1 Coastal Management: Treasure Island - Long Key Nourishment Project Completed - October 20, 2010 The nourishment of Treasure Island and Long Key (TI/LK) beaches began in late July of The previous 2006 TI/LK nourishment project was done after the 2005 hurricane season, utilized a total of 270,000 cubic yards of sand, and was completed in about 2 months (August - September). The 2010 project utilized material from two borrow areas: 1) John's Pass to fill Sunshine Beach and Sunset Beach located on Treasure Island, and 2) Blind Pass to fill Upham Beach on the north end of Long Key (St. Pete Beach). The project used: 127,260 cubic yards of sand to fill 3,000 feet of shoreline on Sunshine Beach, 125,423 cubic yards of sand to fill 4,000 feet of shoreline on Sunset Beach, and 159,572 cubic yards of sand to fill 2,000 feet of shoreline on Upham Beach. The streets that corresponded to the fill limits are indicated on the map below. Work progressed from north to south (Sunshine Beach, to Sunset Beach, and to Upham Beach) over 4 months. Sand was pumped through pipes from the borrow areas to the beaches. At Treasure Island Beach, the construction contractor provided Americans with Disabilities Act (ADA) accessibility to the water throughout the project. During the project, pipe was laid across the beach at the Treasure Island Beach at 112th Avenue. To allow easy public access to the water, a section of pipe was buried in the sand. After Upham Beach was nourished, a second contractor mobilized and begin a project to repair damaged geotextile T-Groins originally placed on the north end of Upham Beach by See attached reports

2 Project Status Report TI/LK Nourishment Project Revised October 20, 2010 Activity Updates October 20, 2010 Upham Beach was completed at 1 a.m. this morning, a couple of weeks earlier than anticipated. The permitted borrow areas were swept completely clean of all available sand. The contractor has begun demobilizing their boats, barges, and other equipment and they will be off the beaches and moved out of the area by the end of next week. Upham Beach should be clear of pipes and equipment by this Friday (October 22). Within the next few weeks, another contractor is expected to be mobilizing equipment at Upham Beach to begin a 2-3 month job repairing the damaged T-Groin structures. October 6, 2010 The dredger finished dredging inside Blind Pass north of the inlet on October 3 and will be dredging at the mouth -- and slightly westward of inlet mouth -- during the remainder of the project. The filling of Upham Beach is proceeding from the Jetty northward and is currently located in front of the Starlite Towers Condominium. September 29, 2010 The filling of Sunset Beach was completed by September 21, The Corps officially deemed Sunset Beach complete on September 23 after confirming the sand volumes placed on the Treasure Island beaches met contract requirements. The fill volumes measured on Sunshine and Sunset beaches were 127,260 cubic yards and 125,423 cubic yards, respectively. The pipeline, dredge, and other associated boats and supplies needed for the next phase have been moved to Blind Pass and Upham Beach. The dredging of Blind Pass and filling of Upham Beach will begin today. September 15, 2010 The Corps determined, due to lack of available sand, that additional fill cannot be placed on the beach north of 88 th Street. Demobilization of equipment and pipes from Sunset Beach and Treasure Island is expected to begin by September 23 rd. The filling of Upham Beach is projected to begin during the first week of October and be completed 4-5 weeks later weather permitting. September 14, 2010 The project is at about 83rd Avenue today. The contractor is expected to complete Sunset Beach to 77th Avenue by Sept 19th. The Corps may issue a change order to the contractor to extend the fill template north of 88 th Avenue with a limited amount of sand remaining from the Borrow Area. August 31, 2010 The contractor is finishing up Sunshine Beach today and may start filling Sunset Beach as early as tomorrow beginning at 88 th Avenue. The sand will be pumped from John s Pass along the beach to Sunset Beach. Some portions of the pipe will be buried to minimize impacts to beach users. August 26, 2010 The project has slowed due to the weather and is currently located at 121 st Avenue with about 1000 feet more beach to fill before completing Sunshine Beach which is expected within a week. Approximately 87,600 cubic yards of sand has been pumped to Sunshine Beach. Pipe is being laid between Sunshine and Sunset beaches and the booster pump located on the beach at 108 th Avenue is being prepared for operation. The booster pump and piping will be used to move sand from the dredge near John s Pass to Sunset Beach.

3 August 18, 2010 The project was shut down for 4 days and is currently located at 124 th Ave. Approximately 55,000 cubic yards of sand has been pumped to Sunshine Beach. About 7-10 working days remain to complete Sunshine Beach. August 13, 2010 The project shut down between 124 th Ave and 125 th Ave at 5 pm August 10th due to poor weather. Work is expected to restart August 14 if weather conditions improve. About 40,000 cubic yards of sand has been pumped onto Sunshine Beach to date. Contractor expects to complete Sunshine Beach in 10 more working days and start filling Sunset Beach by late August if there are no further shut downs. August 6, 2010 The project moved about 100 feet south from 127 th Avenue after the first day of operation which began early evening on August 4. The project work area is expected to move south at about 100 feet each day and should be at or near 126 th Avenue by Monday or Tuesday next week. August 4, 2010 This morning the Southwind Construction Corp. Dredge is moving to the borrow area located about ¼ mile west of the 127 th Avenue beach access. Filling at the north end of Sunshine Beach is expected to begin this evening. August 2, The construction contractor has revised the dredging and beach fill start date and now expect to begin filling Sunshine Beach at 127 th Avenue on August 4 th or 5 th. July 27, 2010 Construction contractor is fusing 500 foot sections of pipe together at 77 th Avenue and then dragging them north to a staging area at about 108 Avenue near their booster pump. The dredge is expected to arrive at John s Pass by July 29. Later this week, the Corps will be doing pre-construction bathymetric surveys of the borrow areas at John s Pass and profiles of the fill area at Sunshine beach. The public is urged to stay clear of work areas. July 19, 2010 Preconstruction meeting held today. The Notice to Proceed was issued. Mobilization of pipes and other equipment is ongoing at Sunset Beach s 77 th Avenue parking lot and adjacent beach. A large booster pump has been delivered to Treasure Island Beach at 112th Avenue. The dredging of John s Pass and filling of Sunshine Beach is scheduled to begin August 2. July 12, 2010 County mailed post cards with general project information and the tentative construction schedule to beachfront property owners and occupants along the Treasure Island beaches and Upham Beach July 2, 2010 Contractor begins placing equipment and pipes on Treasure Island for project. Notice to Proceed scheduled for July 19, July 1, 2010 Construction contract awarded June 9, 2010 Construction project bid opened May 10, 2010 U.S. Army Corps of Engineers (Corps) advertised bid solicitation for beach nourishment construction project contractor March 29, 2010 FDEP Permits issued to dredge sand from John s Pass to fill Sunshine and Sunset beaches (in Treasure Island) and to dredge sand from Blind Pass to fill Upham Beach (in St. Pete Beach on Long Key)

