Impact of Offshore Directed Forcing on Sediment Transport and Structural Integrity at Packery Channel, Corpus Christi Texas
|
|
- Spencer Holmes
- 5 years ago
- Views:
Transcription
1 Google Earth 29 Aug 2017 Impact of Offshore Directed Forcing on Sediment Transport and Structural Integrity at Packery Channel, Corpus Christi Texas Deidre D. Williams Coastal Research Scientist Conrad Blucher Institute for Surveying and Science Texas A&M University-Corpus Christi Philip Blackmar PE HDR Inc. Philippe Tissot Associate Director, Research Scientist Conrad Blucher Institute for Surveying and Science Texas A&M University-Corpus Christi ASPBA Texas Chapter Symposium Harte Research Institute TAMUCC 24 Apr 2018
2 Packery Channel Location near Confluence of CC Bay and Upper Laguna Madre Aransas Pass Corpus Christi Bay Mustang Island Fish Pass Gulf of Mexico Upper Laguna Madre North Padre Island Newport Pass Packery Channel Bob Hall Pier
3 Packery Channel: A Brief History Sand Emily Plug Facilitates Opens Construction Channel June July 2005 Mustang Island Channel Remains Opens North Padre Island Gulf of Mexico 2003 July 2006 Channel Remains Open Oct st Harvey Dredge 2011/2012 Aug /2013
4 Post-Harvey: Location of Significant Damage Requiring Maintenance and/or Restoration Planning Beach and Backshore Coastal Structures and City Infrastructure
5 Pre-Harvey (July 2017): Regions of Shoaling Upper Laguna Madre Transient Shoal Persistent Shoal Depth, ft (NAVD88) pc_dogleggulf_3ft_navd88opus_march2012_ramp Elevation ft_navd88opus_march2012_ramp Inland Channel Segment (North Reach 2) Packery Channel County Park Inland Channel Segment (South Reach 1) Mollie Beattie Coastal Habitat Community Mustang Island Newport Pass Deposition Basin Lake Padre North Padre Island (NPI) Entrance Channel Packery Channel Google Imagery Jan 2017 NPI Seawall Gulf of Mexico
6 Post-Harvey (Sep 2017): Change in Shoaling and Scour Mollie Beattie Coastal Habitat Community Transient Shoal Persistent Shoal Scour Depth, ft (NAVD88) pc_dogleggulf_3ft_navd88opus_march2012_ramp Elevation AVD88OPUS_March2012_ramp Packery Channel County Park Lake Padre Mollie Beattie Coastal Habitat Community North Padre Island (NPI) Mustang Island Newport Pass Packery Channel Gulf of Mexico Image: CNSA 30 Aug 2017
7 Shoaling and Scour in the Entrance Channel Harvey VS Ike Pre-Harvey Pre-Ike Pre-Ike Post-Harvey Post-Ike Post-Ike Net Sand Volume Decreased by 30,000 cu yd pc_dogleggulf_3ft_navd88opus_march2012_ramp Depth, Elevation ft (NAVD88) VD88OPUS_March2012_ramp Net Sand Volume Increased by 30,000 cu yd
8 Elevation, Jul2017 ft (NAVD88) Elevation, ft (NAVD88) Jul2017 West 5 0 Basin Inner Entrance Channel Entrance Channel East Jul pos -5 Harvey Jul 2017 Pre-Harvey Oct 2017 Post-Harvey Gulf of Mexico Basin Distance Along-Channel from Basin Inner Entrance Channel Jul2017 Entrance Channel Sm sm Ike Gulf of Mexico Jul 2017 Pre-Ike Oct 2017 Post-Ike Distance Along-Channel Jul2017 from Basin
9 Along-Channel Current Velocity, m/s /5/2017 8/10/2017 8/15/2017 8/20/2017 8/25/2017 8/30/2017 9/4/ Flood Water Velocity Water Level Along + Flood - Ebb Water Velocity Water Level Water Level, ft MSL Harvey Water Level, ft MSL Ike Ebb Ike /1/2008 9/6/2008 9/11/2008 9/16/2008 9/21/2008 9/26/ /1/2008 Date (MDY) -4
10 Force Driving Scour and Structural Damage 1.5 m/s Mustang Island NPI Island Packery Channel Velocity m/s Gulf of Mexico 0 m/s Developed by: Larry Dell and Philippe Tissot (CBI TAMUCC)
11 North Padre Island And Mustang Island Mustang Island State Park Fish Pass ² Net Volume Change and Rate of Erosion Mustang Island -454,000 cy -24 cy/ft City Jurisdiction and Multi-Jurisdictional North Padre Island Viento del Mar Padre Balli Park -23,000 cy -14 cy/ft Newport Pass -38,200 cy -17 cy/ft Bob Hall Pier +41, cy/ft -38,200 cy -7 cy/ft +38,000 cy +11 cy/ft -175,000 cy -70 cy/ft City Jurisdiction Net Erosion City Jurisdiction Net Accretion County Jurisdiction Net Erosion County Jurisdiction Net Accretion State Jurisdiction NPI Seawall Limits Gulf of Mexico Scale 1.0 mi/ 1.6 km
12 Shoreline Position Change Aug 2004 Pre-Construction Sep 2007 (Pre-Ike) Aug 2004 Pre-Construction Jul 2017 (Pre-Harvey) Pre-Ike Pre-Harvey
13 Aug 2004 Pre-Construction Sep 2007 (Pre-Ike) Sep 2008 (Post-Ike) Aug 2004 Pre-Construction Jul 2017 (Pre-Harvey) Sep 2017 (Post-Harvey) Post-Ike Post-Harvey
