1 Exhibit P-40, Budget Line Item Justification: PB 2017 Navy Date: February N: Other Procurement, Navy / BA 01: Ships Support Equipment / BSA 16: Logistic Support ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Item MDAP/MAIS Code(s): N/A Prior Years FY 2015 FY 2016 FY 2018 FY 2019 FY 2020 FY 2021 Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Obligation Authority ($ in Millions) (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) Flyaway Unit Cost ($ in Dollars) Gross/Weapon System Unit Cost ($ in Dollars) Description: Increases in FY2017 funding request attributable to procurement of Generators and Elect Distribution (8/ST002) FY2017 budgeted component, Canned Lube Oil Pump end item spare (6/ST002), Steering Control System (2/ST002) procurement and associated DSA, and Propeller Blades & PLMU (1/ST002) procurement and associated DSA requirements. LSD 46 Midlife being installed as phased modernization. This budget provides funding for the LSD Mid-life Program. The LSD Mid-life Program replaces obsolete/unsupported HM&E systems and implements Operating Cost (TOC) savings upgrades to maintain amphibious warfare capabilities through DECOM (2038). Primary objectives are to maintain or improve readiness, safety, reliability, lower maintenance costs, improve sailor quality of life, and/or sustain the LSD ship class through their notional service life or beyond. The budget purchases equipment including generators, Low Pressure Air Compressors (LPAC), Canned Lube Oil Pumps, A/C Plants, and 60T deck crane control systems. ST001 - The LSD Mid-life Program replaces obsolete/unsupported HM&E systems and legacy C5I systems, and implements TOC savings upgrades to maintain amphibious warfare capabilities through DECOM (2038). These include items such as LPAC, Steering Control Systems (SCS), A/C-plants, Generators, Propulsion Load Management Units (PLMU), Reverse Osmosis (RO) Desalinators, Automated Digital Network System (ADNS), Battle Force Tactical Network (BFTN), Digital Modular Radio (DMR), Global Broadcast System (GBS), Information Systems Security Program (KMI and KW46), Naval Modular Automated Communications System (NAVMACS), Advanced Digital Antenna Production (ADAP), Navy Multiband Terminal (NMT), and CRYPTO. Navy Page 1 of 31 P-1 Line #41 Volume 1-705

2 Exhibit P-40, Budget Line Item Justification: PB 2017 Navy Date: February N: Other Procurement, Navy / BA 01: Ships Support Equipment / BSA 16: Logistic Support ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Item MDAP/MAIS Code(s): N/A Exhibits Schedule Exhibit Type Title* Subexhibits ID CD Quantity / Cost (Each) / ($ M) Quantity / Cost (Each) / ($ M) Quantity / Cost (Each) / ($ M) Quantity / Cost (Each) / ($ M) Quantity / Cost (Each) / ($ M) Quantity / Cost (Each) / ($ M) P-40a LSD Midlife - / / / - - / - - / - - / - P-3a 1 / ST002 - Propeller Blades & PLMU (TBD) - / / - - / - - / / - - / P-3a 2 / ST002 - Steering Control System (TBD) - / / - - / - - / / - - / P-3a 3 / ST002-30T Deck Crane Control Sys (TBD) - / / - - / - - / - - / - - / - P-3a 4 / ST002 - Low Pressure Air Compressor (TBD) - / / - - / / / - - / P-3a 5 / ST002 - RO & Generators (TBD) - / / - - / - - / - - / - - / - P-3a 6 / ST002 - Canned Lube Oil Pump (TBD) - / / - - / - - / / - - / P-3a 7 / ST002 - Tech Refresh (TBD) - / / - - / - - / - - / - - / - P-3a 8 / ST002 - Generators & Elect Distribution (TBD) - / / - - / / / - - / P-3a 10 / ST002 - Generator LO Supply System (TBD) - / / - - / - - / - - / - - / - P-40 Gross/Weapon System Cost - / / / / / - - / Exhibits Schedule FY 2018 FY 2019 FY 2020 FY 2021 Exhibit Type Title* Subexhibits ID CD Quantity / Cost (Each) / ($ M) Quantity / Cost (Each) / ($ M) Quantity / Cost (Each) / ($ M) Quantity / Cost (Each) / ($ M) Quantity / Cost (Each) / ($ M) Quantity / Cost (Each) / ($ M) P-40a LSD Midlife - / - - / - - / - - / - - / - - / - P-3a 1 / ST002 - Propeller Blades & PLMU (TBD) - / / - - / - - / - - / - - / P-3a 2 / ST002 - Steering Control System (TBD) - / / - - / - - / - - / - - / P-3a 3 / ST002-30T Deck Crane Control Sys (TBD) - / - - / - - / - - / - - / - - / P-3a 4 / ST002 - Low Pressure Air Compressor (TBD) - / / - - / - - / - - / - - / P-3a 5 / ST002 - RO & Generators (TBD) - / - - / - - / - - / - - / - - / P-3a 6 / ST002 - Canned Lube Oil Pump (TBD) - / - - / - - / - - / - - / - - / P-3a 7 / ST002 - Tech Refresh (TBD) - / - - / - - / - - / - - / - - / P-3a 8 / ST002 - Generators & Elect Distribution (TBD) - / / - - / - - / - - / - - / P-3a 10 / ST002 - Generator LO Supply System (TBD) - / - - / / / - - / - - / P-40 Gross/Weapon System Cost - / / / / - - / - - / *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Title represents the P-40a Title when only the P-40a Summary/ is shown. Note: s in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Navy Page 2 of 31 P-1 Line #41 Volume 1-706

3 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2017 Navy Date: February 2016 Item Number / Title [DODIC] 1) ST001 C4I Systems (1) 1.1) Automated Digital Network System (ADNS) 1.2) Battle Force Tactical Network (BFTN) 1.3) Digital Modular Radio (DMR) 1.4) Global Broadcast System (GBS) 1.5) Information Systems Security Program (KMI and KW46) 1.6) Naval Modular Automated Communications System (NAVMACS) 1.7) Advanced Digital Antenna Production (ADAP) 1.8) Navy Multiband Terminal (NMT) ID CD A A A A A A A A MDAP/ MAIS Code Unit Cost ($) Aggregated Items Title: LSD Midlife Qty (Each) Cost ($ M) Unit Cost ($) Qty (Each) Cost ($ M) Unit Cost ($) Qty (Each) Cost ($ M) Unit Cost ($) Qty (Each) Cost ($ M) Unit Cost ($) Qty (Each) Cost ($ M) Unit Cost ($) ) CRYPTO A Subtotal: 1) ST001 C4I Systems ) Install 2.1) Design Services Allocation (DSA) A Subtotal: 2) Install Note: Subtotals or s in this Exhibit P-40a may not be exact or sum exactly, due to rounding. Qty (Each) Cost ($ M) Footnotes: (1) FY2015 ST001-C4I System funded via Ship Modernization, Operations, and Sustainment Funds (SMOSF). Navy Page 3 of 31 P-1 Line #41 Volume 1-707

4 Resource Summary Prior Years FY 2015 FY 2016 FY 2018 FY 2019 FY 2020 FY / ST002 - Propeller Blades & PLMU Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Obligation Authority ($ in Millions) (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) Gross/Weapon System Unit Cost ($ in Dollars) Description: This SHIPALT replaces the existing Propeller Blades with higher efficiency blades and installs Propulsion Load Management Units (PLMU) that result in fuel savings and engine maintenance reduction as well as operational benefits. The prototype for this SHIPALT was installed and proven aboard the LSD 44 under the DOD sponsored Commercial Operations and Support Savings Initiative (COSSI). Return On Investment (ROI) for the class is estimated at over $40M (after payback) and operational benefits include increased top speed, quicker response/deceleration, and elimination of existing system performance problems (i.e., low lube-oil pressure trip of main engines). Only 9 LSDs will require this SHIPALT as part of the Midlife Program. Navy Page 4 of 31 P-1 Line #41 Volume 1-708

5 Models of Systems Affected: Propeller Blades & PLMU Procurement Financial Plan Modification Item 1 of 1: ST002 - Propeller Blades & PLMU B Kits Recurring Modification Type: TBD Related RDT&E PEs: 1 / ST002 - Propeller Blades & PLMU FY 2018 FY 2019 FY 2020 FY 2021 (2) 1.1.1) FMP Ship Units - NonOrganic 7 / / - - / - 1 / / - 1 / / - - / - - / - - / - - / - 8 / ) End Item Spares - Organic 2 / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 2 / Subtotal: Recurring - / / - - / - - / / - - / / - - / - - / - - / - - / - - / Subtotal: ST002 - Propeller Blades & PLMU 9 / / - - / - 1 / / - 1 / / - - / - - / - - / - - / - 10 / Subtotal: Procurement, All Modification Items - / / - - / - - / / - - / / - - / - - / - - / - - / - - / Installation Modification Item 1 of 1: ST002 - Propeller Blades & PLMU - / / - - / - - / / - - / / / - - / - - / - - / - - / Subtotal: Installation - / / - - / - - / / - - / / / - - / - - / - - / - - / Cost (Procurement + Support + Installation) Navy Page 5 of 31 P-1 Line #41 Volume 1-709

