UNCLASSIFIED FY Exhibits Schedule Prior Years FY 2013 FY 2014 FY 2015 Base FY 2015 OCO FY 2015 Total. Total Cost ($ M) Unit Cost ($) Qty (Each)

Size: px
Start display at page:

Download "UNCLASSIFIED FY Exhibits Schedule Prior Years FY 2013 FY 2014 FY 2015 Base FY 2015 OCO FY 2015 Total. Total Cost ($ M) Unit Cost ($) Qty (Each)"

Transcription

1 Exhibit P-40, Budget Line Item Justification: PB 2015 Navy Date: March N: Aircraft Procurement, Navy / BA 05: Modification of Aircraft / BSA 1: Modification of Aircraft ID Code (A=Service Ready, B=Not Service Ready) : A Program Elements for Code B Items: Other Related Program Elements: Resource Summary Prior Years FY 2013 FY 2014 # tal FY 2016 FY 2017 FY 2018 FY 2019 Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) tal Obligation Authority ($ in Millions) (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) Flyaway Unit Cost ($ in Dollars) Gross/Weapon System Unit Cost ($ in Dollars) # The Request will be submitted at a later date. tal Description: This line item funds modifications to the UH-1Y and AH-1W/Z. The mission of the UH-1Y utility helicopter is to provide command and control and combat assault support under day/night and adverse weather conditions and special operations support: supporting arms coordination and aeromedical evacuation. The HH-configured aircraft provide local civilian and military search and rescue support, as well as augmenting Department of Homeland Security resources. The AH-1W/Z is a tandem-seat, two-place attack helicopter. The mission of the AH-1W/Z attack helicopter is to provide rotary wing close air support, anti-armor, armed escort, armed/visual reconnaissance, anti-helicopter and point air defense and fire support coordination during day/night conditions. The armament of the AH-1W/Z includes the Sidewinder and Hellfire missile systems, a chin-mounted 20mm turret gun, and a wide variety of forward-firing and gravity-released external stores. The overall goal of the modifications budgeted in is to eliminate safety hazards, improve survivability, fulfill operational requirements, remedy obsolescence, and maintain significant mission capability and joint interoperable data link circuit capable of transmitting, receiving, and display digital information and video which includes Full Motion Video (FMV). Additionally, the H-1 will continue to upgrade the applicable aircraft sensor and avionics systems and subsystems as well as weapons rocket delivery system which includes the Advance Precision Kill Weapon System. Air vehicle improvements needing critical reliability enhancements will be incorporated. These platforms will continue to fulfill the operational requirements to detect, identify, and destroy tactical-sized armored targets with precision guided munitions during the day, at night, and during adverse weather, as well as providing enhanced conventional weapons delivery by utilizing the system's laser ranging and designating system. Exhibits Schedule tal Title* P-3a - 1 / H-1 AVIONICS IMPROVEMENTS (OSIP ) P-3a Exhibits ID Unit Cost CD ($) tal Cost Unit Cost ($) tal Cost Unit Cost ($) tal Cost Unit Cost ($) tal Cost Unit Cost ($) tal Cost Unit Cost ($) tal Cost Navy Page 1 of 33 P-1 Line #38 Volume 2-375

2 Exhibit P-40, Budget Line Item Justification: PB 2015 Navy Date: March N: Aircraft Procurement, Navy / BA 05: Modification of Aircraft / BSA 1: Modification of Aircraft ID Code (A=Service Ready, B=Not Service Ready) : A Program Elements for Code B Items: Other Related Program Elements: Exhibits Schedule tal Title* P-3a - 2 / H-1 SENSORS AND WEAPONS IMPROVEMENTS (OSIP ) P-3a - 3 / H-1 AIR VEHICLE IMPROVEMENTS (OSIP ) P-3a - 4 / H-1N SAFETY UPGRADES (OSIP ) P-3a P-3a P-3a Exhibits ID Unit Cost CD ($) tal Cost Unit Cost ($) tal Cost Unit Cost ($) tal Cost Unit Cost ($) tal Cost Unit Cost ($) tal Cost P-3a - 5 / INACTIVE OSIPS P-3a tal Gross/Weapon System Cost Exhibits Schedule FY 2016 FY 2017 FY 2018 FY 2019 tal Title* P-3a - 1 / H-1 AVIONICS IMPROVEMENTS (OSIP ) P-3a - 2 / H-1 SENSORS AND WEAPONS IMPROVEMENTS (OSIP ) P-3a - 3 / H-1 AIR VEHICLE IMPROVEMENTS (OSIP ) P-3a - 4 / H-1N SAFETY UPGRADES (OSIP ) P-3a P-3a P-3a P-3a Exhibits ID Unit Cost CD ($) tal Cost Unit Cost ($) tal Cost Unit Cost ($) tal Cost Unit Cost ($) tal Cost Unit Cost ($) tal Cost P-3a - 5 / INACTIVE OSIPS P-3a tal Gross/Weapon System Cost *For the P-3a, Title represents the Modification Number / Title. Note: tals in this Exhibit P-40 set may not be exact or add due to rounding. Justification: The increase in is due to Sensors and Weapons, Air Vehicle and Avionics modifications as the H-1 upgrades program transitions from production to fielded systems. The and tal columns are not properly reflected on the P40. The column should read $ vice $ and the tal column should read $ vice $ Unit Cost ($) Unit Cost ($) tal Cost tal Cost Navy Page 2 of 33 P-1 Line #38 Volume 2-376

3 Resource Summary Prior Years FY 2013 FY 2014 # tal FY 2016 FY 2017 FY 2018 FY / H-1 AVIONICS IMPROVEMENTS (OSIP ) Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) tal Obligation Authority ($ in Millions) (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) Gross/Weapon System Unit Cost ($ in Dollars) # The Request will be submitted at a later date. tal Description: This Operational, Safety and Improvement Program (OSIP) incorporates cost effective changes to H-1 avionics systems, specifically attacking the highest degraders in the H-1 Cost Wise Readiness Integrated Improvement Process and on the Critical Logistics Review lists to reduce the total cost of ownership while improving ready based aircraft and ready for tasking rates. Improvements to safety of flight, maintenance, obsolescence (Diminishing Manufacturing Sources/Material Shortages), and readiness degrader items will yield a more capable and survivable H-1 force to sustain warfighter capability in support of worldwide operations. Improvements will support the tenents of Sea Power 21; specifically operational availability, enhanced capabilities, and interoperability. Systems improved on H-1 aircraft will leverage common architectures and utilize existing technology to the maximum extent practicable to minimize development and procurement costs and to reduce the time to field the improved systems. Systems and changes requiring improvements in the OSIP are the mission computer, Cockpit Control System, Ultra High Frequency/Very High Frequency communication systems, Satellite Communications, Wiring Integration Remote Terminals, Wireless InterCommunications Systems (WICS), Flight Control Computer, Indentification Friend or Foe system, Inertial Navigation System, Global Positioning System, radar altimeter, mass data storage, air data systems, aircraft displays, data recorders and data loaders (data and video recorder and loader, flight data recorder, maintenance data recorder, video recorders) interoperable video and digital data links data interoperability components data link circuit capable of transmitting, receiving, and displaying information and video, helmet mounted display systems, Blue Force Tracker, joint battle command system, Digital Map, Variable Message Format/Digital System Upgrade, collision avoidance systems, Ground Proximity Warning System, Terrain Awareness Warning System, Military Flight Operations Quality Assurance, Aircraft Survivability Equipment, system configuration set updates for avionics components and interfaces for platform weapons and sensors. Other improvements will include Weapon Repairable Assembly modifications to improve avionics and weapons system reliability, maintainability, accuracy and interoperability. DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES: FMV kit installation kits and equipment will be procured in 3Q FY Installs to begin 2Q. Navy Page 3 of 33 P-1 Line #38 Volume 2-377

4 Models of Systems Affected: UH-1Y, AH-1W/Z Modification Type: Operational Improvement Related RDT&E PEs: Procurement Financial Plan Modification Item 1 of 1: H-1 AVIONICS IMPROVEMENTS (OSIP ) A Kits Recurring / tal Cost / tal Cost / tal Cost / tal Cost / tal Cost 1 / H-1 AVIONICS IMPROVEMENTS (OSIP ) tal FY 2016 FY 2017 FY 2018 FY 2019 / tal Cost / tal Cost / tal Cost / tal Cost / tal Cost / tal Cost tal / tal Cost 1.1.1) VMF Interoperability (UH-1Y/AH-1Z) - - / - - / - - / - 3 / / - 3 / / / / / / / NonOrganic (1) 1.1.2) Full Motion Video (FMV) (UH-1Y/AH-1Z) - - / - - / - 12 / / / - 34 / / / / - 24 / / / NonOrganic (2) 1.1.3) System Configuration Set Updates (UH-1Y/ AH-1Z) - Organic - / - - / - 12 / / - - / - - / - - / - - / - - / - - / - - / - 12 / ) Blue Force Tracker (UH-1Y/AH-1W/Z) - Organic - / - - / - - / - - / - - / - - / - - / - - / - 12 / / / / ) Wireless Internal Communication System (WICS) (UH-1Y) - Organic - / - - / - - / - 3 / / - 3 / / / / / / / ) Mission Computer Trays - Organic 5 / / / - - / - - / - - / - - / - - / - - / - - / - - / - 8 / Subtotal: Recurring - / / / / / - - / / / / / / / Non-Recurring 1.2.1) Installation Kits N/R - Organic - / - - / - - / / / - - / / / / / - - / / Subtotal: Non-Recurring - / / - - / / / - - / / / / / - - / / B Kits Recurring 2.1.1) VMF Interoperability (UH-1Y/AH-1Z) - Organic - / - - / - - / - 3 / / - 3 / / / / / / / ) Full Motion Video (FMV) (UH-1Y/AH-1Z) - Organic - / - - / - 12 / / / - 34 / / / / - 24 / / / ) Blue Force Tracker (UH-1Y/AH-1W/Z) - Organic - / - - / - - / - - / - - / - - / - - / - - / - 12 / / / / ) System Configuration Set Updates (UH-1Y/ - / - - / - 12 / / / - 36 / / / / - 36 / / / AH-1Z) - Organic (3) 2.1.5) Retrofit OTO Hardware (UH-1Y/AH-1Z) - Organic - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 48 / / ) Retrofit GEN II Mission Computers (UH-1Y/ AH-1Z) - Organic 2.1.7) Wireless Internal Communication System (WICS) (UH-1Y) - Organic 5 / / / - - / - - / - - / - - / - - / - - / - - / - - / - 8 / / - - / - - / - 3 / / - 3 / / / / / / / Subtotal: Recurring - / / / / / - - / / / / / / / Non-Recurring 2.2.1) Installation Equipment N/R - Organic - / - - / - - / / / - - / / / / / - - / / Navy Page 4 of 33 P-1 Line #38 Volume 2-378

