A Brief History of the Town of Palm Beach Coastal Protection Program. Beach nourishment occurred in Palm Beach as far back as the 1940s.

Size: px
Start display at page:

Download "A Brief History of the Town of Palm Beach Coastal Protection Program. Beach nourishment occurred in Palm Beach as far back as the 1940s."

Transcription

1 A Brief History of the Town of Palm Beach Coastal Protection Program Beach nourishment occurred in Palm Beach as far back as the 1940s. The Lake Worth Inlet Sand Transfer Plant was built in the late 1950s. The Town s modern coastal management program began in the mid-1980s Thanksgiving Day Storm caused the freighter Mercedes to come ashore in north end and State Road A1A to be severed between Sloan s and Widener s Curve FDOT constructed huge revetment in Reach 6 between Sloan s and Widener s Curve Town Council adopted the original Comprehensive Coastal Management Plan (CCMP) Mid-Town Seawall Revetment constructed as an emergency project to absorb energy from waves that were hitting this roadway protective seawall. Late 1980s and Early 1990s Conflict in community re: scope, methods, and funding of the Coastal Protection Program. Late 1980s Permitting and Federal Funding Process for the first Mid-Town Beach Restoration Project. Early 1990s Experimental PEP Reef at Mid-Town (instead of beach restoration) and Town vs. County litigation re: operation of the Sand Transfer Plant PEP Reef removed. Sand Transfer Plant restored. Original Mid-Town Beach Restoration Project (Barton to Hammon with approximately 880,000 cubic yards & 11 groins) Page 1

2 Also in 1995 Town Council created the original Shore Protection Board (SPB) As recommended by the SPB, the CCMP was updated Town Council adopted the updated CCMP and sunsetted the original SPB Town Council approved a 10-year plan for coastal protection and issued bonds as partial funding for the program Construction of the expanded Mid-Town Beach Nourishment Project (Wells to Banyan with approximately 1.2 million cubic yards) 2004 Hurricanes Frances and Jeanne caused severe erosion in Palm Beach, especially in Reaches 7 and Emergency coastal protection projects Seawall construction at Old Ocean Boulevard (Reach 7) Sand berm in Reaches 7 and 8 (Sloan s Curve to La Bonne Vie with approximately 100,000 cubic yards) 2005 Hurricane Wilma caused further erosion Reach 7 Beach Restoration Project (Phipps Park to 2774 Condominium) and dune restoration in Reach 8 (Total: approximately 1.1 million cubic yards) Mid-Town Beach Nourishment Project (El Mirasol to Banyan with approximately 900,000 cubic yards) 2007 NOB Seawall Revetment Project (interim protection from direct wave impact while planning replacement project) Page 2

3 Also in 2007 Sub-Tropical Storm Andrea caused more erosion, especially in Reach 8 south of the Lake Worth Pier. February 2008 FDEP issues Intent to Issue a permit for full scale beach restoration in Reach 8. March 2008 Petition filed objecting to Intent to Issue. August to October 2008 Administrative Hearing on the Reach 8 permit. March 2009 Administrative Law Judge s Recommended Order for FDEP to deny Reach 8 permit. July 2009 FDEP Secretary Sole s Final Order denying the permit. Landmark Impact Combined effect of draft permit, petition, hearing, recommended order, and final order was establishment of more stringent standards for future permits Statewide. August 2008 Tropical Storm Fay caused damage to nourished beaches at Mid-Town and Reach FEMA approved funding assistance for recovery projects at Mid-town and Reach 7. December 2008 Town Council created the current SPB Town sued U.S. Government for damages from erosion caused by Lake Worth Inlet Town reconstructed Lake Worth Inlet Sand Transfer Plant Partial renourishment and dune restoration at Mid-Town and in Reaches 7 and 8. (Total: Approximately 133,000 cubic yards) SPB conducted extensive research, then prepared and refined a long-term plan for coastal protection in Palm Beach. Page 3

4 2012 SPB submitted a revised long-term plan and Town Council retained Woods Hole Group (WHG) to perform a peer review. Hurricane Sandy and multiple nor easters caused severe erosion in Palm Beach, especially in Reach 3 (in the vicinity of the Wells/Sunrise seawall), and damaged the Lake Worth Inlet Sand Transfer Plant so severely it could not operate. Early 2013 Town and U.S. Government ended litigation re: Lake Worth Inlet and declared partnership in better managing sand dredged from the inlet. U.S. Government (Army Corps of Engineers) expanded sand settling basin at Lake Worth Inlet (as proposed by Town) and placed approximately 400,000 cubic yards of sand on the beaches in the north end of Palm Beach. June 2013 After receiving WHG s final recommendations, Town Council approved an $85 million 10-year Coastal Protection Plan. Late 2013 Repaired Sand Transfer Plant resumed operation. FDEP, Town, and County executed the Beach Management Agreement (BMA) for Palm Beach Island, pre-approving much of the Town s 10-year plan (to accomplish implementation of the plan faster and at less expense). Town Council approved funding the 10-year plan with ad valorem taxes. Planned for Wells/Sunrise Oceanfront Roadway Protective Seawall Project Mid-Town Beach Nourishment (Casa Bendita to Banyan with approximately 875,000 cubic yards) Interim nourishment in Reach 7 and dune restoration in Reach 8 (Total: Approximately 150,000 cubic yards) Also Possible in North Ocean Boulevard Oceanfront Roadway Protective Seawall Project Commencement of Groin Rehabilitation Program Planned for Reach 7 Beach Nourishment (Total: Approximately 1 million cubic yards) (Dune Restoration from Sloan s Curve to Phipps Park) (Full Beach Nourishment: Phipps Park to Kreusler Park) Page 4

5 Also Planned for Reach 8 Dune Restoration or larger project if permitted by the EIS for Reach 8 (Minimum of approximately 50,000 cubic yards). (Last Update of Summary: March 12, 2014) Page 5

The Galveston Seawall

The Galveston Seawall Coastal and Ocean Engineering ENGI.8751 Undergraduate Student Forum Faculty of Engineering and Applied Science, Memorial University, St. John s, NL, Canada. March, 2013 The Galveston Seawall Mark Harvey