14 Post-Ike Recovery Post-Harvey Partial Recovery Recovery Aug 2004 Pre-Construction Sep 2007 (Pre-Ike) Sep 2008 (Post-Ike) Jul 2009 (10 mo. Post Ike) Post-Ike: Recovery > Erosion North End of Seawall Aug 2004 Pre-Construction Jul 2017 (Pre-Harvey) Sep 2017 (Post-Harvey) Apr 2018 (8 mo. Post Harvey) Post-Harvey: Partial Recovery
15 Rate of Shoreline Position Change: Viento del Mar to Packery NPI Seawall Viento Del Mar Packery Packery Post Harvey: -13 ft/yr Post Ike: -48 ft/yr Post- Ike Post- Harvey
16 Rate of Shoreline Position Change: Mustang Island Packery Newport Fish Pass Post Harvey: -25 ft/yr Post Ike: -62 ft/yr Post- Harvey Post- Ike
17 Structural Assessment: Packery Structural Components Reach 1 SH361 Bridge Boat Ramp Parking Lot 10 ton Granite Blocks Reach 2 1 to 3 ton Riprap Reach 3 Reach 2 Reach 1 Reach 3 Concrete Block Mattresses (ABMs) Reach 4 Unprotected on north side
18 Structural Assessment: Reach 1 Damage Displaced armor stones Indication that some damage occurred during previous storms (Hurricane Ike) Repairs include re-setting the stones
19 Structural Assessment: Reach 1 Original Design Damages to armor stone weaken system for next storm Damage presents increased threat for more significant damage and greater repair cost
20 Packery Structural Components: Reach 2 Reach 2 1 to 3 ton Riprap SH361 Bridge Boat Ramp Parking Lot Reach 3 Reach 2 Reach 1
21 Structural Assessment: Reach 2 Damage Displaced Riprap Damage likely Cumulative of Previous Storm Impacts Existing Damage = System More Prone to Future Damage Repairs Should Place additional riprap to rebuild section
22 Packery Structural Components: Reach 3 SH361 Bridge Boat Ramp Parking Lot Reach 3 Concrete Block Mattresses (ABMs) Reach 3 Reach 2 Reach 1
23 Structural Assessment: Reach 3 Damage Loss of Foundation Material Beneath ABM and Sidewalk Recommended repairs: Removal of ABM, Re-grade Slope, and Replacement of Protection Damage progressively worsen until repaired
24 Structural Assessment: Reach 3 Location of Damaged Segments
25 End Material
January 2018 Air Traffic Activity Summary
January 2018 Air Traffic Activity Summary Jan-2018 Jan-2017 CY-2018 CY-2017 Passengers 528,947 505,421 4.7% 528,947 505,421 4.7% Passengers 537,332 515,787 4.2% 537,332 515,787 4.2% Passengers 1,066,279
More informationCommercial Property Near Primary Island Intersection
CORPUS CHRISTI, TEXAS Mainland Corpus Christi Laguna Madre JFK Causeway Padre Isles Country Club S. Padre Island Drive PROPERTY Sand Dollar Ave. (Platted) Highway 361 Town Center / Riverwalk Site Packery
More informationThe Galveston Seawall
Coastal and Ocean Engineering ENGI.8751 Undergraduate Student Forum Faculty of Engineering and Applied Science, Memorial University, St. John s, NL, Canada. March, 2013 The Galveston Seawall Mark Harvey
More informationMARCH 2014 HYDROGRAPHIC REPORT
DEPARTMENT OF THE ARMY GALVESTON DISTRICT, CORPS OF ENGINEERS P.O. BOX 1229 GALVESTON, TEXAS 77553-1229 MARCH 2014 HYDROGRAPHIC REPORT CHANNELS WITH PROJECT DEPTHS 25 FEET OR OVER A report of the depths
More information2011 Nags Head Beach Nourishment Project Update. Tim Kana & Haiqing Kaczkowski
2011 Nags Head Beach Nourishment Project Update Tim Kana & Haiqing Kaczkowski NCBIWA Conference 3 April 2017 Outline of the Presentation 1 Review 2011 Nourishment Project Post-project monitoring efforts
More informationPORT EVERGLADES SAND BYPASS PROJECT
28 th Annual National Conference on Beach Preservation Technology February 4, 2015 Clearwater Beach, FL PORT EVERGLADES SAND BYPASS PROJECT AN IMPORTANT FUTURE SAND SOURCE FOR SOUTHEAST FLORIDA BEACHES
More informationGALVESTON DISTRICT O&M NAVIGATION MISSION & RESPONSE TO HURRICANE HARVEY
GALVESTON DISTRICT O&M NAVIGATION MISSION & RESPONSE TO HURRICANE HARVEY 237 237 237 217 217 217 200 200 200 80 119 27 252 174.59 1 255 255 255 0 0 0 163 163 163 131 132 122 239 65 53 Christopher Frabotta
More informationNorfolk District North Atlantic Division
Norfolk District North Atlantic Division Eastern Chapter of WEDA Fall Conference October 26, 2016 Stephen J. Powell, P.E. (757) 201-7788 US Army Corps of Engineers Norfolk District FY-17 Dredging Program
More informationEconomic Impacts of Beach Nourishment in Texas
Galveston Island South Padre Island April 25, 2017 Economic Impacts of Beach Nourishment in Texas Michael Walther Coastal Tech G.E.C., Inc. Reuben Trevino - Galveston Island Park Board of Trustees Special
More information80' MIN 100'-0" 15'-0" 2 FEDERALLY DREDGED NAVIGATION CHANNEL MEASURED AT EL -10' (NOTE 4) NAVIGATION CHANNEL EXISTING YACHT CLUB FLOATS
