1 INNOVATIVE MARINE DESIGNS PND ENGINEERS, INC. January 14, 2016

2 PND Engineers, Inc. Founded in 1979 Headquartered in Anchorage, Alaska with offices in Juneau, Seattle, Houston and Vancouver, B.C. International experience includes: Russia, Kazakhstan, Iraq, Malaysia, Panama, Trinidad, Brazil, and Canada. PND specializes in: Marine/Coastal Engineering Civil Engineering Structural Engineering Geotechnical Engineering Construction Engineering Support Transportation Engineering Bridge Engineering

3 Services and Specialties Marinas Wave Barriers Boat Ramps Cruise Ship Terminals

4 Services and Specialties Container Terminals Offshore Islands LNG Terminals Petroleum Product Terminals

5 Presentation Outline PARTIALLY PENETRATING WAVE BARRIERS SPIN FIN PILES OPEN CELL DOCKS AND BULKHEADS

6 PARTIALLY PENETRATING WAVE BARRIERS

7 Partially Penetrating Wave Barriers Partially Penetrating Wave Barrier Schematic Blane Harbor, WA - Wave Barrier Vertical wave barrier that stops short of the seafloor. Typically applicable in moderate (5 to 10 ) wave environments Advantages: Reduced cost Reduced footprint Allows circulation and fish passage below barrier Can be combined with dock structures

8 Partially Penetrating Wave Barriers Skagway Harbor Skagway, AK With the wave barrier now in place we are able to protect our existing facility as well as all of the vessels the facility accommodates. The 5 wave action originally allowed through the entrance of the harbor has been reduced to barely a ripple Matt O Boyle Harbormaster 300 wave primary barrier with access trestle/promenade and 80 stem wall Designed for 5 significant wave height and transmitted wave height of less than 2 Construction Cost = $3.5MM

9 Partially Penetrating Wave Barriers Cape Disappointment Ilwaco, WA 250 wave barrier Designed to transmit < 1.0 wave under 50 year storm event Cantilever pipe piles with sheet pile wings

10 Partially Penetrating Wave Barriers Bell Street Pier, Seattle, WA Port of Astoria, OR - West Basin Breakwater

11 SPIN FIN PILES

12 SPIN FIN Pile Tips SPIN FIN piles are bearing piles that increase both compression and tensile capacity. Modified end bearing anchored with angled fins. Allows for pile installation in limited overburden, reduced pile lengths and within soft soils. Improved load-deformation characteristics

13 SPIN FIN Pile Testing

14 SPIN FIN Piles Construction Methods Driven using conventional impact and vibratory hammers, templates, and accessories. Driven in same manner as Non-SPIN FIN piles.

15 SPIN FIN Piles - Applications Oakland Bay Turning Basin Oakland, CA

16 SPIN FIN Piles - Applications Mooring Buoys

17 SPIN FIN Piles - Applications

18 Cruise Ship Facilities Nanaimo Cruise Ship Facility Nanaimo, BC, Canada Subconsultant to CH2M Hill PND design scope included: Transfer bridge with covered passenger walkway Concrete pontoon and pile foundation system Mooring and breasting dolphin piles Gangways SPIN FIN piles evaluated and selected to replace costly rock anchors. Construction completed in 2011.

19 Cruise Ship Facilities Nanaimo Cruise Ship Facility Nanaimo, BC, Canada

20 Cruise Ship Facilities Juneau Cruise Ship Dock Juneau, AK $53MM Construction contract Two new cruise ship berths 10 breasting/mooring dolphins, 3 mooring dolphins Two concrete pontoons (50 x400, 50 x300 ) Two approach docks and transfer bridges New 16 x200 concrete mooring float SPIN FIN piles used where practical to reduce the number of required rock anchors Currently under construction

21 Cruise Ship Facilities Juneau Cruise Ship Dock Juneau, AK Prime Contractor: Manson Construction Co. Contract awarded March 2014 Field construction began September 2015 Anticipated completion: May 2017

22 OPEN CELL DOCKS AND BULKHEADS

23 OPEN CELL Structural Stability OPEN CELL Patents: 6,715,964 B2 7,018,141 B2 7,488,140 B2 Patent Application No: 12/879,997 Comprised of vertically driven, interlocked flatweb sheet piles. Arc-shaped face acts as a horizontally tied tension membrane Face and tailwall sheets connect at a wye pile. Straight tailwalls serve as anchors. Similar to Mechanically Stabilized Embankment (MSE) and Closed Cellular Structures.