More information

Hurricane Irma: Palm Beach County Coastal Storm Damage Assessment

Hurricane Irma: Palm Beach County Coastal Storm Damage Assessment Project Area: Coral Cove Park Location: R1 to R7.5 Project Length: 5,170 ft Estimated Volumetric Loss: 38,296 cy Pre-Storm Assessment Date: August 22, 2017 General observations: 30 ft loss of dry beach

More information

Edisto Beach Renourishment and Groin Lengthening Project. Tim Kana Coastal Science & Engineering

Edisto Beach Renourishment and Groin Lengthening Project. Tim Kana Coastal Science & Engineering Edisto Beach Renourishment and Groin Lengthening Project Tim Kana Coastal Science & Engineering Hurricane Matthew 8 Oct 2016 Cat 1 Storm @ Edisto Beach Worst Surge Event Since DAVID in 1979 Tides ~ 5 ft

More information

Coastal Management: Treasure Island - Long Key Nourishment

Coastal Management: Treasure Island - Long Key Nourishment Coastal Management: Treasure Island - Long Key Nourishment Project Completed - October 20, 2010 The nourishment of Treasure Island and Long Key (TI/LK) beaches began in late July of 2010. The previous

More information

2011 Nags Head Beach Nourishment Project Update. Tim Kana & Haiqing Kaczkowski

2011 Nags Head Beach Nourishment Project Update. Tim Kana & Haiqing Kaczkowski 2011 Nags Head Beach Nourishment Project Update Tim Kana & Haiqing Kaczkowski NCBIWA Conference 3 April 2017 Outline of the Presentation 1 Review 2011 Nourishment Project Post-project monitoring efforts

More information

March 2, The Honorable Mayor Williams D. Sessoms, Jr. Members of City Council. Subject: Coastal CIP Presentation to City Council - March 6, 2018

March 2, The Honorable Mayor Williams D. Sessoms, Jr. Members of City Council. Subject: Coastal CIP Presentation to City Council - March 6, 2018 OFFICE OF THE CITY MANAGER (757) 385-4242 (757) 427-5626 FAX MUNICIPAL CENTER BUILDING 1, ROOM 234 2401 COURTHOUSE DRIVE VIRGINIA BEACH, VA 23456-9001 March 2, 2018 The Honorable Mayor Williams D. Sessoms,

More information

St. Augustine Port, Waterway & Beach District. St. Augustine Inlet 2013 draft Inlet Management Plan. March 19, 2013

St. Augustine Port, Waterway & Beach District. St. Augustine Inlet 2013 draft Inlet Management Plan. March 19, 2013 Division of Water Resource Management St. Augustine Port, Waterway & Beach District St. Augustine Inlet 2013 draft Inlet Management Plan March 19, 2013 Discussion Outline Florida Statutes Florida Inlets

More information

DOES BEACH NOURISHMENT PROTECT PROPERTY VALUES FROM HURRICANES? THE CASE OF THE 2004 AND 2005 HURRICANES

DOES BEACH NOURISHMENT PROTECT PROPERTY VALUES FROM HURRICANES? THE CASE OF THE 2004 AND 2005 HURRICANES DOES BEACH NOURISHMENT PROTECT PROPERTY VALUES FROM HURRICANES? THE CASE OF THE 2004 AND 2005 HURRICANES James Murley, Director, Center for Urban and Environmental Solutions (CUES), FAU Dr. Lenore Alpert,

More information

October 7, 2016 Hurricane Matthew Rakes the East Coast of Flagler County for 18.1 Miles

October 7, 2016 Hurricane Matthew Rakes the East Coast of Flagler County for 18.1 Miles October 7, 2016 Hurricane Matthew Rakes the East Coast of Flagler County for 18.1 Miles Hammock Dunes Suffers Penetration of the Ocean into the Community; has a 15-30 ft. Wide Triangular Section of the

More information

REVISED DRAFT Integrated Hurricane Sandy General Reevaluation Report and Environmental Impact Statement. Atlantic Coast of New York

REVISED DRAFT Integrated Hurricane Sandy General Reevaluation Report and Environmental Impact Statement. Atlantic Coast of New York REVISED DRAFT Integrated Hurricane Sandy General Reevaluation Report and Environmental Impact Statement Atlantic Coast of New York East Rockaway Inlet to Rockaway Inlet and Jamaica Bay Appendix F Public

More information

Introduction and Company Overview

Introduction and Company Overview Introduction and Company Overview Multi-discipline consulting firm Founded in 1950 - HQ in Laurel, Maryland Local WPB Office Survey, Utility Coordination, Roadway Design, Environmental and CEI Past Port

More information

Maine Historical Society. Coll Casco Bay Island Development Association Collection

Maine Historical Society. Coll Casco Bay Island Development Association Collection Maine Historical Society Coll. 2724 Casco Bay Island Development Association Collection 1958-2001 Accession #: 2013.271, 2015.003 Processed: February 2014-September 2014 by Lucinda Gannon, MHS Volunteer,

More information

City of Fort Lauderdale. Frequently Asked Questions. Proposed Sea Wall Ordinance

City of Fort Lauderdale. Frequently Asked Questions. Proposed Sea Wall Ordinance City of Fort Lauderdale Frequently Asked Questions Proposed Sea Wall Ordinance The City of Fort Lauderdale is considering amending the Unified Land Development Regulations of the City of Fort Lauderdale

More information

Norfolk District North Atlantic Division

Norfolk District North Atlantic Division Norfolk District North Atlantic Division Eastern Chapter of WEDA Fall Conference October 26, 2016 Stephen J. Powell, P.E. (757) 201-7788 US Army Corps of Engineers Norfolk District FY-17 Dredging Program

More information

Outer Banks Bridges Update:

Outer Banks Bridges Update: Outer Banks Bridges Update: Outer Banks Chamber of Commerce Economic Summit Jerry D. Jennings, PE - Division Engineer April 12, 2018 Mid-Currituck Bridge Currituck Sound (Wright Memorial Bridge) Alligator

