1 Exhibit P-40, Budget Line Item Justification: PB 2015 Army Date: March A: Aircraft Procurement, Army / BA 02: Modification of Aircraft / BSA 10: Modification of Aircraft ID Code (A=Service Ready, B=Not Service Ready) : Program Elements for Code B Items: Other Related Program Elements: Resource Summary Prior Years FY 2013 FY 2014 # Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) 6, , Less PY Advance Procurement ($ in Millions) Net Procurement (P1) ($ in Millions) 6, , Plus CY Advance Procurement ($ in Millions) Obligation Authority ($ in Millions) 6, , (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) Flyaway Unit Cost ($ in Thousands) Gross/Weapon System Unit Cost ($ in Thousands) # The Request will be submitted at a later date. Description: The AH-64 MODS (AA6606) program provides for modernization of the fielded AH-64D Longbow Apache (LBA) fleet. AH-64D is a tandem cockpit, twin engine, single main rotor attack helicopter. The LBA aircraft incorporates the Longbow weapon system and provides the U.S. Army with significant target acquisition and firepower effectiveness, survivability, lethality, and fighting capabilities even during adverse weather conditions. The LBA is equipped with the Fire Control Radar/Radar Frequency Interferometer (FCR/RFI) mission kit and Fire and Forget Longbow HELLFIRE missiles. The Modernized Target Acquisition Designator Sight (MTADS) assembly is an Electro-Optical system that consists of a Day television (DTV), sensor, a Forward Looking Infrared (FLIR) sensor for day and night visibility as well as limited adverse weather operations, a Laser Spot Tracker (LST), and Laser Rangefinder/Designator (LRFD). The Pilot Night Vision Sensor (PNVS) is a FLIR system which allows Nap-of-Earth flight operations at night by the pilot independent of the co-pilot/gunner's FLIR. The Longbow is armed with the Hellfire Antitank Missile, 2.75 inch rockets and a 30mm gun capable of defeating armor. The AH-64 Mods Program allows for near-term operationally driven improvements to the Apache fleet, focusing on deployment lessons learned, reliability improvements, and solving obsolescence issues. Improvements will occur to the Airframe, Armament, Communications, Manned / Unmanned Teaming, Navigation, Sensors, Survivability, Support Elements, and Training Systems. Examples of modifications include Selected Component Recapitalization, Airframe and Sensor Obsolescence upgrades, Software upgrades, Condition d Maintenance (CBM), Trainer upgrades, the Lightweight Missile Launcher (LWML) and Computer/Processing and Data Display and Control upgrades. Approximately half the Apache fleet will be non AB3 configured past These modernization efforts are required to ensure the Longbow Apache remains a ready and relevant Soldier asset. Army Secondary Distribution FY 2013 FY 2014 Quantity Obligation Authority : Quantity Army Page 1 of 29 P-1 Line #20 141
2 Exhibit P-40, Budget Line Item Justification: PB 2015 Army Date: March A: Aircraft Procurement, Army / BA 02: Modification of Aircraft / BSA 10: Modification of Aircraft ID Code (A=Service Ready, B=Not Service Ready) : Program Elements for Code B Items: Other Related Program Elements: Secondary Distribution FY 2013 FY 2014 Secondary Distribution Obligation Authority Exhibits Schedule Title* P-3a - AA6606 / AH-64 Modifications P-3a Exhibits ID Unit Cost CD ($ K) Qty (Each) Cost ($ M) Unit Cost ($ K) Qty (Each) Cost ($ M) Unit Cost ($ K) Qty (Each) Cost ($ M) Unit Cost ($ K) Qty (Each) Cost ($ M) Unit Cost ($ K) Qty (Each) Cost ($ M) - - 6, Gross/Weapon System Cost - - 6, Exhibits Schedule FY 2016 FY 2017 FY 2018 FY 2019 Title* P-3a - AA6606 / AH-64 Modifications P-3a Exhibits ID Unit Cost CD ($ K) Qty (Each) Cost ($ M) Unit Cost ($ K) Qty (Each) Cost ($ M) Unit Cost ($ K) Qty (Each) Cost ($ M) Unit Cost ($ K) Qty (Each) Cost ($ M) Unit Cost ($ K) Qty (Each) Cost ($ M) , Gross/Weapon System Cost , *For the P-3a, Title represents the Modification Number / Title. Note: s in this Exhibit P-40 set may not be exact or add due to rounding. Justification: FY14 funding in the amount of $ Million supports modification efforts for the Airframe, Armament, Manned/Unmanned Teaming Mission Command, Sensors, Survivability, Support Elements and training Systems. All COMPO 1 Active The Apache Project Manager developed new P Form categories to link the new capabilities to an Apache Work Breakdown Structure. The categories (Airframe, Arnament, Manned/Unmanned Teaming, Mission Command, etc) provide a more logical view and align the funding to a specific part of the aircraft. Unit Cost ($ K) Unit Cost ($ K) Qty (Each) Qty (Each) Cost ($ M) Cost ($ M) Army Page 2 of 29 P-1 Line #20 142
3 Resource Summary Prior Years FY 2013 FY 2014 # Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) 6, , Less PY Advance Procurement ($ in Millions) Net Procurement (P1) ($ in Millions) 6, , Plus CY Advance Procurement ($ in Millions) Obligation Authority ($ in Millions) 6, , (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) Gross/Weapon System Unit Cost ($ in Thousands) # The Request will be submitted at a later date. Description: Airframe includes modifications to the Structural Subsystems, Propulsion/Drive/Rotor Systems, Health Monitoring System (CBM), and Recap Support/Kits. Structural Subsystems modifications include improvements to the assembled structural and aerodynamic components of the air vehicle to include the fuselage and associated manual flight control systems, rotor equipment, landing gear and associated equipment, environmental controls, racks, mounts, intersystem cables and distribution boxes. Propulsion/Drive/Rotor Systems together with Engine Electronic Digital Engine Control Unit (EDECU) and Common Hydro-Mechanical Unit (CHMU) provides the capability to carry a heavier combat payload and allow for enhanced performance in high-altitude, hot climates. Landing Gear improvements (High Performance Shock Struts (HPSS)) will improve the aircraft crash survivability and allows for a heavier aircraft with greater combat loads. The Health Monitoring System is associated with CBM support concept and the expansion of the Modernized Signal Processing Unit (MSPU) capabilities, which will continue to evolve, reduce ownership cost and improve the maintenance posture and burden of the Soldier. Mission Command includes modifications and/or upgrades to the various Apache processors and displays. Mission Computer / Processing modifications and/or upgrades include improvements to the master data processing unit(s) responsible for coordinating and directing the major avionics mission systems. Displays and Controls modifications and/or upgrades includes improvements to the equipment which presents processed data by specially designed electronic devices through interconnection with computer or component equipment and the associated equipment needed to control the presentation of the necessary flight and tactical information to the crew for efficient management of the aircraft during all segments of the mission profile under day and night during all weather conditions. This equipment includes multifunction displays, control display units, display processors and on-board mission planning systems. Software Upgrades include critical software enhancements that will enable Apache commanders and aircrews to better perform their combat mission. Sensors include modifications, operational improvements, and/or mitigation of obsolescence issues to the Apache Sensor suite, which includes the MTADS/PNVS, the Modernized Day Sensor Assembly (MDSA), and the Modernized Radar Frequency Interferometer (MRFI) Processor and Receiver. MTADS/PNVS operational and logistics improvements include accelerated application of outstanding Engineering Change Proposals and the sensors overhaul through the Arizona Support Center facility to allow for proper configuration. MDSA Phase I is the Modernized Laser Rangefinder/Designator (M-LFRD) which provides enhanced laser ranging, improved target designation, and target tracking capability by holding a stabilized laser beam on a distant stationary or moving point target for highly precise handoff to precision guided weapons. M-LFRD replaces the obsolete Laser Transceiver Unit, which mitigates ongoing obsolescence risks, improves reliability and maintainability, and reduces operations and support costs. MDSA Phase II replaces the remaining DSA components, adding a laser pointer and high definition color-camera capability. Phase II funding enables software integration, tooling, and test equipment procurement and system production. Support Elements include the modification and production of those items, which are not part of the aircraft system but are required to maintain, service, or calibrate the aircraft systems or portions of the aircraft system while not directly engaged in the performance of its mission and will not be in the inventory for support of other weapon systems. Post Production Organic support establishes Depot Pilot Programs at Corpus Christi Army Depot (CCAD) and byhanna Army Depot (TYAD) for selected Depot Level Repairables (DLR) as part of the Original Equipment Manufacturer (OEM) to Depot Transition. Post Production Organic Support (PPOS) provides Depot Maintenance Plant Equipment, Special ols and Test Equipment, labor training and associated technical data for future repairs once the DLR has transitioned to the depot. PPOS improves Repair Turn Around Time and retain depot maintenance capabilities. Army Page 3 of 29 P-1 Line #20 143
