UNCLASSIFIED FY Exhibits Schedule Prior Years FY 2013 FY 2014 FY 2015 Base FY 2015 OCO FY 2015 Total. Total Cost ($ M) Unit Cost ($) Qty (Each)

Size: px
Start display at page:

Download "UNCLASSIFIED FY Exhibits Schedule Prior Years FY 2013 FY 2014 FY 2015 Base FY 2015 OCO FY 2015 Total. Total Cost ($ M) Unit Cost ($) Qty (Each)"

Transcription

1 Exhibit P-40, Budget Line Item Justification: PB 2015 Navy Date: March N: Aircraft Procurement, Navy / BA 05: Modification of Aircraft / BSA 1: Modification of Aircraft ID Code (A=Service Ready, B=Not Service Ready) : A Program Elements for Code B Items: Other Related Program Elements: Line Item MDAP/MAIS Code: 212 Resource Summary Item MDAP/MAIS Code(s): Prior Years FY 2013 FY 2014 # FY 2016 FY 2017 FY 2018 FY 2019 Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) , Less PY Advance Procurement ($ in Millions) Net Procurement (P1) ($ in Millions) , Plus CY Advance Procurement ($ in Millions) Obligation Authority ($ in Millions) , (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) Flyaway Unit Cost ($ in Dollars) Gross/Weapon System Unit Cost ($ in Dollars) # The Request will be submitted at a later date. Description: This line item funds modifications to the Navy's V-22 aircraft. The V-22 is a tilt rotor, Vertical/Short Takeoff and Landing (V/STOL) aircraft for Joint Service application. The Navy acts as the lead service with support from the United States Air Force (USAF) co-located in the V-22 Program Office. The V-22 Program is designed to provide an aircraft to meet the amphibious/vertical assault needs of the United States Marine Corps, the strike rescue needs of the Navy, and the special operations needs of the USAF and United States Special Operations Command (USSM). The MV-22 variant is replacing the CH-46E in the Marine Corps and will supplement the H-60 in the Navy. The CV-22 variant replaced the MH-53J, and will provide a new capability and augment the MC-130 in the USAF/USSM inventory for special operations infiltration, exfiltration, and resupply missions. The V-22 is capable of flying over 2,100 nautical miles with a single refueling, giving the Services the advantage of a V/STOL aircraft able to rapidly selfdeploy to any location in the world. This line item funds modifications in support of the 192 MV-22's in service by end of Fiscal Year(FY) 2013 and will support an additional 53 aircraft to be delivered through FY The overall goal of the modifications budgeted in is to maintain commonality, implement structural safety and reliability improvements, and improve capability. These modifications will also improve readiness, increase aircraft availability, and decrease operating costs. focus will be on reducing flight hour costs, and improving Time On Wing, as reflected in the Readiness Operational Safety Improvement Program (OSIP). Exhibits Schedule Title* P-3a - 1 / MV-22 Correction of Defiencies and Pre Block A Through C (OSIP ) P-3a Exhibits ID Unit Cost CD ($) Qty (Each) Cost ($ M) Unit Cost ($) Qty (Each) Cost ($ M) Unit Cost ($) Qty (Each) Cost ($ M) Unit Cost ($) Qty (Each) Cost ($ M) Unit Cost ($) Qty (Each) Cost ($ M) Unit Cost ($) Qty (Each) Cost ($ M) Navy Page 1 of 54 P-1 Line #62 Volume 2-997

2 Exhibit P-40, Budget Line Item Justification: PB 2015 Navy Date: March N: Aircraft Procurement, Navy / BA 05: Modification of Aircraft / BSA 1: Modification of Aircraft ID Code (A=Service Ready, B=Not Service Ready) : A Program Elements for Code B Items: Other Related Program Elements: Line Item MDAP/MAIS Code: 212 Item MDAP/MAIS Code(s): Exhibits Schedule Title* P-3a - 2 / MV-22 Readiness (OSIP ) P-3a Exhibits ID Unit Cost CD ($) Qty (Each) Cost ($ M) Unit Cost ($) Qty (Each) Cost ($ M) Unit Cost ($) Qty (Each) Cost ($ M) Unit Cost ($) Qty (Each) Cost ($ M) Unit Cost ($) Qty (Each) Cost ($ M) Gross/Weapon System Cost Exhibits Schedule FY 2016 FY 2017 FY 2018 FY 2019 Title* P-3a - 1 / MV-22 Correction of Defiencies and Pre Block A Through C (OSIP ) P-3a - 2 / MV-22 Readiness (OSIP ) P-3a P-3a Exhibits ID Unit Cost CD ($) Qty (Each) Cost ($ M) Unit Cost ($) Qty (Each) Cost ($ M) Unit Cost ($) Qty (Each) Cost ($ M) Unit Cost ($) Qty (Each) Cost ($ M) Unit Cost ($) Qty (Each) Cost ($ M) , , Gross/Weapon System Cost , *For the P-3a, Title represents the Modification Number / Title. Note: s in this Exhibit P-40 set may not be exact or add due to rounding. Justification: MV-22 Correction of Deficiencies provides near and long term improvements to the fleet, focusing on documented deficiencies related to safety, maintainability, and aircraft systems. These modifications and selected component changes are being accomplished by field retrofit. In order to meet emerging deficiencies the airframe and integrated systems must be modified as critical corrections/changes are identified. Funds will be used to manage, prepare, process and incorporate Engineering Change Proposals (ECP) and implement those changes to sustain and improve MV-22 system operations. ECPs are implemented to coincide with resources and aircraft availability. These changes provide more robust performance in navigation, weapons, avionics, survivability, maneuverability, maintainability, and mission deployment of the MV-22 platform. This modification program may be required to provide timely remedial action for any aircraft system, component or structure. In FY12, ECPs began addressing readiness degraders impacting MV-22 reliability, maintainability, availability, and cost per flight hour were captured under OSIP Unit Cost ($) Unit Cost ($) Qty (Each) Qty (Each) Cost ($ M) Cost ($ M) Navy Page 2 of 54 P-1 Line #62 Volume 2-998

3 Resource Summary Prior Years FY 2013 FY 2014 # FY 2016 FY 2017 FY 2018 FY / MV-22 Correction of Defiencies and Pre Block A Through C (OSIP ) Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) , Less PY Advance Procurement ($ in Millions) Net Procurement (P1) ($ in Millions) , Plus CY Advance Procurement ($ in Millions) Obligation Authority ($ in Millions) , (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) Gross/Weapon System Unit Cost ($ in Dollars) # The Request will be submitted at a later date. Description: MV-22 Correction of Deficiencies provides near and long term improvements to the fleet, focusing on documented deficiencies related to safety, maintainability, and aircraft systems. These modifications and selected component changes are being accomplished by field retrofit. In order to meet emerging deficiencies the airframe and integrated systems must be modified as critical corrections/changes are identified. Funds will be used to manage, prepare, process and incorporate Engineering Change Proposals (ECP) and implement those changes to sustain and improve MV-22 system operations. ECPs are implemented to coincide with resources and aircraft availability. These changes provide more robust performance in navigation, weapons, avionics, survivability, maneuverability, maintainability, and mission deployment of the MV-22 platform. This modification program may be required to provide timely remedial action for any aircraft system, component or structure. Starting in FY12, ECPs that addressed readiness degraders impacting MV-22 reliability, maintainability, availability, and cost per flight hour were captured under Operational Safety Improvement Program (OSIP) Current/Active ECPs: AVIONICS: Avionics modifications to the V-22 will improve display reliability, eliminate communication security issues and alleviate parts obsolescence/vendor problems. Changes to the V-22 avionics will include: Display System upgrade, Cockpit Inter Communication System modification, upgraded Mission Computer, updated Data Transfer Module, Control Display Unit/Engine Instrument Caution Advisory System upgrade, Control Display Unit Keyboard upgrade, and Avionics Interface Units upgrades. As well as Mission System Upgrade and Midwing Processing Unit obsolescence replacement. POWER TRANSMISSION AND CONTROL: Changes to the V-22 Power Transmission and Control System will improve reliability and maintainability. Changes to the V-22 Power Transmission and Control System will include: swashplate reliability upgrades, engine gimbal ring/spherical bearing installation revision, updated refuel/defuel valve, bull gear shroud and engine gimbal ring. COCKPIT: Changes to the V-22 cockpit will improve crew safety, mission suitability and overall reliability. Changes to the V-22 cockpit include: night vision goggle compatible hardware, upgraded inertial reels, upgraded pilot and co-pilot restraint system, throttle control lever soft stop modification, and improved rain removal. STRUCTURAL: Structural changes to the V-22 will increase survivability, improve maintainability and aircraft availability, eliminate component interferences, improve suitability and correct safety related issues. Structural changes include: forward sponson fuel bladder access redesign/install powder panels, environmental control unit Ram air barrier filter, avionics left hand mounting tray, aft upper door strut, add manual drive decal, fold blades in high winds and modified trunnion fitting. PRODUCTION ROTOR LIGHTING PROTECTION: Improves rotor system lighting protection by adding improved bonding harness and grounding strap bracket. BRACKET HYDRAULIC LINE CLAMPING: Relocate clamping provisions from the removable conversion actuator fairing to the frame and improve the tube installation. WASHER: Washer to now be included with attach hardware to ensure adequate tying of the assembly. RELIABILITY & MAINTAINABILITY FIXES: Includes Corrective Action Plans to make the aircraft compliant with Operation Requirements Document requirements. Navy Page 3 of 54 P-1 Line #62 Volume 2-999

