1 Exhibit P-40, Budget Line Item Justification: PB 2015 Air Force Date: March F: Aircraft Procurement, Air Force / BA 05: Modification of Inservice Aircraft / BSA 5: Other Aircraft ID Code (A=Service Ready, B=Not Service Ready) : Program Elements for Code B Items: F Other Related Program Elements: F, F, F Resource Summary Prior Years FY 2013 FY 2014 OCO # FY 2016 FY 2017 FY 2018 FY 2019 To Complete Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Obligation Authority ($ in Millions) (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) Flyaway ($ in Millions) Gross/Weapon System ($ in Millions) # The OCO Request will be submitted at a later date. Description: The C-135 is a four engine aircraft used for long range cargo and passenger airlift and to support theater commanders. The four engine KC-135 provides air refueling through either the refueling boom or drogue. As a cargo aircraft, the KC-135 can carry six standard 463-L pallets. There are 400 aircraft (396 KCs, 4 special purpose) in the C-135 inventory. The average age is 52 years, with 26 years of service life remaining (projected service life of 2040). The primary modifications in FY15 are Block 45, VHF Omni-Directional Radio (VOR)/Instrument Landing System (ILS) Antennae and Low Cost Modifications (LCMs) that address obsolescence and improve flight safety, reliability, and maintainability. In accordance with Section 1815 of the FY 2008 National Defense Authorization Act (P.L ), this item is necessary for use by the active and reserve components of the Armed Forces for homeland defense missions, domestic emergency responses, and providing military support to civil authorities. Funding for this exhibit contained in PEs F and F. AF AFNG AFR Secondary Distribution FY 2013 FY 2014 OCO FY 2016 FY 2017 FY 2018 FY 2019 Obligation Authority Obligation Authority Obligation Authority Air Force Page 1 of 7 P-1 Line #52 Volume 2-299
2 Exhibit P-40, Budget Line Item Justification: PB 2015 Air Force Date: March F: Aircraft Procurement, Air Force / BA 05: Modification of Inservice Aircraft / BSA 5: Other Aircraft ID Code (A=Service Ready, B=Not Service Ready) : Program Elements for Code B Items: F Other Related Program Elements: F, F, F : Secondary Distribution Secondary Distribution FY 2013 FY 2014 OCO FY 2016 FY 2017 FY 2018 FY 2019 Obligation Authority Exhibits Schedule Prior Years FY 2013 FY 2014 OCO Title* Item - 1 / VOR/ILS ANTENNAE Item - 2 / Visual System Replacement (VSR) Item - 3 / LOW COST SAFETY MODIFICATIONS Item - 4 / LOW COST MODIFICATIONS Exhibits ID CD Cost Cost Cost Cost Cost P-3a - P-3a Gross/Weapon System Cost *** Although this is an Exhibit P-40a item, the actual exhibit is not included since all of the required information for this item is already being shown here. *For Items, Title represents the Item Number / Title [DODIC]. For the P-3a, Title represents the Modification Number / Title. Note: s in this Exhibit P-40 set may not be exact or add due to rounding. Justification: Where applicable, justification for individual modifications is provided in the P-3A exhibits. Cost Air Force Page 2 of 7 P-1 Line #52 Volume 2-300
3 Resource Summary Prior Years FY 2013 FY 2014 OCO # Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Obligation Authority ($ in Millions) (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) Gross/Weapon System ($ in Millions) # The OCO Request will be submitted at a later date. Description: Block 45 addresses reliability and maintainability issues currently experienced by the KC-135 Fleet. The modification includes a new Digital Flight Director (DFD), Digital Radar Altimeter (RA), Digital Autopilot (AP) and Electronic Engine Instrument Displays (EEID). Block 45 requirements are outlined in the Capability Development Document (CDD) for KC-135 Communications, Navigation, and Surveillance/Air Traffic Management (CNS/ATM), dated 21 Oct 08. The DFD replaces the existing obsolete analog flight director (high maintenance driver) and provides a fully integrated flight guidance system and at the same time provides improved capability. The RA replaces the existing obsolete AL-101 radio altimeter (high maintenance driver) with a new state of the art digital high mean time between failure (MTBF) RA. The digital AP replaces the current obsolete analog AP system. The EEID replaces the obsolete analog engine instruments. The Air Force expects to achieve MTBF figures as follows: Radar Altimeter - 8,462 (current 1,454) Digital Flight Director - 11,388 (current 899) Autopilot - 2,335 (current 339) Engine Instruments - 4,726 (current 2,336) In addition, by replacing these components, the Air Force expects to realize approximately $8.50M annually (or $440M total) in cost avoidance relative to system repair costs. Aircraft Breakdown: USAF plans to modify 399 C-135 aircraft (395 KC-135 R/T, 4 special purpose) with Block 45 (DFD, AP, RA