1 Exhibit P-40, Budget Line Item Justification: PB 2016 Air Force Date: February F: Aircraft Procurement, Air Force / BA 05: Modification of Inservice Aircraft / BSA 5: Other Aircraft ID Code (A=Service Ready, B=Not Service Ready) : Program Elements for Code B Items: F Other Related Program Elements: F Line Item MDAP/MAIS Code: 252 Resource Summary Item MDAP/MAIS Code(s): Prior Years FY 2014 FY 2015 FY 2017 FY 2018 FY 2019 FY 2020 Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) , Less PY Advance Procurement ($ in Millions) Net Procurement (P1) ($ in Millions) , Plus CY Advance Procurement ($ in Millions) Obligation Authority ($ in Millions) , (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) Flyaway Unit Cost ($ in Millions) Gross/Weapon System Unit Cost ($ in Millions) Description: The RQ-4 System provides high altitude, deep look, long-endurance intelligence, surveillance, and reconnaissance (ISR) capability that complements space and other airborne collectors during peacetime, crisis, and war-fighting scenarios. The aircraft is an autonomous, high altitude, long-endurance, Remotely Piloted Aircraft(RPA). Currently, the active inventory consists of four (4) Block 20s, eighteen (18) Block 30s, and eleven (11) Block 40s. Three (3) additional Block 30s are currently in production with scheduled deliveries in FY17. The ground segment includes the Mission Control Element (MCE) and the Launch Recovery Element (LRE). There are a total of ten (10) active ground segments in the existing RQ-4 inventory. The designed service life of the Block 30 RPAs is approximately 25 years with an average service life remaining of 17 years through The designed service life of the Block 40 RPAs is approximately 25 years with an average service life remaining of 19 years through The designed service life of the ground segments is approximately 32 years with an average service life remaining of 19 years through The RQ-4B is the successor to the RQ-4A, and is designed to employ 3,000 pounds of payload and enable multi-intelligence (multi-int) collecting. The RQ-4B has three configurations: Block 20, Block 30, and Block 40. The Block 20 employs upgraded Synthetic Aperture Radar (SAR) and Electro-Optical/Infrared (EO/IR) sensors - Enhanced Integrated Sensor Suite (EISS) - in an imagery intelligence only configuration. One SAR capable B20 remains in the fleet. Additionally, 4 Block 20's have been converted to Battlefield Airborne Communications Node (BACN) of which three (3) remain active. These aircraft are not SAR capable. The remaining Block 20 aircraft support test projects for all RQ-4 Blocks. The Block 30 employs the same EISS sensors as the Block 20, and integrates a wide spectrum signals intelligence (SIGINT) sensor, the Airborne Signals Intelligence Payload (ASIP). EISS and ASIP are used simultaneously to create a multi-int platform. The Block 40 integrates the Multi-Platform Radar Technology Insertion Program (MP-RTIP) radar that has GMTI capability. The support segment includes aerospace ground equipment, tech orders, spares, support equipment, and training to enable operation of the RQ-4 System. protect production schedules from Diminishing Manufacturing Sources (DMS) and material shortages issues, the program will perform schedule protection buys when appropriate. The RQ-4 program will incorporate applicable synergies with other platforms, including the U.S. Navy Triton, and other RPA weapon systems. The RQ-4 system will be continually modified to maintain pace with evolving threats and increasing capabilities included in modernization efforts. These planned modifications include aircraft, ground station/ communications and other retrofits to incorporate new capabilities such as next-generation sensing, EISS sensor interoperability enhancements and upgrades, SAR complex imagery, Airborne Data Computer, JPEG 2000, Joint Mission Planning System (JMPS), enhanced weather capabilities, engine performance, ice protection system, INMARSAT/COMSEC, Mode 5/Automatic Dependent Surveillance-Broadcast (ADS-B), reliability, maintainability and availability efforts, next generation communications, and sensor integration. Air Force Page 1 of 23 P-1 Line #57 Volume 2-345
2 Exhibit P-40, Budget Line Item Justification: PB 2016 Air Force Date: February F: Aircraft Procurement, Air Force / BA 05: Modification of Inservice Aircraft / BSA 5: Other Aircraft ID Code (A=Service Ready, B=Not Service Ready) : Program Elements for Code B Items: F Other Related Program Elements: F Line Item MDAP/MAIS Code: 252 Item MDAP/MAIS Code(s): For, individual modification lines have been created within the Global Hawk procurement budget to provide transparency to future major modification efforts. These modification efforts include aircraft mods, enhanced weather capabilities, ASIP increment I, SAR complex imagery, reliability, maintainability and availability efforts, low cost modifications, and other efforts. Air Force Page 2 of 23 P-1 Line #57 Volume 2-346
3 Exhibit P-40, Budget Line Item Justification: PB 2016 Air Force Date: February F: Aircraft Procurement, Air Force / BA 05: Modification of Inservice Aircraft / BSA 5: Other Aircraft ID Code (A=Service Ready, B=Not Service Ready) : Program Elements for Code B Items: F Other Related Program Elements: F Line Item MDAP/MAIS Code: 252 Item MDAP/MAIS Code(s): Exhibits Schedule Prior Years FY 2014 FY 2015 Title* Exhibits ID CD Quantity / Cost Quantity / Cost Quantity / Cost Quantity / Cost Quantity / Cost Quantity / Cost 1 / GH Aircraft Mods (Capability Improvement) P-40a*** - / / / / / - - / / GH Ground Station Mods (Capability Improvement) P-40a*** - / / / - - / - - / - - / - 3 / ASIP Install/Calibration (Capability Improvement) P-40a*** - / - - / - - / / - - / - - / - 4 / MODE 5/ADS-B (Capability Improvement) P-40a*** - / - - / - - / - - / - - / - - / - 5 / Sensor Enhancements (Capability Improvement) P-40a*** - / - - / - - / - - / - - / - - / - 6 / Ice Protection System (Capability Improvement) P-40a*** - / - - / - - / - - / - - / - - / - 7 / ADC/JPEG 2000 (Capability Improvement) P-40a*** - / - - / - - / - - / - - / - - / - 8 / GSMP (Capability Improvement) P-40a*** - / - - / - - / - - / - - / - - / - 9 / CSMP (Capability Improvement) P-40a*** - / - - / - - / - - / - - / - - / / Enhanced Weather Capability (Capability Improvement) P-3a - / - - / - - / - - / / - - / / ASIP Increment I (Capability Improvement) P-3a - / - - / - - / - - / / - - / / SAR Complex Imagery (Capability Improvement) P-3a - / - - / - - / - - / / - - / / R&M Enhancements (Reliablity & Maintainability) P-3a - / - - / - - / - - / / - - / / LOW COST MODIFICATIONS (Capability Improvement) P-3a - / - - / - - / - - / / - - / Gross/Weapon System Cost - / / / / / - - / Exhibits Schedule FY 2017 FY 2018 FY 2019 FY 2020 Title* Exhibits ID CD Quantity / Cost Quantity / Cost Quantity / Cost Quantity / Cost Quantity / Cost Quantity / Cost 1 / GH Aircraft Mods (Capability Improvement) P-40a*** - / / / / / / / GH Ground Station Mods (Capability Improvement) P-40a*** - / - - / - - / - - / - - / - - / / ASIP Install/Calibration (Capability Improvement) P-40a*** - / - - / - - / - - / - - / - - / / MODE 5/ADS-B (Capability Improvement) P-40a*** - / / / / - - / - - / / Sensor Enhancements (Capability Improvement) P-40a*** - / - - / / / / / / Ice Protection System (Capability Improvement) P-40a*** - / - - / - - / / / / / ADC/JPEG 2000 (Capability Improvement) P-40a*** - / - - / / / - - / - - / / GSMP (Capability Improvement) P-40a*** - / - - / - - / / / - - / / CSMP (Capability Improvement) P-40a*** - / - - / - - / - - / - - / / / Enhanced Weather Capability (Capability Improvement) P-3a - / / / / / - - / / ASIP Increment I (Capability Improvement) P-3a - / - - / - - / - - / - - / - - / / SAR Complex Imagery (Capability Improvement) P-3a - / / - - / - - / - - / - - / / R&M Enhancements (Reliablity & Maintainability) P-3a - / / / / / / / LOW COST MODIFICATIONS (Capability Improvement) P-3a - / / / / / / Gross/Weapon System Cost - / / / / / / 1, Air Force Page 3 of 23 P-1 Line #57 Volume 2-347