6 Modification Item 1 of 1: ST002 - Propeller Blades & PLMU Manufacturer Information Manufacturer Name: Rolls Royce Manufacturer Location: Walpole, MA Administrative Leadtime (in Months): 2 Production Leadtime (in Months): 12 1 / ST002 - Propeller Blades & PLMU Dates FY 2015 FY 2016 FY 2018 FY 2019 FY 2020 FY 2021 Contract Dates Nov 2016 Delivery Dates Nov 2017 Installation Information Method of Implementation: SHIPYARD/AIT:: Installation Name: FMP Ship Units Installation Cost FY 2018 FY 2019 FY 2020 FY 2021 Prior Years 7 / / - - / - - / - - / - - / - - / - - / - - / - - / - - / / FY / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / / - - / / / - - / - - / - - / - 1 / FY / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 7 / / - - / - - / / - - / / / - - / - - / - - / - 8 / Installation Schedule FY 2015 FY 2016 FY 2018 FY 2019 FY 2020 FY 2021 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC t In Out Method of Implementation (Organic): End Item Spares - Not Installed Installation Quantity: 2 Footnotes: (2) IN/OUT based on current phased mod availability. FY17 install cost is in support of DSA requirements on the FY18 install. Navy Page 6 of 31 P-1 Line #41 Volume 1-710

7 Resource Summary Prior Years FY 2015 FY / ST002 - Steering Control System FY 2018 FY 2019 FY 2020 FY 2021 Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Obligation Authority ($ in Millions) (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) Gross/Weapon System Unit Cost ($ in Dollars) Description: This SHIPALT replaces the analog Helm and Lee Helm Steering Consoles and equipment with an electronic, computerized Steering Control System (SCS) that integrates various navigation parameters, such as location (latitude, longitude) from GPS as well as pitch, roll, speed, heading, and wind. SCS will be designed to integrate with Electronic Chart Display and Information Systems-Navy (ECDIS-N) digital nautical charts. The existing Bridge control system was designed in the late 1970s and is near the end of its useful service life. Parts obsolescence is a rapidly growing and more costly problem on this maintenance intensive control system. The IBS also provides significantly enhanced operational and monitoring capabilities as well as real-time Navigation data. This system will reduce workload, provide significant readiness improvement, improve safety and provide cost avoidance. Navy Page 7 of 31 P-1 Line #41 Volume 1-711

8 Models of Systems Affected: Steering Control System Procurement Financial Plan Modification Item 1 of 1: ST002 - Steering Control System B Kits Recurring Modification Type: TBD Related RDT&E PEs: 2 / ST002 - Steering Control System FY 2018 FY 2019 FY 2020 FY ) Non-FMP Shore Site Units - NonOrganic 2 / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 2 / (3) 1.1.2) FMP Ship Units - NonOrganic 11 / / - - / - 1 / / - 1 / / - - / - - / - - / - - / - 12 / Subtotal: Recurring - / / - - / - - / / - - / / - - / - - / - - / - - / - - / Subtotal: ST002 - Steering Control System 13 / / - - / - 1 / / - 1 / / - - / - - / - - / - - / - 14 / Subtotal: Procurement, All Modification Items - / / - - / - - / / - - / / - - / - - / - - / - - / - - / Installation Modification Item 1 of 1: ST002 - Steering Control System - / / - - / - - / / - - / / / - - / - - / - - / - - / Subtotal: Installation - / / - - / - - / / - - / / / - - / - - / - - / - - / Cost (Procurement + Support + Installation) Navy Page 8 of 31 P-1 Line #41 Volume 1-712

9 Modification Item 1 of 1: ST002 - Steering Control System Manufacturer Information Manufacturer Name: Henschel Manufacturer Location: Newburyport, MA Administrative Leadtime (in Months): 2 Production Leadtime (in Months): 12 2 / ST002 - Steering Control System Dates FY 2015 FY 2016 FY 2018 FY 2019 FY 2020 FY 2021 Contract Dates Nov 2016 Delivery Dates Nov 2017 Installation Information Method of Implementation: [none specified]:: Installation Name: Non-FMP Shore Site Units Installation Cost FY 2018 FY 2019 FY 2020 FY 2021 Prior Years 2 / / - - / - - / - - / - - / - - / - - / - - / - - / - - / / FY / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 2 / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 2 / Installation Schedule FY 2015 FY 2016 FY 2018 FY 2019 FY 2020 FY 2021 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC t In Out Method of Implementation: SHIPYARD/AIT:: Installation Name: FMP Ship Units Installation Cost FY 2018 FY 2019 FY 2020 FY 2021 Prior Years 11 / / - - / - - / - - / - - / - - / - - / - - / - - / - - / / FY / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - Navy Page 9 of 31 P-1 Line #41 Volume 1-713

10 Modification Item 1 of 1: ST002 - Steering Control System Installation Information Method of Implementation: SHIPYARD/AIT:: Installation Name: FMP Ship Units Installation Cost FY 2018 FY 2019 FY 2020 FY / ST002 - Steering Control System FY / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / / - - / / / - - / - - / - - / - 1 / FY / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 11 / / - - / - - / / - - / / / - - / - - / - - / - 12 / Installation Schedule FY 2015 FY 2016 FY 2018 FY 2019 FY 2020 FY 2021 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC t In Out Footnotes: (3) IN/OUT based on current phased mod availability. DSA ($1.2 million) efforts in support of the FY 2018 LSD Class install. Navy Page 10 of 31 P-1 Line #41 Volume 1-714

11 Resource Summary Prior Years FY 2015 FY 2016 FY 2018 FY 2019 FY 2020 FY / ST002-30T Deck Crane Control Sys Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Obligation Authority ($ in Millions) (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) Gross/Weapon System Unit Cost ($ in Dollars) Description: This ship change replaces the control system for the 30 n Crane with a modern, electronic, computerized control system. The existing 30 n Crane control system was designed in the late 1970s and is no longer logistically supported. Maintenance costs continue to be high due to the difficulty in obtaining repair parts and frequent failure of components. In addition, mission capability has been frequently degraded because the Deck Crane is required to support USMC amphibious assault landings and boat ops. Navy Page 11 of 31 P-1 Line #41 Volume 1-715

12 Models of Systems Affected: 30T Deck Crane Modification Type: TBD Related RDT&E PEs: Procurement Financial Plan Modification Item 1 of 1: ST002-30T Deck Crane Control Sys B Kits Recurring FY 2018 FY 2019 FY 2020 FY / ST002-30T Deck Crane Control Sys (4) 1.1.1) FMP Ship Units - NonOrganic 3 / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 3 / Subtotal: Recurring - / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / Subtotal: ST002-30T Deck Crane Control Sys 3 / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 3 / Subtotal: Procurement, All Modification Items - / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / Installation Modification Item 1 of 1: ST002-30T Deck Crane Control Sys - / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / Subtotal: Installation - / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / Cost (Procurement + Support + Installation) Navy Page 12 of 31 P-1 Line #41 Volume 1-716

13 Modification Item 1 of 1: ST002-30T Deck Crane Control Sys Manufacturer Information Manufacturer Name: Rockwell Manufacturer Location: Milwaukee, WI Administrative Leadtime (in Months): 6 Production Leadtime (in Months): 12 Contract Dates Delivery Dates 3 / ST002-30T Deck Crane Control Sys Dates FY 2015 FY 2016 FY 2018 FY 2019 FY 2020 FY 2021 Installation Information Method of Implementation: SHIPYARD/AIT:: Installation Name: FMP Ship Units Installation Cost FY 2018 FY 2019 FY 2020 FY 2021 Prior Years 3 / / - - / - - / - - / - - / - - / - - / - - / - - / - - / / FY / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 3 / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 3 / Installation Schedule FY 2015 FY 2016 FY 2018 FY 2019 FY 2020 FY 2021 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC t In Out Footnotes: (4) Requirement is 4 for the Program. Congressional Add Funds procured 1 in PY. Navy Page 13 of 31 P-1 Line #41 Volume 1-717

14 Resource Summary Prior Years FY 2015 FY / ST002 - Low Pressure Air Compressor FY 2018 FY 2019 FY 2020 FY 2021 Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Obligation Authority ($ in Millions) (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) Gross/Weapon System Unit Cost ($ in Dollars) Description: This Ship Change replaces the Low-Pressure Air Compressors (LPAC) with modern, oil-free compressors. Parts obsolescence is a rapidly growing and more costly problem on these maintenance intensive compressors. This Ship Change provides Return On Investment (ROI) through improved reliability and maintainability of LPACs and reduced maintenance by elimination of oil contamination of pneumatic controls components (new compressors are oil-free). In addition, the new compressors will provide significant readiness improvement through increased reliability of Vital, low-pressure air supply to Vital combat systems and the main propulsion controls. Navy Page 14 of 31 P-1 Line #41 Volume 1-718

15 Models of Systems Affected: LPAC Modification Type: TBD Related RDT&E PEs: Procurement Financial Plan Modification Item 1 of 1: ST002 - Low Pressure Air Compressor B Kits Recurring 4 / ST002 - Low Pressure Air Compressor FY 2018 FY 2019 FY 2020 FY 2021 (5) 1.1) FMP Ship Units - NonOrganic 7 / / - 1 / / - - / - - / - - / - - / - - / - - / - - / - 8 / Subtotal: Recurring - / / - - / / - - / - - / - - / - - / - - / - - / - - / - - / Subtotal: ST002 - Low Pressure Air Compressor 7 / / - 1 / / - - / - - / - - / - - / - - / - - / - - / - 8 / Subtotal: Procurement, All Modification Items - / / - - / / - - / - - / - - / - - / - - / - - / - - / - - / Installation Modification Item 1 of 1: ST002 - Low Pressure Air Compressor - / / - - / / / - - / / / - - / - - / - - / - - / Subtotal: Installation - / / - - / / / - - / / / - - / - - / - - / - - / Cost (Procurement + Support + Installation) Navy Page 15 of 31 P-1 Line #41 Volume 1-719

