1 A Brief History of the Town of Palm Beach Coastal Protection Program Beach nourishment occurred in Palm Beach as far back as the 1940s. The Lake Worth Inlet Sand Transfer Plant was built in the late 1950s. The Town s modern coastal management program began in the mid-1980s Thanksgiving Day Storm caused the freighter Mercedes to come ashore in north end and State Road A1A to be severed between Sloan s and Widener s Curve FDOT constructed huge revetment in Reach 6 between Sloan s and Widener s Curve Town Council adopted the original Comprehensive Coastal Management Plan (CCMP) Mid-Town Seawall Revetment constructed as an emergency project to absorb energy from waves that were hitting this roadway protective seawall. Late 1980s and Early 1990s Conflict in community re: scope, methods, and funding of the Coastal Protection Program. Late 1980s Permitting and Federal Funding Process for the first Mid-Town Beach Restoration Project. Early 1990s Experimental PEP Reef at Mid-Town (instead of beach restoration) and Town vs. County litigation re: operation of the Sand Transfer Plant PEP Reef removed. Sand Transfer Plant restored. Original Mid-Town Beach Restoration Project (Barton to Hammon with approximately 880,000 cubic yards & 11 groins) Page 1
2 Also in 1995 Town Council created the original Shore Protection Board (SPB) As recommended by the SPB, the CCMP was updated Town Council adopted the updated CCMP and sunsetted the original SPB Town Council approved a 10-year plan for coastal protection and issued bonds as partial funding for the program Construction of the expanded Mid-Town Beach Nourishment Project (Wells to Banyan with approximately 1.2 million cubic yards) 2004 Hurricanes Frances and Jeanne caused severe erosion in Palm Beach, especially in Reaches 7 and Emergency coastal protection projects Seawall construction at Old Ocean Boulevard (Reach 7) Sand berm in Reaches 7 and 8 (Sloan s Curve to La Bonne Vie with approximately 100,000 cubic yards) 2005 Hurricane Wilma caused further erosion Reach 7 Beach Restoration Project (Phipps Park to 2774 Condominium) and dune restoration in Reach 8 (Total: approximately 1.1 million cubic yards) Mid-Town Beach Nourishment Project (El Mirasol to Banyan with approximately 900,000 cubic yards) 2007 NOB Seawall Revetment Project (interim protection from direct wave impact while planning replacement project) Page 2
3 Also in 2007 Sub-Tropical Storm Andrea caused more erosion, especially in Reach 8 south of the Lake Worth Pier. February 2008 FDEP issues Intent to Issue a permit for full scale beach restoration in Reach 8. March 2008 Petition filed objecting to Intent to Issue. August to October 2008 Administrative Hearing on the Reach 8 permit. March 2009 Administrative Law Judge s Recommended Order for FDEP to deny Reach 8 permit. July 2009 FDEP Secretary Sole s Final Order denying the permit. Landmark Impact Combined effect of draft permit, petition, hearing, recommended order, and final order was establishment of more stringent standards for future permits Statewide. August 2008 Tropical Storm Fay caused damage to nourished beaches at Mid-Town and Reach FEMA approved funding assistance for recovery projects at Mid-town and Reach 7. December 2008 Town Council created the current SPB Town sued U.S. Government for damages from erosion caused by Lake Worth Inlet Town reconstructed Lake Worth Inlet Sand Transfer Plant Partial renourishment and dune restoration at Mid-Town and in Reaches 7 and 8. (Total: Approximately 133,000 cubic yards) SPB conducted extensive research, then prepared and refined a long-term plan for coastal protection in Palm Beach. Page 3
4 2012 SPB submitted a revised long-term plan and Town Council retained Woods Hole Group (WHG) to perform a peer review. Hurricane Sandy and multiple nor easters caused severe erosion in Palm Beach, especially in Reach 3 (in the vicinity of the Wells/Sunrise seawall), and damaged the Lake Worth Inlet Sand Transfer Plant so severely it could not operate. Early 2013 Town and U.S. Government ended litigation re: Lake Worth Inlet and declared partnership in better managing sand dredged from the inlet. U.S. Government (Army Corps of Engineers) expanded sand settling basin at Lake Worth Inlet (as proposed by Town) and placed approximately 400,000 cubic yards of sand on the beaches in the north end of Palm Beach. June 2013 After receiving WHG s final recommendations, Town Council approved an $85 million 10-year Coastal Protection Plan. Late 2013 Repaired Sand