4 Exhibit P-40, Budget Line Item Justification: PB 2016 Air Force Date: February F: Aircraft Procurement, Air Force / BA 05: Modification of Inservice Aircraft / BSA 5: Other Aircraft ID Code (A=Service Ready, B=Not Service Ready) : Program Elements for Code B Items: F Other Related Program Elements: F Line Item MDAP/MAIS Code: 252 Item MDAP/MAIS Code(s): *** Although this is an Exhibit P-40a item, the actual exhibit is not included since all of the required information for this item is already being shown here. *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: s in this Exhibit P-40 set may not be exact or add due to rounding. Justification: Where applicable, justification for individual modifications is provided in the P-3A exhibits. Air Force Page 4 of 23 P-1 Line #57 Volume 2-348
5 Resource Summary Prior Years FY 2014 FY 2015 FY 2017 FY 2018 FY 2019 FY / Enhanced Weather Capability Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Obligation Authority ($ in Millions) (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) Gross/Weapon System Unit Cost ($ in Millions) Description: The RQ-4 program is developing and testing several capability enhancements to provide improved situational awareness and performance in severe weather. The Enhance Weather Capability effort will field the retrofit of onboard Weather Radar, Lightning Diverter Strips, Increased Engine performance, and minor communications enhancements concurrently developed with Weather Radar due to hardware & software development and fielding synergies. The Enhanced Weather Capability modification effort is a New Start in FY16. Milestone/Development Status The Enhanced Weather Capability development effort is currently in the contracting phase. The T&E activity for the primary effort is the design and qualification of an onboard Weather Radar. This T&E activity will be completed with Block 30 planned to be the first qualified Block. Development and testing for all blocks will be complete in the first half of FY The objective is to begin retrofit activities immediately after completion of DT for Block 30s in order to minimize any delay to the field. Air Force Page 5 of 23 P-1 Line #57 Volume 2-349
6 Models of Systems Affected: RQ-4 Modification Type: Capability Improvement Related RDT&E PEs: F RDT&E PE # Financial Plan Prior Years FY 2014 FY 2015 FY 2017 FY 2018 FY 2019 FY / Enhanced Weather Capability F - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - Procurement Modification Item 1 of 2: Group A Install Kits A Kits Recurring Group A Install Kits:INSTALL KITS Group A (Active) - / - - / - - / - 56 / / - 56 / / / / / / / Subtotal: Recurring - / - - / - - / - - / / - - / / / / / / - - / Subtotal: Group A Install Kits - / - - / - - / - - / / - - / / / / / / - - / Modification Item 2 of 2: Group B Equipment B Kits Recurring Group B Equipment:EQUIPMENT Group B (Active) - / - - / - - / - 56 / / - 56 / / / / / / / Subtotal: Recurring - / - - / - - / - - / / - - / / / / / / - - / Subtotal: Group B Equipment - / - - / - - / - - / / - - / / / / / / - - / Subtotal: Procurement, All Modification Items - / - - / - - / - - / / - - / / / / / / - - / Installation Modification Item 1 of 2: Group A Install Kits - / - - / - - / - - / - - / - - / - 60 / / / / / / Subtotal: Installation - / - - / - - / - - / - - / - - / - 60 / / / / / / Cost (Procurement + Support + Installation) Air Force Page 6 of 23 P-1 Line #57 Volume 2-350
7 Modification Item 1 of 2: Group A Install Kits Manufacturer Information Manufacturer Name: Northrop Grumman Manufacturer Location: Palmdale, California Administrative Leadtime (in Months): 8 Production Leadtime (in Months): / Enhanced Weather Capability Dates FY 2014 FY 2015 FY 2017 FY 2018 FY 2019 FY 2020 Contract Dates Jun 2016 Jun 2017 Jun 2018 Jun 2019 Jun 2020 Delivery Dates Sep 2016 Sep 2017 Sep 2018 Sep 2019 Sep 2020 Installation Information Method of Implementation: Contractor Facility Installation Cost Prior Years FY 2014 FY 2015 FY 2017 FY 2018 FY 2019 FY 2020 Prior Years - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 56 / / - - / - - / - - / - 56 / FY / - - / - - / - - / - - / - - / - 4 / / / - - / - - / - 43 / FY / - - / - - / - - / - - / - - / - - / - 5 / / / - - / - 17 / FY / - - / - - / - - / - - / - - / - - / - - / - 4 / / - - / - 4 / FY / - - / - - / - - / - - / - - / - - / - - / - - / - 3 / / - 3 / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 60 / / / / / / Installation Schedule FY 2014 FY 2015 FY 2017 FY 2018 FY 2019 FY 2020 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC t In Out Air Force Page 7 of 23 P-1 Line #57 Volume 2-351
8 Modification Item 2 of 2: Group B Equipment Manufacturer Information Manufacturer Name: Northrop Grumman Manufacturer Location: Palmdale, California Administrative Leadtime (in Months): 8 Production Leadtime (in Months): / Enhanced Weather Capability Dates FY 2014 FY 2015 FY 2017 FY 2018 FY 2019 FY 2020 Contract Dates Jun 2016 Jun 2017 Jun 2018 Jun 2019 Jun 2020 Delivery Dates Sep 2016 Sep 2017 Sep 2018 Sep 2019 Sep 2020 Installation Information Method of Implementation (Organic): Org/Intermediate Installation Quantity: 0 Air Force Page 8 of 23 P-1 Line #57 Volume 2-352
9 Resource Summary Prior Years FY 2014 FY / ASIP Increment I FY 2017 FY 2018 FY 2019 FY 2020 Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Obligation Authority ($ in Millions) (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) Gross/Weapon System Unit Cost ($ in Millions) Description: ASIP Increment 1 incorporates additional signals and integrates advanced collection algorithms. It is a follow-on effort to the ASIP baseline program in compliance with SIGINT Capability Working Group priorities. The retrofit task will be implemented using the rotatable spares concept. Fielding is estimated to start in Mar The ASIP Increment 1 modification effort is a New Start in FY16. Milestone/Development Status ISR Sensors group (AFLCMC/WIN) will initiate development effort, which will deliver hardware and software for initial testing and DT. Contract award estimated to occur in Feb 15 with delivery in Feb 16. Global Hawk's NRE effort will support DT and procurement of modification kits. Air Force Page 9 of 23 P-1 Line #57 Volume 2-353