4 1 / MV-22 Correction of Defiencies and Pre Block A Through C (OSIP ) ECP-TBD: FLIGHT TRAINING DEVICE (FTD) UPGRADES: Improves training and pilot proficiency by incorporating modifications to the FTD #1 to reflect most current aircraft configuration as directed by Blue Ribbon Panel. ECP-511: AIRFRAME PART TASK TRAINER, Incorporate Block 'B' configuration changes. ECP-TBD: Block B safety configuration changes required to meet mission requirements. Changes are associated with the aircraft Propulsion/Drive, Electrical, Avionics, Hydraulics, and Structure/Airframe. ECP-559: AIRCRAFT MAINTENANCE TRAINER (AMT): AMT #2, Improves training and pilot proficiency by incorporating modifications to the AMT #2 to reflect most current Block A and Block B aircraft configuration. ECP-573: Nose Landing Gear (NLG) Shock Struts, Nose Landing Gear shock struts are a life limited part, redesigned struts will eliminate safety of flight issue. ECP-716: Infra-Red Suppressor Redesign, Provide a more reliable configuration to items that have contributed to poor system reliability and identify a repair kit for the aircraft Infra-Red Suppressor system. ECP-761: Engine Air Particle Seperator (EAPS), Provides a more efficient and reliable system by incorporating an upgraded EAPS Blower case drain hose, an upgraded EAPS Blower outlet hose, and the elimination of restrictors in the case drain circuit. ECP-515: Improved Nacelle Blower, Provides a change to correct current nacelle blower bearing failures. ECP-685: Incorporation of Miscellaneous ECPs, Implements the following ECPs on Lot 4 aircraft: 2nd source Refuel/Defuel Valve, Block B Cargo Door Actuator Redesign and Cargo Tie Down. ECP-721: Ramp Mounted Weapon System (RMWS), Provide an all quadrant Defensive Weapon System for the V-22. ECP-772: Forward Looking Infrared (FLIR) Firmware Improvements, Provides the FLIR System Electronics Unit Video Signal Processor firmware version ECP-803: AMT #3, Improves training and pilot proficiency by incorporating modifications to the AMT #3 to reflect most current Block A and Block B aircraft configuration. ECP-860: K-Voice and Data Recorder replaces the Government Furnished Equipment Flight Incident Recorder due to obsolescence issues and diminishing manufacturing sources for parts. ECP-865 Rapid Ground Refueling provides two new utility outlets, to be used to power the pump package. ECP-869: Nose Landing Gear Improvements in 3 major areas of the nose landing gear mechanisms are proposed, these include: Increase Mechanism Spring Moments, Reducing rque Tube Pivot Friction and Revising the Mechanism Stops to improve reliability and rigging. ECP TBD: Ice Protection Provides new heater blankets without the associated fairings as a stand alone number to lessen the damage to the fairings associated with blades 08: Ice Protection: Central De-ice Distributor/Master Ice Protection Control Unit/Nacelle Ice Protection Control Unit Block B CPD states the V22 is required to be able to operate in moderate icing conditions without adaptive kits. Funding will field kits and installation of the ice protection systems in 3 aircraft. This modification is necessary to ensure that training squadrons have the icing system functionality to support training requirements for squadron deployment in support of. ECP-TBD: Cargo Winch System Redesign ECP-TBD: Slim Multifunction Display (MFD) or flight displays in cockpit, thirty lb. weight savings, less cooling and power requirements, significant obsolescence avoided, greater pilot display capabilities. ECP-888: Inlet Guide Vane & Upstream Regulation provides for proper engine air and Hydraulic System 3 flow to operate the EAPS Scavenge Blowers. This will eliminate blower overspeeds and hydraulic system pressure spikes that have led to hydraulic system fires. It will also provide greater EAPS system availability and scavenge flow resulting in improved engine time-on-wing and blower reliability. Blue Force Tracker (BFT) II Block C Retrofit Kits Provides capability to communicate via established BFT network; providing aircraft current position and status to network subscribers (Joint Force Members) and to view other subscribers position and current status on graphic display. Incorporation will reduce fratricide risk and improve operational coordination. BFT II Block B Retrofit Kits Provides capability to communicate via established BFT network; providing aircraft current position and status to network subscribers (Joint Force Members) and to view other subscribers position and current status on graphic display. Incorporation will reduce fratricide risk and improve operational coordination Overseas Contingency Operations () 12 ECP-844: Interim Defense Weapon System (IDWS): : Capability improvements to IDWS. Employment of IDWS has resulted in identification of necessary modifications to improve effectiveness, lethality, and interoperability of the system. This modification provides necessary capability improvements identified during operational use and interim contract support. ECP-TBD: V-22 Integrated Aircraft Survivability Equipment (IASE) will correct deficiencies of the current RADAR warning system, replace the existing Missile Warning System, implement an active Infra-red countermeasure system, upgrade current countermeasures dispenser and provide integrated threat information on current aircraft main flight displays. Day Heads Up Display - improves ability to land safely in environments where visibility is reduced. Cabin Situational Awareness Device (CSAD)- improve situational awareness and enable the capability to send an analog video signal from the CSAD to Blue Force Tracker. Main Landing Gear Fire Suppression - increase the survivability by reducing the landing gear bay vulnerability by making that area more tolerant of battle damage, specifically fires. Data Transfer System (DTS): Replacement for the current data transfer unit (ASQ-215) system which is obsolete. The DTS is being developed to facilitate legacy as well as future aircraft data processing and transfer. Enhanced Crash Survivable Memory Unit (Cockpit Voice Recorder): protect aircraft flight information and facilitate post-mishap investigations, a crash-survivable recorder capable of recording a/c parametric data and aircrew voice communications. HMX-1 VIP Kits: The kits would include the jump seat covers/cushions, cargo area and ramp carpeting, pad eye covers, associated aircraft installation hardware and storage / transportation containers. MV-22B Block C VIP Seat Covers/Carpet kits in accordance with Deputy Commandant for Aviation requirements letter dated 02 April Navy Page 4 of 54 P-1 Line #62 Volume

5 1 / MV-22 Correction of Defiencies and Pre Block A Through C (OSIP ) FLIR ELAP: Upgrade to the Forward Looking Infrared (FLIR) System Electronics Unit (SEU) with an Enhanced Local Area Processing (ELAP) card to improve visibility for the pilot FLIR SEU: Procurement of System Electronics Units (SEU's) for MV-22 aircraft being modified from Block A to Block B configuration. The SEU provides digital signal processing of the image obtained via the FLIR optics in the Turret FLIR unit, and passes the image data to the MV-22 mission computer. TCAS: Procurement of kits and installations of the Honeywell MILACAS-XR Traffic Collision Avoidance System (TCAS) into MCOI-equipped MV-22 Block B and C aircraft. MILACAS-XR is identical to the TCAS system already in use aboard the CV-22, and will advise MV-22 pilots of other air traffic in proximity to the MV-22, as well as resolution advisories of what course to fly to avoid colliding with the threat aircraft. FUTURE ECPs: BLOCK B, and BLOCK C: Major configuration changes are associated with the aircraft Propulsion/Drive, Electrical, Avionics, Hydraulics, Structure/Airframe, Fuel, Software, and Environmental Control System. Specifically included are Nacelle changes, Avionics, Blade Fold Harness, Fuel Probe, Active Vibration Suppression System, Constant Frequency Generator and Variable Frequency Generator. Additional configuration changes include Effectiveness and Suitability and Enhanced Capability. ECPs for Reliability & Maintainability changes, Ice Protection and Clam Shell Doors) are configuration items associated with production Block B and Block C changes. Aircraft Retrofits are implemented to coincide with resources and aircraft availability, stand-alone retrofit ECPs are generated. These Retrofit ECPs are the implementation of the approved production Block Configuration changes. ECP: Aircraft Maintenance Trainer (AMT) #4, Improves training and pilot proficiency by incorporating modifications to the AMT #4 to reflect most current Block aircraft configuration. ECP: Full Fidelity Simulator (FFS) UPGRADES: Improves training and pilot proficiency by incorporating modifications to the FFS #1-4 to reflect most current aircraft configuration as directed by Blue Ribbon Panel. ECP: Flight Training Devices (FTD) UPGRADES: Improves training and pilot proficiency by incorporating modifications to the FTD #1-14 to reflect most current aircraft configuration as directed by Blue Ribbon Panel. FY15 New Starts include: BFT II BlK C MTX Kits, Cabin Situational Awareness Device, FLIR ELAP and FLIR SEU Note: Prior Year IDWS (Cost Element ) funding provided to modify the 32 existing IDWS Kits. No additional kits were procured. Navy Page 5 of 54 P-1 Line #62 Volume

6 Models of Systems Affected: V-22 Series Procurement Financial Plan Modification Item 1 of 1: MV-22 Correction of Defiencies and Pre Block A Through C (OSIP ) A Kits Recurring Modification Type: Safety, Reliability, Increased Service Life, Improved Mission Capability 1 / MV-22 Correction of Defiencies and Pre Block A Through C (OSIP ) Related RDT&E PEs: N FY 2016 FY 2017 FY 2018 FY ) BFT II Block C - Organic - / - 11 / / / - - / - - / - - / - - / - - / - - / - - / - 24 / ) BFT II Block C MTX Kits - Organic - / - - / - - / - 48 / / - 48 / / / - - / - - / - - / - 66 / (1) 1.1.3) Block A to B - NonOrganic 14 / / / / / - 4 / / / - - / - - / - - / - 27 / ) Block A to B GFE - Organic 14 / / / / / - 4 / / / - - / - - / - - / - 27 / ) Cargo Winch System Redesign - NonOrganic - / - 14 / / - - / - - / - - / - - / - - / - - / - - / - - / - 14 / ) Cabin Situational Awareness Device - Organic - / - - / - - / - 14 / / - 14 / / / - - / - - / - - / - 18 / ) Data Transfer System - Organic - / - - / / / / - 8 / / - - / - - / - - / - - / / ) Day Heads Up Display - Organic 334 / / / / - - / - - / - - / - - / - - / - - / - - / / ) Engine Air Particle Separator - NonOrganic 70 / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 70 / ) Enhanced Crash Survivable Memory Unit (Cockpit Voice Recorder) - NonOrganic - / - 48 / / / / - 32 / / / / / / / ) FLIR ELAP - NonOrganic - / - - / - - / - 20 / / - 20 / / / / - - / - - / / ) FLIR Firmware Improvements - Organic 29 / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 29 / ) FLIR SEU - Organic - / - - / - - / - 11 / / - 11 / / / - - / - - / - - / - 15 / ) Gen 5 Radio ARC Organic - / - - / - - / - - / - - / - - / - - / - 10 / / / - - / - 70 / ) HMX-1 VIP Kits - Organic - / - 12 / / - - / - - / - - / - - / - - / - - / - - / - - / - 12 / ) Ice Protection Blk B Heater Blades - Organic 143 / / - - / - - / - - / - - / - - / - - / - - / - - / - - / / ) IGV & Hyd Flow Reg - NonOrganic 186 / / - 3 / / / - 42 / / - - / - - / - - / - - / / ) Interim CDD - NonOrganic 152 / / - - / - - / - - / - - / - - / - - / - - / - - / - - / / ) Interim Defense Weapon System - Organic 32 / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 32 / ) Interim Defense Weapon System ECP - Organic - / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / ) Interim Defense Weapon System GFE - Organic 12 / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 12 / (2) ) IR Suppressor - NonOrganic 68 / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 68 / ) K-Voice and Data Recorder (VADR) - Organic 58 / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 58 / ) KVADR GFE - Organic 72 / / / / / - 39 / / / - - / - - / - - / / (3) ) Main Landing Fire Suppression - NonOrganic 204 / / - - / - 37 / / - 37 / / - - / - - / - - / - - / / Navy Page 6 of 54 P-1 Line #62 Volume