Transfer Plant resumed operation. FDEP, Town, and County executed the Beach Management Agreement (BMA) for Palm Beach Island, pre-approving much of the Town s 10-year plan (to accomplish implementation of the plan faster and at less expense). Town Council approved funding the 10-year plan with ad valorem taxes. Planned for Wells/Sunrise Oceanfront Roadway Protective Seawall Project Mid-Town Beach Nourishment (Casa Bendita to Banyan with approximately 875,000 cubic yards) Interim nourishment in Reach 7 and dune restoration in Reach 8 (Total: Approximately 150,000 cubic yards) Also Possible in North Ocean Boulevard Oceanfront Roadway Protective Seawall Project Commencement of Groin Rehabilitation Program Planned for Reach 7 Beach Nourishment (Total: Approximately 1 million cubic yards) (Dune Restoration from Sloan s Curve to Phipps Park) (Full Beach Nourishment: Phipps Park to Kreusler Park) Page 4
5 Also Planned for Reach 8 Dune Restoration or larger project if permitted by the EIS for Reach 8 (Minimum of approximately 50,000 cubic yards). (Last Update of Summary: March 12, 2014) Page 5
The Galveston Seawall
Coastal and Ocean Engineering ENGI.8751 Undergraduate Student Forum Faculty of Engineering and Applied Science, Memorial University, St. John s, NL, Canada. March, 2013 The Galveston Seawall Mark Harvey
More informationHurricane Irma: Palm Beach County Coastal Storm Damage Assessment
Project Area: Coral Cove Park Location: R1 to R7.5 Project Length: 5,170 ft Estimated Volumetric Loss: 38,296 cy Pre-Storm Assessment Date: August 22, 2017 General observations: 30 ft loss of dry beach
More informationEdisto Beach Renourishment and Groin Lengthening Project. Tim Kana Coastal Science & Engineering
Edisto Beach Renourishment and Groin Lengthening Project Tim Kana Coastal Science & Engineering Hurricane Matthew 8 Oct 2016 Cat 1 Storm @ Edisto Beach Worst Surge Event Since DAVID in 1979 Tides ~ 5 ft
More informationCoastal Management: Treasure Island - Long Key Nourishment
Coastal Management: Treasure Island - Long Key Nourishment Project Completed - October 20, 2010 The nourishment of Treasure Island and Long Key (TI/LK) beaches began in late July of 2010. The previous
More information2011 Nags Head Beach Nourishment Project Update. Tim Kana & Haiqing Kaczkowski
2011 Nags Head Beach Nourishment Project Update Tim Kana & Haiqing Kaczkowski NCBIWA Conference 3 April 2017 Outline of the Presentation 1 Review 2011 Nourishment Project Post-project monitoring efforts
More informationMarch 2, The Honorable Mayor Williams D. Sessoms, Jr. Members of City Council. Subject: Coastal CIP Presentation to City Council - March 6, 2018
OFFICE OF THE CITY MANAGER (757) 385-4242 (757) 427-5626 FAX MUNICIPAL CENTER BUILDING 1, ROOM 234 2401 COURTHOUSE DRIVE VIRGINIA BEACH, VA 23456-9001 March 2, 2018 The Honorable Mayor Williams D. Sessoms,
More informationSt. Augustine Port, Waterway & Beach District. St. Augustine Inlet 2013 draft Inlet Management Plan. March 19, 2013
Division of Water Resource Management St. Augustine Port, Waterway & Beach District St. Augustine Inlet 2013 draft Inlet Management Plan March 19, 2013 Discussion Outline Florida Statutes Florida Inlets
More informationDOES BEACH NOURISHMENT PROTECT PROPERTY VALUES FROM HURRICANES? THE CASE OF THE 2004 AND 2005 HURRICANES
DOES BEACH NOURISHMENT PROTECT PROPERTY VALUES FROM HURRICANES? THE CASE OF THE 2004 AND 2005 HURRICANES James Murley, Director, Center for Urban and Environmental Solutions (CUES), FAU Dr. Lenore Alpert,
More informationOctober 7, 2016 Hurricane Matthew Rakes the East Coast of Flagler County for 18.1 Miles
October 7, 2016 Hurricane Matthew Rakes the East Coast of Flagler County for 18.1 Miles Hammock Dunes Suffers Penetration of the Ocean into the Community; has a 15-30 ft. Wide Triangular Section of the
More informationREVISED DRAFT Integrated Hurricane Sandy General Reevaluation Report and Environmental Impact Statement. Atlantic Coast of New York
REVISED DRAFT Integrated Hurricane Sandy General Reevaluation Report and Environmental Impact Statement Atlantic Coast of New York East Rockaway Inlet to Rockaway Inlet and Jamaica Bay Appendix F Public
More informationIntroduction and Company Overview
Introduction and Company Overview Multi-discipline consulting firm Founded in 1950 - HQ in Laurel, Maryland Local WPB Office Survey, Utility Coordination, Roadway Design, Environmental and CEI Past Port
More informationMaine Historical Society. Coll Casco Bay Island Development Association Collection