5 Models of Systems Affected: UH-1Y, AH-1W/Z Modification Type: Operational Improvement Related RDT&E PEs: Financial Plan / tal Cost / tal Cost / tal Cost / tal Cost / tal Cost 1 / H-1 AVIONICS IMPROVEMENTS (OSIP ) tal FY 2016 FY 2017 FY 2018 FY 2019 / tal Cost / tal Cost / tal Cost / tal Cost / tal Cost / tal Cost tal / tal Cost Subtotal: Non-Recurring - / / - - / / / - - / / / / / - - / / Subtotal: H-1 AVIONICS IMPROVEMENTS (OSIP ) 10 / / / / / / / / / / ,200 / ,897 / Subtotal: Procurement, All Modification Items - / / / / / - - / / / / / / / Support (All Modification Items) 3.1) Engineering Change Orders - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / / ) Data - / - - / - - / / / - - / / / / / / / ) Training Equipment - / - - / - - / / / - - / / - - / - - / - - / - - / / ) Support Equipment - / - - / - - / / / - - / / / / - - / - - / - - / ) ILS - / - - / - - / / / - - / / / / / / / (4) 3.6) Other Support - / - - / - - / / / - - / / / / / / / ) Interim Contractor Support - / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - Subtotal: Support - / / - - / / / - - / / / / / / / Installation Modification Item 1 of 1: H-1 AVIONICS IMPROVEMENTS (OSIP ) - / / - - / / / - - / / / / / / / Subtotal: Installation - / / - - / / / - - / / / / / / / tal tal Cost (Procurement + Support + Installation) Navy Page 5 of 33 P-1 Line #38 Volume 2-379

6 Modification Item 1 of 1: H-1 AVIONICS IMPROVEMENTS (OSIP ) Modification Item MDAP/MAIS Code: Manufacturer Information Manufacturer Name: TBD -VMF Interoperability Manufacturer Location: >TBD Administrative Leadtime (in Months): 1 Production Leadtime (in Months): 4 1 / H-1 AVIONICS IMPROVEMENTS (OSIP ) Dates FY 2013 FY 2014 FY 2016 FY 2017 FY 2018 FY 2019 Contract Dates Oct 2014 Oct 2015 Oct 2016 Oct 2017 Delivery Dates Jan 2015 Jan 2016 Jan 2017 Jan 2018 Manufacturer Name: TBD - Full Motion Video Manufacturer Location: >TBD Administrative Leadtime (in Months): 1 Production Leadtime (in Months): 4 Dates FY 2013 FY 2014 FY 2016 FY 2017 FY 2018 FY 2019 Contract Dates Oct 2013 Oct 2014 Oct 2015 Oct 2016 Oct 2018 Delivery Dates Jan 2014 Jan 2015 Jan 2016 Jan 2017 Jan 2019 Installation Information Method of Implementation: Contractor Field Mod Team : Installation Name: VMF Interoperability (UH-1Y/AH-1Z) Installation Cost / tal Cost / tal Cost / tal Cost / tal Cost / tal Cost tal FY 2016 FY 2017 FY 2018 FY 2019 / tal Cost / tal Cost / tal Cost / tal Cost / tal Cost / tal Cost tal / tal Cost Prior Years - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 3 / / - 3 / / - - / - - / - - / - - / - 3 / FY / - - / - - / - - / - - / - - / - 5 / / - - / - - / - - / - 5 / FY / - - / - - / - - / - - / - - / - - / - 12 / / - - / - - / - 12 / FY / - - / - - / - - / - - / - - / - - / - - / - 24 / / - - / - 24 / FY / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / / / tal - / - - / - - / - 3 / / - 3 / / / / / / / Navy Page 6 of 33 P-1 Line #38 Volume 2-380

7 Modification Item 1 of 1: H-1 AVIONICS IMPROVEMENTS (OSIP ) Modification Item MDAP/MAIS Code: Installation Information Method of Implementation: Contractor Field Mod Team : Installation Name: VMF Interoperability (UH-1Y/AH-1Z) Installation Schedule 1 / H-1 AVIONICS IMPROVEMENTS (OSIP ) FY 2013 FY 2014 FY 2016 FY 2017 FY 2018 FY 2019 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC t In Out Method of Implementation: Contractor Field Mod Team : Installation Name: Full Motion Video (FMV) (UH-1Y/AH-1Z) Installation Cost / tal Cost / tal Cost / tal Cost / tal Cost / tal Cost tal FY 2016 FY 2017 FY 2018 FY 2019 / tal Cost / tal Cost / tal Cost / tal Cost / tal Cost / tal Cost tal / tal Cost Prior Years - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY / - - / - 12 / / - - / - - / - - / - - / - - / - - / - - / - 12 / / - - / - - / - 34 / / - 34 / / - - / - - / - - / - - / - 34 / FY / - - / - - / - - / - - / - - / - 18 / / - - / - - / - - / - 18 / FY / - - / - - / - - / - - / - - / - - / - 18 / / - - / - - / - 18 / FY / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY / - - / - - / - - / - - / - - / - - / - - / - - / - 24 / / - 24 / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 58 / / tal - / - - / - 12 / / / - 34 / / / / - 24 / / / Installation Schedule FY 2013 FY 2014 FY 2016 FY 2017 FY 2018 FY 2019 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC t In Out Method of Implementation (Organic): Not Installed - System Configuration Set Updates (UH-1Y/AH-1Z) Installation Quantity: 12 Method of Implementation (Organic): Not Installed - Blue Force Tracker (UH-1Y/AH-1W/Z) Installation Quantity: 349 Navy Page 7 of 33 P-1 Line #38 Volume 2-381

8 Modification Item 1 of 1: H-1 AVIONICS IMPROVEMENTS (OSIP ) Modification Item MDAP/MAIS Code: Installation Information Method of Implementation (Organic): Not Installed - Wireless Internal Communication System (WICS) (UH-1Y) Installation Quantity: / H-1 AVIONICS IMPROVEMENTS (OSIP ) Method of Implementation (Organic): Not Installed - Mission Computer Trays Installation Quantity: 8 Method of Implementation (Organic): Not Installed - VMF Interoperability (UH-1Y/AH-1Z) Installation Quantity: 164 Method of Implementation (Organic): Organic - Full Motion Video (FMV) (UH-1Y/AH-1Z) Installation Quantity: 164 Method of Implementation (Organic): Not Installed - Blue Force Tracker (UH-1Y/AH-1W/Z) Installation Quantity: 349 Method of Implementation (Organic): Not Installed - System Configuration Set Updates (UH-1Y/AH-1Z) Installation Quantity: 147 Method of Implementation (Organic): Not Installed - Retrofit OTO Hardware (UH-1Y/AH-1Z) Installation Quantity: 48 Method of Implementation (Organic): Not Installed - Retrofit GEN II Mission Computers (UH-1Y/AH-1Z) Installation Quantity: 8 Method of Implementation (Organic): Not Installed - Wireless Internal Communication System (WICS) (UH-1Y) Installation Quantity: 160 Footnotes: (1) VMF Interoperability adds digitally-aided close air support and Variable Message Format capabilities to the UH-1Y and AH-1Z. (2) Full Motion Video (FMV) supports UUNS CDTS# 11061UA validated by MROC DM (3) System Configuration Set Update is an Organization-Level installation. (4) Other Support includes validation/verification and engineering support for all modifications. Navy Page 8 of 33 P-1 Line #38 Volume 2-382

9 Resource Summary Prior Years FY 2013 FY / H-1 SENSORS AND WEAPONS IMPROVEMENTS (OSIP ) # tal FY 2016 FY 2017 FY 2018 FY 2019 Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) tal Obligation Authority ($ in Millions) (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) Gross/Weapon System Unit Cost ($ in Dollars) # The Request will be submitted at a later date. tal Description: This Operational, Safety and Improvement Program (OSIP) incorporates a number of cost effective changes to H-1 sensors and weapons requirements, specifically attacking the highest degraders in the H-1 Cost Wise Readiness Integrated Improvement Process and on the Critical Logistics Review lists in order to improve ready based aircraft and ready for tasking rates and reduce the total cost of ownership. These improvements are a vital element of the H-1 Upgrades program to significantly enhance the strategy of a more ready, more capable, and more survivable H-1 force to accomplish the successful fielding of this new capability to the warfighter in support of the Overseas Contingency Operations (). The increased readiness and capabilities that will be realized support the tenents of Sea Power 21, specifically operational availability, enhanced capabilities, and interoperability. Systems improved on the H-1 Warfighter aircraft will forward fit to the H-1 Upgrades aircraft and utilize existing technology to the maximum extent practicable to minimize development and procurement costs and to reduce the time to field the improved systems. This OSIP addresses the U.S. Marine Corps' operational requirement to detect, identify, and destroy tactical-sized armored targets with the precision guided munitions during day, night, and adverse weather conditions. The Target Sight System (TSS), Navigational Thermal Imaging System (NTIS), BRITE Star Block II, and Night Targeting System (and Night Targeting System Upgrade (NTSU) sensors provide a night/adverse weather Forward-Looking Infrared and laser designator for the H-1 series helicopters' weapons system engagement, including but not limited to Tube-launched Optically-tracked Wire-guided (TOW) missile, Hellfire, and air-to-ground missile capabilities. This OSIP also addresses improvements to H-1 series helicopters' weapons systems in support of mission success to include missile, rockets, and gun reliability and accuracy. These weapon systems include include Precision Guided Munitions, air-to-ground missiles, Advanced Precision Kill Weapon System (APKWS), Hellfire, M197 20MM Gun System, launchers, Turret Systems, 20MM Linkless Feed System, and crew served weapons. Other sensor improvements will include weapon repair assembly modifications to improve weapons reliability, maintainability, systems stabilization, as well as upgrades to Laser Spot Tracker (LST) and laser pointing devices. Safety programs that will be implemented by this OSIP include, but not limited to, spatial disorientation issues that will be addressed through aircraft upgrades such as integration of Heads-Up-Display improvements, Helmet Display and Tracker System (HDTS), Digital System Upgrade/Situational Awareness Enhancement (SAE), Degraded Visual Environment initiatives, Moving Maps, Transponder upgrade, Tactical Video Data Link (TVDL) system integration/upgrade, electronic warfare initiatives (Intrepid Tiger), and Digital Interoperability initiatives that will meet the platform 'net ready' requirements. These enhancements will allow the H-1 to be interoperable with battle management systems, and provide aircrews with near real time friendly forces and threat locations. Additional NTS/NTSU improvements will include Weapons Repairable Assembly modifications to improve reliability, maintainability, integration of a Digital Video Recorder (DVR), and incorporation of the Mission Data Loader functionality within the DVR. DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES: One BRITE Star Block II system has been modified by the original equipment manufacturer to add a LST subassembly. The LST adds the capability to detect, acquire and track laser designator signatures. Navy Page 9 of 33 P-1 Line #38 Volume 2-383