7 Models of Systems Affected: V-22 Series Financial Plan ) Main Landing Fire Suppression Organic - Organic Modification Type: Safety, Reliability, Increased Service Life, Improved Mission Capability 1 / MV-22 Correction of Defiencies and Pre Block A Through C (OSIP ) Related RDT&E PEs: N FY 2016 FY 2017 FY 2018 FY / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 78 / ) Nose Landing Gear - NonOrganic 142 / / / - - / - - / - - / - - / - - / - - / - - / - - / / (4) ) Readiness IPS CDD - NonOrganic 92 / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 92 / ) Readiness IPS MIPC - NonOrganic 44 / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 44 / ) Readiness Seven Wiring Harness - NonOrganic ) Readiness 13 Wiring Harness - NonOrganic ) Readiness Seven Wiring Harness Organic - Organic 43 / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 43 / / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 51 / / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 44 / ) Ramp Mounted Weapon System - Organic 112 / / / / - - / - - / - - / - - / - - / - - / - - / / ) Rapid Ground Refueling - NonOrganic 148 / / - - / - - / - - / - - / - - / - - / - - / - - / - - / / ) Slim MFD - NonOrganic - / - - / - 23 / / / - 15 / / / - - / - - / - - / - 52 / ) Traffic Collision Avoidance System (TCAS) - NonOrganic ) V-22 Integrated Aircraft Survivability Equipment - NonOrganic - / - - / - - / - - / - - / - - / - 15 / / / / / / / - - / - - / - 30 / / - 30 / / / / / / / ) Archived ECPs - Organic 1,671 / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 1,671 / ) Archived ECPs PY Install - Organic 3,567 / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 3,567 / Subtotal: Recurring - / / / / / - - / / / / / / / Non-Recurring 1.2.1) Installation Kits N/R - Organic - / / / / / - - / / / / - - / - - / - - / Subtotal: Non-Recurring - / / / / / - - / / / / - - / - - / - - / B Kits Recurring 2.1.1) Archived B Kits - Organic 72 / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 72 / ) Archived B Kits PY Install - Organic 12 / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 12 / Subtotal: Recurring - / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / Non-Recurring 2.2.1) Installation Equipment N/R - Organic - / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / Subtotal: Non-Recurring - / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / Subtotal: MV-22 Correction of Defiencies and Pre Block A Through C (OSIP ) 7,464 / / / / / / / / / / / ,509 / Navy Page 7 of 54 P-1 Line #62 Volume

8 Models of Systems Affected: V-22 Series Financial Plan Modification Type: Safety, Reliability, Increased Service Life, Improved Mission Capability 1 / MV-22 Correction of Defiencies and Pre Block A Through C (OSIP ) Related RDT&E PEs: N FY 2016 FY 2017 FY 2018 FY 2019 Subtotal: Procurement, All Modification Items - / / / / / - - / / / / / / / Support (All Modification Items) 3.1) Engineering Change Orders - / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 3.2) Data - / / / - - / - - / - - / - - / - - / - - / - - / - - / - - / (5) 3.3) Training Equipment 7 / / / / / - - / / / / / / / ) PY Installs - / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / ) Support Equipment - / / / / / - - / / / / / - - / - - / (6) 3.6) ILS - / / - - / - - / / - - / / / / / / / ) Other Support - / / / / / - - / / / / / / / (7) 3.8) Interim Contractor Support - / - - / - - / - - / / - - / / / / / / - - / Subtotal: Support - / / / / / - - / / / / / / / Installation Modification Item 1 of 1: MV-22 Correction of Defiencies and Pre Block A Through C (OSIP ) - / / / / / - - / / / / / / / Subtotal: Installation - / / / / / - - / / / / / / / Cost (Procurement + Support + Installation) , Navy Page 8 of 54 P-1 Line #62 Volume

9 Modification Item 1 of 1: MV-22 Correction of Defiencies and Pre Block A Through C (OSIP ) Manufacturer Information Manufacturer Name: Block A to B Administrative Leadtime (in Months): 3 Production Leadtime (in Months): 21 1 / MV-22 Correction of Defiencies and Pre Block A Through C (OSIP ) Dates FY 2013 FY 2014 FY 2016 FY 2017 FY 2018 FY 2019 Contract Dates Dec 2012 Dec 2013 Dec 2014 Dec 2015 Delivery Dates Sep 2014 Sep 2015 Sep 2016 Sep 2017 Manufacturer Name: Cargo Winch System Redesign Administrative Leadtime (in Months): 11 Production Leadtime (in Months): 2 Dates FY 2013 FY 2014 FY 2016 FY 2017 FY 2018 FY 2019 Contract Dates Sep 2013 Delivery Dates Nov 2013 Manufacturer Name: Engine Air Particle Separator Administrative Leadtime (in Months): 4 Production Leadtime (in Months): 8 Contract Dates Delivery Dates Dates FY 2013 FY 2014 FY 2016 FY 2017 FY 2018 FY 2019 Manufacturer Name: Enhanced Crash Survivable Memory Unit Administrative Leadtime (in Months): 13 Production Leadtime (in Months): 12 Dates FY 2013 FY 2014 FY 2016 FY 2017 FY 2018 FY 2019 Contract Dates Nov 2013 Nov 2014 Nov 2015 Nov 2016 Nov 2017 Nov 2018 Nov 2019 Delivery Dates Oct 2014 Oct 2015 Oct 2016 Oct 2017 Oct 2018 Oct 2019 Oct 2020 Manufacturer Name: FLIR ELAP Administrative Leadtime (in Months): 3 Production Leadtime (in Months): 10 Dates FY 2013 FY 2014 FY 2016 FY 2017 FY 2018 FY 2019 Contract Dates Dec 2014 Dec 2015 Dec 2016 Delivery Dates Oct 2015 Oct 2016 Oct 2017 Manufacturer Name: IGV & Hyd Flow Reg Administrative Leadtime (in Months): 4 Production Leadtime (in Months): 3 Dates FY 2013 FY 2014 FY 2016 FY 2017 FY 2018 FY 2019 Contract Dates Jan 2014 Jan 2015 Navy Page 9 of 54 P-1 Line #62 Volume

10 Modification Item 1 of 1: MV-22 Correction of Defiencies and Pre Block A Through C (OSIP ) Manufacturer Information 1 / MV-22 Correction of Defiencies and Pre Block A Through C (OSIP ) Dates FY 2013 FY 2014 FY 2016 FY 2017 FY 2018 FY 2019 Delivery Dates Apr 2014 Apr 2015 Manufacturer Name: Interim CDD Administrative Leadtime (in Months): 2 Production Leadtime (in Months): 10 Contract Dates Delivery Dates Dates FY 2013 FY 2014 FY 2016 FY 2017 FY 2018 FY 2019 Manufacturer Name: IR Suppressor Administrative Leadtime (in Months): 3 Production Leadtime (in Months): 21 Contract Dates Delivery Dates Dates FY 2013 FY 2014 FY 2016 FY 2017 FY 2018 FY 2019 Manufacturer Name: V-22 Integrated Aircraft Survivability Equipment Administrative Leadtime (in Months): 10 Production Leadtime (in Months): 13 Dates FY 2013 FY 2014 FY 2016 FY 2017 FY 2018 FY 2019 Contract Dates Aug 2015 Aug 2016 Aug 2017 Aug 2018 Aug 2019 Delivery Dates Oct 2017 Oct 2018 Oct 2019 Oct 2020 Oct 2021 Manufacturer Name: Main Landing Fire Suppression Administrative Leadtime (in Months): 5 Production Leadtime (in Months): 19 Dates FY 2013 FY 2014 FY 2016 FY 2017 FY 2018 FY 2019 Contract Dates Feb 2015 Delivery Dates Oct 2016 Manufacturer Name: Nose landing gear Administrative Leadtime (in Months): 3 Production Leadtime (in Months): 4 Dates FY 2013 FY 2014 FY 2016 FY 2017 FY 2018 FY 2019 Contract Dates Dec 2012 Delivery Dates Apr 2013 Manufacturer Name: Readiness Administrative Leadtime (in Months): 11 Production Leadtime (in Months): 16 Navy Page 10 of 54 P-1 Line #62 Volume