4 Training Systems include deliverable training services, devices, accessories, aids, equipment, and parts used to facilitate instruction through which personnel will learn to operate and maintain the system with maximum efficiency. Examples include Operator / Maintainer Training (aircraft/classroom), obsolescence and training concurrency to training device systems, and updates to allow individual/team training tasks and collective training. Efforts include the production and upgrade of deliverable training equipment and associated software. Modification to the MUMT system enable fully integrated Unmanned Aerial System Level of Interoperability 4 in the C, L, S, and Ku band using both Tactical Common Data Link and Bandwidth Efficient Tactical Common Data Link; processor updates ensure Information Assurance certification and Interoperability Protocol compatibility. MUMT funding will be used for both non-recurring and recurring engineering. Army : Secondary Distribution Secondary Distribution FY 2013 FY 2014 Quantity Obligation Authority Quantity Obligation Authority Army Page 4 of 29 P-1 Line #20 144
5 Models of Systems Affected: Longbow Apache Procurement Financial Plan Modification Item 1 of 18: Apache Sensors Life Extension & Upgrade Modification Type: Operational & Reliability Improvements and Resolve Obsolescence Issues Related RDT&E PEs: Kit Quantity 669 / / - 8 / - - / - - / - - / - - / - - / - - / - - / - - / / Equipment (GFE) 0 / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / Visible Near Infrared (V/NIR) 0 / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / Other 0 / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / Subtotal: - / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / Subtotal: Apache Sensors Life Extension & Upgrade 669 / / - 8 / - - / - - / - - / - - / - - / - - / - - / - - / / Modification Item 2 of 18: AH-64A MISC Mods $5M or less (no P3a set) Interim Contractor Support 0 / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / Subtotal: - / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / Subtotal: AH-64A MISC Mods $5M or less (no P3a set) 0 / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / Modification Item 3 of 18: Apache Transformation (no P3a set) Sets, Kits & Outfits (SKO) 0 / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / Equipment, NGF 0 / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / ASL/PLL 0 / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / Subtotal: - / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / Subtotal: Apache Transformation (no P3a set) 0 / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / Modification Item 4 of 18: Modernized TADS/PNVS (M-TADS) Equipment 542 / / - - / - - / - - / - - / - - / - - / - - / - - / - - / / Equipment () 23 / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 23 / Army Page 5 of 29 P-1 Line #20 145
6 Models of Systems Affected: Longbow Apache Financial Plan Modification Type: Operational & Reliability Improvements and Resolve Obsolescence Issues Related RDT&E PEs: TEDAC/IHDSS 0 / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / Other Support 0 / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / Subtotal: - / 1, / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 1, Subtotal: Modernized TADS/PNVS (M-TADS) 565 / 1, / - - / - - / - - / - - / - - / - - / - - / - - / - - / / 1, Modification Item 5 of 18: Video from UAS Interoperability Teaming (VUIT-2) VUIT-2 -- FY10 48 / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 48 / VUIT-2 -- FY / / - - / - - / - - / - - / - - / - - / - - / - - / - - / / Subtotal: - / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / Subtotal: Video from UAS Interoperability Teaming (VUIT-2) Modification Item 6 of 18: Apache Product Improvements 192 / / - - / - - / - - / - - / - - / - - / - - / - - / - - / / CBM Hardware/VMEP 428 / / - - / - - / - - / - - / - - / - - / - - / - - / - - / / Other Recap 0 / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / NG Recap Support 0 / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / CBM Services 0 / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / Composite Main Rotor Blade ship sets 10 / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 10 / Other 0 / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / Subtotal: - / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / Subtotal: Apache Product Improvements 438 / / - - / - - / - - / - - / - - / - - / - - / - - / - - / / Modification Item 7 of 18: Lightweight Missile Launcher (LWML) LWML Procurement 522 / / - - / - - / - - / - - / - - / - - / - - / - - / - - / / Subtotal: - / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / Subtotal: Lightweight Missile Launcher (LWML) 522 / / - - / - - / - - / - - / - - / - - / - - / - - / - - / / Army Page 6 of 29 P-1 Line #20 146
7 Models of Systems Affected: Longbow Apache Financial Plan Modification Item 8 of 18: Apache Upgrades and Remanufacture Modification Type: Operational & Reliability Improvements and Resolve Obsolescence Issues Related RDT&E PEs: Blk II Reman Aircraft 117 / 1, / - - / - - / - - / - - / - - / - - / - - / - - / - - / / 1, NG Aircraft Procurement 72 / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 72 / NG Aircraft Procurement () 23 / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 23 / System / Software Upgrade 0 / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / Obsolescence 0 / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / NG MEP 0 / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / Other Support 0 / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / Subtotal: - / 2, / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 2, Subtotal: Apache Upgrades and Remanufacture 212 / 2, / - - / - - / - - / - - / - - / - - / - - / - - / - - / / 2, Modification Item 9 of 18: Modernized Day Side Assembly (M-DSA), Phase1 Equipment 299 / / - - / - - / - - / - - / - - / - - / - - / - - / - - / / Subtotal: - / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / Subtotal: Modernized Day Side Assembly (M-DSA), Phase1 Modification Item 10 of 18: Fire Control Radar (FCR) 299 / / - - / - - / - - / - - / - - / - - / - - / - - / - - / / Installation Kits 30 / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 30 / Installation Kits () 9 / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 9 / Subtotal: - / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / Subtotal: Fire Control Radar (FCR) 39 / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 39 / Modification Item 11 of 18: Apache Block III Long Lead Items 0 / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / Army Page 7 of 29 P-1 Line #20 147
