a fusion/synthetic vision system to provide an initial capability for ground taxi, hover, takeoff and landing modes of flight during brownout conditions. FY 215 Accomplishments: Conducted technical design and development of DVE. FY 216 Plans: Continue design and develop the initial technical system and subsystem specifications for the DVE/BORES. The DVE/BORES program will focus on the development of an Airworthiness Qualification Package, initiate identified aircraft trade studies with original equipment manufacturers, initiate program documentation, identify and begin modeling and simulation activities. Additionally, a Limited User Assessment will be conducted to inform the DVE/BORES program. Plans: Continue the design and develop the technical system and subsystem specifications for the DVE/BORES. The DVE/BORES program will identify airworthiness requirements for hardware and software, complete identified aircraft trade studies with original equipment manufacturers, continue the development of program documentation, and initiate modeling and simulation as risk reduction activities. Program efforts include the issuance of a contract request for proposal with subsequent source selection evaluation of proposals. Title: Aviation Data Exploitation Capability (ADEC) Description: The ADEC is an aviation automated information system program providing specific capabilities needed at the aviation unit level to implement and support improvements within aviation operations, safety, and training to increase operational effectiveness and situational awareness at all command echelons. ADEC provides a common and interoperable capability required to implement the DoD mandated Military Flight Operations Quality Assurance processes. ADEC will standardize flight PE 6421A: Aircraft Avionics Page 12 of 19 R1 Line #74 12

13 : February 216 Exhibit R2A, RDT&E Project Justification: PB / 5 R1 Program Element (Number/Name) PE 6421A / Aircraft Avionics VU3 / Networking And Mission Planning B. Accomplishments/Planned Programs ($ in Millions) scheduling/management, risk management, mission approval, and flight data analysis and visualization. ADEC provides interfaces to CAFRS to reduce data entry and the information technology footprint while enabling disconnected and split based operations. FY 215 FY 216 FY 215 Accomplishments: Initiated ADEC design, development, integration, and developmental and operational testing of the hardware and software version 1.. Conducted ADEC design, development, and integration of software version 2.. FY 216 Plans: Continue ADEC design, development, integration, and developmental testing of software version 2.. Plans: ADEC development, integration, and developmental and operational testing of software version 2.. Title: Aircraft Notebook (ACN) Description: The ACN is an aviation automated information system program required to streamline the completion of aviation maintenance activities and the documentation required to maintain airworthiness for all aircraft. ACN implements TAMMSA digital logbook functionality and integrates with CAFRS to reduce manual entries and increase data accuracy. ACN reduces the information technology footprint within an aviation unit by integrating multiple software applications such as platform software applications, interactive electronic technical manuals, and condition based maintenance plus tools onto one hardware platform. FY 215 Accomplishments: Performed development and integration of ACN hardware and software and Operational Test and Evaluation activities. d formal qualification software development testing and software user test. Accomplishments/Planned Programs Subtotals C. Other Program Funding Summary ($ in Millions) Line Item AA712: Network and Mission Plan AA723: Degraded Visual Environment Remarks PE 6421A: Aircraft Avionics FY FY Page 13 of 19 FY FY FY To FY Continuing Continuing Continuing Continuing R1 Line #74 13

14 : February 216 Exhibit R2A, RDT&E Project Justification: PB / 5 R1 Program Element (Number/Name) PE 6421A / Aircraft Avionics VU3 / Networking And Mission Planning D. Acquisition Strategy This project is comprised of multiple systems supporting aircraft avionics. While the detailed acquisition strategy varies from program to program, the general strategy is for each individual program to complete the development and testing efforts in coordination with the aircraft platforms on integration issues, use the various contracts of the aircraft platforms original equipment manufacturers on integration efforts, and utilize the Aviation & Missile Research, Development, and Engineering Center for software development. This requires the use of various contract methods and types to accomplish the aircraft avionics development efforts. All required acquisition program documentation is prepared. E. Performance Metrics N/A PE 6421A: Aircraft Avionics Page 14 of 19 R1 Line #74 14

15 : February 216 Exhibit R3, RDT&E Project Analysis: PB / 5 R1 Program Element (Number/Name) PE 6421A / Aircraft Avionics Management Services ($ in Millions) Category Item Method & Type FY 215 Performing Activity & Location FY 216 VU3 / Networking And Mission Planning To Program Manager Aviation Networks Mission Planning : Redstone Arsenal, AL Jan PM Support (ACN) Program Manager Aviation Mission Networks Planning : Redstone Arsenal, AL Feb PM Support (BORES/DVE) AMCOM : Redstone Arsenal, AL Sep Sep Oct Continuing Continuing Continuing PM Support (ADEC) Subtotal Product Development ($ in Millions) Category Item Qualify ADEC software and hardware Qualify ACN software and hardware Develop and qualify the software and hardware for BORES/DVE Method & Type FY 215 Performing Activity & Location FY 216 Aviation Missile Research Development Engineering Center (AMRDEC) : Redstone Arsenal, AL Jun 215 Aviation Missile Research Engineering Center (AMRDEC) : Redstone Arsenal, AL Dec 215 C/ : Subtotal PE 6421A: Aircraft Avionics Apr Page 15 of Apr 217 To Mar Continuing Continuing Continuing R1 Line #74 15

16 : February 216 Exhibit R3, RDT&E Project Analysis: PB / 5 R1 Program Element (Number/Name) PE 6421A / Aircraft Avionics Support ($ in Millions) Category Item FY 215 Method & Type Performing Activity & Location FY 216 VU3 / Networking And Mission Planning To Test & Evaluation (ATEC), Aberdeen, MD; AMRDEC : Redstone Arsenal, AL Feb 215 System Engineering, Logistics, and Technical Support (ACN) Test & Evaluation (ATEC), Aberdeen, MD; AMRDEC : Redstone Arsenal, AL Mar 215 System Engineering, Logistics, and Technical Support (BORES/DVE) : Sep Sep Sep Continuing Continuing Continuing System Engineering, Logistics, and Technical Support (ADEC) Subtotal Test and Evaluation ($ in Millions) Category Item ADEC ACN BORES/DVE Method & Type Performing Activity & Location FY Feb 215 Test & Evaluation Command (ATEC), Aberdeen MD; AMRDEC : Redstone Arsenal, AL Oct 215 Aviation & Missile Research Development & Engineering Center(AMRDEC) : Sep 215 FY 216 Test & Evaluation Command (ATEC), Aberdeen MD; AMRDEC : Redstone Arsenal, AL PE 6421A: Aircraft Avionics.48 Apr Sep 216 Page 16 of Apr Sep 217 R1 Line # To Continuing Continuing Continuing 16