24 OPEN CELL System Components PND designs the OPEN CELL system using flat sheet pile and extruded connectors.

25 Design Flexibility Low sensitivity to scour Easy modifications Minimal embedment required Stable in large seismic events High load capacity Allows high wall heights Accommodates soft soil or shallow bedrock Fast-tracked design Speed/Ease of construction Decreased construction costs Cost savings Umm Qasr Pier, Umm Qasr Iraq

26 Structural Cost Comparison

27 OPEN CELL Structure Locations Over 210 OCSP structures constructed to date International projects and projects in design not shown

28 OPEN CELL Bulkheads & Docks Kloosterboer Marine Terminal Dutch Harbor, AK 96-foot sheet pile length, 32 cells Wall length: 1,040 feet 100-year design facility Created 3 acres of useable uplands Soft soils over shallow bedrock. Cost less than 50% of pile supported dock alternative Constructed in 2008

29 OPEN CELL Bulkheads & Docks UMC Terminal Dock Dutch Harbor, AK 52 feet tall, 660 feet long 24 cells Two rail-mounted gantry cranes are used to load container ships.

30 OPEN CELL Bulkheads & Docks UMC Terminal Dock Position III and IV Dutch Harbor, AK New 610-ft dock facility Replaces existing pile supported docks $50MM estimated total installed cost Includes uplands quarry development, utilities, gantry crane rail extension, concrete surfacing and port offices. Anticipated 2018 construction

31 OPEN CELL Bulkheads & Docks Kodiak Ferry Terminals Kodiak, AK Port Lions Ferry Terminal, AK Construction completed 2015 Ouzinkie Ferry Terminal, AK Construction completed 2012

32 OPEN CELL Bulkheads & Docks Nome Middle Dock Nome, AK Wall length: wall height Includes ramp for ro-ro barge access 1,000 PSF uniform live load criteria Extreme environmental conditions Constructed in 2015

33 OPEN CELL Bulkheads & Docks Waste Isolation Bulkheads Evaluated by the US Army Corps of Engineers Research and Development Center Environmental Laboratory (ERDC-EL). Found to be as effective as traditional Confined Disposal Facilities (CDF) for controlling environmental risk for confinement of containment dredge material.

34 OPEN CELL Bulkheads & Docks Waste Isolation Bulkhead Alameda, CA Former Alameda Naval Air Station Capped and contained contaminated soils Reduced cost by 60% over original plan 14 cells 12 feet tall, 720 feet long Galvanized face sheets for corrosion in San Francisco Bay.

35 OPEN CELL Bulkheads & Docks Permanent Canal Closures and Pumps (PCCP) New Orleans, LA Project to create pump station levees to protect New Orleans from flood events The deepest excavation project undertaken by USACE in the Gulf Region

36 QUESTIONS? Chip Courtright, P.E. Senior Engineer Phone: West 36 th Avenue Anchorage, Alaska Additional information available at:

OPEN CELL SHEET PILE TECHNOLOGY. Presentation to Alaska State Legislature, House Finance Committee

OPEN CELL SHEET PILE TECHNOLOGY. Presentation to Alaska State Legislature, House Finance Committee OPEN CELL SHEET PILE TECHNOLOGY Presentation to Alaska State Legislature, House Finance Committee OPEN CELL SHEET PILE Technology Retaining Wall System Patents Obtained by PND Engineers ARRC Dock, Seward,

More information

Manson Construction Co.