More information

DAMAGE ASSESSMENT OF SAND FENCING GARDEN CITY, NORTH LITCHFIELD AND LITCHFIELD BEACH GEORGETOWN COUNTY, SC

DAMAGE ASSESSMENT OF SAND FENCING GARDEN CITY, NORTH LITCHFIELD AND LITCHFIELD BEACH GEORGETOWN COUNTY, SC OF SAND FENCING GARDEN CITY, NORTH LITCHFIELD AND LITCHFIELD BEACH GEORGETOWN COUNTY, SC June 07, 2017 PREPARED FOR: GEORGETOWN COUNTY DEPARTMENT OF PUBLIC SERVICES PREPARED BY: The EARTHWORKS Group 11655

More information

Mini-budget Workshop Coastal Projects

Mini-budget Workshop Coastal Projects Mini-budget Workshop Coastal Projects Public Works Department Coastal Division July 16, 2015 Coastal Infrastructure 99 dune walkovers 9 beachfront parks Dispersed over 35 miles of 2 inlet parks coastline.

More information

U.S. Army Corps of Engineers Wilmington District

U.S. Army Corps of Engineers Wilmington District U.S. Army Corps of Engineers Wilmington District 2012 East Coast - WEDA October 9-11, 2012 Ongoing & Upcoming Contracts US Army Corps of Engineers Wilmington District Ongoing Contracts Project Quantity

More information

Stakeholder Meeting #1. An Introduction to the Blind Pass Inlet Management Study

Stakeholder Meeting #1. An Introduction to the Blind Pass Inlet Management Study Stakeholder Meeting #1 An Introduction to the Blind Pass Inlet Management Study April 21, 2016 5:30 PM, The Sanctuary, Sanibel Island A World of Solutions 0 Agenda Introductions Study Overview Study Status

More information

Potential Application of. Shore-Stabilizing Structures along an Open-Coast Shoreline. Christopher G. Creed, P.E. 23 rd Annual National Conference on

Potential Application of. Shore-Stabilizing Structures along an Open-Coast Shoreline. Christopher G. Creed, P.E. 23 rd Annual National Conference on 23 rd Annual National Conference on Potential Application of Beach Preservation Technology February 3-5, 2010 Indialantic, FL Shore-Stabilizing Structures along an Open-Coast Shoreline Christopher G. Creed,

More information

Water Resources Update after NCGA Long Session

Water Resources Update after NCGA Long Session Water Resources Update after NCGA Long Session North Carolina Beach Inlet & Waterway Association Annual Conference November 16, 2015 Division of Water Resources Overview New Name / Reorganization Jordan

More information

The reasons why coastal management is needed in Minehead:

The reasons why coastal management is needed in Minehead: 1. Resource 1: Why did Minehead need new sea defences? Coastal management in Minehead In pairs, read the following resource and highlight the reasons why coastal management was needed in Minehead. The

More information

Ongoing Projects 3/16/2017 2

Ongoing Projects 3/16/2017 2 Ongoing Projects 26 th to 34 th Street, West Avenue to Bay Avenue ($6.5 million contract awarded) 46 th Street (complete) 29 th Street Firehouse South Jersey Gas improvements 34 th Street playground repairs

More information

Waterfront Plan Working Group Meeting Maritime & Water-Dependent Uses Meeting Agenda

Waterfront Plan Working Group Meeting Maritime & Water-Dependent Uses Meeting Agenda Waterfront Plan Working Group Meeting Maritime & Water-Dependent Uses Meeting Agenda Overview of Port Maritime & Water-Dependent Uses Summary of Maritime Planning and Policies Q&A and Discussion of Operational

More information

Impact of Offshore Directed Forcing on Sediment Transport and Structural Integrity at Packery Channel, Corpus Christi Texas

Impact of Offshore Directed Forcing on Sediment Transport and Structural Integrity at Packery Channel, Corpus Christi Texas Google Earth 29 Aug 2017 Impact of Offshore Directed Forcing on Sediment Transport and Structural Integrity at Packery Channel, Corpus Christi Texas Deidre D. Williams Coastal Research Scientist Conrad

More information

Economic Impacts of Beach Nourishment in Texas

Economic Impacts of Beach Nourishment in Texas Galveston Island South Padre Island April 25, 2017 Economic Impacts of Beach Nourishment in Texas Michael Walther Coastal Tech G.E.C., Inc. Reuben Trevino - Galveston Island Park Board of Trustees Special

More information

May 1, 2015 Meredith Cruz, (561) Palm Beach County Traffic Report May 1 through May 8, 2015

May 1, 2015 Meredith Cruz, (561) Palm Beach County Traffic Report May 1 through May 8, 2015 May 1, 2015 Meredith Cruz, (561) 641-6440 mcruz@corradino.com Palm Beach County Traffic Report May 1 through May 8, 2015 Palm Beach County Palm Beach County traffic will be affected this week by ongoing

More information

Proposed Cherry Grove Canals Dredging Project

Proposed Cherry Grove Canals Dredging Project Proposed Cherry Grove Canals Dredging Project 1 Development of Cherry Grove C.D. Nixon inherited 9,940 acres of land 1924 Nixon family began planning subdivision of Cherry Grove 1950 Mr. Nixon closed natural

More information

MANAGING COASTAL HAZARDS THROUGH BENEFICIAL REUSE OF DREDGED SAND AND AN ADAPTIVE WORKS STRATEGY

MANAGING COASTAL HAZARDS THROUGH BENEFICIAL REUSE OF DREDGED SAND AND AN ADAPTIVE WORKS STRATEGY MANAGING COASTAL HAZARDS THROUGH BENEFICIAL REUSE OF DREDGED SAND AND AN ADAPTIVE WORKS STRATEGY Isabelle Ghetti 1, B.Morgan 2, R.Massie 1, Gary Blumberg 2 1 Shoalhaven City Council, Nowra, NSW 2 Royal