17 : February 216 Exhibit R3, RDT&E Project Analysis: PB / 5 R1 Program Element (Number/Name) PE 6421A / Aircraft Avionics Test and Evaluation ($ in Millions) Category Item Method & Type FY 215 Performing Activity & Location Redstone Arsenal, AL Subtotal Project s FY FY FY VU3 / Networking And Mission Planning To To Remarks PE 6421A: Aircraft Avionics Page 17 of 19 R1 Line #74 17

18 : February 216 Exhibit R4, RDT&E Schedule Profile: PB / 5 PE 6421A: Aircraft Avionics R1 Program Element (Number/Name) PE 6421A / Aircraft Avionics Page 18 of 19 VU3 / Networking And Mission Planning R1 Line #74 18

19 : February 216 Exhibit R4A, RDT&E Schedule Details: PB / 5 R1 Program Element (Number/Name) PE 6421A / Aircraft Avionics VU3 / Networking And Mission Planning Schedule Details Start Events Brownout Rotorcraft Enhancement System (BORES)/Degraded Visual Environment (DVE) End Quarter Year Quarter Year Develop hardware and software (ADEC) Milestone B/C (ADEC) Develop hardware and software (ACN) PE 6421A: Aircraft Avionics Page 19 of 19 R1 Line #74 19

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED. FY 2016 Base FY 2016 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Air Force : February 2015 3600: Research, Development, Test & Evaluation, Air Force / BA 7: Operational Systems Development COST ($ in Millions) FY

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE PE A: AIRCRAFT CERTIFICATION FY 2012 OCO

UNCLASSIFIED R-1 ITEM NOMENCLATURE PE A: AIRCRAFT CERTIFICATION FY 2012 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 212 Army DATE: February 211 24: Research, Development, Test & Evaluation, Army COST ($ in Millions) FY 21 FY 211 FY 212 Base PE 6566A: AIRCRAFT CERTIFICATION

More information

UNCLASSIFIED. FY 2017 Base FY 2017 OCO

UNCLASSIFIED. FY 2017 Base FY 2017 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2017 Air Force : February 2016 3600: Research, Development, Test & Evaluation, Air Force / BA 7: Operational Systems Development COST ($ in Millions) FY

More information

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: Communication, Navigation, Surveillance/Air Traffic Management (CNS/ATM) FY 2012 OCO

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: Communication, Navigation, Surveillance/Air Traffic Management (CNS/ATM) FY 2012 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2012 Air Force DATE: February 2011 COST ($ in Millions) FY 2010 FY 2011 FY 2013 FY 2014 FY 2015 FY 2016 To Program Element 6.754 5.708 4.604-4.604 4.549

More information

UNCLASSIFIED. UNCLASSIFIED Army Page 1 of 23 P-1 Line #27

UNCLASSIFIED. UNCLASSIFIED Army Page 1 of 23 P-1 Line #27 Exhibit P-40, Budget Line Item Justification: PB 2015 Army Date: March 2014 2031A: Aircraft Procurement, Army / BA 02: Modification of Aircraft / BSA 10: Modification of Aircraft ID Code (A=Service Ready,

More information

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 24 P-1 Line #55

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 24 P-1 Line #55 Exhibit P-40, Budget Line Item Justification: PB 2016 Navy Date: February 2015 1506N: Aircraft Procurement, Navy / BA 05: Modification of Aircraft / BSA 1: Modification of Aircraft ID Code (A=Service Ready,

More information

UNCLASSIFIED. FY 2016 Base FY 2016 OCO FY 2016 OCO. FY 2016 Base

UNCLASSIFIED. FY 2016 Base FY 2016 OCO FY 2016 OCO. FY 2016 Base Exhibit P-40, Budget Line Item Justification: PB 2016 Air Force Date: February 2015 3010F: Aircraft Procurement, Air Force / BA 05: Modification of Inservice Aircraft / BSA 2: Tactical Aircraft ID Code

More information

RDT&E BUDGET ITEM JUSTIFICATION SHEET (R-2 Exhibit)

RDT&E BUDGET ITEM JUSTIFICATION SHEET (R-2 Exhibit) PE NUMBER: 0604239F PE TITLE: F-22 EMD BUDGET ACTIVITY COST ($ In Thousands) Actual FY 1999 FY 2000 FY 2001 FY 2002 FY 2003 FY 2004 FY 2005 Cost to Complete Cost Advanced Tactical Fighter FSD 2,010,717

More information

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

UNCLASSIFIED FY 2016 OCO. FY 2016 Base Exhibit P-40, Budget Line Item Justification: PB 2016 Air Force Date: February 2015 3010F: Aircraft Procurement, Air Force / BA 05: Modification of Inservice Aircraft / BSA 5: Other Aircraft ID Code (A=Service

More information

UNCLASSIFIED FY Exhibits Schedule Prior Years FY 2013 FY 2014 FY 2015 Base FY 2015 OCO FY 2015 Total. Total Cost ($ M)

UNCLASSIFIED FY Exhibits Schedule Prior Years FY 2013 FY 2014 FY 2015 Base FY 2015 OCO FY 2015 Total. Total Cost ($ M) Exhibit P-40, Budget Line Item Justification: PB 2015 Army Date: March 2014 2033A: Procurement of W&TCV, Army / BA 01: Tracked Combat Vehicles / BSA 20: Modification of Tracked Combat Vehicles ID Code

More information

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 10 P-1 Line #47

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 10 P-1 Line #47 Exhibit P-40, Budget Line Item Justification: PB 2016 Air Force Date: February 2015 3010F: Aircraft Procurement, Air Force / BA 05: Modification of Inservice Aircraft / BSA 5: Other Aircraft ID Code (A=Service

