80' MIN 100'-0" 15'-0" 2 FEDERALLY DREDGED NAVIGATION CHANNEL MEASURED AT EL -10' (NOTE 4) NAVIGATION CHANNEL EXISTING YACHT CLUB FLOATS

Size: px
Start display at page:

Download "80' MIN 100'-0" 15'-0" 2 FEDERALLY DREDGED NAVIGATION CHANNEL MEASURED AT EL -10' (NOTE 4) NAVIGATION CHANNEL EXISTING YACHT CLUB FLOATS"

Transcription

1

2

3 ' MUDLINE ELEVATION REVISED FEDERAL LIMIT FOR DREDGING FEDERAL LIMIT FOR DREDGING C '-" TRANSIENT MOORAGE FLOAT INACC 8' MIN B FEDERALLY DREDGED NAVIGATION 1' YACHT CLUB FLOATS A '-" INACCESSIBLE MEASURED AT EL ' (NOTE 4) NAVIGATION PROJECT CUT & FILL QUANTITIES: BERM FOOTPRINT: 8 SF BERM VOLUME: 3 CY UPLANDS OPEN CUT FOOTPRINT: 35 SF UPLANDS OPEN CUT VOLUME: 85 CY UPLANDS SLOPE PROTECTION VOLUME: 32 CY DREDGE VOLUME: 15 CY MTL = 8.6' MLLW =.' STEEL SHEETPILE SEAWALL MOORAGE LIMIT FLOAT FAILED SECTION OF SHEETPILE SEAWALL PROPOSED ROCK BERM NOTES: 1. VERTICAL DATUM IS MEAN LOWER LOW WATER. 2. UPLAND SURVEY OBTAINED FROM PND PLAN DATED 12/22/214. SURVEY PERFORMED ON DECEMBER 3 THRU 5, BATHYMETRY SURVEY OBTAINED FROM CORPS OF ENGINEERS. SURVEY PERFORMED ON AUGUST 1 & 2, APPLICANT TO DREDGE TO EL ' BETWEEN TOE OF BERM AND REVISED FEDERAL LIMIT AT TIME OF BERM CONSTRUCTION. PROPOSED UPLANDS OPEN CUT TGALS GRANDSTAND 15 of 78

4 TGALS GRANDSTAND 128'-" 1'-" NAVIGATION MEASURED AT ELEVATION ' PROJECT CUT & FILL QUANTITIES: BERM FOOTPRINT: 8 SF BERM VOLUME: 3 CY UPLANDS OPEN CUT FOOTPRINT: 35 SF UPLANDS OPEN CUT VOLUME: 85 CY UPLANDS SLOPE PROTECTION VOLUME: 32 CY DREDGE VOLUME: 15 CY MTL = 8.6' MLLW =.' 31'-6" PROPOSED ROCK BERM 15'-" DREDGE OFFSET 81'-6" FEDERALLY DREDGED NAVIGATION 2 2'-" MOORAGE EASEMENT EDGE OF FLOATS 1 14' 1' STEEL SHEETPILE SEAWALL 1. 3' 5' 1'-" REQUIRED MINIMUM DREDGE DEPTH DETAIL A-1 BOTTOM OF THOMAS BASIN SECTION "A" - LOOKING SOUTH END OF GRANDSTAND 42 Spruce Mill Way Ketchikan, AK of 7 5 of 8

5 TGALS GRANDSTAND NOTE: CORPS OF ENGINEERS WON'T DREDGE WITHIN THIS ZONE. THEREFORE, BOTTOM WITHIN 15' OF BERM TO BE DREDGED BY APPLICANT TO ' DURING BERM CONSTRUCTION 132'-" 1'-" NAVIGATION MEASURED AT ELEVATION ' PROJECT CUT & FILL QUANTITIES: BERM FOOTPRINT: 8 SF BERM VOLUME: 3 CY UPLANDS OPEN CUT FOOTPRINT: 35 SF UPLANDS OPEN CUT VOLUME: 85 CY UPLANDS SLOPE PROTECTION VOLUME: 32 CY DREDGE VOLUME: 15 CY MTL = 8.6' MLLW =.' 28'-" PROPOSED ROCK BERM 15'-" DREDGE OFFSET 89'-" FEDERALLY DREDGED NAVIGATION MOORAGE FLOAT 1'-" 15'-" 3'-" 2 1 2'-" MOORAGE EASEMENT 14' 1' STEEL SHEETPILE SEAWALL 1. 3' 5' DETAIL B-1 BOTTOM OF REQUIRED MINIMUM DREDGE DEPTH MATERIAL DREDGED BY CORPS OF ENGINEERS MATERIAL DREDGED BY APPLICANT DURING BERM CONSTRUCTION THOMAS BASIN SECTION "B" - LOOKING NORTH END OF GRANDSTAND 42 Spruce Mill Way Ketchikan, AK of 78

6 NOTE: CORPS OF ENGINEERS WON'T DREDGE WITHIN THIS ZONE. THEREFORE, BOTTOM WITHIN 15' OF BERM TO BE DREDGED BY APPLICANT TO ' DURING BERM CONSTRUCTION NAVIGATION MEASURED AT ELEVATION ' PROJECT CUT & FILL QUANTITIES: BERM FOOTPRINT: 8 SF BERM VOLUME: 3 CY UPLANDS OPEN CUT FOOTPRINT: 35 SF UPLANDS OPEN CUT VOLUME: 85 CY UPLANDS SLOPE PROTECTION VOLUME: 32 CY DREDGE VOLUME: 15 CY MTL = 8.6' MLLW =.' MOORAGE FLOAT DREDGE OFFSET PROPOSED ROCK BERM 94'-6" FEDERALLY DREDGED NAVIGATION 2 STEEL SHEETPILE SEAWALL ' 1' 3' 5' DETAIL C-1 BOTTOM OF THOMAS BASIN SECTION "C" - LOOKING NORTH CORNER REQUIRED MINIMUM DREDGE DEPTH MATERIAL DREDGED BY CORPS OF ENGINEERS MATERIAL DREDGED BY APPLICANT DURING BERM CONSTRUCTION 42 Spruce Mill Way Ketchikan, AK of 7 5 of 8

7 1'-" MATERIAL PROPERTIES: 1. ROCK GRADATION: 8" MIN TO 18" MAX, UNIFORMLY GRADED. 2. GEOTEXTILE CONFORMING TO ALASKA DOT STANDARD SPECIFICATIONS, SECTION , "PERMANENT EROSION CONTROL". PROPOSED GEOTEXTILE ON PROPOSED CUT SLOPE SHEETPILE WALL CUT OFF 1'-" ABOVE FINISHED GRADE MTL = 8.6' MLLW =.' PROPOSED 2 FT THICK ARMOR ROCK LAYER 2 PROPOSED ROCK BERM 1 '-6" 1. 1'-" DETAIL A-1 42 Spruce Mill Way Ketchikan, AK of 7