Manson Construction Co. Manson Construction Co. Since 1905 Frederick Paup, Chairman of the Board & Executive Vice President About Manson Established in 1905, Manson began as a small, family-owned Puget Sound marine pile driving

More information

CORPS OF ENGINEERS ALASKA DISTRICT Dredging Projects. Michael Tencza, PE Operations Project Manager November 4, 2015

CORPS OF ENGINEERS ALASKA DISTRICT Dredging Projects. Michael Tencza, PE Operations Project Manager November 4, 2015 CORPS OF ENGINEERS ALASKA DISTRICT 2016 Dredging Projects Michael Tencza, PE Operations Project Manager November 4, 2015 US Army Corps of Engineers Building and Preserving Alaska s Future AWARDED CONTRACTS

More information

New Orleans Municipal Yacht Harbor

New Orleans Municipal Yacht Harbor New Orleans Municipal Yacht Harbor 2018 Capital Projects Construction Updates MYH Floating Marina Community Sailing Center (Coordination with) MYH Boat Launch (MYHMC) MYH Administration Building (CPA &

More information

City of Fort Lauderdale. Frequently Asked Questions. Proposed Sea Wall Ordinance

City of Fort Lauderdale. Frequently Asked Questions. Proposed Sea Wall Ordinance City of Fort Lauderdale Frequently Asked Questions Proposed Sea Wall Ordinance The City of Fort Lauderdale is considering amending the Unified Land Development Regulations of the City of Fort Lauderdale

More information

Guide to Siting of Seawalls January 13, 2014 by Michael Walther, P.E., D.CE, President - Coastal Tech

Guide to Siting of Seawalls January 13, 2014 by Michael Walther, P.E., D.CE, President - Coastal Tech January 13, 2014 by Michael Walther, P.E., D.CE, President - Coastal Tech mwalther@coastaltechcorp.com Prepared for the Sea Turtle Conservancy http://www.conserveturtles.org/ Introduction Overview: This

More information

Port Everglades Master/Vision Plan Update

Port Everglades Master/Vision Plan Update Port Everglades Master/Vision Plan Update Environmental Stakeholder Meeting June 15, 2009 Discussion to Focus On: Updating the 2006 Port Everglades Master Plan Issues dealing with the Turning Notch Potential

More information

Port of Long Beach 2012 Capital Program Update. G.J. Cardamone, PE, FCMAA Director of Construction Management

Port of Long Beach 2012 Capital Program Update. G.J. Cardamone, PE, FCMAA Director of Construction Management Port of Long Beach 2012 Capital Program Update G.J. Cardamone, PE, FCMAA Director of Construction Management Who We Are 3,500 acres of land 4,600 acres of water 6 container terminals 66 Ship-to-Shore cranes

More information

COMMONWEALTH OF THE BAHAMAS MINISTRY OF PUBLIC WORKS & TRANSPORT NASSAU HARBOUR PORT IMPROVEMENT PROJECT. Nassau Harbour Port Improvement Project

COMMONWEALTH OF THE BAHAMAS MINISTRY OF PUBLIC WORKS & TRANSPORT NASSAU HARBOUR PORT IMPROVEMENT PROJECT. Nassau Harbour Port Improvement Project COMMONWEALTH OF THE BAHAMAS MINISTRY OF PUBLIC WORKS & TRANSPORT NASSAU HARBOUR PORT IMPROVEMENT PROJECT AUGUST 2009 OVERALL VIEW OF NASSAU HARBOUR AERIAL VIEW OF NASSAU HARBOUR PROJECT HISTORY 1960 s

More information

North Cruise Berth Projects PortMiami

North Cruise Berth Projects PortMiami North Cruise Berth Projects PortMiami AAPA 2017 Facilities Engineering Seminar Oct 24 26, 2017 Carlos J. Arboleda, PE Vice President Project Director Intermodal Ports 1 PortMiami The Cruise Capital of

More information

HARBOR INFRASTRUCTURE INVENTORIES Buffalo Harbor, New York

HARBOR INFRASTRUCTURE INVENTORIES Buffalo Harbor, New York HARBOR INFRASTRUCTURE INVENTORIES Buffalo Harbor, New York Harbor Location: Buffalo Harbor is located on the Eastern shore of Lake Erie in the City of Buffalo, NY. Authority: River & Harbor Acts of 1826,

More information

Pattullo Bridge Replacement Project

Pattullo Bridge Replacement Project Pattullo Bridge Overview This document will: Explain the challenges facing the Pattullo Bridge today Share how we propose moving forward translink.ca PAGE 1 History By Order of the Lieutenant Governor