More information

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 5 P-1 Line #35

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 5 P-1 Line #35 Exhibit P-40, Budget Line Item Justification: PB 2017 Air Force Date: February 2016 3010F: Aircraft Procurement, Air Force / BA 05: Modification of Inservice Aircraft / BSA 4: Trainer Aircraft ID Code

More information

UNCLASSIFIED FY 2015 FY 2015 OCO. FY 2015 Base FY 2015 FY Base

UNCLASSIFIED FY 2015 FY 2015 OCO. FY 2015 Base FY 2015 FY Base Exhibit P-40, Budget Line Item Justification: PB 2015 Air Force Date: March 2014 3010F: Aircraft Procurement, Air Force / BA 05: Modification of Inservice Aircraft / BSA 5: Other Aircraft ID Code (A=Service

More information

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 16 P-1 Line #57

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 16 P-1 Line #57 Exhibit P-40, Budget Line Item Justification: PB 2017 Navy Date: February 2016 1506N: Aircraft Procurement, Navy / BA 05: Modification of Aircraft / BSA 1: Modification of Aircraft ID Code (A=Service Ready,

More information

UNCLASSIFIED. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018

UNCLASSIFIED. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018 Exhibit P-40, Budget Item Justification Sheet: PB 2014 Navy Date: April 2013 Aircraft / BSA 1: Modification Of Aircraft ID Code (A=Service Ready, B=Not Service Ready) : A Program Elements for Code B Items:

More information

UNCLASSIFIED. FY 2017 Base FY 2017 OCO FY 2017 OCO. FY 2017 Base

UNCLASSIFIED. FY 2017 Base FY 2017 OCO FY 2017 OCO. FY 2017 Base Exhibit P-40, Budget Line Item Justification: PB 2017 Air Force Date: February 2016 3010F: Aircraft Procurement, Air Force / BA 05: Modification of Inservice Aircraft / BSA 2: Tactical Aircraft ID Code

More information

UNCLASSIFIED FY 2016 OCO. FY 2016 Base. FY 2016 Base FY 2016 OCO

UNCLASSIFIED FY 2016 OCO. FY 2016 Base. FY 2016 Base FY 2016 OCO Exhibit P-40, Budget Line Item Justification: PB 2016 Army Date: February 2015 2033A: Procurement of W&TCV, Army / BA 01: Tracked Combat Vehicles / BSA 20: Modification of Tracked Combat Vehicles ID Code

More information

UNCLASSIFIED. UNCLASSIFIED Page 1 of 5. EXHIBIT R-2, RDT&E Budget Item Justification RESEARCH DEVELOPMENT TEST & EVALUATION, NAVY / BA-5

UNCLASSIFIED. UNCLASSIFIED Page 1 of 5. EXHIBIT R-2, RDT&E Budget Item Justification RESEARCH DEVELOPMENT TEST & EVALUATION, NAVY / BA-5 EXHIBIT R-2, RDT&E Budget Item Justification APPROPRIATION/BUDGET ACTIVITY RESEARCH DEVELOPMENT TEST & EVALUATION, NAVY / BA-5 R-1 ITEM NOMENCLATURE 0605430N, C/KC-130 AVIONICS MODERNIZATION PROGRAM (AMP)

More information

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 5 P-1 Line #55

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 5 P-1 Line #55 Exhibit P-40, Budget Line Item Justification: PB 2016 Air Force Date: February 2015 3010F: Aircraft Procurement, Air Force / BA 05: Modification of Inservice Aircraft / BSA 5: Other Aircraft ID Code (A=Service

More information

Operators may need to retrofit their airplanes to ensure existing fleets are properly equipped for RNP operations. aero quarterly qtr_04 11

Operators may need to retrofit their airplanes to ensure existing fleets are properly equipped for RNP operations. aero quarterly qtr_04 11 Operators may need to retrofit their airplanes to ensure existing fleets are properly equipped for RNP operations. 24 equipping a Fleet for required Navigation Performance required navigation performance

More information

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

UNCLASSIFIED FY 2016 OCO. FY 2016 Base Exhibit P-40, Budget Line Item Justification: PB 2016 Air Force Date: February 2015 3010F: Aircraft Procurement, Air Force / BA 05: Modification of Inservice Aircraft / BSA 5: Other Aircraft ID Code (A=Service

More information

Department of Defense DIRECTIVE

Department of Defense DIRECTIVE Department of Defense DIRECTIVE NUMBER 5030.61 May 24, 2013 Incorporating Change 2, August 24, 2017 USD(AT&L) SUBJECT: DoD Airworthiness Policy References: See Enclosure 1 1. PURPOSE. This directive establishes

More information

UNCLASSIFIED FY 2017 OCO. FY 2017 Base

UNCLASSIFIED FY 2017 OCO. FY 2017 Base Exhibit P-40, Budget Line Item Justification: PB 2017 Air Force Date: February 2016 3021F: Space Procurement, Air Force / BA 01: Space Procurement, Air Force / BSA 1: Space Programs ID Code (A=Service

More information

UNCLASSIFIED. UNCLASSIFIED United States Special Operations Command Page 1 of 6 P-1 Line #53

UNCLASSIFIED. UNCLASSIFIED United States Special Operations Command Page 1 of 6 P-1 Line #53 Exhibit P-40, Budget Line Item Justification: PB 2017 United States Special Operations Command : February 2016 0300D: Procurement, Defense-Wide / BA 02: Special Operations Command / BSA 1: Aviation Programs

More information

UNCLASSIFIED. FY 2016 Base FY 2016 OCO FY 2016 OCO. FY 2016 Base

UNCLASSIFIED. FY 2016 Base FY 2016 OCO FY 2016 OCO. FY 2016 Base Exhibit P-40, Budget Line Item Justification: PB 2016 Army Date: February 2015 2031A: Aircraft Procurement, Army / BA 02: Modification of Aircraft / BSA 10: Modification of Aircraft ID Code (A=Service