4

5 Treasure Island & St. Pete Beach (Long Key) 2010 Nourishment Proposed Project Schedule Current as of October 20, 2010 The project schedule is subject to change depending upon weather and other unforeseeable events. Milestone Move dredge and equipment to John s Pass and Sunshine Beach Nourish Sunshine Beach (~40-day task) Move equipment from Sunshine Beach to Sunset Beach Nourish Sunset Beach (~30-day task) Move dredge and equipment to Blind Pass and Upham Beach Nourish Upham Beach (~35-day task) Note: A second contractor will repair the existing Upham Beach geotubes Start Month/Week End Month/Week Complete (X) July / Week 2 July / Week 4 X Aug / Week 1 Aug / Week 4 X Aug / Week 4 Sept / Week 1 X Sept / Week 1 Sept / Week 3 X Sep / Week 3 Sep / Week 4 X Oct / Week 1 Oct / Week 3 X Mid Nov 2010 Feb 2011

6 Upham Beach facing northwest ( )

7 Upham Beach facing west ( )

8 Upham Beach facing southwest ( )

9 Upham Beach facing south ( )

10 Upham Beach S to N ( ) Upham Beach ( )

11 Sunset Beach N to S ( ) Sunset Beach S to N. ( )

12 Sunset Beach S to N (9-1-10) Sunshine Beach N to S (9-1-10) Sunset Beach N to S (9-1-10) Sunset Beach S to N. (9-1-10)

13 Southwind Construction Corp. Dredge (Wilko) in Blind Pass ( )

14 Booster Pump on beach at 112 th Avenue, Treasure Island Piping along Sunset Beach at 77 th Avenue, Treasure Island Photo date: July 19, 2010

15 Construction Site at 127 th Ave, Treasure Island Pipe Discharging Sand Slurry at 127 th Ave, Treasure Island Dredge on Ebb Shoal at John s Pass Photo Date: August 5, 2010

U.S. Army Corps of Engineers Wilmington District

U.S. Army Corps of Engineers Wilmington District U.S. Army Corps of Engineers Wilmington District 2012 East Coast - WEDA October 9-11, 2012 Ongoing & Upcoming Contracts US Army Corps of Engineers Wilmington District Ongoing Contracts Project Quantity

More information

Norfolk District North Atlantic Division

Norfolk District North Atlantic Division Norfolk District North Atlantic Division Eastern Chapter of WEDA Fall Conference October 26, 2016 Stephen J. Powell, P.E. (757) 201-7788 US Army Corps of Engineers Norfolk District FY-17 Dredging Program

More information

A Brief History of the Town of Palm Beach Coastal Protection Program. Beach nourishment occurred in Palm Beach as far back as the 1940s.

A Brief History of the Town of Palm Beach Coastal Protection Program. Beach nourishment occurred in Palm Beach as far back as the 1940s. A Brief History of the Town of Palm Beach Coastal Protection Program Beach nourishment occurred in Palm Beach as far back as the 1940s. The Lake Worth Inlet Sand Transfer Plant was built in the late 1950s.

More information

Port of Kalama, New Approach to Maintenance Dredging

Port of Kalama, New Approach to Maintenance Dredging Port of Kalama, New Approach to Maintenance Dredging Vladimir Shepsis, Coast @ Harbor Engineering, Inc. John Dawson, Coast @ Harbor Engineering, Inc. Mark Wilson, Port of Kalama Tabitha Reeder, Port of

More information

Edisto Beach Renourishment and Groin Lengthening Project. Tim Kana Coastal Science & Engineering

Edisto Beach Renourishment and Groin Lengthening Project. Tim Kana Coastal Science & Engineering Edisto Beach Renourishment and Groin Lengthening Project Tim Kana Coastal Science & Engineering Hurricane Matthew 8 Oct 2016 Cat 1 Storm @ Edisto Beach Worst Surge Event Since DAVID in 1979 Tides ~ 5 ft

More information

Riverine Sand Mining/Scofield Island Restoration (BA-40)

Riverine Sand Mining/Scofield Island Restoration (BA-40) Riverine Sand Mining/Scofield Island Restoration (BA-40) Conference on Ecological and Ecosystem Restoration Kenneth Bahlinger, CPRA Project Manager July 31, 2014 committed to our coast committed to our

More information

Norfolk District North Atlantic Division

Norfolk District North Atlantic Division Norfolk District North Atlantic Division Eastern Chapter of WEDA Fall Conference October 9, 2012 Stephen J. Powell, P.E. (757) 201-7788 US Army Corps of Engineers 5-Year Dredging Schedule (By dredge type)

More information

2. The EPA provided the following information regarding EPA s activities in Newark Bay during the meeting:

2. The EPA provided the following information regarding EPA s activities in Newark Bay during the meeting: CENAN-PP-C 10 September 2013 MEMORANDUM FOR RECORD SUBJECT: Newark Bay Study Area Coordination Team Meeting 1. The regularly scheduled monthly interagency coordination meeting was held on September 10

More information

SAN FRANCISCO DISTRICT FY 2018 NAVIGATION PROGRAM

SAN FRANCISCO DISTRICT FY 2018 NAVIGATION PROGRAM SAN FRANCISCO DISTRICT FY 2018 NAVIGATION PROGRAM 1 255 255 255 237 237 237 0 0 0 217 217 217 163 163 163 200 200 200 WEDA PACIFIC CHAPTER 2017 ANNUAL MEETING 131 132 122 PORTLAND, OREGON 239 65 53 80

More information

Stakeholder Meeting #1. An Introduction to the Blind Pass Inlet Management Study

Stakeholder Meeting #1. An Introduction to the Blind Pass Inlet Management Study Stakeholder Meeting #1 An Introduction to the Blind Pass Inlet Management Study April 21, 2016 5:30 PM, The Sanctuary, Sanibel Island A World of Solutions 0 Agenda Introductions Study Overview Study Status