8 2 MATERIAL PROPERTIES: 1. ROCK GRADATION: 8" MIN TO 18" MAX, UNIFORMLY GRADED. 2. GEOTEXTILE CONFORMING TO ALASKA DOT STANDARD SPECIFICATIONS, SECTION , "PERMANENT EROSION CONTROL". CONCRETE SLAB TO REMAIN PROPOSED GEOTEXTILE ON PROPOSED CUT SLOPE PROPOSED 2 FT THICK ARMOR ROCK LAYER SHEETPILE WALL CUT OFF 1'-" ABOVE FINISHED GRADE PROPOSED ROCK BERM MTL = 8.6' MLLW =.' 1 '-6" '-" DETAIL B-1 42 Spruce Mill Way Ketchikan, AK of 7

9 MATERIAL PROPERTIES: 1. ROCK GRADATION: 8" MIN TO 18" MAX, UNIFORMLY GRADED. 2. GEOTEXTILE CONFORMING TO ALASKA DOT STANDARD SPECIFICATIONS, SECTION , "PERMANENT EROSION CONTROL". 2 1 '-6" PROPOSED GEOTEXTILE ON PROPOSED CUT SLOPE PROPOSED 2 FT THICK ARMOR ROCK LAYER SHEETPILE WALL CUT OFF 1'-" ABOVE FINISHED GRADE MTL = 8.6' MLLW =.' PROPOSED ROCK BERM -12 1'-" DETAIL C-1 42 Spruce Mill Way Ketchikan, AK of 7

CORPS OF ENGINEERS ALASKA DISTRICT Dredging Projects. Michael Tencza, PE Operations Project Manager November 4, 2015

CORPS OF ENGINEERS ALASKA DISTRICT Dredging Projects. Michael Tencza, PE Operations Project Manager November 4, 2015 CORPS OF ENGINEERS ALASKA DISTRICT 2016 Dredging Projects Michael Tencza, PE Operations Project Manager November 4, 2015 US Army Corps of Engineers Building and Preserving Alaska s Future AWARDED CONTRACTS

More information

CLIPPER COVE PROMENADE & MARINA DEVELOPMENT

CLIPPER COVE PROMENADE & MARINA DEVELOPMENT CLIPPER COVE PROMENADE & MARINA DEVELOPMENT Treasure Island / Yerba Buena Island Citizen Advisory Board Review May 05 2015 CLIPPER COVE PROMENADE & MARINA DEVELOPMENT TREASURE ISLAND TI YBI CAB Review

More information

Guide to Siting of Seawalls January 13, 2014 by Michael Walther, P.E., D.CE, President - Coastal Tech

Guide to Siting of Seawalls January 13, 2014 by Michael Walther, P.E., D.CE, President - Coastal Tech January 13, 2014 by Michael Walther, P.E., D.CE, President - Coastal Tech mwalther@coastaltechcorp.com Prepared for the Sea Turtle Conservancy http://www.conserveturtles.org/ Introduction Overview: This

More information

Impact of Offshore Directed Forcing on Sediment Transport and Structural Integrity at Packery Channel, Corpus Christi Texas

Impact of Offshore Directed Forcing on Sediment Transport and Structural Integrity at Packery Channel, Corpus Christi Texas Google Earth 29 Aug 2017 Impact of Offshore Directed Forcing on Sediment Transport and Structural Integrity at Packery Channel, Corpus Christi Texas Deidre D. Williams Coastal Research Scientist Conrad

More information

Sabine Neches Waterway: Smiths Bluff to Beaumont Turning Basin

Sabine Neches Waterway: Smiths Bluff to Beaumont Turning Basin Sabine Neches aterway: -ft.ft 3 8 3 5 5 6 6 4 ' 8 6 ' 93 ' 93 ' Print Date: 4//8 Side Slope Ratio: (Rise : Run Authorized Depth: -ft. Survey Date(s: March 8 SUN MARINE TERMINALS LAY BERTHS AND RIVER MARINE

More information

City of Fort Lauderdale. Frequently Asked Questions. Proposed Sea Wall Ordinance

City of Fort Lauderdale. Frequently Asked Questions. Proposed Sea Wall Ordinance City of Fort Lauderdale Frequently Asked Questions Proposed Sea Wall Ordinance The City of Fort Lauderdale is considering amending the Unified Land Development Regulations of the City of Fort Lauderdale

More information

Mr. Michael Malone CPS Energy 145 Navarro Street San Antonio, Texas Project No

Mr. Michael Malone CPS Energy 145 Navarro Street San Antonio, Texas Project No January 15, 2016 Mr. Michael Malone 145 Navarro Street San Antonio, Texas 78205 Project No. 0328985 Environmental Resources Management CityCentre Four 840 West Sam Houston Pkwy N. Suite 600 Houston, Texas

More information

Hurricane Irma: Palm Beach County Coastal Storm Damage Assessment

Hurricane Irma: Palm Beach County Coastal Storm Damage Assessment Project Area: Coral Cove Park Location: R1 to R7.5 Project Length: 5,170 ft Estimated Volumetric Loss: 38,296 cy Pre-Storm Assessment Date: August 22, 2017 General observations: 30 ft loss of dry beach

More information

The Galveston Seawall

The Galveston Seawall Coastal and Ocean Engineering ENGI.8751 Undergraduate Student Forum Faculty of Engineering and Applied Science, Memorial University, St. John s, NL, Canada. March, 2013 The Galveston Seawall Mark Harvey

More information

Reduction of Wave Runup on a Revetment by Addition of a Berm

Reduction of Wave Runup on a Revetment by Addition of a Berm REMR Technical Note CO-RR-1.3 (Supersedes CO-RR-1.3 1986) Reduction of Wave Runup on a Revetment by Addition of a Berm Purpose To provide design guidance for reducing wave runup on a riprap revetment by

More information

TENTATIVE SCHEDULE

TENTATIVE SCHEDULE TENTATIVE SCHEDULE 20-2015 Facility Dredge Depth (- ft MLLW) 20 Spring Early Summer 20/2012 2012/2013 HWRP/ HWRP/ HWRP/ SFDODS SF- MWP Upland SFDODS SF- MWP upland SFDODS SF- MWP upland SFDODS SF- 2013/2014