More information

OPNAVINST B N98 15 Apr Subj: NAVAL AVIATION POLICY FOR AIRCRAFT AVIONICS SAFETY SYSTEMS

OPNAVINST B N98 15 Apr Subj: NAVAL AVIATION POLICY FOR AIRCRAFT AVIONICS SAFETY SYSTEMS DEPARTMENT OF THE NAVY OFFICE OF THE CHIEF OF NAVAL OPERATIONS 2000 NAVY PENTAGON WASHINGTON, DC 20350-2000 OPNAVINST 13210.1B N98 OPNAV INSTRUCTION 13210.1B From: Chief of Naval Operations Subj: NAVAL

More information

UNCLASSIFIED. FY 2017 Base FY 2017 OCO FY 2017 OCO. FY 2017 Base

UNCLASSIFIED. FY 2017 Base FY 2017 OCO FY 2017 OCO. FY 2017 Base Exhibit P-40, Budget Line Item Justification: PB 2017 Air Force Date: February 2016 3010F: Aircraft Procurement, Air Force / BA 05: Modification of Inservice Aircraft / BSA 5: Other Aircraft ID Code (A=Service

More information

Air Traffic Management

Air Traffic Management Air Traffic Management Transforming Air Traffic Management T rans f orming A ir Today s airspace users are grappling with the air traffic control system s inability to manage an ever-growing amount of

More information

UNCLASSIFIED. FY 2017 Base FY 2017 OCO. FY 2017 Base FY 2017 OCO

UNCLASSIFIED. FY 2017 Base FY 2017 OCO. FY 2017 Base FY 2017 OCO Exhibit P-40, Budget Line Item Justification: PB 2017 Air Force Date: February 2016 3010F: Aircraft Procurement, Air Force / BA 05: Modification of Inservice Aircraft / BSA 3: Airlift Aircraft ID Code

More information

What Is The Proposed 29Palms Training Land Acquisition and Airspace Establishment Project? Frequently Asked Questions Airspace Related June 2014

What Is The Proposed 29Palms Training Land Acquisition and Airspace Establishment Project? Frequently Asked Questions Airspace Related June 2014 MARINE CORPS / DEPARTMENT OF THE NAVY SUBMIT SPECIAL USE AIRSPACE PROPOSALS TO THE FEDERAL AVIATION ADMINISTRATION TO MEET MARINE EXPEDITIONARY BRIGADE TRAINING REQUIREMENTS 1. Why has the Marine Corps

More information

(b) (7)(E) Minimum MSL Gross Takeoff Wt Launch/Recovery Attachment 1

(b) (7)(E) Minimum MSL Gross Takeoff Wt Launch/Recovery Attachment 1 Airworthiness Procedures Avionics/Equipment Lights Operating Attributes Minimum Approach Speed Maximum MSL Minimum MSL Gross Takeoff Wt Launch/Recovery Attachment 1 FAA Type Certificate If No FAA Certificate

More information

Policy Letter (PL) Global Positioning System (GPS) Equipment and Installation Approval

Policy Letter (PL) Global Positioning System (GPS) Equipment and Installation Approval Policy Letter (PL) Global Positioning System (GPS) Equipment and Installation Approval File No. 5009-32-0 PL No. 551-003 RDIMS No. 1019349-V5 Issue No. 01 Issuing Branch Aircraft Certification Effective

More information

UNCLASSIFIED FY Exhibits Schedule Prior Years FY 2013 FY 2014 FY 2015 Base FY 2015 OCO FY 2015 Total. Unit Cost ($ M) Qty (Each)

UNCLASSIFIED FY Exhibits Schedule Prior Years FY 2013 FY 2014 FY 2015 Base FY 2015 OCO FY 2015 Total. Unit Cost ($ M) Qty (Each) Exhibit P-40, Budget Line Item Justification: PB 2015 United States Special Operations Command Date: March 2014 0300D: Procurement, Defense-Wide / BA 02: Special Operations Command / BSA 4: Other Procurement

More information

FLIGHT PATH FOR THE FUTURE OF MOBILITY

FLIGHT PATH FOR THE FUTURE OF MOBILITY FLIGHT PATH FOR THE FUTURE OF MOBILITY Building the flight path for the future of mobility takes more than imagination. Success relies on the proven ability to transform vision into reality for the betterment

More information

What Is The 29Palms Training Land Acquisition and Airspace Establishment Project Frequently Asked Questions Airspace Related July 2015

What Is The 29Palms Training Land Acquisition and Airspace Establishment Project Frequently Asked Questions Airspace Related July 2015 MARINE CORPS / DEPARTMENT OF THE NAVY SUBMIT SPECIAL USE AIRSPACE PROPOSALS TO THE FEDERAL AVIATION ADMINISTRATION TO MEET MARINE EXPEDITIONARY BRIGADE TRAINING REQUIREMENTS 1. Why has the Marine Corps

More information

Federal Aviation. Administration Unmanned Aircraft Human Factors Research Program. Federal Aviation Administration

Federal Aviation. Administration Unmanned Aircraft Human Factors Research Program. Federal Aviation Administration Unmanned Aircraft Human Factors Research Program Kevin W. Williams, AAM-510 William Krebs, AAR-100 May 26, 2005 0 0 Overview The Problem Completed Human Factors Initiatives Accident Data Identification

More information

Safety Enhancement SE ASA Design Virtual Day-VMC Displays

Safety Enhancement SE ASA Design Virtual Day-VMC Displays Safety Enhancement SE 200.2 ASA Design Virtual Day-VMC Displays Safety Enhancement Action: Implementers: (Select all that apply) Statement of Work: Manufacturers develop and implement virtual day-visual

More information

AERONAUTICAL SURVEYS & INSTRUMENT FLIGHT PROCEDURES

AERONAUTICAL SURVEYS & INSTRUMENT FLIGHT PROCEDURES AERONAUTICAL SURVEYS & INSTRUMENT FLIGHT PROCEDURES Current as of November 2012 ALASKA AVIATION SYSTEM PLAN UPDATE Prepared for: State of Alaska Department of Transportation & Public Facilities Division

More information

New York Aviation Management Association Conference

New York Aviation Management Association Conference New York Aviation Management Association Conference Presented by: Carmine W. Gallo Federal Aviation Administration Eastern Region Regional Administrator September 14, 2016 1 The What is and Benefits of