More information

Proposed Cherry Grove Canals Dredging Project

Proposed Cherry Grove Canals Dredging Project Proposed Cherry Grove Canals Dredging Project 1 Development of Cherry Grove C.D. Nixon inherited 9,940 acres of land 1924 Nixon family began planning subdivision of Cherry Grove 1950 Mr. Nixon closed natural

More information

Buffalo District Navigation Program Overview

Buffalo District Navigation Program Overview Buffalo District Navigation Program Overview 16 FEB 2011 US Army Corps of Engineers Buffalo District Area of Operations Our Facilities District Headquarters 2 Area Offices 3 Regulatory Field Offices Lake

More information

30 November Randall G. Hintz Chief, Operations Support Branch Operations Division. US Army Corps of Engineers BUILDING STRONG

30 November Randall G. Hintz Chief, Operations Support Branch Operations Division. US Army Corps of Engineers BUILDING STRONG 30 November 2011 Randall G. Hintz Chief, Operations Support Branch Operations Division US Army Corps of Engineers Overview MAINTENANCE PROJECTS Deep Draft Channels Shallow Draft Channels Coastal Inlets

More information

CORPS OF ENGINEERS ALASKA DISTRICT Dredging Projects. Michael Tencza, PE Operations Project Manager November 4, 2015

CORPS OF ENGINEERS ALASKA DISTRICT Dredging Projects. Michael Tencza, PE Operations Project Manager November 4, 2015 CORPS OF ENGINEERS ALASKA DISTRICT 2016 Dredging Projects Michael Tencza, PE Operations Project Manager November 4, 2015 US Army Corps of Engineers Building and Preserving Alaska s Future AWARDED CONTRACTS

More information

CITY COUNCIL AGENDA MEMORANDUM

CITY COUNCIL AGENDA MEMORANDUM To: Mayor and City Council From: Charles Ozaki, City and County Manager Prepared By: Kevin Standbridge, Deputy City and County Manager Katie Allen, City and County Engineer David Shinneman, Community Development

More information

Amended Maintenance Dredge Spoil Management Plan. Shute Harbour Marina Resort

Amended Maintenance Dredge Spoil Management Plan. Shute Harbour Marina Resort Amended Maintenance Dredge Spoil Management Plan Shute Harbour Marina Resort Amended Maintenance Dredge Spoil Management Plan Quality Information Document Ref Amended Maintenance Dredge and Spoil Maintenance

More information

MOBILE DISTRICT 2018 DREDGING PROGRAM

MOBILE DISTRICT 2018 DREDGING PROGRAM MOBILE DISTRICT 2018 DREDGING PROGRAM SOUTH ATLANTIC DIVISION U.S. ARMY CORPS OF ENGINEERS Trusted Partners Delivering Value Today for a Better Tomorrow US Army Corps of Engineers BUILDING STRONG MOBILE

More information

USACE GALVESTON DISTRICT PROJECT UPDATE

USACE GALVESTON DISTRICT PROJECT UPDATE USACE GALVESTON DISTRICT PROJECT UPDATE 255 255 255 237 237 237 0 0 0 217 217 217 163 163 163 200 200 200 DREDGE YOUR DOCKS 2018 131 132 122 239 65 53 80 119 27 110 135 120 252 174.59 112 92 56 62 102

More information

DAMAGE ASSESSMENT OF SAND FENCING GARDEN CITY, NORTH LITCHFIELD AND LITCHFIELD BEACH GEORGETOWN COUNTY, SC

DAMAGE ASSESSMENT OF SAND FENCING GARDEN CITY, NORTH LITCHFIELD AND LITCHFIELD BEACH GEORGETOWN COUNTY, SC OF SAND FENCING GARDEN CITY, NORTH LITCHFIELD AND LITCHFIELD BEACH GEORGETOWN COUNTY, SC June 07, 2017 PREPARED FOR: GEORGETOWN COUNTY DEPARTMENT OF PUBLIC SERVICES PREPARED BY: The EARTHWORKS Group 11655

More information

Figure 1: Little Dry Creek Trail Crossing

Figure 1: Little Dry Creek Trail Crossing Figure 1: Little Dry Creek Trail Crossing Figure 2: Little Dry Creek Trail Crossing Northwest Rail Environmental Evaluation Temporary Trail Detour Concurrence Form Adams County, Little Dry Creek Trail

More information

Presented to: City of Petaluma City Council

Presented to: City of Petaluma City Council Agenda Item #1.A REVISED Presented to: City of Petaluma City Council Presented By: Dan St. John, F.ASCE, Director Jason Beatty, P.E., Senior Engineer James 'Jody' Boyette, USACE Project Manager November

More information

January 2018 Air Traffic Activity Summary

January 2018 Air Traffic Activity Summary January 2018 Air Traffic Activity Summary Jan-2018 Jan-2017 CY-2018 CY-2017 Passengers 528,947 505,421 4.7% 528,947 505,421 4.7% Passengers 537,332 515,787 4.2% 537,332 515,787 4.2% Passengers 1,066,279

More information

St. Augustine Port, Waterway & Beach District. St. Augustine Inlet 2013 draft Inlet Management Plan. March 19, 2013

St. Augustine Port, Waterway & Beach District. St. Augustine Inlet 2013 draft Inlet Management Plan. March 19, 2013 Division of Water Resource Management St. Augustine Port, Waterway & Beach District St. Augustine Inlet 2013 draft Inlet Management Plan March 19, 2013 Discussion Outline Florida Statutes Florida Inlets

More information

Capital Program Delivery

Capital Program Delivery Capital Program Delivery Transportation & Public Works Department City Council FY 2013 Budget Workshop August 23, 2012 1 TPW Capital Programs 2013 Building Facilities Storm Water Management Roadway & Bridge

More information

Long water shutdown scheduled for Tuesday, September 18

Long water shutdown scheduled for Tuesday, September 18 Thank you for your interest in the Center City Connector Streetcar. In this weekly update, you ll find information about ongoing construction for the 1st phase of utility work in Pioneer Square. Utility

More information

PROGRESS REPORT WATERFRONT PROGRAM. Q (January - March) Highlights from Q1 2018

PROGRESS REPORT WATERFRONT PROGRAM. Q (January - March) Highlights from Q1 2018 WATERFRONT PROGRAM PROGRESS REPORT Q1 2018 (January - March) Highlights from Q1 2018 Advanced Pier 62 Rebuild construction including completion of Pier 62 demolition in February 2018. Prepared for the