and EEID). Two of the 395 aircraft modifications are prototypes funded with RDT&E. The rest will be funded with APAF. The Milestone Decision Authority (MDA) & Program Executive Officer(PEO) approved procurement of 34 LRIP kits prior to test completion and MS C approval in Jul 13. Through preliminary developmental test and evaluation, the KC-135 Block 45 modification program material solution demonstrated mature performance supporting LRIP kit procurement prior to the MS C decision. This approach is in accordance with the approved Block 45 acquisition strategy as discussed in the MS B decision briefing and as documented in the MS B Acquisition Decision Memorandum (ADM). This program has associated Research Development Test and Evaluation funding in PE F. This program has associated initial spares funding in BA 06. FY13 Rescission of $17M reflected in Other Government Costs (OGC). **Note: OGC also includes funding for Test, Milstrip, Fuel & Over & Above; therefore, entire FY13 amounts are not solely indicative of rescission.** Milestone/Development Status Developmental Test & Evaluation completed March Milestone C approval recieved July Air Force Page 3 of 7 P-1 Line #52 Volume 2-301
4 AF AFNG AFR : Secondary Distribution Secondary Distribution FY 2013 FY 2014 OCO Obligation Authority Obligation Authority Obligation Authority Obligation Authority Air Force Page 4 of 7 P-1 Line #52 Volume 2-302
5 Models of Systems Affected: KC-135 Modification Type: Capability Improvement Related RDT&E PEs: F RDT&E PE # Financial Plan Prior Years FY 2013 FY 2014 OCO / Cost / Cost / Cost / Cost / Cost / Cost F 2 / / - - / - - / - - / - - / - Procurement A Kits Recurring Block 45:INSTALL KITS Group A (Active) 15 / / / - 18 / / - 18 / Block 45:INSTALL KITS Group A (Guard) 0 / / / - 19 / / - 19 / Block 45:INSTALL KITS Group A (Reserve) 0 / / / - 8 / / - 8 / Subtotal: Recurring - / / / - - / / - - / B Kits Recurring Block 45:EQUIPMENT Group B (Active) 15 / / / - 18 / / - 18 / Block 45:EQUIPMENT Group B (Guard) 0 / / / - 19 / / - 19 / Block 45:EQUIPMENT Group B (Reserve) 0 / / / - 8 / / - 8 / Subtotal: Recurring - / / / - - / / - - / Subtotal: Block 45 - / / / - - / / - - / Subtotal: Procurement, All Modification Items - / / / - - / / - - / Support (All Modification Items) GROUP B: TOTAL NONRECURRING - / / - - / - - / - - / - - / - Change Orders - / - - / - - / / - - / - - / - Data - / - - / - - / / - - / - - / - SIM/TRAINER 2 / / / / / - 2 / SUPPORT-EQUIP - / / - - / - - / / - - / OTHER GOVT - / / / / / - - / PMA - Contractor Services - / / / / / - - / PMA - Other Gov't Costs - / / / / / - - / Subtotal: Support 2 / / / / / - 2 / Installation - / - - / - 15 / / / - 19 / Subtotal: Installation - / - - / - 15 / / / - 19 / Cost (Procurement + Support + Installation) Air Force Page 5 of 7 P-1 Line #52 Volume 2-303
6 Models of Systems Affected: Procurement Secondary Distribution Modification Type: Capability Improvement Related RDT&E PEs: F FY 2013 FY 2014 OCO FY 2016 FY 2017 FY 2018 FY 2019 / Cost / Cost / Cost / Cost / Cost / Cost / Cost / Cost / Cost AF - / / - - / / - - / / - - / - - / - - / - AFNG - / / - - / / - - / / - - / - - / - - / - AFR - / / - - / / - - / / - - / - - / - - / - Subtotal: Block 45 Secondary Distribution - / / - - / / - - / / - - / - - / - - / - Subtotal: Procurement, All Modification Items - / / - - / / - - / / - - / - - / - - / - Support AF - / / / / - 2 / / - - / - - / - - / - Subtotal: Support - / / / / - 2 / / - - / - - / - - / - Installation Contractor Facility AF - / - 15 / / / - 8 / / - - / - - / - - / - AFNG - / - - / - 8 / / - 8 / / - - / - - / - - / - AFR - / - - / - 3 / / - 3 / / - - / - - / - - / - Subtotal: Contractor Facility - / - 15 / / / - 19 / / - - / - - / - - / - Subtotal: Block 45 - / - 15 / / / - 19 / / - - / - - / - - / - Subtotal: Installation - / - 15 / / / - 19 / / - - / - - / - - / - : Secondary Distribution, All Modification Items - / / / / - - / / - - / - - / - - / - Air Force Page 6 of 7 P-1 Line #52 Volume 2-304
7 Modification Item MDAP/MAIS Code: Manufacturer Information Manufacturer Name: Rockwell Collins Manufacturer Location: Cedar Rapids, IA Administrative Leadtime (in Months): 1 Production Leadtime (in Months): 8 Dates FY 2013 FY 2014 Contract Dates Jul 2013 Jan 2015 Delivery Dates Mar 2014 Sep 2015 Installation Information Method of Implementation: Contractor Facility Installation Cost Prior Years FY 2013 FY 2014 OCO / Cost / Cost / Cost / Cost / Cost / Cost Prior Years - / - - / - 15 / / - - / - - / - Secondary Distribution - AF - / - - / - 15 / / - - / - - / - FY / - - / - - / - 19 / / - 19 / Secondary Distribution - AF - / - - / - - / - 8 / / - 8 / Secondary Distribution - AFNG - / - - / - - / - 8 / / - 8 / Secondary Distribution - AFR - / - - / - - / - 3 / / - 3 / FY / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 15 / / / - 19 / Secondary Distribution - AF - / - - / - 15 / / / - 8 / Secondary Distribution - AFNG - / - - / - - / - 8 / / - 8 / Secondary Distribution - AFR - / - - / - - / - 3 / / - 3 / Installation Schedule FY 2013 FY 2014 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 In Out Air Force Page 7 of 7 P-1 Line #52 Volume 2-305
UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 5 P-1 Line #35
Exhibit P-40, Budget Line Item Justification: PB 2017 Air Force Date: February 2016 3010F: Aircraft Procurement, Air Force / BA 05: Modification of Inservice Aircraft / BSA 4: Trainer Aircraft ID Code
More informationUNCLASSIFIED FY 2016 OCO. FY 2016 Base
Exhibit P-40, Budget Line Item Justification: PB 2016 Air Force Date: February 2015 3010F: Aircraft Procurement, Air Force / BA 05: Modification of Inservice Aircraft / BSA 5: Other Aircraft ID Code (A=Service
More informationUNCLASSIFIED. FY 2017 Base FY 2017 OCO FY 2017 OCO. FY 2017 Base
Exhibit P-40, Budget Line Item Justification: PB 2017 Air Force Date: February 2016 3010F: Aircraft Procurement, Air Force / BA 05: Modification of Inservice Aircraft / BSA 2: Tactical Aircraft ID Code
More informationUNCLASSIFIED. FY 2017 Base FY 2017 OCO FY 2017 OCO. FY 2017 Base
Exhibit P-40, Budget Line Item Justification: PB 2017 Air Force Date: February 2016 3010F: Aircraft Procurement, Air Force / BA 05: Modification of Inservice Aircraft / BSA 2: Tactical Aircraft ID Code
More informationUNCLASSIFIED. FY 2017 Base FY 2017 OCO
Exhibit P-40, Budget Line Item Justification: PB 2017 Air Force Date: February 2016 3010F: Aircraft Procurement, Air Force / BA 05: Modification of Inservice Aircraft / BSA 5: Other Aircraft ID Code (A=Service
More informationUNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 5 P-1 Line #55
Exhibit P-40, Budget Line Item Justification: PB 2016 Air Force Date: February 2015 3010F: Aircraft Procurement, Air Force / BA 05: Modification of Inservice Aircraft / BSA 5: Other Aircraft ID Code (A=Service
More informationUNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 10 P-1 Line #47
Exhibit P-40, Budget Line Item Justification: PB 2016 Air Force Date: February 2015 3010F: Aircraft Procurement, Air Force / BA 05: Modification of Inservice Aircraft / BSA 5: Other Aircraft ID Code (A=Service
More informationUNCLASSIFIED. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018
Exhibit P-40, Budget Item Justification Sheet: PB 2014 Navy Date: April 2013 Aircraft / BSA 1: Modification Of Aircraft ID Code (A=Service Ready, B=Not Service Ready) : A Program Elements for Code B Items:
More informationUNCLASSIFIED. FY 2017 Base FY 2017 OCO. FY 2017 Base FY 2017 OCO
Exhibit P-40, Budget Line Item Justification: PB 2017 Air Force Date: February 2016 3010F: Aircraft Procurement, Air Force / BA 05: Modification of Inservice Aircraft / BSA 3: Airlift Aircraft ID Code
More informationUNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 18 P-1 Line #56
Exhibit P-40, Budget Line Item Justification: PB 2016 Air Force Date: February 2015 3010F: Aircraft Procurement, Air Force / BA 05: Modification of Inservice Aircraft / BSA 5: Other Aircraft ID Code (A=Service
More informationUNCLASSIFIED. FY 2016 Base FY 2016 OCO FY 2016 OCO. FY 2016 Base
Exhibit P-40, Budget Line Item Justification: PB 2016 Air Force Date: February 2015 3010F: Aircraft Procurement, Air Force / BA 05: Modification of Inservice Aircraft / BSA 2: Tactical Aircraft ID Code
More informationUNCLASSIFIED. FY 2016 Base FY 2016 OCO FY 2016 OCO. FY 2016 Base
Exhibit P-40, Budget Line Item Justification: PB 2016 Army Date: February 2015 2031A: Aircraft Procurement, Army / BA 02: Modification of Aircraft / BSA 10: Modification of Aircraft ID Code (A=Service
More informationUNCLASSIFIED. FY 2017 Base FY 2017 OCO FY 2017 OCO. FY 2017 Base
Exhibit P-40, Budget Line Item Justification: PB 2017 Air Force Date: February 2016 3010F: Aircraft Procurement, Air Force / BA 05: Modification of Inservice Aircraft / BSA 5: Other Aircraft ID Code (A=Service
More informationUNCLASSIFIED. FY 2014 Base. OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018
Exhibit P-40, Budget Item Justification Sheet: PB 2014 Air Force Date: April 2013 Inservice Missiles / BSA 1: Class IV ID Code (A=Service Ready, B=Not Service Ready) : A Program Elements for Code B Items:
More informationUNCLASSIFIED. UNCLASSIFIED United States Special Operations Command Page 1 of 6 P-1 Line #53
Exhibit P-40, Budget Line Item Justification: PB 2017 United States Special Operations Command : February 2016 0300D: Procurement, Defense-Wide / BA 02: Special Operations Command / BSA 1: Aviation Programs
More informationUNCLASSIFIED FY Exhibits Schedule Prior Years FY 2013 FY 2014 FY 2015 Base FY 2015 OCO FY 2015 Total. Total Cost ($ M)
Exhibit P-40, Budget Line Item Justification: PB 2015 Army Date: March 2014 2033A: Procurement of W&TCV, Army / BA 01: Tracked Combat Vehicles / BSA 20: Modification of Tracked Combat Vehicles ID Code
More informationUNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 18 P-1 Line #12
Exhibit P-40, Budget Line Item Justification: PB 2017 Navy Date: February 2016 1810N: Other Procurement, Navy / BA 01: Ships Support Equipment / BSA 9: Other Shipboard Equipment ID Code (A=Service Ready,
More informationUNCLASSIFIED FY 2016 OCO. FY 2016 Base
Exhibit P-40, Budget Line Item Justification: PB 2016 Air Force Date: February 2015 3010F: Aircraft Procurement, Air Force / BA 05: Modification of Inservice Aircraft / BSA 5: Other Aircraft ID Code (A=Service
More informationUNCLASSIFIED FY 2016 OCO. FY 2016 Base. FY 2016 Base FY 2016 OCO
Exhibit P-40, Budget Line Item Justification: PB 2016 Army Date: February 2015 2033A: Procurement of W&TCV, Army / BA 01: Tracked Combat Vehicles / BSA 20: Modification of Tracked Combat Vehicles ID Code
More informationUNCLASSIFIED. UNCLASSIFIED Army Page 1 of 23 P-1 Line #27
Exhibit P-40, Budget Line Item Justification: PB 2015 Army Date: March 2014 2031A: Aircraft Procurement, Army / BA 02: Modification of Aircraft / BSA 10: Modification of Aircraft ID Code (A=Service Ready,
More informationUNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 24 P-1 Line #55
Exhibit P-40, Budget Line Item Justification: PB 2016 Navy Date: February 2015 1506N: Aircraft Procurement, Navy / BA 05: Modification of Aircraft / BSA 1: Modification of Aircraft ID Code (A=Service Ready,
More informationUNCLASSIFIED FY 2017 OCO. FY 2017 Base
Exhibit P-40, Budget Line Item Justification: PB 2017 Air Force Date: February 2016 3021F: Space Procurement, Air Force / BA 01: Space Procurement, Air Force / BSA 1: Space Programs ID Code (A=Service
More informationUNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 5 P-1 Line #21
Exhibit P-40, Budget Line Item Justification: PB 2015 Navy Date: March 2014 1507N: Weapons Procurement, Navy / BA 03: Torpedoes and Related Equipment / BSA 1: Torpedoes and Related Equip ID Code (A=Service
More informationUNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 17 P-1 Line #55
Exhibit P-40, Budget Line Item Justification: PB 2017 Air Force Date: February 2016 3010F: Aircraft Procurement, Air Force / BA 05: Modification of Inservice Aircraft / BSA 5: Other Aircraft ID Code (A=Service
More informationUNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 16 P-1 Line #57
Exhibit P-40, Budget Line Item Justification: PB 2017 Navy Date: February 2016 1506N: Aircraft Procurement, Navy / BA 05: Modification of Aircraft / BSA 1: Modification of Aircraft ID Code (A=Service Ready,
More informationUNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 31 P-1 Line #41
Exhibit P-40, Budget Line Item Justification: PB 2017 Navy Date: February 2016 1810N: Other Procurement, Navy / BA 01: Ships Support Equipment / BSA 16: Logistic Support ID Code (A=Service Ready, B=Not
More informationUNCLASSIFIED. FY 2016 Base FY 2016 OCO FY 2016 OCO. FY 2016 Base
Resource Summary Prior Years FY 2014 FY 2015 Base OCO Total FY 2017 FY 2018 FY 2019 FY 2020 To Complete Procurement Quantity (Units in Each) - - - - - - - - - - - - Gross/Weapon System Cost ($ in Millions)
More informationUNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 17 P-1 Line #121
Exhibit P-40, Budget Line Item Justification: PB 2015 Navy Date: March 2014 1810N: Other Procurement, Navy / BA 04: Ordnance Support Equipment / BSA 3: Ship Missile Systems Equipment ID Code (A=Service
More informationUNCLASSIFIED. UNCLASSIFIED Army Page 1 of 16 P-1 Line #15
Exhibit P-40, Budget Line Item Justification: PB 2017 Army Date: February 2016 2031A: Aircraft Procurement, Army / BA 02: Modification of Aircraft / BSA 10: Modification of Aircraft ID Code (A=Service
More informationUNCLASSIFIED. FY 2017 Base FY 2017 OCO
Exhibit R-2, RDT&E Budget Item Justification: PB 2017 Air Force : February 2016 3600: Research, Development, Test & Evaluation, Air Force / BA 7: Operational Systems Development COST ($ in Millions) FY
More informationUNCLASSIFIED. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018
Exhibit P-40, Budget Item Justification Sheet: PB 2014 Navy : April 2013 Ammo, MC / BSA 1: Marine Corps Ammunition ID Code (A=Service Ready, B=Not Service Ready) : A Program Elements for Code B : Other
More informationUNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 21 P-1 Line #19
Exhibit P-40, Budget Line Item Justification: PB 2017 Navy Date: February 2016 1810N: Other Procurement, Navy / BA 01: Ships Support Equipment / BSA 9: Other Shipboard Equipment ID Code (A=Service Ready,
More informationUNCLASSIFIED. FY 2017 Base FY 2017 OCO. FY 2017 Base FY 2017 OCO
UNCLSSIFIED Exhibit P-40, Budget Line Item Justification: PB 2017 ir Force Date: February 2016 ppropriation / Budget ctivity / Budget Sub ctivity: 3080F: Other Procurement, ir Force / B 02: Vehicular Equipment