10 Models of Systems Affected: RQ-4 Modification Type: Capability Improvement Related RDT&E PEs: Procurement Financial Plan Modification Item 1 of 2: Group A Install Kits (2) A Kits Recurring Prior Years FY 2014 FY / ASIP Increment I FY 2017 FY 2018 FY 2019 FY 2020 Group A Install Kits:INSTALL KITS Group A (Active) - / - - / - - / - 15 / / - 15 / / - - / - - / - - / - - / - 15 / Subtotal: Recurring - / - - / - - / - - / / - - / / - - / - - / - - / - - / - - / Subtotal: Group A Install Kits (2) - / - - / - - / - - / / - - / / - - / - - / - - / - - / - - / Modification Item 2 of 2: Group B Equipment (2) B Kits Recurring Group B Equipment:EQUIPMENT Group B (Active) - / - - / - - / - 15 / / - 15 / / - - / - - / - - / - - / - 15 / Subtotal: Recurring - / - - / - - / - - / / - - / / - - / - - / - - / - - / - - / Subtotal: Group B Equipment (2) - / - - / - - / - - / / - - / / - - / - - / - - / - - / - - / Subtotal: Procurement, All Modification Items - / - - / - - / - - / / - - / / - - / - - / - - / - - / - - / Support (All Modification Items) Mod of Spare - / - - / - - / - 12 / / - 12 / / - - / - - / - - / - - / - 12 / Subtotal: Support - / - - / - - / - 12 / / - 12 / / - - / - - / - - / - - / - 12 / Installation Modification Item 1 of 2: Group A Install Kits (2) - / - - / - - / - - / / - - / / - 6 / - - / - - / - - / - 15 / Subtotal: Installation - / - - / - - / - - / / - - / / - 6 / - - / - - / - - / - 15 / Cost (Procurement + Support + Installation) Air Force Page 10 of 23 P-1 Line #57 Volume 2-354
11 Modification Item 1 of 2: Group A Install Kits (2) Manufacturer Information Manufacturer Name: Northrop Grumman Manufacturer Location: Palmdale, California Administrative Leadtime (in Months): 3 Production Leadtime (in Months): / ASIP Increment I Dates FY 2014 FY 2015 FY 2017 FY 2018 FY 2019 FY 2020 Contract Dates Jan 2016 Delivery Dates Mar 2017 Installation Information Method of Implementation: Contractor Facility Installation Cost Prior Years FY 2014 FY 2015 FY 2017 FY 2018 FY 2019 FY 2020 Prior Years - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / / - - / / - 6 / - - / - - / - - / - 15 / FY / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / / - - / / - 6 / - - / - - / - - / - 15 / Installation Schedule FY 2014 FY 2015 FY 2017 FY 2018 FY 2019 FY 2020 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC t In Out Air Force Page 11 of 23 P-1 Line #57 Volume 2-355
12 Modification Item 2 of 2: Group B Equipment (2) Manufacturer Information Manufacturer Name: Northrop Grumman Manufacturer Location: Palmdale, California Administrative Leadtime (in Months): 3 Production Leadtime (in Months): / ASIP Increment I Dates FY 2014 FY 2015 FY 2017 FY 2018 FY 2019 FY 2020 Contract Dates Jan 2016 Delivery Dates Mar 2017 Installation Information Method of Implementation (Organic): Org/Intermediate Installation Quantity: 0 Air Force Page 12 of 23 P-1 Line #57 Volume 2-356
13 Resource Summary Prior Years FY 2014 FY / SAR Complex Imagery FY 2017 FY 2018 FY 2019 FY 2020 Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Obligation Authority ($ in Millions) (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) Gross/Weapon System Unit Cost ($ in Millions) Description: Synthetic Aperture Radar (SAR) Complex Imagery incorporates SAR selectable Point Image Mode, for Detected and Complex Imagery into the Enhanced Integrated Sensor Suite (EISS). Software was developed and incorporated into fielded GH IFC This modification will be implemented on all Block 20 and 30 aircraft and will include necessary revisions to the technical documentation. The major effort for this modification is updating the Phase Distortion Tables (PDT) of the Enhanced Receiver Exciter Controller (EREC) and flight testing. It is anticipated that four flights will be required to complete this effort. The SAR Complex Imagery modification effort is a New Start in FY16. Milestone/Development Status DT is scheduled for Q2 FY15 through Q4 FY15. The PDT table updates and fielding of ERECs will occur as a rotatable pool with an estimated start date in Q1 FY16. Air Force Page 13 of 23 P-1 Line #57 Volume 2-357
14 Models of Systems Affected: RQ-4 Modification Type: Capability Improvement Related RDT&E PEs: Procurement Financial Plan Modification Item 1 of 1: Group B Install Kits B Kits Recurring Prior Years FY 2014 FY / SAR Complex Imagery FY 2017 FY 2018 FY 2019 FY 2020 Group B Install Kits:EQUIPMENT Group B (Active) - / - - / - - / - 20 / / - 20 / / / - - / - - / - - / - 42 / Subtotal: Recurring - / - - / - - / - - / / - - / / / - - / - - / - - / - - / Subtotal: Group B Install Kits - / - - / - - / - - / / - - / / / - - / - - / - - / - - / Subtotal: Procurement, All Modification Items - / - - / - - / - - / / - - / / / - - / - - / - - / - - / Support (All Modification Items) GROUP B: TOTAL NONRECURRING - / - - / - - / - - / / - - / / / - - / - - / - - / - - / Subtotal: Support - / - - / - - / - - / / - - / / / - - / - - / - - / - - / Installation Modification Item 1 of 1: Group B Install Kits - / - - / - - / - 20 / / - 20 / / / - - / - - / - - / - 42 / Subtotal: Installation - / - - / - - / - 20 / / - 20 / / / - - / - - / - - / - 42 / Cost (Procurement + Support + Installation) Air Force Page 14 of 23 P-1 Line #57 Volume 2-358
15 Modification Item 1 of 1: Group B Install Kits Manufacturer Information Manufacturer Name: Northrop Grumman Manufacturer Location: Palmdale, California Administrative Leadtime (in Months): 0 Production Leadtime (in Months): / SAR Complex Imagery Dates FY 2014 FY 2015 FY 2017 FY 2018 FY 2019 FY 2020 Contract Dates Oct 2015 Oct 2016 Delivery Dates Nov 2015 Nov 2016 Installation Information Method of Implementation: Contractor Facility Installation Cost Prior Years FY 2014 FY 2015 FY 2017 FY 2018 FY 2019 FY 2020 Prior Years - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 20 / / - 20 / / - - / - - / - - / - - / - 20 / FY / - - / - - / - - / - - / - - / - 22 / / - - / - - / - - / - 22 / FY / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 20 / / - 20 / / / - - / - - / - - / - 42 / Installation Schedule FY 2014 FY 2015 FY 2017 FY 2018 FY 2019 FY 2020 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC t In Out Air Force Page 15 of 23 P-1 Line #57 Volume 2-359
16 Resource Summary Prior Years FY 2014 FY / R&M Enhancements FY 2017 FY 2018 FY 2019 FY 2020 Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Obligation Authority ($ in Millions) (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) Gross/Weapon System Unit Cost ($ in Millions) Description: The purpose of this modification is to enable the incorporation of a package of reliability, maintainability & availability enhancements into the RQ-4 weapon system that will improve component Mean Time Between Failure (MTBF) and maintenance action requirements to drive down system sustainability cost over time. Current examples under this modification include but are not limited to: alternative paint removal, enhanced maintainer operating screens, alternate fuel qualification, improved LRU cooling and reduced vibration for critical connectors. These efforts address issues identified by the Joint Reliability and Maintainability Evaluation Team (JRMET) and CAT I deficiency reports. A total of 36 kits for existing air vehicles and 10 ground station kits will be procured. Note: Under this effort the contractor will provide for the manufacture, installation, calibration, and acceptance test of reliability, maintainability & availability modifications on RQ-4 aircraft and ground based equipment. Funding for R&M Enhancements had previously been captured in Mod , GH Aircraft Mods. This is not a New Start for FY16. Milestone/Development Status The RQ-4 program will continue to develop, test and recommend reliability, maintainability, availability, sustainability and safety enhancements and solutions for incorporation in future RQ-4 weapon system RM&A modification packages in an effort to continually improve aircraft and payload availability and reduce lifecycle cost. Air Force Page 16 of 23 P-1 Line #57 Volume 2-360