11 3 1 6 9 4 5 4 8 7 7 9 ' MUDLINE ELEVATION 8 1 6 11 6 1 7 8 5 7 7 12 11 5 12 7 8 9 5 11 8 REVISED FEDERAL LIMIT FOR DREDGING FEDERAL LIMIT FOR DREDGING 12 1 11 7 1 4 8 5 8 5 14 4 14 3 9 3 8 5 1 5 11
More information2012 Texas Water Conservation Association Meeting
2012 Texas Water Conservation Association Meeting BG Thomas Kula Southwestern Division Commander 15 June 2012 US Army Corps of Engineers AGENDA UNCLASSIFIED Overview of Southwestern Division Missions Texas
More informationCity of Fort Lauderdale. Frequently Asked Questions. Proposed Sea Wall Ordinance
City of Fort Lauderdale Frequently Asked Questions Proposed Sea Wall Ordinance The City of Fort Lauderdale is considering amending the Unified Land Development Regulations of the City of Fort Lauderdale
More informationU.S. Army Corps of Engineers Wilmington District
U.S. Army Corps of Engineers Wilmington District 2012 East Coast - WEDA October 9-11, 2012 Ongoing & Upcoming Contracts US Army Corps of Engineers Wilmington District Ongoing Contracts Project Quantity
More informationHOTEL INDUSTRY OVERVIEW. Texas
HOTEL INDUSTRY OVERVIEW Texas DEMAND GROWTH STRONG BALANCED OCC & ADR GROWTH % Change Room Supply* 149M 1.3% Room Demand* 92M 5.6% Occupancy 61.6% 4.3% A.D.R. $90 4.4% RevPAR $55 8.9% Room Revenue* $8.3B
More informationSt. Augustine Port, Waterway & Beach District. St. Augustine Inlet 2013 draft Inlet Management Plan. March 19, 2013
Division of Water Resource Management St. Augustine Port, Waterway & Beach District St. Augustine Inlet 2013 draft Inlet Management Plan March 19, 2013 Discussion Outline Florida Statutes Florida Inlets
More informationHYDRAULIC DESIGN OF THE TOURISTIC BERTHING IN ASWAN CITY
HYDRAULIC DESIGN OF THE TOURISTIC BERTHING IN ASWAN CITY Dr. Hossam El-Sersawy Researcher, Nile Research Institute (NRI), National Water Research Center (NWRC), Egypt E-mail: h_sersawy@hotmail.com Dr.
More informationMOBILE DISTRICT 2018 DREDGING PROGRAM
MOBILE DISTRICT 2018 DREDGING PROGRAM SOUTH ATLANTIC DIVISION U.S. ARMY CORPS OF ENGINEERS Trusted Partners Delivering Value Today for a Better Tomorrow US Army Corps of Engineers BUILDING STRONG MOBILE
More information2014 Colorado River Annual Operating Plan Colorado River Management Work Group (CRMWG) Final Consultation September 5, 2013
2014 Colorado River Annual Operating Plan Colorado River Management Work Group (CRMWG) Final Consultation September 5, 2013 2014 Colorado River AOP Final Consultation Meeting Welcome and Introductions
More informationNorfolk District North Atlantic Division
Norfolk District North Atlantic Division Eastern Chapter of WEDA Fall Conference October 9, 2012 Stephen J. Powell, P.E. (757) 201-7788 US Army Corps of Engineers 5-Year Dredging Schedule (By dredge type)
More informationSAME/SBA CONFERENCE. Col. Christopher W. Sallese Commander, Galveston District U.S. Army Corps of Engineers April 11, 2012
SAME/A CONFERENCE Col. Christopher W. Sallese Commander, Galveston District U.S. Army Corps of Engineers April 11, 2012 U.S. Army Corps of Engineers Galveston District BUILDING STRONG 1 History of the
More informationTNPA 2 nd Strategic Customer Forum Update on Infrastructure Projects. 13 August
TNPA 2 nd Strategic Customer Forum Update on Infrastructure Projects 13 August 2014 1 THE TNPA WORLD OF PORT INFRASTRUCTURE Complete Pixman Images 2010 Dredging International - Pallieter Overview of Presentation
More informationLake Chelan Operations
Lake Chelan Operations IPMA Executive Seminar September 17, 2013 Presented by: Janet Jaspers Chelan County PUD Lake Chelan Hydroelectric Project Today s Discussion Chelan PUD Overview Interesting Facts
More informationSUBJECT: Newark Bay Study Area Coordination Team Meeting, 9 October 2012
CENAN-PP-H 9 Oct 12 MEMORANDUM FOR RECORD SUBJECT: Newark Bay Study Area Coordination Team Meeting, 9 October 2012 1. The regularly scheduled monthly interagency coordination meeting was held on 9 Oct
More informationHARBOR INFRASTRUCTURE INVENTORIES Erie Harbor, PA
HARBOR INFRASTRUCTURE INVENTORIES Erie Harbor, PA Harbor Location: Erie Harbor is located on the southern shore of Lake Erie in the City of Erie, PA about 98 Miles southwest of Buffalo. Authority: River
More informationA Brief History of the Town of Palm Beach Coastal Protection Program. Beach nourishment occurred in Palm Beach as far back as the 1940s.