More information

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 17 P-1 Line #55

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 17 P-1 Line #55 Exhibit P-40, Budget Line Item Justification: PB 2017 Air Force Date: February 2016 3010F: Aircraft Procurement, Air Force / BA 05: Modification of Inservice Aircraft / BSA 5: Other Aircraft ID Code (A=Service

More information

ADVANCED SURVEILLANCE IN ONE INTEGRATED PACKAGE

ADVANCED SURVEILLANCE IN ONE INTEGRATED PACKAGE T 3 CAS ADVANCED SURVEILLANCE IN ONE INTEGRATED PACKAGE TCAS TAWS ADS-B APPLICATIONS NEXTGEN TRANSPONDER ACSS 3 CAS TM T 3 CAS THE SINGLE SOLUTION TO YOUR SURVEILLANCE NEEDS T 3 CAS traffic management

More information

RNP AR APCH Approvals: An Operator s Perspective

RNP AR APCH Approvals: An Operator s Perspective RNP AR APCH Approvals: An Operator s Perspective Presented to: ICAO Introduction to Performance Based Navigation Seminar The statements contained herein are based on good faith assumptions and provided

More information

UNCLASSIFIED FY 2015 FY 2015 OCO. FY 2015 Base FY 2015 FY Base

UNCLASSIFIED FY 2015 FY 2015 OCO. FY 2015 Base FY 2015 FY Base Exhibit P-40, Budget Line Item Justification: PB 2015 Army Date: March 2014 2031A: Aircraft Procurement, Army / BA 02: Modification of Aircraft / BSA 10: Modification of Aircraft ID Code (A=Service Ready,

More information

MetroAir Virtual Airlines

MetroAir Virtual Airlines MetroAir Virtual Airlines NAVIGATION BASICS V 1.0 NOT FOR REAL WORLD AVIATION GETTING STARTED 2 P a g e Having a good understanding of navigation is critical when you fly online the VATSIM network. ATC

More information

Commit to Safety: Professional Pilots Always Use a Checklist INITIAL EQUIPMENT SETUP

Commit to Safety: Professional Pilots Always Use a Checklist INITIAL EQUIPMENT SETUP Commit to Safety: Professional Pilots Always Use a Checklist INITIAL EQUIPMENT SETUP READ THE MANUAL Familiarize yourself with all aspects of your suas before you even consider going out for your first

More information

Unmanned Aircraft Operations in the National Airspace System. AGENCY: Federal Aviation Administration (FAA), DOT.

Unmanned Aircraft Operations in the National Airspace System. AGENCY: Federal Aviation Administration (FAA), DOT. [4910-13] DEPARTMENT OF TRANSPORTATION Federal Aviation Administration 14 CFR Part 91 Docket No. FAA-2006-25714 Unmanned Aircraft Operations in the National Airspace System AGENCY: Federal Aviation Administration

More information

(b) (7)(E), (b) (6), (b) (7)(C)

(b) (7)(E), (b) (6), (b) (7)(C) ASN Case Status Date Created Date Submitted, (b) (6), (b) (7)(C) Proponent Organization Declaration Sponsor Attn Of Address Address2 City State Postal Code Telephone Email Declaration(a) Declaration(b)

More information

Saint Petersburg-Clearwater International Airport. Airspace & Instrument Approach Analysis

Saint Petersburg-Clearwater International Airport. Airspace & Instrument Approach Analysis Saint Petersburg-Clearwater International Airport Airspace & Instrument Approach Analysis February 23, 2005 Jeppesen Boeing Jeppesen Government / Military Services Group Airspace Services Division AIRSPACE

More information

U.S. NAVY CNS/ATM Program Status

U.S. NAVY CNS/ATM Program Status U.S. NAVY CNS/ATM Program Status 9 June 2009 Dave Staso CNS/ATM IPTL NAVAIR PMA209 (240) 925-9220 david.staso@navy.mil UNCLASSIFIED Minimum Functionality is a Requirement Amish buggies are not allowed

More information

HEAD-UP DISPLAY (HUD), EQUIVALENT DISPLAYS AND VISION SYSTEMS

HEAD-UP DISPLAY (HUD), EQUIVALENT DISPLAYS AND VISION SYSTEMS ATT 2.B-1 ATTACHMENT 2.B HEAD-UP DISPLAY (HUD), EQUIVALENT DISPLAYS AND VISION SYSTEMS Supplementary to 2.2.2.2, 2.4.15.1, 3.4.2.7 and 3.6.12 Introduction The material in this attachment provides guidance

More information

UNCLASSIFIED. FY 2017 Base FY 2017 OCO FY 2017 OCO. FY 2017 Base

UNCLASSIFIED. FY 2017 Base FY 2017 OCO FY 2017 OCO. FY 2017 Base Exhibit P-40, Budget Line Item Justification: PB 2017 Air Force Date: February 2016 3010F: Aircraft Procurement, Air Force / BA 05: Modification of Inservice Aircraft / BSA 2: Tactical Aircraft ID Code

More information

WORKSHOP 1 ICAO RPAS Panel Working Group 1 Airworthiness

WORKSHOP 1 ICAO RPAS Panel Working Group 1 Airworthiness REMOTELY PILOTED AIRCRAFT SYSTEMS SYMPOSIUM 23-25 March 2015 WORKSHOP 1 ICAO RPAS Panel Working Group 1 Airworthiness Stephen George Bruno Moitre Rapporteurs WG1 Remotely Piloted Aircraft Systems (RPAS)

More information

ACAS on VLJs and LJs Assessment of safety Level (AVAL) Outcomes of the AVAL study (presented by Thierry Arino, Egis Avia)

ACAS on VLJs and LJs Assessment of safety Level (AVAL) Outcomes of the AVAL study (presented by Thierry Arino, Egis Avia) ACAS on VLJs and LJs Assessment of safety Level (AVAL) Outcomes of the AVAL study (presented by Thierry Arino, Egis Avia) Slide 1 Presentation content Introduction Background on Airborne Collision Avoidance

More information

OVERVIEW OF THE FAA ADS-B LINK DECISION

OVERVIEW OF THE FAA ADS-B LINK DECISION June 7, 2002 OVERVIEW OF THE FAA ADS-B LINK DECISION Summary This paper presents an overview of the FAA decision on the ADS-B link architecture for use in the National Airspace System and discusses the

