1 Exhibit P-40, Budget Line Item Justification: PB 2017 Navy Date: February N: Aircraft Procurement, Navy / BA 05: Modification of Aircraft / BSA 1: Modification of Aircraft ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: 000 Resource Summary Item MDAP/MAIS Code(s): N/A Prior Years FY 2015 FY 2016 FY 2018 FY 2019 FY 2020 FY 2021 Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) 1, , , Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) 1, , , Plus CY Advance Procurement ($ in Millions) Obligation Authority ($ in Millions) 1, , , (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) Flyaway Unit Cost ($ in Dollars) Gross/Weapon System Unit Cost ($ in Dollars) Description: Decrease in COMMON ECM EQUIPMENT by $2.75M as required for the Department of the Navy to comply with the Bipartisan Budget Act of This line item funds common Electronic Countermeasures (ECM) equipment for strike and assault aircraft. The overall goal of the modification budget is to provide a reprogrammable radar and missile warning system, provide attacking missile declaration, sector direction finding, laser detection, and self-protection capability devices to applicable user aircraft AN/APR-39(V) 2: The AN/APR-39A/B/C/D (V) 2 Radar Signal Detecting Set is designed for US Marine Corps, US Navy, US Air Force, and US Army Assault Support aircraft to provide onboard situational awareness and warning of radar threats. FY 2012 funds were used to start the Class I ECP Non-Recurring Engineering (NRE) efforts for the correction of deficiencies of the RWR system. NRE, integration, validation/ verification and procurement of the upgraded APR-39 system (APR-39D (V)2) will continue through FY FY 2016 funds support the procurement of 28 APR-39D(V)2s for MV-22 and 16 APR-39D(V)2s for H-1 aircraft ALE-39 to 47 Retrofit: This OSIP provides funding for retrofit installation of AN/ALE-47 on F/A-18/C/D aircraft lots and to procure new AN/ALE-47 Test Sets (ALM-290) to replace original version ALM-286s. The replacement of the AN/ALE-39 Dispenser system with the AN/ALE-47 will correct serious safety problems and greatly improve aircraft survivability DIRCM: This Operational Safety Improvements Program (OSIP) provides current available technology improvements for survivability to United States Marine Corps aircraft. funding was used to procure A-Kits and B-kits, along with program support. The funds in FY 2014, FY 2015, FY 2016 and support procurement, upgrade, and testing and fielding of the Department of Navy Large Aircraft Infrared Countermeasure (DoN LAIRCM)/Advanced Threat Warning (ATW) capability. This budget supports procurement, Engineering Change Proposals (ECPs), integration, validation, Follow on Test and Evaluation (FOT&E) and fielding of DoN LAIRCM systems on CH-53E/K, KC-130J, P-8A and MV-22 platforms Common On-Board Jammer: Integrated Defensive Electronic Counter Measure (IDECM) Block 4 is an ECP to the ALQ-214 intended to render it suitable for operation on the F/A-18C/D aircraft, while retaining all IDECM suite functionality when installed on F/A-18E/F aircraft. The Electronic Frequency Converter (EFC) enables dataflow via the fiber optic cable to the Fiber Optic wed Decoy (FOTD) and is part of the IB-4 configuration when installed on the F/A-18E/F aircraft. This OSIP is for the onboard portion of the IB-4 configuration Correction of Discrepancies: This OSIP will provide the required correction to multiple sub components that are obsolete. Navy Page 1 of 32 P-1 Line #51

2 Exhibit P-40, Budget Line Item Justification: PB 2017 Navy Date: February N: Aircraft Procurement, Navy / BA 05: Modification of Aircraft / BSA 1: Modification of Aircraft ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: 000 Item MDAP/MAIS Code(s): N/A Assault Correction of Discrepancies: Assault of Corrections of Discrepancies OSIP will affect changes to assault Electronic Countermeasure (ECM) equipment in the aircraft that have been delivered for fleet operations. These ECM systems require various upgrade initiatives and logistic support to keep these aircraft mission capable with a robust defensive system that ensure aircraft survivability Assault Direct Infrared Counter Measures (ADIRCM): This OSIP provides funding for the installation of Assault DIRCM on the USN/USMC chosen material solution for AH-1Z, UH-1Y, and MH-60S aircraft in response to Joint Urgent Operational Needs Statement (SO-0010). Navy Page 2 of 32 P-1 Line #51

3 Exhibit P-40, Budget Line Item Justification: PB 2017 Navy Date: February N: Aircraft Procurement, Navy / BA 05: Modification of Aircraft / BSA 1: Modification of Aircraft ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: 000 Item MDAP/MAIS Code(s): N/A Exhibits Schedule Prior Years FY 2015 FY 2016 Exhibit Type Title* Subexhibits ID CD Quantity / Cost (Each) / ($ M) Quantity / Cost (Each) / ($ M) Quantity / Cost (Each) / ($ M) Navy Page 3 of 32 P-1 Line #51 Quantity / Cost (Each) / ($ M) Quantity / Cost (Each) / ($ M) Quantity / Cost (Each) / ($ M) P-3a 1 / AN/APR-39D(V)2 RWR (OSIP ) (MISSION CAPABILITY) - / / / / / - - / P-3a P-3a P-3a P-3a 2 / ALE-39 TO ALE-47 RETROFIT (OSIP ) (MISSION CAPABILITY) - / / / / / - - / / DIRECTED INFRARED COUNTERMEASURE DoN LAIRCM /AAQ-24 (OSIP ) (MISSION CAPABILITY) - / / / / / / / COMMON ON-BOARD JAMMER (OBJ)( OSIP ) (MISSION CAPABILITY) - / / / / / - - / / CORRECTIONS OF DISCREPANCIES (OSIP ) (SAFETY/ RELIABILITY) - / / / / / - - / P-3a 6 / ASSAULT CORRECTION OF DISCREPANCIES (OSIP ) (SAFETY/RELIABILITY) - / / / / / - - / P-3a 7 / ASSAULT DIRCM (OSIP ) (TBD) - / / - - / - - / - - / / P-3a 8 / INACTIVE OSIPs (TBD) - / / - - / - - / - - / - - / - P-40 Gross/Weapon System Cost - / 1, / / / / / Exhibits Schedule FY 2018 FY 2019 FY 2020 FY 2021 Exhibit Type Title* Subexhibits ID CD Quantity / Cost (Each) / ($ M) Quantity / Cost (Each) / ($ M) Quantity / Cost (Each) / ($ M) Quantity / Cost (Each) / ($ M) Quantity / Cost (Each) / ($ M) Quantity / Cost (Each) / ($ M) P-3a 1 / AN/APR-39D(V)2 RWR (OSIP ) (MISSION CAPABILITY) - / / / / / / P-3a P-3a P-3a P-3a 2 / ALE-39 TO ALE-47 RETROFIT (OSIP ) (MISSION CAPABILITY) - / / / - - / - - / / / DIRECTED INFRARED COUNTERMEASURE DoN LAIRCM /AAQ-24 (OSIP ) (MISSION CAPABILITY) - / / / / / / 1, / COMMON ON-BOARD JAMMER (OBJ)( OSIP ) (MISSION CAPABILITY) - / / / / / / / CORRECTIONS OF DISCREPANCIES (OSIP ) (SAFETY/ RELIABILITY) - / - - / - - / - - / - - / - - / P-3a 6 / ASSAULT CORRECTION OF DISCREPANCIES (OSIP ) (SAFETY/RELIABILITY) - / / / - - / - - / - - / P-3a 7 / ASSAULT DIRCM (OSIP ) (TBD) - / - - / - - / - - / - - / - - / P-3a 8 / INACTIVE OSIPs (TBD) - / - - / - - / - - / - - / - - / P-40 Gross/Weapon System Cost - / / / / / 1, / 4, *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: s in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: Program provides for common electronic countermeasures equipment for strike and assault aircraft. :

4 Exhibit P-40, Budget Line Item Justification: PB 2017 Navy Date: February N: Aircraft Procurement, Navy / BA 05: Modification of Aircraft / BSA 1: Modification of Aircraft ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: 000 Item MDAP/MAIS Code(s): N/A funds for the DoN LAIRCM and Assault Direct Infrared Counter Measures (ADIRCM) programs provide increased survivability against surface to air IR missiles, laser guided threats, small arms, anti-aircraft artillery (AAA), machine guns and rocket propelled grenades for combat, assault rotary wing and fixed wing aircraft in theater. Navy Page 4 of 32 P-1 Line #51

5 Resource Summary Prior Years FY 2015 FY / AN/APR-39D(V)2 RWR (OSIP ) FY 2018 FY 2019 FY 2020 FY 2021 Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Obligation Authority ($ in Millions) (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) Gross/Weapon System Unit Cost ($ in Dollars) Description: DESCRIPTION / JUSTIFICATION: The AN/APR-39A/B/C/D (V) 2 Radar Signal Detecting Set is designed for US Marine Corps, US Navy, US Air Force, and US Army Assault Support aircraft to provide onboard situational awareness and warning of radar threats by Statement of Operational Requirements Document (ORD) number dated 14 February The AN/APR-39A/B/C/D(V)2 also provides control and display of the AAR-47 Missile Warning System and Chaff dispense commands to the ALE-47 Counter Measure Dispensing System. The AN/APR-39C/D (V) 2 provides control and display of the AAQ-24 and AAR-59. The APR-39A/B/C/D (V) 2 consists of five antennas, one Cockpit Control unit, a display, two, three, or four receivers, and one processor. This OSIP supports a Class I ECP, APR-39D (V) 2, that corrects part I major deficiencies against the Radar Warning Receiver (RWR) noted in AH-1W, MV-22 and KC-130T Operational Evaluation (OpEval) reports. The current RWR provides inaccurate direction of arrival information, time delayed detection and identification of threat emitters causing loss of situational awareness to combat aircrews. The APR-39D (V) 2 system will be the RWR solution for all assault support aircraft (MV-22, AH-1, H-60, UH-1, H-53, and C-130). FY 2016 Overseas Contingency Operations () funds will support the procurement of 28 APR-39D(V)2s for MV-22 AND 16 APR-39D(V)2s for H-1 aircraft. C(V)2 and D(V)2 flight tests required for MV-22, KC-130T and H-1 aircraft. C(V)2 and D(V)2 Systems Software upgrades required throughout the FYDP for various platforms. DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES: The AN/APR-39A/B (V) 2 is in the Aircraft Procurement, Navy (APN)-1 Post Production and sustainment phase (MSIII3Q/96). The Department of Navy is the lead service of this joint service program. FY 2012 funds were used to start the Class I ECP Non-Recurring Engineering (NRE) efforts for the correction of deficiencies of the RWR system. NRE, integration, validation/ verification and procurement of the upgraded APR-39 system (APR-39D (V)2) will continue through FY Navy Page 5 of 32 P-1 Line #51