A Brief History of the Town of Palm Beach Coastal Protection Program Beach nourishment occurred in Palm Beach as far back as the 1940s. The Lake Worth Inlet Sand Transfer Plant was built in the late 1950s.
More informationOctober 7, 2016 Hurricane Matthew Rakes the East Coast of Flagler County for 18.1 Miles
October 7, 2016 Hurricane Matthew Rakes the East Coast of Flagler County for 18.1 Miles Hammock Dunes Suffers Penetration of the Ocean into the Community; has a 15-30 ft. Wide Triangular Section of the
More informationPotential Application of. Shore-Stabilizing Structures along an Open-Coast Shoreline. Christopher G. Creed, P.E. 23 rd Annual National Conference on
23 rd Annual National Conference on Potential Application of Beach Preservation Technology February 3-5, 2010 Indialantic, FL Shore-Stabilizing Structures along an Open-Coast Shoreline Christopher G. Creed,
More informationAn International Journal
An International Journal FOREWORD Gulf of Mexico Marine Labs JOHN W. TUNNELL, JR AND GEORGE F. CROZIER Published by the Marine Environmental Sciences Consortium of Alabama Gulf of Mexico Science, 2010(1
More informationFOR SALE Acres - Tortuga Harbor Development
Tortuga Harbor development site FOR SALE LOCATION: Tortuga Harbor Development Site, with frontage on Hwy 361 and approximately 800 along the Packery Channel; Site is located just off intersection of Park
More informationUSACE GALVESTON DISTRICT PROJECT UPDATE
USACE GALVESTON DISTRICT PROJECT UPDATE 255 255 255 237 237 237 0 0 0 217 217 217 163 163 163 200 200 200 DREDGE YOUR DOCKS 2018 131 132 122 239 65 53 80 119 27 110 135 120 252 174.59 112 92 56 62 102
More information25 th Avenue Grade Separation. September 13, 2017
25 th Avenue Grade Separation September 13, 2017 Agenda I. Overview II. III. IV. Project Description Project Benefits Project Construction V. Next Steps VI. Questions 2 Overview Project Location 4 E. 25
More informationEFFECT OF THE COASTAL CONSERVATION DUE TO BEACH NOURISHMENT OF TOTORI SAND DUNE COAST
Proceedings of the 7 th International Conference on Asian and Pacific Coasts (APAC 203) Bali, Indonesia, September 2-26, 203 EFFECT OF THE COASTAL CONSERVATION DUE TO BEACH NOURISHMENT OF TOTORI SAND DUNE
More informationSAN FRANCISCO DISTRICT FY 2018 NAVIGATION PROGRAM
SAN FRANCISCO DISTRICT FY 2018 NAVIGATION PROGRAM 1 255 255 255 237 237 237 0 0 0 217 217 217 163 163 163 200 200 200 WEDA PACIFIC CHAPTER 2017 ANNUAL MEETING 131 132 122 PORTLAND, OREGON 239 65 53 80
More informationThe Geography of Climate
The Geography of Climate Objective for Today: Today we will examine ways that latitude and landforms influence climate The focus of our study will be the South American Continent in the Formal Region known
More informationLAGUNA ISLES DEVELOPMENT
DEVELOPMENT FOR SALE LAGUNA ISLES DEVELOPMENT State Highway 361 South of Downtown Port Aransas, Texas 44.77 ACRES MIXED-USE DEVELOPMENT + 300 planned SF lots, most with bay or golf course frontage and
More informationResidential Attitudes about Hurricanes on the Lone Star Coast
Residential Attitudes about Hurricanes on the Lone Star Coast 2010 APCG Meeting Coeur d Alene, Idaho September 17, 2010 Presented By: Bryant Evans Houston Community College Residential Attitudes about
More informationEngineering With Nature Geographic Project Mapping Tool (EWN ProMap)
Engineering With Nature Geographic Project Mapping Tool (EWN ProMap) Cynthia Banks Program Manager Burton Suedel, PhD Research Biologist Michelle Bourne Research Biologist U.S. Army ERDC 23 June 2015 Dredging
More informationComposite CN Value Based on Hydrologic Soil Group and Estimated Future Land Cover
Composite CN Value Based on Hydrologic Soil Group and Estimated Future Land Cover Village of Milan, Mirabal Park /5/016 DEVELOPED LAND AREAS** Basin Basin HSG "B" HSG "C" HSG "D" Basin Basin Area Area
More informationLatest market insights and marketing plans from VisitBritain/VisitEngland. Anke Monestel, VisitEngland 8 th February 2018
Latest market insights and marketing plans from VisitBritain/VisitEngland Anke Monestel, VisitEngland 8 th February 2018 1 Inbound tourism trends 2 Friday, February 9, 2018 2003 2004 2005 2006 2007 2008