Maine Historical Society Coll. 2724 Casco Bay Island Development Association Collection 1958-2001 Accession #: 2013.271, 2015.003 Processed: February 2014-September 2014 by Lucinda Gannon, MHS Volunteer,
More informationCity of Fort Lauderdale. Frequently Asked Questions. Proposed Sea Wall Ordinance
City of Fort Lauderdale Frequently Asked Questions Proposed Sea Wall Ordinance The City of Fort Lauderdale is considering amending the Unified Land Development Regulations of the City of Fort Lauderdale
More informationNorfolk District North Atlantic Division
Norfolk District North Atlantic Division Eastern Chapter of WEDA Fall Conference October 26, 2016 Stephen J. Powell, P.E. (757) 201-7788 US Army Corps of Engineers Norfolk District FY-17 Dredging Program
More informationOuter Banks Bridges Update:
Outer Banks Bridges Update: Outer Banks Chamber of Commerce Economic Summit Jerry D. Jennings, PE - Division Engineer April 12, 2018 Mid-Currituck Bridge Currituck Sound (Wright Memorial Bridge) Alligator
More informationDAMAGE ASSESSMENT OF SAND FENCING GARDEN CITY, NORTH LITCHFIELD AND LITCHFIELD BEACH GEORGETOWN COUNTY, SC
OF SAND FENCING GARDEN CITY, NORTH LITCHFIELD AND LITCHFIELD BEACH GEORGETOWN COUNTY, SC June 07, 2017 PREPARED FOR: GEORGETOWN COUNTY DEPARTMENT OF PUBLIC SERVICES PREPARED BY: The EARTHWORKS Group 11655
More informationMini-budget Workshop Coastal Projects
Mini-budget Workshop Coastal Projects Public Works Department Coastal Division July 16, 2015 Coastal Infrastructure 99 dune walkovers 9 beachfront parks Dispersed over 35 miles of 2 inlet parks coastline.
More informationU.S. Army Corps of Engineers Wilmington District
U.S. Army Corps of Engineers Wilmington District 2012 East Coast - WEDA October 9-11, 2012 Ongoing & Upcoming Contracts US Army Corps of Engineers Wilmington District Ongoing Contracts Project Quantity
More informationStakeholder Meeting #1. An Introduction to the Blind Pass Inlet Management Study
Stakeholder Meeting #1 An Introduction to the Blind Pass Inlet Management Study April 21, 2016 5:30 PM, The Sanctuary, Sanibel Island A World of Solutions 0 Agenda Introductions Study Overview Study Status
More informationPotential Application of. Shore-Stabilizing Structures along an Open-Coast Shoreline. Christopher G. Creed, P.E. 23 rd Annual National Conference on
23 rd Annual National Conference on Potential Application of Beach Preservation Technology February 3-5, 2010 Indialantic, FL Shore-Stabilizing Structures along an Open-Coast Shoreline Christopher G. Creed,
More informationWater Resources Update after NCGA Long Session
Water Resources Update after NCGA Long Session North Carolina Beach Inlet & Waterway Association Annual Conference November 16, 2015 Division of Water Resources Overview New Name / Reorganization Jordan
More informationThe reasons why coastal management is needed in Minehead:
1. Resource 1: Why did Minehead need new sea defences? Coastal management in Minehead In pairs, read the following resource and highlight the reasons why coastal management was needed in Minehead. The
More informationOngoing Projects 3/16/2017 2
Ongoing Projects 26 th to 34 th Street, West Avenue to Bay Avenue ($6.5 million contract awarded) 46 th Street (complete) 29 th Street Firehouse South Jersey Gas improvements 34 th Street playground repairs
More informationWaterfront Plan Working Group Meeting Maritime & Water-Dependent Uses Meeting Agenda
Waterfront Plan Working Group Meeting Maritime & Water-Dependent Uses Meeting Agenda Overview of Port Maritime & Water-Dependent Uses Summary of Maritime Planning and Policies Q&A and Discussion of Operational
More informationImpact of Offshore Directed Forcing on Sediment Transport and Structural Integrity at Packery Channel, Corpus Christi Texas
Google Earth 29 Aug 2017 Impact of Offshore Directed Forcing on Sediment Transport and Structural Integrity at Packery Channel, Corpus Christi Texas Deidre D. Williams Coastal Research Scientist Conrad
More informationEconomic Impacts of Beach Nourishment in Texas
Galveston Island South Padre Island April 25, 2017 Economic Impacts of Beach Nourishment in Texas Michael Walther Coastal Tech G.E.C., Inc. Reuben Trevino - Galveston Island Park Board of Trustees Special
More informationMay 1, 2015 Meredith Cruz, (561) Palm Beach County Traffic Report May 1 through May 8, 2015
May 1, 2015 Meredith Cruz, (561) 641-6440 mcruz@corradino.com Palm Beach County Traffic Report May 1 through May 8, 2015 Palm Beach County Palm Beach County traffic will be affected this week by ongoing