16 Modification Item 1 of 1: ST002 - Low Pressure Air Compressor Manufacturer Information Manufacturer Name: RIX Manufacturer Location: Benecia, CA Administrative Leadtime (in Months): 2 Production Leadtime (in Months): 16 4 / ST002 - Low Pressure Air Compressor Dates FY 2015 FY 2016 FY 2018 FY 2019 FY 2020 FY 2021 Contract Dates Jul 2016 Delivery Dates Nov 2017 Installation Information Method of Implementation: SHIPYARD/AIT:: Installation Name: FMP Ship Units Installation Cost FY 2018 FY 2019 FY 2020 FY 2021 Prior Years 7 / / - - / - - / - - / - - / - - / - - / - - / - - / - - / / FY / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY / - - / - - / / / - - / / / - - / - - / - - / - 1 / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 7 / / - - / / / - - / / / - - / - - / - - / - 8 / Installation Schedule FY 2015 FY 2016 FY 2018 FY 2019 FY 2020 FY 2021 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC t In Out Footnotes: (5) Shipset equals 3 LPAC to be installed on LSD 46. FY16 DSA efforts are required in order to re-compete the procurement and award contract for LSD 46 LPACs. FY17 DSA is for the standard year prior to install costs for Long Lead Time Material and Advanced Planning. IN/OUT based on current phased mod availability. Navy Page 16 of 31 P-1 Line #41 Volume 1-720

17 Resource Summary Prior Years FY 2015 FY / ST002 - RO & Generators FY 2018 FY 2019 FY 2020 FY 2021 Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Obligation Authority ($ in Millions) (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) Gross/Weapon System Unit Cost ($ in Dollars) Description: This SHIPALT removes the auxiliary boilers and steam system equipment and replaces them with electrical equipment including Reverse Osmosis (RO) desalineators which replace the steam evaporators, and numerous electric heaters and galley equipment replacing their steam counterparts. This SHIPALT provides significant Return On Investment (ROI) through improved reliability and maintainability of electrical ship systems/equipment versus the obsolete and maintenance intensive steam systems/equipment. Also, additional electrical plant loads will improve efficient operation of the currently under-loaded SSDGs and contribute to the ROI through reduced maintenance costs for the SSDGs. These ship systems will also increase ships force safety and eliminate personnel hazards from steam. Navy Page 17 of 31 P-1 Line #41 Volume 1-721

18 Models of Systems Affected: RO Generator Modification Type: TBD Related RDT&E PEs: Procurement Financial Plan Modification Item 1 of 1: ST002 - RO & Generators B Kits Recurring 5 / ST002 - RO & Generators FY 2018 FY 2019 FY 2020 FY ) FMP Ship Units - NonOrganic 11 / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 11 / Subtotal: Recurring - / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / Subtotal: ST002 - RO & Generators 11 / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 11 / Subtotal: Procurement, All Modification Items - / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / Installation Modification Item 1 of 1: ST002 - RO & Generators - / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / Subtotal: Installation - / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / Cost (Procurement + Support + Installation) Navy Page 18 of 31 P-1 Line #41 Volume 1-722

19 Modification Item 1 of 1: ST002 - RO & Generators Manufacturer Information Manufacturer Name: Aqua-Chem Manufacturer Location: Knoxville, TN Administrative Leadtime (in Months): 2 Production Leadtime (in Months): 21 Contract Dates Delivery Dates 5 / ST002 - RO & Generators Dates FY 2015 FY 2016 FY 2018 FY 2019 FY 2020 FY 2021 Installation Information Method of Implementation: SHIPYARD/AIT:: Installation Name: FMP Ship Units Installation Cost FY 2018 FY 2019 FY 2020 FY 2021 Prior Years 11 / / - - / - - / - - / - - / - - / - - / - - / - - / - - / / FY / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 11 / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 11 / Installation Schedule FY 2015 FY 2016 FY 2018 FY 2019 FY 2020 FY 2021 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC t In Out Navy Page 19 of 31 P-1 Line #41 Volume 1-723

20 Resource Summary Prior Years FY 2015 FY / ST002 - Canned Lube Oil Pump FY 2018 FY 2019 FY 2020 FY 2021 Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Obligation Authority ($ in Millions) (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) Gross/Weapon System Unit Cost ($ in Dollars) Description: Procures and installs a lube oil pump and controllers for the main four (4) propulsion diesel engines, including piping and sensor modifications. Navy Page 20 of 31 P-1 Line #41 Volume 1-724

21 Models of Systems Affected: Canned Lube Oil Pump Modification Type: TBD Related RDT&E PEs: Procurement Financial Plan Modification Item 1 of 1: ST002 - Canned Lube Oil Pump B Kits Recurring 6 / ST002 - Canned Lube Oil Pump FY 2018 FY 2019 FY 2020 FY 2021 (6) 1.1.1) FMP Ship Units - NonOrganic 11 / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 11 / ) End Item Spares - Organic - / - - / - - / - 1 / / - 1 / / - - / - - / - - / - - / - 1 / Subtotal: Recurring - / / - - / - - / / - - / / - - / - - / - - / - - / - - / Subtotal: ST002 - Canned Lube Oil Pump 11 / / - - / - 1 / / - 1 / / - - / - - / - - / - - / - 12 / Subtotal: Procurement, All Modification Items - / / - - / - - / / - - / / - - / - - / - - / - - / - - / Installation Modification Item 1 of 1: ST002 - Canned Lube Oil Pump - / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / Subtotal: Installation - / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / Cost (Procurement + Support + Installation) Navy Page 21 of 31 P-1 Line #41 Volume 1-725

22 Modification Item 1 of 1: ST002 - Canned Lube Oil Pump Manufacturer Information Manufacturer Name: IMO Pumps Manufacturer Location: Monroe, NC Administrative Leadtime (in Months): 2 Production Leadtime (in Months): 10 6 / ST002 - Canned Lube Oil Pump Dates FY 2015 FY 2016 FY 2018 FY 2019 FY 2020 FY 2021 Contract Dates Jan 2017 Delivery Dates Dec 2017 Installation Information Method of Implementation: SHIPYARD/AIT:: Installation Name: FMP Ship Units Installation Cost FY 2018 FY 2019 FY 2020 FY 2021 Prior Years 11 / / - - / - - / - - / - - / - - / - - / - - / - - / - - / / FY / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 11 / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 11 / Installation Schedule FY 2015 FY 2016 FY 2018 FY 2019 FY 2020 FY 2021 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC t In Out Method of Implementation (Organic): End Item Spares Installation Quantity: 1 Footnotes: (6) requirement is 11. Congressional Add Funds procured 5 and installed 3 in PY. Navy Page 22 of 31 P-1 Line #41 Volume 1-726

23 Resource Summary Prior Years FY 2015 FY / ST002 - Tech Refresh FY 2018 FY 2019 FY 2020 FY 2021 Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Obligation Authority ($ in Millions) (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) Gross/Weapon System Unit Cost ($ in Dollars) Description: Upgrades to internal computer hardware and software on the Mid-Life Installed control systems for the Propulsion Load Management Unit (PLMU), Steering Control System and RO & Generators on the earlier installations of these systems in accordance with standard Navy Computer Control System Tech Refresh requirements. Navy Page 23 of 31 P-1 Line #41 Volume 1-727

24 Models of Systems Affected: Tech Refresh Modification Type: TBD Related RDT&E PEs: Procurement Financial Plan Modification Item 1 of 1: ST002 - Tech Refresh B Kits Recurring 7 / ST002 - Tech Refresh FY 2018 FY 2019 FY 2020 FY ) Tech Refresh - NonOrganic 4 / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 4 / Subtotal: Recurring - / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / Subtotal: ST002 - Tech Refresh 4 / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 4 / Subtotal: Procurement, All Modification Items - / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / Installation Modification Item 1 of 1: ST002 - Tech Refresh - / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / Subtotal: Installation - / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / Cost (Procurement + Support + Installation) Navy Page 24 of 31 P-1 Line #41 Volume 1-728

25 Modification Item 1 of 1: ST002 - Tech Refresh Manufacturer Information Manufacturer Name: Various Manufacturer Location: Various Administrative Leadtime (in Months): 1 Production Leadtime (in Months): 3 Contract Dates Delivery Dates 7 / ST002 - Tech Refresh Dates FY 2015 FY 2016 FY 2018 FY 2019 FY 2020 FY 2021 Installation Information Method of Implementation: AIT:: Installation Name: Tech Refresh Installation Cost FY 2018 FY 2019 FY 2020 FY 2021 Prior Years 4 / / - - / - - / - - / - - / - - / - - / - - / - - / - - / / FY / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 4 / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 4 / Installation Schedule FY 2015 FY 2016 FY 2018 FY 2019 FY 2020 FY 2021 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC t In Out Navy Page 25 of 31 P-1 Line #41 Volume 1-729

26 Resource Summary Prior Years FY 2015 FY / ST002 - Generators & Elect Distribution FY 2018 FY 2019 FY 2020 FY 2021 Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Obligation Authority ($ in Millions) (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) Gross/Weapon System Unit Cost ($ in Dollars) Description: This SHIPALT replaces the generator on the Ship Service Diesel Generators (SSDG) with a higher wattage version and increased electric distribution capability for shore power, switchboard and load centers. This SHIPALT provides significant Return on Investment (ROI) through improved reliability and maintainability of electrical ship systems/equipment versus the obsolete and maintenance intensive equipment. Also, additional electrical plant loads will improve efficient operation of the currently under-loaded SSDGs and contribute to the ROI through reduced maintenance costs for the SSDGs. Navy Page 26 of 31 P-1 Line #41 Volume 1-730