10 2 / H-1 SENSORS AND WEAPONS IMPROVEMENTS (OSIP ) Navy Page 10 of 33 P-1 Line #38 Volume 2-384

11 Models of Systems Affected: UH-1Y, AH-1W/Z Modification Type: Operational Improvement Related RDT&E PEs: Procurement Financial Plan Modification Item 1 of 1: H-1 SENSORS AND WEAPONS IMPROVEMENTS (OSIP ) A Kits Recurring / tal Cost / tal Cost / tal Cost / tal Cost / tal Cost 2 / H-1 SENSORS AND WEAPONS IMPROVEMENTS (OSIP ) tal FY 2016 FY 2017 FY 2018 FY 2019 / tal Cost / tal Cost / tal Cost / tal Cost / tal Cost / tal Cost tal / tal Cost (5) 1.1.1) AFC-396 (UH-1Y) - NonOrganic 21 / / / / / - 15 / / / / / - - / / ) Helmet Display and Tracker System (HDTS) 65 / / - - / - - / - - / - - / - - / - - / - - / - - / - 19 / / (AH-1W) - NonOrganic (6) Subtotal: Recurring - / / / / / - - / / / / / - - / / B Kits Recurring 2.1.1) BRITE Star BLK II (UH-1Y) - Organic 10 / / / / / - 2 / / / / - - / - - / - 33 / ) BRITE Star BLK II Laser Spot Tracker (UH-1Y) - Organic 2.1.3) Target Sight System (TSS) Laser Spot Tracker (AH-1Z) - Organic 2.1.4) Target Sight System (TSS) Upgrade Kit (AH-1Z) - Organic 2.1.5) Helmet Display and Tracker System (HDTS) (AH-1W) - Organic - / - - / - - / - 24 / / - 24 / / / / - - / - - / / / - - / - - / - - / - - / - - / - 2 / / / / / / / - - / - - / - 25 / / - 25 / / / - - / - - / - - / - 38 / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 19 / / ) Helmet Display and Tracker System (HDTS) - / - - / / / - - / - - / - - / - - / - - / - - / / / Helmet Kit (AH-1W) - Organic (7) 2.1.8) Linkless Feed System (AH-1W/Z) - Organic - / - - / - 5 / / - - / - - / - - / - - / - - / - - / - 7 / / ) Night Target System Upgrade (NTSU) Kit - / - - / - - / - 13 / / - 13 / / - - / - - / - - / - 29 / / (AH-1W) - Organic (8) Subtotal: Recurring - / / / / / - - / / / / / / / Non-Recurring 2.2.1) Installation Equipment N/R - Organic - / - - / - - / - - / - - / - - / - - / / / / / / Subtotal: Non-Recurring - / / - - / - - / - - / - - / - - / / / / / / Subtotal: H-1 SENSORS AND WEAPONS IMPROVEMENTS (OSIP ) 96 / / / / / - 79 / / / / / / ,023 / Subtotal: Procurement, All Modification Items - / / / / / - - / / / / / / / Support (All Modification Items) 3.1) Engineering Change Orders - / - - / / - - / - - / - - / - - / - - / - - / - - / - - / - - / Navy Page 11 of 33 P-1 Line #38 Volume 2-385

12 Models of Systems Affected: UH-1Y, AH-1W/Z Modification Type: Operational Improvement Related RDT&E PEs: Financial Plan / tal Cost / tal Cost / tal Cost / tal Cost / tal Cost 2 / H-1 SENSORS AND WEAPONS IMPROVEMENTS (OSIP ) tal FY 2016 FY 2017 FY 2018 FY 2019 / tal Cost / tal Cost / tal Cost / tal Cost / tal Cost / tal Cost tal / tal Cost (9) 3.2) Data - / / / / / - - / / / / / / / ) Training Equipment - / - - / - 2 / / - - / - - / - - / - - / - - / - - / - - / - 2 / ) Support Equipment - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / / ) ILS - / - - / - - / - - / / - - / / / / / / / (10) 3.6) Other Support - / / / / / - - / / / / / / / ) Interim Contractor Support - / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - Subtotal: Support - / / / / / - - / / / / / / / Installation Modification Item 1 of 1: H-1 SENSORS AND WEAPONS IMPROVEMENTS (OSIP ) - / / / / / - - / / / / / - - / / Subtotal: Installation - / / / / / - - / / / / / - - / / tal tal Cost (Procurement + Support + Installation) Navy Page 12 of 33 P-1 Line #38 Volume 2-386

13 Modification Item 1 of 1: H-1 SENSORS AND WEAPONS IMPROVEMENTS (OSIP ) Modification Item MDAP/MAIS Code: Manufacturer Information Manufacturer Name: Wyle Laboratories, Inc.- AFC-396 Manufacturer Location: >Alabama Administrative Leadtime (in Months): 1 Production Leadtime (in Months): 2 2 / H-1 SENSORS AND WEAPONS IMPROVEMENTS (OSIP ) Dates FY 2013 FY 2014 FY 2016 FY 2017 FY 2018 FY 2019 Contract Dates Oct 2012 Oct 2013 Oct 2014 Oct 2015 Oct 2016 Oct 2017 Delivery Dates Dec 2012 Dec 2013 Dec 2014 Dec 2015 Dec 2016 Dec 2017 Manufacturer Name: Elbit Systems Limited - HDTS Manufacturer Location: >Israel Administrative Leadtime (in Months): 1 Production Leadtime (in Months): 2 Dates FY 2013 FY 2014 FY 2016 FY 2017 FY 2018 FY 2019 Contract Dates Oct 2014 Delivery Dates Dec 2014 Installation Information Method of Implementation: Contractor Field Mod Team : Installation Name: AFC-396 (UH-1Y) Installation Cost / tal Cost / tal Cost / tal Cost / tal Cost / tal Cost tal FY 2016 FY 2017 FY 2018 FY 2019 / tal Cost / tal Cost / tal Cost / tal Cost / tal Cost / tal Cost tal / tal Cost Prior Years 21 / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 21 / FY / - 19 / / - - / - - / - - / - - / - - / - - / - - / - - / - 19 / FY / - - / - 18 / / - - / - - / - - / - - / - - / - - / - - / - 18 / / - - / - - / - 15 / / - 15 / / - - / - - / - - / - - / - 15 / FY / - - / - - / - - / - - / - - / - 16 / / - - / - - / - - / - 16 / FY / - - / - - / - - / - - / - - / - - / - 15 / / - - / - - / - 15 / FY / - - / - - / - - / - - / - - / - - / - - / - 14 / / - - / - 14 / FY / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - tal 21 / / / / / - 15 / / / / / - - / / Navy Page 13 of 33 P-1 Line #38 Volume 2-387

14 Modification Item 1 of 1: H-1 SENSORS AND WEAPONS IMPROVEMENTS (OSIP ) Modification Item MDAP/MAIS Code: Installation Information Method of Implementation: Contractor Field Mod Team : Installation Name: AFC-396 (UH-1Y) Installation Schedule 2 / H-1 SENSORS AND WEAPONS IMPROVEMENTS (OSIP ) FY 2013 FY 2014 FY 2016 FY 2017 FY 2018 FY 2019 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC t In Out Method of Implementation: Contractor Field Mod Team : Installation Name: Helmet Display and Tracker System (HDTS) (AH-1W) Installation Cost / tal Cost / tal Cost / tal Cost / tal Cost / tal Cost tal FY 2016 FY 2017 FY 2018 FY 2019 / tal Cost / tal Cost / tal Cost / tal Cost / tal Cost / tal Cost tal / tal Cost Prior Years - / - - / - 55 / / - - / - - / - - / - - / - - / - - / - - / - 55 / FY / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 19 / / tal - / - - / - 55 / / - - / - - / - - / - - / - - / - - / - 19 / / Installation Schedule FY 2013 FY 2014 FY 2016 FY 2017 FY 2018 FY 2019 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC t In Out Method of Implementation (Organic): Not Installed - BRITE Star BLK II (UH-1Y) Installation Quantity: 33 Method of Implementation (Organic): Not Installed - BRITE Star BLK II Laser Spot Tracker (UH-1Y) Installation Quantity: 168 Navy Page 14 of 33 P-1 Line #38 Volume 2-388

15 Modification Item 1 of 1: H-1 SENSORS AND WEAPONS IMPROVEMENTS (OSIP ) Modification Item MDAP/MAIS Code: Installation Information Method of Implementation (Organic): Not Installed - Target Sight System (TSS) Laser Spot Tracker (AH-1Z) Installation Quantity: / H-1 SENSORS AND WEAPONS IMPROVEMENTS (OSIP ) Method of Implementation (Organic): Not Installed - Target Sight System (TSS) Upgrade Kit (AH-1Z) Installation Quantity: 38 Method of Implementation (Organic): Not Installed - Helmet Display and Tracker System (HDTS) (AH-1W) Installation Quantity: 19 Method of Implementation (Organic): Not Installed - Helmet Display and Tracker System (HDTS) Helmet Kit (AH-1W) Installation Quantity: 320 Method of Implementation (Organic): Not Installed - Linkless Feed System (AH-1W/Z) Installation Quantity: 12 Method of Implementation (Organic): Not Installed - Night Target System Upgrade (NTSU) Kit (AH-1W) Installation Quantity: 42 Method of Implementation (Organic): Not Installed - Training Equipment Installation Quantity: 2 Footnotes: (5) AFC-396 will configure the UH-1Y to fly with any of the three existing sensors: STAR Safire, BRITE Star Block I or BRITE Star Block II. (6) Due to aircraft availability, FY 2012 HDTS installation kits procured under BLI 0527 OSIP in FY 2013 are being installed under this OSIP in FY (7) Helmet Display and Tracker System (HDTS) Helmet Kit procurement quantities in FY are based on the estimated number of AH-1W operators flying HDTS-equipped aircraft. (8) NTSU Installation Equipment previously procured in BLI 0527 OSIP continues under this OSIP in. (9) increase for BRITE Star Laser Spot Tracker (LST) and TSS Upgrade Kit publications. FY 2016 increase for BRITE Star and TSS LST publications. (10) Other Support includes validation/verification and engineering support for all modifications. Navy Page 15 of 33 P-1 Line #38 Volume 2-389