More informationUNCLASSIFIED. UNCLASSIFIED Page 1 of 5. EXHIBIT R-2, RDT&E Budget Item Justification RESEARCH DEVELOPMENT TEST & EVALUATION, NAVY / BA-5
EXHIBIT R-2, RDT&E Budget Item Justification APPROPRIATION/BUDGET ACTIVITY RESEARCH DEVELOPMENT TEST & EVALUATION, NAVY / BA-5 R-1 ITEM NOMENCLATURE 0605430N, C/KC-130 AVIONICS MODERNIZATION PROGRAM (AMP)
More informationUNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 33 P-1 Line #94
Exhibit P-40, Budget Line Item Justification: PB 2017 Navy Date: February 2016 1810N: Other Procurement, Navy / BA 02: Communications & Electronics Equip / BSA 12: Submarine Communications ID Code (A=Service
More informationUNCLASSIFIED. FY 2017 Base FY 2017 OCO FY 2017 OCO. FY 2017 Base
Exhibit P-40, Budget Line Item Justification: PB 2017 Army Date: February 2016 2033A: Procurement of W&TCV, Army / BA 01: Tracked Combat Vehicles / BSA 20: Modification of Tracked Combat Vehicles ID Code
More informationUNCLASSIFIED FY Exhibits Schedule Prior Years FY 2013 FY 2014 FY 2015 Base FY 2015 OCO FY 2015 Total. Total Cost ($ M) Unit Cost ($) Qty (Each)
Exhibit P-40, Budget Line Item Justification: PB 2015 Navy Date: March 2014 1506N: Aircraft Procurement, Navy / BA 05: Modification of Aircraft / BSA 1: Modification of Aircraft ID Code (A=Service Ready,
More informationUNCLASSIFIED. FY 2017 Base FY 2017 OCO
Exhibit P-40, Budget Line Item Justification: PB 2017 Navy Date: February 2016 1506N: Aircraft Procurement, Navy / BA 05: Modification of Aircraft / BSA 1: Modification of Aircraft ID Code (A=Service Ready,
More informationUNCLASSIFIED FY Exhibits Schedule Prior Years FY 2013 FY 2014 FY 2015 Base FY 2015 OCO FY 2015 Total. Unit Cost ($ M) Qty (Each)
Exhibit P-40, Budget Line Item Justification: PB 2015 United States Special Operations Command Date: March 2014 0300D: Procurement, Defense-Wide / BA 02: Special Operations Command / BSA 4: Other Procurement
More informationUNCLASSIFIED. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018
Exhibit P-40, Budget Item Justification Sheet: PB 2014 Navy : April 2013 Ammo, MC / BSA 1: Marine Corps Ammunition ID Code (A=Service Ready, B=Not Service Ready) : A Program Elements for Code B : Other
More informationUNCLASSIFIED FY 2017 OCO. FY 2017 Base
Exhibit P-40, Budget Line Item Justification: PB 2017 Navy Date: February 2016 1810N: Other Procurement, Navy / BA 04: Ordnance Support Equipment / BSA 7: Other Expendable Ordnance ID Code (A=Service Ready,
More informationUNCLASSIFIED FY 2015 FY 2015 OCO. FY 2015 Base FY 2015 FY Base
Exhibit P-40, Budget Line Item Justification: PB 2015 Army Date: March 2014 2031A: Aircraft Procurement, Army / BA 02: Modification of Aircraft / BSA 10: Modification of Aircraft ID Code (A=Service Ready,
More informationUNCLASSIFIED. FY 2016 Base FY 2016 OCO
Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Air Force : February 2015 3600: Research, Development, Test & Evaluation, Air Force / BA 7: Operational Systems Development COST ($ in Millions) FY
More informationUNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 34 P-1 Line #51
Exhibit P-40, Budget Line Item Justification: PB 2016 Navy Date: February 2015 1506N: Aircraft Procurement, Navy / BA 05: Modification of Aircraft / BSA 1: Modification of Aircraft ID Code (A=Service Ready,
More informationRDT&E BUDGET ITEM JUSTIFICATION SHEET (R-2 Exhibit)
PE NUMBER: 0604239F PE TITLE: F-22 EMD BUDGET ACTIVITY COST ($ In Thousands) Actual FY 1999 FY 2000 FY 2001 FY 2002 FY 2003 FY 2004 FY 2005 Cost to Complete Cost Advanced Tactical Fighter FSD 2,010,717
More informationUNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: Communication, Navigation, Surveillance/Air Traffic Management (CNS/ATM) FY 2012 OCO
Exhibit R-2, RDT&E Budget Item Justification: PB 2012 Air Force DATE: February 2011 COST ($ in Millions) FY 2010 FY 2011 FY 2013 FY 2014 FY 2015 FY 2016 To Program Element 6.754 5.708 4.604-4.604 4.549
More informationUNCLASSIFIED FY Exhibits Schedule Prior Years FY 2013 FY 2014 FY 2015 Base FY 2015 OCO FY 2015 Total. Total Cost ($ M) Unit Cost ($) Qty (Each)
Exhibit P-40, Budget Line Item Justification: PB 2015 Navy Date: March 2014 1506N: Aircraft Procurement, Navy / BA 05: Modification of Aircraft / BSA 1: Modification of Aircraft ID Code (A=Service Ready,
More informationUNCLASSIFIED R-1 ITEM NOMENCLATURE PE A: AIRCRAFT CERTIFICATION FY 2012 OCO
Exhibit R-2, RDT&E Budget Item Justification: PB 212 Army DATE: February 211 24: Research, Development, Test & Evaluation, Army COST ($ in Millions) FY 21 FY 211 FY 212 Base PE 6566A: AIRCRAFT CERTIFICATION
More informationUNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 151 P-1 Line #32
Exhibit P-40, Budget Line Item Justification: PB 2017 Navy Date: February 2016 1506N: Aircraft Procurement, Navy / BA 05: Modification of Aircraft / BSA 1: Modification of Aircraft ID Code (A=Service Ready,
More informationUNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 30 P-1 Line #36
Exhibit P-40, Budget Line Item Justification: PB 2016 Navy Date: February 2015 1506N: Aircraft Procurement, Navy / BA 05: Modification of Aircraft / BSA 1: Modification of Aircraft ID Code (A=Service Ready,
More informationUNCLASSIFIED. FY 2014 Base. OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018
Exhibit P-40, Budget Item Justification Sheet: PB 2014 Army Date: April 2013 Aircraft / BSA 10: Modification Of Aircraft ID Code (A=Service Ready, B=Not Service Ready) : Program Elements for Code B Items:
More informationUNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 17 P-1 Line #13
Exhibit P-40, Budget Line Item Justification: PB 2016 Navy : February 2015 1508N: Procurement of Ammo, Navy & MC / BA 01: Proc Ammo, Navy / BSA 1: Navy Ammunition A Program Elements for Code B Items: Other
More informationCost-effective, flexible avionics for today s missions and future challenges. Flight2 integrated avionics system. UPGRADES FOR LEGACY C-130s
Cost-effective, flexible avionics for today s missions and future challenges. Flight2 integrated avionics system UPGRADES FOR LEGACY C-130s Bring cabin capability into highest definition. Flight2 integrated
More informationUNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 126 P-1 Line #32
Exhibit P-40, Budget Line Item Justification: PB 2016 Navy Date: February 2015 1506N: Aircraft Procurement, Navy / BA 05: Modification of Aircraft / BSA 1: Modification of Aircraft ID Code (A=Service Ready,
More informationUNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 27 P-1 Line #2
UNCLSSIFIED Exhibit P-40, Budget Line Item Justification: PB mended 2015 ir Force Date: June 2014 ppropriation / Budget ctivity / Budget Sub ctivity: 3011F: Procurement of mmunition, ir Force / B 01: mmunition
More informationJanuary 2018 Air Traffic Activity Summary
January 2018 Air Traffic Activity Summary Jan-2018 Jan-2017 CY-2018 CY-2017 Passengers 528,947 505,421 4.7% 528,947 505,421 4.7% Passengers 537,332 515,787 4.2% 537,332 515,787 4.2% Passengers 1,066,279
More informationUNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 31 P-1 Line #2
UNCLSSIFIED Exhibit P-40, Budget Line Item Justification: PB 2016 ir Force : February 2015 ppropriation / Budget ctivity / Budget Sub ctivity: 3011F: Procurement of mmunition, ir Force / B 01: mmunition
More informationUNCLASSIFIED UNCLASSIFIED
: February 216 Exhibit R2, RDT&E Budget Item Justification: PB 217 24: Research, Development, Test & Evaluation, / BA 5: System Development & Demonstration (SDD) COST ($ in Millions) FY 215 Program Element
More informationPerformance. Aircraft System
German Aerospace Center Flight Operations Introduction DLR is Germany s aerospace research center and space agency with about 4700 employees in 31 research institutes distributed over 8 main research centers
More informationPublications and Training Solutions Course Syllabus:
COURSE TITLE: Pro Line II Avionics Flight Line Maintenance (Level I) PREREQUISITES: Students should have a basic knowledge of aircraft avionics systems and a working command of the English language. Students
More informationAircraft Specification Summary Convair CV580 SN: 168 Registration: ZK FTA
Aircraft Specification Summary Convair CV580 SN: 168 Registration: ZK FTA Details as of: 22 January 2016 1. Aircraft Specifications AIRCRAFT SPECIFICATIONS Manufacturer: General Dynamics, Convair Division
More informationAircraft Specification Summary Bombardier CRJ900 Next Generation M SN : REG: CX- C R B
Aircraft Specification Summary Bombardier CRJ900 Next Generation M SN : 15169 REG: CX- C R B TSN 10,343 CSN 8,465 Operated by PLUNA S.A. Date: 01-October-2013 Page 1 of 6 A. Operational Data: Reduced Vertical
More informationPresidential Aircraft Recapitalization
Presidential Aircraft Recapitalization Solicitation Number: FA8625-15-C-6599 Agency: Department of the Air Force Office: Air Force Materiel Command Location: AFLCMC/PK - WPAFB (includes PZ, WL, WW, WI,
More informationPublications and Training Solutions Course Syllabus:
COURSE TITLE: Pro Line 4 Learjet 60 Flight Line Maintenance PREREQUISITES: Students should have a basic knowledge of aircraft avionics systems and a working command of the English language. Students should
More informationDOD STATEMENT OF INTENT
DOD STATEMENT OF INTENT (To Provide Airlift Services to the Department of Defense) OMB NUMBER: 0701-0137 EXPIRES: 20140930 The public reporting burden for this collection of information is estimated to
More informationAircraft Specification Summary Convair CV580 SN: 372 Registration: ZK KFL
Aircraft Specification Summary Convair CV580 SN: 372 Registration: ZK KFL Details as of: 26 January 2016 1. Aircraft Specifications AIRCRAFT SPECIFICATIONS Manufacturer: General Dynamics, Convair Division
More informationUNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 39 P-1 Line #54