More information

Coastal Impact on barrier Islands: Application to Praia de Faro

Coastal Impact on barrier Islands: Application to Praia de Faro Coastal Impact on barrier Islands: Application to Praia de Faro Theocharis Plomaritis, Oscar Ferreira and Susana Costas RISCKIT Final Meeting This project has received funding from the European Union s

More information

Engineering With Nature Geographic Project Mapping Tool (EWN ProMap)

Engineering With Nature Geographic Project Mapping Tool (EWN ProMap) Engineering With Nature Geographic Project Mapping Tool (EWN ProMap) Cynthia Banks Program Manager Burton Suedel, PhD Research Biologist Michelle Bourne Research Biologist U.S. Army ERDC 23 June 2015 Dredging

More information

Using Managed Retreat to Address Coastal Erosion in Brewster

Using Managed Retreat to Address Coastal Erosion in Brewster Using Managed Retreat to Address Coastal Erosion in Brewster Chris Miller, Director, Brewster Department of Natural Resources CMiller@brewster-ma.gov Brewster, Massachusetts Almost 1/3 of town preserved

More information

Brevard County Utility Services Department

Brevard County Utility Services Department Brevard County Utility Services Department April 3, 2018 Jim Helmer, Department Director Brian Sorensen, W/WW Manager 1 Utility Services Department 9 TREATMENT PLANTS 6 WASTEWATER, 3 WATER 163 EMPLOYEES

More information

Palm Beach County Traffic Report July 13 through July 20, 2012

Palm Beach County Traffic Report July 13 through July 20, 2012 For Immediate Release July 13, 2012 Meredith Cruz, (561) 641-6440 mcruz@corradino.com Palm Beach County Traffic Report July 13 through July 20, 2012 Palm Beach County Palm Beach County traffic will be

More information

# BATHS # BEDROOMS MONTHLY RATE NORTH MYRTLE BEACH WINTER/MONTHLY RENTAL HOMES

# BATHS # BEDROOMS MONTHLY RATE NORTH MYRTLE BEACH WINTER/MONTHLY RENTAL HOMES WINTER/ RENTAL HOMES Bay Watch III 441 1 1 Oceanfront $850 $28 per day Buena Vista Plaza 506 1 1 Oceanfront $650 $22 per day Buena Vista Plaza 707 1 1 Oceanfront $750 $25 per day Chateau Manor 103 1 1

More information

Buck Island Reef National Monument News Release Date: Immediate Contact: Joel Tutein, Superintendent, x 222

Buck Island Reef National Monument News Release Date: Immediate Contact: Joel Tutein, Superintendent, x 222 National Park Service U.S. Department of the Interior www.nps.gov 2100 Church Street, # 100 Christiansted, VI 00820 News Release Date: Immediate Contact: Joel Tutein, Superintendent, Joel.Tutein@nps.gov

More information

Riverine Sand Mining/Scofield Island Restoration (BA-40)

Riverine Sand Mining/Scofield Island Restoration (BA-40) Riverine Sand Mining/Scofield Island Restoration (BA-40) Conference on Ecological and Ecosystem Restoration Kenneth Bahlinger, CPRA Project Manager July 31, 2014 committed to our coast committed to our

More information

The major parties key coastal policy initiatives

The major parties key coastal policy initiatives NEWSLETTER July 2016 EDITORIAL: Coastal policies of major parties inadequate By Barry Sammels Chair, Australian Coastal Councils Association and Mayor, City of Rockingham With the result of the 2016 Federal

More information

Satoquo SEINO (Graduate School of Engineering, Kyushu University, Japan)

Satoquo SEINO (Graduate School of Engineering, Kyushu University, Japan) A reconsideration of horseshoe crab conservation methodology in Japan over the last 100 years and prospects for a marine protected area network in Asian seas Satoquo SEINO (Graduate School of Engineering,

More information

Cat Island Chain Background & Access Guide

Cat Island Chain Background & Access Guide Cat Chain Background & Access Guide Brown County Port & Resource Recovery Department 2561 S. Broadway, Green Bay, WI 54304 (920) 492-4950 www.portofgreenbay.com January 2018 1 Restoration of the Cat Chain

More information

Fred Milch Project Review Manager East Central Florida Regional Planning Council

Fred Milch Project Review Manager East Central Florida Regional Planning Council RESHAPING THE ROLE OF PARKS, RECREATIONAL AREAS, AND GREEN SPACE TO ENHANCE LIVABILITY Fred Milch Project Review Manager East Central Florida Regional Planning Council St. Johns River to Sea Loop Webinar

More information

High-Level Roundtable on International Cooperation for Sustainable Development in Caribbean Small Island Developing States

High-Level Roundtable on International Cooperation for Sustainable Development in Caribbean Small Island Developing States High-Level Roundtable on International Cooperation for Sustainable Development in Caribbean Small Island Developing States Natural disasters, risk reduction, economic and social sustainability for Caribbean

More information

EFFECT OF THE COASTAL CONSERVATION DUE TO BEACH NOURISHMENT OF TOTORI SAND DUNE COAST

EFFECT OF THE COASTAL CONSERVATION DUE TO BEACH NOURISHMENT OF TOTORI SAND DUNE COAST Proceedings of the 7 th International Conference on Asian and Pacific Coasts (APAC 203) Bali, Indonesia, September 2-26, 203 EFFECT OF THE COASTAL CONSERVATION DUE TO BEACH NOURISHMENT OF TOTORI SAND DUNE

More information

DRAFT Subject to Modifications

DRAFT Subject to Modifications TREASURE COAST REGIONAL PLANNING COUNCIL M E M O R A N D U M To: Council Members AGENDA ITEM 9 From: Date: Subject: Staff May 16, 2013 Council Meeting Memorandum of Understanding for Tri-Rail Coastal Link

More information

Vista Field Airport. Master Plan Update. February, Prepared for: Port of Kennewick One Clover Island Kennewick, Washington

Vista Field Airport. Master Plan Update. February, Prepared for: Port of Kennewick One Clover Island Kennewick, Washington Vista Field Airport February, 2006 Prepared for: Port of Kennewick One Clover Island Kennewick, Washington 99336 Prepared by: J-U-B ENGINEERS, Inc. 2810 W. Clearwater Avenue, Suite 201 Kennewick, Washington