27 Models of Systems Affected: Generators & Elect Distribution Procurement Financial Plan Modification Item 1 of 1: ST002 - Generators & Elect Distribution B Kits Recurring Modification Type: TBD Related RDT&E PEs: 8 / ST002 - Generators & Elect Distribution FY 2018 FY 2019 FY 2020 FY 2021 (7) 1.1.1) FMP Ship Units - NonOrganic - / - - / - 1 / / / - - / / / - - / - - / - - / - 1 / Subtotal: Recurring - / / - - / / / - - / / / - - / - - / - - / - - / Subtotal: ST002 - Generators & Elect Distribution - / - - / - 1 / / / - - / / / - - / - - / - - / - 1 / Subtotal: Procurement, All Modification Items - / / - - / / / - - / / / - - / - - / - - / - - / Installation Modification Item 1 of 1: ST002 - Generators & Elect Distribution - / / - - / / / - - / / / - - / - - / - - / - - / Subtotal: Installation - / / - - / / / - - / / / - - / - - / - - / - - / Cost (Procurement + Support + Installation) Navy Page 27 of 31 P-1 Line #41 Volume 1-731

28 Modification Item 1 of 1: ST002 - Generators & Elect Distribution Manufacturer Information Manufacturer Name: Awua-Chem Manufacturer Location: Knoxiville, TN Administrative Leadtime (in Months): 2 Production Leadtime (in Months): 21 8 / ST002 - Generators & Elect Distribution Dates FY 2015 FY 2016 FY 2018 FY 2019 FY 2020 FY 2021 Contract Dates Mar 2016 Jan 2017 Delivery Dates Dec 2017 Dec 2017 Installation Information Method of Implementation: SHIPYARD/AIT:: Installation Name: FMP Ship Units Installation Cost FY 2018 FY 2019 FY 2020 FY 2021 Prior Years - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY / - - / - - / / / - - / / / - - / - - / - - / - 1 / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / / / - - / / / - - / - - / - - / - 1 / Installation Schedule FY 2015 FY 2016 FY 2018 FY 2019 FY 2020 FY 2021 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC t In Out Footnotes: (7) The replacement generator to be installed in FY18 for LSD-46 is procured in components and is budgeted in FY16, FY17, and FY18 based on the production lead-times of individual components. FY16 funding is required to procure generator couplings, load centers, shore power receptacles, and shore power switchboard with lead-times ranging from 11 to 21 months. IN/OUT based on current phased mod availability. FY17 DSA is for the year prior to install costs associated with the remainder of Midlife Long Lead Time Material and Advanced Planning. IN/OUT based on current phased mod availability. Navy Page 28 of 31 P-1 Line #41 Volume 1-732

29 Resource Summary Prior Years FY 2015 FY / ST002 - Generator LO Supply System FY 2018 FY 2019 FY 2020 FY 2021 Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Obligation Authority ($ in Millions) (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) Gross/Weapon System Unit Cost ($ in Dollars) Description: This ship change replaces the existing lube oil supply system with a new lube oil supply system in which the diesel engine is bypassed by using a supply tap point off the existing diesel supply inlet. This will then supply filtered, conditioned oil to the generator bearings. Post Mid-Life LSD-41/49 class have been experiencing generator bearing failures due to debris being introduced by the engine. Navy Page 29 of 31 P-1 Line #41 Volume 1-733

30 Models of Systems Affected: [No Model Specified] Modification Type: TBD Related RDT&E PEs: Procurement Financial Plan Modification Item 1 of 1: ST002 - Generator LO Supply System B Kits Recurring 10 / ST002 - Generator LO Supply System FY 2018 FY 2019 FY 2020 FY ) FMP Ship Units - NonOrganic - / - - / - - / - - / - - / - - / - - / - 1 / / - - / - - / - 1 / Subtotal: Recurring - / / - - / - - / - - / - - / - - / - - / / - - / - - / - - / Subtotal: ST002 - Generator LO Supply System - / - - / - - / - - / - - / - - / - - / - 1 / / - - / - - / - 1 / Subtotal: Procurement, All Modification Items - / / - - / - - / - - / - - / - - / - - / / - - / - - / - - / Installation Modification Item 1 of 1: ST002 - Generator LO Supply System - / / - - / - - / - - / - - / - - / - - / - - / / - - / - - / Subtotal: Installation - / / - - / - - / - - / - - / - - / - - / - - / / - - / - - / Cost (Procurement + Support + Installation) Navy Page 30 of 31 P-1 Line #41 Volume 1-734

31 Modification Item 1 of 1: ST002 - Generator LO Supply System Manufacturer Information Manufacturer Name: TBD Manufacturer Location: TBD Administrative Leadtime (in Months): 3 Production Leadtime (in Months): 9 10 / ST002 - Generator LO Supply System Dates FY 2015 FY 2016 FY 2018 FY 2019 FY 2020 FY 2021 Contract Dates Feb 2019 Delivery Dates Nov 2019 Installation Information Method of Implementation: [none specified]:: Installation Name: FMP Ship Units Installation Cost FY 2018 FY 2019 FY 2020 FY 2021 Prior Years - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY / - - / - - / - - / - - / - - / - - / - - / - 1 / / - - / - 1 / FY / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 1 / / - - / - 1 / Installation Schedule FY 2015 FY 2016 FY 2018 FY 2019 FY 2020 FY 2021 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC t In Out Navy Page 31 of 31 P-1 Line #41 Volume 1-735

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 18 P-1 Line #12

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 18 P-1 Line #12 Exhibit P-40, Budget Line Item Justification: PB 2017 Navy Date: February 2016 1810N: Other Procurement, Navy / BA 01: Ships Support Equipment / BSA 9: Other Shipboard Equipment ID Code (A=Service Ready,

More information

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 21 P-1 Line #19

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 21 P-1 Line #19 Exhibit P-40, Budget Line Item Justification: PB 2017 Navy Date: February 2016 1810N: Other Procurement, Navy / BA 01: Ships Support Equipment / BSA 9: Other Shipboard Equipment ID Code (A=Service Ready,

More information

UNCLASSIFIED. FY 2017 Base FY 2017 OCO FY 2017 OCO. FY 2017 Base

UNCLASSIFIED. FY 2017 Base FY 2017 OCO FY 2017 OCO. FY 2017 Base Exhibit P-40, Budget Line Item Justification: PB 2017 Air Force Date: February 2016 3010F: Aircraft Procurement, Air Force / BA 05: Modification of Inservice Aircraft / BSA 2: Tactical Aircraft ID Code

More information

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 5 P-1 Line #35

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 5 P-1 Line #35 Exhibit P-40, Budget Line Item Justification: PB 2017 Air Force Date: February 2016 3010F: Aircraft Procurement, Air Force / BA 05: Modification of Inservice Aircraft / BSA 4: Trainer Aircraft ID Code

More information

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 17 P-1 Line #121

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 17 P-1 Line #121 Exhibit P-40, Budget Line Item Justification: PB 2015 Navy Date: March 2014 1810N: Other Procurement, Navy / BA 04: Ordnance Support Equipment / BSA 3: Ship Missile Systems Equipment ID Code (A=Service

More information

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

UNCLASSIFIED FY 2016 OCO. FY 2016 Base Exhibit P-40, Budget Line Item Justification: PB 2016 Air Force Date: February 2015 3010F: Aircraft Procurement, Air Force / BA 05: Modification of Inservice Aircraft / BSA 5: Other Aircraft ID Code (A=Service

More information

UNCLASSIFIED. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018

UNCLASSIFIED. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018 Exhibit P-40, Budget Item Justification Sheet: PB 2014 Navy Date: April 2013 Aircraft / BSA 1: Modification Of Aircraft ID Code (A=Service Ready, B=Not Service Ready) : A Program Elements for Code B Items:

More information

UNCLASSIFIED. UNCLASSIFIED United States Special Operations Command Page 1 of 6 P-1 Line #53

UNCLASSIFIED. UNCLASSIFIED United States Special Operations Command Page 1 of 6 P-1 Line #53 Exhibit P-40, Budget Line Item Justification: PB 2017 United States Special Operations Command : February 2016 0300D: Procurement, Defense-Wide / BA 02: Special Operations Command / BSA 1: Aviation Programs

More information

UNCLASSIFIED. FY 2016 Base FY 2016 OCO FY 2016 OCO. FY 2016 Base

UNCLASSIFIED. FY 2016 Base FY 2016 OCO FY 2016 OCO. FY 2016 Base Exhibit P-40, Budget Line Item Justification: PB 2016 Army Date: February 2015 2031A: Aircraft Procurement, Army / BA 02: Modification of Aircraft / BSA 10: Modification of Aircraft ID Code (A=Service

More information

UNCLASSIFIED FY Exhibits Schedule Prior Years FY 2013 FY 2014 FY 2015 Base FY 2015 OCO FY 2015 Total. Total Cost ($ M)

UNCLASSIFIED FY Exhibits Schedule Prior Years FY 2013 FY 2014 FY 2015 Base FY 2015 OCO FY 2015 Total. Total Cost ($ M) Exhibit P-40, Budget Line Item Justification: PB 2015 Army Date: March 2014 2033A: Procurement of W&TCV, Army / BA 01: Tracked Combat Vehicles / BSA 20: Modification of Tracked Combat Vehicles ID Code

More information

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 24 P-1 Line #55

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 24 P-1 Line #55 Exhibit P-40, Budget Line Item Justification: PB 2016 Navy Date: February 2015 1506N: Aircraft Procurement, Navy / BA 05: Modification of Aircraft / BSA 1: Modification of Aircraft ID Code (A=Service Ready,