LSSIFID xhibit P-40, Budget Line Item ustification: PB 2017 avy Date: February 2016 ppropriation / Budget ctivity / Budget Sub ctivity: 1810: ther Procurement, avy / B 02: ommunications & lectronics quip
More informationSummary. Filename: IDOC Created: July 24, 2012 Modified: May 6, 2013
Commercial Systems 400 Collins Road NE Cedar Rapids, IA 52498 Tel.319.295.5000 Fax 319.295.5064 Title: Rockwell Collins Data Link Graphical Weather Services, Single & Dual FANS, ARINC 702A AOC Messaging
More informationFrom AIS To AIM. Agenda. Agenda. Jack Hsu Mark Varellas
Agenda Agenda From AIS To AIM 1. Introduction to MDA 2. What is AIS to AIM? 3. FAA Approach to AIM 4. AIM Transition Planning 5. ext Steps 1. Introduction to MDA 2. What is AIS to AIM? 3. FAA Approach
More informationBRINGING THE POWER OF GARMIN TO ACEHAWK
BRINGING THE POWER OF GARMIN TO ACEHAWK CIVIL PEDIGREE TACTICAL AGILITY ACEHAWK- Seamless Integration The ACEHAWK has one of the most intuitive pilot-vehicle interfaces (PVI) available on the market. The
More informationAircraft Specification Summary Convair CV580 SN: 42 Registration: ZK KFH
Aircraft Specification Summary Convair CV580 SN: 42 Registration: ZK KFH Details as of: 26 January 2016 1. Aircraft Specifications AIRCRAFT SPECIFICATIONS Manufacturer: General Dynamics, Convair Division
More informationAEROSPACE & ELECTRONICS BRENDAN CURRAN PRESIDENT
AEROSPACE & ELECTRONICS BRENDAN CURRAN PRESIDENT Aerospace & Electronics Overview and Results Market Outlook Technological Differentiation and Growth Summary 2 Crane Aerospace & Electronics Industry Leader
More informationCOMPLIANCE WITH THIS PUBLICATION IS MANDATORY
BY ORDER OF THE SECRETARY OF THE AIR FORCE AIR FORCE POLICY DIRECTIVE 62-6 11 JUNE 2010 Developmental Engineering USAF AIRWORTHINESS COMPLIANCE WITH THIS PUBLICATION IS MANDATORY ACCESSIBILITY: Publications
More informationThe Corps of Engineers Dredges on the West Coast
The Corps of Engineers Dredges on the West Coast Presented To California Marine Affairs and Navigation Conference Sheryl Carrubba Operations Manager, Channels & Harbors Portland District November 8, 2011
More informationAE 452 Aeronautical Engineering Design II Cost of an Airplane. Prof. Dr. Serkan Özgen Dept. Aerospace Engineering April 2017
AE 452 Aeronautical Engineering Design II Cost of an Airplane Prof. Dr. Serkan Özgen Dept. Aerospace Engineering April 2017 Difficulties when estimating cost Number of parameters involved (technical, financial,
More informationAE 452 Aeronautical Engineering Design II Cost Analysis. Prof. Dr. Serkan Özgen Dept. Aerospace Engineering
AE 452 Aeronautical Engineering Design II Cost Analysis Prof. Dr. Serkan Özgen Dept. Aerospace Engineering 1 Problems when estimating cost Number of parameters involved (technical, financial, political)
More informationNZQA unit standard version 2 Page 1 of 7. Apply knowledge of aircraft radio systems to the certification of aeronautical maintenance
Page 1 of 7 Title Apply knowledge of aircraft radio systems to the certification of aeronautical maintenance Level 6 Credits 30 Purpose This knowledge-based unit standard is one of a series intended for
More informationBoeing 707. Overhaul & Repair Capabilities. USAerospacetn.com. U.S. Aerospace Corp. FAA Certified Part 145 Repair Station License USCR533K
Boeing 707 Overhaul & Repair Capabilities FAA Certified Part 145 Repair Station License USCR533K EASA Approved Certificate No. EASA.145.6330 USAerospacetn.com Effective: May 1, 2014 U.S. Aerospace Corp.
More informationGlobal Avionics Training Specialists, LLC
Global Avionics Training Specialists, LLC CESSNA CITATION SPZ-650/CITATION III & VI LINE MAINTENANCE FAMILIARIZATION COURSE SYLLABUS I. INTRODUCTION A. SYSTEM DESCRIPTION The SPZ-650 Integrated Flight
More informationQ300 Serial Number 583 Available for Sale. Offers for Sale. Q Series: Q300 MSN 583. TTSN: 24,072 Flight Hours TCSN: 33,232 Flight Cycles
Offers for Sale Q Series: Q300 MSN 583 TTSN: 24,072 Flight Hours TCSN: 33,232 Flight Cycles Data Date: 20 th May 2018 Expected Availability: July 2018 Page 1 of 8 Date of Manufacture: February 2002 Model
More informationQ300 Serial Number 657 Available for Sale. Offers for Sale. Q Series: Q300 MSN 657. TTSN: 17,909 Flight Hours TCSN: 20,374 Flight Cycles
Offers for Sale Q Series: Q300 MSN 657 TTSN: 17,909 Flight Hours TCSN: 20,374 Flight Cycles Data Date: 20 th May 2018 Expected Availability: August 2019 Page 1 of 8 Date of Manufacture: March 2008 Model
More informationAir Force Test Center 96 TW
Air Force Test Center 96 TW USAF Airworthiness Overview and the AFTC Mr. Alan Colthorp 896 th Test Support Squadron Eglin AFB, FL I n t e g r i t y - S e r v i c e - E x c e l l e n c e Agenda USAF airworthiness
More informationU.S. NAVY CNS/ATM Program Status