11 Modification Item 1 of 1: MV-22 Correction of Defiencies and Pre Block A Through C (OSIP ) Manufacturer Information Contract Dates Delivery Dates 1 / MV-22 Correction of Defiencies and Pre Block A Through C (OSIP ) Dates FY 2013 FY 2014 FY 2016 FY 2017 FY 2018 FY 2019 Manufacturer Name: Rapid Ground Refueling Administrative Leadtime (in Months): 12 Production Leadtime (in Months): 12 Contract Dates Delivery Dates Dates FY 2013 FY 2014 FY 2016 FY 2017 FY 2018 FY 2019 Manufacturer Name: SLIM MFD Administrative Leadtime (in Months): 9 Production Leadtime (in Months): 4 Dates FY 2013 FY 2014 FY 2016 FY 2017 FY 2018 FY 2019 Contract Dates Jun 2014 Jun 2015 Jun 2016 Delivery Dates Oct 2014 Oct 2015 Oct 2016 Manufacturer Name: TCAS Administrative Leadtime (in Months): 8 Production Leadtime (in Months): 5 Dates FY 2013 FY 2014 FY 2016 FY 2017 FY 2018 FY 2019 Contract Dates May 2016 May 2017 May 2018 May 2019 Delivery Dates Oct 2016 Oct 2017 Oct 2018 Oct 2019 Method of Implementation: Contractor Drive-In Mod : Installation Name: Block A to B FY 2016 FY 2017 FY 2018 FY 2019 Prior Years 9 / / / / - - / - - / - - / - - / - - / - - / - - / - 14 / FY / - - / - 1 / / / - 2 / / - - / - - / - - / - - / - 3 / FY / - - / - - / - 2 / / - 2 / / / - - / - - / - - / - 4 / / - - / - - / - - / - - / - - / - 2 / / / - - / - - / - 4 / FY / - - / - - / - - / - - / - - / - - / - 2 / / - - / - - / - 2 / FY / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - Navy Page 11 of 54 P-1 Line #62 Volume

12 Modification Item 1 of 1: MV-22 Correction of Defiencies and Pre Block A Through C (OSIP ) Method of Implementation: Contractor Drive-In Mod : Installation Name: Block A to B FY 2016 FY 2017 FY 2018 FY / MV-22 Correction of Defiencies and Pre Block A Through C (OSIP ) FY / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 9 / / / / / - 4 / / / / - - / - - / - 27 / FY 2013 FY 2014 FY 2016 FY 2017 FY 2018 FY 2019 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC t In Out Method of Implementation: Contractor Drive-In Modification : Installation Name: Cargo Winch System Redesign FY 2016 FY 2017 FY 2018 FY 2019 Prior Years - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY / - - / - 14 / / - - / - - / - - / - - / - - / - - / - - / - 14 / FY / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 14 / / - - / - - / - - / - - / - - / - - / - - / - 14 / Navy Page 12 of 54 P-1 Line #62 Volume

13 Modification Item 1 of 1: MV-22 Correction of Defiencies and Pre Block A Through C (OSIP ) Method of Implementation: Contractor Drive-In Modification : Installation Name: Cargo Winch System Redesign 1 / MV-22 Correction of Defiencies and Pre Block A Through C (OSIP ) FY 2013 FY 2014 FY 2016 FY 2017 FY 2018 FY 2019 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC t In Out Method of Implementation: Contractor Forced Retrofit of Components : Installation Name: Engine Air Particle Separator FY 2016 FY 2017 FY 2018 FY 2019 Prior Years 32 / / / - - / - - / - - / - - / - - / - - / - - / - - / - 70 / FY / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 32 / / / - - / - - / - - / - - / - - / - - / - - / - - / - 70 / FY 2013 FY 2014 FY 2016 FY 2017 FY 2018 FY 2019 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC t In Out Navy Page 13 of 54 P-1 Line #62 Volume

14 Modification Item 1 of 1: MV-22 Correction of Defiencies and Pre Block A Through C (OSIP ) Method of Implementation: Contractor Forced Retrofit of Components : Installation Name: Enhanced Crash Survivable Memory Unit FY 2016 FY 2017 FY 2018 FY / MV-22 Correction of Defiencies and Pre Block A Through C (OSIP ) Prior Years - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY / - - / - - / - 48 / / - 48 / / - - / - - / - - / - - / - 48 / FY / - - / - - / - - / - - / - - / - 48 / / - - / - - / - - / - 48 / / - - / - - / - - / - - / - - / - - / - 32 / / - - / - - / - 32 / FY / - - / - - / - - / - - / - - / - - / - - / - 32 / / - - / - 32 / FY / - - / - - / - - / - - / - - / - - / - - / - - / - 32 / / - 32 / FY / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 32 / / FY / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 32 / / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 58 / / / - - / - - / - 48 / / - 48 / / / / / / / FY 2013 FY 2014 FY 2016 FY 2017 FY 2018 FY 2019 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC t In Out Method of Implementation: Contractor Field Modification : Installation Name: FLIR ELAP FY 2016 FY 2017 FY 2018 FY 2019 Prior Years - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 20 / / - - / - - / - - / - 20 / FY / - - / - - / - - / - - / - - / - - / - 50 / / - - / - - / - 50 / FY / - - / - - / - - / - - / - - / - - / - - / - 55 / / - - / - 55 / FY / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - Navy Page 14 of 54 P-1 Line #62 Volume

15 Modification Item 1 of 1: MV-22 Correction of Defiencies and Pre Block A Through C (OSIP ) Method of Implementation: Contractor Field Modification : Installation Name: FLIR ELAP FY 2016 FY 2017 FY 2018 FY / MV-22 Correction of Defiencies and Pre Block A Through C (OSIP ) - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 20 / / / / - - / / FY 2013 FY 2014 FY 2016 FY 2017 FY 2018 FY 2019 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC t In Out Method of Implementation: Contractor Forced Retrofit of Components : Installation Name: IGV & Hyd Flow Reg FY 2016 FY 2017 FY 2018 FY 2019 Prior Years 76 / / / / - - / - - / - - / - - / - - / - - / - - / / FY / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY / - - / - 3 / / - - / - - / - - / - - / - - / - - / - - / - 3 / / - - / - - / - 42 / / - 42 / / - - / - - / - - / - - / - 42 / FY / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 76 / / / / / - 42 / / - - / - - / - - / - - / / Navy Page 15 of 54 P-1 Line #62 Volume

16 Modification Item 1 of 1: MV-22 Correction of Defiencies and Pre Block A Through C (OSIP ) Method of Implementation: Contractor Forced Retrofit of Components : Installation Name: IGV & Hyd Flow Reg 1 / MV-22 Correction of Defiencies and Pre Block A Through C (OSIP ) FY 2013 FY 2014 FY 2016 FY 2017 FY 2018 FY 2019 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC t In Out Method of Implementation: Contractor Forced Retrofit of Components : Installation Name: Interim CDD FY 2016 FY 2017 FY 2018 FY 2019 Prior Years 52 / / / - - / - - / - - / - - / - - / - - / - - / - - / / FY / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 52 / / / - - / - - / - - / - - / - - / - - / - - / - - / / FY 2013 FY 2014 FY 2016 FY 2017 FY 2018 FY 2019 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC t In Out Navy Page 16 of 54 P-1 Line #62 Volume

17 Modification Item 1 of 1: MV-22 Correction of Defiencies and Pre Block A Through C (OSIP ) Method of Implementation: Contractor Forced Retrofit of Components : Installation Name: IR Suppressor FY 2016 FY 2017 FY 2018 FY / MV-22 Correction of Defiencies and Pre Block A Through C (OSIP ) Prior Years 43 / / / / / / / / - - / - - / - - / - 68 / FY / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 43 / / / / / - 8 / / / - - / - - / - - / - 68 / FY 2013 FY 2014 FY 2016 FY 2017 FY 2018 FY 2019 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC t In Out Method of Implementation: Navy Field Modification : Installation Name: Main Landing Fire Suppression FY 2016 FY 2017 FY 2018 FY 2019 Prior Years 76 / / - 72 / / - - / - - / - 48 / / / - - / - - / / FY / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 37 / / - - / - - / - 37 / FY / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - Navy Page 17 of 54 P-1 Line #62 Volume

18 Modification Item 1 of 1: MV-22 Correction of Defiencies and Pre Block A Through C (OSIP ) Method of Implementation: Navy Field Modification : Installation Name: Main Landing Fire Suppression FY 2016 FY 2017 FY 2018 FY / MV-22 Correction of Defiencies and Pre Block A Through C (OSIP ) - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 76 / / - 72 / / - - / - - / - 48 / / / - - / - - / / FY 2013 FY 2014 FY 2016 FY 2017 FY 2018 FY 2019 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC t In Out Method of Implementation: Contractor Drive-In Modification : Installation Name: Nose Landing Gear FY 2016 FY 2017 FY 2018 FY 2019 Prior Years 94 / / / - - / - - / - - / - - / - - / - - / - - / - - / / FY / - 48 / / - - / - - / - - / - - / - - / - - / - - / - - / - 48 / FY / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 94 / / / - - / - - / - - / - - / - - / - - / - - / - - / / Navy Page 18 of 54 P-1 Line #62 Volume

19 Modification Item 1 of 1: MV-22 Correction of Defiencies and Pre Block A Through C (OSIP ) Method of Implementation: Contractor Drive-In Modification : Installation Name: Nose Landing Gear 1 / MV-22 Correction of Defiencies and Pre Block A Through C (OSIP ) FY 2013 FY 2014 FY 2016 FY 2017 FY 2018 FY 2019 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC t In Out Method of Implementation: Contractor Drive-in Mod : Installation Name: Readiness FY 2016 FY 2017 FY 2018 FY 2019 Prior Years 101 / / / - - / - - / - - / - - / - - / - - / - - / - - / / FY / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / / / / - - / - - / - - / - - / - - / - - / - - / - - / / FY 2013 FY 2014 FY 2016 FY 2017 FY 2018 FY 2019 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC t In Out Navy Page 19 of 54 P-1 Line #62 Volume

UNCLASSIFIED. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018

UNCLASSIFIED. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018 Exhibit P-40, Budget Item Justification Sheet: PB 2014 Navy Date: April 2013 Aircraft / BSA 1: Modification Of Aircraft ID Code (A=Service Ready, B=Not Service Ready) : A Program Elements for Code B Items:

More information

UNCLASSIFIED FY 2016 OCO. FY 2016 Base. FY 2016 Base FY 2016 OCO

UNCLASSIFIED FY 2016 OCO. FY 2016 Base. FY 2016 Base FY 2016 OCO Exhibit P-40, Budget Line Item Justification: PB 2016 Army Date: February 2015 2033A: Procurement of W&TCV, Army / BA 01: Tracked Combat Vehicles / BSA 20: Modification of Tracked Combat Vehicles ID Code