More information

Item # 28. Chief Capital Management Officer Report. November 20, 2008

Item # 28. Chief Capital Management Officer Report. November 20, 2008 Item # 28 Chief Capital Management Officer Report November 20, 2008 1 Metro Gold Line Eastside Extension Project Update November 2008 6 Mile Alignment 1.7 Miles of Tunnel 8 Stations (6 At-grade & 2 Underground)

More information

New Orleans Municipal Yacht Harbor

New Orleans Municipal Yacht Harbor New Orleans Municipal Yacht Harbor 2018 Capital Projects Construction Updates MYH Floating Marina Community Sailing Center (Coordination with) MYH Boat Launch (MYHMC) MYH Administration Building (CPA &

More information

March 2, The Honorable Mayor Williams D. Sessoms, Jr. Members of City Council. Subject: Coastal CIP Presentation to City Council - March 6, 2018

March 2, The Honorable Mayor Williams D. Sessoms, Jr. Members of City Council. Subject: Coastal CIP Presentation to City Council - March 6, 2018 OFFICE OF THE CITY MANAGER (757) 385-4242 (757) 427-5626 FAX MUNICIPAL CENTER BUILDING 1, ROOM 234 2401 COURTHOUSE DRIVE VIRGINIA BEACH, VA 23456-9001 March 2, 2018 The Honorable Mayor Williams D. Sessoms,

More information

- Countywide - Roadway Cone Zone / Lane Closure / Sidewalk Repair Schedule

- Countywide - Roadway Cone Zone / Lane Closure / Sidewalk Repair Schedule Report for Monday, September 10, 2018 through Monday, September 17, 2018 S. Perry Park Rd. (DC105) and Red Rocks Dr. Intersection Improvements Safety improvements on the S. Perry Park Road (DC 105) and

More information

Campus Construction Program Report WLAC Monthly Facilities Committee Meeting November 16, 2015

Campus Construction Program Report WLAC Monthly Facilities Committee Meeting November 16, 2015 Campus Construction Program Report WLAC Monthly Facilities Committee Meeting November 16, 2015 1. Cost Update 2. Schedule Update 3. Pre Design Update 4. Design Update 5. Contractor Procurement Update November

More information

BENEFICIAL USE OF DREDGED MATERIAL DISPOSAL HISTORY HOUMA NAVIGATION CANAL, LA

BENEFICIAL USE OF DREDGED MATERIAL DISPOSAL HISTORY HOUMA NAVIGATION CANAL, LA BENEFICIAL USE OF DREDGED MATERIAL DISPOSAL HISTORY HOUMA NAVIGATION CANAL, LA 1991-2012 The Houma Navigation Canal (HNC) provides a navigation channel between Houma, Louisiana, and the Gulf of Mexico

More information

DASHBOARD DEC YOUR MONTHLY UPDATE FOR IOWA ONE CALL

DASHBOARD DEC YOUR MONTHLY UPDATE FOR IOWA ONE CALL Executive Summary Per the Board s request, we have added this Executive Summary to the Monthly Dashboard. We ll be including it from now on. It will provide you with a running total of the number of tickets

More information

Appendix N MAINTENANCE DREDGING STATEMENT OF NEED & PERMIT COMPLIANCE. North Thousand Islands Management Plan Appendices

Appendix N MAINTENANCE DREDGING STATEMENT OF NEED & PERMIT COMPLIANCE. North Thousand Islands Management Plan Appendices Appendix N MAINTENANCE DREDGING STATEMENT OF NEED & PERMIT COMPLIANCE North Thousand Islands Management Plan Appendices Maintenance Dredging Statement of Need & Permit Compliance The waterways, which consist

More information

Notice and Opportunity to Comment on New Proposed Passenger Facility Charge (PFC) New Application

Notice and Opportunity to Comment on New Proposed Passenger Facility Charge (PFC) New Application July 3, 2018 Notice and Opportunity to Comment on New Proposed Passenger Facility Charge (PFC) New Application The City of Kansas City (City), Missouri through its Aviation Department ( the Department

More information

Figure 7. Dragline at Cape Coral, Figure 8. Cape Coral oblique aerial photograph, 1959.

Figure 7. Dragline at Cape Coral, Figure 8. Cape Coral oblique aerial photograph, 1959. The dredge-and-fill method, which would later be criticized for its environmental impact, employed in the peak years of the early 1960s as many as four dredges and ten draglines, which at times operated

More information

EFFECT OF THE COASTAL CONSERVATION DUE TO BEACH NOURISHMENT OF TOTORI SAND DUNE COAST

EFFECT OF THE COASTAL CONSERVATION DUE TO BEACH NOURISHMENT OF TOTORI SAND DUNE COAST Proceedings of the 7 th International Conference on Asian and Pacific Coasts (APAC 203) Bali, Indonesia, September 2-26, 203 EFFECT OF THE COASTAL CONSERVATION DUE TO BEACH NOURISHMENT OF TOTORI SAND DUNE

More information

Hertfordshire Business Barometer April 2018

Hertfordshire Business Barometer April 2018 Hertfordshire Business Barometer April 1 Contents Summary of findings 3 Marketing update 4 Visitor Attractions: monthly performance 6 Serviced Accommodation: monthly performance 10 Other news: national

More information

Virgin Islands Port Authority Marine Tariff Rate Amendments August 30, 2017 Public Hearing

Virgin Islands Port Authority Marine Tariff Rate Amendments August 30, 2017 Public Hearing Virgin Islands Port Authority Marine Tariff Rate Amendments August 30, 2017 Public Hearing V I R G I N I S L A N D S P O R T A U T H O R I T Y S T. C R O I X S T. T H O M A S S T. J O H N U N I T E D S

More information

CHAPTER 241. SAND BYPASSING TO "PLAYA DE CASTILLA" (HUELVA SPAIN) Jose Fernandez (1) Gregorio Gomez Pina (2) Angel Mufloz (3)

CHAPTER 241. SAND BYPASSING TO PLAYA DE CASTILLA (HUELVA SPAIN) Jose Fernandez (1) Gregorio Gomez Pina (2) Angel Mufloz (3) CHAPTER 241 SAND BYPASSING TO "PLAYA DE CASTILLA" (HUELVA SPAIN) Jose Fernandez (1) Gregorio Gomez Pina (2) Angel Mufloz (3) Abstract The "Sand bypassing to Playa de Castilla" project consists of a sand

More information

Figure 1. Overview map of Burrard Inlet, showing location of False Creek inlet.