6 Models of Systems Affected: UH-1Y, AH-1Z, MV-22, KC-130T, CH-53E/K, KC-130J, MH-53, HH-60H, MH-60S Procurement Financial Plan Modification Item 1 of 1: AN/APR-39D(V)2 RWR (OSIP ) B Kits Recurring Modification Type: MISSION CAPABILITY Prior Years FY 2015 FY 2016 Related RDT&E PEs: Navy Page 6 of 32 P-1 Line #51 1 / AN/APR-39D(V)2 RWR (OSIP ) FY 2018 FY 2019 FY 2020 FY ) Install Equip AN/APR-39A/C/D(V)2- MV / / / - 2 / / - 2 / / / / / / / Organic (1) 2.1.2) Install Equip AN/APR-39A/C/D(V)2 - MV-22 - Organic - / - - / - 28 / / - - / - - / - - / - - / - - / - - / - - / - 28 / ) Install Equip AN/APR-39 D(V)2-AH-1Z - Organic - / - - / - - / - 3 / / - 3 / / / / / / / ) Install Equip AN/APR-39D(V)2 - AH - 1Z - Organic - / - - / - 16 / / - - / - - / - - / - - / - - / - - / - - / - 16 / ) Archived BKits Recurring - Organic - Organic 764 / / - - / - - / - - / - - / - - / - - / - - / - - / - - / / Subtotal: Recurring - / / / / / - - / / / / / / / Non-Recurring (2) 2.2.1) D(V)2 System Flight Test - Organic - / - - / / / / - - / / / / - - / - - / / (3) 2.2.2) C(V)2 System Flight Test - Organic - / - - / - - / - - / / - - / / - - / - - / - - / - - / / ) Archived BKits Non-Recurring - Organic - / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / Subtotal: Non-Recurring - / / / / / - - / / / / - - / - - / / Subtotal: AN/APR-39D(V)2 RWR (OSIP ) 780 / / / / / - 5 / / / / / / ,313 / Subtotal: Procurement, All Modification Items - / / / / / - - / / / / / / / Support (All Modification Items) 3.1) ECO - / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / ) ECO - / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / ) B(V)X Computer Processor ECP - / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / ) D(V)2 System ECP - / / / / / - - / / / / / / - - / ) C(V)2 System SW - / - - / / / / - - / / / / / / - - / ) D(V)2 System SW - / - - / / / / - - / / / / / / - - / ) Data - / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / ) Training Equipment - / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / ) Support Equipment - / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 2.082

7 Models of Systems Affected: UH-1Y, AH-1Z, MV-22, KC-130T, CH-53E/K, KC-130J, MH-53, HH-60H, MH-60S Financial Plan Modification Type: MISSION CAPABILITY Prior Years FY 2015 FY 2016 Related RDT&E PEs: 1 / AN/APR-39D(V)2 RWR (OSIP ) FY 2018 FY 2019 FY 2020 FY ) Support Equipment - / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / ) ILS - / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / ) ILS - / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / ) Other Support - / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / (4) 3.14) Other Support - / / / / / - - / / / / / / / ) MV-22 Integration Support - / - - / - - / / - - / - - / - - / - - / - - / - - / - - / - - / ) AH-1 Integration Support - / - - / - - / / - - / - - / - - / - - / - - / - - / - - / - - / Subtotal: Support - / / / / / - - / / / / / / / Installation Subtotal: Installation - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - Cost (Procurement + Support + Installation) Navy Page 7 of 32 P-1 Line #51

8 Modification Item 1 of 1: AN/APR-39D(V)2 RWR (OSIP ) Installation Information Method of Implementation (Organic): Install Equip AN/APR-39A/C/D(V)2- MV-22 - Not Installed Installation Quantity: / AN/APR-39D(V)2 RWR (OSIP ) Method of Implementation (Organic): Install Equip AN/APR-39A/C/D(V)2 - MV-22 - Not Installed Installation Quantity: 28 Method of Implementation (Organic): Install Equip AN/APR-39 D(V)2-AH-1Z - Not Installed Installation Quantity: 173 Method of Implementation (Organic): Install Equip AN/APR-39D(V)2 - AH - 1Z - Not Installed Installation Quantity: 16 Method of Implementation (Organic): Archived BKits Recurring - Organic - Not Installed Installation Quantity: 764 Footnotes: (1) MV-22 UUNS and Joint Urgent Operational Need Statement (JUONS) requirements have caused delays to program execution, limited the availability of aircraft required for APR-39 testing. Program realigned in FY17 to recover and preserve FY18 and out schedule. FY2017 thru FY2021 quantity decreased due to program delays resulting from Congressional actions, test aircraft availability and to support "Buy to Budget" requirements. (2) and FY 2018 non-recurring efforts is required for each platform after each integration. (3) and FY 2018 non-recurring efforts is required for each platform after each integration. (4) FY2016 Other Support decreased to reflect Congressional action due to carryover. FY17 and out Other Support funding realigned to recover required resources for updated program execution. Navy Page 8 of 32 P-1 Line #51

9 Resource Summary Prior Years FY 2015 FY 2016 FY 2018 FY 2019 FY 2020 FY / ALE-39 TO ALE-47 RETROFIT (OSIP ) Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Obligation Authority ($ in Millions) (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) Gross/Weapon System Unit Cost ($ in Dollars) Description: DESCRIPTION/JUSTIFICATION: The replacement of the AN/ALE-39 Dispenser System with the AN/ALE-47 will correct serious safety problems and greatly improve aircraft survivability. As a joint program, Under Secretary of Defense (Acquisition Technology & Logistics) memo of November 1986 directed US Navy and US Army to participate in the US Air Force (USAF) Engineering Manufacturing Development (EMD) phase. Requirements were established by USAF Statement of Operational Requirements Document (ORD) number II-D, dated 8 July Operational, Safety and Improvement Program (OSIP) was established for the retrofit of CH-53E, EA-6B, AH-1W, CH-46E, UH-1N, MH-53E, F/A-18C/D, AV-8B, MV-22, KC-130F/R/T, H-60, P-3, SH-60B Type/Model/Series (T/M/S). DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES: The AN/ALE-47 system is in production and being installed in multiple US Navy, US Marine Corp and USAF aircraft. Milestone III decision awarded March Stand-alone modification procedures for F/A-18 were approved in 2014 and will allow for increased installations based on aircraft availability. This OSIP provides funding for retrofit installation of AN/ALE-47 on F/A-18/C/D aircraft lots and to procure new AN/ALE-47 Test Sets (ALM-290) to replace original version ALM-286s. An interim contract for component procurements during the qualification phase of the follow-on contract is planned for award October Navy Page 9 of 32 P-1 Line #51

10 Models of Systems Affected: CH-53E, EA-6B, AH-1W, CH-46E, UH-1N, MH-53E, F/A-18C/D, AV-8B, MV-22, KC-130F/R/T, H-60, P-3, SH-60B Procurement Financial Plan Modification Item 1 of 1: ALE-39 TO ALE-47 RETROFIT (OSIP ) A Kits Recurring Modification Type: MISSION CAPABILITY Prior Years FY 2015 FY 2016 Related RDT&E PEs: FY 2018 FY 2019 FY 2020 FY 2021 Navy Page 10 of 32 P-1 Line #51 2 / ALE-39 TO ALE-47 RETROFIT (OSIP ) 1.1.1) Archived AKits/Recurring - Organic 2,539 / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 2,539 / (5) 1.1.2) F/A-18 A-Kit - NonOrganic 141 / / / / / - 25 / / / / - - / - 24 / / Subtotal: Recurring - / / / / / - - / / / / - - / - - / / Non-Recurring 1.2.1) Archived AKits/Non-Recurring - Organic 22 / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 22 / Subtotal: Non-Recurring - / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / B Kits Recurring 2.1.1) Archived BKits/Recurring - Organic 6,120 / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 6,120 / (6) 2.1.2) F/A-18 B Kits - Organic 141 / / / / / - 25 / / / / - - / - 24 / / Subtotal: Recurring - / / / / / - - / / / / - - / - - / / Subtotal: ALE-39 TO ALE-47 RETROFIT (OSIP ) 8,963 / / / / / - 50 / / / / - - / - 48 / ,281 / Subtotal: Procurement, All Modification Items - / / / / / - - / / / / - - / - - / / Support (All Modification Items) 3.1) Equip ECO - / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / ) Data - / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / ) Training Equip - / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / ) Support Equip - / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / ) Support Equipment - / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / (7) 3.6) F/A-18 ALM-290 Test Sets - / / / / / - - / / / / - - / - - / / ) FY05 Supp - / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / ) Title 9 Supplemental - / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / ) ILS - / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / ) ILS CH-53D/E - / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / ) Other Support - / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 8.856

11 Models of Systems Affected: CH-53E, EA-6B, AH-1W, CH-46E, UH-1N, MH-53E, F/A-18C/D, AV-8B, MV-22, KC-130F/R/T, H-60, P-3, SH-60B Financial Plan Modification Type: MISSION CAPABILITY Prior Years FY 2015 FY 2016 Related RDT&E PEs: FY 2018 FY 2019 FY 2020 FY / ALE-39 TO ALE-47 RETROFIT (OSIP ) (8) 3.12) Other Support - / / / / / - - / / / / - - / - - / / Subtotal: Support - / / / / / - - / / / / - - / - - / / Installation Modification Item 1 of 1: ALE-39 TO ALE-47 RETROFIT (OSIP ) - / / / / / - - / / / / - - / - - / / Subtotal: Installation - / / / / / - - / / / / - - / - - / / Cost (Procurement + Support + Installation) Navy Page 11 of 32 P-1 Line #51