8 Models of Systems Affected: Longbow Apache Financial Plan Modification Type: Operational & Reliability Improvements and Resolve Obsolescence Issues Related RDT&E PEs: A to Block III (NRE) 0 / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / Subtotal: - / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / Subtotal: Apache Block III 0 / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / Modification Item 12 of 18: Apache Training Aids, Devices, Simulators & Simul LCT (NG/USAACE/WAATS) 5 / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 5 / System TADSS 50 / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 50 / Subtotal: - / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / Subtotal: Apache Training Aids, Devices, Simulators & Simul Modification Item 13 of 18: Airframe 55 / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 55 / Structural Subsystems - / - - / / - - / - - / - - / - - / - - / - - / - - / - - / - - / Health Monitoring System - / - - / - - / / / - - / / / / / / - - / Recap Support / Kits - / - - / / / - - / - - / - - / - - / - - / - - / - - / - - / Other Support - / - - / - - / / - - / - - / - - / - - / - - / - - / - - / - - / Subtotal: - / - - / / / / - - / / / / / / - - / B Kits Non- Propulsion-Drive-Rotor Systems - / - 72 / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 72 / - Subtotal: Non- - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - Subtotal: Airframe - / - 72 / / / / - - / / / / / / - 72 / Modification Item 14 of 18: Mission Command Processors - / - - / / / / - - / / / / / / - - / Displays - / - - / / / / - - / / / / / / - - / Subtotal: - / - - / / / / - - / / / / / / - - / Subtotal: Mission Command - / - - / / / / - - / / / / / / - - / Army Page 8 of 29 P-1 Line #20 148
9 Models of Systems Affected: Longbow Apache Financial Plan Modification Item 15 of 18: Sensors Modification Type: Operational & Reliability Improvements and Resolve Obsolescence Issues Related RDT&E PEs: MTADS/PNVS - / - - / / / - - / - - / - - / - - / - - / - - / - - / - - / RFI - / - - / / / - - / - - / - - / - - / - - / - - / - - / - - / Other Support - / - - / - - / / / - - / / / / / / - - / Subtotal: - / - - / / / / - - / / / / / / - - / B Kits MDSA Phase 1 - / / / - - / - - / - - / - - / - - / - - / - - / - - / / MDSA Phase 2 - / - - / - - / - 15 / / - 15 / / / / / / / Subtotal: - / - - / / - - / / - - / / / / / / - - / Subtotal: Sensors - / / / / / - 15 / / / / / / / Modification Item 16 of 18: Support Elements Post Production Organic Support - / - - / / - - / - - / - - / - - / - - / - - / - - / - - / - - / Subtotal: - / - - / / - - / - - / - - / - - / - - / - - / - - / - - / - - / Subtotal: Support Elements - / - - / / - - / - - / - - / - - / - - / - - / - - / - - / - - / Modification Item 17 of 18: Training Systems Operator Devices - / - - / / - - / / - - / / / / / / - - / Maintainer Devices - / - - / / - - / / - - / / / / / / - - / TC - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / / Subtotal: - / - - / / - - / / - - / / / / / / / Subtotal: Training Systems - / - - / / - - / / - - / / / / / / / Modification Item 18 of 18: Manned / Unmanned Teaming (MUM-T) Installation Kits (MUMT-2) - / - - / - - / - 36 / / - 36 / / / / / / / Army Page 9 of 29 P-1 Line #20 149
10 Models of Systems Affected: Longbow Apache Financial Plan Modification Type: Operational & Reliability Improvements and Resolve Obsolescence Issues Related RDT&E PEs: Other - / - - / - - / - - / / - - / / / / / / - - / Subtotal: - / - - / - - / - - / / - - / / / / / / - - / Non- Installation Kits (MUMT-X) - / - - / - - / - 7 / / - 7 / / - - / - - / - - / - - / - 7 / Subtotal: Non- - / - - / - - / - - / / - - / / - - / - - / - - / - - / - - / Subtotal: Manned / Unmanned Teaming (MUM-T) - / - - / - - / - 43 / / - 43 / / / / / / / Subtotal: Procurement, All Modification Items 2,991 / 6, Installation Modification Item 1 of 18: Apache Sensors Life Extension & Upgrade Modification Item 2 of 18: AH-64A MISC Mods $5M or less (no P3a set) Modification Item 3 of 18: Apache Transformation (no P3a set) Modification Item 4 of 18: Modernized TADS/PNVS (M- TADS) Modification Item 5 of 18: Video from UAS Interoperability Teaming (VUIT-2) 222 / / / / - 58 / / / / / / ,591 / 7, / / - - / - - / - - / - - / - - / - - / - - / - - / - - / / - 0 / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 0 / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / / / - - / - - / - - / - - / - - / - - / - - / - - / - - / / / / - - / - - / - - / - - / - - / - - / - - / - - / - - / / - Modification Item 6 of 18: Apache Product Improvements 972 / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 1,032 / Modification Item 7 of 18: Lightweight Missile Launcher (LWML) Modification Item 8 of 18: Apache Upgrades and Remanufacture Modification Item 9 of 18: Modernized Day Side Assembly (M-DSA), Phase1 362 / / - - / - - / - - / - - / - - / - - / - - / - - / - - / / / / - - / - - / - - / - - / - - / - - / - - / - - / - - / / - 0 / / - 62 / / - - / / - 12 / - - / - - / - - / - - / / - Modification Item 10 of 18: Fire Control Radar (FCR) 24 / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 27 / - Modification Item 11 of 18: Apache Block III 0 / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - Modification Item 12 of 18: Apache Training Aids, Devices, Simulators & Simul 26 / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 26 / - Modification Item 13 of 18: Airframe 0 / / - - / - 72 / - - / - 72 / - - / - - / - 16 / - - / - - / - 88 / - Modification Item 14 of 18: Mission Command 0 / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - Modification Item 15 of 18: Sensors 0 / / - - / - 1 / - - / - 1 / / - 19 / - 30 / - 38 / - - / / - Modification Item 16 of 18: Support Elements 0 / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - Army Page 10 of 29 P-1 Line #20 150
11 Models of Systems Affected: Longbow Apache Financial Plan Modification Type: Operational & Reliability Improvements and Resolve Obsolescence Issues Related RDT&E PEs: Modification Item 17 of 18: Training Systems 0 / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - Modification Item 18 of 18: Manned / Unmanned Teaming (MUM-T) 0 / / - - / - - / - - / - - / - 43 / - 23 / - 50 / - 22 / - 79 / / - Subtotal: Installation 3,020 / / - 62 / / - - / / / - 42 / - 96 / - 60 / - 79 / - 4,238 / Cost (Procurement + Support + Installation) 6, , Army Page 11 of 29 P-1 Line #20 151
12 Modification Item 1 of 18: Apache Sensors Life Extension & Upgrade Manufacturer Name: Various Manufacturer Location: Various Administrative Leadtime (in Months): 2 Production Leadtime (in Months): 1 Dates FY 2013 FY 2014 FY 2016 FY 2017 FY 2018 FY 2019 Method of Implementation: Modification Prior Years 681 / / / / / - - / / / / / / / FY / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 69 / - 0 / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / / / - - / - - / - - / - - / - - / - - / - - / - - / - - / / - FY 2013 FY 2014 FY 2016 FY 2017 FY 2018 FY 2019 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC t In Out Army Page 12 of 29 P-1 Line #20 152
13 Modification Item 2 of 18: AH-64A MISC Mods $5M or less (no P3a set) Manufacturer Name: Various Administrative Leadtime (in Months): Manufacturer Location: Various Production Leadtime (in Months): Dates FY 2013 FY 2014 FY 2016 FY 2017 FY 2018 FY 2019 Method of Implementation: NA Prior Years 0 / / / / / - - / / / / / / / FY / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 0 / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 0 / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 0 / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2013 FY 2014 FY 2016 FY 2017 FY 2018 FY 2019 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC t In Out Army Page 13 of 29 P-1 Line #20 153
14 Modification Item 3 of 18: Apache Transformation (no P3a set) Manufacturer Name: NA Administrative Leadtime (in Months): Manufacturer Location: NA Production Leadtime (in Months): Dates FY 2013 FY 2014 FY 2016 FY 2017 FY 2018 FY 2019 Method of Implementation: NA Prior Years 0 / / / / / - - / / / / / / / FY / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 0 / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 0 / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 0 / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2013 FY 2014 FY 2016 FY 2017 FY 2018 FY 2019 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC t In Out Army Page 14 of 29 P-1 Line #20 154
15 Modification Item 4 of 18: Modernized TADS/PNVS (M-TADS) Manufacturer Name: Lockheed Martin Manufacturer Location: Orlando, FL Administrative Leadtime (in Months): 2 Production Leadtime (in Months): 24 Dates FY 2013 FY 2014 FY 2016 FY 2017 FY 2018 FY 2019 Method of Implementation: Modification Prior Years 542 / / / / / - - / / / / / / / FY / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 0 / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 0 / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / / / - - / - - / - - / - - / - - / - - / - - / - - / - - / / - FY 2013 FY 2014 FY 2016 FY 2017 FY 2018 FY 2019 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC t In Out Army Page 15 of 29 P-1 Line #20 155