More information

Port of Kalama, New Approach to Maintenance Dredging

Port of Kalama, New Approach to Maintenance Dredging Port of Kalama, New Approach to Maintenance Dredging Vladimir Shepsis, Coast @ Harbor Engineering, Inc. John Dawson, Coast @ Harbor Engineering, Inc. Mark Wilson, Port of Kalama Tabitha Reeder, Port of

More information

OPEN CELL SHEET PILE TECHNOLOGY. Presentation to Alaska State Legislature, House Finance Committee

OPEN CELL SHEET PILE TECHNOLOGY. Presentation to Alaska State Legislature, House Finance Committee OPEN CELL SHEET PILE TECHNOLOGY Presentation to Alaska State Legislature, House Finance Committee OPEN CELL SHEET PILE Technology Retaining Wall System Patents Obtained by PND Engineers ARRC Dock, Seward,

More information

ADDENDUM NO. TWO AB

ADDENDUM NO. TWO AB ADDENDUM NO. TWO AB2018-28 Notice is hereby given that on June 22, 2018 at 11:00 A.M. (Prevailing time), sealed bids will be opened and read in public by the Purchasing Department in the Mercer County

More information

Appendix 4 St. Charles Basin

Appendix 4 St. Charles Basin Appendix 4 St. Charles Basin The St. Charles hurricane protection system (HPS), shown in Figure 1, was designed as part of the Lake Pontchartrain, LA, and Vicinity Hurricane Protection Project. The St.

More information

City of Rolling Hills INCORPORATED JANUARY 24, 1957

City of Rolling Hills INCORPORATED JANUARY 24, 1957 City of Rolling Hills INCORPORATED JANUARY 24, 1957 NO. 2 PORTUGUESE BEND ROAD ROLLING HILLS, CA 90274 (310) 377-1521 FAX (310) 377-7288 INSTRUCTIONS FOR COMPLETION OF THE LOT COVERAGE FORMS TOTAL STRUCTURES

More information

ATTACHMENT C CITY OF FEDERAL WAY 2018 ASPHALT OVERLAY PROJECT BID SCHEDULE

ATTACHMENT C CITY OF FEDERAL WAY 2018 ASPHALT OVERLAY PROJECT BID SCHEDULE ATTACHMENT C CITY OF FEDERAL WAY ASPHALT OVERLAY PROJECT SCHEDULE NOTE: Unit Prices for all items, all extensions, and the total amount of the bid must be shown. Show unit prices in legible figures. Where

More information

ORDINANCE NO. C-16- WHEREAS, the proposed minimum seawall elevation exceeds the current maximum by 0.7 feet (8.4 inches); and

ORDINANCE NO. C-16- WHEREAS, the proposed minimum seawall elevation exceeds the current maximum by 0.7 feet (8.4 inches); and ORDINANCE NO. AN ORDINANCE AMENDING THE UNIFIED LAND DEVELOPMENT REGULATIONS OF THE CITY OF FORT LAUDERDALE, FLORIDA, AMENDING SECTION 47-19.3, BOAT SLIPS, DOCKS, BOAT DAVITS, HOISTS AND SIMILAR MOORING

More information

Rudy McLellan, P.E. GEC, Inc., Baton Rouge, LA For Vicksburg Bridge Commission, VBC

Rudy McLellan, P.E. GEC, Inc., Baton Rouge, LA For Vicksburg Bridge Commission, VBC OLD MISSISSIPPI RIVER BRIDGE AT VICKSBURG Challenges Maintaining a Vital East-West Rail Corridor Rudy McLellan, P.E. GEC, Inc., Baton Rouge, LA For Vicksburg Bridge Commission, VBC River Crossings at Vicksburg

More information

Indiana Department of Natural Resources / Division of Water

Indiana Department of Natural Resources / Division of Water The Department of Natural Resources is providing this report to satisfy the requirements of the "Procedures Concerning Certain Licenses Act", IC 14-11-4, and its associated administrative rule, 312 IAC

More information

SUBJECT: Newark Bay Study Area Coordination Team Meeting, 9 October 2012

SUBJECT: Newark Bay Study Area Coordination Team Meeting, 9 October 2012 CENAN-PP-H 9 Oct 12 MEMORANDUM FOR RECORD SUBJECT: Newark Bay Study Area Coordination Team Meeting, 9 October 2012 1. The regularly scheduled monthly interagency coordination meeting was held on 9 Oct

More information

U.S. DEPARTMENT OF COMMERCE National Oceanic and Atmospheric Administration National Ocean Service Datums Page Page 1 of 5

U.S. DEPARTMENT OF COMMERCE National Oceanic and Atmospheric Administration National Ocean Service Datums Page Page 1 of 5 Datums Page Page 1 PRIMARY BENCH MARK STAMPING: 2245 A 1982 866 2245 A TIDAL MONUMENTATION: Tidal Station disk VM#: 16408 AGENCY: National Ocean Survey (NOS) PID#: DD1345 The primary bench mark is a disk

More information

MOBILE DISTRICT 2018 DREDGING PROGRAM

MOBILE DISTRICT 2018 DREDGING PROGRAM MOBILE DISTRICT 2018 DREDGING PROGRAM SOUTH ATLANTIC DIVISION U.S. ARMY CORPS OF ENGINEERS Trusted Partners Delivering Value Today for a Better Tomorrow US Army Corps of Engineers BUILDING STRONG MOBILE

More information

25150 SW 227 th AVENUE Homestead, FL 33031

25150 SW 227 th AVENUE Homestead, FL 33031 25150 SW 227 th AVENUE Homestead, FL 33031 5 Acres $223,900.00 Telephone: 954-224-6111 email: CLF@Comfortrealtycorp.com www.comfortrealtycorp.com WHISPER WALK ESTATES 5 ACRE TRACT Tel: 954 224 6111 * email:

More information

TRANSMITTAL. Please contact me with any questions. 7 Spruce Road, Freeport, ME T: (207)

TRANSMITTAL. Please contact me with any questions. 7 Spruce Road, Freeport, ME T: (207) BAKER DESIGN CONSULTANTS Civil, Marine and Structural Engineering To: Alex Jaegerman FAICP Director of Planning & Development Town of Yarmouth 200 Main Street PO Box 907 Yarmouth, ME 04096 From: Barney

More information

Amended Maintenance Dredge Spoil Management Plan. Shute Harbour Marina Resort

Amended Maintenance Dredge Spoil Management Plan. Shute Harbour Marina Resort Amended Maintenance Dredge Spoil Management Plan Shute Harbour Marina Resort Amended Maintenance Dredge Spoil Management Plan Quality Information Document Ref Amended Maintenance Dredge and Spoil Maintenance