More information

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 24 P-1 Line #55

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 24 P-1 Line #55 Exhibit P-40, Budget Line Item Justification: PB 2016 Navy Date: February 2015 1506N: Aircraft Procurement, Navy / BA 05: Modification of Aircraft / BSA 1: Modification of Aircraft ID Code (A=Service Ready,

More information

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 16 P-1 Line #57

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 16 P-1 Line #57 Exhibit P-40, Budget Line Item Justification: PB 2017 Navy Date: February 2016 1506N: Aircraft Procurement, Navy / BA 05: Modification of Aircraft / BSA 1: Modification of Aircraft ID Code (A=Service Ready,

More information

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 5 P-1 Line #35

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 5 P-1 Line #35 Exhibit P-40, Budget Line Item Justification: PB 2017 Air Force Date: February 2016 3010F: Aircraft Procurement, Air Force / BA 05: Modification of Inservice Aircraft / BSA 4: Trainer Aircraft ID Code

More information

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

UNCLASSIFIED FY 2016 OCO. FY 2016 Base Exhibit P-40, Budget Line Item Justification: PB 2016 Air Force Date: February 2015 3010F: Aircraft Procurement, Air Force / BA 05: Modification of Inservice Aircraft / BSA 5: Other Aircraft ID Code (A=Service

More information

UNCLASSIFIED. FY 2017 Base FY 2017 OCO FY 2017 OCO. FY 2017 Base

UNCLASSIFIED. FY 2017 Base FY 2017 OCO FY 2017 OCO. FY 2017 Base Exhibit P-40, Budget Line Item Justification: PB 2017 Air Force Date: February 2016 3010F: Aircraft Procurement, Air Force / BA 05: Modification of Inservice Aircraft / BSA 2: Tactical Aircraft ID Code

More information

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 10 P-1 Line #47

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 10 P-1 Line #47 Exhibit P-40, Budget Line Item Justification: PB 2016 Air Force Date: February 2015 3010F: Aircraft Procurement, Air Force / BA 05: Modification of Inservice Aircraft / BSA 5: Other Aircraft ID Code (A=Service

More information

UNCLASSIFIED. UNCLASSIFIED United States Special Operations Command Page 1 of 6 P-1 Line #53

UNCLASSIFIED. UNCLASSIFIED United States Special Operations Command Page 1 of 6 P-1 Line #53 Exhibit P-40, Budget Line Item Justification: PB 2017 United States Special Operations Command : February 2016 0300D: Procurement, Defense-Wide / BA 02: Special Operations Command / BSA 1: Aviation Programs

More information

UNCLASSIFIED FY Exhibits Schedule Prior Years FY 2013 FY 2014 FY 2015 Base FY 2015 OCO FY 2015 Total. Total Cost ($ M)

UNCLASSIFIED FY Exhibits Schedule Prior Years FY 2013 FY 2014 FY 2015 Base FY 2015 OCO FY 2015 Total. Total Cost ($ M) Exhibit P-40, Budget Line Item Justification: PB 2015 Army Date: March 2014 2033A: Procurement of W&TCV, Army / BA 01: Tracked Combat Vehicles / BSA 20: Modification of Tracked Combat Vehicles ID Code

More information

UNCLASSIFIED FY 2015 FY 2015 OCO. FY 2015 Base FY 2015 FY Base

UNCLASSIFIED FY 2015 FY 2015 OCO. FY 2015 Base FY 2015 FY Base Exhibit P-40, Budget Line Item Justification: PB 2015 Air Force Date: March 2014 3010F: Aircraft Procurement, Air Force / BA 05: Modification of Inservice Aircraft / BSA 5: Other Aircraft ID Code (A=Service

More information

UNCLASSIFIED. FY 2016 Base FY 2016 OCO FY 2016 OCO. FY 2016 Base

UNCLASSIFIED. FY 2016 Base FY 2016 OCO FY 2016 OCO. FY 2016 Base Exhibit P-40, Budget Line Item Justification: PB 2016 Army Date: February 2015 2031A: Aircraft Procurement, Army / BA 02: Modification of Aircraft / BSA 10: Modification of Aircraft ID Code (A=Service

More information

UNCLASSIFIED. FY 2017 Base FY 2017 OCO FY 2017 OCO. FY 2017 Base

UNCLASSIFIED. FY 2017 Base FY 2017 OCO FY 2017 OCO. FY 2017 Base Exhibit P-40, Budget Line Item Justification: PB 2017 Air Force Date: February 2016 3010F: Aircraft Procurement, Air Force / BA 05: Modification of Inservice Aircraft / BSA 2: Tactical Aircraft ID Code

More information

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 18 P-1 Line #12

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 18 P-1 Line #12 Exhibit P-40, Budget Line Item Justification: PB 2017 Navy Date: February 2016 1810N: Other Procurement, Navy / BA 01: Ships Support Equipment / BSA 9: Other Shipboard Equipment ID Code (A=Service Ready,

More information

UNCLASSIFIED. FY 2017 Base FY 2017 OCO

UNCLASSIFIED. FY 2017 Base FY 2017 OCO Exhibit P-40, Budget Line Item Justification: PB 2017 Air Force Date: February 2016 3010F: Aircraft Procurement, Air Force / BA 05: Modification of Inservice Aircraft / BSA 5: Other Aircraft ID Code (A=Service

More information

UNCLASSIFIED. UNCLASSIFIED Army Page 1 of 23 P-1 Line #27

UNCLASSIFIED. UNCLASSIFIED Army Page 1 of 23 P-1 Line #27 Exhibit P-40, Budget Line Item Justification: PB 2015 Army Date: March 2014 2031A: Aircraft Procurement, Army / BA 02: Modification of Aircraft / BSA 10: Modification of Aircraft ID Code (A=Service Ready,

More information

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

UNCLASSIFIED FY 2016 OCO. FY 2016 Base Exhibit P-40, Budget Line Item Justification: PB 2016 Air Force Date: February 2015 3010F: Aircraft Procurement, Air Force / BA 05: Modification of Inservice Aircraft / BSA 5: Other Aircraft ID Code (A=Service

More information

UNCLASSIFIED. FY 2017 Base FY 2017 OCO. FY 2017 Base FY 2017 OCO

UNCLASSIFIED. FY 2017 Base FY 2017 OCO. FY 2017 Base FY 2017 OCO Exhibit P-40, Budget Line Item Justification: PB 2017 Air Force Date: February 2016 3010F: Aircraft Procurement, Air Force / BA 05: Modification of Inservice Aircraft / BSA 3: Airlift Aircraft ID Code

More information

UNCLASSIFIED. FY 2016 Base FY 2016 OCO FY 2016 OCO. FY 2016 Base

UNCLASSIFIED. FY 2016 Base FY 2016 OCO FY 2016 OCO. FY 2016 Base Exhibit P-40, Budget Line Item Justification: PB 2016 Air Force Date: February 2015 3010F: Aircraft Procurement, Air Force / BA 05: Modification of Inservice Aircraft / BSA 2: Tactical Aircraft ID Code

More information

UNCLASSIFIED FY Exhibits Schedule Prior Years FY 2013 FY 2014 FY 2015 Base FY 2015 OCO FY 2015 Total. Total Cost ($ M) Unit Cost ($) Qty (Each)

UNCLASSIFIED FY Exhibits Schedule Prior Years FY 2013 FY 2014 FY 2015 Base FY 2015 OCO FY 2015 Total. Total Cost ($ M) Unit Cost ($) Qty (Each) Exhibit P-40, Budget Line Item Justification: PB 2015 Navy Date: March 2014 1506N: Aircraft Procurement, Navy / BA 05: Modification of Aircraft / BSA 1: Modification of Aircraft ID Code (A=Service Ready,

More information

UNCLASSIFIED. FY 2017 Base FY 2017 OCO FY 2017 OCO. FY 2017 Base

UNCLASSIFIED. FY 2017 Base FY 2017 OCO FY 2017 OCO. FY 2017 Base Exhibit P-40, Budget Line Item Justification: PB 2017 Army Date: February 2016 2033A: Procurement of W&TCV, Army / BA 01: Tracked Combat Vehicles / BSA 20: Modification of Tracked Combat Vehicles ID Code

More information

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 21 P-1 Line #19

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 21 P-1 Line #19 Exhibit P-40, Budget Line Item Justification: PB 2017 Navy Date: February 2016 1810N: Other Procurement, Navy / BA 01: Ships Support Equipment / BSA 9: Other Shipboard Equipment ID Code (A=Service Ready,

More information

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 17 P-1 Line #121

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 17 P-1 Line #121 Exhibit P-40, Budget Line Item Justification: PB 2015 Navy Date: March 2014 1810N: Other Procurement, Navy / BA 04: Ordnance Support Equipment / BSA 3: Ship Missile Systems Equipment ID Code (A=Service

More information

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 31 P-1 Line #41

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 31 P-1 Line #41 Exhibit P-40, Budget Line Item Justification: PB 2017 Navy Date: February 2016 1810N: Other Procurement, Navy / BA 01: Ships Support Equipment / BSA 16: Logistic Support ID Code (A=Service Ready, B=Not

More information

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 5 P-1 Line #55

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 5 P-1 Line #55 Exhibit P-40, Budget Line Item Justification: PB 2016 Air Force Date: February 2015 3010F: Aircraft Procurement, Air Force / BA 05: Modification of Inservice Aircraft / BSA 5: Other Aircraft ID Code (A=Service

More information

UNCLASSIFIED FY 2017 OCO. FY 2017 Base

UNCLASSIFIED FY 2017 OCO. FY 2017 Base Exhibit P-40, Budget Line Item Justification: PB 2017 Air Force Date: February 2016 3021F: Space Procurement, Air Force / BA 01: Space Procurement, Air Force / BSA 1: Space Programs ID Code (A=Service