More information

Port Everglades Master/Vision Plan Update

Port Everglades Master/Vision Plan Update Port Everglades Master/Vision Plan Update Environmental Stakeholder Meeting June 15, 2009 Discussion to Focus On: Updating the 2006 Port Everglades Master Plan Issues dealing with the Turning Notch Potential

More information

PITA. PITA's campaign scores victory for public beach access. Christmas Fair celebrates 20th year. November 2014 INSIDE THIS ISSUE

PITA. PITA's campaign scores victory for public beach access. Christmas Fair celebrates 20th year. November 2014 INSIDE THIS ISSUE November 2014 PITA Sponsored by Plum Island Taxpayers and Associates, Inc. ( PITA ) Bringing Plum Island Together Volume 14, Issue 3 INSIDE THIS ISSUE - PITA S CAMPAIGN SCORES VICTORY OF ACCESS - CHRISTMAS

More information

SAME/SBA CONFERENCE. Col. Christopher W. Sallese Commander, Galveston District U.S. Army Corps of Engineers April 11, 2012

SAME/SBA CONFERENCE. Col. Christopher W. Sallese Commander, Galveston District U.S. Army Corps of Engineers April 11, 2012 SAME/A CONFERENCE Col. Christopher W. Sallese Commander, Galveston District U.S. Army Corps of Engineers April 11, 2012 U.S. Army Corps of Engineers Galveston District BUILDING STRONG 1 History of the

More information

LAUNCH OF THE COASTAL ZONE MANAGEMENT TRUST

LAUNCH OF THE COASTAL ZONE MANAGEMENT TRUST A 60km stretch of coastline on the Yucatan Peninsula of Mexico is the testing ground for an idea that could protect fragile environments around the world: insuring coral reefs. The Economist World Ocean

More information

Road widening from 2 lanes to 4 lanes. Bridge removal and piping of the canal. Lane closures are not expected.

Road widening from 2 lanes to 4 lanes. Bridge removal and piping of the canal. Lane closures are not expected. PALM BEACH COUNTY TRAFFIC DIVISION UPDATE OF ROAD AND BRIDGE CONSTRUCTION LIST DATE OF ISSUE: SEPTEMBER 12, 2012 STATUS FOR SEPTEMBER 17, 2012 THROUGH SEPTEMBER 23, 2012 *** CONSTRUCTION WORK ZONES ADDED

More information

2017 TBARTA Future Regional Priority Projects Adopted by TBARTA Board, December 9, 2016

2017 TBARTA Future Regional Priority Projects Adopted by TBARTA Board, December 9, 2016 2017 TBARTA Future Regional Priority Projects Adopted by TBARTA Board, December 9, 2016 Project numbers do not signify ranking they are for mapping identification purposes only. 1. 15th Street East The

More information

Marine Transportation Safety Investigation Report M17P0406

Marine Transportation Safety Investigation Report M17P0406 Marine Transportation Safety Investigation Report M17P0406 COLLISION Dredger FRPD 309 Fraser River, British Columbia 05 December 2017 About the investigation The Transportation Safety Board of Canada (TSB)

More information

Neighborhood Dredging SSD Program. Brief to Beaches & Waterways Commission

Neighborhood Dredging SSD Program. Brief to Beaches & Waterways Commission Neighborhood Dredging SSD Program Brief to Beaches & Waterways Commission August 4, 2011 1 Neighborhood Channel Dredging Program Initiative Supports City Council Goal #4: Revitalize Neighborhoods and Plan

More information

Virgin Islands Port Authority Hurricane. Recovery Update. March 2018

Virgin Islands Port Authority Hurricane. Recovery Update. March 2018 Virgin Islands Port Authority Hurricane Recovery Update March 2018 VIRGIN I SLANDS PORT AUTHORITY UNITED STAT ES VIRGIN I SLAND S Hurricanes Irma & Maria s Impact on the USVI s Ports On September 6 and

More information

Guide to Siting of Seawalls January 13, 2014 by Michael Walther, P.E., D.CE, President - Coastal Tech

Guide to Siting of Seawalls January 13, 2014 by Michael Walther, P.E., D.CE, President - Coastal Tech January 13, 2014 by Michael Walther, P.E., D.CE, President - Coastal Tech mwalther@coastaltechcorp.com Prepared for the Sea Turtle Conservancy http://www.conserveturtles.org/ Introduction Overview: This

More information

Ocean Way at U.S. #1 (Town of Jupiter) Installation of a new traffic signal.

Ocean Way at U.S. #1 (Town of Jupiter) Installation of a new traffic signal. PALM BEACH COUNTY TRAFFIC DIVISION UPDATE OF ROAD AND BRIDGE CONSTRUCTION LIST DATE OF ISSUE: FEBRUARY 13, 2013 STATUS FOR FEBRUARY 18, 2013 THROUGH FEBRUARY 24, 2013 *** CONSTRUCTION WORK ZONES ADDED

More information

Capital Planning City of Ocean City 1

Capital Planning City of Ocean City 1 City of Ocean City Capital Planning 2015-2019 City of Ocean City 1 Road Improvements Project Completion Date 2012 Fall Road Improvement Spring, 2014 Program - (Paving 7 th Street, 8 th Street, 800 Block

More information

CHAPTER 186. Shore Protection Plan for the Nile Delta Coastline. A.L. Kadib, Member, ASCE^, A.T. Shak, A. Member, ASCE< 2 ), A.A.