More information

Design and Construction of Berm Breakwaters

Design and Construction of Berm Breakwaters Design and Construction of Berm Breakwaters Jentsje van der Meer - Van der Meer Consulting UNESCO-IHE Sigurdur Sigurdarson - Icelandic Road and Coastal Administration IceBreak Consulting Engineers New

More information

IS A BUDGET ONLY DESCRIPTION QUANTITY UNIT

IS A BUDGET ONLY DESCRIPTION QUANTITY UNIT Miller Creek Consultants LLC CONCRETE RECAP 1/29/2009 ESTIMATE DATE: 1-Jan-09 Project: 4000 psi 95.00 Location: 3000 psi 88.00 PROJECT DATA PROJECT NAME: Concrete Estimate THIS IS A BUDGET ONLY DESCRIPTION

More information

The Use of Low Cost Breakwaters for Mangrove Restoration in Muddy Foreshores

The Use of Low Cost Breakwaters for Mangrove Restoration in Muddy Foreshores The Use of Low Cost Breakwaters for Mangrove Restoration in Muddy Foreshores Douglas A. Gaffney, P.E. Ranata Robertson October 23, 2012 The Use of Low Cost Breakwaters for Mangrove Restoration in Muddy

More information

COATING AND STRUCTURAL CONCRETE COATING (ANTI-GRAFFITI) 1'-3" FINISHED GRADE 1'-3" 3" VENEER ALLOWANCE LEDGER W/ MECHANICAL ANCHOR BOLT

COATING AND STRUCTURAL CONCRETE COATING (ANTI-GRAFFITI) 1'-3 FINISHED GRADE 1'-3 3 VENEER ALLOWANCE LEDGER W/ MECHANICAL ANCHOR BOLT R "W" PAY LIMITS OF ITEM 601 PAY LIMITS OF ITEM 601 STRUCTURAL CONCRETE STRUCTURAL CONCRETE 1'3" PCBC END SEGMENT B C 1'3" COATING AND STRUCTURAL CONCRETE COATING (ANTIGRAFFITI) 1'3" CURB FINISHED GRADE

More information

The Olathe Quiet Zone

The Olathe Quiet Zone The Olathe Quiet Zone LEARNING TO LIVE WITH THE RAILROAD AS YOUR NEIGHBOR APWA August 18, 2008 1 2 BNSF At-Grade Crossings BNSF System Track Map Emporia - 88 TPD Ft Scott - 40 TPD Southgate 8 TPD 3 BNSF

More information

Edisto Beach Renourishment and Groin Lengthening Project. Tim Kana Coastal Science & Engineering

Edisto Beach Renourishment and Groin Lengthening Project. Tim Kana Coastal Science & Engineering Edisto Beach Renourishment and Groin Lengthening Project Tim Kana Coastal Science & Engineering Hurricane Matthew 8 Oct 2016 Cat 1 Storm @ Edisto Beach Worst Surge Event Since DAVID in 1979 Tides ~ 5 ft

More information

Composite CN Value Based on Hydrologic Soil Group and Estimated Future Land Cover

Composite CN Value Based on Hydrologic Soil Group and Estimated Future Land Cover Composite CN Value Based on Hydrologic Soil Group and Estimated Future Land Cover Village of Milan, Mirabal Park /5/016 DEVELOPED LAND AREAS** Basin Basin HSG "B" HSG "C" HSG "D" Basin Basin Area Area

More information

Agenda Report. Spruce Street Outlet Drainage Improvements Tower Road Relief Sewer

Agenda Report. Spruce Street Outlet Drainage Improvements Tower Road Relief Sewer Agenda Report Subject: Prepared By: Spruce Street Outlet Drainage Improvements Tower Road Relief Sewer Steven M. Saunders, Director of Public Works/Village Engineer Date: August 12, 2012 On March 8, 2012

More information

BUS 2 1. Introduction 2. Structural systems

BUS 2 1. Introduction 2. Structural systems BUS 2 1. Introduction 2. Structural systems 3. Staircases terminology, requirements 4. Staircases structures, historic review 5. Staircases 6. Expansion joints 7. Foundations terminology 8. Foundations

More information

RANCHO VISTA - APPROVED 29 LOT FINAL MAP WITH BONDS POSTED

RANCHO VISTA - APPROVED 29 LOT FINAL MAP WITH BONDS POSTED RANCHO VISTA - APPROVED 29 LOT FINAL MAP WITH BONDS POSTED SAN DIMAS DRIVE - OCEANSIDE, CA 16.87 Gross Acres 4 Miles to the Beach Views from all Lots 3,458-6,448 SF Average Lot Sizes 2,126, 2,357, 2,462

More information

TOOLING COMPONENTS. tel fax Clamping Kits Step Blocks...7. Driver Studs...

TOOLING COMPONENTS.  tel fax Clamping Kits Step Blocks...7. Driver Studs... Clamping Kits... 2-8 Step Blocks...7 Driver Studs... 9-13 Bolts, Screws... 14-20 Nuts, Washers... 21-29 Sex Bolts... 30-31 Clamps... 32-44 Screws... 45-49 Knobs & Levers... 49-53 Rest Pads...54 Index Plungers...

More information

2. The EPA provided the following information regarding EPA s activities in Newark Bay during the meeting:

2. The EPA provided the following information regarding EPA s activities in Newark Bay during the meeting: CENAN-PP-C 10 September 2013 MEMORANDUM FOR RECORD SUBJECT: Newark Bay Study Area Coordination Team Meeting 1. The regularly scheduled monthly interagency coordination meeting was held on September 10

More information

The project comprises the design of the following works:

The project comprises the design of the following works: An integrated approach to the design of the port and marina infrastructure of the island of Mykonos D. Avgoustinos, N. Panagopoulos, I. Sioris TRITON Consulting Engineers Ltd, 10 Makedonon Str., 11521

More information

Table of Contents. Riser Rings. Riser Rings. Riser Rings. Product Description Page

Table of Contents. Riser Rings. Riser Rings. Riser Rings. Product Description Page Riser Ring Catalog Table of Contents Riser Rings Product Description Page Riser Rings Steel And Cast Iron Riser Rings Adjustable Riser Rings Steel Manhole Riser Rings Steel Catch Basin Riser Rings Steel

More information

LAS VARAS RANCH CA COASTAL TRAIL PROPOSED ALIGNMENT

LAS VARAS RANCH CA COASTAL TRAIL PROPOSED ALIGNMENT LAS VARAS RANCH CA COASTAL TRAIL PROPOSED ALIGNMENT Santa Barbara Trails Council * Prepared by Ray Ford February 1,2012 The following notes accompany the Santa Barbara Trails Council map for the Las Varas

More information

CBJ DOCKS AND HARBORS BOARD REGULAR MEETING AGENDA For Thursday, August 30th, I. Call to Order (7:00 p.m. at the CBJ Assembly Chambers.