16 Resource Summary Prior Years FY 2013 FY 2014 # tal FY 2016 FY 2017 FY 2018 FY / H-1 AIR VEHICLE IMPROVEMENTS (OSIP ) Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) tal Obligation Authority ($ in Millions) (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) Gross/Weapon System Unit Cost ($ in Dollars) # The Request will be submitted at a later date. tal Description: This Operational, Safety and Improvement Program (OSIP) incorporates a number of cost effective changes to H-1 air vehicle requirements, specifically attacking the highest degraders in the H-1 Cost Wise Readiness Integrated Improvement Process and on the Critical Logistics Review lists in order to improve ready based aircraft and ready for tasking rates and reduce the total cost ownership. These improvements are a vital element of the H-1 program to significantly enhance the strategy of a more ready, more capable and more survivable H-1 force to accomplish the successful fielding of this new capability to the warfighter in support of the Overseas Contingency Operations. The increased readiness and capabilities that will be realized support the tenents of Sea Power 21, specifically operational availability, enhanced capabilities, and interoperability. Planned improvements under this OSIP cover airframes (structural and air vehicle systems), propulsion, survivability, reliability and maintainability, fuel systems, electrical power, drives, engines, rotors, flying qualities, flight controls, human factors, and weight and balance. This OSIP intends to utilize upgrades to existing technology to the maximum extent practicable to minimize development and procurement costs, and to reduce the time to field the improved systems. During Full Scale Development testing of the H-1 aircraft, it was determined that incorporation of redesigned components applicable to the critical load paths will significantly increase the service life of the aircraft and components to meet the life limit of 10,000 flight hours. Safety programs that will be implemented by this OSIP include, but are not limited to, safety related items, door and hatch latches/hardware, external lights, and mission grip mounts. Reliability and maintainability programs that will be implemented by this OSIP include, but are not limited to, engineering, reliability improvements covering non-recurring engineering and eventual modification of the Alternating Current/Direct Current generator, canopy door frame, gearboxes, fuselage/cabin/seats, external lights, engine mount bearings, main drive shaft, aircraft Nickel Cadmium battery, weight reduction/gross weight increase initiatives, integrated mechanical diagnostic system improvements, clearances issues, main/ tail rotor improvements, materials improvements, drive system improvements, thermal improvements, corrosion/water intrusion control improvements, cold spray improvements, armor flooring survivability enhancements, rotor blade and gun turret covers, cargo hooks, and engine cowlings, airframe improvements including the improved defensive armament system (IDAS), and survivability enhancements. Specifically, the following are anticipated in addition to those mentioned elsewhere, Health Usage Monitoring System common tail boom wiring, swash plate improvement, UH-1Y floor panel/belly access and water intrusion modification, composite elevator, Environmental Control System, and Upgrades main rotor blade improvement. DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES: Tail boom clamp & retainer contract award 1Q FY UH-1Y Main Rotor Gear Box (MRGB) pylon strap rivet kits contract award 1Q FY Tail Rotor Drive Shaft clearance mod kit contract award 1Q. NOTE: The following items are Organization-level installs: canopy door frames, heat exchange airframe mounting mod, rotor brake improvement, slip ring/standpipe, and tail rotor blades. Navy Page 16 of 33 P-1 Line #38 Volume 2-390

17 3 / H-1 AIR VEHICLE IMPROVEMENTS (OSIP ) Navy Page 17 of 33 P-1 Line #38 Volume 2-391

18 Models of Systems Affected: UH-1Y, AH-1W/Z Modification Type: Safety/Reliability Improvements Related RDT&E PEs: Procurement Financial Plan Modification Item 1 of 1: H-1 AIR VEHICLE IMPROVEMENTS (OSIP ) A Kits Recurring / tal Cost / tal Cost / tal Cost / tal Cost / tal Cost tal FY 2016 FY 2017 FY 2018 FY 2019 / tal Cost / tal Cost / tal Cost 3 / H-1 AIR VEHICLE IMPROVEMENTS (OSIP ) / tal Cost / tal Cost / tal Cost tal / tal Cost 1.1.1) Tail Boom Clamp and Retainer Mod (UH-1Y/ - / - - / - 15 / / / - 15 / / / / / / - 77 / AH-1Z) - NonOrganic (11) 1.1.2) External Lights Upgrades (UH-1Y/AH-1Z) - 9 / / - 69 / / / - 80 / / / / / / / NonOrganic (12) 1.1.3) Slip Ring/Standpipe (UH-1Y/AH-1Z) - Organic - / - - / - - / - - / - - / - - / - 20 / / / / / / ) T C (AH-1Z Reman) - NonOrganic - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 36 / / ) Canopy Door Frames (AH-1W/Z) - Organic - / - - / - - / - - / - - / - - / - 37 / / / / / / ) MRGB Pylon Strap Rivets (UH-1Y) - NonOrganic - / - - / - 15 / / / - 15 / / / / - - / - - / - 40 / ) Gearbox Reliabilty Improvements (UH-1Y/AH-1W/ Z) - Organic 1.1.8) Heat Exchange Airframe Mounting Mod (UH-1Y/ AH-1Z) - Organic 1.1.9) Tail Rotor Drive Shaft (TRDS) Clearance Improvements (UH-1Y/AH-1Z) - Organic - / - - / - - / - - / - - / - - / - - / - - / - - / - - / / / / - - / - - / - - / - - / - - / - 40 / / / - - / - - / - 64 / / - - / - - / - - / - - / - - / - 7 / / / / / / ) Tailboom Stinger (UH-1Y/AH-1Z) - Organic - / - - / - - / - 15 / / - 15 / / / / / / / ) AC/DC Generator Improvement (UH-1Y/AH-1Z) - NonOrganic ) Rotor Brake Improvement (UH-1Y/AH-1Z) - Organic - / - - / - - / - - / - - / - - / - - / - - / - - / - 10 / / / / - - / - - / - - / - - / - - / - - / - - / - - / - 40 / / / ) Tail Rotor Blades (UH-1Y/AH-1Z) - Organic - / - - / - - / - - / - - / - - / - 10 / / / / / / ) ECP 0017R3 Swash Plate Seal (UH-1Y/AH-1Z) - Organic - / - - / - - / - 15 / / - 15 / / / / / / / Subtotal: Recurring - / / - - / / / - - / / / / / / / Non-Recurring 1.2.1) Installation Kits N/R - Organic - / - - / - - / / / - - / / / - - / - - / - - / - - / Subtotal: Non-Recurring - / / - - / / / - - / / / - - / - - / - - / - - / B Kits Recurring 2.1.1) External Lights (UH-1Y/AH-1Z) - Organic - / - - / - 69 / / / - 80 / / / / / / / ) Mission Grip Mount (AH-1Z) - Organic - / - - / - - / - 73 / / - 73 / / / / / / / Navy Page 18 of 33 P-1 Line #38 Volume 2-392

19 Models of Systems Affected: UH-1Y, AH-1W/Z Modification Type: Safety/Reliability Improvements Related RDT&E PEs: Financial Plan 2.1.3) AC/DC Generator Improvement (UH-1Y/AH-1Z) - Organic / tal Cost / tal Cost / tal Cost / tal Cost / tal Cost tal FY 2016 FY 2017 FY 2018 FY 2019 / tal Cost / tal Cost / tal Cost 3 / H-1 AIR VEHICLE IMPROVEMENTS (OSIP ) / tal Cost / tal Cost / tal Cost tal / tal Cost - / - - / - - / - - / - - / - - / - - / - - / - - / - 10 / / / Subtotal: Recurring - / / - - / / / - - / / / / / / / Non-Recurring 2.2.1) Installation Equipment N/R - Organic - / - - / - - / - - / / - - / / / - - / - - / - - / - - / Subtotal: Non-Recurring - / / - - / - - / / - - / / / - - / - - / - - / - - / Subtotal: H-1 AIR VEHICLE IMPROVEMENTS (OSIP ) 9 / / / / / / / / / / ,921 / ,286 / Subtotal: Procurement, All Modification Items - / / - - / / / - - / / / / / / / Support (All Modification Items) 3.1) Engineering Change Orders - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / / ) Data - / - - / - - / / / - - / / / / / / / ) Training Equipment - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 3 / / ) Support Equipment - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / / ) ILS - / - - / - - / - - / / - - / / / / / / / (13) 3.6) Other Support - / - - / - - / / / - - / / / / / / / ) Interim Contractor Support - / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - Subtotal: Support - / / - - / / / - - / / / / / / / Installation Modification Item 1 of 1: H-1 AIR VEHICLE IMPROVEMENTS (OSIP ) - / / - - / / / - - / / / / / / / Subtotal: Installation - / / - - / / / - - / / / / / / / tal tal Cost (Procurement + Support + Installation) Navy Page 19 of 33 P-1 Line #38 Volume 2-393