More information

UNCLASSIFIED. UNCLASSIFIED Army Page 1 of 16 P-1 Line #15

UNCLASSIFIED. UNCLASSIFIED Army Page 1 of 16 P-1 Line #15 Exhibit P-40, Budget Line Item Justification: PB 2017 Army Date: February 2016 2031A: Aircraft Procurement, Army / BA 02: Modification of Aircraft / BSA 10: Modification of Aircraft ID Code (A=Service

More information

Definitions. U-SAFE : UAS Secure Autonomous Flight Environment. UTM: UAS Traffic Management

Definitions. U-SAFE : UAS Secure Autonomous Flight Environment. UTM: UAS Traffic Management Definitions U-SAFE : UAS Secure Autonomous Flight Environment UTM: UAS Traffic Management NUSTAR: National UAS Standardized Test and Rating 2 U-SAFE Award Dec 11, 2015 Signature Initiative in Central New

More information

Technical Standard Order

Technical Standard Order Department of Transportation Federal Aviation Administration Aircraft Certification Service Washington, DC TSO-C145a Effective Date: 09/19/02 Technical Standard Order Subject: AIRBORNE NAVIGATION SENSORS

More information

Space Based ADS-B. ICAO SAT meeting - June 2016 AIREON LLC PROPRIETARY INFORMATION

Space Based ADS-B. ICAO SAT meeting - June 2016 AIREON LLC PROPRIETARY INFORMATION Space Based ADS-B ICAO SAT meeting - June 2016 1 Options to Detect an Aircraft Position Position Accuracy / Update Interval Voice Position Reporting ADS-C Position Reporting Radar Surveillance / MLAT Space

More information

UNCLASSIFIED. FY 2017 Base FY 2017 OCO FY 2017 OCO. FY 2017 Base

UNCLASSIFIED. FY 2017 Base FY 2017 OCO FY 2017 OCO. FY 2017 Base Exhibit P-40, Budget Line Item Justification: PB 2017 Army Date: February 2016 2033A: Procurement of W&TCV, Army / BA 01: Tracked Combat Vehicles / BSA 20: Modification of Tracked Combat Vehicles ID Code

More information

U.S. DEPARTMENT OF TRANSPORTATION FEDERAL AVIATION ADMINISTRATION National Policy

U.S. DEPARTMENT OF TRANSPORTATION FEDERAL AVIATION ADMINISTRATION National Policy U.S. DEPARTMENT OF TRANSPORTATION FEDERAL AVIATION ADMINISTRATION National Policy NOTICE N 8000.353 SUBJ: Revised Guidance for Authorizing the Use of Electronic Flight Bags, Issuance of A061, Electronic

More information

FAA GBAS Program Update January 29, 2010

FAA GBAS Program Update January 29, 2010 US-India Aviation Cooperation Program FAA GBAS Program Update January 29, 2010 Carlos A. Rodriguez FAA GBAS Program Manager Major milestone completed in the history of the FAA GBAS program FAA completed

More information

Hazard Identification Questionnaire

Hazard Identification Questionnaire Hazard Identification Questionnaire OVERVIEW This questionnaire is designed to help identify potential risks and help identify areas of risk exposure. It is not an exhaustive list. This questionnaire is

More information

Fly at the speed of ingenuity on your Learjet 85

Fly at the speed of ingenuity on your Learjet 85 rockwell collins Pro Line Fusion Avionics Fly at the speed of ingenuity on your Learjet 85 Image courtesy of Bombardier. Experience the most advanced avionics system ever offered on a mid-size jet. Achieve

More information

COMMUNICATIONS PANEL. WG-I 20 Meeting

COMMUNICATIONS PANEL. WG-I 20 Meeting International Civil Aviation Organization CP/WG-I20/WP-04 29/02/2016 WORKING PAPER COMMUNICATIONS PANEL WG-I 20 Meeting Montreal, Canada 29 Feb 4 Mar, 2016 Agenda Item xx: Title: IP Environment for UAS

More information

PRO LINE FUSION INTEGRATED AVIONICS SYSTEM. Pro Line Fusion on Gulfstream G280: Your direct path to see and access more.

PRO LINE FUSION INTEGRATED AVIONICS SYSTEM. Pro Line Fusion on Gulfstream G280: Your direct path to see and access more. Pro Line Fusion on Gulfstream G280: Your direct path to see and access more. Starting with its baseline features, the Pro Line Fusion avionics in your Gulfstream PlaneView280 flight deck offer capabilities

More information

(b) (7)(E) (b) (7)(E) (b) (7)(E) (b) (7)(E) (b) (7)(E)

(b) (7)(E) (b) (7)(E) (b) (7)(E) (b) (7)(E) (b) (7)(E) Class Of Airspace County Nearest Airport AOR Class-A Class-B Class-C Class-D Class-E Class-G Washington System Description Aircraft Type Predator B Performance Characteristics Cruise Speed Operating Attributes

More information

Pro Line Fusion integrated avionics system. Pro Line Fusion on Embraer Legacy 450 and 500: Business-jet technology designed with tomorrow in mind.

Pro Line Fusion integrated avionics system. Pro Line Fusion on Embraer Legacy 450 and 500: Business-jet technology designed with tomorrow in mind. Pro Line Fusion on Embraer Legacy 450 and 500: Business-jet technology designed with tomorrow in mind. Your Pro Line Fusion flight deck provides a broad range of baseline capabilities that maximize the

More information

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 17 P-1 Line #121

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 17 P-1 Line #121 Exhibit P-40, Budget Line Item Justification: PB 2015 Navy Date: March 2014 1810N: Other Procurement, Navy / BA 04: Ordnance Support Equipment / BSA 3: Ship Missile Systems Equipment ID Code (A=Service

More information

STRATEGY/ACTION PLAN FOR IMPLEMENTATION OF REDUCED VERTICAL SEPARATION MINIMA IN THE AFRICA-INDIAN OCEAN REGION 22 NOVEMBER 2003