CBJ DOCKS AND HARBORS BOARD REGULAR MEETING AGENDA For Thursday, August 30th, I. Call to Order (7:00 p.m. at the CBJ Assembly Chambers. CBJ DOCKS AND HARBORS BOARD REGULAR MEETING AGENDA For Thursday, August 30th, 2012 I. Call to Order (7:00 p.m. at the CBJ Assembly Chambers.) II. III. Roll (Greg Busch, John Bush, Tom Donek, Eric Kueffner,

More information

INNOVATIVE MARINE DESIGNS PND ENGINEERS, INC. January 14, 2016

INNOVATIVE MARINE DESIGNS PND ENGINEERS, INC. January 14, 2016 INNOVATIVE MARINE DESIGNS PND ENGINEERS, INC. January 14, 2016 PND Engineers, Inc. Founded in 1979 Headquartered in Anchorage, Alaska with offices in Juneau, Seattle, Houston and Vancouver, B.C. International

More information

AND AND ALL OF SAID LANDS SITUATE, LYING AND BEING IN THE CITY OF HOLLYWOOD, BROWARD COUNTY, FLORIDA, CONTAINING 326,439 SQUARE FEET ( ACRES).

AND AND ALL OF SAID LANDS SITUATE, LYING AND BEING IN THE CITY OF HOLLYWOOD, BROWARD COUNTY, FLORIDA, CONTAINING 326,439 SQUARE FEET ( ACRES). PROPOSED DEALERSHIP AND FOR: 11 NORTH STATE ROAD, FLORIDA. 3301 INDEX OF DRAWINGS ARCHITECTURAL A-0 COVER SHEET SHEET 1 OF BOUNDARY AND TOPOGRAPHIC SURVEY SHEET OF BOUNDARY AND TOPOGRAPHIC SURVEY A-1.1

More information

PLANNING BOARD MINUTES March 13, 2017 CASCO COMMUNITY CENTER 7:00 P.M. MEMBERS PRESENT: Stan Buchanan, Ray Grant & Lynne Potter Bob Barnes, Ted

PLANNING BOARD MINUTES March 13, 2017 CASCO COMMUNITY CENTER 7:00 P.M. MEMBERS PRESENT: Stan Buchanan, Ray Grant & Lynne Potter Bob Barnes, Ted PLANNING BOARD MINUTES March 13, 2017 CASCO COMMUNITY CENTER 7:00 P.M. MEMBERS PRESENT: Stan Buchanan, Ray Grant & Lynne Potter MEMBERS ABSENT: Bob Barnes, Ted Beckner & Jim Macklin STAFF PRESENT: James

More information

A Brief History of the Town of Palm Beach Coastal Protection Program. Beach nourishment occurred in Palm Beach as far back as the 1940s.

A Brief History of the Town of Palm Beach Coastal Protection Program. Beach nourishment occurred in Palm Beach as far back as the 1940s. A Brief History of the Town of Palm Beach Coastal Protection Program Beach nourishment occurred in Palm Beach as far back as the 1940s. The Lake Worth Inlet Sand Transfer Plant was built in the late 1950s.

More information

Sandbag Barrier. Suitable Applications Sandbag barriers may be suitable: As a linear sediment control measure:

Sandbag Barrier. Suitable Applications Sandbag barriers may be suitable: As a linear sediment control measure: Categories EC Erosion Control SE Sediment Control TC Tracking Control WE Wind Erosion Control Non-Stormwater NS Management Control Waste Management and WM Materials Pollution Control Legend: Primary Category

More information

Peace Project Water Use Plan

Peace Project Water Use Plan Peace Project Water Use Plan Williston Reservoir Trial Tributaries Implementation Year 5 Reference: GMSWORKS-19 6 Mile 2016 Engineering Inspection Report Study Period: 2016 KERR WOOD LEIDAL Site Inspection

More information

Lake Tahoe Shoreline Plan 03 Policy Topic: Access Issues

Lake Tahoe Shoreline Plan 03 Policy Topic: Access Issues Lake Tahoe Shoreline Plan 03 Policy Topic: Access Issues V9 Last Updated 03.10.2017 1 Brief Description Physical access to the waters of Lake Tahoe is one of the key issues surrounding the Shoreline Plan

More information

Avalanche Accident Report

Avalanche Accident Report Hatcher Pass Avalanche Center POB 1223 Chickaloon, AK 99674 907-746-4566 info@hatcherpassavalanchecenter.org Avalanche Accident Report January 2, 2016 Avalanche Accident in Grubstake Gulch, Talkeetna Mountains,

More information

Site Formation Works of the Kai Tak Cruise Terminal Project

Site Formation Works of the Kai Tak Cruise Terminal Project Site Formation Works of the Kai Tak Cruise Terminal Project Presented by Ian Muir MIEAust, CPEng Maritime Business Unit Head Asia Pacific and Deputy Project Director for the Kai Tak Cruise Terminal Site

More information

Part 8 Street lighting DISTRIBUTION CONSTRUCTION STANDARDS HANDBOOK

Part 8 Street lighting DISTRIBUTION CONSTRUCTION STANDARDS HANDBOOK Part 8 Street lighting DISTRIBUTION CONSTRUCTION STANDARDS HANDBOOK Drawing Register Number Revision Description S2 D Minor Road, Wood or Concrete Pole with Crossarm S3 D Arterial Road, Wood Pole with

More information

APPROVED 10 LOT TENTATIVE TRACT MAP - OCEAN VIEWS

APPROVED 10 LOT TENTATIVE TRACT MAP - OCEAN VIEWS Rare Development Opportunity in the Olde Carlsbad Neighborhood Ocean Views from Some Lots Lot Sizes 9,500-15,527 SF Area of New Home Prices From $1,000,000-$1,500,000 SUBMIT BEST OFFER - OFFERS DUE DECEMBER

More information

203.0100 Removing Small Pipe Culverts CATEGORY STATION LOCATION EACH 0010 2+00-16+50 0010 7+13-8+41 LT. 155 3 0010 4+42 CL 1 10,660 9+90-13+73 RT. 390 3 7+63'SB' 67' LT. 1 14+25'GV' 49' LT. 1 17+05'GV'

More information

Consideration will be given to other methods of compliance which may be presented to the Authority.