Figure 1. Overview map of Burrard Inlet, showing location of False Creek inlet. Figure 1. Overview map of Burrard Inlet, showing location of False Creek inlet. 65 Figure 2. Location map of False Creek and shoreline and mid-channel monitoring sites. 66 Figure 3. Location of CSO's,

More information

SUMMARY OF THE MEETING OF THE WOODS HOLE, MARTHA S VINEYARD AND NANTUCKET STEAMSHIP AUTHORITY. September 25, 2018

SUMMARY OF THE MEETING OF THE WOODS HOLE, MARTHA S VINEYARD AND NANTUCKET STEAMSHIP AUTHORITY. September 25, 2018 SUMMARY OF THE MEETING OF THE WOODS HOLE, MARTHA S VINEYARD AND NANTUCKET STEAMSHIP AUTHORITY September 25, 2018 The members of the Woods Hole, Martha s Vineyard and Nantucket Steamship Authority ( SSA

More information

Manigurr-ma Palmerston partnership showcases city

Manigurr-ma Palmerston partnership showcases city Community Bulletin #76 JKC Australia LNG Pty Ltd (JKC) Manigurr-ma Palmerston partnership showcases city It s hoped that Manigurr-ma Village residents will be enticed to Palmerston following the production

More information

County of Fairfax, Virginia. Silver Line Update. Committee for Dulles March 2, Mark Canale Fairfax County Department of Transportation

County of Fairfax, Virginia. Silver Line Update. Committee for Dulles March 2, Mark Canale Fairfax County Department of Transportation Silver Line Update Committee for Dulles March 2, 2017 Mark Canale Fairfax County Department of Transportation Phase 1 Summary Old Meadow Road Realignment design work proceeding, construction to be completed

More information

Kentucky Lock Project Update Inland Waterways Users Board Meeting No. 84

Kentucky Lock Project Update Inland Waterways Users Board Meeting No. 84 Kentucky Lock Project Update Inland Waterways Users Board Meeting No. 84 MR. DON GETTY PROJECT MANAGER Kentucky Lock Addition Nashville District 19 July 2017 The views, opinions and findings contained

More information

The Galveston Seawall

The Galveston Seawall Coastal and Ocean Engineering ENGI.8751 Undergraduate Student Forum Faculty of Engineering and Applied Science, Memorial University, St. John s, NL, Canada. March, 2013 The Galveston Seawall Mark Harvey

More information

MANAGING COASTAL HAZARDS THROUGH BENEFICIAL REUSE OF DREDGED SAND AND AN ADAPTIVE WORKS STRATEGY

MANAGING COASTAL HAZARDS THROUGH BENEFICIAL REUSE OF DREDGED SAND AND AN ADAPTIVE WORKS STRATEGY MANAGING COASTAL HAZARDS THROUGH BENEFICIAL REUSE OF DREDGED SAND AND AN ADAPTIVE WORKS STRATEGY Isabelle Ghetti 1, B.Morgan 2, R.Massie 1, Gary Blumberg 2 1 Shoalhaven City Council, Nowra, NSW 2 Royal

More information

Completion: August 2011 LS #321 Design LS #8

Completion: August 2011 LS #321 Design LS #8 1 CIPNumber c350406 2 c350302 3 c350902 LEGEND PERMITTING/ BIDDING CHARLOTTE COUNTY UTILITIES Burnt Store Water Reclamation Facility (Expansion to 0.75 MGD) East Port Expansion Water Reclamation Facility

More information

FURTHER TO AUTHORITY MEETING #5/13 To Be Held June 21, 2013

FURTHER TO AUTHORITY MEETING #5/13 To Be Held June 21, 2013 FURTHER TO AUTHORITY MEETING #5/13 To Be Held June 21, 2013 FURTHER TO: Pages AUTH7. SECTION I - ITEMS FOR AUTHORITY ACTION AUTH7.4 AUTH7.5 AUTH7.6 COATSWORTH CUT PROJECT Contract RSD13-080 - Channel Dredging

More information

Marine Transportation Safety Investigation Report M17P0406

Marine Transportation Safety Investigation Report M17P0406 Marine Transportation Safety Investigation Report M17P0406 COLLISION Dredger FRPD 309 Fraser River, British Columbia 05 December 2017 About the investigation The Transportation Safety Board of Canada (TSB)

More information

TORONTO TRANSIT COMMISSION REPORT NO.

TORONTO TRANSIT COMMISSION REPORT NO. Revised: March/13 TORONTO TRANSIT COMMISSION REPORT NO. MEETING DATE: November 18, 2013 SUBJECT: YONGE-EGLINTON AND EGLINTON WEST INTERCHANGE STATIONS METROLINX EGLINTON CROSSTOWN LIGHT RAIL TRANSIT PROJECT

More information

Introduction and Company Overview

Introduction and Company Overview Introduction and Company Overview Multi-discipline consulting firm Founded in 1950 - HQ in Laurel, Maryland Local WPB Office Survey, Utility Coordination, Roadway Design, Environmental and CEI Past Port

More information

Meeting held at FCC Environment Offices Thursday 12 th March 2015

Meeting held at FCC Environment Offices Thursday 12 th March 2015 Calvert Landfill Liaison Committee Meeting held at FCC Environment Offices Thursday 12 th March 2015 Present: Ms A Macpherson (chair) Ms J Phipps Mr S Essam Mr P Gaskin Ms R Bellamy Ms S D Amon Mr R Webster

More information

26 October 2017 Icelandair Group Interim Report NET PROFIT USD 101 MILLION IN THIRD QUARTER

26 October 2017 Icelandair Group Interim Report NET PROFIT USD 101 MILLION IN THIRD QUARTER NET PROFIT USD 101 MILLION IN THIRD QUARTER Total income in Q3 up by 10% between years, to USD 536.0 million Passenger revenue higher than expected EBITDA unchanged year on year, at USD 161.1 million Passenger

More information

SUBJECT: Newark Bay Study Area Coordination Team Meeting, 9 October 2012

SUBJECT: Newark Bay Study Area Coordination Team Meeting, 9 October 2012 CENAN-PP-H 9 Oct 12 MEMORANDUM FOR RECORD SUBJECT: Newark Bay Study Area Coordination Team Meeting, 9 October 2012 1. The regularly scheduled monthly interagency coordination meeting was held on 9 Oct

More information

SAME/SBA CONFERENCE. Col. Christopher W. Sallese Commander, Galveston District U.S. Army Corps of Engineers April 11, 2012