17 Models of Systems Affected: RQ-4 Modification Type: Reliablity & Maintainability Related RDT&E PEs: Procurement Financial Plan Modification Item 1 of 2: Grp A Install Kits (3) A Kits Recurring Prior Years FY 2014 FY / R&M Enhancements FY 2017 FY 2018 FY 2019 FY 2020 Grp A Install Kits:INSTALL KITS Group A (Active) - / - - / - - / - 4 / / - 4 / / / / / / / Subtotal: Recurring - / - - / - - / - - / / - - / / / / / / / Subtotal: Grp A Install Kits (3) - / - - / - - / - - / / - - / / / / / / / Modification Item 2 of 2: Grp B Equipment (3) B Kits Recurring Grp B Equipment:EQUIPMENT Group B (Active) - / - - / - - / - 4 / / - 4 / / / / / / / Subtotal: Recurring - / - - / - - / - - / / - - / / / / / / / Subtotal: Grp B Equipment (3) - / - - / - - / - - / / - - / / / / / / / Subtotal: Procurement, All Modification Items - / - - / - - / - - / / - - / / / / / / / Installation Modification Item 1 of 2: Grp A Install Kits (3) - / - - / - - / - - / - - / - - / - 4 / / / / / / Subtotal: Installation - / - - / - - / - - / - - / - - / - 4 / / / / / / Cost (Procurement + Support + Installation) Air Force Page 17 of 23 P-1 Line #57 Volume 2-361
18 Modification Item 1 of 2: Grp A Install Kits (3) Manufacturer Information Manufacturer Name: Northrop Grumman Manufacturer Location: Palmdale, California Administrative Leadtime (in Months): 1 Production Leadtime (in Months): / R&M Enhancements Dates FY 2014 FY 2015 FY 2017 FY 2018 FY 2019 FY 2020 Contract Dates Nov 2015 Nov 2016 Nov 2017 Nov 2018 Nov 2019 Delivery Dates Nov 2016 Nov 2017 Nov 2018 Nov 2019 Nov 2020 Installation Information Method of Implementation: Contractor Facility Installation Cost Prior Years FY 2014 FY 2015 FY 2017 FY 2018 FY 2019 FY 2020 Prior Years - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 4 / / - - / - - / - - / - 4 / FY / - - / - - / - - / - - / - - / - - / - 3 / / - - / - - / - 3 / FY / - - / - - / - - / - - / - - / - - / - - / - 4 / / - - / - 4 / FY / - - / - - / - - / - - / - - / - - / - - / - - / - 3 / / - 3 / FY / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 4 / / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 28 / / / - - / - - / - - / - - / - - / - 4 / / / / / / Installation Schedule FY 2014 FY 2015 FY 2017 FY 2018 FY 2019 FY 2020 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC t In Out Air Force Page 18 of 23 P-1 Line #57 Volume 2-362
19 Modification Item 2 of 2: Grp B Equipment (3) Manufacturer Information Manufacturer Name: Northrop Grumman Manufacturer Location: Palmdale, California Administrative Leadtime (in Months): 1 Production Leadtime (in Months): / R&M Enhancements Dates FY 2014 FY 2015 FY 2017 FY 2018 FY 2019 FY 2020 Contract Dates Nov 2015 Nov 2016 Nov 2017 Nov 2018 Nov 2019 Delivery Dates Nov 2016 Nov 2017 Nov 2018 Nov 2019 Nov 2020 Installation Information Method of Implementation (Organic): Org/Intermediate Installation Quantity: 0 Air Force Page 19 of 23 P-1 Line #57 Volume 2-363
20 Resource Summary Prior Years FY 2014 FY / LOW COST MODIFICATIONS FY 2017 FY 2018 FY 2019 FY 2020 Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Obligation Authority ($ in Millions) (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) Gross/Weapon System Unit Cost ($ in Millions) Description: The RQ-4 fleet will be continually modified to maintain pace with the evolving threat and the increasing capabilities included in modernization efforts. Low cost modification efforts are anticipated and are necessary for continued operational support. Funding for low cost modifications had previously been captured in Mod , GH Aircraft Mods. This is not a New Start for FY16. Milestone/Development Status Low cost modifications will be required to improve capabilities to the RQ-4 fleet. Air Force Page 20 of 23 P-1 Line #57 Volume 2-364
21 Models of Systems Affected: RQ-4 Modification Type: Capability Improvement Related RDT&E PEs: Procurement Financial Plan Modification Item 1 of 2: Grp A Install Kits (7) A Kits Recurring Prior Years FY 2014 FY / LOW COST MODIFICATIONS FY 2017 FY 2018 FY 2019 FY 2020 Grp A Install Kits:INSTALL KITS Group A (Active) - / - - / - - / - 1 / / - 1 / / / / / / / Subtotal: Recurring - / - - / - - / - - / / - - / / / / / / / Subtotal: Grp A Install Kits (7) - / - - / - - / - - / / - - / / / / / / / Modification Item 2 of 2: Grp B Equipment (7) B Kits Recurring Grp B Equipment:EQUIPMENT Group B (Active) - / - - / - - / - 1 / / - 1 / / / / / / / Subtotal: Recurring - / - - / - - / - - / / - - / / / / / / / Subtotal: Grp B Equipment (7) - / - - / - - / - - / / - - / / / / / / / Subtotal: Procurement, All Modification Items - / - - / - - / - - / / - - / / / / / / / Installation Modification Item 1 of 2: Grp A Install Kits (7) - / - - / - - / - - / - - / - - / - 1 / / / / / / Subtotal: Installation - / - - / - - / - - / - - / - - / - 1 / / / / / / Cost (Procurement + Support + Installation) Air Force Page 21 of 23 P-1 Line #57 Volume 2-365
22 Modification Item 1 of 2: Grp A Install Kits (7) Manufacturer Information Manufacturer Name: Northrop Grumman Manufacturer Location: Palmdale, California Administrative Leadtime (in Months): 1 Production Leadtime (in Months): 12 1 / LOW COST MODIFICATIONS Dates FY 2014 FY 2015 FY 2017 FY 2018 FY 2019 FY 2020 Contract Dates Nov 2015 Nov 2016 Nov 2017 Nov 2018 Nov 2019 Delivery Dates Nov 2016 Nov 2017 Nov 2018 Nov 2019 Nov 2020 Installation Information Method of Implementation: Contractor Facility Installation Cost Prior Years FY 2014 FY 2015 FY 2017 FY 2018 FY 2019 FY 2020 Prior Years - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 1 / / - - / - - / - - / - 1 / FY / - - / - - / - - / - - / - - / - - / - 1 / / - - / - - / - 1 / FY / - - / - - / - - / - - / - - / - - / - - / - 1 / / - - / - 1 / FY / - - / - - / - - / - - / - - / - - / - - / - - / - 1 / / - 1 / FY / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 1 / / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 9 / / / - - / - - / - - / - - / - - / - 1 / / / / / / Installation Schedule FY 2014 FY 2015 FY 2017 FY 2018 FY 2019 FY 2020 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC t In Out Air Force Page 22 of 23 P-1 Line #57 Volume 2-366
23 Modification Item 2 of 2: Grp B Equipment (7) Manufacturer Information Manufacturer Name: Northrop Grumman Manufacturer Location: Palmdale, California Administrative Leadtime (in Months): 1 Production Leadtime (in Months): 12 1 / LOW COST MODIFICATIONS Dates FY 2014 FY 2015 FY 2017 FY 2018 FY 2019 FY 2020 Contract Dates Nov 2015 Nov 2016 Nov 2017 Nov 2018 Nov 2019 Delivery Dates Nov 2016 Nov 2017 Nov 2018 Nov 2019 Nov 2020 Installation Information Method of Implementation (Organic): Org/Intermediate Installation Quantity: 0 Air Force Page 23 of 23 P-1 Line #57 Volume 2-367
UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 17 P-1 Line #55
Exhibit P-40, Budget Line Item Justification: PB 2017 Air Force Date: February 2016 3010F: Aircraft Procurement, Air Force / BA 05: Modification of Inservice Aircraft / BSA 5: Other Aircraft ID Code (A=Service
More informationUNCLASSIFIED. FY 2017 Base FY 2017 OCO FY 2017 OCO. FY 2017 Base
Exhibit P-40, Budget Line Item Justification: PB 2017 Air Force Date: February 2016 3010F: Aircraft Procurement, Air Force / BA 05: Modification of Inservice Aircraft / BSA 2: Tactical Aircraft ID Code
More informationUNCLASSIFIED. FY 2017 Base FY 2017 OCO FY 2017 OCO. FY 2017 Base
Exhibit P-40, Budget Line Item Justification: PB 2017 Air Force Date: February 2016 3010F: Aircraft Procurement, Air Force / BA 05: Modification of Inservice Aircraft / BSA 2: Tactical Aircraft ID Code
More informationUNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 24 P-1 Line #55
Exhibit P-40, Budget Line Item Justification: PB 2016 Navy Date: February 2015 1506N: Aircraft Procurement, Navy / BA 05: Modification of Aircraft / BSA 1: Modification of Aircraft ID Code (A=Service Ready,
More informationUNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 5 P-1 Line #35
Exhibit P-40, Budget Line Item Justification: PB 2017 Air Force Date: February 2016 3010F: Aircraft Procurement, Air Force / BA 05: Modification of Inservice Aircraft / BSA 4: Trainer Aircraft ID Code
More informationUNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 10 P-1 Line #47
Exhibit P-40, Budget Line Item Justification: PB 2016 Air Force Date: February 2015 3010F: Aircraft Procurement, Air Force / BA 05: Modification of Inservice Aircraft / BSA 5: Other Aircraft ID Code (A=Service
More informationUNCLASSIFIED FY 2016 OCO. FY 2016 Base
Exhibit P-40, Budget Line Item Justification: PB 2016 Air Force Date: February 2015 3010F: Aircraft Procurement, Air Force / BA 05: Modification of Inservice Aircraft / BSA 5: Other Aircraft ID Code (A=Service
More informationUNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 16 P-1 Line #57
Exhibit P-40, Budget Line Item Justification: PB 2017 Navy Date: February 2016 1506N: Aircraft Procurement, Navy / BA 05: Modification of Aircraft / BSA 1: Modification of Aircraft ID Code (A=Service Ready,
More informationUNCLASSIFIED. FY 2016 Base FY 2016 OCO FY 2016 OCO. FY 2016 Base
Exhibit P-40, Budget Line Item Justification: PB 2016 Army Date: February 2015 2031A: Aircraft Procurement, Army / BA 02: Modification of Aircraft / BSA 10: Modification of Aircraft ID Code (A=Service
More informationUNCLASSIFIED. UNCLASSIFIED United States Special Operations Command Page 1 of 6 P-1 Line #53
Exhibit P-40, Budget Line Item Justification: PB 2017 United States Special Operations Command : February 2016 0300D: Procurement, Defense-Wide / BA 02: Special Operations Command / BSA 1: Aviation Programs
More informationUNCLASSIFIED. FY 2016 Base FY 2016 OCO FY 2016 OCO. FY 2016 Base
Exhibit P-40, Budget Line Item Justification: PB 2016 Air Force Date: February 2015 3010F: Aircraft Procurement, Air Force / BA 05: Modification of Inservice Aircraft / BSA 2: Tactical Aircraft ID Code
More informationUNCLASSIFIED FY 2015 FY 2015 OCO. FY 2015 Base FY 2015 FY Base
Exhibit P-40, Budget Line Item Justification: PB 2015 Air Force Date: March 2014 3010F: Aircraft Procurement, Air Force / BA 05: Modification of Inservice Aircraft / BSA 5: Other Aircraft ID Code (A=Service
More informationUNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 5 P-1 Line #55
Exhibit P-40, Budget Line Item Justification: PB 2016 Air Force Date: February 2015 3010F: Aircraft Procurement, Air Force / BA 05: Modification of Inservice Aircraft / BSA 5: Other Aircraft ID Code (A=Service
More informationUNCLASSIFIED FY 2017 OCO. FY 2017 Base
Exhibit P-40, Budget Line Item Justification: PB 2017 Air Force Date: February 2016 3021F: Space Procurement, Air Force / BA 01: Space Procurement, Air Force / BSA 1: Space Programs ID Code (A=Service
More informationUNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 18 P-1 Line #56
Exhibit P-40, Budget Line Item Justification: PB 2016 Air Force Date: February 2015 3010F: Aircraft Procurement, Air Force / BA 05: Modification of Inservice Aircraft / BSA 5: Other Aircraft ID Code (A=Service
More informationUNCLASSIFIED. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018
Exhibit P-40, Budget Item Justification Sheet: PB 2014 Navy Date: April 2013 Aircraft / BSA 1: Modification Of Aircraft ID Code (A=Service Ready, B=Not Service Ready) : A Program Elements for Code B Items:
More informationUNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 5 P-1 Line #21
Exhibit P-40, Budget Line Item Justification: PB 2015 Navy Date: March 2014 1507N: Weapons Procurement, Navy / BA 03: Torpedoes and Related Equipment / BSA 1: Torpedoes and Related Equip ID Code (A=Service
More informationUNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 18 P-1 Line #12
Exhibit P-40, Budget Line Item Justification: PB 2017 Navy Date: February 2016 1810N: Other Procurement, Navy / BA 01: Ships Support Equipment / BSA 9: Other Shipboard Equipment ID Code (A=Service Ready,
More informationUNCLASSIFIED. FY 2014 Base. OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018
Exhibit P-40, Budget Item Justification Sheet: PB 2014 Air Force Date: April 2013 Inservice Missiles / BSA 1: Class IV ID Code (A=Service Ready, B=Not Service Ready) : A Program Elements for Code B Items:
More informationUNCLASSIFIED. FY 2017 Base FY 2017 OCO. FY 2017 Base FY 2017 OCO
Exhibit P-40, Budget Line Item Justification: PB 2017 Air Force Date: February 2016 3010F: Aircraft Procurement, Air Force / BA 05: Modification of Inservice Aircraft / BSA 3: Airlift Aircraft ID Code
More informationUNCLASSIFIED. FY 2017 Base FY 2017 OCO
Exhibit P-40, Budget Line Item Justification: PB 2017 Air Force Date: February 2016 3010F: Aircraft Procurement, Air Force / BA 05: Modification of Inservice Aircraft / BSA 5: Other Aircraft ID Code (A=Service
More informationUNCLASSIFIED. UNCLASSIFIED Army Page 1 of 23 P-1 Line #27
Exhibit P-40, Budget Line Item Justification: PB 2015 Army Date: March 2014 2031A: Aircraft Procurement, Army / BA 02: Modification of Aircraft / BSA 10: Modification of Aircraft ID Code (A=Service Ready,
More informationUNCLASSIFIED FY Exhibits Schedule Prior Years FY 2013 FY 2014 FY 2015 Base FY 2015 OCO FY 2015 Total. Total Cost ($ M)
Exhibit P-40, Budget Line Item Justification: PB 2015 Army Date: March 2014 2033A: Procurement of W&TCV, Army / BA 01: Tracked Combat Vehicles / BSA 20: Modification of Tracked Combat Vehicles ID Code
More informationUNCLASSIFIED FY 2016 OCO. FY 2016 Base. FY 2016 Base FY 2016 OCO
Exhibit P-40, Budget Line Item Justification: PB 2016 Army Date: February 2015 2033A: Procurement of W&TCV, Army / BA 01: Tracked Combat Vehicles / BSA 20: Modification of Tracked Combat Vehicles ID Code
More informationUNCLASSIFIED. UNCLASSIFIED Army Page 1 of 16 P-1 Line #15
Exhibit P-40, Budget Line Item Justification: PB 2017 Army Date: February 2016 2031A: Aircraft Procurement, Army / BA 02: Modification of Aircraft / BSA 10: Modification of Aircraft ID Code (A=Service