More information

Jason J. Hull, P.E. Director of Engineering. Port Freeport 1100 Cherry Street Freeport, Texas

Jason J. Hull, P.E. Director of Engineering. Port Freeport 1100 Cherry Street Freeport, Texas Jason J. Hull, P.E. Director of Engineering Port Freeport 1100 Cherry Street Freeport, Texas 77541 979.233.2667 hull@portfreeport.com Port Freeport s History Feb. 1913 Corps Hopper Dredge Comstock sank

More information

Great Lakes Navigation System Buffalo District

Great Lakes Navigation System Buffalo District Great Lakes Navigation System Buffalo District Josh Feldmann U.S. Army Corps of Engineers Chief, Operations Branch 9 FEB 2016 US Army Corps of Engineers BUILDING STRONG Key FY16/17 Buffalo District O&M

More information

HARBOR INFRASTRUCTURE INVENTORIES Cleveland Harbor, OH

HARBOR INFRASTRUCTURE INVENTORIES Cleveland Harbor, OH HARBOR INFRASTRUCTURE INVENTORIES Cleveland Harbor, OH Harbor Location: Cleveland Harbor is located at the mouth of the Cuyahoga River on the southern shore of Lake Erie in the city of Cleveland, OH. Authority:

More information

CRUISE SHIP SHORE POWER PROSPECTS. Rich Pruitt, Associate Vice President Environmental Programs Royal Caribbean Cruises, Ltd.

CRUISE SHIP SHORE POWER PROSPECTS. Rich Pruitt, Associate Vice President Environmental Programs Royal Caribbean Cruises, Ltd. CRUISE SHIP SHORE POWER PROSPECTS Rich Pruitt, Associate Vice President Environmental Programs Royal Caribbean Cruises, Ltd. Shore Power Description Power is transmitted from an on-shore transformer to

More information

Aid to Local Ports FY19 Requests

Aid to Local Ports FY19 Requests City Accomack- Greenbackville Harbor Phase III Accomack-Quinby Harbor Bulkhead Cape Charles- Installation of 4 th breakwater Total Project Cost Amount Requested Proposed Allocation Carryover Request $260,000.00

More information

1. The scour elevation can normally be found on the bridge hydraulics sheet and in the Pile Data Table. True False

1. The scour elevation can normally be found on the bridge hydraulics sheet and in the Pile Data Table. True False Homework 1 1. The scour elevation can normally be found on the bridge hydraulics sheet and in the Pile Data Table. True False 2. The Required Nominal Bearing Resistance Resistance will normally be shown

More information

The project comprises the design of the following works:

The project comprises the design of the following works: An integrated approach to the design of the port and marina infrastructure of the island of Mykonos D. Avgoustinos, N. Panagopoulos, I. Sioris TRITON Consulting Engineers Ltd, 10 Makedonon Str., 11521

More information

HARBOR INFRASTRUCTURE INVENTORIES Erie Harbor, PA

HARBOR INFRASTRUCTURE INVENTORIES Erie Harbor, PA HARBOR INFRASTRUCTURE INVENTORIES Erie Harbor, PA Harbor Location: Erie Harbor is located on the southern shore of Lake Erie in the City of Erie, PA about 98 Miles southwest of Buffalo. Authority: River

More information

Marine Exchange of Alaska Port of Juneau Navigation Study

Marine Exchange of Alaska Port of Juneau Navigation Study Safe, Secure, Efficient and Environmentally Responsible Maritime Operations 1000 Harbor Way, Juneau, Alaska 99801 Ph: (907) 463-2607 December 10, 2008 Mr. John Stone Port Director City of Juneau 155 S.