12 Modification Item 1 of 1: ALE-39 TO ALE-47 RETROFIT (OSIP ) Manufacturer Information Manufacturer Name: NAWC, Weapon Center Manufacturer Location: China Lake, CA Administrative Leadtime (in Months): 2 Production Leadtime (in Months): 4 2 / ALE-39 TO ALE-47 RETROFIT (OSIP ) Dates FY 2015 FY 2016 FY 2018 FY 2019 FY 2020 FY 2021 Contract Dates Nov 2014 Nov 2015 Nov 2016 Nov 2017 Nov 2018 Delivery Dates Feb 2015 Feb 2016 Feb 2017 Feb 2018 Feb 2019 Installation Information Method of Implementation: Depot Level Installation:: Installation Name: F/A-18C Installation Costs Installation Cost Prior Years FY 2015 FY 2016 FY 2018 FY 2019 FY 2020 FY 2021 Prior Years 132 / / / - - / - - / - - / - - / - - / - - / - - / - - / / FY / - 26 / / - - / - - / - - / - - / - - / - - / - - / - - / - 26 / FY / - - / - 34 / / - - / - - / - - / - - / - - / - - / - - / - 34 / / - - / - - / - 25 / / - 25 / / - - / - - / - - / - - / - 25 / FY / - - / - - / - - / - - / - - / - 25 / / - - / - - / - - / - 25 / FY / - - / - - / - - / - - / - - / - - / - 25 / / - - / - - / - 25 / FY / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 24 / / / / / / / - 25 / / / / - - / - 24 / / Installation Schedule FY 2015 FY 2016 FY 2018 FY 2019 FY 2020 FY 2021 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC t In Out Method of Implementation (Organic): Archived AKits/Recurring - Not Installed Installation Quantity: 2539 Method of Implementation (Organic): Archived AKits/Non-Recurring - Not Installed Installation Quantity: 22 Navy Page 12 of 32 P-1 Line #51

13 Modification Item 1 of 1: ALE-39 TO ALE-47 RETROFIT (OSIP ) Installation Information Method of Implementation (Organic): Archived BKits/Recurring - Not Installed Installation Quantity: / ALE-39 TO ALE-47 RETROFIT (OSIP ) Method of Implementation (Organic): F/A-18 B Kits Installation Quantity: 300 Footnotes: (5) During -FY 2019 A-kits are being procured for F/A-18C 2-dispenser, F/A-18D 2-dispenser, and F/A-18D 4-dispenser configurations. The A-kit components and unit costs will vary, depending on which type, model, series (TMS) will receive the modification. Commander, Naval Air Forces (CNAL/CNAP) is continuing extension of flight hours and service life on the F/A-18s, possibly to FY 2031, to fill strike fighter shortfall, requiring (49) additional aircraft modifications. FY 2019 funded (25) F/A-18 A Kits, leaving a Cost quantity of (24) for the planned aircraft modifications to accommodate F/A-18 aircraft with extended service life. (6) The FY decrease in unit costs for F/A-18 B-kits is due to use of reclaimed assets being screened/validated as Ready for Issue (RFI) status and used as Government Furnished Equipment (GFE) assets, vice new procurements. FY 2019 cost increase due to A-Kit components and unit cost will vary, depending upon which type, model, series (T/M/S) is receiving the modification. The TD for AFC-566 was approved to allow for stand-alone modifications, which will provide more flexibility to schedule aircraft for ALE-47 Retrofit induction without schedule delays of concurrent aircraft modifications. CNAL/CNAP is continuing extension of flight hours and service life on the F/A-18s, possibly to FY 2031, to fill strike fighter shortfall, requiring (49) additional aircraft modifications. FY 2019 funded (25) F/A-18 A Kits, leaving a Cost quantity of (24) for the planned aircraft modifications to accommodate F/A-18 aircraft with extended service life. Equal number of F/A-18 A & B kits are required for installation. (7) The increase in total costs in FY 2016 through and FY 2019 for the ALM-290 test sets is due to the increased labor rates for manufacturing and increased pricing for miscellaneous components that are nearing obsolescence being procured through contract. (8) The increase in Other Support costs in FY 2018 for Engineering and Logistics support is due to the increased labor rates for Mission Data File (MDF)fielding. Navy Page 13 of 32 P-1 Line #51

14 Resource Summary Prior Years FY 2015 FY 2016 FY 2018 FY 2019 FY 2020 FY / DIRECTED INFRARED COUNTERMEASURE DoN LAIRCM / AAQ-24 (OSIP ) Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) , Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) , Plus CY Advance Procurement ($ in Millions) Obligation Authority ($ in Millions) , (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) Gross/Weapon System Unit Cost ($ in Dollars) Description: DESCRIPTION/JUSTIFICATION: The AN/AAQ-24 Department of the Navy, Large Aircraft Infrared Countermeasures (DoN LAIRCM) System (B-kit) consists of 5 components: Missile Warning Sensor (MWS, 5 or 6); processor (1), Guardian Laser Transmitter Assembly (GLTA, 2); Controller Interface Unit (CIU, 1) and Viper Laser. The Defense Intelligence Agency (DIA) System Threat Assessment Report (STAR) and current USMC operations pose surface to air threats requiring DoN LAIRCM capabilities to maintain survivability against improved Man-Portable Air Defense Systems (MANPADS), Rocket Propelled Grenades (RPG), hostile gunfire, Anti-Aircraft Artillery (AAA), and laser-directed weapons. This budget supports procurement, Engineering Change Proposals (ECPs), integration, validation, Follow on Test and Evaluation (FOT&E), and fielding of DoN LAIRCM systems on CH-53E/K, KC-130J, P-8A and MV-22 platforms in accordance with Statement of Operational Requirement Document (ORD) number d on FY15 Joint Urgent Operational Need (JUON), SM and USA programs have submitted requirements for DoN LAIRCM integration. line funding will support the procurement, integration, validation, Follow on Test & Evaluation (FOT&E), and fielding through the FYDP; supplemental funds will do the same in FY 2015, FY 2016 and. DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES: Assistant Secretary of the Navy (ASN) approved the DoN LAIRCM program Milestone C / Full Rate Production (FRP) in Jan The Engineering Change Proposals (ECPs) provide better aircrew situational awareness and IRCM performance through improved MWS detection (Pd) and a lower False Alarm Rate (FAR); threat information to support Smart Dispensing; Hostile Fire Indication (HFI); and Laser Warning (LW). The DoN LAIRCM customer base continues to expand as performance is demonstrated. Since FRP in 2010, CH-53K, C-20, C-40, KC-130J, and MV -22 PMOs have submitted requirements for LAIRCM. The associated program offices (i.e., PMA-207, PMA-261, PMA-275 etc.) use Aircraft Procurement, Navy (APN) 1,2,4, and 5 funding as appropriate to integrate and procure DoN LAIRCM systems. Other service platform programs have also requested DoN LAIRCM support that will require procurement, integration, validation throughout the FYDP. Navy Page 14 of 32 P-1 Line #51

15 Models of Systems Affected: CH-53E, CH-53K, MV-22, P-8A, KC-130J Procurement Financial Plan Modification Item 1 of 1: DIRECTED INFRARED COUNTERMEASURE DoN LAIRCM /AAQ-24 (OSIP ) B Kits Recurring Modification Type: MISSION CAPABILITY Prior Years FY 2015 FY 2016 Related RDT&E PEs: Navy Page 15 of 32 P-1 Line #51 3 / DIRECTED INFRARED COUNTERMEASURE DoN LAIRCM / AAQ-24 (OSIP ) FY 2018 FY 2019 FY 2020 FY ) Archieved B Kits Recurring - Organic 23 / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 23 / (9) 2.1.2) DIRCM (B Kits) - Organic 7 / / / / / - 17 / / / / / / / (10) 2.1.3) DIRCM (B Kits) - Organic 68 / / - 10 / / - 24 / / / - - / - - / - - / - - / / ) ATW Retrofit Kits - Organic 61 / / / - - / - - / - - / - - / - - / - - / - - / - - / - 93 / (11) 2.1.5) ATW Retrofit Kits - Organic 12 / / - - / - 14 / / - 14 / / - - / - - / - - / - 13 / / Subtotal: Recurring - / / / / / / / / / / / / 1, Non-Recurring 2.2.1) A/C Integration NRE - Organic - / - - / / - - / - - / - - / - - / - - / - - / - - / - - / - - / (12) 2.2.2) A/C Integration NRE - Organic - / - - / - - / - - / - - / / / - - / - - / - - / - - / - - / (13) 2.2.3) Navy Test - Organic - / / / / / - - / / / / / / - - / ) Archived B Kits Non Recurring - Organic - / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / Subtotal: Non-Recurring - / / / / / / / / / / / - - / Subtotal: DIRECTED INFRARED COUNTERMEASURE DoN LAIRCM /AAQ-24 (OSIP ) 171 / / / / / / / / / / / / 1, Subtotal: Procurement, All Modification Items - / / / / / / / / / / / / 1, Support (All Modification Items) 3.1) Engineering Change Orders - / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / ) Engineering Change Orders - / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / (14) 3.3) Software Upgrade - / - - / - - / - - / / - - / / / / / - - / / ) Data - / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / ) Data - / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / ) Training Equipment - / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / (15) 3.7) Support Equipment - / / / - - / / - - / / - - / / / / /

16 Models of Systems Affected: CH-53E, CH-53K, MV-22, P-8A, KC-130J Financial Plan Modification Type: MISSION CAPABILITY Prior Years FY 2015 FY 2016 Related RDT&E PEs: 3 / DIRECTED INFRARED COUNTERMEASURE DoN LAIRCM / AAQ-24 (OSIP ) FY 2018 FY 2019 FY 2020 FY ) Support Equipment - / / / - - / - - / / / - - / - - / - - / - - / - - / (16) 3.9) ILS - / / - - / - - / - - / - - / - - / - - / / / - - / / ) ILS - / / / - - / - - / - - / - - / - - / - - / - - / - - / - - / (17) 3.11) Other Support - / / / / / - - / / / / / / / ) Other Support - / / / - - / - - / / / - - / - - / - - / - - / - - / ) Archived BKits Recurring - Organic - / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / Subtotal: Support - / / / / / / / / / / / / Installation Subtotal: Installation - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - Cost (Procurement + Support + Installation) , Navy Page 16 of 32 P-1 Line #51