STRATEGY/ACTION PLAN FOR IMPLEMENTATION OF REDUCED VERTICAL SEPARATION MINIMA IN THE AFRICA-INDIAN OCEAN REGION 22 NOVEMBER 2003 STRATEGY/ACTION PLAN FOR IMPLEMENTATION OF REDUCED VERTICAL SEPARATION MINIMA IN THE AFRICA-INDIAN OCEAN REGION 22 NOVEMBER 2003 Prepared by the APIRG RVSM Implementation Task Force AFI STRATEGY/ACTION

More information

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 18 P-1 Line #12

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 18 P-1 Line #12 Exhibit P-40, Budget Line Item Justification: PB 2017 Navy Date: February 2016 1810N: Other Procurement, Navy / BA 01: Ships Support Equipment / BSA 9: Other Shipboard Equipment ID Code (A=Service Ready,

More information

SYLLABUS INTRODUCTION TO ROTARY WING FLYING QUALITIES AND PERFORMANCE

SYLLABUS INTRODUCTION TO ROTARY WING FLYING QUALITIES AND PERFORMANCE 22783 Cedar Point Road, Building 2168 Patuxent River, MD 20670 Phone: 301 757 5049 301 757 2731 Fax: 301 342 5003 www.navair.navy.mil/nawcad/usntps SYLLABUS INTRODUCTION TO ROTARY WING FLYING QUALITIES

More information

Federal Aviation Administration Portfolio for Safety Research and Development. Seminar Paul Krois October, 2008

Federal Aviation Administration Portfolio for Safety Research and Development. Seminar Paul Krois October, 2008 Portfolio for Safety Research and Development Presented to: By: Date: EUROCONTROL Safety R&D Seminar Paul Krois October, 2008 Introduction The FAA National Aviation Research Plan (NARP) integrates and

More information

NextGen and GA 2014 Welcome Outline Safety Seminars Safety Seminars

NextGen and GA 2014 Welcome Outline Safety Seminars Safety Seminars NextGen and GA 2014 Presented by Thomas Gorski CFI Welcome Restrooms Exits Emergency Evacuation Sponsor Acknowledgment Interactive Presentation Style Breaks 2 Outline My Background Overview of FAASTeam

More information

UNMANNED AIRCRAFT PROVISIONS IN FAA REAUTHORIZATION BILL

UNMANNED AIRCRAFT PROVISIONS IN FAA REAUTHORIZATION BILL UNMANNED AIRCRAFT PROVISIONS IN FAA REAUTHORIZATION BILL Section 341 Comprehensive Plan -Codifies in title 49 the requirement in the 2012 FAA reauthorization Act that a comprehensive plan to safely accelerate

More information

Gogo Connected Aircraft Services

Gogo Connected Aircraft Services Gogo Connected Aircraft Services Connected Aircraft Services The power of a connected fleet These benefits are made possible through Gogo Inflight Services, the Gogo FLEX Inflight System, the Gogo Inflight

More information

Boeing s goal is gateto-gate. crew awareness that promotes safety and efficiency.

Boeing s goal is gateto-gate. crew awareness that promotes safety and efficiency. Boeing s goal is gateto-gate enhanced crew awareness that promotes safety and efficiency. Improving Runway Safety with Flight Deck Enhancements Flight deck design improvements can reduce the risk of runway

More information

Glass Cockpits in General Aviation Aircraft. Consequences for training and simulators. Fred Abbink

Glass Cockpits in General Aviation Aircraft. Consequences for training and simulators. Fred Abbink Glass Cockpits in General Aviation Aircraft. Consequences for training and simulators Fred Abbink Content Development of Air transport cockpits, avionics, automation and safety Pre World War 2 Post World

More information

LAUNCHING YOUR UNMANNED AIRCRAFT PROGRAM

LAUNCHING YOUR UNMANNED AIRCRAFT PROGRAM LAUNCHING YOUR UNMANNED AIRCRAFT PROGRAM THE DARTDRONES TEAM UNMANNED AIRCRAFT APPLICATIONS AERIAL INSPECTIONS AERIAL INSPECTIONS Safer and faster alternative to visual inspection by an individual Damage

More information

TANZANIA CIVIL AVIATION AUTHORITY AIR NAVIGATION SERVICES INSPECTORATE. Title: CONSTRUCTION OF VISUAL AND INSTRUMENT FLIGHT PROCEDURES

TANZANIA CIVIL AVIATION AUTHORITY AIR NAVIGATION SERVICES INSPECTORATE. Title: CONSTRUCTION OF VISUAL AND INSTRUMENT FLIGHT PROCEDURES Page 1 of 8 1. PURPOSE 1.1. This Advisory Circular provides guidance to personnel involved in construction of instrument and visual flight procedures for publication in the Aeronautical Information Publication.

More information

Advancing FTD technologies and the opportunity to the pilot training journey. L3 Proprietary

Advancing FTD technologies and the opportunity to the pilot training journey. L3 Proprietary Advancing FTD technologies and the opportunity to the pilot training journey L3 Proprietary Aviation Training Innovation Over the past decade the airline training industry has pursued technology to improve

More information

Technologies for Autonomous Operations of UAVs

Technologies for Autonomous Operations of UAVs Technologies for Autonomous Operations of UAVs TAKE OFF Conference Unmanned Aircraft Systems Towards Civil Applications 10. November 2009, Graz/Austria EADS 2009 All rights reserved Technologies for Autonomous

More information

Federal Aviation Administration Flight Plan Presented at the Canadian Aviation Safety Seminar April 20, 2004

Federal Aviation Administration Flight Plan Presented at the Canadian Aviation Safety Seminar April 20, 2004 Federal Aviation Administration Flight Plan 2004-2008 Presented at the Canadian Aviation Safety Seminar April 20, 2004 Challenges Reducing an Already Low Commercial Accident Rate Building an Air Traffic

More information

Investor Presentation

Investor Presentation Investor Presentation Credit Suisse Global Industrials Conference December 3, 2013 2013 Rockwell Collins. All rights reserved. Safe Harbor Statement This presentation contains statements, including certain

More information

TRAFFIC TRANSPONDER / WEATHER. ADS-B compliance is just the beginning. Aviation Products