More informationThe Corps of Engineers Dredges on the West Coast
The Corps of Engineers Dredges on the West Coast Presented To California Marine Affairs and Navigation Conference Sheryl Carrubba Operations Manager, Channels & Harbors Portland District November 8, 2011
More informationwww: vermilionparishpolicejury.com
www: vermilionparishpolicejury.com 1 Coastal Projects in Vermilion Parish Constructed over the last 26 years (CWPPRA, CIAP, State Surplus) PPL Number Project Name Project Types Current Estimate Acres
More informationDAMAGE ASSESSMENT OF SAND FENCING GARDEN CITY, NORTH LITCHFIELD AND LITCHFIELD BEACH GEORGETOWN COUNTY, SC
OF SAND FENCING GARDEN CITY, NORTH LITCHFIELD AND LITCHFIELD BEACH GEORGETOWN COUNTY, SC June 07, 2017 PREPARED FOR: GEORGETOWN COUNTY DEPARTMENT OF PUBLIC SERVICES PREPARED BY: The EARTHWORKS Group 11655
More informationGuide to Siting of Seawalls January 13, 2014 by Michael Walther, P.E., D.CE, President - Coastal Tech
January 13, 2014 by Michael Walther, P.E., D.CE, President - Coastal Tech mwalther@coastaltechcorp.com Prepared for the Sea Turtle Conservancy http://www.conserveturtles.org/ Introduction Overview: This
More informationPost tsunami Recovery of Port and Harbor areas in Japan from the 2011 Great East Japan Earthquake Tsunami
Date : 18 Nov., 2015 Venue : Furama Ballroom 1 SESSION 1 : A Decade of Partnerships in Sustainable Development of the Seas of East Asia: Synergies and Achievements WORKSHOP 1.1 : Managing Risks in Climate
More informationInner Harbor Navigation Canal Lock. Victor A. Landry III Operations Manager, GIWW New Orleans District U.S. Army Corps of Engineers
Inner Harbor Navigation Canal Lock Victor A. Landry III Operations Manager, GIWW New Orleans District U.S. Army Corps of Engineers 22 August 2008 GIWW & IHNC Lock Overview Dewatering Challenges GICA 103
More informationStakeholder Meeting #1. An Introduction to the Blind Pass Inlet Management Study
Stakeholder Meeting #1 An Introduction to the Blind Pass Inlet Management Study April 21, 2016 5:30 PM, The Sanctuary, Sanibel Island A World of Solutions 0 Agenda Introductions Study Overview Study Status
More informationTourism Trends. Humphrey Walwyn Head of VisitEngland Research October 2018
Tourism Trends Humphrey Walwyn Head of VisitEngland Research October 2018 1 England Research & Evaluation GBTS - Overnights (statutory research & official statistic) GBDVS - Day (statutory/ official) Occupancy
More informationCoastal Impact on barrier Islands: Application to Praia de Faro
Coastal Impact on barrier Islands: Application to Praia de Faro Theocharis Plomaritis, Oscar Ferreira and Susana Costas RISCKIT Final Meeting This project has received funding from the European Union s
More informationWaterfront Plan Working Group Meeting Maritime & Water-Dependent Uses Meeting Agenda
Waterfront Plan Working Group Meeting Maritime & Water-Dependent Uses Meeting Agenda Overview of Port Maritime & Water-Dependent Uses Summary of Maritime Planning and Policies Q&A and Discussion of Operational
More informationU.S. Hotel Industry Performance. Brad Garner Chief Operating Officer
U.S. Hotel Industry Performance Brad Garner Chief Operating Officer 1 Agenda Total US Review Scale Review Segmentation Markets Supply Pipeline 2013 / 2014 Forecast 2 www.hotelnewsnow.com Click on Hotel
More informationBuffalo District Navigation Program Overview
Buffalo District Navigation Program Overview 16 FEB 2011 US Army Corps of Engineers Buffalo District Area of Operations Our Facilities District Headquarters 2 Area Offices 3 Regulatory Field Offices Lake
More informationAugust 2014 Passenger and Cargo Traffic Statistics Reno-Tahoe International Airport
August 2014 Passenger and Cargo Traffic Statistics Reno-Tahoe International Airport October 8, 2014 U.S. DOMESTIC INDUSTRY OVERVIEW FOR AUGUST 2014 All RNO Carriers Domestic Systemwide year over year comparison
More informationEdisto Beach Renourishment and Groin Lengthening Project. Tim Kana Coastal Science & Engineering
Edisto Beach Renourishment and Groin Lengthening Project Tim Kana Coastal Science & Engineering Hurricane Matthew 8 Oct 2016 Cat 1 Storm @ Edisto Beach Worst Surge Event Since DAVID in 1979 Tides ~ 5 ft