17 Modification Item 1 of 1: DIRECTED INFRARED COUNTERMEASURE DoN LAIRCM /AAQ-24 (OSIP ) Installation Information Method of Implementation (Organic): Archieved B Kits Recurring - Not Installed Installation Quantity: 23 3 / DIRECTED INFRARED COUNTERMEASURE DoN LAIRCM / AAQ-24 (OSIP ) Method of Implementation (Organic): DIRCM (B Kits) - Not Installed Installation Quantity: 450 Method of Implementation (Organic): DIRCM (B Kits) - Not Installed Installation Quantity: 102 Method of Implementation (Organic): ATW Retrofit Kits - Not Installed Installation Quantity: 93 Method of Implementation (Organic): ATW Retrofit Kits - Not Installed Installation Quantity: 39 Footnotes: (9) B-Kit unit cost varies across the FYDP based on platform type/model. platform requirements are based on the current planned inventory (original quantity reduced due to retiring platform assets were forward-fit to meet new platform requirements). (10) DIRCM B-Kit unit cost varies across the FYDP based on platform type/model. platform requirements are based on the current planned inventory (original quantity reduced due to retiring platform assets were forward-fit to meet new platform requirements). (11) Cost (CTC) (13) remaining Advanced Threat Warning (ATW) sensor Kits to retrofit the 132. Historically funded almost entirely with funds; each year we buy to the available budget. The Kit cost is calculated based on 6x sensors per aircraft (MV-22) and using the current production cost. d on production cost learning curve, economies of scale due to additional platforms, and fewer sensors per kit (5 vs 6) we plan to procure additional kits in FY 2016 (FY 2015 funds) and ( funds) to buy down all remaining kits. (12) A/C Integration NRE increase in FY17 to support KC-130-J and MV-22 integration efforts for UUNS #03606UC. (13) FY 2018 and FY 2020 cost increase includes testing to integrate new LAIRCM processor and Control Indicator Unit (CIU) configurations. (14) FY 2020 software upgrades increased to support the implementation and verification of LAIRCM with new platform Aircraft Survivability Equipment (ASE); and to implement digital interoperability requirements defined in the integrated ASE/Information Systems (iase/is) Interface Control Document (ICD). (15) In 2018 we plan to have sufficient Support Equipment (SE) quantities to support fielded assets to date. Due to the large cut in FY 2018 budget, the procurement is dedicated to B-kits knowing we can leverage platform funding or catch up the following years. (16) Integrated Logistics Support (ILS) increases or decreases based on new T/M/S (customers) testing and fielding schedules. CTC in ILS and Other Support exists because PMA support is required throughout the FYDP as long as Contracting, Engineering Change Proposals (ECPs), Integration, Validation and Verification, Test and Fielding continues. (17) Funding re-alignment in FY16 to procure 1 B-Kit, fund Navy Test, and to increase Other Support in support of the FY15 Urgent Universal Needs Statement/Joint Urgent Operational Needs Statement. Navy Page 17 of 32 P-1 Line #51

18 Resource Summary Prior Years FY 2015 FY / COMMON ON-BOARD JAMMER (OBJ)( OSIP ) FY 2018 FY 2019 FY 2020 FY 2021 Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Obligation Authority ($ in Millions) (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) Gross/Weapon System Unit Cost ($ in Dollars) Description: DESCRIPTION/JUSTIFICATION: Integrated Defensive Electronic Countermeasure (IDECM) Block (IB-4) is an Engineering Change Proposal (ECP) to the ALQ-214 intended to render it suitable for operation on the F/A-18C/D aircraft, while retaining all IDECM suite functionality when installed on F/A-18E/F aircraft. This ECP will result in a Common On-Board Jammer (OBJ) system that must meet the requirements of the OBJ Block 2 Operational Requirements Document (ORD) # and be compatible with the ALE-55 Fiber Optic wed Decoy (FOTD). The Electronic Frequency Converter (EFC) enables dataflow via the fiber optic cable to the FOTD and is part of the IB-4 configuration when installed on the F/A-18E/F aircraft. This Operational Safety Improvement Program (OSIP) is for the onboard portion of the IB-4 configuration. DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES: The ALQ-214 received Milestone III approval in January 2004 and is still in Full Rate Production (FRP). FRP 9 is the first ALQ-214 production lot in the IB-4 configuration and was awarded 3rd Qtr FY FRP 10 is the second production transition contract which was awarded in 3rd Qtr FY Production line transition to the IB-4 configuration completed in FY FRP 11 was awarded 2nd Qtr FY Annual production contract awards are expected to continue through FY A total of 190 IB-4 ALQ-214s are planned for procurement. Navy Page 18 of 32 P-1 Line #51

19 4 / COMMON ON-BOARD JAMMER (OBJ)( OSIP ) Models of Systems Affected: F/A-18C/D/E/F Modification Type: MISSION CAPABILITY Related RDT&E PEs: N Procurement Financial Plan Modification Item 1 of 1: COMMON ON-BOARD JAMMER (OBJ)( OSIP ) B Kits Recurring 2.1.1) ALQ-214 Retrofit Kits (C/D) Install Equipment - Organic Prior Years FY 2015 FY 2016 FY 2018 FY 2019 FY 2020 FY / / / - - / - - / - - / - - / - - / - - / - - / - - / / ) ALQ-214 Retrofit Kits (E/F) Install Equipment / / / / / - 96 / / / - - / - - / - - / / Organic (18) (19) 2.1.3) ALQ-214 Install Equipment - Organic 49 / / / / / - 20 / / / / / / / ) EFC Install Equipment - Organic 135 / / - - / - - / - - / - - / - - / - - / - - / - - / - - / / Subtotal: Recurring - / / / / / - - / / / / / / / Subtotal: COMMON ON-BOARD JAMMER (OBJ) ( OSIP ) 394 / / / / / / / / / / / / Subtotal: Procurement, All Modification Items - / / / / / - - / / / / / / / Support (All Modification Items) 3.3) Training Equipment - / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / ) Other Support - / / / / / - - / / / / / / / Subtotal: Support - / / / / / - - / / / / / / / Installation Subtotal: Installation - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - Cost (Procurement + Support + Installation) Navy Page 19 of 32 P-1 Line #51

20 Modification Item 1 of 1: COMMON ON-BOARD JAMMER (OBJ)( OSIP ) Installation Information Method of Implementation (Organic): ALQ-214 Retrofit Kits (C/D) Install Equipment - Not Installed Installation Quantity: / COMMON ON-BOARD JAMMER (OBJ)( OSIP ) Method of Implementation (Organic): ALQ-214 Retrofit Kits (E/F) Install Equipment - Not Installed Installation Quantity: 389 Method of Implementation (Organic): ALQ-214 Install Equipment - Not Installed Installation Quantity: 324 Method of Implementation (Organic): EFC Install Equipment - Not Installed Installation Quantity: 135 Footnotes: (18) E/F Install Equipment unit cost is based upon projected cost. Additional 65 ALQ-214 E/F Retrofit kits procured to correlate to additional aircraft procured by PMA-265. ALQ-214 E/F Retrofit Kits quantity increased by 134 kits due to N98 inventory objective requirements, documented in N98 memo Serial Number: N98/13U146134, dated 4 February Retrofit kits procured through FY 2018 to support operational deployments with the Block 4 Capability. FY 2016 begins a new Firm Fixed Price (FFP) contract; estimated unit cost is based upon the Cost Model. (19) ALQ-214 Block 4 quantity increased by 134 systems due to N98 inventory objective requirements, documented in N98 memo Serial Number: N98/13U146134, dated 4 February Quantity increase in FY 2015 and FY 2016 due to reduced unit cost negotiated in Full Rate Production (FRP)12 and FRP13 ALQ-214 contract. Unit cost increase from FY 2015 to FY 2016 due to NAVSUP procuring spares in FY unit cost increase is based on projected inflation and associated contract cost. Additional units to be procured in resulting in a 1 year earlier completion of the program. COBJ is a buy to budget program. PMA-265 procurement requirements for ALQ-214 ended in FY Prior year does not reflect an additional 2 ALQ-214 units procured with PMA 265 funding. Navy Page 20 of 32 P-1 Line #51

21 Resource Summary Prior Years FY 2015 FY / CORRECTIONS OF DISCREPANCIES (OSIP ) FY 2018 FY 2019 FY 2020 FY 2021 Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Obligation Authority ($ in Millions) (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) Gross/Weapon System Unit Cost ($ in Dollars) Description: DESCRIPTION/JUSTIFICATION: This Operational Safety Improvement Program (OSIP) is for the correction of discrepancies and to effect changes to ALR-67(V) 2 system and electronic countermeasure equipment in aircraft that have been delivered for fleet operations. This system requires various upgrade initiative and logistic support to keep the F/A-18 a capable aircraft with a robust defensive system that improves its survivability. This OSIP will provide funding for the upgrade of the ALR-67(V) 2 computer, low band antenna, special receiver and quadrant receiver weapons replaceable assemblies. DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES: The contractor will develop a Preliminary Design Review (PDR) for Program Control Unit (PCU)1 drawing package and prototype Circuit Card Assemblies (CCA), and perform Critical Design Review (CDR); conduct system testing, evaluations, environmental and qualification testing; modify Shop Replaceable Assemblies (SRA) with Diminished Manufacturing Source (DMS) issues and develop Acceptance Test Plans (ATP) and Engineering Change Proposals (ECP); and, verify testing and evaluations of new designs. The US Navy Fleet Support Team will provide system engineering qualification on aircraft, support equipment, and develop Technical directives and any additional Integrated Logistics Support (ILS) requirements. The US Navy and contractor software support activities will develop software integrations. Navy Page 21 of 32 P-1 Line #51

22 Models of Systems Affected: F/A-18C/D/E/F Modification Type: SAFETY/RELIABILITY Related RDT&E PEs: Procurement Financial Plan Modification Item 1 of 1: CORRECTIONS OF DISCREPANCIES (OSIP ) A Kits Recurring Prior Years FY 2015 FY / CORRECTIONS OF DISCREPANCIES (OSIP ) FY 2018 FY 2019 FY 2020 FY ) RR-2055 Special Receiver (SRA) - Organic 15 / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 15 / ) RR-2055 Special Receiver ECP- TBD - Organic - / - - / - 7 / / / - 8 / / - - / - - / - - / - - / - 15 / ) CP-1293 PCU-1 - Organic - / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / Subtotal: Recurring - / / - - / / / - - / / - - / - - / - - / - - / - - / Non-Recurring 1.2.1) Installation Kits NR - Organic - / - - / / - - / - - / - - / - - / - - / - - / - - / - - / - - / Subtotal: Non-Recurring - / / / - - / - - / - - / - - / - - / - - / - - / - - / - - / Subtotal: CORRECTIONS OF DISCREPANCIES (OSIP ) 15 / / / / / - 8 / / - - / - - / - - / - - / - 30 / Subtotal: Procurement, All Modification Items - / / / / / - - / / - - / - - / - - / - - / - - / Support (All Modification Items) (20) 3.6) Other Support - / / / / / - - / / - - / - - / - - / - - / - - / Subtotal: Support - / / / / / - - / / - - / - - / - - / - - / - - / Installation Subtotal: Installation - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - Cost (Procurement + Support + Installation) Navy Page 22 of 32 P-1 Line #51