More informationProposed Cherry Grove Canals Dredging Project
Proposed Cherry Grove Canals Dredging Project 1 Development of Cherry Grove C.D. Nixon inherited 9,940 acres of land 1924 Nixon family began planning subdivision of Cherry Grove 1950 Mr. Nixon closed natural
More informationMANAGING COASTAL HAZARDS THROUGH BENEFICIAL REUSE OF DREDGED SAND AND AN ADAPTIVE WORKS STRATEGY
MANAGING COASTAL HAZARDS THROUGH BENEFICIAL REUSE OF DREDGED SAND AND AN ADAPTIVE WORKS STRATEGY Isabelle Ghetti 1, B.Morgan 2, R.Massie 1, Gary Blumberg 2 1 Shoalhaven City Council, Nowra, NSW 2 Royal
More informationCoastal Impact on barrier Islands: Application to Praia de Faro
Coastal Impact on barrier Islands: Application to Praia de Faro Theocharis Plomaritis, Oscar Ferreira and Susana Costas RISCKIT Final Meeting This project has received funding from the European Union s
More informationEngineering With Nature Geographic Project Mapping Tool (EWN ProMap)
Engineering With Nature Geographic Project Mapping Tool (EWN ProMap) Cynthia Banks Program Manager Burton Suedel, PhD Research Biologist Michelle Bourne Research Biologist U.S. Army ERDC 23 June 2015 Dredging
More informationUsing Managed Retreat to Address Coastal Erosion in Brewster
Using Managed Retreat to Address Coastal Erosion in Brewster Chris Miller, Director, Brewster Department of Natural Resources CMiller@brewster-ma.gov Brewster, Massachusetts Almost 1/3 of town preserved
More informationBrevard County Utility Services Department
Brevard County Utility Services Department April 3, 2018 Jim Helmer, Department Director Brian Sorensen, W/WW Manager 1 Utility Services Department 9 TREATMENT PLANTS 6 WASTEWATER, 3 WATER 163 EMPLOYEES
More informationPalm Beach County Traffic Report July 13 through July 20, 2012
For Immediate Release July 13, 2012 Meredith Cruz, (561) 641-6440 mcruz@corradino.com Palm Beach County Traffic Report July 13 through July 20, 2012 Palm Beach County Palm Beach County traffic will be
More information# BATHS # BEDROOMS MONTHLY RATE NORTH MYRTLE BEACH WINTER/MONTHLY RENTAL HOMES
WINTER/ RENTAL HOMES Bay Watch III 441 1 1 Oceanfront $850 $28 per day Buena Vista Plaza 506 1 1 Oceanfront $650 $22 per day Buena Vista Plaza 707 1 1 Oceanfront $750 $25 per day Chateau Manor 103 1 1
More informationBuck Island Reef National Monument News Release Date: Immediate Contact: Joel Tutein, Superintendent, x 222
National Park Service U.S. Department of the Interior www.nps.gov 2100 Church Street, # 100 Christiansted, VI 00820 News Release Date: Immediate Contact: Joel Tutein, Superintendent, Joel.Tutein@nps.gov
More informationRiverine Sand Mining/Scofield Island Restoration (BA-40)
Riverine Sand Mining/Scofield Island Restoration (BA-40) Conference on Ecological and Ecosystem Restoration Kenneth Bahlinger, CPRA Project Manager July 31, 2014 committed to our coast committed to our
More informationThe major parties key coastal policy initiatives
NEWSLETTER July 2016 EDITORIAL: Coastal policies of major parties inadequate By Barry Sammels Chair, Australian Coastal Councils Association and Mayor, City of Rockingham With the result of the 2016 Federal
More informationSatoquo SEINO (Graduate School of Engineering, Kyushu University, Japan)
A reconsideration of horseshoe crab conservation methodology in Japan over the last 100 years and prospects for a marine protected area network in Asian seas Satoquo SEINO (Graduate School of Engineering,
More informationCat Island Chain Background & Access Guide
Cat Chain Background & Access Guide Brown County Port & Resource Recovery Department 2561 S. Broadway, Green Bay, WI 54304 (920) 492-4950 www.portofgreenbay.com January 2018 1 Restoration of the Cat Chain
More informationFred Milch Project Review Manager East Central Florida Regional Planning Council
RESHAPING THE ROLE OF PARKS, RECREATIONAL AREAS, AND GREEN SPACE TO ENHANCE LIVABILITY Fred Milch Project Review Manager East Central Florida Regional Planning Council St. Johns River to Sea Loop Webinar
More informationHigh-Level Roundtable on International Cooperation for Sustainable Development in Caribbean Small Island Developing States
High-Level Roundtable on International Cooperation for Sustainable Development in Caribbean Small Island Developing States Natural disasters, risk reduction, economic and social sustainability for Caribbean
More informationEFFECT OF THE COASTAL CONSERVATION DUE TO BEACH NOURISHMENT OF TOTORI SAND DUNE COAST