More information

UNCLASSIFIED. FY 2017 Base FY 2017 OCO FY 2017 OCO. FY 2017 Base

UNCLASSIFIED. FY 2017 Base FY 2017 OCO FY 2017 OCO. FY 2017 Base Exhibit P-40, Budget Line Item Justification: PB 2017 Air Force Date: February 2016 3010F: Aircraft Procurement, Air Force / BA 05: Modification of Inservice Aircraft / BSA 2: Tactical Aircraft ID Code

More information

UNCLASSIFIED FY 2015 FY 2015 OCO. FY 2015 Base FY 2015 FY Base

UNCLASSIFIED FY 2015 FY 2015 OCO. FY 2015 Base FY 2015 FY Base Exhibit P-40, Budget Line Item Justification: PB 2015 Air Force Date: March 2014 3010F: Aircraft Procurement, Air Force / BA 05: Modification of Inservice Aircraft / BSA 5: Other Aircraft ID Code (A=Service

More information

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 16 P-1 Line #57

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 16 P-1 Line #57 Exhibit P-40, Budget Line Item Justification: PB 2017 Navy Date: February 2016 1506N: Aircraft Procurement, Navy / BA 05: Modification of Aircraft / BSA 1: Modification of Aircraft ID Code (A=Service Ready,

More information

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 33 P-1 Line #94

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 33 P-1 Line #94 Exhibit P-40, Budget Line Item Justification: PB 2017 Navy Date: February 2016 1810N: Other Procurement, Navy / BA 02: Communications & Electronics Equip / BSA 12: Submarine Communications ID Code (A=Service

More information

UNCLASSIFIED. FY 2017 Base FY 2017 OCO

UNCLASSIFIED. FY 2017 Base FY 2017 OCO Exhibit P-40, Budget Line Item Justification: PB 2017 Air Force Date: February 2016 3010F: Aircraft Procurement, Air Force / BA 05: Modification of Inservice Aircraft / BSA 5: Other Aircraft ID Code (A=Service

More information

UNCLASSIFIED FY 2017 OCO. FY 2017 Base

UNCLASSIFIED FY 2017 OCO. FY 2017 Base Exhibit P-40, Budget Line Item Justification: PB 2017 Air Force Date: February 2016 3021F: Space Procurement, Air Force / BA 01: Space Procurement, Air Force / BSA 1: Space Programs ID Code (A=Service

More information

UNCLASSIFIED FY 2016 OCO. FY 2016 Base. FY 2016 Base FY 2016 OCO

UNCLASSIFIED FY 2016 OCO. FY 2016 Base. FY 2016 Base FY 2016 OCO Exhibit P-40, Budget Line Item Justification: PB 2016 Army Date: February 2015 2033A: Procurement of W&TCV, Army / BA 01: Tracked Combat Vehicles / BSA 20: Modification of Tracked Combat Vehicles ID Code

More information

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 10 P-1 Line #47

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 10 P-1 Line #47 Exhibit P-40, Budget Line Item Justification: PB 2016 Air Force Date: February 2015 3010F: Aircraft Procurement, Air Force / BA 05: Modification of Inservice Aircraft / BSA 5: Other Aircraft ID Code (A=Service

More information

UNCLASSIFIED. FY 2016 Base FY 2016 OCO FY 2016 OCO. FY 2016 Base

UNCLASSIFIED. FY 2016 Base FY 2016 OCO FY 2016 OCO. FY 2016 Base Exhibit P-40, Budget Line Item Justification: PB 2016 Air Force Date: February 2015 3010F: Aircraft Procurement, Air Force / BA 05: Modification of Inservice Aircraft / BSA 2: Tactical Aircraft ID Code

More information

UNCLASSIFIED. FY 2017 Base FY 2017 OCO FY 2017 OCO. FY 2017 Base

UNCLASSIFIED. FY 2017 Base FY 2017 OCO FY 2017 OCO. FY 2017 Base Exhibit P-40, Budget Line Item Justification: PB 2017 Air Force Date: February 2016 3010F: Aircraft Procurement, Air Force / BA 05: Modification of Inservice Aircraft / BSA 5: Other Aircraft ID Code (A=Service

More information

UNCLASSIFIED. FY 2017 Base FY 2017 OCO. FY 2017 Base FY 2017 OCO

UNCLASSIFIED. FY 2017 Base FY 2017 OCO. FY 2017 Base FY 2017 OCO Exhibit P-40, Budget Line Item Justification: PB 2017 Air Force Date: February 2016 3010F: Aircraft Procurement, Air Force / BA 05: Modification of Inservice Aircraft / BSA 3: Airlift Aircraft ID Code

More information

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 5 P-1 Line #55

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 5 P-1 Line #55 Exhibit P-40, Budget Line Item Justification: PB 2016 Air Force Date: February 2015 3010F: Aircraft Procurement, Air Force / BA 05: Modification of Inservice Aircraft / BSA 5: Other Aircraft ID Code (A=Service

More information

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

UNCLASSIFIED FY 2016 OCO. FY 2016 Base Exhibit P-40, Budget Line Item Justification: PB 2016 Air Force Date: February 2015 3010F: Aircraft Procurement, Air Force / BA 05: Modification of Inservice Aircraft / BSA 5: Other Aircraft ID Code (A=Service

More information

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 17 P-1 Line #55

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 17 P-1 Line #55 Exhibit P-40, Budget Line Item Justification: PB 2017 Air Force Date: February 2016 3010F: Aircraft Procurement, Air Force / BA 05: Modification of Inservice Aircraft / BSA 5: Other Aircraft ID Code (A=Service

More information

UNCLASSIFIED. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018

UNCLASSIFIED. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018 Exhibit P-40, Budget Item Justification Sheet: PB 2014 Navy : April 2013 Ammo, MC / BSA 1: Marine Corps Ammunition ID Code (A=Service Ready, B=Not Service Ready) : A Program Elements for Code B : Other

More information

UNCLASSIFIED. FY 2014 Base. OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018

UNCLASSIFIED. FY 2014 Base. OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018 Exhibit P-40, Budget Item Justification Sheet: PB 2014 Air Force Date: April 2013 Inservice Missiles / BSA 1: Class IV ID Code (A=Service Ready, B=Not Service Ready) : A Program Elements for Code B Items:

More information

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 5 P-1 Line #21

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 5 P-1 Line #21 Exhibit P-40, Budget Line Item Justification: PB 2015 Navy Date: March 2014 1507N: Weapons Procurement, Navy / BA 03: Torpedoes and Related Equipment / BSA 1: Torpedoes and Related Equip ID Code (A=Service

More information

UNCLASSIFIED FY 2017 OCO. FY 2017 Base

UNCLASSIFIED FY 2017 OCO. FY 2017 Base Exhibit P-40, Budget Line Item Justification: PB 2017 Navy Date: February 2016 1810N: Other Procurement, Navy / BA 04: Ordnance Support Equipment / BSA 7: Other Expendable Ordnance ID Code (A=Service Ready,

More information

UNCLASSIFIED. UNCLASSIFIED Army Page 1 of 23 P-1 Line #27

UNCLASSIFIED. UNCLASSIFIED Army Page 1 of 23 P-1 Line #27 Exhibit P-40, Budget Line Item Justification: PB 2015 Army Date: March 2014 2031A: Aircraft Procurement, Army / BA 02: Modification of Aircraft / BSA 10: Modification of Aircraft ID Code (A=Service Ready,

More information

UNCLASSIFIED. FY 2017 Base FY 2017 OCO FY 2017 OCO. FY 2017 Base

UNCLASSIFIED. FY 2017 Base FY 2017 OCO FY 2017 OCO. FY 2017 Base Exhibit P-40, Budget Line Item Justification: PB 2017 Army Date: February 2016 2033A: Procurement of W&TCV, Army / BA 01: Tracked Combat Vehicles / BSA 20: Modification of Tracked Combat Vehicles ID Code

More information

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 18 P-1 Line #56

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 18 P-1 Line #56 Exhibit P-40, Budget Line Item Justification: PB 2016 Air Force Date: February 2015 3010F: Aircraft Procurement, Air Force / BA 05: Modification of Inservice Aircraft / BSA 5: Other Aircraft ID Code (A=Service

More information

UNCLASSIFIED. UNCLASSIFIED Army Page 1 of 16 P-1 Line #15

UNCLASSIFIED. UNCLASSIFIED Army Page 1 of 16 P-1 Line #15 Exhibit P-40, Budget Line Item Justification: PB 2017 Army Date: February 2016 2031A: Aircraft Procurement, Army / BA 02: Modification of Aircraft / BSA 10: Modification of Aircraft ID Code (A=Service

More information

UNCLASSIFIED FY Exhibits Schedule Prior Years FY 2013 FY 2014 FY 2015 Base FY 2015 OCO FY 2015 Total. Total Cost ($ M) Unit Cost ($) Qty (Each)

UNCLASSIFIED FY Exhibits Schedule Prior Years FY 2013 FY 2014 FY 2015 Base FY 2015 OCO FY 2015 Total. Total Cost ($ M) Unit Cost ($) Qty (Each) Exhibit P-40, Budget Line Item Justification: PB 2015 Navy Date: March 2014 1506N: Aircraft Procurement, Navy / BA 05: Modification of Aircraft / BSA 1: Modification of Aircraft ID Code (A=Service Ready,

More information

UNCLASSIFIED. FY 2016 Base FY 2016 OCO FY 2016 OCO. FY 2016 Base

UNCLASSIFIED. FY 2016 Base FY 2016 OCO FY 2016 OCO. FY 2016 Base Resource Summary Prior Years FY 2014 FY 2015 Base OCO Total FY 2017 FY 2018 FY 2019 FY 2020 To Complete Procurement Quantity (Units in Each) - - - - - - - - - - - - Gross/Weapon System Cost ($ in Millions)