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 34 P-1 Line #51

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 34 P-1 Line #51 Exhibit P-40, Budget Line Item Justification: PB 2016 Navy Date: February 2015 1506N: Aircraft Procurement, Navy / BA 05: Modification of Aircraft / BSA 1: Modification of Aircraft ID Code (A=Service Ready,

More information

UNCLASSIFIED. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018

UNCLASSIFIED. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018 Exhibit P-40, Budget Item Justification Sheet: PB 2014 Navy Date: April 2013 Aircraft / BSA 1: Modification Of Aircraft ID Code (A=Service Ready, B=Not Service Ready) : A Program Elements for Code B Items:

More information

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 24 P-1 Line #55

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 24 P-1 Line #55 Exhibit P-40, Budget Line Item Justification: PB 2016 Navy Date: February 2015 1506N: Aircraft Procurement, Navy / BA 05: Modification of Aircraft / BSA 1: Modification of Aircraft ID Code (A=Service Ready,

More information

UNCLASSIFIED. UNCLASSIFIED United States Special Operations Command Page 1 of 6 P-1 Line #53

UNCLASSIFIED. UNCLASSIFIED United States Special Operations Command Page 1 of 6 P-1 Line #53 Exhibit P-40, Budget Line Item Justification: PB 2017 United States Special Operations Command : February 2016 0300D: Procurement, Defense-Wide / BA 02: Special Operations Command / BSA 1: Aviation Programs

More information

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 10 P-1 Line #47

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 10 P-1 Line #47 Exhibit P-40, Budget Line Item Justification: PB 2016 Air Force Date: February 2015 3010F: Aircraft Procurement, Air Force / BA 05: Modification of Inservice Aircraft / BSA 5: Other Aircraft ID Code (A=Service

More information

UNCLASSIFIED. FY 2017 Base FY 2017 OCO FY 2017 OCO. FY 2017 Base

UNCLASSIFIED. FY 2017 Base FY 2017 OCO FY 2017 OCO. FY 2017 Base Exhibit P-40, Budget Line Item Justification: PB 2017 Air Force Date: February 2016 3010F: Aircraft Procurement, Air Force / BA 05: Modification of Inservice Aircraft / BSA 2: Tactical Aircraft ID Code

More information

UNCLASSIFIED. FY 2017 Base FY 2017 OCO

UNCLASSIFIED. FY 2017 Base FY 2017 OCO Exhibit P-40, Budget Line Item Justification: PB 2017 Air Force Date: February 2016 3010F: Aircraft Procurement, Air Force / BA 05: Modification of Inservice Aircraft / BSA 5: Other Aircraft ID Code (A=Service

More information

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 16 P-1 Line #57

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 16 P-1 Line #57 Exhibit P-40, Budget Line Item Justification: PB 2017 Navy Date: February 2016 1506N: Aircraft Procurement, Navy / BA 05: Modification of Aircraft / BSA 1: Modification of Aircraft ID Code (A=Service Ready,

More information

UNCLASSIFIED. FY 2016 Base FY 2016 OCO FY 2016 OCO. FY 2016 Base

UNCLASSIFIED. FY 2016 Base FY 2016 OCO FY 2016 OCO. FY 2016 Base Exhibit P-40, Budget Line Item Justification: PB 2016 Army Date: February 2015 2031A: Aircraft Procurement, Army / BA 02: Modification of Aircraft / BSA 10: Modification of Aircraft ID Code (A=Service

More information

UNCLASSIFIED. FY 2017 Base FY 2017 OCO FY 2017 OCO. FY 2017 Base

UNCLASSIFIED. FY 2017 Base FY 2017 OCO FY 2017 OCO. FY 2017 Base Exhibit P-40, Budget Line Item Justification: PB 2017 Air Force Date: February 2016 3010F: Aircraft Procurement, Air Force / BA 05: Modification of Inservice Aircraft / BSA 2: Tactical Aircraft ID Code

More information

UNCLASSIFIED. FY 2017 Base FY 2017 OCO. FY 2017 Base FY 2017 OCO

UNCLASSIFIED. FY 2017 Base FY 2017 OCO. FY 2017 Base FY 2017 OCO Exhibit P-40, Budget Line Item Justification: PB 2017 Air Force Date: February 2016 3010F: Aircraft Procurement, Air Force / BA 05: Modification of Inservice Aircraft / BSA 3: Airlift Aircraft ID Code

More information

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

UNCLASSIFIED FY 2016 OCO. FY 2016 Base Exhibit P-40, Budget Line Item Justification: PB 2016 Air Force Date: February 2015 3010F: Aircraft Procurement, Air Force / BA 05: Modification of Inservice Aircraft / BSA 5: Other Aircraft ID Code (A=Service

More information

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 5 P-1 Line #35

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 5 P-1 Line #35 Exhibit P-40, Budget Line Item Justification: PB 2017 Air Force Date: February 2016 3010F: Aircraft Procurement, Air Force / BA 05: Modification of Inservice Aircraft / BSA 4: Trainer Aircraft ID Code

More information

UNCLASSIFIED. UNCLASSIFIED Army Page 1 of 23 P-1 Line #27

UNCLASSIFIED. UNCLASSIFIED Army Page 1 of 23 P-1 Line #27 Exhibit P-40, Budget Line Item Justification: PB 2015 Army Date: March 2014 2031A: Aircraft Procurement, Army / BA 02: Modification of Aircraft / BSA 10: Modification of Aircraft ID Code (A=Service Ready,

More information

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 18 P-1 Line #12

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 18 P-1 Line #12 Exhibit P-40, Budget Line Item Justification: PB 2017 Navy Date: February 2016 1810N: Other Procurement, Navy / BA 01: Ships Support Equipment / BSA 9: Other Shipboard Equipment ID Code (A=Service Ready,

More information

UNCLASSIFIED FY 2015 FY 2015 OCO. FY 2015 Base FY 2015 FY Base

UNCLASSIFIED FY 2015 FY 2015 OCO. FY 2015 Base FY 2015 FY Base Exhibit P-40, Budget Line Item Justification: PB 2015 Air Force Date: March 2014 3010F: Aircraft Procurement, Air Force / BA 05: Modification of Inservice Aircraft / BSA 5: Other Aircraft ID Code (A=Service

More information

UNCLASSIFIED FY 2016 OCO. FY 2016 Base. FY 2016 Base FY 2016 OCO

UNCLASSIFIED FY 2016 OCO. FY 2016 Base. FY 2016 Base FY 2016 OCO Exhibit P-40, Budget Line Item Justification: PB 2016 Army Date: February 2015 2033A: Procurement of W&TCV, Army / BA 01: Tracked Combat Vehicles / BSA 20: Modification of Tracked Combat Vehicles ID Code

More information

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

UNCLASSIFIED FY 2016 OCO. FY 2016 Base Exhibit P-40, Budget Line Item Justification: PB 2016 Air Force Date: February 2015 3010F: Aircraft Procurement, Air Force / BA 05: Modification of Inservice Aircraft / BSA 5: Other Aircraft ID Code (A=Service

More information

UNCLASSIFIED FY Exhibits Schedule Prior Years FY 2013 FY 2014 FY 2015 Base FY 2015 OCO FY 2015 Total. Total Cost ($ M)

UNCLASSIFIED FY Exhibits Schedule Prior Years FY 2013 FY 2014 FY 2015 Base FY 2015 OCO FY 2015 Total. Total Cost ($ M) Exhibit P-40, Budget Line Item Justification: PB 2015 Army Date: March 2014 2033A: Procurement of W&TCV, Army / BA 01: Tracked Combat Vehicles / BSA 20: Modification of Tracked Combat Vehicles ID Code

More information

UNCLASSIFIED. FY 2016 Base FY 2016 OCO FY 2016 OCO. FY 2016 Base

UNCLASSIFIED. FY 2016 Base FY 2016 OCO FY 2016 OCO. FY 2016 Base Exhibit P-40, Budget Line Item Justification: PB 2016 Air Force Date: February 2015 3010F: Aircraft Procurement, Air Force / BA 05: Modification of Inservice Aircraft / BSA 2: Tactical Aircraft ID Code

More information

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 5 P-1 Line #55

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 5 P-1 Line #55 Exhibit P-40, Budget Line Item Justification: PB 2016 Air Force Date: February 2015 3010F: Aircraft Procurement, Air Force / BA 05: Modification of Inservice Aircraft / BSA 5: Other Aircraft ID Code (A=Service

More information

UNCLASSIFIED FY 2017 OCO. FY 2017 Base

UNCLASSIFIED FY 2017 OCO. FY 2017 Base Exhibit P-40, Budget Line Item Justification: PB 2017 Air Force Date: February 2016 3021F: Space Procurement, Air Force / BA 01: Space Procurement, Air Force / BSA 1: Space Programs ID Code (A=Service

More information

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 17 P-1 Line #121

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 17 P-1 Line #121 Exhibit P-40, Budget Line Item Justification: PB 2015 Navy Date: March 2014 1810N: Other Procurement, Navy / BA 04: Ordnance Support Equipment / BSA 3: Ship Missile Systems Equipment ID Code (A=Service

More information

UNCLASSIFIED. FY 2017 Base FY 2017 OCO FY 2017 OCO. FY 2017 Base

UNCLASSIFIED. FY 2017 Base FY 2017 OCO FY 2017 OCO. FY 2017 Base Exhibit P-40, Budget Line Item Justification: PB 2017 Air Force Date: February 2016 3010F: Aircraft Procurement, Air Force / BA 05: Modification of Inservice Aircraft / BSA 5: Other Aircraft ID Code (A=Service