More information

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 18 P-1 Line #56

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 18 P-1 Line #56 Exhibit P-40, Budget Line Item Justification: PB 2016 Air Force Date: February 2015 3010F: Aircraft Procurement, Air Force / BA 05: Modification of Inservice Aircraft / BSA 5: Other Aircraft ID Code (A=Service

More information

UNCLASSIFIED. FY 2017 Base FY 2017 OCO FY 2017 OCO. FY 2017 Base

UNCLASSIFIED. FY 2017 Base FY 2017 OCO FY 2017 OCO. FY 2017 Base Exhibit P-40, Budget Line Item Justification: PB 2017 Air Force Date: February 2016 3010F: Aircraft Procurement, Air Force / BA 05: Modification of Inservice Aircraft / BSA 5: Other Aircraft ID Code (A=Service

More information

UNCLASSIFIED FY 2015 FY 2015 OCO. FY 2015 Base FY 2015 FY Base

UNCLASSIFIED FY 2015 FY 2015 OCO. FY 2015 Base FY 2015 FY Base Exhibit P-40, Budget Line Item Justification: PB 2015 Army Date: March 2014 2031A: Aircraft Procurement, Army / BA 02: Modification of Aircraft / BSA 10: Modification of Aircraft ID Code (A=Service Ready,

More information

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 5 P-1 Line #21

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 5 P-1 Line #21 Exhibit P-40, Budget Line Item Justification: PB 2015 Navy Date: March 2014 1507N: Weapons Procurement, Navy / BA 03: Torpedoes and Related Equipment / BSA 1: Torpedoes and Related Equip ID Code (A=Service

More information

UNCLASSIFIED. FY 2014 Base. OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018

UNCLASSIFIED. FY 2014 Base. OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018 Exhibit P-40, Budget Item Justification Sheet: PB 2014 Air Force Date: April 2013 Inservice Missiles / BSA 1: Class IV ID Code (A=Service Ready, B=Not Service Ready) : A Program Elements for Code B Items:

More information

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 17 P-1 Line #55

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 17 P-1 Line #55 Exhibit P-40, Budget Line Item Justification: PB 2017 Air Force Date: February 2016 3010F: Aircraft Procurement, Air Force / BA 05: Modification of Inservice Aircraft / BSA 5: Other Aircraft ID Code (A=Service

More information

UNCLASSIFIED. FY 2017 Base FY 2017 OCO

UNCLASSIFIED. FY 2017 Base FY 2017 OCO Exhibit P-40, Budget Line Item Justification: PB 2017 Navy Date: February 2016 1506N: Aircraft Procurement, Navy / BA 05: Modification of Aircraft / BSA 1: Modification of Aircraft ID Code (A=Service Ready,

More information

UNCLASSIFIED. FY 2016 Base FY 2016 OCO FY 2016 OCO. FY 2016 Base

UNCLASSIFIED. FY 2016 Base FY 2016 OCO FY 2016 OCO. FY 2016 Base Resource Summary Prior Years FY 2014 FY 2015 Base OCO Total FY 2017 FY 2018 FY 2019 FY 2020 To Complete Procurement Quantity (Units in Each) - - - - - - - - - - - - Gross/Weapon System Cost ($ in Millions)

More information

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 34 P-1 Line #51

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 34 P-1 Line #51 Exhibit P-40, Budget Line Item Justification: PB 2016 Navy Date: February 2015 1506N: Aircraft Procurement, Navy / BA 05: Modification of Aircraft / BSA 1: Modification of Aircraft ID Code (A=Service Ready,

More information

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 30 P-1 Line #36

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 30 P-1 Line #36 Exhibit P-40, Budget Line Item Justification: PB 2016 Navy Date: February 2015 1506N: Aircraft Procurement, Navy / BA 05: Modification of Aircraft / BSA 1: Modification of Aircraft ID Code (A=Service Ready,

More information

UNCLASSIFIED. UNCLASSIFIED Army Page 1 of 16 P-1 Line #15

UNCLASSIFIED. UNCLASSIFIED Army Page 1 of 16 P-1 Line #15 Exhibit P-40, Budget Line Item Justification: PB 2017 Army Date: February 2016 2031A: Aircraft Procurement, Army / BA 02: Modification of Aircraft / BSA 10: Modification of Aircraft ID Code (A=Service

More information

UNCLASSIFIED. FY 2014 Base. OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018

UNCLASSIFIED. FY 2014 Base. OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018 Exhibit P-40, Budget Item Justification Sheet: PB 2014 Army Date: April 2013 Aircraft / BSA 10: Modification Of Aircraft ID Code (A=Service Ready, B=Not Service Ready) : Program Elements for Code B Items:

More information

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 151 P-1 Line #32

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 151 P-1 Line #32 Exhibit P-40, Budget Line Item Justification: PB 2017 Navy Date: February 2016 1506N: Aircraft Procurement, Navy / BA 05: Modification of Aircraft / BSA 1: Modification of Aircraft ID Code (A=Service Ready,

More information

UNCLASSIFIED. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018

UNCLASSIFIED. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018 Exhibit P-40, Budget Item Justification Sheet: PB 2014 Navy : April 2013 Ammo, MC / BSA 1: Marine Corps Ammunition ID Code (A=Service Ready, B=Not Service Ready) : A Program Elements for Code B : Other

More information

UNCLASSIFIED FY 2017 OCO. FY 2017 Base

UNCLASSIFIED FY 2017 OCO. FY 2017 Base Exhibit P-40, Budget Line Item Justification: PB 2017 Navy Date: February 2016 1810N: Other Procurement, Navy / BA 04: Ordnance Support Equipment / BSA 7: Other Expendable Ordnance ID Code (A=Service Ready,

More information

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 33 P-1 Line #94

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 33 P-1 Line #94 Exhibit P-40, Budget Line Item Justification: PB 2017 Navy Date: February 2016 1810N: Other Procurement, Navy / BA 02: Communications & Electronics Equip / BSA 12: Submarine Communications ID Code (A=Service

More information

UNCLASSIFIED FY Exhibits Schedule Prior Years FY 2013 FY 2014 FY 2015 Base FY 2015 OCO FY 2015 Total. Unit Cost ($ M) Qty (Each)

UNCLASSIFIED FY Exhibits Schedule Prior Years FY 2013 FY 2014 FY 2015 Base FY 2015 OCO FY 2015 Total. Unit Cost ($ M) Qty (Each) Exhibit P-40, Budget Line Item Justification: PB 2015 United States Special Operations Command Date: March 2014 0300D: Procurement, Defense-Wide / BA 02: Special Operations Command / BSA 4: Other Procurement

More information

UNCLASSIFIED. FY 2017 Base FY 2017 OCO

UNCLASSIFIED. FY 2017 Base FY 2017 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2017 Air Force : February 2016 3600: Research, Development, Test & Evaluation, Air Force / BA 7: Operational Systems Development COST ($ in Millions) FY

More information

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 126 P-1 Line #32

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 126 P-1 Line #32 Exhibit P-40, Budget Line Item Justification: PB 2016 Navy Date: February 2015 1506N: Aircraft Procurement, Navy / BA 05: Modification of Aircraft / BSA 1: Modification of Aircraft ID Code (A=Service Ready,

More information

UNCLASSIFIED. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018

UNCLASSIFIED. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018 Exhibit P-40, Budget Item Justification Sheet: PB 2014 Navy : April 2013 Ammo, MC / BSA 1: Marine Corps Ammunition ID Code (A=Service Ready, B=Not Service Ready) : A Program Elements for Code B : Other

More information

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED. FY 2016 Base FY 2016 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Air Force : February 2015 3600: Research, Development, Test & Evaluation, Air Force / BA 7: Operational Systems Development COST ($ in Millions) FY

More information

DGCANO SUBJECT REFERENCE COMPLIANCE APPLICABILITY DGCA/BOEING 767/01 EMERGENCY EVACUATION SLIDES FAA AD AS IN THE AD AS IN THE AD

DGCANO SUBJECT REFERENCE COMPLIANCE APPLICABILITY DGCA/BOEING 767/01 EMERGENCY EVACUATION SLIDES FAA AD AS IN THE AD AS IN THE AD DGCA/BOEING 767/01 EMERGENCY EVACUATION SLIDES FAA AD 86-06-06 DGCA/BOEING 767/02 PNEUMATIC SYSTEM CHECK VALVE INSPECTION FAA AD 90-12-02 DGCA/BOEING 767/03 FLAPS CARRIAGE SPINDLES FAA AD 90-17-19 DGCA/BOEING

More information

UH1H HP Modification and Upgrade Program

UH1H HP Modification and Upgrade Program UH1H HP Modification and Upgrade Program The UH-1H has served the United States military for many years, setting the performance standards for all helicopters. Since the start of production, over 10,000

More information

RDT&E BUDGET ITEM JUSTIFICATION SHEET (R-2 Exhibit)

RDT&E BUDGET ITEM JUSTIFICATION SHEET (R-2 Exhibit) PE NUMBER: 0604239F PE TITLE: F-22 EMD BUDGET ACTIVITY COST ($ In Thousands) Actual FY 1999 FY 2000 FY 2001 FY 2002 FY 2003 FY 2004 FY 2005 Cost to Complete Cost Advanced Tactical Fighter FSD 2,010,717

More information

January 2018 Air Traffic Activity Summary

January 2018 Air Traffic Activity Summary January 2018 Air Traffic Activity Summary Jan-2018 Jan-2017 CY-2018 CY-2017 Passengers 528,947 505,421 4.7% 528,947 505,421 4.7% Passengers 537,332 515,787 4.2% 537,332 515,787 4.2% Passengers 1,066,279

More information

UNCLASSIFIED. UNCLASSIFIED Page 1 of 5. EXHIBIT R-2, RDT&E Budget Item Justification RESEARCH DEVELOPMENT TEST & EVALUATION, NAVY / BA-5