SAME/SBA CONFERENCE. Col. Christopher W. Sallese Commander, Galveston District U.S. Army Corps of Engineers April 11, 2012 SAME/A CONFERENCE Col. Christopher W. Sallese Commander, Galveston District U.S. Army Corps of Engineers April 11, 2012 U.S. Army Corps of Engineers Galveston District BUILDING STRONG 1 History of the

More information

Ideal RV Park in One of the Most Beautiful, Charming Small Mountain Towns

Ideal RV Park in One of the Most Beautiful, Charming Small Mountain Towns Ideal RV Park in One of the Most Beautiful, Charming Small Mountain Towns PIONEER RV PARK 1326 Pioneer Road, Quincy, CA 68 RV Sites + Owner Manufactured Home Big Rig Sites, County Sewer & Water, Mostly

More information

Hampton Roads Express Lane Network

Hampton Roads Express Lane Network More Choices For Travelers Hampton Roads Express Lane Network James Utterback, PMP Hampton Roads District Administrator Presented to HRTPO Board July 20, 2017 Regional Express Lane Network 2 History of

More information

Fire Station No. 1 Presentation MAY 16, 2016

Fire Station No. 1 Presentation MAY 16, 2016 Fire Station No. 1 Presentation MAY 16, 2016 AGENDA Background Alternatives Schedule Cost Direction moving forward 2 COUNCIL DIRECTION LOCATION OPTION Existing station Parking lot STATION OPTIONS (7 9

More information

Research and Statistics Department FOR RELEASE 8:50 A.M. Friday, February 23, 2018

Research and Statistics Department FOR RELEASE 8:50 A.M. Friday, February 23, 2018 Bank of Japan Research and Statistics Department FOR RELEASE 8:50 A.M. Friday, February 23, 2018 Report on the Services Producer Price ( Preliminary Figures for January 2018 ) The Services Producer Price

More information

BOND 2012 PROPOSITION 1

BOND 2012 PROPOSITION 1 Horne Rd (Ayers St to Port Avenue) $2,261 $1,418 Hanson Aug15 JFK Causeway Area Imps McArdle Rd (Whitaker Dr to Ennis Joslin Rd) S Staples St (Morgan Ave to IH 37) Navigation Blvd (Up River Rd to Leopard

More information

NC Dredge Studies NCBIWA Spring Conference April 23, 2018

NC Dredge Studies NCBIWA Spring Conference April 23, 2018 NC Dredge Studies Study of the Use and Efficiency of the Dredge Manteo Study of Acquisition of Dedicated Dredging Capacity Study of Dredging Services Cost-Benefit Analysis 2018 NCBIWA Spring Conference

More information

Airport Noise Advisory Panel (ANAP)

Airport Noise Advisory Panel (ANAP) Airport Noise Advisory Panel (ANAP) Scheduled Daily Passenger Airlines Departures * 2012 - Reno-Tahoe International Airport (RNO) April (60 + 1 non-stop departures) Continental discontinued their non-stop

More information

EX USS SHADWELL Disposal Wreck in Place

EX USS SHADWELL Disposal Wreck in Place 20 February 2018 EX USS SHADWELL Disposal Wreck in Place EX USS SHADWELL, a decommissioned CASA GRANDE Class Dock Landing Ship has had a long history supporting the US Navy. She was built by Newport News

More information

Number of New MLS Listings Single-Family Residential Breakdown 21.8%

Number of New MLS Listings Single-Family Residential Breakdown 21.8% For Further Information: 443-8152 November, 1998 The Toronto Real Estate Board 7000 6000 5000 4000 3000 2000 1000 0 Jan Feb Mar Number of MLS Sales S.F.D P.O.T. Apr May June July Aug Sept Oct Nov Dec TREB

More information

FROM: Donald J. Polmann, Director of Science and Engineering ( New Water Plan - Quarterly Report - Approve Submittal to SWFWMD

FROM: Donald J. Polmann, Director of Science and Engineering ( New Water Plan - Quarterly Report - Approve Submittal to SWFWMD TAMPA WATER Supplying Water To The Region DATE: February 1,2008 TO: J err y L. Maxwell, General Manager AGENDA ITEM C18 FROM: Donald J. Polmann, Director of Science and Engineering ( SUBJECT: New Water

More information

CAPACITY PLANNING. CALENDAR OF MILESTONE DATES DECEMBER 2019 and MAY 2020 TIMETABLES (PRODUCTION SCHEDULE)

CAPACITY PLANNING. CALENDAR OF MILESTONE DATES DECEMBER 2019 and MAY 2020 TIMETABLES (PRODUCTION SCHEDULE) CAPACITY PLANNING CALENDAR OF MILESTONE DATES DECEMBER 2019 and MAY 2020 TIMETABLES (PRODUCTION SCHEDULE) Published on behalf of:- Capacity Planning Quadrant: MK Elder Gate Milton Keynes Central MK9 1EN

More information

GALVESTON DISTRICT O&M NAVIGATION MISSION & RESPONSE TO HURRICANE HARVEY

GALVESTON DISTRICT O&M NAVIGATION MISSION & RESPONSE TO HURRICANE HARVEY GALVESTON DISTRICT O&M NAVIGATION MISSION & RESPONSE TO HURRICANE HARVEY 237 237 237 217 217 217 200 200 200 80 119 27 252 174.59 1 255 255 255 0 0 0 163 163 163 131 132 122 239 65 53 Christopher Frabotta

More information

Pump Stations...more than just pumps

Pump Stations...more than just pumps Task Force Hope Status Report Newsletter March 13, 2013 Pump Stations...more than just pumps Photo by Jerry Baggett Pump Station 11, Algiers Canal Repairs and Fronting Protection Repaired pump stations

More information

DTTAS Quarterly Aviation Statistics Snapshot Quarter Report

DTTAS Quarterly Aviation Statistics Snapshot Quarter Report Contents DTTAS Quarterly Aviation Statistics Snapshot Quarter 3 2018 Report 1.1 Dublin Airport Key Statistics... 1 1.2 Cork Airport Key Statistics... 3 1.3 Shannon Airport Key Statistics... 5 1.4 Total

More information

COMMONWEALTH OF THE BAHAMAS MINISTRY OF PUBLIC WORKS & TRANSPORT NASSAU HARBOUR PORT IMPROVEMENT PROJECT. Nassau Harbour Port Improvement Project