TRAFFIC TRANSPONDER / WEATHER. ADS-B compliance is just the beginning. Aviation Products TRAFFIC TRANSPONDER / WEATHER ADS-B compliance is just the beginning. Aviation Products LYNX ADS-B TRANSPONDER & DISPLAY SYSTEMS ADS-B compliance just got easy. The Lynx ADS-B transponder and display systems

More information

COMPLIANCE WITH THIS PUBLICATION IS MANDATORY

COMPLIANCE WITH THIS PUBLICATION IS MANDATORY BY ORDER OF THE SECRETARY OF THE AIR FORCE AIR FORCE POLICY DIRECTIVE 62-6 11 JUNE 2010 Developmental Engineering USAF AIRWORTHINESS COMPLIANCE WITH THIS PUBLICATION IS MANDATORY ACCESSIBILITY: Publications

More information

UNCLASSIFIED. FY 2017 Base FY 2017 OCO

UNCLASSIFIED. FY 2017 Base FY 2017 OCO Exhibit P-40, Budget Line Item Justification: PB 2017 Air Force Date: February 2016 3010F: Aircraft Procurement, Air Force / BA 05: Modification of Inservice Aircraft / BSA 5: Other Aircraft ID Code (A=Service

More information

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 18 P-1 Line #56

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 18 P-1 Line #56 Exhibit P-40, Budget Line Item Justification: PB 2016 Air Force Date: February 2015 3010F: Aircraft Procurement, Air Force / BA 05: Modification of Inservice Aircraft / BSA 5: Other Aircraft ID Code (A=Service

More information

Critical Systems and Software Solutions

Critical Systems and Software Solutions www.thalesgroup.com Thales Canada, Avionics Critical Systems and Software Solutions leading flight control system technology and critical software solutions for the most innovative regional and business

More information

Addendum: UAV Avionics

Addendum: UAV Avionics Addendum: UAV Avionics Dr. Bérénice Mettler University of Minnesota Jan. 29, 2012 (v.1/24/13) Dr. Bérénice Mettler (University of Minnesota) Addendum: UAV Avionics Jan. 29, 2012 (v.1/24/13) 1 / 8 Overview

More information

July 29-30, 2010 Washington, D.C Procurement Agencies. Coast Guard Agencies

July 29-30, 2010 Washington, D.C Procurement Agencies. Coast Guard Agencies 2010 Military, Civilian and Commercial UAV Systems & Applications Unmanned Aircraft Systems Defense and Tactics Conference & Expo July 29-30, 2010 Washington, D.C Photo credit: US DoD 25 Countries 40 Procurement

More information

UAS Symposium Key Research Challenges and Opportunities

UAS Symposium Key Research Challenges and Opportunities UAS Symposium Key Research Challenges and Opportunities Sabrina Saunders-Hodge, UAS R&D Portfolio Manager, FAA/NextGen Federal Aviation Administration Date: April 20, 2016 UAS Symposium Research & Development

More information

TRAFFIC ALERT AND COLLISION AVOIDANCE SYSTEM (TCAS II)

TRAFFIC ALERT AND COLLISION AVOIDANCE SYSTEM (TCAS II) TRAFFIC ALERT AND COLLISION AVOIDANCE SYSTEM (TCAS II) Version 1.0 Effective June 2004 CASADOC 205 Traffic Alert and Collision Avoidance System (TCAS II) This is an internal CASA document. It contains

More information

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 5 P-1 Line #21

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 5 P-1 Line #21 Exhibit P-40, Budget Line Item Justification: PB 2015 Navy Date: March 2014 1507N: Weapons Procurement, Navy / BA 03: Torpedoes and Related Equipment / BSA 1: Torpedoes and Related Equip ID Code (A=Service

More information

Unique Challenges of Unmanned Air Systems (UASs) Test and Evaluation

Unique Challenges of Unmanned Air Systems (UASs) Test and Evaluation Unclassified 2008 Annual NDIA International Symposium Unclassified Unique Challenges of Unmanned Air Systems (UASs) Test and Evaluation Presented By: RDML David Dunaway Assistant Commander, Test and Evaluation,

More information

New issues raised on collision avoidance by the introduction of remotely piloted aircraft (RPA) in the ATM system

New issues raised on collision avoidance by the introduction of remotely piloted aircraft (RPA) in the ATM system New issues raised on collision avoidance by the introduction of remotely piloted aircraft (RPA) in the ATM system Jean-Marc Loscos DSNA expert on collision avoidance and airborne surveillance EIWAC 2013

More information

Flight Evaluation Schedule For GPS IFR Approval Primary Means Enroute, Terminal and Non-Precision Approach

Flight Evaluation Schedule For GPS IFR Approval Primary Means Enroute, Terminal and Non-Precision Approach Flight Evaluation Schedule For GPS IFR Approval Primary Means Enroute, Terminal and Non-Precision Approach Aircraft Description: Model ZK- Operator GPS Description: Manufacturer Model Serial Number TSO-C129

More information

How Frasca Supports Offshore Helicopter Pilot Training At Bristow Group

How Frasca Supports Offshore Helicopter Pilot Training At Bristow Group How Frasca Supports Offshore Helicopter Pilot Training At Bristow Group Customer Feature Bristow Group Needed a New Training Solution In the mid-2000s, Bristow Group s training needs analysis identified

More information

ASTM International Committee F38 Unmanned Aircraft Systems. Michael J. Goy Defense Standardization Program Office

ASTM International Committee F38 Unmanned Aircraft Systems. Michael J. Goy Defense Standardization Program Office ASTM International Committee F38 Unmanned Aircraft Systems Michael J. Goy Defense Standardization Program Office ASTM International Committee F38 on Unmanned Aircraft Systems Mission Statement. The mission

More information

Performance. Aircraft System

Performance. Aircraft System German Aerospace Center Flight Operations Introduction DLR is Germany s aerospace research center and space agency with about 4700 employees in 31 research institutes distributed over 8 main research centers

More information

UAS OPERATIONS AS AN ECOSYSTEM

UAS OPERATIONS AS AN ECOSYSTEM 1 including photocopying, recording, or other electronic or mechanical methods, without the prior written permission of the content owner, The Unmanned Safety Institute, LLC. UAS OPERATIONS AS AN ECOSYSTEM

More information