16 Modification Item 5 of 18: Video from UAS Interoperability Teaming (VUIT-2) Manufacturer Name: Science and Engineering Services, Inc Administrative Leadtime (in Months): Manufacturer Location: Huntsville, AL Production Leadtime (in Months): Dates FY 2013 FY 2014 FY 2016 FY 2017 FY 2018 FY 2019 Method of Implementation:. Prior Years 108 / / / / / - - / / / / / / / FY / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 0 / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 0 / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / / / - - / - - / - - / - - / - - / - - / - - / - - / - - / / - FY 2013 FY 2014 FY 2016 FY 2017 FY 2018 FY 2019 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC t In Out Army Page 16 of 29 P-1 Line #20 156
17 Modification Item 6 of 18: Apache Product Improvements Manufacturer Name: Various Administrative Leadtime (in Months): Manufacturer Location: Various Production Leadtime (in Months): Dates FY 2013 FY 2014 FY 2016 FY 2017 FY 2018 FY 2019 Method of Implementation:. Prior Years 772 / / / / / - - / / / / / / / FY / / - - / - - / - - / - - / - - / - - / - - / - - / - - / / FY / / - - / - - / - - / - - / - - / - - / - - / - - / - - / / / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 0 / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 1,032 / FY 2013 FY 2014 FY 2016 FY 2017 FY 2018 FY 2019 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC t In ,042 Out ,042 Army Page 17 of 29 P-1 Line #20 157
18 Modification Item 7 of 18: Lightweight Missile Launcher (LWML) Manufacturer Name: Lockheed Martin Administrative Leadtime (in Months): Manufacturer Location: Orlando, FL Production Leadtime (in Months): Dates FY 2013 FY 2014 FY 2016 FY 2017 FY 2018 FY 2019 Method of Implementation: Modification Prior Years 362 / / / / / - - / / / / / / / FY / / - - / - - / - - / - - / - - / - - / - - / - - / - - / / - 0 / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 0 / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / / / - - / - - / - - / - - / - - / - - / - - / - - / - - / / - FY 2013 FY 2014 FY 2016 FY 2017 FY 2018 FY 2019 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC t In Out Army Page 18 of 29 P-1 Line #20 158
19 Modification Item 8 of 18: Apache Upgrades and Remanufacture Manufacturer Name: Boeing Administrative Leadtime (in Months): Manufacturer Location: Mesa, AZ Production Leadtime (in Months): Dates FY 2013 FY 2014 FY 2016 FY 2017 FY 2018 FY 2019 Method of Implementation: Remanufacture Prior Years 236 / / / / / - - / / / / / / / FY / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 0 / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 0 / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / / / - - / - - / - - / - - / - - / - - / - - / - - / - - / / - FY 2013 FY 2014 FY 2016 FY 2017 FY 2018 FY 2019 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC t In Out Army Page 19 of 29 P-1 Line #20 159
20 Modification Item 9 of 18: Modernized Day Side Assembly (M-DSA), Phase1 Manufacturer Name: Lockheed Martin Manufacturer Location: Orlando, FL Administrative Leadtime (in Months): 6 Production Leadtime (in Months): 30 Dates FY 2013 FY 2014 FY 2016 FY 2017 FY 2018 FY 2019 Sep 2011 Mar 2013 Method of Implementation: Modification Prior Years 0 / / / / / / / / / / / / FY / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 0 / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 0 / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 0 / / - 62 / / - - / / - 12 / - - / - - / - - / - - / / - FY 2013 FY 2014 FY 2016 FY 2017 FY 2018 FY 2019 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC t In Out Army Page 20 of 29 P-1 Line #20 160
21 Modification Item 10 of 18: Fire Control Radar (FCR) Manufacturer Name: Longbow Limited Manufacturer Location: Orlando, FL and Baltimore, MD Administrative Leadtime (in Months): 4 Production Leadtime (in Months): 24 Dates FY 2013 FY 2014 FY 2016 FY 2017 FY 2018 FY 2019 Jan 2012 Jan 2014 Method of Implementation: Modification Prior Years 24 / / / / / - - / / / / / / / FY / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 0 / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 0 / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 24 / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 27 / - FY 2013 FY 2014 FY 2016 FY 2017 FY 2018 FY 2019 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC t In Out Army Page 21 of 29 P-1 Line #20 161
22 Modification Item 11 of 18: Apache Block III Manufacturer Name:. Manufacturer Location:. Administrative Leadtime (in Months): Production Leadtime (in Months): Dates FY 2013 FY 2014 FY 2016 FY 2017 FY 2018 FY 2019 Method of Implementation:. Prior Years 0 / / / / / - - / / / / / / / FY / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 0 / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 0 / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 0 / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2013 FY 2014 FY 2016 FY 2017 FY 2018 FY 2019 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC t In Out Army Page 22 of 29 P-1 Line #20 162
23 Modification Item 12 of 18: Apache Training Aids, Devices, Simulators & Simul Manufacturer Name:. Manufacturer Location:. Administrative Leadtime (in Months): Production Leadtime (in Months): Dates FY 2013 FY 2014 FY 2016 FY 2017 FY 2018 FY 2019 Method of Implementation:. Prior Years 26 / / / / / - - / / / / / / / FY / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 0 / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 0 / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 26 / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 26 / - FY 2013 FY 2014 FY 2016 FY 2017 FY 2018 FY 2019 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC t In Out Army Page 23 of 29 P-1 Line #20 163
24 Modification Item 13 of 18: Airframe Manufacturer Name: Various Administrative Leadtime (in Months): Manufacturer Location: Various Production Leadtime (in Months): Dates FY 2013 FY 2014 FY 2016 FY 2017 FY 2018 FY 2019 Method of Implementation: Modifications Prior Years 0 / / / / / - - / / / / / / / FY / / - - / - 72 / - - / - 72 / - - / - - / - - / - - / - - / - 72 / - 0 / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY / / - - / - - / - - / - - / - - / - - / - 16 / - - / - - / - 16 / - 0 / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 0 / / - - / - 72 / - - / - 72 / - - / - - / - 16 / - - / - - / - 88 / - FY 2013 FY 2014 FY 2016 FY 2017 FY 2018 FY 2019 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC t In Out Army Page 24 of 29 P-1 Line #20 164
25 Modification Item 14 of 18: Mission Command Manufacturer Name: Various Administrative Leadtime (in Months): Manufacturer Location: Various Production Leadtime (in Months): Dates FY 2013 FY 2014 FY 2016 FY 2017 FY 2018 FY 2019 Method of Implementation:. Prior Years 0 / / / / / - - / / / / / / / FY / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 0 / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 0 / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 0 / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2013 FY 2014 FY 2016 FY 2017 FY 2018 FY 2019 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC t In Out Army Page 25 of 29 P-1 Line #20 165
26 Modification Item 15 of 18: Sensors Manufacturer Name: Lockheed Martin Administrative Leadtime (in Months): Manufacturer Location: Orlando, FL Production Leadtime (in Months): Dates FY 2013 FY 2014 FY 2016 FY 2017 FY 2018 FY 2019 Method of Implementation: Modifications Prior Years 0 / / / / / - - / / / / / / / FY / / - - / - 1 / - - / - 1 / / - - / - - / - - / - - / / - 0 / / - - / - - / - - / - - / - - / - 19 / - - / - - / - - / - 19 / - FY / / - - / - - / - - / - - / - - / - - / - 30 / - - / - - / - 30 / - FY / / - - / - - / - - / - - / - - / - - / - - / - 38 / - - / - 38 / - 0 / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 0 / / - - / - 1 / - - / - 1 / / - 19 / - 30 / - 38 / - - / / - FY 2013 FY 2014 FY 2016 FY 2017 FY 2018 FY 2019 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC t In Out Army Page 26 of 29 P-1 Line #20 166
27 Modification Item 16 of 18: Support Elements Manufacturer Name: TBD Administrative Leadtime (in Months): Manufacturer Location: TBD Production Leadtime (in Months): Dates FY 2013 FY 2014 FY 2016 FY 2017 FY 2018 FY 2019 Method of Implementation:. Prior Years 0 / / / / / - - / / / / / / / FY / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 0 / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 0 / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 0 / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2013 FY 2014 FY 2016 FY 2017 FY 2018 FY 2019 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC t In Out Army Page 27 of 29 P-1 Line #20 167