CHAPTER 186. Shore Protection Plan for the Nile Delta Coastline. A.L. Kadib, Member, ASCE^, A.T. Shak, A. Member, ASCE< 2 ), A.A. CHAPTER 186 Shore Protection Plan for the Nile Delta Coastline A.L. Kadib, Member, ASCE^, A.T. Shak, A. Member, ASCE< 2 ), A.A. Mazen^3), and M.K. Nadar< 4 ) A Shore Protection Master Plan (SPMP) for the

More information

2012 Texas Water Conservation Association Meeting

2012 Texas Water Conservation Association Meeting 2012 Texas Water Conservation Association Meeting BG Thomas Kula Southwestern Division Commander 15 June 2012 US Army Corps of Engineers AGENDA UNCLASSIFIED Overview of Southwestern Division Missions Texas

More information

Palm Beach County Traffic Report August 24 through August 31, 2012

Palm Beach County Traffic Report August 24 through August 31, 2012 For Immediate Release August 24, 2012 Meredith Cruz, (561) 641-6440 mcruz@corradino.com Palm Beach County Traffic Report August 24 through August 31, 2012 Palm Beach County Palm Beach County traffic will

More information

Resolution NOW THEREF ORE, BE IT RESOLVED BY THE BOARD OF COUNTY COMMISSIONER S OF MANATEE COUNTY, FLORIDA:

Resolution NOW THEREF ORE, BE IT RESOLVED BY THE BOARD OF COUNTY COMMISSIONER S OF MANATEE COUNTY, FLORIDA: Resolution 13-122 A RESOLUTION OF THE BOARD OF COUNTY COMMISSIONERS OF MANATEE COUNTY, FLORIDA, AUTHORIZING THE NATURAL RESOURCES DEPARTMENT TO FILE A LONG-RANGE BEACH EROSION CONTROL BUDGET PLAN WITH

More information

PORT EVERGLADES SAND BYPASS PROJECT

PORT EVERGLADES SAND BYPASS PROJECT 28 th Annual National Conference on Beach Preservation Technology February 4, 2015 Clearwater Beach, FL PORT EVERGLADES SAND BYPASS PROJECT AN IMPORTANT FUTURE SAND SOURCE FOR SOUTHEAST FLORIDA BEACHES

More information

HARBOR INFRASTRUCTURE INVENTORIES Erie Harbor, PA

HARBOR INFRASTRUCTURE INVENTORIES Erie Harbor, PA HARBOR INFRASTRUCTURE INVENTORIES Erie Harbor, PA Harbor Location: Erie Harbor is located on the southern shore of Lake Erie in the City of Erie, PA about 98 Miles southwest of Buffalo. Authority: River

More information

TOWARDS SUSTAINABLE MANAGEMENT OF MARINE AND COASTAL HABITATS ASIA- PACIFIC DAY FOR THE OCEAN

TOWARDS SUSTAINABLE MANAGEMENT OF MARINE AND COASTAL HABITATS ASIA- PACIFIC DAY FOR THE OCEAN TOWARDS SUSTAINABLE MANAGEMENT OF MARINE AND COASTAL HABITATS WANNAKIAT THUBTHIMSANG PHUKET MARINE BIOLOGICAL CENTER, DMCR, THAILAND ASIA- PACIFIC DAY FOR THE OCEAN 20 NOVEMBER 2018, CONFERENCE ROOM 4,

More information

80' MIN 100'-0" 15'-0" 2 FEDERALLY DREDGED NAVIGATION CHANNEL MEASURED AT EL -10' (NOTE 4) NAVIGATION CHANNEL EXISTING YACHT CLUB FLOATS

80' MIN 100'-0 15'-0 2 FEDERALLY DREDGED NAVIGATION CHANNEL MEASURED AT EL -10' (NOTE 4) NAVIGATION CHANNEL EXISTING YACHT CLUB FLOATS 11 3 1 6 9 4 5 4 8 7 7 9 ' MUDLINE ELEVATION 8 1 6 11 6 1 7 8 5 7 7 12 11 5 12 7 8 9 5 11 8 REVISED FEDERAL LIMIT FOR DREDGING FEDERAL LIMIT FOR DREDGING 12 1 11 7 1 4 8 5 8 5 14 4 14 3 9 3 8 5 1 5 11

More information

Public Information Center August 12, 2010

Public Information Center August 12, 2010 Route 52 Causeway Bridge Replacement & Somers Point Circle Elimination Project Somers Point Atlantic County Public Information Center August 12, 2010 Ocean City Cape May County Presentation Overview General

More information

Village of Stockholm

Village of Stockholm Village of Stockholm 2016 Plan for the Community Park Park Committee: Harley Cochran Mark Coronna Steve Grams Jerry Larson Hap Palmberg FINAL: FOR VILLAGE BOARD APPROVAL March 8, 2016 1 Table of Contents

More information

COOS COUNTY AIRPORT DISTRICT REGULAR BOARD MEETING Thursday August 20, 2015

COOS COUNTY AIRPORT DISTRICT REGULAR BOARD MEETING Thursday August 20, 2015 COOS COUNTY AIRPORT DISTRICT REGULAR BOARD MEETING Thursday August 20, 2015 Minutes of the regular monthly meeting of the Board of Commissioners of the Coos County Airport District held on Thursday, August

More information

Intense Hurricane Strike Reconstruction, Vieques, Puerto Rico

Intense Hurricane Strike Reconstruction, Vieques, Puerto Rico Intense Hurricane Strike Reconstruction, Vieques, Puerto Rico beach vegetated barrier Caribbean Sea N Vieques, Puerto Rico 200 m b) a) 67ºW 65ºW 1989 1956 18.5ºN 1928 PRP12 headland La Parguera 17.5ºN

More information

DRAFT GENERAL IMPLEMENTATION PLAN AND SPECIFIC IMPLEMENTATION PLAN MIDDLETON MUNICIPAL AIRPORT MOREY FIELD. Revised 12/12/03

DRAFT GENERAL IMPLEMENTATION PLAN AND SPECIFIC IMPLEMENTATION PLAN MIDDLETON MUNICIPAL AIRPORT MOREY FIELD. Revised 12/12/03 DRAFT GENERAL IMPLEMENTATION PLAN AND SPECIFIC IMPLEMENTATION PLAN MIDDLETON MUNICIPAL AIRPORT MOREY FIELD Revised 12/12/03 As recommended for approval by the Plan Commission General Project Description