More informationTim Hunter Christchurch & Canterbury Tourism Steve Clarke Canterbury Earthquake Recovery Authority (CERA) Disaster & Rebuild 16 January 2015
Tim Hunter Christchurch & Canterbury Tourism Steve Clarke Canterbury Earthquake Recovery Authority (CERA) Disaster & Rebuild 16 January 2015 Every country has a disaster paradigm Flood Tropical Storm Bush
More informationRiverine Sand Mining/Scofield Island Restoration (BA-40)
Riverine Sand Mining/Scofield Island Restoration (BA-40) Conference on Ecological and Ecosystem Restoration Kenneth Bahlinger, CPRA Project Manager July 31, 2014 committed to our coast committed to our
More informationCampus Construction Program Report WLAC Monthly Facilities Committee Meeting November 16, 2015
Campus Construction Program Report WLAC Monthly Facilities Committee Meeting November 16, 2015 1. Cost Update 2. Schedule Update 3. Pre Design Update 4. Design Update 5. Contractor Procurement Update November
More information30 November Randall G. Hintz Chief, Operations Support Branch Operations Division. US Army Corps of Engineers BUILDING STRONG
30 November 2011 Randall G. Hintz Chief, Operations Support Branch Operations Division US Army Corps of Engineers Overview MAINTENANCE PROJECTS Deep Draft Channels Shallow Draft Channels Coastal Inlets
More informationHurricane Irma: Palm Beach County Coastal Storm Damage Assessment
Project Area: Coral Cove Park Location: R1 to R7.5 Project Length: 5,170 ft Estimated Volumetric Loss: 38,296 cy Pre-Storm Assessment Date: August 22, 2017 General observations: 30 ft loss of dry beach
More informationTENTATIVE SCHEDULE
TENTATIVE SCHEDULE 20-2015 Facility Dredge Depth (- ft MLLW) 20 Spring Early Summer 20/2012 2012/2013 HWRP/ HWRP/ HWRP/ SFDODS SF- MWP Upland SFDODS SF- MWP upland SFDODS SF- MWP upland SFDODS SF- 2013/2014
More informationJason J. Hull, P.E. Director of Engineering. Port Freeport 1100 Cherry Street Freeport, Texas
Jason J. Hull, P.E. Director of Engineering Port Freeport 1100 Cherry Street Freeport, Texas 77541 979.233.2667 hull@portfreeport.com Port Freeport s History Feb. 1913 Corps Hopper Dredge Comstock sank
More informationProject A: Revetment Scale: 1 = 10. 3/7 Revision: Benchmarks. Eroding Parking Area. View from Above. Locklies Creek. Ebb.
Project A: Revetment Scale: 1 = 10 View from Above Floating Dock 3/7 Revision: Benchmarks 34 Locklies Creek Ebb Flood E. 18x8 Floating Dock Channelward of Vegetation 30 Class A1A Rip Rap MLW MHW 57 1 4
More informationMarch 2014 Passenger and Cargo Traffic Statistics Reno-Tahoe International Airport
March 2014 Passenger and Cargo Traffic Statistics Reno-Tahoe International Airport April 25, 2014 U.S. DOMESTIC INDUSTRY OVERVIEW FOR MARCH 2014 All RNO Carriers Domestic Systemwide year over year comparison
More informationDTTAS Quarterly Aviation Statistics Snapshot Quarter Report
Contents DTTAS Quarterly Aviation Statistics Snapshot Quarter 4 2015 Report 1.1 Dublin Airport Key Statistics... 1 1.2 Cork Airport Key Statistics... 3 1.3 Shannon Airport Key Statistics... 5 1.4 Total
More informationDTTAS Quarterly Aviation Statistics Snapshot Quarter Report
Contents DTTAS Quarterly Aviation Statistics Snapshot Quarter 1 2018 Report 1.1 Dublin Airport Key Statistics... 1 1.2 Cork Airport Key Statistics... 3 1.3 Shannon Airport Key Statistics... 5 1.4 Total
More informationTim Hunter Chief Executive. CCT Business Partner Update 3 March 2015
Tim Hunter Chief Executive CCT Business Partner Update 3 March 2015 A Great Summer Strong international arrival growth More flights and more beds Great weather = more visitors doing more Jan-10 Feb-10
More informationTEXAS PORTS Value to the Nation
TEXAS PORTS Value to the Nation Col. Christopher W. Sallese District Commander, Galveston District U.S. Army Corps of Engineers March 18, 2013 Houston-Galveston Area Council US Army Corps of Engineers
More informationSAN ANTONIO RIVER IMPROVEMENTS PROJECT. April 27, 2009
SAN ANTONIO RIVER IMPROVEMENTS PROJECT April 27, 2009 1 Project Limits 2 Project Partners City of San Antonio Provides project funding for project amenities (i.e.. Sidewalks, Landscaping, Lighting, etc.)