20 Modification Item 1 of 1: H-1 AIR VEHICLE IMPROVEMENTS (OSIP ) Modification Item MDAP/MAIS Code: Manufacturer Information Manufacturer Name: Depot - Tail Boom Clamp & Retainer Manufacturer Location: >North Carolina Administrative Leadtime (in Months): 1 Production Leadtime (in Months): 2 3 / H-1 AIR VEHICLE IMPROVEMENTS (OSIP ) Dates FY 2013 FY 2014 FY 2016 FY 2017 FY 2018 FY 2019 Contract Dates Oct 2013 Oct 2014 Oct 2015 Oct 2016 Oct 2017 Oct 2018 Delivery Dates Dec 2013 Dec 2014 Dec 2015 Dec 2016 Dec 2017 Dec 2018 Manufacturer Name: Depot - MRGB Plyon Strap Rivets Manufacturer Location: >North Carolina Administrative Leadtime (in Months): 1 Production Leadtime (in Months): 6 Dates FY 2013 FY 2014 FY 2016 FY 2017 FY 2018 FY 2019 Contract Dates Oct 2013 Oct 2014 Oct 2015 Oct 2016 Delivery Dates Apr 2014 Apr 2015 Apr 2016 Apr 2017 Manufacturer Name: TBD - External Lights Manufacturer Location: >Huntsville, AL Administrative Leadtime (in Months): 4 Production Leadtime (in Months): 2 Dates FY 2013 FY 2014 FY 2016 FY 2017 FY 2018 FY 2019 Contract Dates Jan 2014 Jan 2015 Jan 2016 Jan 2017 Jan 2018 Jan 2019 Delivery Dates Mar 2014 Mar 2015 Mar 2016 Mar 2017 Mar 2018 Mar 2019 Manufacturer Name: Depot - AC/DC Generator Improvement Manufacturer Location: >North Carolina Administrative Leadtime (in Months): 1 Production Leadtime (in Months): 3 Dates FY 2013 FY 2014 FY 2016 FY 2017 FY 2018 FY 2019 Contract Dates Oct 2018 Delivery Dates Feb 2019 Installation Information Method of Implementation: Depot Modification Team : Installation Name: Tail Boom Clamp and Retainer Mod (UH-1Y/AH-1Z) Installation Cost / tal Cost / tal Cost / tal Cost / tal Cost / tal Cost tal FY 2016 FY 2017 FY 2018 FY 2019 / tal Cost / tal Cost / tal Cost / tal Cost / tal Cost / tal Cost tal / tal Cost Prior Years - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY / - - / - 15 / / - - / - - / - - / - - / - - / - - / - - / - 15 / / - - / - - / - 15 / / - 15 / / - - / - - / - - / - - / - 15 / Navy Page 20 of 33 P-1 Line #38 Volume 2-394

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 30 P-1 Line #36

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 30 P-1 Line #36 Exhibit P-40, Budget Line Item Justification: PB 2016 Navy Date: February 2015 1506N: Aircraft Procurement, Navy / BA 05: Modification of Aircraft / BSA 1: Modification of Aircraft ID Code (A=Service Ready,

More information

UNCLASSIFIED. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018

UNCLASSIFIED. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018 Exhibit P-40, Budget Item Justification Sheet: PB 2014 Navy Date: April 2013 Aircraft / BSA 1: Modification Of Aircraft ID Code (A=Service Ready, B=Not Service Ready) : A Program Elements for Code B Items:

More information

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 24 P-1 Line #55

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 24 P-1 Line #55 Exhibit P-40, Budget Line Item Justification: PB 2016 Navy Date: February 2015 1506N: Aircraft Procurement, Navy / BA 05: Modification of Aircraft / BSA 1: Modification of Aircraft ID Code (A=Service Ready,

More information

UNCLASSIFIED. FY 2017 Base FY 2017 OCO FY 2017 OCO. FY 2017 Base

UNCLASSIFIED. FY 2017 Base FY 2017 OCO FY 2017 OCO. FY 2017 Base Exhibit P-40, Budget Line Item Justification: PB 2017 Air Force Date: February 2016 3010F: Aircraft Procurement, Air Force / BA 05: Modification of Inservice Aircraft / BSA 2: Tactical Aircraft ID Code

More information

UNCLASSIFIED FY Exhibits Schedule Prior Years FY 2013 FY 2014 FY 2015 Base FY 2015 OCO FY 2015 Total. Total Cost ($ M)

UNCLASSIFIED FY Exhibits Schedule Prior Years FY 2013 FY 2014 FY 2015 Base FY 2015 OCO FY 2015 Total. Total Cost ($ M) Exhibit P-40, Budget Line Item Justification: PB 2015 Army Date: March 2014 2033A: Procurement of W&TCV, Army / BA 01: Tracked Combat Vehicles / BSA 20: Modification of Tracked Combat Vehicles ID Code

More information

UNCLASSIFIED. FY 2016 Base FY 2016 OCO FY 2016 OCO. FY 2016 Base

UNCLASSIFIED. FY 2016 Base FY 2016 OCO FY 2016 OCO. FY 2016 Base Exhibit P-40, Budget Line Item Justification: PB 2016 Army Date: February 2015 2031A: Aircraft Procurement, Army / BA 02: Modification of Aircraft / BSA 10: Modification of Aircraft ID Code (A=Service

More information

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 16 P-1 Line #57

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 16 P-1 Line #57 Exhibit P-40, Budget Line Item Justification: PB 2017 Navy Date: February 2016 1506N: Aircraft Procurement, Navy / BA 05: Modification of Aircraft / BSA 1: Modification of Aircraft ID Code (A=Service Ready,

More information

UNCLASSIFIED. FY 2017 Base FY 2017 OCO FY 2017 OCO. FY 2017 Base

UNCLASSIFIED. FY 2017 Base FY 2017 OCO FY 2017 OCO. FY 2017 Base Exhibit P-40, Budget Line Item Justification: PB 2017 Air Force Date: February 2016 3010F: Aircraft Procurement, Air Force / BA 05: Modification of Inservice Aircraft / BSA 2: Tactical Aircraft ID Code

More information

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

UNCLASSIFIED FY 2016 OCO. FY 2016 Base Exhibit P-40, Budget Line Item Justification: PB 2016 Air Force Date: February 2015 3010F: Aircraft Procurement, Air Force / BA 05: Modification of Inservice Aircraft / BSA 5: Other Aircraft ID Code (A=Service

More information

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 10 P-1 Line #47

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 10 P-1 Line #47 Exhibit P-40, Budget Line Item Justification: PB 2016 Air Force Date: February 2015 3010F: Aircraft Procurement, Air Force / BA 05: Modification of Inservice Aircraft / BSA 5: Other Aircraft ID Code (A=Service

More information

UNCLASSIFIED FY 2016 OCO. FY 2016 Base. FY 2016 Base FY 2016 OCO

UNCLASSIFIED FY 2016 OCO. FY 2016 Base. FY 2016 Base FY 2016 OCO Exhibit P-40, Budget Line Item Justification: PB 2016 Army Date: February 2015 2033A: Procurement of W&TCV, Army / BA 01: Tracked Combat Vehicles / BSA 20: Modification of Tracked Combat Vehicles ID Code

More information

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 5 P-1 Line #35

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 5 P-1 Line #35 Exhibit P-40, Budget Line Item Justification: PB 2017 Air Force Date: February 2016 3010F: Aircraft Procurement, Air Force / BA 05: Modification of Inservice Aircraft / BSA 4: Trainer Aircraft ID Code

More information

UNCLASSIFIED. FY 2016 Base FY 2016 OCO FY 2016 OCO. FY 2016 Base

UNCLASSIFIED. FY 2016 Base FY 2016 OCO FY 2016 OCO. FY 2016 Base Exhibit P-40, Budget Line Item Justification: PB 2016 Air Force Date: February 2015 3010F: Aircraft Procurement, Air Force / BA 05: Modification of Inservice Aircraft / BSA 2: Tactical Aircraft ID Code

More information

UNCLASSIFIED. UNCLASSIFIED United States Special Operations Command Page 1 of 6 P-1 Line #53

UNCLASSIFIED. UNCLASSIFIED United States Special Operations Command Page 1 of 6 P-1 Line #53 Exhibit P-40, Budget Line Item Justification: PB 2017 United States Special Operations Command : February 2016 0300D: Procurement, Defense-Wide / BA 02: Special Operations Command / BSA 1: Aviation Programs

More information

UNCLASSIFIED. FY 2017 Base FY 2017 OCO

UNCLASSIFIED. FY 2017 Base FY 2017 OCO Exhibit P-40, Budget Line Item Justification: PB 2017 Air Force Date: February 2016 3010F: Aircraft Procurement, Air Force / BA 05: Modification of Inservice Aircraft / BSA 5: Other Aircraft ID Code (A=Service

More information

UNCLASSIFIED. UNCLASSIFIED Army Page 1 of 23 P-1 Line #27

UNCLASSIFIED. UNCLASSIFIED Army Page 1 of 23 P-1 Line #27 Exhibit P-40, Budget Line Item Justification: PB 2015 Army Date: March 2014 2031A: Aircraft Procurement, Army / BA 02: Modification of Aircraft / BSA 10: Modification of Aircraft ID Code (A=Service Ready,

More information

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 18 P-1 Line #12

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 18 P-1 Line #12 Exhibit P-40, Budget Line Item Justification: PB 2017 Navy Date: February 2016 1810N: Other Procurement, Navy / BA 01: Ships Support Equipment / BSA 9: Other Shipboard Equipment ID Code (A=Service Ready,

More information

UNCLASSIFIED FY 2015 FY 2015 OCO. FY 2015 Base FY 2015 FY Base

UNCLASSIFIED FY 2015 FY 2015 OCO. FY 2015 Base FY 2015 FY Base Exhibit P-40, Budget Line Item Justification: PB 2015 Air Force Date: March 2014 3010F: Aircraft Procurement, Air Force / BA 05: Modification of Inservice Aircraft / BSA 5: Other Aircraft ID Code (A=Service

More information

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 5 P-1 Line #55

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 5 P-1 Line #55 Exhibit P-40, Budget Line Item Justification: PB 2016 Air Force Date: February 2015 3010F: Aircraft Procurement, Air Force / BA 05: Modification of Inservice Aircraft / BSA 5: Other Aircraft ID Code (A=Service

More information

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 5 P-1 Line #21

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 5 P-1 Line #21 Exhibit P-40, Budget Line Item Justification: PB 2015 Navy Date: March 2014 1507N: Weapons Procurement, Navy / BA 03: Torpedoes and Related Equipment / BSA 1: Torpedoes and Related Equip ID Code (A=Service

More information

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

UNCLASSIFIED FY 2016 OCO. FY 2016 Base Exhibit P-40, Budget Line Item Justification: PB 2016 Air Force Date: February 2015 3010F: Aircraft Procurement, Air Force / BA 05: Modification of Inservice Aircraft / BSA 5: Other Aircraft ID Code (A=Service