Proceedings of the 7 th International Conference on Asian and Pacific Coasts (APAC 203) Bali, Indonesia, September 2-26, 203 EFFECT OF THE COASTAL CONSERVATION DUE TO BEACH NOURISHMENT OF TOTORI SAND DUNE
More informationDRAFT Subject to Modifications
TREASURE COAST REGIONAL PLANNING COUNCIL M E M O R A N D U M To: Council Members AGENDA ITEM 9 From: Date: Subject: Staff May 16, 2013 Council Meeting Memorandum of Understanding for Tri-Rail Coastal Link
More informationVista Field Airport. Master Plan Update. February, Prepared for: Port of Kennewick One Clover Island Kennewick, Washington
Vista Field Airport February, 2006 Prepared for: Port of Kennewick One Clover Island Kennewick, Washington 99336 Prepared by: J-U-B ENGINEERS, Inc. 2810 W. Clearwater Avenue, Suite 201 Kennewick, Washington
More informationPort Everglades Master/Vision Plan Update
Port Everglades Master/Vision Plan Update Environmental Stakeholder Meeting June 15, 2009 Discussion to Focus On: Updating the 2006 Port Everglades Master Plan Issues dealing with the Turning Notch Potential
More informationPITA. PITA's campaign scores victory for public beach access. Christmas Fair celebrates 20th year. November 2014 INSIDE THIS ISSUE
November 2014 PITA Sponsored by Plum Island Taxpayers and Associates, Inc. ( PITA ) Bringing Plum Island Together Volume 14, Issue 3 INSIDE THIS ISSUE - PITA S CAMPAIGN SCORES VICTORY OF ACCESS - CHRISTMAS
More informationSAME/SBA CONFERENCE. Col. Christopher W. Sallese Commander, Galveston District U.S. Army Corps of Engineers April 11, 2012
SAME/A CONFERENCE Col. Christopher W. Sallese Commander, Galveston District U.S. Army Corps of Engineers April 11, 2012 U.S. Army Corps of Engineers Galveston District BUILDING STRONG 1 History of the
More informationLAUNCH OF THE COASTAL ZONE MANAGEMENT TRUST
A 60km stretch of coastline on the Yucatan Peninsula of Mexico is the testing ground for an idea that could protect fragile environments around the world: insuring coral reefs. The Economist World Ocean
More informationRoad widening from 2 lanes to 4 lanes. Bridge removal and piping of the canal. Lane closures are not expected.
PALM BEACH COUNTY TRAFFIC DIVISION UPDATE OF ROAD AND BRIDGE CONSTRUCTION LIST DATE OF ISSUE: SEPTEMBER 12, 2012 STATUS FOR SEPTEMBER 17, 2012 THROUGH SEPTEMBER 23, 2012 *** CONSTRUCTION WORK ZONES ADDED
More information2017 TBARTA Future Regional Priority Projects Adopted by TBARTA Board, December 9, 2016
2017 TBARTA Future Regional Priority Projects Adopted by TBARTA Board, December 9, 2016 Project numbers do not signify ranking they are for mapping identification purposes only. 1. 15th Street East The
More informationMarine Transportation Safety Investigation Report M17P0406
Marine Transportation Safety Investigation Report M17P0406 COLLISION Dredger FRPD 309 Fraser River, British Columbia 05 December 2017 About the investigation The Transportation Safety Board of Canada (TSB)
More informationNeighborhood Dredging SSD Program. Brief to Beaches & Waterways Commission
Neighborhood Dredging SSD Program Brief to Beaches & Waterways Commission August 4, 2011 1 Neighborhood Channel Dredging Program Initiative Supports City Council Goal #4: Revitalize Neighborhoods and Plan
More informationVirgin Islands Port Authority Hurricane. Recovery Update. March 2018
Virgin Islands Port Authority Hurricane Recovery Update March 2018 VIRGIN I SLANDS PORT AUTHORITY UNITED STAT ES VIRGIN I SLAND S Hurricanes Irma & Maria s Impact on the USVI s Ports On September 6 and
More informationGuide to Siting of Seawalls January 13, 2014 by Michael Walther, P.E., D.CE, President - Coastal Tech
January 13, 2014 by Michael Walther, P.E., D.CE, President - Coastal Tech mwalther@coastaltechcorp.com Prepared for the Sea Turtle Conservancy http://www.conserveturtles.org/ Introduction Overview: This
More informationOcean Way at U.S. #1 (Town of Jupiter) Installation of a new traffic signal.
PALM BEACH COUNTY TRAFFIC DIVISION UPDATE OF ROAD AND BRIDGE CONSTRUCTION LIST DATE OF ISSUE: FEBRUARY 13, 2013 STATUS FOR FEBRUARY 18, 2013 THROUGH FEBRUARY 24, 2013 *** CONSTRUCTION WORK ZONES ADDED
More informationCapital Planning City of Ocean City 1
City of Ocean City Capital Planning 2015-2019 City of Ocean City 1 Road Improvements Project Completion Date 2012 Fall Road Improvement Spring, 2014 Program - (Paving 7 th Street, 8 th Street, 800 Block
More informationCHAPTER 186. Shore Protection Plan for the Nile Delta Coastline. A.L. Kadib, Member, ASCE^, A.T. Shak, A. Member, ASCE< 2 ), A.A.