COMMONWEALTH OF THE BAHAMAS MINISTRY OF PUBLIC WORKS & TRANSPORT NASSAU HARBOUR PORT IMPROVEMENT PROJECT. Nassau Harbour Port Improvement Project COMMONWEALTH OF THE BAHAMAS MINISTRY OF PUBLIC WORKS & TRANSPORT NASSAU HARBOUR PORT IMPROVEMENT PROJECT AUGUST 2009 OVERALL VIEW OF NASSAU HARBOUR AERIAL VIEW OF NASSAU HARBOUR PROJECT HISTORY 1960 s

More information

Design Meeting Presentation

Design Meeting Presentation Contract No. 17ECS-TI-05SP April November 2017 Design Meeting Presentation November 2015 Agenda Items: Introduction (5 min) Overview (10 min) Scope of work (60 min): Schedule and Traffic Staging / Closures

More information

CAPACITY PLANNING. CALENDAR OF MILESTONE DATES DECEMBER 2018 and MAY 2019 TIMETABLES (PRODUCTION SCHEDULE)

CAPACITY PLANNING. CALENDAR OF MILESTONE DATES DECEMBER 2018 and MAY 2019 TIMETABLES (PRODUCTION SCHEDULE) CAPACITY PLANNING CALENDAR OF MILESTONE DATES DECEMBER 2018 and MAY 2019 TIMETABLES (PRODUCTION SCHEDULE) Published on behalf of:- Capacity Planning Quadrant: MK Elder Gate Milton Keynes Central MK9 1EN

More information

Beach Monitoring and Hotspots

Beach Monitoring and Hotspots Beach Monitoring and Hotspots At a February special meeting, Coastal Science and Engineering (CSE) summarized the post-project beach monitoring results to date. The 2008 project was deemed successful,

More information

October 7, 2016 Hurricane Matthew Rakes the East Coast of Flagler County for 18.1 Miles

October 7, 2016 Hurricane Matthew Rakes the East Coast of Flagler County for 18.1 Miles October 7, 2016 Hurricane Matthew Rakes the East Coast of Flagler County for 18.1 Miles Hammock Dunes Suffers Penetration of the Ocean into the Community; has a 15-30 ft. Wide Triangular Section of the

More information

CITY OF BROOKFIELD Capital Improvement Fund Budget

CITY OF BROOKFIELD Capital Improvement Fund Budget CITY OF BROOKFIELD Capital Improvement Fund Budget The City adopts an annual capital improvement budget, based on a five-year capital improvement program (CIP). The annual budget and CIP are prepared by

More information

Agenda Report. Spruce Street Outlet Drainage Improvements Tower Road Relief Sewer

Agenda Report. Spruce Street Outlet Drainage Improvements Tower Road Relief Sewer Agenda Report Subject: Prepared By: Spruce Street Outlet Drainage Improvements Tower Road Relief Sewer Steven M. Saunders, Director of Public Works/Village Engineer Date: August 12, 2012 On March 8, 2012

More information

Holgate Taxpayers Association Spring Membership Meeting Minutes - June 2, 2018

Holgate Taxpayers Association Spring Membership Meeting Minutes - June 2, 2018 Holgate Taxpayers Association Spring Membership Meeting Minutes - June 2, 2018 The meeting was called to order by Dan Macone at 10.01 a.m. Dan thanked the membership for their support and remarked that

More information

CODE ENFORCEMENT SPECIAL MAGISTRATE PUBLIC HEARING CITY OF ST. PETE BEACH

CODE ENFORCEMENT SPECIAL MAGISTRATE PUBLIC HEARING CITY OF ST. PETE BEACH CODE ENFORCEMENT SPECIAL MAGISTRATE PUBLIC HEARING CITY OF ST. PETE BEACH 155 Corey Avenue St. Pete Beach, FL 33706 Monday, March 12, 2018 10:00 a.m. Case Docket 1. CALL TO ORDER 10:00 A.M. 2. PLEDGE OF

More information

2018 Goldwedge Mines Inc. Licence of Occupation Management Plan. Photo: xxxx. Goldwedge Mines Inc.

2018 Goldwedge Mines Inc. Licence of Occupation Management Plan. Photo: xxxx. Goldwedge Mines Inc. 2018 2018 Goldwedge Mines Inc. Licence of Occupation Management Plan Photo: xxxx Goldwedge Mines Inc. March 2018 TABLE OF CONTENTS TABLE OF CONTENTS... i Figures... i 1. Background... 2 Project Overview...

More information

City of Sutherlin Planning Commission Meeting Tuesday, September 15, :00 p.m. Sutherlin Civic Auditorium Agenda

City of Sutherlin Planning Commission Meeting Tuesday, September 15, :00 p.m. Sutherlin Civic Auditorium Agenda City of Sutherlin Planning Commission Meeting Tuesday, September 15, 2015 7:00 p.m. Sutherlin Civic Auditorium Agenda Pledge of Allegiance Welcome and Introductions Introduction of Media Approval of Minutes:

More information

Public Information Exchange

Public Information Exchange Public Information Exchange Belton/Stillhouse Hollow Lakes Ronnie Bruggman US Army Corps of Engineers U. S. Army Corps of Engineers Missions Belton/Stillhouse Flood Risk Management Natural Resources Water

More information

City of Chelan Comprehensive Plan Update. Vision Workshop. Agenda

City of Chelan Comprehensive Plan Update. Vision Workshop. Agenda City of Chelan Comprehensive Plan Update Vision Workshop November 16, 2016 Agenda Welcome What is a comprehensive plan? Schedule Visioning / Open House Activities How to stay informed and involved 2 1

More information

Surgical Services and Observation Unit Project Given by Highland Hospital to the Highland Park Community.