Consideration will be given to other methods of compliance which may be presented to the Authority. Advisory Circular AC 139-10 Revision 1 Control of Obstacles 27 April 2007 General Civil Aviation Authority advisory circulars (AC) contain information about standards, practices and procedures that the

More information

Use steel clip angle as a drill template and drill through mullion. Install bolts with bolt heads on the masonry side of the jamb mullion.

Use steel clip angle as a drill template and drill through mullion. Install bolts with bolt heads on the masonry side of the jamb mullion. Additional 200xpt and 250xpt installation instructions are shown on page 11. STICK METHOD ERECTION (refer to figures 1 and 2) Step 1 Establish all control lines and grades. Step 2 Attach steel intermediate

More information

Economic Impacts of Beach Nourishment in Texas

Economic Impacts of Beach Nourishment in Texas Galveston Island South Padre Island April 25, 2017 Economic Impacts of Beach Nourishment in Texas Michael Walther Coastal Tech G.E.C., Inc. Reuben Trevino - Galveston Island Park Board of Trustees Special

More information

30 November Randall G. Hintz Chief, Operations Support Branch Operations Division. US Army Corps of Engineers BUILDING STRONG

30 November Randall G. Hintz Chief, Operations Support Branch Operations Division. US Army Corps of Engineers BUILDING STRONG 30 November 2011 Randall G. Hintz Chief, Operations Support Branch Operations Division US Army Corps of Engineers Overview MAINTENANCE PROJECTS Deep Draft Channels Shallow Draft Channels Coastal Inlets

More information

DAMAGE ASSESSMENT OF SAND FENCING GARDEN CITY, NORTH LITCHFIELD AND LITCHFIELD BEACH GEORGETOWN COUNTY, SC

DAMAGE ASSESSMENT OF SAND FENCING GARDEN CITY, NORTH LITCHFIELD AND LITCHFIELD BEACH GEORGETOWN COUNTY, SC OF SAND FENCING GARDEN CITY, NORTH LITCHFIELD AND LITCHFIELD BEACH GEORGETOWN COUNTY, SC June 07, 2017 PREPARED FOR: GEORGETOWN COUNTY DEPARTMENT OF PUBLIC SERVICES PREPARED BY: The EARTHWORKS Group 11655

More information

Application for Permit to Develop in a Floodplain Area

Application for Permit to Develop in a Floodplain Area Application for Permit to Develop in a Floodplain Area The undersigned hereby makes application for a permit to develop in a designated floodplain area. The work to be performed is described below and

More information

2011 Nags Head Beach Nourishment Project Update. Tim Kana & Haiqing Kaczkowski

2011 Nags Head Beach Nourishment Project Update. Tim Kana & Haiqing Kaczkowski 2011 Nags Head Beach Nourishment Project Update Tim Kana & Haiqing Kaczkowski NCBIWA Conference 3 April 2017 Outline of the Presentation 1 Review 2011 Nourishment Project Post-project monitoring efforts

More information

MP : Headwaters of the Fraser River

MP : Headwaters of the Fraser River MP 236 237: Headwaters of the Fraser River The mile between these two mileage posts is often just referred to as the bottom switchback or the curve at the bottom of Berthoud Pass. For many locals this

More information

COON CREEK WATERSHED DISTRICT Request for Board Action

COON CREEK WATERSHED DISTRICT Request for Board Action Item 13: Request to Award Work on Woodcrest Creek Bank Stabilization Project Page 1 of 6 COON CREEK WATERSHED DISTRICT Request for Board Action MEETING DATE: December 8, 2014 AGENDA NUMBER: 13 ITEM: Request

More information

HYDRAULIC DESIGN OF THE TOURISTIC BERTHING IN ASWAN CITY

HYDRAULIC DESIGN OF THE TOURISTIC BERTHING IN ASWAN CITY HYDRAULIC DESIGN OF THE TOURISTIC BERTHING IN ASWAN CITY Dr. Hossam El-Sersawy Researcher, Nile Research Institute (NRI), National Water Research Center (NWRC), Egypt E-mail: h_sersawy@hotmail.com Dr.

More information

MP : the top of the bottom switchback

MP : the top of the bottom switchback MP 237 238: the top of the bottom switchback For reference this section of U S Highway 40 has been called the top of the bottom switchback on the Grand County side of the Pass. It is here that the proposed

More information

Great Lakes Navigation System Buffalo District

Great Lakes Navigation System Buffalo District Great Lakes Navigation System Buffalo District Josh Feldmann U.S. Army Corps of Engineers Chief, Operations Branch 9 FEB 2016 US Army Corps of Engineers BUILDING STRONG Key FY16/17 Buffalo District O&M

More information

March 2, The Honorable Mayor Williams D. Sessoms, Jr. Members of City Council. Subject: Coastal CIP Presentation to City Council - March 6, 2018

March 2, The Honorable Mayor Williams D. Sessoms, Jr. Members of City Council. Subject: Coastal CIP Presentation to City Council - March 6, 2018 OFFICE OF THE CITY MANAGER (757) 385-4242 (757) 427-5626 FAX MUNICIPAL CENTER BUILDING 1, ROOM 234 2401 COURTHOUSE DRIVE VIRGINIA BEACH, VA 23456-9001 March 2, 2018 The Honorable Mayor Williams D. Sessoms,

More information

St. Augustine Port, Waterway & Beach District. St. Augustine Inlet 2013 draft Inlet Management Plan. March 19, 2013

St. Augustine Port, Waterway & Beach District. St. Augustine Inlet 2013 draft Inlet Management Plan. March 19, 2013 Division of Water Resource Management St. Augustine Port, Waterway & Beach District St. Augustine Inlet 2013 draft Inlet Management Plan March 19, 2013 Discussion Outline Florida Statutes Florida Inlets

More information

Welcome to the City of Ketchikan Port & Harbors

Welcome to the City of Ketchikan Port & Harbors Effective Sept 1, 2017 Welcome to the City of Ketchikan Port & Harbors The City of Ketchikan operates five public boat harbors in the Ketchikan area. Harbor regulations and user fees are established by

More information

U.S. Army Corps of Engineers Wilmington District

U.S. Army Corps of Engineers Wilmington District U.S. Army Corps of Engineers Wilmington District 2012 East Coast - WEDA October 9-11, 2012 Ongoing & Upcoming Contracts US Army Corps of Engineers Wilmington District Ongoing Contracts Project Quantity