More information

Project Update 3. Carpentaria Rail. Port Carpentaria Railway Project. Carpentaria Rail. 21 Second Ave, Mount Isa, Queensland, Australia, 4825

Project Update 3. Carpentaria Rail. Port Carpentaria Railway Project. Carpentaria Rail. 21 Second Ave, Mount Isa, Queensland, Australia, 4825 Project Update 3 Carpentaria Rail Port Carpentaria Railway Project Carpentaria Rail 21 Second Ave, Mount Isa, Queensland, Australia, 4825 Tel 0413178182 Port Carpentaria community consultation commenced

More information

MoorMaster, automated mooring for ports automation

MoorMaster, automated mooring for ports automation Click Cavotec to edit MoorMaster Master title style MoorMaster, automated mooring for ports automation AAPA Facilities Engineering Seminar and Expo 2015 Presented by: Mike Howie Group Product Manager,

More information

ALBERT LOH consultants. m a r i n e s p e c i a l i s t

ALBERT LOH consultants. m a r i n e s p e c i a l i s t ALBERT LOH consultants m a r i n e s p e c i a l i s t ALBERT LOH consultants m a r i n e s p e c i a l i s t Albert Loh Consultants has a long history as engineers and consultants on all aspects of works

More information

how it started where we are now what is coming up NEW WESTMINSTER WATERFRONT PARK THE RIVER THE PAST THE PEOPLE

how it started where we are now what is coming up NEW WESTMINSTER WATERFRONT PARK THE RIVER THE PAST THE PEOPLE how it started Downtown Waterfront Park How It Started March 2009 City of New Westminster Purchases 3.2 Hectare Westminster Pier Site March 2009 City of New Westminster and Design Team develop plan for

More information

Technical Design Manual

Technical Design Manual Technical Design Manual BPG.TDM.VS.03.02 - November 2015 For use in the determination, application and design of Blade Piles, Slip Joint Pile Caps, Piled Slab Systems, Lateral Bracing Piles and connections

More information

CBJ DOCKS AND HARBORS BOARD REGULAR MEETING AGENDA For Thursday, August 30th, I. Call to Order (7:00 p.m. at the CBJ Assembly Chambers.

CBJ DOCKS AND HARBORS BOARD REGULAR MEETING AGENDA For Thursday, August 30th, I. Call to Order (7:00 p.m. at the CBJ Assembly Chambers. CBJ DOCKS AND HARBORS BOARD REGULAR MEETING AGENDA For Thursday, August 30th, 2012 I. Call to Order (7:00 p.m. at the CBJ Assembly Chambers.) II. III. Roll (Greg Busch, John Bush, Tom Donek, Eric Kueffner,

More information

SHEET PILE WALLS A SPACE-SAVING AVALANCHE DEFENCE STRUCTURE

SHEET PILE WALLS A SPACE-SAVING AVALANCHE DEFENCE STRUCTURE SHEET PILE WALLS A SPACE-SAVING AVALANCHE DEFENCE STRUCTURE ÁRNI JÓNSSON, ORION Consulting Engineers * ERIK HESTNES, Norwegian Geotechnical Institute** ABSTRACT: Steel sheet piles, primarily used as retaining

More information

Floating Docks. Our unique capability is your solution

Floating Docks. Our unique capability is your solution Floating Docks Our unique capability is your solution Our Experience Your Infrastructure Every floating dock facility is the unique combination of the floating dock and the infrastructure it requires to

More information

Bigger, Deeper, Wider

Bigger, Deeper, Wider Bigger, Deeper, Wider About Port Freeport Government entity created by voters in 1925 Local sponsor for the Freeport Harbor Channel and engages with the U.S. Army Corps of Engineers Significant responsibilities

More information

Criteria for a Successful Shore Power Project

Criteria for a Successful Shore Power Project Criteria for a Successful Shore Power Project Availability of an adequate supply of electricity at a reasonable cost. Frequency of calls by cruise vessels equipped to connect to Shore Power. Availability

More information

Riverine Sand Mining/Scofield Island Restoration (BA-40)

Riverine Sand Mining/Scofield Island Restoration (BA-40) Riverine Sand Mining/Scofield Island Restoration (BA-40) Conference on Ecological and Ecosystem Restoration Kenneth Bahlinger, CPRA Project Manager July 31, 2014 committed to our coast committed to our

More information

THE PLANNING AND DESIGN OF PORT IMPROVEMENTS: Community Meeting #2

THE PLANNING AND DESIGN OF PORT IMPROVEMENTS: Community Meeting #2 THE PLNNING ND DESIGN OF PORT IMPROVEMENTS: Community Meeting #2 The City of Ketchikan September 14, 2016 OPEN HOUSE OVERVIEW Discuss the global and regional cruise market conditions and implications for