More information

National Outdoor Recreation Conference April 2018

National Outdoor Recreation Conference April 2018 An Unorthodox Approach to Trail Planning for a Mountain Community National Outdoor Recreation Conference April 2018 Today s story Alta, Utah Winter vs. Summer Population Growth /Economic Development Trail

More information

UAS to GIS Utilizing a low-cost Unmanned Aerial System (UAS) for Coastal Erosion Monitoring

UAS to GIS Utilizing a low-cost Unmanned Aerial System (UAS) for Coastal Erosion Monitoring UAS to GIS Utilizing a low-cost Unmanned Aerial System (UAS) for Coastal Erosion Monitoring Agenda Scope of today s presentation Demonstration Objectives Wrightsville Beach Test Area Masonboro Inlet Jetties

More information

How is St Barths After Irma? Checking In

How is St Barths After Irma? Checking In How is St Barths After Irma? Checking In Cecilia Pelloux Contributor i Apr 16, 2018, 04:09am 2,607 views #DeLuxe Gustavia, 6 months after Irma. CÉCILIA PELLOUX St Barths is a very special place for me.

More information

Venice Aviation Society, Inc. (VASI) 1335 Horizon Rd. Venice, Florida

Venice Aviation Society, Inc. (VASI) 1335 Horizon Rd. Venice, Florida Venice Aviation Society, Inc. (VASI) 1335 Horizon Rd. Venice, Florida 34293 www.veniceaviationsociety.com September 24, 2009 Mr. Bart Vernace Assistant Manager FAA Orlando Airport District Office 5950

More information

Holgate Taxpayers Association Spring Membership Meeting Minutes - June 2, 2018

Holgate Taxpayers Association Spring Membership Meeting Minutes - June 2, 2018 Holgate Taxpayers Association Spring Membership Meeting Minutes - June 2, 2018 The meeting was called to order by Dan Macone at 10.01 a.m. Dan thanked the membership for their support and remarked that

More information

MAP AMENDMENT/HEIGHT MAP AMENDMENT SUMMARY. Three stories above River Street Two stories above River Street

MAP AMENDMENT/HEIGHT MAP AMENDMENT SUMMARY. Three stories above River Street Two stories above River Street MPC STAFF REPORT TEXT AMENDMENT Historic District Height Map MAP AMENDMENT/HEIGHT MAP AMENDMENT SUMMARY Report Status Initial Report- Petitioner, Property Owner, Agent Information SRD, LLC d/b/a The Kessler

More information

Kirkcaldy Sea Wall Improvements. Non-technical Summary. For illustration purposes only to give an indicative representation of the scheme.

Kirkcaldy Sea Wall Improvements. Non-technical Summary. For illustration purposes only to give an indicative representation of the scheme. ENVIRONMENTAL STATEMENT Non-technical Summary For illustration purposes only to give an indicative representation of the scheme. Kirkcaldy Sea Wall Improvements Introduction A concrete sea wall fronts

More information

WHY THERE IS NO STORM SURGE PROTECTION FOR THE LAKE PONTCHARTRAIN BASIN

WHY THERE IS NO STORM SURGE PROTECTION FOR THE LAKE PONTCHARTRAIN BASIN WHY THERE IS NO STORM SURGE PROTECTION FOR THE LAKE PONTCHARTRAIN BASIN A Report Addressing: I. The Reason Why The Corps Of Engineers Abandoned Its Plan To Keep Storm Surge Out Of The Lake Pontchartrain

More information

Update Report - Etobicoke Creek and South Mimico Creek Trails

Update Report - Etobicoke Creek and South Mimico Creek Trails REPORT FOR ACTION Update Report - Etobicoke Creek and South Mimico Creek Trails Date: October 23, 2017 To: Etobicoke York Community Council From: General Manager, Parks Forestry and Recreation Wards: Ward

More information

Southeast Conference and Alaska Forest Association Intervenors in New Challenge to 2001 Roadless Rule s Application in Alaska

Southeast Conference and Alaska Forest Association Intervenors in New Challenge to 2001 Roadless Rule s Application in Alaska Southeast Conference and Alaska Forest Association Intervenors in New Challenge to 2001 Roadless Rule s Application in Alaska 1 S T A T E O F A L A S K A V. U. S. D E P A R T M E N T O F A G R I C U L

More information

This attorney-client retainer agreement (hereafter referred as Agreement ) is entered into by and. (your name as it appears on passport) (hereafter

This attorney-client retainer agreement (hereafter referred as Agreement ) is entered into by and. (your name as it appears on passport) (hereafter Attorney-Client Retainer Agreement This attorney-client retainer agreement (hereafter referred as Agreement ) is entered into by and between (your name as it appears on passport) (hereafter referred as

More information

DIRECTOR S REPORT TRANSPORTATION BOARD OCTOBER 8, 2018

DIRECTOR S REPORT TRANSPORTATION BOARD OCTOBER 8, 2018 DIRECTOR S REPORT TRANSPORTATION BOARD OCTOBER 8, 2018 1 US EPA CONSENT DECREE NDOT HAS MET OR EXCEEDED ALL DEADLINES FOR REQUIREMENTS CONTAINED IN THE CONSENT DECREE WITH THE US EPA NO STIPULATED PENALTIES

More information

Completion: August 2011 LS #321 Design LS #8

Completion: August 2011 LS #321 Design LS #8 1 CIPNumber c350406 2 c350302 3 c350902 LEGEND PERMITTING/ BIDDING CHARLOTTE COUNTY UTILITIES Burnt Store Water Reclamation Facility (Expansion to 0.75 MGD) East Port Expansion Water Reclamation Facility

More information

The Joint Charlotte County - Punta Gorda and Lee MPO Meeting has changed from 10:00 a.m. to 9:30 a.m.