28 Modification Item 17 of 18: Training Systems Manufacturer Name: Boeing / LSI Inc Administrative Leadtime (in Months): 3 Manufacturer Location: St. Louis, MO / Jacksonville, FL Production Leadtime (in Months): Dates FY 2013 FY 2014 FY 2016 FY 2017 FY 2018 FY 2019 Method of Implementation: Field Retrofits Prior Years 0 / / / / / - - / / / / / / / FY / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 0 / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 0 / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 0 / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2013 FY 2014 FY 2016 FY 2017 FY 2018 FY 2019 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC t In Out Army Page 28 of 29 P-1 Line #20 168
29 Modification Item 18 of 18: Manned / Unmanned Teaming (MUM-T) Manufacturer Name: TBD Administrative Leadtime (in Months): Manufacturer Location: TBD Production Leadtime (in Months): Dates FY 2013 FY 2014 FY 2016 FY 2017 FY 2018 FY 2019 Method of Implementation: TBD Prior Years 0 / / / / / - - / / / / / / / FY / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 0 / / - - / - - / - - / - - / - 43 / - - / - - / - - / - - / - 43 / - FY / / - - / - - / - - / - - / - - / - 23 / - - / - - / - - / - 23 / - FY / / - - / - - / - - / - - / - - / - - / - 50 / - - / - - / - 50 / - FY / / - - / - - / - - / - - / - - / - - / - - / - 22 / - - / - 22 / - FY / / - - / - - / - - / - - / - - / - - / - - / - - / - 79 / - 79 / - 0 / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 0 / / - - / - - / - - / - - / - 43 / - 23 / - 50 / - 22 / - 79 / / - FY 2013 FY 2014 FY 2016 FY 2017 FY 2018 FY 2019 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC t In Out Army Page 29 of 29 P-1 Line #20 169
UNCLASSIFIED. FY 2014 Base. OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018
Exhibit P-40, Budget Item Justification Sheet: PB 2014 Army Date: April 2013 Aircraft / BSA 10: Modification Of Aircraft ID Code (A=Service Ready, B=Not Service Ready) : Program Elements for Code B Items:
More informationUNCLASSIFIED FY Exhibits Schedule Prior Years FY 2013 FY 2014 FY 2015 Base FY 2015 OCO FY 2015 Total. Total Cost ($ M)
Exhibit P-40, Budget Line Item Justification: PB 2015 Army Date: March 2014 2033A: Procurement of W&TCV, Army / BA 01: Tracked Combat Vehicles / BSA 20: Modification of Tracked Combat Vehicles ID Code
More informationUNCLASSIFIED FY 2016 OCO. FY 2016 Base. FY 2016 Base FY 2016 OCO
Exhibit P-40, Budget Line Item Justification: PB 2016 Army Date: February 2015 2033A: Procurement of W&TCV, Army / BA 01: Tracked Combat Vehicles / BSA 20: Modification of Tracked Combat Vehicles ID Code
More informationUNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 10 P-1 Line #47
Exhibit P-40, Budget Line Item Justification: PB 2016 Air Force Date: February 2015 3010F: Aircraft Procurement, Air Force / BA 05: Modification of Inservice Aircraft / BSA 5: Other Aircraft ID Code (A=Service
More informationUNCLASSIFIED. FY 2016 Base FY 2016 OCO FY 2016 OCO. FY 2016 Base
Exhibit P-40, Budget Line Item Justification: PB 2016 Army Date: February 2015 2031A: Aircraft Procurement, Army / BA 02: Modification of Aircraft / BSA 10: Modification of Aircraft ID Code (A=Service
More informationUNCLASSIFIED. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018
Exhibit P-40, Budget Item Justification Sheet: PB 2014 Navy Date: April 2013 Aircraft / BSA 1: Modification Of Aircraft ID Code (A=Service Ready, B=Not Service Ready) : A Program Elements for Code B Items:
More informationUNCLASSIFIED. FY 2017 Base FY 2017 OCO FY 2017 OCO. FY 2017 Base
Exhibit P-40, Budget Line Item Justification: PB 2017 Air Force Date: February 2016 3010F: Aircraft Procurement, Air Force / BA 05: Modification of Inservice Aircraft / BSA 2: Tactical Aircraft ID Code
More informationUNCLASSIFIED. FY 2017 Base FY 2017 OCO FY 2017 OCO. FY 2017 Base
Exhibit P-40, Budget Line Item Justification: PB 2017 Air Force Date: February 2016 3010F: Aircraft Procurement, Air Force / BA 05: Modification of Inservice Aircraft / BSA 2: Tactical Aircraft ID Code
More informationUNCLASSIFIED. FY 2016 Base FY 2016 OCO FY 2016 OCO. FY 2016 Base
Exhibit P-40, Budget Line Item Justification: PB 2016 Air Force Date: February 2015 3010F: Aircraft Procurement, Air Force / BA 05: Modification of Inservice Aircraft / BSA 2: Tactical Aircraft ID Code
More informationUNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 24 P-1 Line #55
Exhibit P-40, Budget Line Item Justification: PB 2016 Navy Date: February 2015 1506N: Aircraft Procurement, Navy / BA 05: Modification of Aircraft / BSA 1: Modification of Aircraft ID Code (A=Service Ready,
More informationUNCLASSIFIED FY 2016 OCO. FY 2016 Base
Exhibit P-40, Budget Line Item Justification: PB 2016 Air Force Date: February 2015 3010F: Aircraft Procurement, Air Force / BA 05: Modification of Inservice Aircraft / BSA 5: Other Aircraft ID Code (A=Service
More informationUNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 5 P-1 Line #35
Exhibit P-40, Budget Line Item Justification: PB 2017 Air Force Date: February 2016 3010F: Aircraft Procurement, Air Force / BA 05: Modification of Inservice Aircraft / BSA 4: Trainer Aircraft ID Code
More informationUNCLASSIFIED FY Exhibits Schedule Prior Years FY 2013 FY 2014 FY 2015 Base FY 2015 OCO FY 2015 Total. Total Cost ($ M) Unit Cost ($) Qty (Each)
Exhibit P-40, Budget Line Item Justification: PB 2015 Navy Date: March 2014 1506N: Aircraft Procurement, Navy / BA 05: Modification of Aircraft / BSA 1: Modification of Aircraft ID Code (A=Service Ready,
More informationUNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 16 P-1 Line #57
Exhibit P-40, Budget Line Item Justification: PB 2017 Navy Date: February 2016 1506N: Aircraft Procurement, Navy / BA 05: Modification of Aircraft / BSA 1: Modification of Aircraft ID Code (A=Service Ready,
More informationUNCLASSIFIED. FY 2017 Base FY 2017 OCO
Exhibit P-40, Budget Line Item Justification: PB 2017 Air Force Date: February 2016 3010F: Aircraft Procurement, Air Force / BA 05: Modification of Inservice Aircraft / BSA 5: Other Aircraft ID Code (A=Service
More informationUNCLASSIFIED FY 2017 OCO. FY 2017 Base
Exhibit P-40, Budget Line Item Justification: PB 2017 Air Force Date: February 2016 3021F: Space Procurement, Air Force / BA 01: Space Procurement, Air Force / BSA 1: Space Programs ID Code (A=Service
More informationUNCLASSIFIED. UNCLASSIFIED Army Page 1 of 23 P-1 Line #27
Exhibit P-40, Budget Line Item Justification: PB 2015 Army Date: March 2014 2031A: Aircraft Procurement, Army / BA 02: Modification of Aircraft / BSA 10: Modification of Aircraft ID Code (A=Service Ready,
More informationUNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 5 P-1 Line #55
Exhibit P-40, Budget Line Item Justification: PB 2016 Air Force Date: February 2015 3010F: Aircraft Procurement, Air Force / BA 05: Modification of Inservice Aircraft / BSA 5: Other Aircraft ID Code (A=Service
More informationUNCLASSIFIED FY 2016 OCO. FY 2016 Base
Exhibit P-40, Budget Line Item Justification: PB 2016 Air Force Date: February 2015 3010F: Aircraft Procurement, Air Force / BA 05: Modification of Inservice Aircraft / BSA 5: Other Aircraft ID Code (A=Service
More informationUNCLASSIFIED. UNCLASSIFIED United States Special Operations Command Page 1 of 6 P-1 Line #53
Exhibit P-40, Budget Line Item Justification: PB 2017 United States Special Operations Command : February 2016 0300D: Procurement, Defense-Wide / BA 02: Special Operations Command / BSA 1: Aviation Programs
More informationUNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 18 P-1 Line #56
Exhibit P-40, Budget Line Item Justification: PB 2016 Air Force Date: February 2015 3010F: Aircraft Procurement, Air Force / BA 05: Modification of Inservice Aircraft / BSA 5: Other Aircraft ID Code (A=Service
More informationUNCLASSIFIED FY 2015 FY 2015 OCO. FY 2015 Base FY 2015 FY Base
Exhibit P-40, Budget Line Item Justification: PB 2015 Air Force Date: March 2014 3010F: Aircraft Procurement, Air Force / BA 05: Modification of Inservice Aircraft / BSA 5: Other Aircraft ID Code (A=Service
More informationUNCLASSIFIED. FY 2017 Base FY 2017 OCO FY 2017 OCO. FY 2017 Base
Exhibit P-40, Budget Line Item Justification: PB 2017 Army Date: February 2016 2033A: Procurement of W&TCV, Army / BA 01: Tracked Combat Vehicles / BSA 20: Modification of Tracked Combat Vehicles ID Code
More informationUNCLASSIFIED. FY 2014 Base. OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018