More information

UNCLASSIFIED. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018

UNCLASSIFIED. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018 Exhibit P-40, Budget Item Justification Sheet: PB 2014 Navy : April 2013 Ammo, MC / BSA 1: Marine Corps Ammunition ID Code (A=Service Ready, B=Not Service Ready) : A Program Elements for Code B : Other

More information

UNCLASSIFIED. FY 2017 Base FY 2017 OCO

UNCLASSIFIED. FY 2017 Base FY 2017 OCO Exhibit P-40, Budget Line Item Justification: PB 2017 Navy Date: February 2016 1506N: Aircraft Procurement, Navy / BA 05: Modification of Aircraft / BSA 1: Modification of Aircraft ID Code (A=Service Ready,

More information

UNCLASSIFIED FY 2015 FY 2015 OCO. FY 2015 Base FY 2015 FY Base

UNCLASSIFIED FY 2015 FY 2015 OCO. FY 2015 Base FY 2015 FY Base Exhibit P-40, Budget Line Item Justification: PB 2015 Army Date: March 2014 2031A: Aircraft Procurement, Army / BA 02: Modification of Aircraft / BSA 10: Modification of Aircraft ID Code (A=Service Ready,

More information

UNCLASSIFIED. FY 2017 Base FY 2017 OCO. FY 2017 Base FY 2017 OCO

UNCLASSIFIED. FY 2017 Base FY 2017 OCO. FY 2017 Base FY 2017 OCO UNCLSSIFIED Exhibit P-40, Budget Line Item Justification: PB 2017 ir Force Date: February 2016 ppropriation / Budget ctivity / Budget Sub ctivity: 3080F: Other Procurement, ir Force / B 02: Vehicular Equipment

More information

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 151 P-1 Line #32

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 151 P-1 Line #32 Exhibit P-40, Budget Line Item Justification: PB 2017 Navy Date: February 2016 1506N: Aircraft Procurement, Navy / BA 05: Modification of Aircraft / BSA 1: Modification of Aircraft ID Code (A=Service Ready,

More information

UNCLASSIFIED FY Exhibits Schedule Prior Years FY 2013 FY 2014 FY 2015 Base FY 2015 OCO FY 2015 Total. Unit Cost ($ M) Qty (Each)

UNCLASSIFIED FY Exhibits Schedule Prior Years FY 2013 FY 2014 FY 2015 Base FY 2015 OCO FY 2015 Total. Unit Cost ($ M) Qty (Each) Exhibit P-40, Budget Line Item Justification: PB 2015 United States Special Operations Command Date: March 2014 0300D: Procurement, Defense-Wide / BA 02: Special Operations Command / BSA 4: Other Procurement

More information

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 30 P-1 Line #36

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 30 P-1 Line #36 Exhibit P-40, Budget Line Item Justification: PB 2016 Navy Date: February 2015 1506N: Aircraft Procurement, Navy / BA 05: Modification of Aircraft / BSA 1: Modification of Aircraft ID Code (A=Service Ready,

More information

UNCLASSIFIED. FY 2017 Base FY 2017 OCO

UNCLASSIFIED. FY 2017 Base FY 2017 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2017 Air Force : February 2016 3600: Research, Development, Test & Evaluation, Air Force / BA 7: Operational Systems Development COST ($ in Millions) FY

More information

UNCLASSIFIED. FY 2014 Base. OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018

UNCLASSIFIED. FY 2014 Base. OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018 Exhibit P-40, Budget Item Justification Sheet: PB 2014 Army Date: April 2013 Aircraft / BSA 10: Modification Of Aircraft ID Code (A=Service Ready, B=Not Service Ready) : Program Elements for Code B Items:

More information

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 17 P-1 Line #13

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 17 P-1 Line #13 Exhibit P-40, Budget Line Item Justification: PB 2016 Navy : February 2015 1508N: Procurement of Ammo, Navy & MC / BA 01: Proc Ammo, Navy / BSA 1: Navy Ammunition A Program Elements for Code B Items: Other

More information

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 34 P-1 Line #51

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 34 P-1 Line #51 Exhibit P-40, Budget Line Item Justification: PB 2016 Navy Date: February 2015 1506N: Aircraft Procurement, Navy / BA 05: Modification of Aircraft / BSA 1: Modification of Aircraft ID Code (A=Service Ready,

More information

UNCLASSIFIED FY Exhibits Schedule Prior Years FY 2013 FY 2014 FY 2015 Base FY 2015 OCO FY 2015 Total. Total Cost ($ M) Unit Cost ($) Qty (Each)

UNCLASSIFIED FY Exhibits Schedule Prior Years FY 2013 FY 2014 FY 2015 Base FY 2015 OCO FY 2015 Total. Total Cost ($ M) Unit Cost ($) Qty (Each) Exhibit P-40, Budget Line Item Justification: PB 2015 Navy Date: March 2014 1506N: Aircraft Procurement, Navy / BA 05: Modification of Aircraft / BSA 1: Modification of Aircraft ID Code (A=Service Ready,

More information

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 126 P-1 Line #32

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 126 P-1 Line #32 Exhibit P-40, Budget Line Item Justification: PB 2016 Navy Date: February 2015 1506N: Aircraft Procurement, Navy / BA 05: Modification of Aircraft / BSA 1: Modification of Aircraft ID Code (A=Service Ready,

More information

UNCLASSIFIED. UNCLASSIFIED Page 1 of 5. EXHIBIT R-2, RDT&E Budget Item Justification RESEARCH DEVELOPMENT TEST & EVALUATION, NAVY / BA-5

UNCLASSIFIED. UNCLASSIFIED Page 1 of 5. EXHIBIT R-2, RDT&E Budget Item Justification RESEARCH DEVELOPMENT TEST & EVALUATION, NAVY / BA-5 EXHIBIT R-2, RDT&E Budget Item Justification APPROPRIATION/BUDGET ACTIVITY RESEARCH DEVELOPMENT TEST & EVALUATION, NAVY / BA-5 R-1 ITEM NOMENCLATURE 0605430N, C/KC-130 AVIONICS MODERNIZATION PROGRAM (AMP)

More information

RDT&E BUDGET ITEM JUSTIFICATION SHEET (R-2 Exhibit)

RDT&E BUDGET ITEM JUSTIFICATION SHEET (R-2 Exhibit) PE NUMBER: 0604239F PE TITLE: F-22 EMD BUDGET ACTIVITY COST ($ In Thousands) Actual FY 1999 FY 2000 FY 2001 FY 2002 FY 2003 FY 2004 FY 2005 Cost to Complete Cost Advanced Tactical Fighter FSD 2,010,717

More information

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 27 P-1 Line #2

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 27 P-1 Line #2 UNCLSSIFIED Exhibit P-40, Budget Line Item Justification: PB mended 2015 ir Force Date: June 2014 ppropriation / Budget ctivity / Budget Sub ctivity: 3011F: Procurement of mmunition, ir Force / B 01: mmunition

More information

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED. FY 2016 Base FY 2016 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Air Force : February 2015 3600: Research, Development, Test & Evaluation, Air Force / BA 7: Operational Systems Development COST ($ in Millions) FY

More information

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: Communication, Navigation, Surveillance/Air Traffic Management (CNS/ATM) FY 2012 OCO

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: Communication, Navigation, Surveillance/Air Traffic Management (CNS/ATM) FY 2012 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2012 Air Force DATE: February 2011 COST ($ in Millions) FY 2010 FY 2011 FY 2013 FY 2014 FY 2015 FY 2016 To Program Element 6.754 5.708 4.604-4.604 4.549

More information

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 31 P-1 Line #2

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 31 P-1 Line #2 UNCLSSIFIED Exhibit P-40, Budget Line Item Justification: PB 2016 ir Force : February 2015 ppropriation / Budget ctivity / Budget Sub ctivity: 3011F: Procurement of mmunition, ir Force / B 01: mmunition

More information

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 39 P-1 Line #54

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 39 P-1 Line #54 LSSIFID xhibit P-40, Budget Line Item ustification: PB 2017 avy Date: February 2016 ppropriation / Budget ctivity / Budget Sub ctivity: 1810: ther Procurement, avy / B 02: ommunications & lectronics quip

More information

Strategic road map. President & CEO Ole Johansson

Strategic road map. President & CEO Ole Johansson Strategic road map President & CEO Ole Johansson Capital Markets Day, 16 June 2006 Order intake growth continued, April - May 2006 Order intake up by 39% to MEUR 647 (464) Ship Power MEUR 381 (218) Power

More information

January 2018 Air Traffic Activity Summary

January 2018 Air Traffic Activity Summary January 2018 Air Traffic Activity Summary Jan-2018 Jan-2017 CY-2018 CY-2017 Passengers 528,947 505,421 4.7% 528,947 505,421 4.7% Passengers 537,332 515,787 4.2% 537,332 515,787 4.2% Passengers 1,066,279

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE PE A: AIRCRAFT CERTIFICATION FY 2012 OCO

UNCLASSIFIED R-1 ITEM NOMENCLATURE PE A: AIRCRAFT CERTIFICATION FY 2012 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 212 Army DATE: February 211 24: Research, Development, Test & Evaluation, Army COST ($ in Millions) FY 21 FY 211 FY 212 Base PE 6566A: AIRCRAFT CERTIFICATION

More information

Cost-effective, flexible avionics for today s missions and future challenges. Flight2 integrated avionics system. UPGRADES FOR LEGACY C-130s