More information

UNCLASSIFIED. FY 2017 Base FY 2017 OCO. FY 2017 Base FY 2017 OCO

UNCLASSIFIED. FY 2017 Base FY 2017 OCO. FY 2017 Base FY 2017 OCO Exhibit P-40, Budget Line Item Justification: PB 2017 Air Force Date: February 2016 3010F: Aircraft Procurement, Air Force / BA 05: Modification of Inservice Aircraft / BSA 3: Airlift Aircraft ID Code

More information

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 17 P-1 Line #121

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 17 P-1 Line #121 Exhibit P-40, Budget Line Item Justification: PB 2015 Navy Date: March 2014 1810N: Other Procurement, Navy / BA 04: Ordnance Support Equipment / BSA 3: Ship Missile Systems Equipment ID Code (A=Service

More information

UNCLASSIFIED. FY 2017 Base FY 2017 OCO FY 2017 OCO. FY 2017 Base

UNCLASSIFIED. FY 2017 Base FY 2017 OCO FY 2017 OCO. FY 2017 Base Exhibit P-40, Budget Line Item Justification: PB 2017 Air Force Date: February 2016 3010F: Aircraft Procurement, Air Force / BA 05: Modification of Inservice Aircraft / BSA 5: Other Aircraft ID Code (A=Service

More information

UNCLASSIFIED FY 2017 OCO. FY 2017 Base

UNCLASSIFIED FY 2017 OCO. FY 2017 Base Exhibit P-40, Budget Line Item Justification: PB 2017 Air Force Date: February 2016 3021F: Space Procurement, Air Force / BA 01: Space Procurement, Air Force / BSA 1: Space Programs ID Code (A=Service

More information

UNCLASSIFIED. FY 2017 Base FY 2017 OCO FY 2017 OCO. FY 2017 Base

UNCLASSIFIED. FY 2017 Base FY 2017 OCO FY 2017 OCO. FY 2017 Base Exhibit P-40, Budget Line Item Justification: PB 2017 Army Date: February 2016 2033A: Procurement of W&TCV, Army / BA 01: Tracked Combat Vehicles / BSA 20: Modification of Tracked Combat Vehicles ID Code

More information

UNCLASSIFIED FY 2015 FY 2015 OCO. FY 2015 Base FY 2015 FY Base

UNCLASSIFIED FY 2015 FY 2015 OCO. FY 2015 Base FY 2015 FY Base Exhibit P-40, Budget Line Item Justification: PB 2015 Army Date: March 2014 2031A: Aircraft Procurement, Army / BA 02: Modification of Aircraft / BSA 10: Modification of Aircraft ID Code (A=Service Ready,

More information

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 18 P-1 Line #56

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 18 P-1 Line #56 Exhibit P-40, Budget Line Item Justification: PB 2016 Air Force Date: February 2015 3010F: Aircraft Procurement, Air Force / BA 05: Modification of Inservice Aircraft / BSA 5: Other Aircraft ID Code (A=Service

More information

UNCLASSIFIED. FY 2014 Base. OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018

UNCLASSIFIED. FY 2014 Base. OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018 Exhibit P-40, Budget Item Justification Sheet: PB 2014 Air Force Date: April 2013 Inservice Missiles / BSA 1: Class IV ID Code (A=Service Ready, B=Not Service Ready) : A Program Elements for Code B Items:

More information

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 21 P-1 Line #19

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 21 P-1 Line #19 Exhibit P-40, Budget Line Item Justification: PB 2017 Navy Date: February 2016 1810N: Other Procurement, Navy / BA 01: Ships Support Equipment / BSA 9: Other Shipboard Equipment ID Code (A=Service Ready,

More information

UNCLASSIFIED. FY 2017 Base FY 2017 OCO

UNCLASSIFIED. FY 2017 Base FY 2017 OCO Exhibit P-40, Budget Line Item Justification: PB 2017 Navy Date: February 2016 1506N: Aircraft Procurement, Navy / BA 05: Modification of Aircraft / BSA 1: Modification of Aircraft ID Code (A=Service Ready,

More information

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 31 P-1 Line #41

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 31 P-1 Line #41 Exhibit P-40, Budget Line Item Justification: PB 2017 Navy Date: February 2016 1810N: Other Procurement, Navy / BA 01: Ships Support Equipment / BSA 16: Logistic Support ID Code (A=Service Ready, B=Not

More information

UNCLASSIFIED. FY 2014 Base. OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018

UNCLASSIFIED. FY 2014 Base. OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018 Exhibit P-40, Budget Item Justification Sheet: PB 2014 Army Date: April 2013 Aircraft / BSA 10: Modification Of Aircraft ID Code (A=Service Ready, B=Not Service Ready) : Program Elements for Code B Items:

More information

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 17 P-1 Line #55

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 17 P-1 Line #55 Exhibit P-40, Budget Line Item Justification: PB 2017 Air Force Date: February 2016 3010F: Aircraft Procurement, Air Force / BA 05: Modification of Inservice Aircraft / BSA 5: Other Aircraft ID Code (A=Service

More information

UNCLASSIFIED. UNCLASSIFIED Army Page 1 of 16 P-1 Line #15

UNCLASSIFIED. UNCLASSIFIED Army Page 1 of 16 P-1 Line #15 Exhibit P-40, Budget Line Item Justification: PB 2017 Army Date: February 2016 2031A: Aircraft Procurement, Army / BA 02: Modification of Aircraft / BSA 10: Modification of Aircraft ID Code (A=Service

More information

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 34 P-1 Line #51

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 34 P-1 Line #51 Exhibit P-40, Budget Line Item Justification: PB 2016 Navy Date: February 2015 1506N: Aircraft Procurement, Navy / BA 05: Modification of Aircraft / BSA 1: Modification of Aircraft ID Code (A=Service Ready,

More information

UNCLASSIFIED FY Exhibits Schedule Prior Years FY 2013 FY 2014 FY 2015 Base FY 2015 OCO FY 2015 Total. Total Cost ($ M) Unit Cost ($) Qty (Each)

UNCLASSIFIED FY Exhibits Schedule Prior Years FY 2013 FY 2014 FY 2015 Base FY 2015 OCO FY 2015 Total. Total Cost ($ M) Unit Cost ($) Qty (Each) Exhibit P-40, Budget Line Item Justification: PB 2015 Navy Date: March 2014 1506N: Aircraft Procurement, Navy / BA 05: Modification of Aircraft / BSA 1: Modification of Aircraft ID Code (A=Service Ready,

More information

UNCLASSIFIED. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018

UNCLASSIFIED. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018 Exhibit P-40, Budget Item Justification Sheet: PB 2014 Navy : April 2013 Ammo, MC / BSA 1: Marine Corps Ammunition ID Code (A=Service Ready, B=Not Service Ready) : A Program Elements for Code B : Other

More information

UNCLASSIFIED FY Exhibits Schedule Prior Years FY 2013 FY 2014 FY 2015 Base FY 2015 OCO FY 2015 Total. Unit Cost ($ M) Qty (Each)

UNCLASSIFIED FY Exhibits Schedule Prior Years FY 2013 FY 2014 FY 2015 Base FY 2015 OCO FY 2015 Total. Unit Cost ($ M) Qty (Each) Exhibit P-40, Budget Line Item Justification: PB 2015 United States Special Operations Command Date: March 2014 0300D: Procurement, Defense-Wide / BA 02: Special Operations Command / BSA 4: Other Procurement

More information

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 33 P-1 Line #94

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 33 P-1 Line #94 Exhibit P-40, Budget Line Item Justification: PB 2017 Navy Date: February 2016 1810N: Other Procurement, Navy / BA 02: Communications & Electronics Equip / BSA 12: Submarine Communications ID Code (A=Service

More information

UNCLASSIFIED. FY 2016 Base FY 2016 OCO FY 2016 OCO. FY 2016 Base

UNCLASSIFIED. FY 2016 Base FY 2016 OCO FY 2016 OCO. FY 2016 Base Resource Summary Prior Years FY 2014 FY 2015 Base OCO Total FY 2017 FY 2018 FY 2019 FY 2020 To Complete Procurement Quantity (Units in Each) - - - - - - - - - - - - Gross/Weapon System Cost ($ in Millions)

More information

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED. FY 2016 Base FY 2016 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Air Force : February 2015 3600: Research, Development, Test & Evaluation, Air Force / BA 7: Operational Systems Development COST ($ in Millions) FY

More information

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 151 P-1 Line #32

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 151 P-1 Line #32 Exhibit P-40, Budget Line Item Justification: PB 2017 Navy Date: February 2016 1506N: Aircraft Procurement, Navy / BA 05: Modification of Aircraft / BSA 1: Modification of Aircraft ID Code (A=Service Ready,

More information

UNCLASSIFIED FY 2017 OCO. FY 2017 Base

UNCLASSIFIED FY 2017 OCO. FY 2017 Base Exhibit P-40, Budget Line Item Justification: PB 2017 Navy Date: February 2016 1810N: Other Procurement, Navy / BA 04: Ordnance Support Equipment / BSA 7: Other Expendable Ordnance ID Code (A=Service Ready,

More information

UNCLASSIFIED. FY 2017 Base FY 2017 OCO

UNCLASSIFIED. FY 2017 Base FY 2017 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2017 Air Force : February 2016 3600: Research, Development, Test & Evaluation, Air Force / BA 7: Operational Systems Development COST ($ in Millions) FY

More information

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 126 P-1 Line #32

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 126 P-1 Line #32 Exhibit P-40, Budget Line Item Justification: PB 2016 Navy Date: February 2015 1506N: Aircraft Procurement, Navy / BA 05: Modification of Aircraft / BSA 1: Modification of Aircraft ID Code (A=Service Ready,

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE PE A: AIRCRAFT CERTIFICATION FY 2012 OCO

UNCLASSIFIED R-1 ITEM NOMENCLATURE PE A: AIRCRAFT CERTIFICATION FY 2012 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 212 Army DATE: February 211 24: Research, Development, Test & Evaluation, Army COST ($ in Millions) FY 21 FY 211 FY 212 Base PE 6566A: AIRCRAFT CERTIFICATION

More information

RDT&E BUDGET ITEM JUSTIFICATION SHEET (R-2 Exhibit)

RDT&E BUDGET ITEM JUSTIFICATION SHEET (R-2 Exhibit) PE NUMBER: 0604239F PE TITLE: F-22 EMD BUDGET ACTIVITY COST ($ In Thousands) Actual FY 1999 FY 2000 FY 2001 FY 2002 FY 2003 FY 2004 FY 2005 Cost to Complete Cost Advanced Tactical Fighter FSD 2,010,717