More information

Erhama bin Jaber Al Jalahma Shipyard

Erhama bin Jaber Al Jalahma Shipyard client Nakilat Erhama bin Jaber Al Jalahma Shipyard Introduction The North Field, located in the State of Qatar s territorial waters, is the one of the world s largest natural gas fields, with reserves

More information

NC Dredge Studies NCBIWA Spring Conference April 23, 2018

NC Dredge Studies NCBIWA Spring Conference April 23, 2018 NC Dredge Studies Study of the Use and Efficiency of the Dredge Manteo Study of Acquisition of Dedicated Dredging Capacity Study of Dredging Services Cost-Benefit Analysis 2018 NCBIWA Spring Conference

More information

The "M.V. Fintry Queen" Executive Summary - Business Plan 2017

The M.V. Fintry Queen Executive Summary - Business Plan 2017 The "M.V. Fintry Queen" Okanagan Lake Boat Company Inc. www.fintryqueen.ca For information purposes only: DRAFT Jan 2017 Executive Summary - Business Plan 2017 The M.V. Fintry Queen is a 325 passenger

More information

Roberts Bank Terminal 2 Project

Roberts Bank Terminal 2 Project SEPTEMBER 2013 Roberts Bank Terminal 2 Project The Roberts Bank Terminal 2 Project is a proposed new three-berth container terminal in Delta, B.C. that would provide 2.4 million TEUs (twenty-foot equivalent

More information

1. USACE Response to Sandy Ports 2. NAVFAC Response to Sandy - Base 3. USSOUTHCOM/NAVFAC Response in HaiC Port Au Prince Port

1. USACE Response to Sandy Ports 2. NAVFAC Response to Sandy - Base 3. USSOUTHCOM/NAVFAC Response in HaiC Port Au Prince Port 1. USACE Response to Sandy Ports 2. NAVFAC Response to Sandy - Base 3. USSOUTHCOM/NAVFAC Response in HaiC Port Au Prince Port Marcelo Salles, USACE LNO to USSOUTHCOM (With help from USACE NY District,

More information

the foss seattle shipyard helping you succeed in a competitive market

the foss seattle shipyard helping you succeed in a competitive market the foss seattle shipyard helping you succeed in a competitive market the foss shipyard advantage When you decide to invest in your fleet, you can count on Foss s proven track record to get the job done

More information

LRTP Ref. Type of Work. Detailed Project Description. Cruise Terminal H Improvements C-6 $13,050 $13,050

LRTP Ref. Type of Work. Detailed Project Description. Cruise Terminal H Improvements C-6 $13,050 $13,050 (All s are located at the Seaport, unless otherwise noted) Facility/ Name Detailed Description SP20000000 01 Cruise Terminal H Improv. Cruise Terminal H Improvements $13,050 $13,050 2016 Upgrade Terminal

More information

Port of Durban. Entrance Channel Widening & Deepening Project Completion Function. 31 March 2010

Port of Durban. Entrance Channel Widening & Deepening Project Completion Function. 31 March 2010 Port of Durban Entrance Channel Widening & Deepening Project Completion Function 31 March 2010 Presented by: Theunis Steenkamp Project Director Natcor 1 The saying goes.. THE JOB IS NOT OVER UNTILL THE

More information

Port Everglades 2014 Master/Vision Plan Update

Port Everglades 2014 Master/Vision Plan Update 1 Port Everglades 2014 Master/Vision Plan Update Public Meeting May 28, 2014 2 Agenda Port Everglades Mission Project Background 2014 Master/Vision Plan Update Process Status of 2009 5-Year Master Plan

More information

Panama Canal Stakeholder Working Group Meeting

Panama Canal Stakeholder Working Group Meeting Panama Canal Stakeholder Working Group Meeting POHA, Bayport Container Terminal, Houston, Texas August 27, 2012 TOTAL ECONOMIC IMPACT 9,749 Texas jobs are in some way related to the Port Of the 9,749