Exhibit P-40, Budget Item Justification Sheet: PB 2014 Air Force Date: April 2013 Inservice Missiles / BSA 1: Class IV ID Code (A=Service Ready, B=Not Service Ready) : A Program Elements for Code B Items:
More informationUNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 18 P-1 Line #12
Exhibit P-40, Budget Line Item Justification: PB 2017 Navy Date: February 2016 1810N: Other Procurement, Navy / BA 01: Ships Support Equipment / BSA 9: Other Shipboard Equipment ID Code (A=Service Ready,
More informationUNCLASSIFIED. FY 2017 Base FY 2017 OCO FY 2017 OCO. FY 2017 Base
Exhibit P-40, Budget Line Item Justification: PB 2017 Air Force Date: February 2016 3010F: Aircraft Procurement, Air Force / BA 05: Modification of Inservice Aircraft / BSA 5: Other Aircraft ID Code (A=Service
More informationUNCLASSIFIED. FY 2017 Base FY 2017 OCO. FY 2017 Base FY 2017 OCO
Exhibit P-40, Budget Line Item Justification: PB 2017 Air Force Date: February 2016 3010F: Aircraft Procurement, Air Force / BA 05: Modification of Inservice Aircraft / BSA 3: Airlift Aircraft ID Code
More informationUNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 17 P-1 Line #55
Exhibit P-40, Budget Line Item Justification: PB 2017 Air Force Date: February 2016 3010F: Aircraft Procurement, Air Force / BA 05: Modification of Inservice Aircraft / BSA 5: Other Aircraft ID Code (A=Service
More informationUNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 30 P-1 Line #36
Exhibit P-40, Budget Line Item Justification: PB 2016 Navy Date: February 2015 1506N: Aircraft Procurement, Navy / BA 05: Modification of Aircraft / BSA 1: Modification of Aircraft ID Code (A=Service Ready,
More informationUNCLASSIFIED. UNCLASSIFIED Army Page 1 of 16 P-1 Line #15
Exhibit P-40, Budget Line Item Justification: PB 2017 Army Date: February 2016 2031A: Aircraft Procurement, Army / BA 02: Modification of Aircraft / BSA 10: Modification of Aircraft ID Code (A=Service
More informationUNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 17 P-1 Line #121
Exhibit P-40, Budget Line Item Justification: PB 2015 Navy Date: March 2014 1810N: Other Procurement, Navy / BA 04: Ordnance Support Equipment / BSA 3: Ship Missile Systems Equipment ID Code (A=Service
More informationUNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 5 P-1 Line #21
Exhibit P-40, Budget Line Item Justification: PB 2015 Navy Date: March 2014 1507N: Weapons Procurement, Navy / BA 03: Torpedoes and Related Equipment / BSA 1: Torpedoes and Related Equip ID Code (A=Service
More informationUNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 31 P-1 Line #41
Exhibit P-40, Budget Line Item Justification: PB 2017 Navy Date: February 2016 1810N: Other Procurement, Navy / BA 01: Ships Support Equipment / BSA 16: Logistic Support ID Code (A=Service Ready, B=Not
More informationUNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 21 P-1 Line #19
Exhibit P-40, Budget Line Item Justification: PB 2017 Navy Date: February 2016 1810N: Other Procurement, Navy / BA 01: Ships Support Equipment / BSA 9: Other Shipboard Equipment ID Code (A=Service Ready,
More informationUNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 33 P-1 Line #94
Exhibit P-40, Budget Line Item Justification: PB 2017 Navy Date: February 2016 1810N: Other Procurement, Navy / BA 02: Communications & Electronics Equip / BSA 12: Submarine Communications ID Code (A=Service
More informationUNCLASSIFIED. FY 2016 Base FY 2016 OCO FY 2016 OCO. FY 2016 Base
Resource Summary Prior Years FY 2014 FY 2015 Base OCO Total FY 2017 FY 2018 FY 2019 FY 2020 To Complete Procurement Quantity (Units in Each) - - - - - - - - - - - - Gross/Weapon System Cost ($ in Millions)
More informationUNCLASSIFIED R-1 ITEM NOMENCLATURE PE A: AIRCRAFT CERTIFICATION FY 2012 OCO
Exhibit R-2, RDT&E Budget Item Justification: PB 212 Army DATE: February 211 24: Research, Development, Test & Evaluation, Army COST ($ in Millions) FY 21 FY 211 FY 212 Base PE 6566A: AIRCRAFT CERTIFICATION
More informationUNCLASSIFIED FY Exhibits Schedule Prior Years FY 2013 FY 2014 FY 2015 Base FY 2015 OCO FY 2015 Total. Total Cost ($ M) Unit Cost ($) Qty (Each)
Exhibit P-40, Budget Line Item Justification: PB 2015 Navy Date: March 2014 1506N: Aircraft Procurement, Navy / BA 05: Modification of Aircraft / BSA 1: Modification of Aircraft ID Code (A=Service Ready,
More informationUNCLASSIFIED FY Exhibits Schedule Prior Years FY 2013 FY 2014 FY 2015 Base FY 2015 OCO FY 2015 Total. Unit Cost ($ M) Qty (Each)
Exhibit P-40, Budget Line Item Justification: PB 2015 United States Special Operations Command Date: March 2014 0300D: Procurement, Defense-Wide / BA 02: Special Operations Command / BSA 4: Other Procurement
More informationUNCLASSIFIED. FY 2016 Base FY 2016 OCO
Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Air Force : February 2015 3600: Research, Development, Test & Evaluation, Air Force / BA 7: Operational Systems Development COST ($ in Millions) FY
More informationUNCLASSIFIED. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018
Exhibit P-40, Budget Item Justification Sheet: PB 2014 Navy : April 2013 Ammo, MC / BSA 1: Marine Corps Ammunition ID Code (A=Service Ready, B=Not Service Ready) : A Program Elements for Code B : Other
More informationUNCLASSIFIED. FY 2017 Base FY 2017 OCO
Exhibit R-2, RDT&E Budget Item Justification: PB 2017 Air Force : February 2016 3600: Research, Development, Test & Evaluation, Air Force / BA 7: Operational Systems Development COST ($ in Millions) FY
More informationUNCLASSIFIED FY 2017 OCO. FY 2017 Base
Exhibit P-40, Budget Line Item Justification: PB 2017 Navy Date: February 2016 1810N: Other Procurement, Navy / BA 04: Ordnance Support Equipment / BSA 7: Other Expendable Ordnance ID Code (A=Service Ready,
More informationUNCLASSIFIED. FY 2017 Base FY 2017 OCO
Exhibit P-40, Budget Line Item Justification: PB 2017 Navy Date: February 2016 1506N: Aircraft Procurement, Navy / BA 05: Modification of Aircraft / BSA 1: Modification of Aircraft ID Code (A=Service Ready,
More informationRDT&E BUDGET ITEM JUSTIFICATION SHEET (R-2 Exhibit)
PE NUMBER: 0604239F PE TITLE: F-22 EMD BUDGET ACTIVITY COST ($ In Thousands) Actual FY 1999 FY 2000 FY 2001 FY 2002 FY 2003 FY 2004 FY 2005 Cost to Complete Cost Advanced Tactical Fighter FSD 2,010,717
More informationUNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 151 P-1 Line #32
Exhibit P-40, Budget Line Item Justification: PB 2017 Navy Date: February 2016 1506N: Aircraft Procurement, Navy / BA 05: Modification of Aircraft / BSA 1: Modification of Aircraft ID Code (A=Service Ready,
More informationUNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 34 P-1 Line #51
Exhibit P-40, Budget Line Item Justification: PB 2016 Navy Date: February 2015 1506N: Aircraft Procurement, Navy / BA 05: Modification of Aircraft / BSA 1: Modification of Aircraft ID Code (A=Service Ready,
More informationUNCLASSIFIED. UNCLASSIFIED Page 1 of 5. EXHIBIT R-2, RDT&E Budget Item Justification RESEARCH DEVELOPMENT TEST & EVALUATION, NAVY / BA-5
EXHIBIT R-2, RDT&E Budget Item Justification APPROPRIATION/BUDGET ACTIVITY RESEARCH DEVELOPMENT TEST & EVALUATION, NAVY / BA-5 R-1 ITEM NOMENCLATURE 0605430N, C/KC-130 AVIONICS MODERNIZATION PROGRAM (AMP)
More informationUNCLASSIFIED UNCLASSIFIED
: February 216 Exhibit R2, RDT&E Budget Item Justification: PB 217 24: Research, Development, Test & Evaluation, / BA 5: System Development & Demonstration (SDD) COST ($ in Millions) FY 215 Program Element
More informationUNCLASSIFIED. FY 2017 Base FY 2017 OCO. FY 2017 Base FY 2017 OCO
UNCLSSIFIED Exhibit P-40, Budget Line Item Justification: PB 2017 ir Force Date: February 2016 ppropriation / Budget ctivity / Budget Sub ctivity: 3080F: Other Procurement, ir Force / B 02: Vehicular Equipment
More informationUNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: Communication, Navigation, Surveillance/Air Traffic Management (CNS/ATM) FY 2012 OCO
Exhibit R-2, RDT&E Budget Item Justification: PB 2012 Air Force DATE: February 2011 COST ($ in Millions) FY 2010 FY 2011 FY 2013 FY 2014 FY 2015 FY 2016 To Program Element 6.754 5.708 4.604-4.604 4.549
More informationUNCLASSIFIED. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018
Exhibit P-40, Budget Item Justification Sheet: PB 2014 Navy : April 2013 Ammo, MC / BSA 1: Marine Corps Ammunition ID Code (A=Service Ready, B=Not Service Ready) : A Program Elements for Code B : Other
More informationYour success is our goal. Rely on our engineering.