More information

Small Boat Harbor Update UAA Science-to-Engineering Workshop January 8, 2004

Small Boat Harbor Update UAA Science-to-Engineering Workshop January 8, 2004 Small Boat Harbor Update UAA Science-to-Engineering Workshop January 8, 2004 CONSTRUCTION GENERAL CONSTRUCTION GENERAL S NOME HARBOR ST PAUL HARBOR ST GEORGE HARBOR CHIGNIK HARBOR SEWARD HARBOR EXPANSION

More information

POINT OF VIEW on the proposed solutions for improving navigation at critical points at Bechet, Corabia, Belene and Popina

POINT OF VIEW on the proposed solutions for improving navigation at critical points at Bechet, Corabia, Belene and Popina FAST DANUBE C.N.F.R NAVROM S.A. Galaţi POINT OF VIEW on the proposed solutions for improving navigation at critical points at Bechet, Corabia, Belene and Popina 20.09.2018 Critical point from Bechet (km

More information

ALPINE PIPELINE RIVER CROSSINGS 2009 MONITORING REPORT

ALPINE PIPELINE RIVER CROSSINGS 2009 MONITORING REPORT ALPINE PIPELINE RIVER CROSSINGS 2009 MONITORING REPORT Submitted to ConocoPhillips Alaska, Inc. Submitted by Michael Baker, Jr., Inc. 1400 West Benson Blvd., Suite 200 Anchorage, Alaska 99503 TABLE OF

More information

Trail Phasing Plan. Note: Trails in the Clear Creek Canyon area (Segments will be finalized in the future to minimize wildlife impacts

Trail Phasing Plan. Note: Trails in the Clear Creek Canyon area (Segments will be finalized in the future to minimize wildlife impacts Note: Trails in the Clear Creek Canyon area (Segments 2 5 and a future JCOS connection) will be finalized in the future to minimize wildlife impacts Trail Phasing Plan P Parking 3 Easy Trail Intermediate

More information

FOR SALE Joyner Marina 401 Marina Street Carolina Beach, NC Contact Kelvin Dumas, CCIM OFFER REALTY (919)

FOR SALE Joyner Marina 401 Marina Street Carolina Beach, NC Contact Kelvin Dumas, CCIM OFFER REALTY (919) FOR SALE Joyner Marina 401 Marina Street Carolina Beach, NC 28428 Contact Kelvin Dumas, CCIM OFFER REALTY (919) 832-1572 PROPERTY OVERVIEW ± 5.58 acres ; ± 1.5 Acres of uplands; ± 4.08 Acres of submerged

More information

SOLON PLANNING & ZONING COMMISSION APRIL 25, :30 P.M.

SOLON PLANNING & ZONING COMMISSION APRIL 25, :30 P.M. 8894 SOLON PLANNING & ZONING COMMISSION APRIL 25, 2017 7:30 P.M. The Planning Commission met at City Hall on the above date. Present: Commission Members Bentley, Mazur and Newberry (arrived 7:26 P.M.),

More information

CITY PLANNING COMMISSION AGENDA ITEM NOS: 5.A, 5.B STAFF: MICHAEL SCHULTZ

CITY PLANNING COMMISSION AGENDA ITEM NOS: 5.A, 5.B STAFF: MICHAEL SCHULTZ CPC Agenda Page 83 CITY PLANNING COMMISSION AGENDA ITEM NOS: 5.A, 5.B STAFF: MICHAEL SCHULTZ FILE NO(S): CPC DP 03-00259-A5MN11 QUASI-JUDICIAL AR NV 11-00538 QUASI-JUDICIAL PROJECT: BROADMOOR TEMPORARY

More information

Environmentally Sensitive Maintenance for Dirt & Gravel trails TRAIL MIX. TRAIL MIX: aggregate for trails

Environmentally Sensitive Maintenance for Dirt & Gravel trails TRAIL MIX. TRAIL MIX: aggregate for trails TRAIL MIX: aggregate for trails Environmentally Sensitive Maintenance for Dirt & Gravel trails Penn State University: Center for Dirt and Gravel Road Studies Dave Shearer drs32@psu.edu www.dirtandgravelroad.org

More information

CBO-750 ASSEMBLY INSTRUCTIONS

CBO-750 ASSEMBLY INSTRUCTIONS CBO-750 ASSEMBLY INSTRUCTIONS CBO-750 Ovens Should be Installed by a Professional or Suitably-Qualified Individual. Support Base The CBO-750 Oven Support Base must: be constructed of masonry or metal have

More information

New Orleans Municipal Yacht Harbor

New Orleans Municipal Yacht Harbor New Orleans Municipal Yacht Harbor 2018 Capital Projects Construction Updates MYH Floating Marina Community Sailing Center (Coordination with) MYH Boat Launch (MYHMC) MYH Administration Building (CPA &

More information

GALVESTON DISTRICT Dredging Schedules

GALVESTON DISTRICT Dredging Schedules GALVESTON DISTRICT Dredging Schedules Christopher Frabotta Chief, Navigation Branch Southwestern Division - Galveston District November 2, 2016 Galveston District Dredging Meeting Custodians of the Texas

More information

CITY OF BELLINGHAM PARKS & RECREATION DEPARTMENT

CITY OF BELLINGHAM PARKS & RECREATION DEPARTMENT CTY OF BELLNGHAM PARKS & RECREATON DEPARTMENT BOULEVARD PARK PATTLE PONT TRESTLE RENOVATON :\24\08\001\Pattle Point\Permit\PRMT 1.dwg, 7/8/2009 11:04:16 AM TDE ELEVATON E:HW 0.42 MHHW 8.51 MHW 7.70 MLW

More information

Lake Chelan Operations

Lake Chelan Operations Lake Chelan Operations IPMA Executive Seminar September 17, 2013 Presented by: Janet Jaspers Chelan County PUD Lake Chelan Hydroelectric Project Today s Discussion Chelan PUD Overview Interesting Facts

More information

Kennesaw Mountain Trail Club. Trail Skills Workshop ~ Dips and Drains. Presented by: Jay M Dement

Kennesaw Mountain Trail Club. Trail Skills Workshop ~ Dips and Drains. Presented by: Jay M Dement Kennesaw Mountain Trail Club Trail Skills Workshop ~ Dips and Drains Presented by: Jay M Dement KEY CONCEPTS: Control Erosion and Users Where Do Trails Come From, and How Do They Work: Concept of trail