CHAPTER 186 Shore Protection Plan for the Nile Delta Coastline A.L. Kadib, Member, ASCE^, A.T. Shak, A. Member, ASCE< 2 ), A.A. Mazen^3), and M.K. Nadar< 4 ) A Shore Protection Master Plan (SPMP) for the
More information2012 Texas Water Conservation Association Meeting
2012 Texas Water Conservation Association Meeting BG Thomas Kula Southwestern Division Commander 15 June 2012 US Army Corps of Engineers AGENDA UNCLASSIFIED Overview of Southwestern Division Missions Texas
More informationPalm Beach County Traffic Report August 24 through August 31, 2012
For Immediate Release August 24, 2012 Meredith Cruz, (561) 641-6440 mcruz@corradino.com Palm Beach County Traffic Report August 24 through August 31, 2012 Palm Beach County Palm Beach County traffic will
More informationResolution NOW THEREF ORE, BE IT RESOLVED BY THE BOARD OF COUNTY COMMISSIONER S OF MANATEE COUNTY, FLORIDA:
Resolution 13-122 A RESOLUTION OF THE BOARD OF COUNTY COMMISSIONERS OF MANATEE COUNTY, FLORIDA, AUTHORIZING THE NATURAL RESOURCES DEPARTMENT TO FILE A LONG-RANGE BEACH EROSION CONTROL BUDGET PLAN WITH
More informationPORT EVERGLADES SAND BYPASS PROJECT
28 th Annual National Conference on Beach Preservation Technology February 4, 2015 Clearwater Beach, FL PORT EVERGLADES SAND BYPASS PROJECT AN IMPORTANT FUTURE SAND SOURCE FOR SOUTHEAST FLORIDA BEACHES
More informationHARBOR INFRASTRUCTURE INVENTORIES Erie Harbor, PA
HARBOR INFRASTRUCTURE INVENTORIES Erie Harbor, PA Harbor Location: Erie Harbor is located on the southern shore of Lake Erie in the City of Erie, PA about 98 Miles southwest of Buffalo. Authority: River
More informationTOWARDS SUSTAINABLE MANAGEMENT OF MARINE AND COASTAL HABITATS ASIA- PACIFIC DAY FOR THE OCEAN
TOWARDS SUSTAINABLE MANAGEMENT OF MARINE AND COASTAL HABITATS WANNAKIAT THUBTHIMSANG PHUKET MARINE BIOLOGICAL CENTER, DMCR, THAILAND ASIA- PACIFIC DAY FOR THE OCEAN 20 NOVEMBER 2018, CONFERENCE ROOM 4,
More information80' MIN 100'-0" 15'-0" 2 FEDERALLY DREDGED NAVIGATION CHANNEL MEASURED AT EL -10' (NOTE 4) NAVIGATION CHANNEL EXISTING YACHT CLUB FLOATS
11 3 1 6 9 4 5 4 8 7 7 9 ' MUDLINE ELEVATION 8 1 6 11 6 1 7 8 5 7 7 12 11 5 12 7 8 9 5 11 8 REVISED FEDERAL LIMIT FOR DREDGING FEDERAL LIMIT FOR DREDGING 12 1 11 7 1 4 8 5 8 5 14 4 14 3 9 3 8 5 1 5 11
More informationPublic Information Center August 12, 2010
Route 52 Causeway Bridge Replacement & Somers Point Circle Elimination Project Somers Point Atlantic County Public Information Center August 12, 2010 Ocean City Cape May County Presentation Overview General
More informationVillage of Stockholm
Village of Stockholm 2016 Plan for the Community Park Park Committee: Harley Cochran Mark Coronna Steve Grams Jerry Larson Hap Palmberg FINAL: FOR VILLAGE BOARD APPROVAL March 8, 2016 1 Table of Contents
More informationCOOS COUNTY AIRPORT DISTRICT REGULAR BOARD MEETING Thursday August 20, 2015
COOS COUNTY AIRPORT DISTRICT REGULAR BOARD MEETING Thursday August 20, 2015 Minutes of the regular monthly meeting of the Board of Commissioners of the Coos County Airport District held on Thursday, August
More informationIntense Hurricane Strike Reconstruction, Vieques, Puerto Rico
Intense Hurricane Strike Reconstruction, Vieques, Puerto Rico beach vegetated barrier Caribbean Sea N Vieques, Puerto Rico 200 m b) a) 67ºW 65ºW 1989 1956 18.5ºN 1928 PRP12 headland La Parguera 17.5ºN
More informationDRAFT GENERAL IMPLEMENTATION PLAN AND SPECIFIC IMPLEMENTATION PLAN MIDDLETON MUNICIPAL AIRPORT MOREY FIELD. Revised 12/12/03
DRAFT GENERAL IMPLEMENTATION PLAN AND SPECIFIC IMPLEMENTATION PLAN MIDDLETON MUNICIPAL AIRPORT MOREY FIELD Revised 12/12/03 As recommended for approval by the Plan Commission General Project Description
More informationNational Outdoor Recreation Conference April 2018
An Unorthodox Approach to Trail Planning for a Mountain Community National Outdoor Recreation Conference April 2018 Today s story Alta, Utah Winter vs. Summer Population Growth /Economic Development Trail
More informationUAS to GIS Utilizing a low-cost Unmanned Aerial System (UAS) for Coastal Erosion Monitoring
UAS to GIS Utilizing a low-cost Unmanned Aerial System (UAS) for Coastal Erosion Monitoring Agenda Scope of today s presentation Demonstration Objectives Wrightsville Beach Test Area Masonboro Inlet Jetties
More informationHow is St Barths After Irma? Checking In
How is St Barths After Irma? Checking In Cecilia Pelloux Contributor i Apr 16, 2018, 04:09am 2,607 views #DeLuxe Gustavia, 6 months after Irma. CÉCILIA PELLOUX St Barths is a very special place for me.