Your success is our goal. Rely on our engineering. When it comes to aircraft engineering solutions, we are renowned for our vast expertise, outstanding experience and high quality performance. What our
More informationUAS OPERATIONS AS AN ECOSYSTEM
1 including photocopying, recording, or other electronic or mechanical methods, without the prior written permission of the content owner, The Unmanned Safety Institute, LLC. UAS OPERATIONS AS AN ECOSYSTEM
More informationLAUNCHING YOUR UNMANNED AIRCRAFT PROGRAM
LAUNCHING YOUR UNMANNED AIRCRAFT PROGRAM THE DARTDRONES TEAM UNMANNED AIRCRAFT APPLICATIONS AERIAL INSPECTIONS AERIAL INSPECTIONS Safer and faster alternative to visual inspection by an individual Damage
More informationAircraft Controls MILITARY AIRCRAFT COMMERCIAL AIRCRAFT AFTERMARKET
Aircraft Controls MILITARY AIRCRAFT COMMERCIAL AIRCRAFT AFTERMARKET The largest of the five Moog operating segments is Aircraft Controls. Revenues from development, production and aftermarket support of
More informationAEROSPACE & ELECTRONICS BRENDAN CURRAN PRESIDENT
AEROSPACE & ELECTRONICS BRENDAN CURRAN PRESIDENT Aerospace & Electronics Overview and Results Market Outlook Technological Differentiation and Growth Summary 2 Crane Aerospace & Electronics Industry Leader
More informationAirworthiness Criteria: Special Class Airworthiness Criteria for the FlightScan
This document is scheduled to be published in the Federal Register on 11/16/2017 and available online at https://federalregister.gov/d/2017-24866, and on FDsys.gov [4910-13] DEPARTMENT OF TRANSPORTATION
More informationUNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 17 P-1 Line #13
Exhibit P-40, Budget Line Item Justification: PB 2016 Navy : February 2015 1508N: Procurement of Ammo, Navy & MC / BA 01: Proc Ammo, Navy / BSA 1: Navy Ammunition A Program Elements for Code B Items: Other
More informationFLIGHT PATH FOR THE FUTURE OF MOBILITY
FLIGHT PATH FOR THE FUTURE OF MOBILITY Building the flight path for the future of mobility takes more than imagination. Success relies on the proven ability to transform vision into reality for the betterment
More informationBRINGING THE POWER OF GARMIN TO ACEHAWK
BRINGING THE POWER OF GARMIN TO ACEHAWK CIVIL PEDIGREE TACTICAL AGILITY ACEHAWK- Seamless Integration The ACEHAWK has one of the most intuitive pilot-vehicle interfaces (PVI) available on the market. The
More informationGegaso Ltd. Company Presentation
Gegaso Ltd. Company Presentation This document and the information contained in it are proprietary of Gegaso Ltd. No person is allowed to use, copy, reprint, reproduce, publish or disclose to others this
More informationAeros 40D Sky Dragon. TYPE CERTIFIED BY: United States Federal Aviation Administration Civil Aviation Authorities: Europe and Asia
Aeros 40D Sky Dragon The Aeros 40D Sky Dragon Airship The United States Federal Aviation Administration (FAA) Type Certified Aeros 40D Sky Dragon is the most advanced non rigid airship, incorporating innovative
More informationSYLLABUS INTRODUCTION TO ROTARY WING FLYING QUALITIES AND PERFORMANCE
22783 Cedar Point Road, Building 2168 Patuxent River, MD 20670 Phone: 301 757 5049 301 757 2731 Fax: 301 342 5003 www.navair.navy.mil/nawcad/usntps SYLLABUS INTRODUCTION TO ROTARY WING FLYING QUALITIES
More informationsmall Unmanned Aircraft Systems Arlington Police Department June 28, 2011
suas small Unmanned Aircraft Systems Arlington Police Department June 28, 2011 1. Overview of APD suas program to date 2. Discuss the C.O.A. (FAA certificate of authorization to fly) and restrictions
More informationThales on the Civil Aerospace market
thalesgroup.com Innovation - Civil Aerospace - Defence Aerospace - Transportation - Defence - Security Thales on the Civil Aerospace market AT A GLANCE World n 1 in ATM, covering 40% of world s surface
More informationUNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 126 P-1 Line #32
Exhibit P-40, Budget Line Item Justification: PB 2016 Navy Date: February 2015 1506N: Aircraft Procurement, Navy / BA 05: Modification of Aircraft / BSA 1: Modification of Aircraft ID Code (A=Service Ready,
More informationVoice communications between the two helicopters was made via VHF radio frequencies.