Cost-effective, flexible avionics for today s missions and future challenges. Flight2 integrated avionics system. UPGRADES FOR LEGACY C-130s Cost-effective, flexible avionics for today s missions and future challenges. Flight2 integrated avionics system UPGRADES FOR LEGACY C-130s Bring cabin capability into highest definition. Flight2 integrated

More information

Manual vs. Automatic Operation and Operational Restrictions

Manual vs. Automatic Operation and Operational Restrictions Customer Services, Operations, and Safety Committee Board Information Item IV-B March 11, 2010 Manual vs. Automatic Operation and Operational Restrictions Page 81 of 91 Washington Metropolitan Area Transit

More information

UNCLASSIFIED UNCLASSIFIED

UNCLASSIFIED UNCLASSIFIED : February 216 Exhibit R2, RDT&E Budget Item Justification: PB 217 24: Research, Development, Test & Evaluation, / BA 5: System Development & Demonstration (SDD) COST ($ in Millions) FY 215 Program Element

More information

With the completion of this project, we would like to follow-up on the projections as well as highlight a few other items:

With the completion of this project, we would like to follow-up on the projections as well as highlight a few other items: TO: FROM: Mayor and Council Interim City Manager Rebecca Underhill, Director of Finance DATE: February 28, 2014 SUBJECT: Water Meter Project Analysis On March 28, 2012, Acting City Manager Mike Loftin

More information

Case examples: CEF -fundings for Innovations

Case examples: CEF -fundings for Innovations Case examples: CEF -fundings for Innovations ILKKA RYTKÖLÄ Wärtsilä 1 / 31 Wärtsilä 23 November 2016 Ilkka Rytkölä Doc.ID: Revision: Status: Contents 1. Baltic SO 2 lution 2. Methanol; The Marine Fuel

More information

AIRCRAFT SERVICE CHANGE

AIRCRAFT SERVICE CHANGE AIRCRAFT SERVICE CHANGE NUMBER 077 SUBJECT NAVIGATION (ATA 34) TCAS 7.1 INSTALLATION JUNE 12, 2012 PILOTS INFORMATION SHEET TCAS 7.1 INSTALLATION This service change upgrades TCAS 2000 or 3000SP systems

More information

BILFINGER SE NUCLEAR ENERGY PROJECTS: WE MAKE IT WORK FROM ENGINEERING AND TECHNOLOGY TO FABRICATION, CONSTRUCTION AND SERVICES

BILFINGER SE NUCLEAR ENERGY PROJECTS: WE MAKE IT WORK FROM ENGINEERING AND TECHNOLOGY TO FABRICATION, CONSTRUCTION AND SERVICES BILFINGER SE NUCLEAR ENERGY PROJECTS: WE MAKE IT WORK FROM ENGINEERING AND TECHNOLOGY TO FABRICATION, CONSTRUCTION AND SERVICES Energy & Utilities NUCLEAR ENERGY PROJECTS: WE MAKE IT WORK We design, manufacture

More information

SERVICE BULLETIN TIME LIMITS/MAINTENANCE CHECKS - AIRBORNE INSTRUMENT AIR SYSTEM COMPONENT REPLACEMENT SCHEDULE

SERVICE BULLETIN TIME LIMITS/MAINTENANCE CHECKS - AIRBORNE INSTRUMENT AIR SYSTEM COMPONENT REPLACEMENT SCHEDULE Beech TITLE: TIME LIMITS/MAINTENANCE CHECKS - AIRBORNE INSTRUMENT AIR SYSTEM COMPONENT REPLACEMENT SCHEDULE SYNOPSIS OF CHANGE This Service Bulletin has been revised at the request of the Federal Aviation

More information

Hawker 850XP. Supplement Pack

Hawker 850XP. Supplement Pack Hawker 85XP Supplement Pack The supplements contained in this supplement pack may not have been approved yet by foreign regulatory agencies. To determine approval status, view our web page at http://pubs.beechcraft.com

More information

Jeppesen Total Navigation Solution

Jeppesen Total Navigation Solution Jeppesen Total Navigation Solution Executive summary Do more with less. It s a challenge we all face, and it s the reality of military operations. Jeppesen s Total Navigation Solution (TNS) gives you enterprise,

More information

AEROSPACE & ELECTRONICS BRENDAN CURRAN PRESIDENT

AEROSPACE & ELECTRONICS BRENDAN CURRAN PRESIDENT AEROSPACE & ELECTRONICS BRENDAN CURRAN PRESIDENT Aerospace & Electronics Overview and Results Market Outlook Technological Differentiation and Growth Summary 2 Crane Aerospace & Electronics Industry Leader

More information

Concept Design for a Strike Littoral Intelligence Surveillance and Reconnaissance Submarine SLĪSR

Concept Design for a Strike Littoral Intelligence Surveillance and Reconnaissance Submarine SLĪSR Concept Design for a Strike Littoral Intelligence Surveillance and Reconnaissance Submarine SLĪSR Ship Design and Technology Symposium CDR John Campbell LCDR Greg Crawford LT Eric Thurkins 27 April 2012

More information

Flight Evaluation Schedule For GPS IFR Approval Primary Means Enroute, Terminal and Non-Precision Approach

Flight Evaluation Schedule For GPS IFR Approval Primary Means Enroute, Terminal and Non-Precision Approach Flight Evaluation Schedule For GPS IFR Approval Primary Means Enroute, Terminal and Non-Precision Approach Aircraft Description: Model ZK- Operator GPS Description: Manufacturer Model Serial Number TSO-C129

More information

Aeros 40D Sky Dragon. TYPE CERTIFIED BY: United States Federal Aviation Administration Civil Aviation Authorities: Europe and Asia

Aeros 40D Sky Dragon. TYPE CERTIFIED BY: United States Federal Aviation Administration Civil Aviation Authorities: Europe and Asia Aeros 40D Sky Dragon The Aeros 40D Sky Dragon Airship The United States Federal Aviation Administration (FAA) Type Certified Aeros 40D Sky Dragon is the most advanced non rigid airship, incorporating innovative

More information

WÄRTSILÄ CORPORATION

WÄRTSILÄ CORPORATION WÄRTSILÄ CORPORATION UBS PAN EUROPEAN SMALL & MIDCAP CONFERENCE RAIMO LIND, EVP & CFO 19 MAY 211 1 Wärtsilä Q1/11 Highlights Net sales EUR 1,83 million, +18% Order intake EUR 979 million, +11% Operating

More information

U.S. Navy Global Class AGOR Mid-Life Refits Managed by the Office of Naval Research (ONR) UNOLS Annual Meeting November 1, 2018

U.S. Navy Global Class AGOR Mid-Life Refits Managed by the Office of Naval Research (ONR) UNOLS Annual Meeting November 1, 2018 U.S. Navy Global Class AGOR Mid-Life Refits Managed by the Office of Naval Research (ONR) UNOLS Annual Meeting November 1, 2018 AGOR 23 Thomas G Thompson University of Washington (UW) Shipyard 6/16 12/18

More information

AIRCRAFT SERVICE CHANGE

AIRCRAFT SERVICE CHANGE AIRCRAFT SERVICE CHANGE NUMBER 909 SUBJECT INDICATING / RECORDING (ATA 31) PLANEVIEW MASTER OPERATING SYSTEM SOFTWARE UPDATE DECEMBER 22, 2011 PILOTS INFORMATION SHEET PLANEVIEW MASTER OPERATING SYSTEM

More information

O'Pati FOR SALE m (129'7"ft) Golden Yachts O'Pati. O'Pati is a 40m luxurious motor yacht built in 2011 by Golden Yachts.

O'Pati FOR SALE m (129'7ft) Golden Yachts O'Pati. O'Pati is a 40m luxurious motor yacht built in 2011 by Golden Yachts. O'Pati 39.50m (129'7"ft) Golden Yachts 2011 O'Pati O'Pati is a 40m luxurious motor yacht built in 2011 by Golden Yachts. Price 9 990 000 Details correct as of 06 Mar, 2019 Cabins: 5 Guests: 12 Crew: 7

More information

Commanding Officer, USS GLADIATOR (MCM-11) Chief of Naval Operations (N09BH) (1) Command History for Calendar Year 1999.