More information

EDGEHILL RANCH APPROVED 15 LOT TENTATIVE MAP W. 15TH AVENUE - ESCONDIDO, CA

EDGEHILL RANCH APPROVED 15 LOT TENTATIVE MAP W. 15TH AVENUE - ESCONDIDO, CA 13,233 SF Average Lot Size 6.88 Acres Area of 600-800k Homes Sale Price: $995,000 - Submit all Offers W 9th Ave Redwood St Centre City Pkwy Tulip St Grace Christian School W 11th Ave Felicita Elementary

More information

INSTRUCTIONS FOR ADMINISTRATIVE APPROVAL OF PROJECTS (OVER-THE COUNTER APPROVAL)

INSTRUCTIONS FOR ADMINISTRATIVE APPROVAL OF PROJECTS (OVER-THE COUNTER APPROVAL) INSTRUCTIONS FOR ADMINISTRATIVE APPROVAL OF PROJECTS (OVER-THE COUNTER APPROVAL) According to Section 17.24.020 of the Rolling Hills Municipal Code, illegal uses or structures are required to be made conforming

More information

Buffalo District Navigation Program Overview

Buffalo District Navigation Program Overview Buffalo District Navigation Program Overview 16 FEB 2011 US Army Corps of Engineers Buffalo District Area of Operations Our Facilities District Headquarters 2 Area Offices 3 Regulatory Field Offices Lake

More information

Wicking Geosynthetic Used for Frost Heave Prevention Pioneer Mountain Scenic Byway

Wicking Geosynthetic Used for Frost Heave Prevention Pioneer Mountain Scenic Byway Wicking Geosynthetic Used for Frost Heave Prevention Pioneer Mountain Scenic Byway Mark Sikkema TenCate 365 South Holland Drive Pendergrass, GA 30567 (760)-693-1800 m.sikkema@tencate.com James B. Carpita,

More information

Port Everglades Master Plan Update Tenant Workshop. July 12, Port Everglades Master Plan Update 2006

Port Everglades Master Plan Update Tenant Workshop. July 12, Port Everglades Master Plan Update 2006 Tenant Workshop July 12, 2007 1 Original 2026 Year Vision Plan DYNEGY PROPERTY SHARED AIRPORT/SUPPORT FACILITY 12 12 2 Input from Tenants Northport Convention Center carve out Expanded cruise berth at

More information

Presented to: City of Petaluma City Council

Presented to: City of Petaluma City Council Agenda Item #1.A REVISED Presented to: City of Petaluma City Council Presented By: Dan St. John, F.ASCE, Director Jason Beatty, P.E., Senior Engineer James 'Jody' Boyette, USACE Project Manager November

More information

Public Notice ISSUED: December 10, 2018 EXPIRES: January 9, 2019

Public Notice ISSUED: December 10, 2018 EXPIRES: January 9, 2019 APPLICANT: REFER TO: St. Louis and Lake Counties Regional Rail Authority 2018-01942-ARC Public Notice ISSUED: December 10, 2018 EXPIRES: January 9, 2019 SECTION:404 - Clean Water Act 1. APPLICATION FOR

More information

Hydraulic Report. Trail 5 Snowmobile Trail Over Mulligan Creek. Prepared By: COLEMAN ENGINEERING COMPANY Karisa V. Falls, P.E.

Hydraulic Report. Trail 5 Snowmobile Trail Over Mulligan Creek. Prepared By: COLEMAN ENGINEERING COMPANY Karisa V. Falls, P.E. Prepared for: Prepared by: Marquette County Road Commission Coleman Engineering Company Marquette, Michigan Iron Mountain, MI December 2011 Hydraulic Report Trail 5 Snowmobile Trail Over Mulligan Creek

More information

CENTER PIVOT TRACK MANAGEMENT OPTIONS

CENTER PIVOT TRACK MANAGEMENT OPTIONS Proceedings of the 28th Annual Central Plains Irrigation Conference, Kearney, Nebraska, February 23-24, 2016 Available from CPIA, 760 N. Thompson, Colby, Kansas CENTER PIVOT TRACK MANAGEMENT OPTIONS Steven

More information

Miner & Silverstein Appraisal Company Division of Miner & Silverstein, LLP

Miner & Silverstein Appraisal Company Division of Miner & Silverstein, LLP Miner & Silverstein Appraisal Company Division of Miner & Silverstein, LLP Marina Market Analysis Upper Connecticut River Marina Market Study Winter 2005-2006 The following presents a winter 2005-06 market

More information

DEPARTMENT OF TRANSPORTATION FEDERAL AVIATION ADMINISTRATION TYPE CERTIFICATE DATA SHEET NO. 3A19

DEPARTMENT OF TRANSPORTATION FEDERAL AVIATION ADMINISTRATION TYPE CERTIFICATE DATA SHEET NO. 3A19 DEPARTMENT OF TRANSPORTATION FEDERAL AVIATION ADMINISTRATION TYPE CERTIFICATE DATA SHEET NO. 3A19 3A19 Revision 44 CESSNA 150 150J 150A 150K 150B A150K 150C 150L 150D A150L 150E 150M 150F A150M 150G 152

More information

January 25, House Select Committee on Strategic Transportation Planning and Long Term Funding Solutions

January 25, House Select Committee on Strategic Transportation Planning and Long Term Funding Solutions House Select Committee on Strategic Planning and Long Term Funding Solutions January 25, 2016 Sterling Baker, P.E. Multimodal Special Projects Engineer Key Items Ferry System Overview System wide Summary

More information

NC Dredge Studies NCBIWA Spring Conference April 23, 2018

NC Dredge Studies NCBIWA Spring Conference April 23, 2018 NC Dredge Studies Study of the Use and Efficiency of the Dredge Manteo Study of Acquisition of Dedicated Dredging Capacity Study of Dredging Services Cost-Benefit Analysis 2018 NCBIWA Spring Conference

More information

UDP COMMENT Building in the Park concept is not successful. Attempting to wrap the Park around the tower is not working.

UDP COMMENT Building in the Park concept is not successful. Attempting to wrap the Park around the tower is not working. GBLARCHITECTS Building in the Park concept is not successful. Attempting to wrap the Park around the tower is not working. 1.1 1 The building now has a base which defines the edge of the Park and is orthogonal

More information

False Creek Harbour Authority Fishermen s Wharf

False Creek Harbour Authority Fishermen s Wharf False Creek Harbour Authority Fishermen s Wharf 42 nd Annual Conference of Pacific Coast Congress of Harbormasters & Port Managers Vancouver, British Columbia Welcome PCC Members, Sustaining Members, Exhibitors,

More information