UNCLASSIFIED. UNCLASSIFIED Page 1 of 5. EXHIBIT R-2, RDT&E Budget Item Justification RESEARCH DEVELOPMENT TEST & EVALUATION, NAVY / BA-5 EXHIBIT R-2, RDT&E Budget Item Justification APPROPRIATION/BUDGET ACTIVITY RESEARCH DEVELOPMENT TEST & EVALUATION, NAVY / BA-5 R-1 ITEM NOMENCLATURE 0605430N, C/KC-130 AVIONICS MODERNIZATION PROGRAM (AMP)

More information

KEY FEATURES IN SHORT

KEY FEATURES IN SHORT KA C90/B200/350 KA C90/B200/350 It is the fixed base simulator of commercial turboprop multi-crew aircraft. The simulator meets all the requirements determined for EASA CS-FSTD(A) FNPTII +MCC level. The

More information

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 17 P-1 Line #13

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 17 P-1 Line #13 Exhibit P-40, Budget Line Item Justification: PB 2016 Navy : February 2015 1508N: Procurement of Ammo, Navy & MC / BA 01: Proc Ammo, Navy / BSA 1: Navy Ammunition A Program Elements for Code B Items: Other

More information

AEROSPACE & ELECTRONICS BRENDAN CURRAN PRESIDENT

AEROSPACE & ELECTRONICS BRENDAN CURRAN PRESIDENT AEROSPACE & ELECTRONICS BRENDAN CURRAN PRESIDENT Aerospace & Electronics Overview and Results Market Outlook Technological Differentiation and Growth Summary 2 Crane Aerospace & Electronics Industry Leader

More information

UNCLASSIFIED. FY 2017 Base FY 2017 OCO. FY 2017 Base FY 2017 OCO

UNCLASSIFIED. FY 2017 Base FY 2017 OCO. FY 2017 Base FY 2017 OCO UNCLSSIFIED Exhibit P-40, Budget Line Item Justification: PB 2017 ir Force Date: February 2016 ppropriation / Budget ctivity / Budget Sub ctivity: 3080F: Other Procurement, ir Force / B 02: Vehicular Equipment

More information

Garrecht TRX 1500 Traffic-Sensor

Garrecht TRX 1500 Traffic-Sensor SECTION 9 Pilot s Operating Handbook Supplement Garrecht TRX 1500 Traffic-Sensor This supplement is applicable and must be integrated into the Airplane Flight Manual if a Garrecht Traffic-Sensor is installed

More information

MS-395 William Butler Aircraft Maintenance Collection

MS-395 William Butler Aircraft Maintenance Collection Collection Number: MS-395 MS-395 William Butler Aircraft Maintenance Collection Title: William Butler Aircraft Maintenance Collection Dates: 1943-2000, (bulk 1983-1990) Creator: William Butler Summary/Abstract:

More information

Advisory Circular (AC)

Advisory Circular (AC) Advisory Circular (AC) Flight Test Considerations For The Approval Of The Design Of Aircraft Modifications File No. 5009-6-513 AC No. 513-003 RDIMS No. 528350-V3 Issue No. 01 Issuing Branch Aircraft Certification

More information

AIRCRAFT SERVICE CHANGE

AIRCRAFT SERVICE CHANGE AIRCRAFT SERVICE CHANGE NUMBER 077 SUBJECT NAVIGATION (ATA 34) TCAS 7.1 INSTALLATION JUNE 12, 2012 PILOTS INFORMATION SHEET TCAS 7.1 INSTALLATION This service change upgrades TCAS 2000 or 3000SP systems

More information

Cost-effective, flexible avionics for today s missions and future challenges. Flight2 integrated avionics system. UPGRADES FOR LEGACY C-130s

Cost-effective, flexible avionics for today s missions and future challenges. Flight2 integrated avionics system. UPGRADES FOR LEGACY C-130s Cost-effective, flexible avionics for today s missions and future challenges. Flight2 integrated avionics system UPGRADES FOR LEGACY C-130s Bring cabin capability into highest definition. Flight2 integrated

More information

Your success is our goal. Rely on our engineering.

Your success is our goal. Rely on our engineering. Your success is our goal. Rely on our engineering. When it comes to aircraft engineering solutions, we are renowned for our vast expertise, outstanding experience and high quality performance. What our

More information

BRINGING THE POWER OF GARMIN TO ACEHAWK

BRINGING THE POWER OF GARMIN TO ACEHAWK BRINGING THE POWER OF GARMIN TO ACEHAWK CIVIL PEDIGREE TACTICAL AGILITY ACEHAWK- Seamless Integration The ACEHAWK has one of the most intuitive pilot-vehicle interfaces (PVI) available on the market. The

More information

UNCLASSIFIED UNCLASSIFIED

UNCLASSIFIED UNCLASSIFIED : February 216 Exhibit R2, RDT&E Budget Item Justification: PB 217 24: Research, Development, Test & Evaluation, / BA 5: System Development & Demonstration (SDD) COST ($ in Millions) FY 215 Program Element

More information

(HELICOPTER FORCE LANDED AND BURNT OUT AFTER ENGINE FIRE WARNINGS)

(HELICOPTER FORCE LANDED AND BURNT OUT AFTER ENGINE FIRE WARNINGS) Follow-up Action on Occurrence Report ACCIDENT TO SIKORSKY S61N, G-BBHM, AT POOLE, DORSET ON 15 JULY 2002 (HELICOPTER FORCE LANDED AND BURNT OUT AFTER ENGINE FIRE WARNINGS) CAA FACTOR NUMBER : F21/2004

More information

EE Chapter 12 Design and Maintenance of Aircraft System

EE Chapter 12 Design and Maintenance of Aircraft System EE 2145230 Chapter 12 Design and Maintenance of Aircraft System 12.1 Requirements for Electrical Systems Proper maintenance of aircraft requires that the electrical systems be kept in the best possible

More information

1-7(28)-2W Wiring Diagrams Manual 10 Sept.27/ to

1-7(28)-2W Wiring Diagrams Manual 10 Sept.27/ to OUT-OF-PRODUCTION MANUAL LIST. DASH 7 New PSM Number Description -7- Operating Data Manual 0 Nov. 0/05-7A-A-DOT Airplane Flight Manual 5 June 02/05 TA 0-7A-A-UK Airplane Flight Manual 20 Aug. 5/05-7-2

More information

Air Navigation (General) Regulations (as amended and as applied to the Isle of Man)

Air Navigation (General) Regulations (as amended and as applied to the Isle of Man) Air Navigation (General) Regulations 2006 (as amended and as applied to the Isle of Man) Contents Table of Contents Contents Foreword ii... i PART 1 - GENERAL... 1 1. Citation and commencement... 1 3.

More information

Manual Status List DHC-2 to DHC-7

Manual Status List DHC-2 to DHC-7 OUT-OF-PRODUCTION MANUAL LIST. DASH 7 New PSM Number Description -7- Operating Data Manual 0 Nov. 0/05-7A-A-DOT Airplane Flight Manual 5 June 02/05 TA 0-7A-A-UK Airplane Flight Manual 20 Aug. 5/05-7-2

More information

Dornier OE-LIR MSN 3115

Dornier OE-LIR MSN 3115 Dornier 328-100 OE-LIR MSN 3115 SPECIFICATION SUMMARY Manufacturer Date Current Hours Current Cycles 2000 24925 24253 Prepared by Matthias Miller, with best knowledge of 30th May 2017 CONTENTS 1 GENERAL...3

More information

2008 Legacy 600 Embraer

2008 Legacy 600 Embraer 2008 Legacy 600 Embraer Price: Make Offer With Only 141 Hours Total Time This aircraft is the lowest time Legacy 600 available Factory new, in pristine condition with numerous options EASA and EU(OPS 1

More information

Air c r a f t Sale s A c q uisitions F inancing C onsulting

Air c r a f t Sale s A c q uisitions F inancing C onsulting Air c r a f t Sale s A c q uisitions F inancing C onsulting Serial 24645 Registration EI-EOE Aircraft Total Time 36,946 hours. Cycles 54,299 ASKING PRICE: MAKE OFFER For more information, please contact

More information

D DAVID PUBLISHING. Development and Achievement of the T-50 Flight Control s Consolidated OFP. 1. Introduction. 2. Consolidated OFP s Needs

D DAVID PUBLISHING. Development and Achievement of the T-50 Flight Control s Consolidated OFP. 1. Introduction. 2. Consolidated OFP s Needs Journal of Aerospace Science and Technology 1 (2015) 67-72 doi: 10.17265/2332-8258/2015.02.003 D DAVID PUBLISHING Development and Achievement of the T-50 Flight Control s Consolidated OFP Soon Ryong Jang,

More information

Thales on the Civil Aerospace market

Thales on the Civil Aerospace market thalesgroup.com Innovation - Civil Aerospace - Defence Aerospace - Transportation - Defence - Security Thales on the Civil Aerospace market AT A GLANCE World n 1 in ATM, covering 40% of world s surface

More information

AVIAT AIRCRAFT INC. P.O. Box South Washington Afton, WY USA Tel: Fax:

AVIAT AIRCRAFT INC. P.O. Box South Washington Afton, WY USA Tel: Fax: DATE: 2 April 1999 REVISION: n/c AIRCRAFT: HUSKY A-1 P.O. Box 1240 672 South Washington Afton, WY 83110 USA Tel: 307-886-3151 Fax: 307-886-9674 e-mail: aviat@aviataircraft.com SUBJECT: Normal Category

More information

SERVICE BULLETIN REVISION

SERVICE BULLETIN REVISION Revision 3 REVISION TRANSMITTAL SHEET This sheet transmits Revision 3 to which: A. Removes the NOTE from the Effectivity section. B. Adds a NOTE to the Reason section. C. Changes SB750-76-06 to SB750-76-07

More information

Q300 Serial Number 657 Available for Sale. Offers for Sale. Q Series: Q300 MSN 657. TTSN: 17,909 Flight Hours TCSN: 20,374 Flight Cycles

Q300 Serial Number 657 Available for Sale. Offers for Sale. Q Series: Q300 MSN 657. TTSN: 17,909 Flight Hours TCSN: 20,374 Flight Cycles Offers for Sale Q Series: Q300 MSN 657 TTSN: 17,909 Flight Hours TCSN: 20,374 Flight Cycles Data Date: 20 th May 2018 Expected Availability: August 2019 Page 1 of 8 Date of Manufacture: March 2008 Model

More information

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: Communication, Navigation, Surveillance/Air Traffic Management (CNS/ATM) FY 2012 OCO

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: Communication, Navigation, Surveillance/Air Traffic Management (CNS/ATM) FY 2012 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2012 Air Force DATE: February 2011 COST ($ in Millions) FY 2010 FY 2011 FY 2013 FY 2014 FY 2015 FY 2016 To Program Element 6.754 5.708 4.604-4.604 4.549

More information

LANDING GEAR - REPLACEMENT OF NOSE LANDING GEAR RETRACT PLUNGER ASSEMBLY

LANDING GEAR - REPLACEMENT OF NOSE LANDING GEAR RETRACT PLUNGER ASSEMBLY Beechcraft TITLE: SERVICE BULLETIN LANDING GEAR - REPLACEMENT OF NOSE LANDING GEAR RETRACT PLUNGER ASSEMBLY 1. Planning Information A. Effectivity (1) Airplanes (a) Civil (i) (ii) (b) Military (i) The

More information

Airworthiness Directive Schedule

Airworthiness Directive Schedule Airworthiness Directive Schedule Aeroplanes 25 February 2016 Notes: 1. This AD schedule is applicable to Mitsubishi MU-2B-26A and MU-2B-60 aircraft manufactured under FAA Type Certificate No. A10SW. 2.