More information

UNCLASSIFIED. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018

UNCLASSIFIED. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018 Exhibit P-40, Budget Item Justification Sheet: PB 2014 Navy : April 2013 Ammo, MC / BSA 1: Marine Corps Ammunition ID Code (A=Service Ready, B=Not Service Ready) : A Program Elements for Code B : Other

More information

UNCLASSIFIED. FY 2017 Base FY 2017 OCO. FY 2017 Base FY 2017 OCO

UNCLASSIFIED. FY 2017 Base FY 2017 OCO. FY 2017 Base FY 2017 OCO UNCLSSIFIED Exhibit P-40, Budget Line Item Justification: PB 2017 ir Force Date: February 2016 ppropriation / Budget ctivity / Budget Sub ctivity: 3080F: Other Procurement, ir Force / B 02: Vehicular Equipment

More information

UH1H HP Modification and Upgrade Program

UH1H HP Modification and Upgrade Program UH1H HP Modification and Upgrade Program The UH-1H has served the United States military for many years, setting the performance standards for all helicopters. Since the start of production, over 10,000

More information

UNCLASSIFIED. UNCLASSIFIED Page 1 of 5. EXHIBIT R-2, RDT&E Budget Item Justification RESEARCH DEVELOPMENT TEST & EVALUATION, NAVY / BA-5

UNCLASSIFIED. UNCLASSIFIED Page 1 of 5. EXHIBIT R-2, RDT&E Budget Item Justification RESEARCH DEVELOPMENT TEST & EVALUATION, NAVY / BA-5 EXHIBIT R-2, RDT&E Budget Item Justification APPROPRIATION/BUDGET ACTIVITY RESEARCH DEVELOPMENT TEST & EVALUATION, NAVY / BA-5 R-1 ITEM NOMENCLATURE 0605430N, C/KC-130 AVIONICS MODERNIZATION PROGRAM (AMP)

More information

> Designed by pilots, for pilots. Helmet Mounted Sight Display for helicopters.

> Designed by pilots, for pilots. Helmet Mounted Sight Display for helicopters. > TopOwl Designed by pilots, for pilots Helmet Mounted Sight Display for helicopters www.thalesgroup.com On board: In Service, ahead of the pack System developed and currently over 700 helmets delivered

More information

UNCLASSIFIED UNCLASSIFIED

UNCLASSIFIED UNCLASSIFIED : February 216 Exhibit R2, RDT&E Budget Item Justification: PB 217 24: Research, Development, Test & Evaluation, / BA 5: System Development & Demonstration (SDD) COST ($ in Millions) FY 215 Program Element

More information

LAUNCHING YOUR UNMANNED AIRCRAFT PROGRAM

LAUNCHING YOUR UNMANNED AIRCRAFT PROGRAM LAUNCHING YOUR UNMANNED AIRCRAFT PROGRAM THE DARTDRONES TEAM UNMANNED AIRCRAFT APPLICATIONS AERIAL INSPECTIONS AERIAL INSPECTIONS Safer and faster alternative to visual inspection by an individual Damage

More information

Aeros 40D Sky Dragon. TYPE CERTIFIED BY: United States Federal Aviation Administration Civil Aviation Authorities: Europe and Asia

Aeros 40D Sky Dragon. TYPE CERTIFIED BY: United States Federal Aviation Administration Civil Aviation Authorities: Europe and Asia Aeros 40D Sky Dragon The Aeros 40D Sky Dragon Airship The United States Federal Aviation Administration (FAA) Type Certified Aeros 40D Sky Dragon is the most advanced non rigid airship, incorporating innovative

More information

Your success is our goal. Rely on our engineering.

Your success is our goal. Rely on our engineering. Your success is our goal. Rely on our engineering. When it comes to aircraft engineering solutions, we are renowned for our vast expertise, outstanding experience and high quality performance. What our

More information

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 17 P-1 Line #13

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 17 P-1 Line #13 Exhibit P-40, Budget Line Item Justification: PB 2016 Navy : February 2015 1508N: Procurement of Ammo, Navy & MC / BA 01: Proc Ammo, Navy / BSA 1: Navy Ammunition A Program Elements for Code B Items: Other

More information

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: Communication, Navigation, Surveillance/Air Traffic Management (CNS/ATM) FY 2012 OCO

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: Communication, Navigation, Surveillance/Air Traffic Management (CNS/ATM) FY 2012 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2012 Air Force DATE: February 2011 COST ($ in Millions) FY 2010 FY 2011 FY 2013 FY 2014 FY 2015 FY 2016 To Program Element 6.754 5.708 4.604-4.604 4.549

More information

AEROSPACE & ELECTRONICS BRENDAN CURRAN PRESIDENT

AEROSPACE & ELECTRONICS BRENDAN CURRAN PRESIDENT AEROSPACE & ELECTRONICS BRENDAN CURRAN PRESIDENT Aerospace & Electronics Overview and Results Market Outlook Technological Differentiation and Growth Summary 2 Crane Aerospace & Electronics Industry Leader

More information

Gegaso Ltd. Company Presentation

Gegaso Ltd. Company Presentation Gegaso Ltd. Company Presentation This document and the information contained in it are proprietary of Gegaso Ltd. No person is allowed to use, copy, reprint, reproduce, publish or disclose to others this

More information

OPNAVINST B N98 15 Apr Subj: NAVAL AVIATION POLICY FOR AIRCRAFT AVIONICS SAFETY SYSTEMS

OPNAVINST B N98 15 Apr Subj: NAVAL AVIATION POLICY FOR AIRCRAFT AVIONICS SAFETY SYSTEMS DEPARTMENT OF THE NAVY OFFICE OF THE CHIEF OF NAVAL OPERATIONS 2000 NAVY PENTAGON WASHINGTON, DC 20350-2000 OPNAVINST 13210.1B N98 OPNAV INSTRUCTION 13210.1B From: Chief of Naval Operations Subj: NAVAL

More information

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 27 P-1 Line #2

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 27 P-1 Line #2 UNCLSSIFIED Exhibit P-40, Budget Line Item Justification: PB mended 2015 ir Force Date: June 2014 ppropriation / Budget ctivity / Budget Sub ctivity: 3011F: Procurement of mmunition, ir Force / B 01: mmunition

More information

July 29-30, 2010 Washington, D.C Procurement Agencies. Coast Guard Agencies

July 29-30, 2010 Washington, D.C Procurement Agencies. Coast Guard Agencies 2010 Military, Civilian and Commercial UAV Systems & Applications Unmanned Aircraft Systems Defense and Tactics Conference & Expo July 29-30, 2010 Washington, D.C Photo credit: US DoD 25 Countries 40 Procurement

More information

Safety Enhancement SE ASA Design Virtual Day-VMC Displays

Safety Enhancement SE ASA Design Virtual Day-VMC Displays Safety Enhancement SE 200.2 ASA Design Virtual Day-VMC Displays Safety Enhancement Action: Implementers: (Select all that apply) Statement of Work: Manufacturers develop and implement virtual day-visual

More information

Military Aviation Fleet & MRO Forecast

Military Aviation Fleet & MRO Forecast Military Aviation Fleet & MRO Forecast April 6, 2016 Daniel Z. Katz Director, Defense Analysis and Data Aviation Week Intelligence and Data Services Arlington, VA Source: Aviation Week 2016 Fleet & MRO

More information

Hereafter there are some examples on how parts of a test campaign should typically be classified. In case of any doubt contact the Agency:

Hereafter there are some examples on how parts of a test campaign should typically be classified. In case of any doubt contact the Agency: Hereafter there are some examples on how parts of a test campaign should typically be classified. In case of any doubt contact the Agency: Category 1 # CAT 1 Flight Test Justification (3.1. Annex XII Part

More information

The Green Airplane and Cyber

The Green Airplane and Cyber 33 nd Annual International T&E Symposium The Green Airplane and Cyber Hank Steinfeld, NAVAIR Paola Pringle, NAVAIR What is the Green Airplane? The green airplane is the product that is the derivative source.

More information

AEROSPACE & ELECTRONICS BRENDAN CURRAN PRESIDENT

AEROSPACE & ELECTRONICS BRENDAN CURRAN PRESIDENT AEROSPACE & ELECTRONICS BRENDAN CURRAN PRESIDENT Executive Summary Revenue projections growing with commercial volumes and strengthening defense market Maintaining excellent margins High-value products

More information

Hazard Identification Questionnaire

Hazard Identification Questionnaire Hazard Identification Questionnaire OVERVIEW This questionnaire is designed to help identify potential risks and help identify areas of risk exposure. It is not an exhaustive list. This questionnaire is

More information

NEXT GENERATION VERSATILITY

NEXT GENERATION VERSATILITY Offshore AW169 NEXT GENERATION VERSATILITY DELIVERING PERFORMANCE The AW169 is the brand new 4.5 tonnes class twin-engine helicopter. Ideally suited to the demanding Offshore mission, capable of carrying

More information

Advisory Circular (AC)

Advisory Circular (AC) Advisory Circular (AC) Flight Test Considerations For The Approval Of The Design Of Aircraft Modifications File No. 5009-6-513 AC No. 513-003 RDIMS No. 528350-V3 Issue No. 01 Issuing Branch Aircraft Certification

More information

BRINGING THE POWER OF GARMIN TO ACEHAWK

BRINGING THE POWER OF GARMIN TO ACEHAWK BRINGING THE POWER OF GARMIN TO ACEHAWK CIVIL PEDIGREE TACTICAL AGILITY ACEHAWK- Seamless Integration The ACEHAWK has one of the most intuitive pilot-vehicle interfaces (PVI) available on the market. The

More information

Operators may need to retrofit their airplanes to ensure existing fleets are properly equipped for RNP operations. aero quarterly qtr_04 11

Operators may need to retrofit their airplanes to ensure existing fleets are properly equipped for RNP operations. aero quarterly qtr_04 11 Operators may need to retrofit their airplanes to ensure existing fleets are properly equipped for RNP operations. 24 equipping a Fleet for required Navigation Performance required navigation performance

More information

REMOTE AVIONICS MODIFICATION SERVICES

REMOTE AVIONICS MODIFICATION SERVICES Design Support Fabrication Installation Certification REMOTE AVIONICS MODIFICATION SERVICES 1 L2 Consulting Services, Inc. L2Aviation.com 512-894-3414 L2 RAMS TEAM RAMS Services History Mobile Installation

More information

Cost-effective, flexible avionics for today s missions and future challenges. Flight2 integrated avionics system. UPGRADES FOR LEGACY C-130s

Cost-effective, flexible avionics for today s missions and future challenges. Flight2 integrated avionics system. UPGRADES FOR LEGACY C-130s Cost-effective, flexible avionics for today s missions and future challenges. Flight2 integrated avionics system UPGRADES FOR LEGACY C-130s Bring cabin capability into highest definition. Flight2 integrated

More information

What Is The Proposed 29Palms Training Land Acquisition and Airspace Establishment Project? Frequently Asked Questions Airspace Related June 2014

What Is The Proposed 29Palms Training Land Acquisition and Airspace Establishment Project? Frequently Asked Questions Airspace Related June 2014 MARINE CORPS / DEPARTMENT OF THE NAVY SUBMIT SPECIAL USE AIRSPACE PROPOSALS TO THE FEDERAL AVIATION ADMINISTRATION TO MEET MARINE EXPEDITIONARY BRIGADE TRAINING REQUIREMENTS 1. Why has the Marine Corps

More information

Committed to keeping you flying Controls and Avionics Solutions

Committed to keeping you flying Controls and Avionics Solutions Committed to keeping you flying Controls and Avionics Solutions Engine Controls BAE Systems is a world leader in full authority digital engine control (FADEC) design, development, production, and support.