More informationUNCLASSIFIED. FY 2017 Base FY 2017 OCO FY 2017 OCO. FY 2017 Base
Exhibit P-40, Budget Line Item Justification: PB 2017 Air Force Date: February 2016 3010F: Aircraft Procurement, Air Force / BA 05: Modification of Inservice Aircraft / BSA 5: Other Aircraft ID Code (A=Service
More informationUNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 17 P-1 Line #121
Exhibit P-40, Budget Line Item Justification: PB 2015 Navy Date: March 2014 1810N: Other Procurement, Navy / BA 04: Ordnance Support Equipment / BSA 3: Ship Missile Systems Equipment ID Code (A=Service
More informationUNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 21 P-1 Line #19
Exhibit P-40, Budget Line Item Justification: PB 2017 Navy Date: February 2016 1810N: Other Procurement, Navy / BA 01: Ships Support Equipment / BSA 9: Other Shipboard Equipment ID Code (A=Service Ready,
More informationUNCLASSIFIED. FY 2017 Base FY 2017 OCO FY 2017 OCO. FY 2017 Base
Exhibit P-40, Budget Line Item Justification: PB 2017 Army Date: February 2016 2033A: Procurement of W&TCV, Army / BA 01: Tracked Combat Vehicles / BSA 20: Modification of Tracked Combat Vehicles ID Code
More informationUNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 31 P-1 Line #41
Exhibit P-40, Budget Line Item Justification: PB 2017 Navy Date: February 2016 1810N: Other Procurement, Navy / BA 01: Ships Support Equipment / BSA 16: Logistic Support ID Code (A=Service Ready, B=Not
More informationUNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 33 P-1 Line #94
Exhibit P-40, Budget Line Item Justification: PB 2017 Navy Date: February 2016 1810N: Other Procurement, Navy / BA 02: Communications & Electronics Equip / BSA 12: Submarine Communications ID Code (A=Service
More informationUNCLASSIFIED FY Exhibits Schedule Prior Years FY 2013 FY 2014 FY 2015 Base FY 2015 OCO FY 2015 Total. Unit Cost ($ M) Qty (Each)
Exhibit P-40, Budget Line Item Justification: PB 2015 United States Special Operations Command Date: March 2014 0300D: Procurement, Defense-Wide / BA 02: Special Operations Command / BSA 4: Other Procurement
More informationUNCLASSIFIED. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018
Exhibit P-40, Budget Item Justification Sheet: PB 2014 Navy : April 2013 Ammo, MC / BSA 1: Marine Corps Ammunition ID Code (A=Service Ready, B=Not Service Ready) : A Program Elements for Code B : Other
More informationUNCLASSIFIED FY Exhibits Schedule Prior Years FY 2013 FY 2014 FY 2015 Base FY 2015 OCO FY 2015 Total. Total Cost ($ M) Unit Cost ($) Qty (Each)
Exhibit P-40, Budget Line Item Justification: PB 2015 Navy Date: March 2014 1506N: Aircraft Procurement, Navy / BA 05: Modification of Aircraft / BSA 1: Modification of Aircraft ID Code (A=Service Ready,
More informationUNCLASSIFIED FY 2017 OCO. FY 2017 Base
Exhibit P-40, Budget Line Item Justification: PB 2017 Navy Date: February 2016 1810N: Other Procurement, Navy / BA 04: Ordnance Support Equipment / BSA 7: Other Expendable Ordnance ID Code (A=Service Ready,
More informationUNCLASSIFIED FY 2015 FY 2015 OCO. FY 2015 Base FY 2015 FY Base
Exhibit P-40, Budget Line Item Justification: PB 2015 Army Date: March 2014 2031A: Aircraft Procurement, Army / BA 02: Modification of Aircraft / BSA 10: Modification of Aircraft ID Code (A=Service Ready,
More informationUNCLASSIFIED. FY 2016 Base FY 2016 OCO FY 2016 OCO. FY 2016 Base
Resource Summary Prior Years FY 2014 FY 2015 Base OCO Total FY 2017 FY 2018 FY 2019 FY 2020 To Complete Procurement Quantity (Units in Each) - - - - - - - - - - - - Gross/Weapon System Cost ($ in Millions)
More informationUNCLASSIFIED. FY 2014 Base. OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018
Exhibit P-40, Budget Item Justification Sheet: PB 2014 Army Date: April 2013 Aircraft / BSA 10: Modification Of Aircraft ID Code (A=Service Ready, B=Not Service Ready) : Program Elements for Code B Items:
More informationUNCLASSIFIED. FY 2017 Base FY 2017 OCO
Exhibit P-40, Budget Line Item Justification: PB 2017 Navy Date: February 2016 1506N: Aircraft Procurement, Navy / BA 05: Modification of Aircraft / BSA 1: Modification of Aircraft ID Code (A=Service Ready,
More informationUNCLASSIFIED. FY 2017 Base FY 2017 OCO
Exhibit R-2, RDT&E Budget Item Justification: PB 2017 Air Force : February 2016 3600: Research, Development, Test & Evaluation, Air Force / BA 7: Operational Systems Development COST ($ in Millions) FY
More informationUNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 151 P-1 Line #32
Exhibit P-40, Budget Line Item Justification: PB 2017 Navy Date: February 2016 1506N: Aircraft Procurement, Navy / BA 05: Modification of Aircraft / BSA 1: Modification of Aircraft ID Code (A=Service Ready,
More informationUNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 34 P-1 Line #51
Exhibit P-40, Budget Line Item Justification: PB 2016 Navy Date: February 2015 1506N: Aircraft Procurement, Navy / BA 05: Modification of Aircraft / BSA 1: Modification of Aircraft ID Code (A=Service Ready,
More informationUNCLASSIFIED. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018
Exhibit P-40, Budget Item Justification Sheet: PB 2014 Navy : April 2013 Ammo, MC / BSA 1: Marine Corps Ammunition ID Code (A=Service Ready, B=Not Service Ready) : A Program Elements for Code B : Other
More informationUNCLASSIFIED FY Exhibits Schedule Prior Years FY 2013 FY 2014 FY 2015 Base FY 2015 OCO FY 2015 Total. Total Cost ($ M) Unit Cost ($) Qty (Each)
Exhibit P-40, Budget Line Item Justification: PB 2015 Navy Date: March 2014 1506N: Aircraft Procurement, Navy / BA 05: Modification of Aircraft / BSA 1: Modification of Aircraft ID Code (A=Service Ready,
More informationUNCLASSIFIED. FY 2017 Base FY 2017 OCO. FY 2017 Base FY 2017 OCO
UNCLSSIFIED Exhibit P-40, Budget Line Item Justification: PB 2017 ir Force Date: February 2016 ppropriation / Budget ctivity / Budget Sub ctivity: 3080F: Other Procurement, ir Force / B 02: Vehicular Equipment
More informationUNCLASSIFIED. FY 2016 Base FY 2016 OCO
Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Air Force : February 2015 3600: Research, Development, Test & Evaluation, Air Force / BA 7: Operational Systems Development COST ($ in Millions) FY
More informationUNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 30 P-1 Line #36
Exhibit P-40, Budget Line Item Justification: PB 2016 Navy Date: February 2015 1506N: Aircraft Procurement, Navy / BA 05: Modification of Aircraft / BSA 1: Modification of Aircraft ID Code (A=Service Ready,
More informationUNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 17 P-1 Line #13
Exhibit P-40, Budget Line Item Justification: PB 2016 Navy : February 2015 1508N: Procurement of Ammo, Navy & MC / BA 01: Proc Ammo, Navy / BSA 1: Navy Ammunition A Program Elements for Code B Items: Other
More informationUNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: Communication, Navigation, Surveillance/Air Traffic Management (CNS/ATM) FY 2012 OCO
Exhibit R-2, RDT&E Budget Item Justification: PB 2012 Air Force DATE: February 2011 COST ($ in Millions) FY 2010 FY 2011 FY 2013 FY 2014 FY 2015 FY 2016 To Program Element 6.754 5.708 4.604-4.604 4.549
More informationRDT&E BUDGET ITEM JUSTIFICATION SHEET (R-2 Exhibit)