More information

Committed to keeping you flying Controls and Avionics Solutions

Committed to keeping you flying Controls and Avionics Solutions Committed to keeping you flying Controls and Avionics Solutions Engine Controls BAE Systems is a world leader in full authority digital engine control (FADEC) design, development, production, and support.

More information

AIRWORTHINESS ADVISORY. Airworthiness Impacts of Electronic Flight Bags

AIRWORTHINESS ADVISORY. Airworthiness Impacts of Electronic Flight Bags DEPARTMENT OF THE AIR FORCE AA-15-01 Headquarters Air Force Life Cycle Management Center (AFMC) 15 JAN 2015 Engineering Directorate Wright-Patterson AFB OH 45433-7101 AIRWORTHINESS ADVISORY Airworthiness

More information

WORKSHOP TRAINING & FLEET SAFETY

WORKSHOP TRAINING & FLEET SAFETY WORKSHOP TRAINING & FLEET SAFETY Eurocopter Dauphin Symposium 2012 Singapore - October 5 th & 6 th, 2012 Worldwide Training Strategy = Customer Proximity to Improve Safety 2 Training Deployment Type/recurrent

More information

RAAA Annual Convention This information is property of Embraer and cannot be used or reproduced without written permission.

RAAA Annual Convention This information is property of Embraer and cannot be used or reproduced without written permission. RAAA Annual Convention 2014 Embraer Commercial Aviation Turboprops platform ERJ-145 family E-Jets family EMB 120 Brasilia 1985 ERJ-145 1996 50 seats ERJ-140 2001 44 seats E195 June 2006 E190 August 2005

More information

How Frasca Supports Offshore Helicopter Pilot Training At Bristow Group

How Frasca Supports Offshore Helicopter Pilot Training At Bristow Group How Frasca Supports Offshore Helicopter Pilot Training At Bristow Group Customer Feature Bristow Group Needed a New Training Solution In the mid-2000s, Bristow Group s training needs analysis identified

More information

Q300 Serial Number 583 Available for Sale. Offers for Sale. Q Series: Q300 MSN 583. TTSN: 24,072 Flight Hours TCSN: 33,232 Flight Cycles

Q300 Serial Number 583 Available for Sale. Offers for Sale. Q Series: Q300 MSN 583. TTSN: 24,072 Flight Hours TCSN: 33,232 Flight Cycles Offers for Sale Q Series: Q300 MSN 583 TTSN: 24,072 Flight Hours TCSN: 33,232 Flight Cycles Data Date: 20 th May 2018 Expected Availability: July 2018 Page 1 of 8 Date of Manufacture: February 2002 Model

More information

BOEING VIP. In summary, this aircraft is equipped with new equipment throughout and is ready for immediate service.

BOEING VIP. In summary, this aircraft is equipped with new equipment throughout and is ready for immediate service. BOEING 737-500 VIP This Boeing 737-500 has recently undergone extensive maintenance and engineering work including a D check and has been converted to a VIP configuration in November 2010. The aircraft

More information

COMPLIANCE WITH THIS PUBLICATION IS MANDATORY

COMPLIANCE WITH THIS PUBLICATION IS MANDATORY BY ORDER OF THE COMMANDER AIR COMBAT COMMAND AIR FORCE INSTRUCTION 21-103 AIR COMBAT COMMAND Supplement 21 SEPTEMBER 2017 MAINTENANCE EQUIPMENT INVENTORY, STATUS, AND UTILIZATION REPORTING SYSTEM F-15A/B/C/D

More information

ANY MISSION. ANY TIME. ANY WHERE.

ANY MISSION. ANY TIME. ANY WHERE. SIKORSKY S-92 ANY MISSION. ANY TIME. ANY WHERE. 6900 Main Street, Stratford, Connecticut 06615 USA +1 (800) WINGED-S (946-4337) International +1 (203) 386-3029 www.lockheedmartin.com/sikorsky This Document

More information

OVERSEAS TERRITORIES AVIATION REQUIREMENTS (OTARs)

OVERSEAS TERRITORIES AVIATION REQUIREMENTS (OTARs) OVERSEAS TERRITORIES AVIATION REQUIREMENTS (OTARs) Part 173 FLIGHT CHECKING ORGANISATION APPROVAL Published by Air Safety Support International Ltd Air Safety Support International Limited 2005 ISBN 0-11790-410-4

More information

For the purposes of this guidance material the following definitions are used:

For the purposes of this guidance material the following definitions are used: AMC1 FCL.710 - Guidance on differences training The following should be used as guidance when conducting differences training on types or variants within single pilot class or type ratings. Difference

More information

CIRRUS AIRPLANE MAINTENANCE MANUAL

CIRRUS AIRPLANE MAINTENANCE MANUAL INTRODUCTION 1. COVERAGE This Cirrus Design SR22 Airplane Maintenance Manual was prepared by Cirrus Design Technical Publications. This manual contains information necessary to enable a trained mechanic

More information

PR-429BF-600M. Bell 429 Blade Fold Kit Operations Manual

PR-429BF-600M. Bell 429 Blade Fold Kit Operations Manual Table of Contents Table of Contents... 1 Record of Revisions... 2 References... 3 Introduction... 4 Contact Information... 4 Prerequisites... 5 First Time Use... 6 Blade Clamp Placement... 6 Blade Clamp

More information

Aircraft Specification Summary Bombardier CRJ900 Next Generation M SN : REG: CX- C R B

Aircraft Specification Summary Bombardier CRJ900 Next Generation M SN : REG: CX- C R B Aircraft Specification Summary Bombardier CRJ900 Next Generation M SN : 15169 REG: CX- C R B TSN 10,343 CSN 8,465 Operated by PLUNA S.A. Date: 01-October-2013 Page 1 of 6 A. Operational Data: Reduced Vertical

More information

Q300 Serial Number 653 Available for Sale. Offers for Sale. Q Series: Q300 MSN 653. TTSN: 19,775 Flight Hours TCSN: 22,775 Flight Cycles

Q300 Serial Number 653 Available for Sale. Offers for Sale. Q Series: Q300 MSN 653. TTSN: 19,775 Flight Hours TCSN: 22,775 Flight Cycles Offers for Sale Q Series: Q300 MSN 653 TTSN: 19,775 Flight Hours TCSN: 22,775 Flight Cycles Data Date: 20 th May 2018 Expected Availability: November 2018 Page 1 of 8 Date of Manufacture: December 2007

More information

Specifications AGUSTA AW139. Serial Number 31116

Specifications AGUSTA AW139. Serial Number 31116 Specifications AGUSTA AW139 Serial Number 31116 AIRCRAFT EXECUTIVE SUMMARY A GREAT PEDIGREE Sparfell & Partners is pleased to offer, for immediate sale, this 2008 AGUSTAWESTLAND AW139. Executive Summary

More information

FAA/HSAC PART 135 SYSTEM SAFETY RISK MANAGEMENT SAFETY ELEMENT TRAINING OF FLIGHT CREWMEMBERS JOB AID Revision 1

FAA/HSAC PART 135 SYSTEM SAFETY RISK MANAGEMENT SAFETY ELEMENT TRAINING OF FLIGHT CREWMEMBERS JOB AID Revision 1 SAFETY ELEMENT 4.2.3 - TRAINING OF FLIGHT CREWMEMBERS JOB AID Revision 1 The Federal Aviation Administration (FAA) is proactively moving away from compliance based safety surveillance programs to Systems

More information

TM MTF ARMY MODEL OH-58A/C HELICOPTER

TM MTF ARMY MODEL OH-58A/C HELICOPTER TECHNICAL MANUAL MAINTENANCE TEST FLIGHT MANUAL ARMY MODEL OH-58A/C HELICOPTER DISTRIBUTION STATEMENT A: Approved for public release; distribution is unlimited. This manual supersedes TM 55-1520-228-MTF,

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE PE A: AIRCRAFT CERTIFICATION FY 2012 OCO

UNCLASSIFIED R-1 ITEM NOMENCLATURE PE A: AIRCRAFT CERTIFICATION FY 2012 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 212 Army DATE: February 211 24: Research, Development, Test & Evaluation, Army COST ($ in Millions) FY 21 FY 211 FY 212 Base PE 6566A: AIRCRAFT CERTIFICATION

More information

2009 Embraer Legacy 600

2009 Embraer Legacy 600 2009 Embraer Legacy 600 S/N 1100 G-RUBE JAR Ops Equipped, EASA CERTIFIED Total Time 575 Hours / 424 Cycles G-RUBE features a stand-up cabin and luxuriously appointed interior with seating comprising individual

More information