Commanding Officer, USS GLADIATOR (MCM-11) Chief of Naval Operations (N09BH) (1) Command History for Calendar Year 1999. DEP~RTMENT qf THE ~AVY. USS GLADIATOR i(mcm-11) FPO AA 34091-193, IN R{:PL Y REFER TO: 5700 Ser 00/058 25 OCT 00 From: To: Subj: Ref: Encl: Commanding Officer, USS GLADIATOR (MCM-11) Chief of Naval Operations

More information

SAS takes forceful action in a challenging market

SAS takes forceful action in a challenging market SAS Q2 2013/14 1 1 SAS takes forceful action in a challenging market Q2 EBT MSEK -1,078 Disappointing result in a challenging market most European carriers struggle During the last year, capacity has outgrown

More information

WÄRTSILÄ CORPORATION INTERIM REPORT JANUARY-MARCH April 2018 Jaakko Eskola, President & CEO. Wärtsilä PUBLIC

WÄRTSILÄ CORPORATION INTERIM REPORT JANUARY-MARCH April 2018 Jaakko Eskola, President & CEO. Wärtsilä PUBLIC WÄRTSILÄ CORPORATION INTERIM REPORT JANUARY-MARCH 218 24 April 218 Jaakko Eskola, President & CEO 1 Wärtsilä PUBLIC 24 April 218 Q1 Result presentation ORDER INTAKE AND NET SALES DEVELOPED WELL IN THE

More information

HOSE ASSEMBLY CLEANLINESS

HOSE ASSEMBLY CLEANLINESS November 18, 2002 HOSE ASSEMBLY CLEANLINESS Preface Hydraulic system cleanliness is a term used to describe the level of solid and liquid contamination found in hydraulic systems. Contamination may be

More information

U.S. NAVY CNS/ATM Program Status

U.S. NAVY CNS/ATM Program Status U.S. NAVY CNS/ATM Program Status 9 June 2009 Dave Staso CNS/ATM IPTL NAVAIR PMA209 (240) 925-9220 david.staso@navy.mil UNCLASSIFIED Minimum Functionality is a Requirement Amish buggies are not allowed

More information

ZUBR AIR-CUSHION LANDING SHIP OF AMPHIBIOUS TYPE

ZUBR AIR-CUSHION LANDING SHIP OF AMPHIBIOUS TYPE ZUBR AIR-CUSHION LANDING SHIP OF AMPHIBIOUS TYPE GENERAL INFORMATION Ship class landing ship Type gas turbine air-cushion landing ship of amphibious type. Designation transportation of warlike equipment

More information

Cooperative Development of Operational Safety & Continuing Airworthiness Programme

Cooperative Development of Operational Safety & Continuing Airworthiness Programme COSCAP North Asia Cooperative Development of Operational Safety & Continuing Airworthiness Programme 14th STEERING COMMITTEE MEETING Contributions and Budget 2014/15 Discussion Paper 5 (Presented by CTA)

More information

8.4 Critical Equipment Analysis - TANKERS

8.4 Critical Equipment Analysis - TANKERS : Severity Failure Score / No If yes, please state 1 Hull fittings/ Propulsion Ships hull All ships No 2 Hull fittings/ Propulsion Propellor All ships No 3 Hull fittings/ Propulsion Rudder All ships No

More information

PROGRESS REPORT ON PROJECT 1 Removal of Wrecks in the Traffic Separation Scheme in the SOMS

PROGRESS REPORT ON PROJECT 1 Removal of Wrecks in the Traffic Separation Scheme in the SOMS PROGRESS REPORT ON PROJECT 1 Removal of Wrecks in the Traffic Separation Scheme in the SOMS CONTENT 1. Introduction; 2. Objective; 3. Scope; 4. An Updates @ Achievement; Hydrographic Survey Risk Assessment

More information

Power Plants 2010 Turbine Retrofit Solutions Vrnjačka Banja, 26-29/10/2010

Power Plants 2010 Turbine Retrofit Solutions Vrnjačka Banja, 26-29/10/2010 Power Plants 2010 Turbine Retrofit Solutions Piotr Czerwiński Vrnjačka Banja, 26-29/10/2010 Agenda Introduction to retrofitting Alstom s advanced retrofit technology Retrofit solutions Key references Financial

More information

Subj: SHIP'S HISTORY SUBMISSION FOR USS HURRICANE (PC-3) Acting

Subj: SHIP'S HISTORY SUBMISSION FOR USS HURRICANE (PC-3) Acting DEPARTMENT OF THE NAVY COMMANDING OFFICER USS HURRICANE (PC 3) FPO AP 96667-1962 5750 Ser PC31208 05 Oct 98 From: Commanding Officer, USS HURRICANE (PC 3) To: Director of Naval History (OP-09BH), Washington

More information

CRISTAL Toulouse. Fourth Meeting of ADS-B Study and Implementation Task Force October 2005 Nadi, Fiji

CRISTAL Toulouse. Fourth Meeting of ADS-B Study and Implementation Task Force October 2005 Nadi, Fiji CRISTAL Toulouse Fourth Meeting of ADS-B Study and Implementation Task Force 26-28 October 2005 Nadi, Fiji CASCADE Validation Approach EUROCONTROL Project focusing on ADS and Data Link Include validation

More information

Ref: (a) OPNAVINST D (b) Deputy Director of Naval History ltr 5757 Ser SH/18232 dated 21 November 1989 D. S. QLADMAN

Ref: (a) OPNAVINST D (b) Deputy Director of Naval History ltr 5757 Ser SH/18232 dated 21 November 1989 D. S. QLADMAN DEPARTMENT OF THE NAVY USS JUNEAU (LPD-10) FPO SAN FRANCISCO. CA 96669-1713 From: Commanding Officer, USS JUNEAU (LPD-10) To : Director, Naval Historical Center, Building 57, Washington Navy Yard, Washington

More information

USS BOONE (FFQ-28) FPO M

USS BOONE (FFQ-28) FPO M DEPARTMENT OF THE NAVY USS BOONE (FFQ-28) FPO M 34093-1 484 5720 Ser Co/0026 #219c/a/9 3 From: Commanding Officer, uss BooNE (FFG-28) To : Director of Naval History (Code: OP-OSBH), Washington Naval Yard,

More information

AE 452 Aeronautical Engineering Design II Cost of an Airplane. Prof. Dr. Serkan Özgen Dept. Aerospace Engineering April 2017

AE 452 Aeronautical Engineering Design II Cost of an Airplane. Prof. Dr. Serkan Özgen Dept. Aerospace Engineering April 2017 AE 452 Aeronautical Engineering Design II Cost of an Airplane Prof. Dr. Serkan Özgen Dept. Aerospace Engineering April 2017 Difficulties when estimating cost Number of parameters involved (technical, financial,

More information

Components Forecast & Trends. Matthew T. Harman Analyst, Aerospace Industry MRO Arlington, VA

Components Forecast & Trends. Matthew T. Harman Analyst, Aerospace Industry MRO Arlington, VA Components Forecast & Trends Matthew T. Harman Analyst, Aerospace Industry MRO Arlington, VA Aviation Week Expense Category Breakdown 2017 Forecast Worldwide MRO Expense Categories 8% Engine Maintenance

More information

DEPARTMENT OF CIVIL AVIATION Airworthiness Notices EXTENDED DIVERSION TIME OPERATIONS (EDTO)

DEPARTMENT OF CIVIL AVIATION Airworthiness Notices EXTENDED DIVERSION TIME OPERATIONS (EDTO) EXTENDED DIVERSION TIME OPERATIONS (EDTO) 1. APPLICABILITY 1.1 This notice is applicable to operator engaged in Commercial Air Transport Operations beyond the threshold time established by DCA for EDTO

More information

CIVIL AVIATION AUTHORITY, PAKISTAN OPERATIONAL CONTROL SYSTEMS CONTENTS

CIVIL AVIATION AUTHORITY, PAKISTAN OPERATIONAL CONTROL SYSTEMS CONTENTS CIVIL AVIATION AUTHORITY, PAKISTAN Air Navigation Order No. : 91-0004 Date : 7 th April, 2010 Issue : Two OPERATIONAL CONTROL SYSTEMS CONTENTS SECTIONS 1. Authority 2. Purpose 3. Scope 4. Operational Control

More information

AE 452 Aeronautical Engineering Design II Cost Analysis. Prof. Dr. Serkan Özgen Dept. Aerospace Engineering

AE 452 Aeronautical Engineering Design II Cost Analysis. Prof. Dr. Serkan Özgen Dept. Aerospace Engineering AE 452 Aeronautical Engineering Design II Cost Analysis Prof. Dr. Serkan Özgen Dept. Aerospace Engineering 1 Problems when estimating cost Number of parameters involved (technical, financial, political)

More information

MANUAL REVISION TRANSMITTAL Manual 165A ( ) Illustrated Tool and Equipment Manual. REVISION 21 dated October 2017

MANUAL REVISION TRANSMITTAL Manual 165A ( ) Illustrated Tool and Equipment Manual. REVISION 21 dated October 2017 HARTZELL PROPELLER INC. One Propeller Place Piqua, Ohio 45356-2634 U.S.A. Telephone: 937.778.4200 Fax: 937.778.4215 MANUAL REVISION TRANSMITTAL Manual (61-00-65) Illustrated Tool and Equipment Manual REVISION

More information

DEPARTMENT OF THE NAW USS AUSTIN (LPD-4) f f FPO AE Ser LPD4/X: 063

DEPARTMENT OF THE NAW USS AUSTIN (LPD-4) f f FPO AE Ser LPD4/X: 063 DEPARTMENT OF THE NAW USS AUSTIN (LPD-4) f f FPO AE 09564-1707 5750 Ser LPD4/X: 063 27 APR 98. - From: co&nanding Officer, USS AUSTIN LPD-4 To: Chief of Naval Operations (NOgBH), Washington, DC 20370 "

More information

PROPULSION SPARE PARTS

PROPULSION SPARE PARTS WÄRTSILÄ PROPULSION SERVICES Wärtsilä Propulsion Services cover the following: Delivery of original spare parts Propeller repair Worldwide fi eld service Overhaul of all propulsion systems Retrofi tting

More information

Wärtsilä Italia S.p.A. Confindustria Venezia Giulia - Trieste, 28 th February 2018

Wärtsilä Italia S.p.A. Confindustria Venezia Giulia - Trieste, 28 th February 2018 Wärtsilä Italia S.p.A. Confindustria Venezia Giulia - Trieste, 28 th February 2018 1 THIS IS WÄRTSILÄ A global leader in advanced technologies and complete lifecycle solutions for the marine and energy

More information

In order to be eligible, all students participating as individuals or in teams (of no more than four students), must meet the following requirements:

In order to be eligible, all students participating as individuals or in teams (of no more than four students), must meet the following requirements: Boeing Innovation Challenge Submission Deadline: November 21, 2018, 12 pm Pacific Time Submit to: boeinginnovationchallenge@boeing.com Entry Form: see last page The Boeing Innovation Challenge is a competition

More information