PE NUMBER: 0604239F PE TITLE: F-22 EMD BUDGET ACTIVITY COST ($ In Thousands) Actual FY 1999 FY 2000 FY 2001 FY 2002 FY 2003 FY 2004 FY 2005 Cost to Complete Cost Advanced Tactical Fighter FSD 2,010,717
More informationUNCLASSIFIED R-1 ITEM NOMENCLATURE PE A: AIRCRAFT CERTIFICATION FY 2012 OCO
Exhibit R-2, RDT&E Budget Item Justification: PB 212 Army DATE: February 211 24: Research, Development, Test & Evaluation, Army COST ($ in Millions) FY 21 FY 211 FY 212 Base PE 6566A: AIRCRAFT CERTIFICATION
More informationUNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 126 P-1 Line #32
Exhibit P-40, Budget Line Item Justification: PB 2016 Navy Date: February 2015 1506N: Aircraft Procurement, Navy / BA 05: Modification of Aircraft / BSA 1: Modification of Aircraft ID Code (A=Service Ready,
More informationUNCLASSIFIED UNCLASSIFIED
: February 216 Exhibit R2, RDT&E Budget Item Justification: PB 217 24: Research, Development, Test & Evaluation, / BA 5: System Development & Demonstration (SDD) COST ($ in Millions) FY 215 Program Element
More informationAirborne Remote Sensing Component of Marine Debris Monitoring
Airborne Remote Sensing Component of Marine Debris Monitoring Dr. Thomas H Mace Mace Geospatial, LLC Workshop on Mission Concepts for Marine Debris Sensing Honolulu, Hi, Jan 19 21, 2016 Multistage Remote
More informationFLIGHT PATH FOR THE FUTURE OF MOBILITY
FLIGHT PATH FOR THE FUTURE OF MOBILITY Building the flight path for the future of mobility takes more than imagination. Success relies on the proven ability to transform vision into reality for the betterment
More informationJanuary 2018 Air Traffic Activity Summary
January 2018 Air Traffic Activity Summary Jan-2018 Jan-2017 CY-2018 CY-2017 Passengers 528,947 505,421 4.7% 528,947 505,421 4.7% Passengers 537,332 515,787 4.2% 537,332 515,787 4.2% Passengers 1,066,279
More informationUNCLASSIFIED. UNCLASSIFIED Page 1 of 5. EXHIBIT R-2, RDT&E Budget Item Justification RESEARCH DEVELOPMENT TEST & EVALUATION, NAVY / BA-5
EXHIBIT R-2, RDT&E Budget Item Justification APPROPRIATION/BUDGET ACTIVITY RESEARCH DEVELOPMENT TEST & EVALUATION, NAVY / BA-5 R-1 ITEM NOMENCLATURE 0605430N, C/KC-130 AVIONICS MODERNIZATION PROGRAM (AMP)
More informationAeros 40D Sky Dragon. TYPE CERTIFIED BY: United States Federal Aviation Administration Civil Aviation Authorities: Europe and Asia
Aeros 40D Sky Dragon The Aeros 40D Sky Dragon Airship The United States Federal Aviation Administration (FAA) Type Certified Aeros 40D Sky Dragon is the most advanced non rigid airship, incorporating innovative
More informationUNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 31 P-1 Line #2
UNCLSSIFIED Exhibit P-40, Budget Line Item Justification: PB 2016 ir Force : February 2015 ppropriation / Budget ctivity / Budget Sub ctivity: 3011F: Procurement of mmunition, ir Force / B 01: mmunition
More informationUAS Training Solutions
UAS Training Solutions UAS Training Solutions Training and operational support for mission readiness The use of unmanned aerial systems (UAS) by defence and security forces globally has grown over the
More informationThales on the Civil Aerospace market
thalesgroup.com Innovation - Civil Aerospace - Defence Aerospace - Transportation - Defence - Security Thales on the Civil Aerospace market AT A GLANCE World n 1 in ATM, covering 40% of world s surface
More informationIndustria, Innovazione e Ricerca: Le nuove frontiere del volo a pilotaggio remoto
Industria, Innovazione e Ricerca: Le nuove frontiere del volo a pilotaggio remoto Aniello Cozzolino Head of Research & Technology Development, Piaggio Aerospace University of Naples Federico II, June,
More informationUNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 27 P-1 Line #2
UNCLSSIFIED Exhibit P-40, Budget Line Item Justification: PB mended 2015 ir Force Date: June 2014 ppropriation / Budget ctivity / Budget Sub ctivity: 3011F: Procurement of mmunition, ir Force / B 01: mmunition
More informationYour Trusted Special Missions Partner
SPECIAL MISSIONS Your Trusted Special Missions Partner CAPABILITY/OVERVIEW 1 Hawker Pacific Aviation s Trusted Choice Hawker Pacific is the market leader in integrated civil and military aerospace sales
More informationMULTIDISCIPLINARYMEETING REGARDING GLOBAL TRACKING
International Civil Aviation Organization Global Tracking 2014-WP/1 5/5/14 WORKING PAPER MULTIDISCIPLINARYMEETING REGARDING GLOBAL TRACKING Montréal, 12 May to 13 May 2014 Agenda item 1: Explore the need
More informationCOMMUNICATIONS PANEL. WG-I 20 Meeting
International Civil Aviation Organization CP/WG-I20/WP-04 29/02/2016 WORKING PAPER COMMUNICATIONS PANEL WG-I 20 Meeting Montreal, Canada 29 Feb 4 Mar, 2016 Agenda Item xx: Title: IP Environment for UAS
More informationAIRCRAFT SERVICE CHANGE
AIRCRAFT SERVICE CHANGE NUMBER 909 SUBJECT INDICATING / RECORDING (ATA 31) PLANEVIEW MASTER OPERATING SYSTEM SOFTWARE UPDATE DECEMBER 22, 2011 PILOTS INFORMATION SHEET PLANEVIEW MASTER OPERATING SYSTEM
More informationADVANCED SURVEILLANCE IN ONE INTEGRATED PACKAGE
T 3 CAS ADVANCED SURVEILLANCE IN ONE INTEGRATED PACKAGE TCAS TAWS ADS-B APPLICATIONS NEXTGEN TRANSPONDER ACSS 3 CAS TM T 3 CAS THE SINGLE SOLUTION TO YOUR SURVEILLANCE NEEDS T 3 CAS traffic management
More informationManual vs. Automatic Operation and Operational Restrictions
Customer Services, Operations, and Safety Committee Board Information Item IV-B March 11, 2010 Manual vs. Automatic Operation and Operational Restrictions Page 81 of 91 Washington Metropolitan Area Transit
More informationAEROSPACE & ELECTRONICS BRENDAN CURRAN PRESIDENT
AEROSPACE & ELECTRONICS BRENDAN CURRAN PRESIDENT Aerospace & Electronics Overview and Results Market Outlook Technological Differentiation and Growth Summary 2 Crane Aerospace & Electronics Industry Leader
More informationTechnologies for Autonomous Operations of UAVs
Technologies for Autonomous Operations of UAVs TAKE OFF Conference Unmanned Aircraft Systems Towards Civil Applications 10. November 2009, Graz/Austria EADS 2009 All rights reserved Technologies for Autonomous
More informationSurveillance and Broadcast Services
Surveillance and Broadcast Services Benefits Analysis Overview August 2007 Final Investment Decision Baseline January 3, 2012 Program Status: Investment Decisions September 9, 2005 initial investment decision:
More informationOVERVIEW OF THE FAA ADS-B LINK DECISION
June 7, 2002 OVERVIEW OF THE FAA ADS-B LINK DECISION Summary This paper presents an overview of the FAA decision on the ADS-B link architecture for use in the National Airspace System and discusses the
More informationJuly 29-30, 2010 Washington, D.C Procurement Agencies. Coast Guard Agencies
2010 Military, Civilian and Commercial UAV Systems & Applications Unmanned Aircraft Systems Defense and Tactics Conference & Expo July 29-30, 2010 Washington, D.C Photo credit: US DoD 25 Countries 40 Procurement
More informationAIRCRAFT SERVICE CHANGE
AIRCRAFT SERVICE CHANGE NUMBER 077 SUBJECT NAVIGATION (ATA 34) TCAS 7.1 INSTALLATION JUNE 12, 2012 PILOTS INFORMATION SHEET TCAS 7.1 INSTALLATION This service change upgrades TCAS 2000 or 3000SP systems
More informationDEPARTMENT OF CIVIL AVIATION Airworthiness Notices EXTENDED DIVERSION TIME OPERATIONS (EDTO)