More information

UNCLASSIFIED. FY 2017 Base FY 2017 OCO FY 2017 OCO. FY 2017 Base

UNCLASSIFIED. FY 2017 Base FY 2017 OCO FY 2017 OCO. FY 2017 Base Exhibit P-40, Budget Line Item Justification: PB 2017 Army Date: February 2016 2033A: Procurement of W&TCV, Army / BA 01: Tracked Combat Vehicles / BSA 20: Modification of Tracked Combat Vehicles ID Code

More information

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 17 P-1 Line #55

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 17 P-1 Line #55 Exhibit P-40, Budget Line Item Justification: PB 2017 Air Force Date: February 2016 3010F: Aircraft Procurement, Air Force / BA 05: Modification of Inservice Aircraft / BSA 5: Other Aircraft ID Code (A=Service

More information

UNCLASSIFIED FY Exhibits Schedule Prior Years FY 2013 FY 2014 FY 2015 Base FY 2015 OCO FY 2015 Total. Total Cost ($ M) Unit Cost ($) Qty (Each)

UNCLASSIFIED FY Exhibits Schedule Prior Years FY 2013 FY 2014 FY 2015 Base FY 2015 OCO FY 2015 Total. Total Cost ($ M) Unit Cost ($) Qty (Each) Exhibit P-40, Budget Line Item Justification: PB 2015 Navy Date: March 2014 1506N: Aircraft Procurement, Navy / BA 05: Modification of Aircraft / BSA 1: Modification of Aircraft ID Code (A=Service Ready,

More information

UNCLASSIFIED. FY 2014 Base. OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018

UNCLASSIFIED. FY 2014 Base. OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018 Exhibit P-40, Budget Item Justification Sheet: PB 2014 Air Force Date: April 2013 Inservice Missiles / BSA 1: Class IV ID Code (A=Service Ready, B=Not Service Ready) : A Program Elements for Code B Items:

More information

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 31 P-1 Line #41

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 31 P-1 Line #41 Exhibit P-40, Budget Line Item Justification: PB 2017 Navy Date: February 2016 1810N: Other Procurement, Navy / BA 01: Ships Support Equipment / BSA 16: Logistic Support ID Code (A=Service Ready, B=Not

More information

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 5 P-1 Line #21

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 5 P-1 Line #21 Exhibit P-40, Budget Line Item Justification: PB 2015 Navy Date: March 2014 1507N: Weapons Procurement, Navy / BA 03: Torpedoes and Related Equipment / BSA 1: Torpedoes and Related Equip ID Code (A=Service

More information

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 21 P-1 Line #19

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 21 P-1 Line #19 Exhibit P-40, Budget Line Item Justification: PB 2017 Navy Date: February 2016 1810N: Other Procurement, Navy / BA 01: Ships Support Equipment / BSA 9: Other Shipboard Equipment ID Code (A=Service Ready,

More information

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 18 P-1 Line #56

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 18 P-1 Line #56 Exhibit P-40, Budget Line Item Justification: PB 2016 Air Force Date: February 2015 3010F: Aircraft Procurement, Air Force / BA 05: Modification of Inservice Aircraft / BSA 5: Other Aircraft ID Code (A=Service

More information

UNCLASSIFIED FY 2015 FY 2015 OCO. FY 2015 Base FY 2015 FY Base

UNCLASSIFIED FY 2015 FY 2015 OCO. FY 2015 Base FY 2015 FY Base Exhibit P-40, Budget Line Item Justification: PB 2015 Army Date: March 2014 2031A: Aircraft Procurement, Army / BA 02: Modification of Aircraft / BSA 10: Modification of Aircraft ID Code (A=Service Ready,

More information

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 151 P-1 Line #32

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 151 P-1 Line #32 Exhibit P-40, Budget Line Item Justification: PB 2017 Navy Date: February 2016 1506N: Aircraft Procurement, Navy / BA 05: Modification of Aircraft / BSA 1: Modification of Aircraft ID Code (A=Service Ready,

More information

UNCLASSIFIED. UNCLASSIFIED Army Page 1 of 16 P-1 Line #15

UNCLASSIFIED. UNCLASSIFIED Army Page 1 of 16 P-1 Line #15 Exhibit P-40, Budget Line Item Justification: PB 2017 Army Date: February 2016 2031A: Aircraft Procurement, Army / BA 02: Modification of Aircraft / BSA 10: Modification of Aircraft ID Code (A=Service

More information

UNCLASSIFIED. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018

UNCLASSIFIED. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018 Exhibit P-40, Budget Item Justification Sheet: PB 2014 Navy : April 2013 Ammo, MC / BSA 1: Marine Corps Ammunition ID Code (A=Service Ready, B=Not Service Ready) : A Program Elements for Code B : Other

More information

UNCLASSIFIED. FY 2016 Base FY 2016 OCO FY 2016 OCO. FY 2016 Base

UNCLASSIFIED. FY 2016 Base FY 2016 OCO FY 2016 OCO. FY 2016 Base Resource Summary Prior Years FY 2014 FY 2015 Base OCO Total FY 2017 FY 2018 FY 2019 FY 2020 To Complete Procurement Quantity (Units in Each) - - - - - - - - - - - - Gross/Weapon System Cost ($ in Millions)

More information

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 33 P-1 Line #94

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 33 P-1 Line #94 Exhibit P-40, Budget Line Item Justification: PB 2017 Navy Date: February 2016 1810N: Other Procurement, Navy / BA 02: Communications & Electronics Equip / BSA 12: Submarine Communications ID Code (A=Service

More information

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 30 P-1 Line #36

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 30 P-1 Line #36 Exhibit P-40, Budget Line Item Justification: PB 2016 Navy Date: February 2015 1506N: Aircraft Procurement, Navy / BA 05: Modification of Aircraft / BSA 1: Modification of Aircraft ID Code (A=Service Ready,

More information

UNCLASSIFIED. UNCLASSIFIED Page 1 of 5. EXHIBIT R-2, RDT&E Budget Item Justification RESEARCH DEVELOPMENT TEST & EVALUATION, NAVY / BA-5

UNCLASSIFIED. UNCLASSIFIED Page 1 of 5. EXHIBIT R-2, RDT&E Budget Item Justification RESEARCH DEVELOPMENT TEST & EVALUATION, NAVY / BA-5 EXHIBIT R-2, RDT&E Budget Item Justification APPROPRIATION/BUDGET ACTIVITY RESEARCH DEVELOPMENT TEST & EVALUATION, NAVY / BA-5 R-1 ITEM NOMENCLATURE 0605430N, C/KC-130 AVIONICS MODERNIZATION PROGRAM (AMP)

More information

UNCLASSIFIED. FY 2017 Base FY 2017 OCO

UNCLASSIFIED. FY 2017 Base FY 2017 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2017 Air Force : February 2016 3600: Research, Development, Test & Evaluation, Air Force / BA 7: Operational Systems Development COST ($ in Millions) FY

More information

UNCLASSIFIED FY Exhibits Schedule Prior Years FY 2013 FY 2014 FY 2015 Base FY 2015 OCO FY 2015 Total. Total Cost ($ M) Unit Cost ($) Qty (Each)

UNCLASSIFIED FY Exhibits Schedule Prior Years FY 2013 FY 2014 FY 2015 Base FY 2015 OCO FY 2015 Total. Total Cost ($ M) Unit Cost ($) Qty (Each) Exhibit P-40, Budget Line Item Justification: PB 2015 Navy Date: March 2014 1506N: Aircraft Procurement, Navy / BA 05: Modification of Aircraft / BSA 1: Modification of Aircraft ID Code (A=Service Ready,

More information

UNCLASSIFIED. FY 2014 Base. OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018

UNCLASSIFIED. FY 2014 Base. OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018 Exhibit P-40, Budget Item Justification Sheet: PB 2014 Army Date: April 2013 Aircraft / BSA 10: Modification Of Aircraft ID Code (A=Service Ready, B=Not Service Ready) : Program Elements for Code B Items:

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE PE A: AIRCRAFT CERTIFICATION FY 2012 OCO

UNCLASSIFIED R-1 ITEM NOMENCLATURE PE A: AIRCRAFT CERTIFICATION FY 2012 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 212 Army DATE: February 211 24: Research, Development, Test & Evaluation, Army COST ($ in Millions) FY 21 FY 211 FY 212 Base PE 6566A: AIRCRAFT CERTIFICATION

More information

UNCLASSIFIED. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018

UNCLASSIFIED. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018 Exhibit P-40, Budget Item Justification Sheet: PB 2014 Navy : April 2013 Ammo, MC / BSA 1: Marine Corps Ammunition ID Code (A=Service Ready, B=Not Service Ready) : A Program Elements for Code B : Other

More information

UNCLASSIFIED FY 2017 OCO. FY 2017 Base

UNCLASSIFIED FY 2017 OCO. FY 2017 Base Exhibit P-40, Budget Line Item Justification: PB 2017 Navy Date: February 2016 1810N: Other Procurement, Navy / BA 04: Ordnance Support Equipment / BSA 7: Other Expendable Ordnance ID Code (A=Service Ready,

More information

RDT&E BUDGET ITEM JUSTIFICATION SHEET (R-2 Exhibit)

RDT&E BUDGET ITEM JUSTIFICATION SHEET (R-2 Exhibit) PE NUMBER: 0604239F PE TITLE: F-22 EMD BUDGET ACTIVITY COST ($ In Thousands) Actual FY 1999 FY 2000 FY 2001 FY 2002 FY 2003 FY 2004 FY 2005 Cost to Complete Cost Advanced Tactical Fighter FSD 2,010,717

More information

UNCLASSIFIED FY Exhibits Schedule Prior Years FY 2013 FY 2014 FY 2015 Base FY 2015 OCO FY 2015 Total. Unit Cost ($ M) Qty (Each)

UNCLASSIFIED FY Exhibits Schedule Prior Years FY 2013 FY 2014 FY 2015 Base FY 2015 OCO FY 2015 Total. Unit Cost ($ M) Qty (Each) Exhibit P-40, Budget Line Item Justification: PB 2015 United States Special Operations Command Date: March 2014 0300D: Procurement, Defense-Wide / BA 02: Special Operations Command / BSA 4: Other Procurement

More information

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 126 P-1 Line #32

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 126 P-1 Line #32 Exhibit P-40, Budget Line Item Justification: PB 2016 Navy Date: February 2015 1506N: Aircraft Procurement, Navy / BA 05: Modification of Aircraft / BSA 1: Modification of Aircraft ID Code (A=Service Ready,