U.S. NAVY CNS/ATM Program Status 9 June 2009 Dave Staso CNS/ATM IPTL NAVAIR PMA209 (240) 925-9220 david.staso@navy.mil UNCLASSIFIED Minimum Functionality is a Requirement Amish buggies are not allowed
More informationFebruary 2006 BOEING FRONTIERS FEATURE STORY
With more than 75 years of aerial-refueling experience, Boeing remains an industryleader with the KC-767 and its groundbreaking technologies. Here at the Integrated Defense Systems Wichita facility in
More informationNASA S SPACE GRANT MIDWEST HIGH-POWER ROCKET COMPETITION THE ROLL/ORIENTATION CHALLENGE
NASA S SPACE GRANT 2017-2018 MIDWEST HIGH-POWER ROCKET COMPETITION THE ROLL/ORIENTATION CHALLENGE SPRING 2018 COMPETITION LAUNCH HOSTED BY THE MN SPACE GRANT CONSORTIUM AND BY TRIPOLI MN Informational
More informationWFP Chad SPECIAL OPERATION SO
WFP Chad SPECIAL OPERATION SO 200058 Country: Chad Type of project: Special Operation Title: Provision of Air Services to Humanitarian Community in Chad Total cost (US$): US$ 11,362,014 Duration: 12 months
More informationSERVICE LETTER REVISION
Revision 13 REVISION TRANSMITTAL SHEET This sheet transmits Revision 13 to, which: A. Updates the Accomplishment Instructions and the list of training agencies. B. Revises the expiration date to March
More informationDEPARTMENT OF CIVIL AVIATION Airworthiness Notices EXTENDED DIVERSION TIME OPERATIONS (EDTO)
EXTENDED DIVERSION TIME OPERATIONS (EDTO) 1. APPLICABILITY 1.1 This notice is applicable to operator engaged in Commercial Air Transport Operations beyond the threshold time established by DCA for EDTO
More informationAEROSPACE & ELECTRONICS
AEROSPACE & ELECTRONICS BRENDAN CURRAN PRESIDENT 1 Aerospace & Electronics Overview and Results Market Outlook Technological Differentiation and Growth Summary 2 Crane Aerospace & Electronics 1904 Lear
More informationGlossary. Part I Acronyms/Data Terminology. AIFSS -- Automated International Flight Service Station.
Glossary Part I Acronyms/Data Terminology AC -- Air Carrier. AFSS -- Automated Flight Service Station. AIFSS -- Automated International Flight Service Station. ARTCC -- Air Route Traffic Control Center.
More informationAero Design Battery Shop
Aero Design Battery Shop A HEICO COMPANY August 30, 2017 Subject: Instructions for Continued Airworthiness To Whom It May Concern: Aero Design ensures that our Parts Manufacture Approval (PMA) parts meet
More informationCOMPLIANCE WITH THIS PUBLICATION IS MANDATORY
BY ORDER OF THE AIR FORCE TEST CENTER COMMANDER AIR FORCE TEST CENTER INSTRUCTION 62-602 14 JUNE 2017 Developmental Engineering AIRWORTHINESS COMPLIANCE WITH THIS PUBLICATION IS MANDATORY ACCESSIBILITY:
More informationSTUDY OVERVIEW MASTER PLAN GOALS AND OBJECTIVES
INTRODUCTION An Airport Master Plan provides an evalua on of the airport s avia on demand and an overview of the systema c airport development that will best meet those demands. The Master Plan establishes
More informationSTATUTORY INSTRUMENTS. S.I. No. 855 of 2004 IRISH AVIATION AUTHORITY (AIR TRAFFIC SERVICE SYSTEMS) ORDER, 2004
STATUTORY INSTRUMENTS S.I. No. 855 of 2004 IRISH AVIATION AUTHORITY (AIR TRAFFIC SERVICE SYSTEMS) ORDER, 2004 PUBLISHED BY THE STATIONERY OFFICE DUBLIN To be purchased directly from the GOVERNMENT PUBLICATIONS
More informationMS-395 William Butler Aircraft Maintenance Collection
Collection Number: MS-395 MS-395 William Butler Aircraft Maintenance Collection Title: William Butler Aircraft Maintenance Collection Dates: 1943-2000, (bulk 1983-1990) Creator: William Butler Summary/Abstract:
More informationPitot/Static System. Avionics. Single ADC LEFT PITOT TUBE AIR DATA COMPUTER RIGHT PITOT TUBE COPILOT ASI PILOT COPILOT ASI VSI PILOT
Pitot/Static System Single ADC Avionics LEFT PITOT TUBE CO ASI RIGHT PITOT TUBE ASI TRANSPONDER FLIGHT RECORDER FLIGHT DIRECTOR AUTO CO CO VSI CABIN AIR PRESSURE VSI AURAL WARNING UNIT (MACH WARNING) AURAL
More informationFAA Satellite. Navigation Update. Federal Aviation Administration. May 2014
FAA Satellite Navigation Update Wide Area Augmentation System (WAAS) Update Ground Based Augmentation System Update (GBAS) Alternative Positioning, Navigation & Timing (APNT) Update Questions Topics 2
More informationCOMPLIANCE WITH THIS PUBLICATION IS MANDATORY
BY ORDER OF THE COMMANDER AIR COMBAT COMMAND AIR FORCE INSTRUCTION 21-103 AIR COMBAT COMMAND Supplement 21 SEPTEMBER 2017 MAINTENANCE EQUIPMENT INVENTORY, STATUS, AND UTILIZATION REPORTING SYSTEM F-15A/B/C/D
More informationSIA GROUP FINANCIAL RESULTS
FINANCIAL RESULTS For Ended 30 June 2018 197200078R Operating Result Q1 Q1 Better/ FY18/19 FY17/18 R1 (Worse) ($M) ($M) (%) Total Revenue 3,844 3,864 (0.5) Q1 Better/ FY17/18 R2 (Worse) ($M) (%) 3,689
More informationFlight Inspection Services
Flight Inspection Services Overview Copyright 2013 Serbia and Montenegro Air Traffic Services (SMATSA), LLC About us SMATSA is the provider of air navigation services in the airspace of the Republic of
More information