EXTENDED DIVERSION TIME OPERATIONS (EDTO) 1. APPLICABILITY 1.1 This notice is applicable to operator engaged in Commercial Air Transport Operations beyond the threshold time established by DCA for EDTO
More informationASTM International Committee F38 Unmanned Aircraft Systems. Michael J. Goy Defense Standardization Program Office
ASTM International Committee F38 Unmanned Aircraft Systems Michael J. Goy Defense Standardization Program Office ASTM International Committee F38 on Unmanned Aircraft Systems Mission Statement. The mission
More informationHereafter there are some examples on how parts of a test campaign should typically be classified. In case of any doubt contact the Agency:
Hereafter there are some examples on how parts of a test campaign should typically be classified. In case of any doubt contact the Agency: Category 1 # CAT 1 Flight Test Justification (3.1. Annex XII Part
More informationS 2 BAS Space Services Benefits in Aviation Systems. 2 nd ARTES Applications Workshop April 19 th, 2012 Harwell, UK
S 2 BAS Space Services Benefits in Aviation Systems April 19 th, 2012 Harwell, UK General Aviation and Business traffic will expand in the near future (4-6% per year. Source: Eurocontrol, 2011) Regional
More informationSafety Enhancement SE ASA Design Virtual Day-VMC Displays
Safety Enhancement SE 200.2 ASA Design Virtual Day-VMC Displays Safety Enhancement Action: Implementers: (Select all that apply) Statement of Work: Manufacturers develop and implement virtual day-visual
More informationResearch Challenges Associated with Unmanned Aircraft Systems Airspace Integration
Research Challenges Associated with Unmanned Aircraft Systems Airspace Integration Andrew Lacher 21 February 2012 For National Academy of Sciences: Aeronautics Research and Technology Roundtable MITRE
More informationPerformance. Aircraft System
German Aerospace Center Flight Operations Introduction DLR is Germany s aerospace research center and space agency with about 4700 employees in 31 research institutes distributed over 8 main research centers
More informationFederal Aviation Administration Flight Plan Presented at the Canadian Aviation Safety Seminar April 20, 2004
Federal Aviation Administration Flight Plan 2004-2008 Presented at the Canadian Aviation Safety Seminar April 20, 2004 Challenges Reducing an Already Low Commercial Accident Rate Building an Air Traffic
More informationAirworthiness considerations for UAVs
A general overview about the approach to a UAV System under current regulations for operation, airspace and certification Presentation by : STN ATLAS ELEKTRONIK Klaus Wohlers, LMP Airborne Systems Type
More informationCIVIL AVIATION PUBLICATION CAP 00 GENERAL
CAP 00 GENERAL FOREWORD REVISION STATUS & LEP This Page Intentionally Left Blank FOREWORD Civil Aviation Publications (CAPs) are issued under the authority granted to the Director General by Decree. The
More informationCommit to Safety: Professional Pilots Always Use a Checklist INITIAL EQUIPMENT SETUP
Commit to Safety: Professional Pilots Always Use a Checklist INITIAL EQUIPMENT SETUP READ THE MANUAL Familiarize yourself with all aspects of your suas before you even consider going out for your first
More informationAppendix. Gatwick Airport Ltd - Further information on Gatwick s revised phasing strategy (including Programme) Gatwick Airport Limited
Gatwick Airport Limited Response to Airports Commission Consultation Appendix 37 Gatwick Airport Ltd - Further information on Gatwick s revised phasing strategy (including Programme) Further information
More informationGegaso Ltd. Company Presentation
Gegaso Ltd. Company Presentation This document and the information contained in it are proprietary of Gegaso Ltd. No person is allowed to use, copy, reprint, reproduce, publish or disclose to others this
More informationAllan Storm Aerospace Capabilities Section Armament & Aerospace Capabilities Directorate NATO Headquarters, Brussels, Belgium
CIVIL/MILITARY Working Together for a Common Future Allan Storm Aerospace Capabilities Section Armament & Aerospace Capabilities Directorate NATO Headquarters, Brussels, Belgium 24 March 2015 Remotely
More informationWORKSHOP 1 ICAO RPAS Panel Working Group 1 Airworthiness
REMOTELY PILOTED AIRCRAFT SYSTEMS SYMPOSIUM 23-25 March 2015 WORKSHOP 1 ICAO RPAS Panel Working Group 1 Airworthiness Stephen George Bruno Moitre Rapporteurs WG1 Remotely Piloted Aircraft Systems (RPAS)
More information40 BEALEAFBI OCTOBER Chapter 8 RQ-4 OPERATIONS
40 BEALEAFBI11-250 1 OCTOBER 2012 Chapter 8 RQ-4 OPERATIONS 8.1. CERTIFICATE OF AUTHORIZATION. Pilots will comply with each COA and LOA in effect between Beale and other Air Traffic Control (ATC) facilities.
More informationAIRBUS WRAPS UP ITS SUCCESSFUL 2018 SINGAPORE AIRSHOW PARTICIPATION
AIRBUS WRAPS UP ITS SUCCESSFUL 2018 SINGAPORE AIRSHOW PARTICIPATION News / Events / Festivals, Manufacturer 1 Another strong showing for Airbus at this biennial Asia-Pacific event From the digitalisation
More informationUnmanned Aircraft Systems Integration
Unmanned Aircraft Systems Integration Advancing Autonomous Capabilities in the Artificial Intelligence/Cyber Domain Presented to: The Patuxent Partnership Presented by: Art Hinaman, Manager, Technical
More informationTRANSMITTAL SHEET. Concurrent Requirement Added G450 Customer Bulletin Number 141 (aircraft that have previously incorporated ASC 016)
TRANSMITTAL SHEET This sheet transmits Revision A, dated, to Gulfstream G450 Aircraft Service Change 016, dated August 18, 2005, titled Aircraft General (ATA 00) Maximum Takeoff Gross Weight (MTOGW) Increase.
More informationInvestor Presentation
Investor Presentation Credit Suisse Global Industrials Conference December 3, 2013 2013 Rockwell Collins. All rights reserved. Safe Harbor Statement This presentation contains statements, including certain
More informationUAS: French situation and perspectives
UAS: French situation and perspectives Muriel Preux DGAC RPAS versus suas RPAS: - Even if the pilot is not onboard, and if the impact on aviation is real, rather classical aviation issues: same industrial
More informationThe Australian ADS-B Program Greg Dunstone
The Australian ADS-B Program Greg Dunstone Surveillance Program Lead, Airservices Australia 2001-4 : Australian operational trial Operationally commissioned 9 aircraft Dh8, Shorts, B200, Jabiru Objective
More informationU.S. NAVY CNS/ATM Program Status
U.S. NAVY CNS/ATM Program Status 9 June 2009 Dave Staso CNS/ATM IPTL NAVAIR PMA209 (240) 925-9220 david.staso@navy.mil UNCLASSIFIED Minimum Functionality is a Requirement Amish buggies are not allowed
More informationOperators may need to retrofit their airplanes to ensure existing fleets are properly equipped for RNP operations. aero quarterly qtr_04 11
Operators may need to retrofit their airplanes to ensure existing fleets are properly equipped for RNP operations. 24 equipping a Fleet for required Navigation Performance required navigation performance
More informationARCHIVED REPORT. ADS-B (U.S. FAA) - Archived 12/2010
Electronic Systems Forecast ARCHIVED REPORT For data and forecasts on current programs please visit www.forecastinternational.com or call +1 203.426.0800 - Archived 12/2010 Outlook First regions in the
More information