More information

Aircraft Controls MILITARY AIRCRAFT COMMERCIAL AIRCRAFT AFTERMARKET

Aircraft Controls MILITARY AIRCRAFT COMMERCIAL AIRCRAFT AFTERMARKET Aircraft Controls MILITARY AIRCRAFT COMMERCIAL AIRCRAFT AFTERMARKET The largest of the five Moog operating segments is Aircraft Controls. Revenues from development, production and aftermarket support of

More information

COALITION AIRSPACE MANAGEMNENT AND DECONFLICTION

COALITION AIRSPACE MANAGEMNENT AND DECONFLICTION COALITION AIRSPACE MANAGEMNENT AND DECONFLICTION 4 October 2006 Briefer: Squadron Leader Geoff Wilson-Smith Royal Air Force Exchange Officer Information Directorate Air Force Research Laboratory Tel: (315)

More information

2004 Raytheon Premier I N24YP S/N RB-95. Specifications and Summary

2004 Raytheon Premier I N24YP S/N RB-95. Specifications and Summary 2004 Raytheon Premier I N24YP S/N RB-95 Specifications and Summary 2004 Raytheon Premier I N24YP S/N RB-95 OFFERED AT: $2,195,000 HISTORY: One Owner Since New AVAILABLE: IMMEDIATELY STATUS: As of December

More information

Your Trusted Special Missions Partner

Your Trusted Special Missions Partner SPECIAL MISSIONS Your Trusted Special Missions Partner CAPABILITY/OVERVIEW 1 Hawker Pacific Aviation s Trusted Choice Hawker Pacific is the market leader in integrated civil and military aerospace sales

More information

What Is The 29Palms Training Land Acquisition and Airspace Establishment Project Frequently Asked Questions Airspace Related July 2015

What Is The 29Palms Training Land Acquisition and Airspace Establishment Project Frequently Asked Questions Airspace Related July 2015 MARINE CORPS / DEPARTMENT OF THE NAVY SUBMIT SPECIAL USE AIRSPACE PROPOSALS TO THE FEDERAL AVIATION ADMINISTRATION TO MEET MARINE EXPEDITIONARY BRIGADE TRAINING REQUIREMENTS 1. Why has the Marine Corps

More information

When most people build their avionics package,

When most people build their avionics package, nuts & bolts technical counselor The Avionics Master To protect and defend GEORGE R. WILHELMSEN When most people build their avionics package, they mostly think about the great avionics they want to put

More information

RADA Electronic Industries Ltd. (Nasdaq: RADA) March 2019

RADA Electronic Industries Ltd. (Nasdaq: RADA) March 2019 RADA Electronic Industries Ltd. (Nasdaq: RADA) March 2019 DISCLAIMER This presentation contains certain statements that may be deemed to be forward looking statements within the meaning of Section 27A

More information

Aircraft Specification Summary Convair CV580 SN: 168 Registration: ZK FTA

Aircraft Specification Summary Convair CV580 SN: 168 Registration: ZK FTA Aircraft Specification Summary Convair CV580 SN: 168 Registration: ZK FTA Details as of: 22 January 2016 1. Aircraft Specifications AIRCRAFT SPECIFICATIONS Manufacturer: General Dynamics, Convair Division

More information

HEAD-UP DISPLAY (HUD), EQUIVALENT DISPLAYS AND VISION SYSTEMS

HEAD-UP DISPLAY (HUD), EQUIVALENT DISPLAYS AND VISION SYSTEMS ATT 2.B-1 ATTACHMENT 2.B HEAD-UP DISPLAY (HUD), EQUIVALENT DISPLAYS AND VISION SYSTEMS Supplementary to 2.2.2.2, 2.4.15.1, 3.4.2.7 and 3.6.12 Introduction The material in this attachment provides guidance

More information

Garrecht TRX 1500 Traffic-Sensor

Garrecht TRX 1500 Traffic-Sensor SECTION 9 Pilot s Operating Handbook Supplement Garrecht TRX 1500 Traffic-Sensor This supplement is applicable and must be integrated into the Airplane Flight Manual if a Garrecht Traffic-Sensor is installed

More information

TIGER COMBAT HELICOPTER

TIGER COMBAT HELICOPTER TIGER COMBAT HELICOPTER Lessons learnt on EMAR implementation Thomas Gaborit TIGER: EMAR LESSONS LEARNT AGENDA 1. OCCAR-EA procurement organisation 2. TIGER combat helicopter framework 3. TIGER airworthiness

More information

Thales on the Civil Aerospace market

Thales on the Civil Aerospace market thalesgroup.com Innovation - Civil Aerospace - Defence Aerospace - Transportation - Defence - Security Thales on the Civil Aerospace market AT A GLANCE World n 1 in ATM, covering 40% of world s surface

More information

CARRIER STRIKE GROUPS

CARRIER STRIKE GROUPS CARRIER STRIKE GROUPS A carrier strike group (CSG) can be tasked to accomplish a variety of wartime missions, as well as missions other than war. During peacetime operations, a CSG typically conducts forward-presence

More information

OPERATIONS CIRCULAR 01/2012. Subject: HEAD-UP DISPLAYS (HUD) AND ENHANCED VISION SYSTEMS (EVS)

OPERATIONS CIRCULAR 01/2012. Subject: HEAD-UP DISPLAYS (HUD) AND ENHANCED VISION SYSTEMS (EVS) GOVERNMENT OF INDIA CIVIL AVIATION DEPARTMENT OFFICE OF THE DIRECTOR GENERAL OF CIVIL AVIATION OPP. SAFDARJUNG AIRPORT, NEW DELHI 110 003 TELEPHONE: 091-011-4635261 4644768 FAX: 091-011-4644764 TELEX:

More information

Subj: SHIP'S HISTORY SUBMISSION FOR USS HURRICANE (PC-3) Acting

Subj: SHIP'S HISTORY SUBMISSION FOR USS HURRICANE (PC-3) Acting DEPARTMENT OF THE NAVY COMMANDING OFFICER USS HURRICANE (PC 3) FPO AP 96667-1962 5750 Ser PC31208 05 Oct 98 From: Commanding Officer, USS HURRICANE (PC 3) To: Director of Naval History (OP-09BH), Washington

More information

Wireless Technology for Aircrafts. Opportunities and Challenges. Fly-by-Wireless Workshop March 27-28, 2007

Wireless Technology for Aircrafts. Opportunities and Challenges. Fly-by-Wireless Workshop March 27-28, 2007 Wireless Technology for Aircrafts Opportunities and Challenges Fly-by-Wireless Workshop March 27-28, 2007 Presented by Henrique A Alves henrique.alves@embraer.com.br Agenda Introduction to EMBRAER Wireless

More information

Bell 525 Relentless Program Presentation

Bell 525 Relentless Program Presentation Bell 525 Relentless Program Presentation SFTE/SETP Southwest Flight Test Symposium October 25, 2014 James C Harris The Bell 525 is designed in collaboration with an industry advisory group to meet all

More information

No specific requirements were established for non complex helicopters.therefore EASA has

No specific requirements were established for non complex helicopters.therefore EASA has Special Condition to define the MMEL requirements as Certification Basis for non complex motor powered helicopters. Introductory Note The following Special Condition has been classified as a new Special

More information

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 31 P-1 Line #2

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 31 P-1 Line #2 UNCLSSIFIED Exhibit P-40, Budget Line Item Justification: PB 2016 ir Force : February 2015 ppropriation / Budget ctivity / Budget Sub ctivity: 3011F: Procurement of mmunition, ir Force / B 01: mmunition

More information

small Unmanned Aircraft Systems Arlington Police Department June 28, 2011

small Unmanned Aircraft Systems Arlington Police Department June 28, 2011 suas small Unmanned Aircraft Systems Arlington Police Department June 28, 2011 1. Overview of APD suas program to date 2. Discuss the C.O.A. (FAA certificate of authorization to fly) and restrictions

More information

COMPLIANCE WITH THIS PUBLICATION IS MANDATORY

COMPLIANCE WITH THIS PUBLICATION IS MANDATORY BY ORDER OF THE COMMANDER AIR COMBAT COMMAND AIR FORCE INSTRUCTION 21-103 AIR COMBAT COMMAND Supplement 21 SEPTEMBER 2017 MAINTENANCE EQUIPMENT INVENTORY, STATUS, AND UTILIZATION REPORTING SYSTEM F-15A/B/C/D

More information

AVIAT AIRCRAFT INC. P.O. Box South Washington Afton, WY USA Tel: Fax:

AVIAT AIRCRAFT INC. P.O. Box South Washington Afton, WY USA Tel: Fax: DATE: 2 April 1999 REVISION: n/c AIRCRAFT: HUSKY A-1 P.O. Box 1240 672 South Washington Afton, WY 83110 USA Tel: 307-886-3151 Fax: 307-886-9674 e-mail: aviat@aviataircraft.com SUBJECT: Normal Category

More information