More informationOverview of Park Board Budgets & Industry Forecasts. Kelly de Schaun, Executive Director
Overview of Park Board Budgets & Industry Forecasts Kelly de Schaun, Executive Director Park Board of Trustee Budget Overview Fiscal Year October 1 to September 30 of each year Composition of Operational
More informationHotel Association of North Texas. Karrie Keen Director, Destination and Trend Operations
Hotel Association of North Texas Karrie Keen Director, Destination and Trend Operations To view this presentation, go to HotelNewsNow.com and click on Industry Analysis then Hotel data presentations. Agenda
More informationElkhorn Slough Tidal Wetland Project
Elkhorn Slough Tidal Wetland Project Joint Meeting Strategic Planning Team and Science Panel September 23, 2009 Funding National Oceanic and Atmospheric Admin. David and Lucille Packard Foundation Resources
More informationRestoration and Challenge of Sendai Towards a Disaster-Resilient and Environmentally-Friendly City
City of Sendai Restoration and Challenge of Sendai Towards a Disaster-Resilient and Environmentally-Friendly City Akira TAKAHASHI akira_takahashi_a@city.sendai.jp Director, Disaster-Resilient and Environmentally-Friendly
More informationLAUNCH OF THE COASTAL ZONE MANAGEMENT TRUST
A 60km stretch of coastline on the Yucatan Peninsula of Mexico is the testing ground for an idea that could protect fragile environments around the world: insuring coral reefs. The Economist World Ocean
More informationORDINANCE NO. C-16- WHEREAS, the proposed minimum seawall elevation exceeds the current maximum by 0.7 feet (8.4 inches); and
ORDINANCE NO. AN ORDINANCE AMENDING THE UNIFIED LAND DEVELOPMENT REGULATIONS OF THE CITY OF FORT LAUDERDALE, FLORIDA, AMENDING SECTION 47-19.3, BOAT SLIPS, DOCKS, BOAT DAVITS, HOISTS AND SIMILAR MOORING
More informationCoastal Management: Treasure Island - Long Key Nourishment
Coastal Management: Treasure Island - Long Key Nourishment Project Completed - October 20, 2010 The nourishment of Treasure Island and Long Key (TI/LK) beaches began in late July of 2010. The previous
More informationWith the completion of this project, we would like to follow-up on the projections as well as highlight a few other items:
TO: FROM: Mayor and Council Interim City Manager Rebecca Underhill, Director of Finance DATE: February 28, 2014 SUBJECT: Water Meter Project Analysis On March 28, 2012, Acting City Manager Mike Loftin
More informationBaltimore Harbor & Channels, Maryland and Virginia
FACT SHEET January 2006 Type of Project: Navigation Project Phase: Operation & Maintenance Authorization: Section 101 of the River and Harbor Act of 1958 (42-Foot Project), Section 101 of the River and
More information-,. II II. t:' -I r~ Hor~~on~?~ Environmental Services, Inc. - ~'-""~?>'"'~ .G~\\ \<:--s Po?> I~- Gulf of Mexico FIGURE 1. 2 Legend l:=i Project Area
SWG-28-352 MODIFICAION REQUEST Page 1 of 26 USACE RECEIVED DATE: 1 AUG18.. 7196/Graphics/IP Figures-Relocated Outfall Structures/7196A1PA_vic.mxd I SBF I 4-15-213 -,. II II I- _J.G\\ \ - '-""?>'"'
More informationSize data for all Gulf areas are available starting Fishing areas in the Headboat survey are described in Table 1.
SEDAR7 - DW - 46 Size frequency distribution of red snapper from dockside sampling of recreational landings in the Gulf of Mexico 1984-22 (TXPW, MRFSS, and s size data) by Guillermo A. Diaz Southeast Fisheries
More informationState of the Waterway 2017
State of the Waterway 2017 Steven W. Nerheim Director VTS Houston/Galveston Lone Star Harbor Safety Committee 2 FEBRUARY 2018 U.S. Port Rankings 2015 1 South Louisiana, LA, Port of 259.1-3.07% 15 Texas
More informationAnnual Diversion Rate for Class I Waste by Sector. Annual Diversion Rate for Class I Waste. January September University of Arkansas
Annual Diversion Rate for Class I Waste by Sector Waste (Metric Ton) Recycling (Metric Ton) Diversion Rate Facilities Management 761.8 272.17 26% 91.5 6.37 6% 173.9 39.23 18% 229.38 3.87 12% Total Tons
More informationPresented to: City of Petaluma City Council
Agenda Item #1.A REVISED Presented to: City of Petaluma City Council Presented By: Dan St. John, F.ASCE, Director Jason Beatty, P.E., Senior Engineer James 'Jody' Boyette, USACE Project Manager November
More informationRegional Economic Conditions
Regional Economic Conditions Jason Bram, Research Officer Community Advisory Group Meeting March 29, 2018 The views expressed here are those of the presenter and do not necessarily represent those of the
More informationThe Airline Crisis. 25 th IFATCA ASP Regional Meeting. Shixin CHENG Manager, Safety, Operations & Infrastructure IATA North Asia Region
The Airline Crisis 25 th IFATCA ASP Regional Meeting Shixin CHENG Manager, Safety, Operations & Infrastructure IATA North Asia Region To represent, lead and serve the airline industry Outlook for the airline