Surgical Services and Observation Unit Project Given by Highland Hospital to the Highland Park Community. Overview Surgical Services and Observation Unit Given by Highland Hospital to the Highland Park. 1 Review of Progress to Date July Sector 6 meeting Overview of Highland facility needs and building addition

More information

HOTEL INDUSTRY OVERVIEW. Texas

HOTEL INDUSTRY OVERVIEW. Texas HOTEL INDUSTRY OVERVIEW Texas DEMAND GROWTH STRONG BALANCED OCC & ADR GROWTH % Change Room Supply* 149M 1.3% Room Demand* 92M 5.6% Occupancy 61.6% 4.3% A.D.R. $90 4.4% RevPAR $55 8.9% Room Revenue* $8.3B

More information

CONSOLE SUNSHINE COAST: CONSTRUCTION INDUSTRY ACTIVITY AND WORKFORCE PROFILE

CONSOLE SUNSHINE COAST: CONSTRUCTION INDUSTRY ACTIVITY AND WORKFORCE PROFILE CONSOLE SUNSHINE COAST: CONSTRUCTION INDUSTRY ACTIVITY AND WORKFORCE PROFILE MAY 2014 Disclaimer: Whilst all care and diligence has been exercised in the preparation of this report, Construction Skills

More information

Impact of Offshore Directed Forcing on Sediment Transport and Structural Integrity at Packery Channel, Corpus Christi Texas

Impact of Offshore Directed Forcing on Sediment Transport and Structural Integrity at Packery Channel, Corpus Christi Texas Google Earth 29 Aug 2017 Impact of Offshore Directed Forcing on Sediment Transport and Structural Integrity at Packery Channel, Corpus Christi Texas Deidre D. Williams Coastal Research Scientist Conrad

More information

City Council Report. Mayor and City Council Susan Cline, Director, Public Works, Civil Engineering

City Council Report. Mayor and City Council Susan Cline, Director, Public Works, Civil Engineering City Council Report To: From: Mayor and City Council Susan Cline, Director, Public Works, Civil Engineering City Council Meeting: February 28, 2017 Agenda Item: 3.H Subject: Award of Feasibility/Design-Build

More information

Dredging 101. Why, Who, How and So What! 2015 WAMSI Research Conference. 30 March 2015

Dredging 101. Why, Who, How and So What! 2015 WAMSI Research Conference. 30 March 2015 Dredging 101 Why, Who, How and So What! 2015 WAMSI Research Conference 30 March 2015 Presentation Contents Quick Oversight on Why we need to Dredge and Who Carries it out Global Context of some of our

More information

DISTRICT EXPRESS LANES ANNUAL REPORT FISCAL YEAR 2017 JULY 1, 2016 JUNE 30, FloridaExpressLanes.com

DISTRICT EXPRESS LANES ANNUAL REPORT FISCAL YEAR 2017 JULY 1, 2016 JUNE 30, FloridaExpressLanes.com DISTRICT EXPRESS LANES ANNUAL REPORT FISCAL YEAR 2017 JULY 1, 2016 JUNE 30, 2017 FloridaExpressLanes.com This page intentionally left blank. TABLE OF CONTENTS List of Figures... ii List of Tables.... ii

More information

SECTION 106 ACTIVITIES ANNUAL REPORT

SECTION 106 ACTIVITIES ANNUAL REPORT SECTION 106 ACTIVITIES ANNUAL REPORT FOR THE YEAR ENDING DECEMBER 31, 2014 Metropolitan Washington Airports Authority 198 Van Buren Street, Suite 300 Herndon, Virginia 20170 JANUARY 2015 Introduction The

More information

LESLIE BARNS & CONNECTION TRACK. Project Update Construction and Traffic Management Consultation

LESLIE BARNS & CONNECTION TRACK. Project Update Construction and Traffic Management Consultation LESLIE BARNS & CONNECTION TRACK Project Update Construction and Traffic Management Consultation PRESENTATION SUMMARY Part 1 Brief Project Update (New Streetcars & Streetscape Improvements) Part 2 Construction

More information

BOND 2012 PROPOSITION 1

BOND 2012 PROPOSITION 1 BOND 2012 PROPOSITION 1 Horne Rd (Ayers St to Port Avenue) $2,261 $1,418 Hanson Aug15 JFK Causeway Area Imps Navigation Blvd (Up River Rd to Leopard St) $684 $4,909 $2,900 Jan16 Apr16 Apr16 S Staples St

More information

Tamanend Park Day FREE FAMILY EVENT! Saturday, September 9, :00 AM - 2:00 PM. Down on the Farm TAMDAY2017. Schedule of Events

Tamanend Park Day FREE FAMILY EVENT! Saturday, September 9, :00 AM - 2:00 PM. Down on the Farm TAMDAY2017. Schedule of Events Down on the Farm FREE FAMILY EVENT! Day Colonial Crafts 11 AM-2 PM Saturday, September 9, 2017 11:00 AM - 2:00 PM Schedule of Events Zydeco-A-Go-GO Live Band 11 AM-2 PM Elmwood Zoo on Wheels 12-1 PM Face

More information

Planned Procurement Opportunities Report. March 2017

Planned Procurement Opportunities Report. March 2017 HILLSBOROUGH COUNTY AVIATION AUTHORITY Planned Procurement Opportunities Report Prepared by the Procurement Department Overview The Planned Procurement Opportunities Report is updated and posted on the

More information

China Creek North Park Upgrades and Glen Pump Station. Park Board Committee Meeting Monday, July 10, 2017

China Creek North Park Upgrades and Glen Pump Station. Park Board Committee Meeting Monday, July 10, 2017 China Creek North Park Upgrades and Glen Pump Station Park Board Committee Meeting Monday, July 10, 2017 Purpose The purpose of this presentation is to: Share the results of the public engagement processes;

More information

Appendix. Gatwick Airport Ltd - Further information on Gatwick s revised phasing strategy (including Programme) Gatwick Airport Limited

Appendix. Gatwick Airport Ltd - Further information on Gatwick s revised phasing strategy (including Programme) Gatwick Airport Limited Gatwick Airport Limited Response to Airports Commission Consultation Appendix 37 Gatwick Airport Ltd - Further information on Gatwick s revised phasing strategy (including Programme) Further information

More information

BUSINESS BAROMETER December 2018

BUSINESS BAROMETER December 2018 Credit: Chris Orange BUSINESS BAROMETER December Credit: Nigel Moore 1 Contents Summary of findings 3 Annual monthly performance: visitor attractions..4 Visit Herts Team update 5 National context.8 Visitor

More information

Ohio Department of Transportation Construction Update

Ohio Department of Transportation Construction Update Ohio Department of Transportation Construction Update DISTRICT 5 DAVE RAY, P.E., P.S., DISTRICT DEPUTY DIRECTOR 9600 Jacksontown Road Jacksontown, OH 43030 www.transportation.ohio.gov/dist5 ODOT District

More information

PennDOT Interstate Work next week March 30-April 3:

PennDOT Interstate Work next week March 30-April 3: PennDOT Interstate Work next week March 30-April 3: Interstate 80 Interstate 81 DELAYS THIS WEEK: Exit 256 to the Schuylkill County line. Eastbound & Westbound. Bridge cleaning Monday (3/30), Tuesday (3/31)

More information