NTSB Identification: LAX94FA383A On September 27, 1994, at 2043 hours mountain standard time, a McDonnell Douglas MD520N (NOTAR), N520NT, collided with a McDonnell Douglas AH-64D (Longbow), R00324, while
More informationIn-Flight Entertainment and Connectivity
In-Flight Entertainment and Connectivity In-Flight Entertainment and Connectrivity Boeing provides interior modifications that deliver the Boeing Edge, an advantage that results from the industry s largest
More informationGlass Cockpits in General Aviation Aircraft. Consequences for training and simulators. Fred Abbink
Glass Cockpits in General Aviation Aircraft. Consequences for training and simulators Fred Abbink Content Development of Air transport cockpits, avionics, automation and safety Pre World War 2 Post World
More informationBob Hawkins Deputy Lead Engineer SLS Integrated Avionics and Software
National Aeronautics and Space Administration 5... 4... 3... 2... 1... SPACE LAUNCH SYSTEM Exploration Class Capability for Deep Space Exploration Bob Hawkins Deputy Lead Engineer SLS Integrated Avionics
More informationA New Era. in Offshore Aviation. a SEACOR company
A New Era in Offshore Aviation a SEACOR company A N E W E R A I N O F F S H O R E AV I AT I O N The world s first functional helicopter took to the air in 1939. Sikorsky s open cockpit helicopter, powered
More informationMetroAir Virtual Airlines
MetroAir Virtual Airlines NAVIGATION BASICS V 1.0 NOT FOR REAL WORLD AVIATION GETTING STARTED 2 P a g e Having a good understanding of navigation is critical when you fly online the VATSIM network. ATC
More informationPerformance. Aircraft System
German Aerospace Center Flight Operations Introduction DLR is Germany s aerospace research center and space agency with about 4700 employees in 31 research institutes distributed over 8 main research centers
More informationUH1H HP Modification and Upgrade Program
UH1H HP Modification and Upgrade Program The UH-1H has served the United States military for many years, setting the performance standards for all helicopters. Since the start of production, over 10,000
More informationKEY FEATURES IN SHORT
KA C90/B200/350 KA C90/B200/350 It is the fixed base simulator of commercial turboprop multi-crew aircraft. The simulator meets all the requirements determined for EASA CS-FSTD(A) FNPTII +MCC level. The
More informationUNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 27 P-1 Line #2
UNCLSSIFIED Exhibit P-40, Budget Line Item Justification: PB mended 2015 ir Force Date: June 2014 ppropriation / Budget ctivity / Budget Sub ctivity: 3011F: Procurement of mmunition, ir Force / B 01: mmunition
More informationCommitted to keeping you flying Controls and Avionics Solutions
Committed to keeping you flying Controls and Avionics Solutions Engine Controls BAE Systems is a world leader in full authority digital engine control (FADEC) design, development, production, and support.
More information> Designed by pilots, for pilots. Helmet Mounted Sight Display for helicopters.
> TopOwl Designed by pilots, for pilots Helmet Mounted Sight Display for helicopters www.thalesgroup.com On board: In Service, ahead of the pack System developed and currently over 700 helmets delivered
More informationATC automation: facts and steps ahead
ATC automation: facts and steps ahead Objectives Context Stating the problem Current solution Steps ahead Implementation constraints ATC automation: facts and steps ahead Objectives Understand why ATC
More informationU.S. ARMY LEAD THE FLEET USAGE ANALYSIS. David White Westar Corporation. Michael McFalls U.S. Army Aviation & Missile Command
U.S. ARMY LEAD THE FLEET USAGE ANALYSIS David White Westar Corporation Michael McFalls U.S. Army Aviation & Missile Command David Largess COBRO (a Westar Company) ABSTRACT The purpose of the U.S. Army
More informationAirborne Remote Sensing Component of Marine Debris Monitoring
Airborne Remote Sensing Component of Marine Debris Monitoring Dr. Thomas H Mace Mace Geospatial, LLC Workshop on Mission Concepts for Marine Debris Sensing Honolulu, Hi, Jan 19 21, 2016 Multistage Remote
More informationOperators may need to retrofit their airplanes to ensure existing fleets are properly equipped for RNP operations. aero quarterly qtr_04 11
Operators may need to retrofit their airplanes to ensure existing fleets are properly equipped for RNP operations. 24 equipping a Fleet for required Navigation Performance required navigation performance
More informationOVERVIEW OF THE FAA ADS-B LINK DECISION
June 7, 2002 OVERVIEW OF THE FAA ADS-B LINK DECISION Summary This paper presents an overview of the FAA decision on the ADS-B link architecture for use in the National Airspace System and discusses the
More informationFokker Technologies The Fokker mind, heart and soul
Fokker Technologies Fokker Technologies The Fokker mind, heart and soul A deeper understanding that all parts of an aircraft are interconnected. Like the human body an aircraft is one, fully integrated
More informationExamples of SIE Industry and Technical Experience
1 Principal design, supply chain management and certification firm for ORBIS International's MD-10 Flying Eye Hospital including cabin reconfiguration, seating, IFE, surgery rooms, ECS, water purification,
More informationROYAL CANADIAN AIR CADETS PROFICIENCY LEVEL ONE INSTRUCTIONAL GUIDE SECTION 6 EO C IDENTIFY INTERNATIONAL AIRCRAFT PREPARATION
ROYAL CANADIAN AIR CADETS PROFICIENCY LEVEL ONE INSTRUCTIONAL GUIDE SECTION 6 EO C130.02 IDENTIFY INTERNATIONAL AIRCRAFT Total Time: 30 min PREPARATION PRE-LESSON INSTRUCTIONS Resources needed for the
More informationDEVELOPING AN ECOSYSTEM FOR UAS SAFETY 2017 WHITEPAPER SERIES
DEVELOPING AN ECOSYSTEM FOR UAS SAFETY 2017 1 THE ADDITION OF UNMANNED AIRCRAFT SYSTEMS (UAS) TO A CORPORATE FLIGHT DEPARTMENT The use of Unmanned Aircraft Systems (UAS) is becoming popular for varying
More informationGlobal Civil Aviation & Military Simulation & Training Market( ) Trends & Opportunities
Global Civil Aviation & Military Simulation & Training Market(2016-20) Trends & Opportunities View Report Details Scope of the Report The report titled Global Civil Aviation and Military Training and Simulation
More informationPaperless Aircraft Operations - IATA s Vision and Actions - Chris MARKOU IATA Operational Costs Management
Paperless Aircraft Operations - IATA s Vision and Actions - Chris MARKOU IATA Operational Costs Management IATA s Paperless Initiatives Passenger Reservations, Ticketing and Airport Processes e-ticketing
More informationFederal Aviation Administration Flight Plan Presented at the Canadian Aviation Safety Seminar April 20, 2004
Federal Aviation Administration Flight Plan 2004-2008 Presented at the Canadian Aviation Safety Seminar April 20, 2004 Challenges Reducing an Already Low Commercial Accident Rate Building an Air Traffic
More informationUAS Training Solutions
UAS Training Solutions UAS Training Solutions Training and operational support for mission readiness The use of unmanned aerial systems (UAS) by defence and security forces globally has grown over the
More informationWhy Ohio? Research and Development: Test Infrastructure: Expertise and Workforce:
Ohio UAS Center Strategic Plan 2019 Why Ohio? Ohio has a rich history of aviation going back to the days when the Wright Brothers first pioneered flight in 1903. Today, Ohio remains a national leader in
More informationEADS CASA response to the Ministry of Defence of the Slovak Republic
1 EXECUTIVE SUMMARY 1.1 EXECUTIVE SUMMARY EADS CASA is pleased to submit this Response to the Request for Information (RFI) issued by the Armament Division of the on February 14, 2006. The Response is
More informationHazard Identification Questionnaire
Hazard Identification Questionnaire OVERVIEW This questionnaire is designed to help identify potential risks and help identify areas of risk exposure. It is not an exhaustive list. This questionnaire is
More informationTIGER COMBAT HELICOPTER
TIGER COMBAT HELICOPTER Lessons learnt on EMAR implementation Thomas Gaborit TIGER: EMAR LESSONS LEARNT AGENDA 1. OCCAR-EA procurement organisation 2. TIGER combat helicopter framework 3. TIGER airworthiness
More informationOPERATIONS CIRCULAR 01/2012. Subject: HEAD-UP DISPLAYS (HUD) AND ENHANCED VISION SYSTEMS (EVS)
GOVERNMENT OF INDIA CIVIL AVIATION DEPARTMENT OFFICE OF THE DIRECTOR GENERAL OF CIVIL AVIATION OPP. SAFDARJUNG AIRPORT, NEW DELHI 110 003 TELEPHONE: 091-011-4635261 4644768 FAX: 091-011-4644764 TELEX:
More information2015 Q3 Investor Conference
2015 Q3 Investor Conference Accountability Innovation Dedication Customer Orientation Aerospace Industrial Development Corporation Date: October 13, 2015-0- 0 0 Contents I. Markets II. Operations and Financial
More informationTAXIBOT. May Technical Partner
TAXIBOT May 2017 TaxiBot Concept Pilot Controlled taxiing without aircraft engines running Aircraft engines turned on at taxi end shortly before take-off Major savings in aircraft fuel consumption Significant
More informationCalifornia State University Long Beach Policy on Unmanned Aircraft Systems
California State University, Long Beach June 14, 2016 Policy Statement: 16-04 California State University Long Beach Policy on Unmanned Aircraft Systems The following policy statement was recommended by
More information