More information

UNCLASSIFIED. FY 2017 Base FY 2017 OCO. FY 2017 Base FY 2017 OCO

UNCLASSIFIED. FY 2017 Base FY 2017 OCO. FY 2017 Base FY 2017 OCO UNCLSSIFIED Exhibit P-40, Budget Line Item Justification: PB 2017 ir Force Date: February 2016 ppropriation / Budget ctivity / Budget Sub ctivity: 3080F: Other Procurement, ir Force / B 02: Vehicular Equipment

More information

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED. FY 2016 Base FY 2016 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Air Force : February 2015 3600: Research, Development, Test & Evaluation, Air Force / BA 7: Operational Systems Development COST ($ in Millions) FY

More information

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 17 P-1 Line #13

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 17 P-1 Line #13 Exhibit P-40, Budget Line Item Justification: PB 2016 Navy : February 2015 1508N: Procurement of Ammo, Navy & MC / BA 01: Proc Ammo, Navy / BSA 1: Navy Ammunition A Program Elements for Code B Items: Other

More information

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: Communication, Navigation, Surveillance/Air Traffic Management (CNS/ATM) FY 2012 OCO

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: Communication, Navigation, Surveillance/Air Traffic Management (CNS/ATM) FY 2012 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2012 Air Force DATE: February 2011 COST ($ in Millions) FY 2010 FY 2011 FY 2013 FY 2014 FY 2015 FY 2016 To Program Element 6.754 5.708 4.604-4.604 4.549

More information

Aircraft Controls MILITARY AIRCRAFT COMMERCIAL AIRCRAFT AFTERMARKET

Aircraft Controls MILITARY AIRCRAFT COMMERCIAL AIRCRAFT AFTERMARKET Aircraft Controls MILITARY AIRCRAFT COMMERCIAL AIRCRAFT AFTERMARKET The largest of the five Moog operating segments is Aircraft Controls. Revenues from development, production and aftermarket support of

More information

U.S. NAVY CNS/ATM Program Status

U.S. NAVY CNS/ATM Program Status U.S. NAVY CNS/ATM Program Status 9 June 2009 Dave Staso CNS/ATM IPTL NAVAIR PMA209 (240) 925-9220 david.staso@navy.mil UNCLASSIFIED Minimum Functionality is a Requirement Amish buggies are not allowed

More information

Military Aviation Fleet & MRO Forecast

Military Aviation Fleet & MRO Forecast Military Aviation Fleet & MRO Forecast April 6, 2016 Daniel Z. Katz Director, Defense Analysis and Data Aviation Week Intelligence and Data Services Arlington, VA Source: Aviation Week 2016 Fleet & MRO

More information

COMPLIANCE WITH THIS PUBLICATION IS MANDATORY

COMPLIANCE WITH THIS PUBLICATION IS MANDATORY BY ORDER OF THE COMMANDER AIR COMBAT COMMAND AIR FORCE INSTRUCTION 21-103 AIR COMBAT COMMAND Supplement 21 SEPTEMBER 2017 MAINTENANCE EQUIPMENT INVENTORY, STATUS, AND UTILIZATION REPORTING SYSTEM F-15A/B/C/D

More information

Presidential Aircraft Recapitalization

Presidential Aircraft Recapitalization Presidential Aircraft Recapitalization Solicitation Number: FA8625-15-C-6599 Agency: Department of the Air Force Office: Air Force Materiel Command Location: AFLCMC/PK - WPAFB (includes PZ, WL, WW, WI,

More information

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 27 P-1 Line #2

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 27 P-1 Line #2 UNCLSSIFIED Exhibit P-40, Budget Line Item Justification: PB mended 2015 ir Force Date: June 2014 ppropriation / Budget ctivity / Budget Sub ctivity: 3011F: Procurement of mmunition, ir Force / B 01: mmunition

More information

Cost-effective, flexible avionics for today s missions and future challenges. Flight2 integrated avionics system. UPGRADES FOR LEGACY C-130s

Cost-effective, flexible avionics for today s missions and future challenges. Flight2 integrated avionics system. UPGRADES FOR LEGACY C-130s Cost-effective, flexible avionics for today s missions and future challenges. Flight2 integrated avionics system UPGRADES FOR LEGACY C-130s Bring cabin capability into highest definition. Flight2 integrated

More information

COMPLIANCE WITH THIS PUBLICATION IS MANDATORY

COMPLIANCE WITH THIS PUBLICATION IS MANDATORY BY ORDER OF THE COMMANDER AIR COMBAT COMMAND AIR FORCE INSTRUCTION 21-103 AIR COMBAT COMMAND Supplement ADDENDUM_T 12 OCTOBER 2017 MAINTENANCE EQUIPMENT INVENTORY, STATUS, AND UTILIZATION REPORTING/ F-15E

More information

MANPAD Protection for Commercial Aircraft

MANPAD Protection for Commercial Aircraft MANPAD Protection for Commercial Aircraft Jack Pledger Director, IRCM Business Development 199-004225 1 April 2004 Introduction The Threat 2 The Threat is Real and Present Today Type Region Non-State Group

More information

Aus-DIRCM Lear Jet Flight Demonstration

Aus-DIRCM Lear Jet Flight Demonstration Aus-DIRCM Lear Jet Flight Demonstration Lyell Wedd Airborne Self Protection SPO Defence Materiel Organisation Canberra, ACT John Cole Tenix Defence Pty. Ltd. Second Avenue, Technology Park, Mawson Lakes

More information

Official Journal of the European Union L 186/27

Official Journal of the European Union L 186/27 7.7.2006 Official Journal of the European Union L 186/27 COMMISSION REGULATION (EC) No 1032/2006 of 6 July 2006 laying down requirements for automatic systems for the exchange of flight data for the purpose

More information

Technical Standard Order

Technical Standard Order Department of Transportation Federal Aviation Administration Aircraft Certification Service Washington, DC TSO-C145a Effective Date: 09/19/02 Technical Standard Order Subject: AIRBORNE NAVIGATION SENSORS

More information

UNCLASSIFIED UNCLASSIFIED

UNCLASSIFIED UNCLASSIFIED : February 216 Exhibit R2, RDT&E Budget Item Justification: PB 217 24: Research, Development, Test & Evaluation, / BA 5: System Development & Demonstration (SDD) COST ($ in Millions) FY 215 Program Element

More information

Department of Defense DIRECTIVE

Department of Defense DIRECTIVE Department of Defense DIRECTIVE NUMBER 5030.61 May 24, 2013 Incorporating Change 2, August 24, 2017 USD(AT&L) SUBJECT: DoD Airworthiness Policy References: See Enclosure 1 1. PURPOSE. This directive establishes

More information

Operators may need to retrofit their airplanes to ensure existing fleets are properly equipped for RNP operations. aero quarterly qtr_04 11

Operators may need to retrofit their airplanes to ensure existing fleets are properly equipped for RNP operations. aero quarterly qtr_04 11 Operators may need to retrofit their airplanes to ensure existing fleets are properly equipped for RNP operations. 24 equipping a Fleet for required Navigation Performance required navigation performance

More information

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 31 P-1 Line #2

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 31 P-1 Line #2 UNCLSSIFIED Exhibit P-40, Budget Line Item Justification: PB 2016 ir Force : February 2015 ppropriation / Budget ctivity / Budget Sub ctivity: 3011F: Procurement of mmunition, ir Force / B 01: mmunition

More information

COMPLIANCE WITH THIS PUBLICATION IS MANDATORY

COMPLIANCE WITH THIS PUBLICATION IS MANDATORY BY ORDER OF THE SECRETARY OF THE AIR FORCE AIR FORCE POLICY DIRECTIVE 62-6 11 JUNE 2010 Developmental Engineering USAF AIRWORTHINESS COMPLIANCE WITH THIS PUBLICATION IS MANDATORY ACCESSIBILITY: Publications

More information

RADA Electronic Industries Ltd. (Nasdaq: RADA) March 2019

RADA Electronic Industries Ltd. (Nasdaq: RADA) March 2019 RADA Electronic Industries Ltd. (Nasdaq: RADA) March 2019 DISCLAIMER This presentation contains certain statements that may be deemed to be forward looking statements within the meaning of Section 27A

More information

What Is The Proposed 29Palms Training Land Acquisition and Airspace Establishment Project? Frequently Asked Questions Airspace Related June 2014

What Is The Proposed 29Palms Training Land Acquisition and Airspace Establishment Project? Frequently Asked Questions Airspace Related June 2014 MARINE CORPS / DEPARTMENT OF THE NAVY SUBMIT SPECIAL USE AIRSPACE PROPOSALS TO THE FEDERAL AVIATION ADMINISTRATION TO MEET MARINE EXPEDITIONARY BRIGADE TRAINING REQUIREMENTS 1. Why has the Marine Corps

More information

2015 Q3 Investor Conference

2015 Q3 Investor Conference 2015 Q3 Investor Conference Accountability Innovation Dedication Customer Orientation Aerospace Industrial Development Corporation Date: October 13, 2015-0- 0 0 Contents I. Markets II. Operations and Financial

More information

Airspace Establishment Project Frequently Asked Questions Permanent SUA and Environmental Assessment March 2019

Airspace Establishment Project Frequently Asked Questions Permanent SUA and Environmental Assessment March 2019 OVERVIEW OF PERMANENT SPECIAL USE AIRSPACE ESTABLISHMENT AND MODIFICATIONS AT MARINE AIR GROUND TASK FORCE TRAINING COMMAND, TWENTYNINE PALMS, CA 1. What is Special Use Airspace (SUA)? Special Use Airspace

More information

OVERSEAS TERRITORIES AVIATION REQUIREMENTS (OTARs)

OVERSEAS TERRITORIES AVIATION REQUIREMENTS (OTARs) OVERSEAS TERRITORIES AVIATION REQUIREMENTS (OTARs) Part 173 FLIGHT CHECKING ORGANISATION APPROVAL Published by Air Safety Support International Ltd Air Safety Support International Limited 2005 ISBN 0-11790-410-4

More information

CRANE Co. Overview. Aerospace & Electronics. Engineered Materials

CRANE Co. Overview. Aerospace & Electronics. Engineered Materials CRANE Co. Overview Aerospace & Electronics Engineered Materials Merchandising Fluid Handling Controls 1 Crane Aerospace & Electronics $678M Sales (2011) AEROSPACE 62% Aerospace 61% text Electronics 39%