More informationVenice Aviation Society, Inc. (VASI) 1335 Horizon Rd. Venice, Florida
Venice Aviation Society, Inc. (VASI) 1335 Horizon Rd. Venice, Florida 34293 www.veniceaviationsociety.com September 24, 2009 Mr. Bart Vernace Assistant Manager FAA Orlando Airport District Office 5950
More informationHolgate Taxpayers Association Spring Membership Meeting Minutes - June 2, 2018
Holgate Taxpayers Association Spring Membership Meeting Minutes - June 2, 2018 The meeting was called to order by Dan Macone at 10.01 a.m. Dan thanked the membership for their support and remarked that
More informationMAP AMENDMENT/HEIGHT MAP AMENDMENT SUMMARY. Three stories above River Street Two stories above River Street
MPC STAFF REPORT TEXT AMENDMENT Historic District Height Map MAP AMENDMENT/HEIGHT MAP AMENDMENT SUMMARY Report Status Initial Report- Petitioner, Property Owner, Agent Information SRD, LLC d/b/a The Kessler
More informationKirkcaldy Sea Wall Improvements. Non-technical Summary. For illustration purposes only to give an indicative representation of the scheme.
ENVIRONMENTAL STATEMENT Non-technical Summary For illustration purposes only to give an indicative representation of the scheme. Kirkcaldy Sea Wall Improvements Introduction A concrete sea wall fronts
More informationWHY THERE IS NO STORM SURGE PROTECTION FOR THE LAKE PONTCHARTRAIN BASIN
WHY THERE IS NO STORM SURGE PROTECTION FOR THE LAKE PONTCHARTRAIN BASIN A Report Addressing: I. The Reason Why The Corps Of Engineers Abandoned Its Plan To Keep Storm Surge Out Of The Lake Pontchartrain
More informationUpdate Report - Etobicoke Creek and South Mimico Creek Trails
REPORT FOR ACTION Update Report - Etobicoke Creek and South Mimico Creek Trails Date: October 23, 2017 To: Etobicoke York Community Council From: General Manager, Parks Forestry and Recreation Wards: Ward
More informationSoutheast Conference and Alaska Forest Association Intervenors in New Challenge to 2001 Roadless Rule s Application in Alaska
Southeast Conference and Alaska Forest Association Intervenors in New Challenge to 2001 Roadless Rule s Application in Alaska 1 S T A T E O F A L A S K A V. U. S. D E P A R T M E N T O F A G R I C U L
More informationThis attorney-client retainer agreement (hereafter referred as Agreement ) is entered into by and. (your name as it appears on passport) (hereafter
Attorney-Client Retainer Agreement This attorney-client retainer agreement (hereafter referred as Agreement ) is entered into by and between (your name as it appears on passport) (hereafter referred as
More informationDIRECTOR S REPORT TRANSPORTATION BOARD OCTOBER 8, 2018
DIRECTOR S REPORT TRANSPORTATION BOARD OCTOBER 8, 2018 1 US EPA CONSENT DECREE NDOT HAS MET OR EXCEEDED ALL DEADLINES FOR REQUIREMENTS CONTAINED IN THE CONSENT DECREE WITH THE US EPA NO STIPULATED PENALTIES
More informationCompletion: August 2011 LS #321 Design LS #8
1 CIPNumber c350406 2 c350302 3 c350902 LEGEND PERMITTING/ BIDDING CHARLOTTE COUNTY UTILITIES Burnt Store Water Reclamation Facility (Expansion to 0.75 MGD) East Port Expansion Water Reclamation Facility
More informationThe Joint Charlotte County - Punta Gorda and Lee MPO Meeting has changed from 10:00 a.m. to 9:30 a.m.