More informationRIVER ACCESS STRATEGY
RIVER ACCESS STRATEGY The River Access Strategy is a 10-year plan the City of Edmonton is developing to inform future programming, operations and infrastructure improvements that support access to the
More informationPORT OF CORPUS CHRISTI BUILDING FOR THE FUTURE
Frank C. Brogan P.E., R.P.L.S. Director of Engineering Services PORT OF CORPUS CHRISTI BUILDING FOR THE FUTURE TRANSPORTATION RESEARCH BOARD Galveston, Texas June 25, 2001 PORT OF CORPUS CHRISTI AUTHORITY
More informationMeasures & Projections October 31, GoToBermuda.com
Measures & Projections October 31, 2015 GoToBermuda.com October Total Vacation Visitor Arrivals Vacation Arrivals Oct-14 Oct-15 2015 Air Vacation 9,203 10,344 1,141 12.40 126,842 127,044 202 0.16 Cruise
More informationRemote Sensing UAS Imagery Mission Results
Remote Sensing UAS Imagery Mission Results State of Florida Hurricane Irma Event Sept 11, 2017 NAI 6 Cape Coral IAA Collection Plan for SEP 11, 2017 NAI 5 Pine Island NAI 4 Naples NAI 3 Marco Island NAI
More informationBear Creek Habitat Improvement Project
06/10/10 Bear Creek Habitat Improvement Project El Paso County, Colorado Pike National Forest and Colorado Springs Utilities Owned Land Report prepared by: Eric Billmeyer Executive Director Rocky Mountain
More informationJanuary 2014 Passenger and Cargo Traffic Statistics Reno-Tahoe International Airport
January 2014 Passenger and Cargo Traffic Statistics Reno-Tahoe International Airport March 12, 2014 U.S. DOMESTIC INDUSTRY OVERVIEW FOR DECEMBER 2013 All RNO Carriers Domestic Systemwide year over year
More informationSeptember 2013 Passenger and Cargo Traffic Statistics Reno-Tahoe International Airport
September 2013 Passenger and Cargo Traffic Statistics Reno-Tahoe International Airport October 31, 2013 U.S. DOMESTIC INDUSTRY OVERVIEW FOR SEPTEMBER 2013 All RNO Carriers Systemwide year over year comparison
More informationCORPS OF ENGINEERS ALASKA DISTRICT Dredging Projects. Michael Tencza, PE Operations Project Manager November 4, 2015
CORPS OF ENGINEERS ALASKA DISTRICT 2016 Dredging Projects Michael Tencza, PE Operations Project Manager November 4, 2015 US Army Corps of Engineers Building and Preserving Alaska s Future AWARDED CONTRACTS
More informationDecember 2013 Passenger and Cargo Traffic Statistics Reno-Tahoe International Airport
December 2013 Passenger and Cargo Traffic Statistics Reno-Tahoe International Airport January 24, 2014 U.S. DOMESTIC INDUSTRY OVERVIEW FOR DECEMBER 2013 All RNO Carriers Domestic Systemwide year over year
More informationState of the Waterway 2017
State of the Waterway 2017 Steven W. Nerheim Director, VTS Houston/Galveston Lone Star Harbor Safety Committee 10 th February 2017 U.S. Port Rankings - 2014 (Millions of short tons) 1 Port of S Louisiana,
More informationVisit Phoenix Market Update January Eric Kerr Director of Research & Business Analysis
Visit Phoenix Market Update January 2019 Eric Kerr Director of Research & Business Analysis Visitation totals 2012-2017 & Spending trends Hotel Market Overview YTD - November Chain scales, Submarkets,
More informationU.S. DOMESTIC INDUSTRY OVERVIEW FOR OCTOBER 2010 All RNO Carriers Systemwide year over year comparison
Inter-Office Memo Reno-Tahoe Airport Authority Date: November 22, 2010 To: Chairman and Board of Trustees From: Krys T. Bart, A.A.E., President/CEO Subject: RENO-TAHOE INTERNATIONAL AIRPORT OCTOBER 2010
More informationEficiencia Logistica Q Ruben Medina Director de Desarrollo Economico
Eficiencia Logistica Q3 2017 Ruben Medina Director de Desarrollo Economico The Energy Port of the Americas Port of Corpus Christi Authority is: #1 US port for export of crude oil 4 th largest US Port by
More informationOverview of Japan s Sustainable Tourism Development
Overview of Japan s Sustainable Tourism Development UNWTO Conference at Hyderabad, India Kazuyoshi Hasegawa Director of the Board & Secretary General Japan Association of Travel Agents April 2013 Index
More informationPERFORMANCE MEASURE INFORMATION SHEET #16
PERFORMANCE MEASURE INFORMATION SHEET #16 ARROW LAKES RESERVOIR: RECREATION Objective / Location Recreation/Arrow Lakes Reservoir Performance Measure Access Days Units Description MSIC 1) # Access Days
More informationPRELIMINARY ACCOUNTS FOR 2012
INTERIM REPORT FOR Q4 2012 AND INTERIM REPORT FOR Q4 2012 AND PRELIMINARY ACCOUNTS FOR 2012 HIGHLIGHTS Q4 with growth in volume and improved normalized EBITDA MNOK 261 improvement in normalized EBITDA
More informationRegion 1 Piney Woods
Region 1 Piney Woods Piney Woods 1. This ecoregion is found in East Texas. 2. Climate: average annual rainfall of 36 to 50 inches is fairly uniformly distributed throughout the year, and humidity and temperatures
More information