More information

AIRCRAFT SERVICE CHANGE

AIRCRAFT SERVICE CHANGE AIRCRAFT SERVICE CHANGE NUMBER 909 SUBJECT INDICATING / RECORDING (ATA 31) PLANEVIEW MASTER OPERATING SYSTEM SOFTWARE UPDATE DECEMBER 22, 2011 PILOTS INFORMATION SHEET PLANEVIEW MASTER OPERATING SYSTEM

More information

Aviation market is back worldwide

Aviation market is back worldwide GE Infrastructure Analyst Meeting November 2, 2005 GE Aviation Scott C. Donnelly November 2, 2005 Aviation market is back worldwide Airline Passenger Demand 2,800 2,600 2,400 2,200 2,000 1,800 Revenue

More information

What Is The 29Palms Training Land Acquisition and Airspace Establishment Project Frequently Asked Questions Airspace Related July 2015

What Is The 29Palms Training Land Acquisition and Airspace Establishment Project Frequently Asked Questions Airspace Related July 2015 MARINE CORPS / DEPARTMENT OF THE NAVY SUBMIT SPECIAL USE AIRSPACE PROPOSALS TO THE FEDERAL AVIATION ADMINISTRATION TO MEET MARINE EXPEDITIONARY BRIGADE TRAINING REQUIREMENTS 1. Why has the Marine Corps

More information

Gabelli Asset Management Aircraft Supplier Conference

Gabelli Asset Management Aircraft Supplier Conference Gabelli Asset Management Aircraft Supplier Conference Rob Gillette Aerospace President & CEO September 5, 2008 Forward Looking Statements This report contains forward-looking statements within the meaning

More information

9/16/ CHG 213 VOLUME 3 GENERAL TECHNICAL ADMINISTRATION CHAPTER 61 AIRCRAFT NETWORK SECURITY PROGRAM

9/16/ CHG 213 VOLUME 3 GENERAL TECHNICAL ADMINISTRATION CHAPTER 61 AIRCRAFT NETWORK SECURITY PROGRAM VOLUME 3 GENERAL TECHNICAL ADMINISTRATION CHAPTER 61 AIRCRAFT NETWORK SECURITY PROGRAM Section 1 Safety Assurance System: Evaluate the Operator s 14 CFR Parts 121, 121/135, 125, and 129 Aircraft Network

More information

D DAVID PUBLISHING. Development and Achievement of the T-50 Flight Control s Consolidated OFP. 1. Introduction. 2. Consolidated OFP s Needs

D DAVID PUBLISHING. Development and Achievement of the T-50 Flight Control s Consolidated OFP. 1. Introduction. 2. Consolidated OFP s Needs Journal of Aerospace Science and Technology 1 (2015) 67-72 doi: 10.17265/2332-8258/2015.02.003 D DAVID PUBLISHING Development and Achievement of the T-50 Flight Control s Consolidated OFP Soon Ryong Jang,

More information

Military Airworthiness Conference 2015

Military Airworthiness Conference 2015 Military Airworthiness Conference 2015 Oct. 14 th, 2015 Certification Planning Division Analysis, Test and Evaluation Bureau Defense Acquisition Program Administration Approved for Public Release; No sensitive

More information

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 39 P-1 Line #54

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 39 P-1 Line #54 LSSIFID xhibit P-40, Budget Line Item ustification: PB 2017 avy Date: February 2016 ppropriation / Budget ctivity / Budget Sub ctivity: 1810: ther Procurement, avy / B 02: ommunications & lectronics quip

More information

AE 452 Aeronautical Engineering Design II Cost Analysis. Prof. Dr. Serkan Özgen Dept. Aerospace Engineering

AE 452 Aeronautical Engineering Design II Cost Analysis. Prof. Dr. Serkan Özgen Dept. Aerospace Engineering AE 452 Aeronautical Engineering Design II Cost Analysis Prof. Dr. Serkan Özgen Dept. Aerospace Engineering 1 Problems when estimating cost Number of parameters involved (technical, financial, political)

More information

SYLLABUS INTRODUCTION TO ROTARY WING FLYING QUALITIES AND PERFORMANCE

SYLLABUS INTRODUCTION TO ROTARY WING FLYING QUALITIES AND PERFORMANCE 22783 Cedar Point Road, Building 2168 Patuxent River, MD 20670 Phone: 301 757 5049 301 757 2731 Fax: 301 342 5003 www.navair.navy.mil/nawcad/usntps SYLLABUS INTRODUCTION TO ROTARY WING FLYING QUALITIES

More information

U.S. ARMY LEAD THE FLEET USAGE ANALYSIS. David White Westar Corporation. Michael McFalls U.S. Army Aviation & Missile Command

U.S. ARMY LEAD THE FLEET USAGE ANALYSIS. David White Westar Corporation. Michael McFalls U.S. Army Aviation & Missile Command U.S. ARMY LEAD THE FLEET USAGE ANALYSIS David White Westar Corporation Michael McFalls U.S. Army Aviation & Missile Command David Largess COBRO (a Westar Company) ABSTRACT The purpose of the U.S. Army

More information

AEROSPACE & ELECTRONICS BRENDAN CURRAN PRESIDENT

AEROSPACE & ELECTRONICS BRENDAN CURRAN PRESIDENT AEROSPACE & ELECTRONICS BRENDAN CURRAN PRESIDENT Aerospace & Electronics Overview and Results Market Outlook Technological Differentiation and Growth Summary 2 Crane Aerospace & Electronics Industry Leader

More information

District 3 ITS Project Update

District 3 ITS Project Update District 3 ITS Project Update Chad Williams, P.E. District 3 ITS Engineer Key ITS Projects in District 3 Bay County Advanced Traffic Management System (ATMS) Okaloosa County Computerized Traffic Control

More information

With the completion of this project, we would like to follow-up on the projections as well as highlight a few other items:

With the completion of this project, we would like to follow-up on the projections as well as highlight a few other items: TO: FROM: Mayor and Council Interim City Manager Rebecca Underhill, Director of Finance DATE: February 28, 2014 SUBJECT: Water Meter Project Analysis On March 28, 2012, Acting City Manager Mike Loftin

More information

Surveillance and Broadcast Services

Surveillance and Broadcast Services Surveillance and Broadcast Services Benefits Analysis Overview August 2007 Final Investment Decision Baseline January 3, 2012 Program Status: Investment Decisions September 9, 2005 initial investment decision:

More information

COMPLIANCE WITH THIS PUBLICATION IS MANDATORY

COMPLIANCE WITH THIS PUBLICATION IS MANDATORY BY ORDER OF THE SECRETARY OF THE AIR FORCE AIR FORCE INSTRUCTION 11-201 30 NOVEMBER 2018 Flying Operations FLIGHT INFORMATION PUBLICATIONS COMPLIANCE WITH THIS PUBLICATION IS MANDATORY ACCESSIBILITY: Publications

More information

General Aviation Drive Melbourne International Airport Melbourne, Florida USA T: F:

General Aviation Drive Melbourne International Airport Melbourne, Florida USA T: F: www.seaerospace.com 1399 General Aviation Drive Melbourne International Airport Melbourne, Florida 32935 USA T: +321-255-9877 F: +321-255-9608 Presentation Index Click on title to jump to page. Corporate

More information

TRANSMITTAL SHEET. Concurrent Requirement Added G450 Customer Bulletin Number 141 (aircraft that have previously incorporated ASC 016)

TRANSMITTAL SHEET. Concurrent Requirement Added G450 Customer Bulletin Number 141 (aircraft that have previously incorporated ASC 016) TRANSMITTAL SHEET This sheet transmits Revision A, dated, to Gulfstream G450 Aircraft Service Change 016, dated August 18, 2005, titled Aircraft General (ATA 00) Maximum Takeoff Gross Weight (MTOGW) Increase.

More information

AIRWORTHINESS ADVISORY CIRCULAR

AIRWORTHINESS ADVISORY CIRCULAR GOVERNMENT OF INDIA CIVIL AVIATION DEPARTMENT DIRECTOR GENERAL OF CIVIL AVIATION AAC NO 4 of 2006 Date: 21 st August 2006 AIRWORTHINESS ADVISORY CIRCULAR SUBJECT: AIRWORTHINESS APPROVALS FOR EXPORTS 1.

More information

Advisory Circular. 1.1 Purpose Applicability Description of Changes... 2

Advisory Circular. 1.1 Purpose Applicability Description of Changes... 2 Advisory Circular Subject: Part Design Approvals Issuing Office: Standards Document No.: AC 521-007 File Classification No.: Z 5000-34 Issue No.: 01 RDIMS No.: 5612108-V33 Effective Date: 2012-03-16 1.1

More information

AE 452 Aeronautical Engineering Design II Cost of an Airplane. Prof. Dr. Serkan Özgen Dept. Aerospace Engineering April 2017

AE 452 Aeronautical Engineering Design II Cost of an Airplane. Prof. Dr. Serkan Özgen Dept. Aerospace Engineering April 2017 AE 452 Aeronautical Engineering Design II Cost of an Airplane Prof. Dr. Serkan Özgen Dept. Aerospace Engineering April 2017 Difficulties when estimating cost Number of parameters involved (technical, financial,

More information

FLIGHT CONTROLS - FLAP FLEX SHAFT (CABLE) ASSEMBLY INSPECTION/ REPLACEMENT

FLIGHT CONTROLS - FLAP FLEX SHAFT (CABLE) ASSEMBLY INSPECTION/ REPLACEMENT Beech SERVICE BULLETIN TITLE: FLIGHT CONTROLS - FLAP FLEX SHAFT (CABLE) ASSEMBLY INSPECTION/ REPLACEMENT 1. Planning Information A. Effectivity (1) Airplanes (a) Civil All airplanes that have complied

More information

Safe Harbor Statement

Safe Harbor Statement B. Riley & Co. 8 th Annual Las Vegas Investor Conference Peter Gundermann, President & CEO March 13, 2007 Safe Harbor Statement These slides contain (and the accompanying oral discussion will contain)

More information

July 29-30, 2010 Washington, D.C Procurement Agencies. Coast Guard Agencies

July 29-30, 2010 Washington, D.C Procurement Agencies. Coast Guard Agencies 2010 Military, Civilian and Commercial UAV Systems & Applications Unmanned Aircraft Systems Defense and Tactics Conference & Expo July 29-30, 2010 Washington, D.C Photo credit: US DoD 25 Countries 40 Procurement

More information