The Joint Charlotte County - Punta Gorda and Lee MPO Meeting has changed from 10:00 a.m. to 9:30 a.m. JOINT MEETING OF THE CHARLOTTE COUNTY-PUNTA GORDA METROPOLITAN PLANNING ORGANIZATION BOARD AND LEE
More informationNew Orleans Municipal Yacht Harbor
New Orleans Municipal Yacht Harbor 2018 Capital Projects Construction Updates MYH Floating Marina Community Sailing Center (Coordination with) MYH Boat Launch (MYHMC) MYH Administration Building (CPA &
More informationBOARD OF COUNTY COMMISSIONERS OKALOOSA COUNTY, FLORIDA
TOURIST DEVELOPMENT SERVICE AREA: CULTURE/RECREATION BOARD OF COUNTY COMMISSIONERS OKALOOSA COUNTY, FLORIDA DEPARTMENT/PROGRAM: TOURIST DEVELOPMENT - MARKETING PROGRAM DESCRIPTION: Okaloosa Tourist Development
More informationWelcome to the Downtown Fort Lauderdale Neighborhood Working Group Meeting. First meeting june 17, 2010
Welcome to the Downtown Fort Lauderdale Neighborhood Working Group Meeting First meeting june 17, 2010 State of the Project Draft Environmental Impact Statement Study Phase This study is NOT the final
More informationFLL Master Plan Update Technical Advisory Committee (TAC) Briefing #1. September 28, 2016
FLL Master Plan Update Technical Advisory Committee (TAC) Briefing #1 September 28, 2016 TAC Committee Role: Internal Stakeholders To provide input on the master planning analysis from the technical and
More informatione 2 design season three New Orleans: The Water Line Episode Summary
e 2 design season three New Orleans: The Water Line Episode Summary After the devastation of Hurricane Katrina, which hit the southern coast of the United States on August 28, 2005, the residents of the
More informationThe South Ponte Vedra News
The South Ponte Vedra News April 2014 News Editor: Amy Brannon amybrannon2011@gmail.com MONTHLY HAPPENINGS Monthly Social 2 nd Friday 6-8:30 P.M. Bingo Last Thursday 7 P.M. Bridge Tuesdays 7 P.M. Exercise
More informationMUNICIPALITY OF KINCARDINE
MUNICIPALITY OF KINCARDINE EMERGENCY MANAGEMENT PROGRAM COMMITTEE MINUTES Kincardine Fire Station Meeting Room Thursday, 10:30 a.m. Chair Mayor Committee Members Community Emergency Management Coordinator
More information395 Express Lanes Project Update
395 Express Lanes Project Update Key Dates Milestone Date Limited Notice to Proceed February 2017 Early Works March-June 2017 Full Notice to Proceed July 2017 Preparatory Work Summer 2017 Draft Noise Abatement
More informationProposed Official Plan Amendment 41 to the Region of York Official Plan
COMMITTEE OF THE WHOLE NOVEMBER 18, 2002 REGION OF YORK OFFICIAL PLAN AMENDMENT 41 THE OAK RIDGES MORAINE CONSERVATION PLAN Recommendation The Commissioner of Planning recommends: 1. That the City of Vaughan
More informationSafety, Infrastructure, and Tenant Improvement Project. Public Hearing Informational Brochure February 26, 2013
New York State Department of Transportation Safety, Infrastructure, and Tenant Improvement Project Public Hearing Informational Brochure February 26, 2013 This DEIS/Draft EA evaluates the potential impacts
More informationBoston-Logan International Airport: Proposed Consolidation of Rental Car Operations
Boston-Logan International Airport: Proposed Consolidation of Rental Car Operations ACI Legal Conference April 17, 2008 Prepared by: Trudy P. Reilly, Senior Legal Counsel, Massport Presentation Outline
More information30 November Randall G. Hintz Chief, Operations Support Branch Operations Division. US Army Corps of Engineers BUILDING STRONG
30 November 2011 Randall G. Hintz Chief, Operations Support Branch Operations Division US Army Corps of Engineers Overview MAINTENANCE PROJECTS Deep Draft Channels Shallow Draft Channels Coastal Inlets
More informationMINUTES OF MEETING RIVER HALL COMMUNITY DEVELOPMENT DISTRICT. A Public Hearing and Regular Meeting of the Board of Supervisors of the River Hall
MINUTES OF MEETING RIVER HALL COMMUNITY DEVELOPMENT DISTRICT A Public Hearing and Regular Meeting of the Board of Supervisors of the River Hall Community Development District were held on Thursday, August
More informationWater, Sewer and Stormwater General Facilities & Connection Charges
City of Snoqualmie Water, Sewer and Stormwater General Facilities & Connection Charges City Council Meeting March 9, 2015 Presented by: Sergey Tarasov, Project Manager Presentation Overview New customer
More informationCofferdam Performance Hurricanes Harvey & Irma
Cofferdam Performance Hurricanes Harvey & Irma - 2017 Greg Hammer Senior Geotechnical Engineer CELRH-DSPC-GS DSMMCX Third Workshop on Case Histories in Dam Safety Risk-Informed Decision Making 2018 USSD