The Joint Charlotte County - Punta Gorda and Lee MPO Meeting has changed from 10:00 a.m. to 9:30 a.m. The Joint Charlotte County - Punta Gorda and Lee MPO Meeting has changed from 10:00 a.m. to 9:30 a.m. JOINT MEETING OF THE CHARLOTTE COUNTY-PUNTA GORDA METROPOLITAN PLANNING ORGANIZATION BOARD AND LEE

More information

New Orleans Municipal Yacht Harbor

New Orleans Municipal Yacht Harbor New Orleans Municipal Yacht Harbor 2018 Capital Projects Construction Updates MYH Floating Marina Community Sailing Center (Coordination with) MYH Boat Launch (MYHMC) MYH Administration Building (CPA &

More information

BOARD OF COUNTY COMMISSIONERS OKALOOSA COUNTY, FLORIDA

BOARD OF COUNTY COMMISSIONERS OKALOOSA COUNTY, FLORIDA TOURIST DEVELOPMENT SERVICE AREA: CULTURE/RECREATION BOARD OF COUNTY COMMISSIONERS OKALOOSA COUNTY, FLORIDA DEPARTMENT/PROGRAM: TOURIST DEVELOPMENT - MARKETING PROGRAM DESCRIPTION: Okaloosa Tourist Development

More information

Welcome to the Downtown Fort Lauderdale Neighborhood Working Group Meeting. First meeting june 17, 2010

Welcome to the Downtown Fort Lauderdale Neighborhood Working Group Meeting. First meeting june 17, 2010 Welcome to the Downtown Fort Lauderdale Neighborhood Working Group Meeting First meeting june 17, 2010 State of the Project Draft Environmental Impact Statement Study Phase This study is NOT the final

More information

FLL Master Plan Update Technical Advisory Committee (TAC) Briefing #1. September 28, 2016

FLL Master Plan Update Technical Advisory Committee (TAC) Briefing #1. September 28, 2016 FLL Master Plan Update Technical Advisory Committee (TAC) Briefing #1 September 28, 2016 TAC Committee Role: Internal Stakeholders To provide input on the master planning analysis from the technical and

More information

e 2 design season three New Orleans: The Water Line Episode Summary

e 2 design season three New Orleans: The Water Line Episode Summary e 2 design season three New Orleans: The Water Line Episode Summary After the devastation of Hurricane Katrina, which hit the southern coast of the United States on August 28, 2005, the residents of the

More information

The South Ponte Vedra News

The South Ponte Vedra News The South Ponte Vedra News April 2014 News Editor: Amy Brannon amybrannon2011@gmail.com MONTHLY HAPPENINGS Monthly Social 2 nd Friday 6-8:30 P.M. Bingo Last Thursday 7 P.M. Bridge Tuesdays 7 P.M. Exercise

More information

MUNICIPALITY OF KINCARDINE

MUNICIPALITY OF KINCARDINE MUNICIPALITY OF KINCARDINE EMERGENCY MANAGEMENT PROGRAM COMMITTEE MINUTES Kincardine Fire Station Meeting Room Thursday, 10:30 a.m. Chair Mayor Committee Members Community Emergency Management Coordinator

More information

395 Express Lanes Project Update

395 Express Lanes Project Update 395 Express Lanes Project Update Key Dates Milestone Date Limited Notice to Proceed February 2017 Early Works March-June 2017 Full Notice to Proceed July 2017 Preparatory Work Summer 2017 Draft Noise Abatement

More information

Proposed Official Plan Amendment 41 to the Region of York Official Plan

Proposed Official Plan Amendment 41 to the Region of York Official Plan COMMITTEE OF THE WHOLE NOVEMBER 18, 2002 REGION OF YORK OFFICIAL PLAN AMENDMENT 41 THE OAK RIDGES MORAINE CONSERVATION PLAN Recommendation The Commissioner of Planning recommends: 1. That the City of Vaughan

More information

Safety, Infrastructure, and Tenant Improvement Project. Public Hearing Informational Brochure February 26, 2013

Safety, Infrastructure, and Tenant Improvement Project. Public Hearing Informational Brochure February 26, 2013 New York State Department of Transportation Safety, Infrastructure, and Tenant Improvement Project Public Hearing Informational Brochure February 26, 2013 This DEIS/Draft EA evaluates the potential impacts

More information

Boston-Logan International Airport: Proposed Consolidation of Rental Car Operations

Boston-Logan International Airport: Proposed Consolidation of Rental Car Operations Boston-Logan International Airport: Proposed Consolidation of Rental Car Operations ACI Legal Conference April 17, 2008 Prepared by: Trudy P. Reilly, Senior Legal Counsel, Massport Presentation Outline

More information

30 November Randall G. Hintz Chief, Operations Support Branch Operations Division. US Army Corps of Engineers BUILDING STRONG

30 November Randall G. Hintz Chief, Operations Support Branch Operations Division. US Army Corps of Engineers BUILDING STRONG 30 November 2011 Randall G. Hintz Chief, Operations Support Branch Operations Division US Army Corps of Engineers Overview MAINTENANCE PROJECTS Deep Draft Channels Shallow Draft Channels Coastal Inlets

More information

MINUTES OF MEETING RIVER HALL COMMUNITY DEVELOPMENT DISTRICT. A Public Hearing and Regular Meeting of the Board of Supervisors of the River Hall

MINUTES OF MEETING RIVER HALL COMMUNITY DEVELOPMENT DISTRICT. A Public Hearing and Regular Meeting of the Board of Supervisors of the River Hall MINUTES OF MEETING RIVER HALL COMMUNITY DEVELOPMENT DISTRICT A Public Hearing and Regular Meeting of the Board of Supervisors of the River Hall Community Development District were held on Thursday, August

More information

Water, Sewer and Stormwater General Facilities & Connection Charges

Water, Sewer and Stormwater General Facilities & Connection Charges City of Snoqualmie Water, Sewer and Stormwater General Facilities & Connection Charges City Council Meeting March 9, 2015 Presented by: Sergey Tarasov, Project Manager Presentation Overview New customer

More information

Cofferdam Performance Hurricanes Harvey & Irma

Cofferdam Performance Hurricanes Harvey & Irma Cofferdam Performance Hurricanes Harvey & Irma - 2017 Greg Hammer Senior Geotechnical Engineer CELRH-DSPC-GS DSMMCX Third Workshop on Case Histories in Dam Safety Risk-Informed Decision Making 2018 USSD