More information

NC Dredge Studies. Sterling Baker, P.E. NCDOT James Gregson NCDEQ April 5, 2018

NC Dredge Studies. Sterling Baker, P.E. NCDOT James Gregson NCDEQ April 5, 2018 NC Dredge Studies Study of the Use and Efficiency of the Dredge Manteo Study of Acquisition of Dedicated Dredging Capacity Study of Dredging Services Cost-Benefit Analysis Sterling Baker, P.E. NCDOT James

More information

TENTATIVE SCHEDULE

TENTATIVE SCHEDULE TENTATIVE SCHEDULE 20-2015 Facility Dredge Depth (- ft MLLW) 20 Spring Early Summer 20/2012 2012/2013 HWRP/ HWRP/ HWRP/ SFDODS SF- MWP Upland SFDODS SF- MWP upland SFDODS SF- MWP upland SFDODS SF- 2013/2014

More information

Gina Dickerson Senior Project Manager, Point Thomson ExxonMobil

Gina Dickerson Senior Project Manager, Point Thomson ExxonMobil Gina Dickerson Senior Project Manager, Point Thomson ExxonMobil Gina Dickerson Meet Alaska January 2014 Point Thomson Project Update Alaska North Slope (ANS) Point Thomson Kuparuk Prudhoe Bay Badami Oil

More information

Virgin Islands Port Authority Marine Tariff Rate Amendments August 30, 2017 Public Hearing

Virgin Islands Port Authority Marine Tariff Rate Amendments August 30, 2017 Public Hearing Virgin Islands Port Authority Marine Tariff Rate Amendments August 30, 2017 Public Hearing V I R G I N I S L A N D S P O R T A U T H O R I T Y S T. C R O I X S T. T H O M A S S T. J O H N U N I T E D S

More information

80' MIN 100'-0" 15'-0" 2 FEDERALLY DREDGED NAVIGATION CHANNEL MEASURED AT EL -10' (NOTE 4) NAVIGATION CHANNEL EXISTING YACHT CLUB FLOATS

80' MIN 100'-0 15'-0 2 FEDERALLY DREDGED NAVIGATION CHANNEL MEASURED AT EL -10' (NOTE 4) NAVIGATION CHANNEL EXISTING YACHT CLUB FLOATS 11 3 1 6 9 4 5 4 8 7 7 9 ' MUDLINE ELEVATION 8 1 6 11 6 1 7 8 5 7 7 12 11 5 12 7 8 9 5 11 8 REVISED FEDERAL LIMIT FOR DREDGING FEDERAL LIMIT FOR DREDGING 12 1 11 7 1 4 8 5 8 5 14 4 14 3 9 3 8 5 1 5 11

More information

Port Handbook SANSOUCI PUERTO SANTO DOMINGO

Port Handbook SANSOUCI PUERTO SANTO DOMINGO TITLE: Port Handbook ENGLISH VERSION Page 1 of 14 Port Handbook SANSOUCI PUERTO SANTO DOMINGO Latitude: 18 28.000 N LONG 069 53.000 W World Port Index No: 11040. D.R Chart: 25449 B.A Chart: 467 D.M.A Chart:

More information

Developments in berth layout

Developments in berth layout Developments in berth layout Recent examples in the Port of Rotterdam Willem Hoebée 9th International Harbour Masters Congress Bruges - Ghent, Belgium 26th - 30th May 2014 1 Agenda Introduction Components

More information

Port of Kalama, New Approach to Maintenance Dredging

Port of Kalama, New Approach to Maintenance Dredging Port of Kalama, New Approach to Maintenance Dredging Vladimir Shepsis, Coast @ Harbor Engineering, Inc. John Dawson, Coast @ Harbor Engineering, Inc. Mark Wilson, Port of Kalama Tabitha Reeder, Port of

More information

Waterways Council November 10, 2017

Waterways Council November 10, 2017 Waterways Council November 10, 2017 MULTI-PURPOSE LANDLORD PORT The Port of New Orleans generates its own revenues as a multipurpose landlord port. Cargo 69%; cruise 21%; real estate 10% Diversity increases

More information

Crossing the Keweenaw Waterway in an Emergency with a U.S Army Floating Bridge

Crossing the Keweenaw Waterway in an Emergency with a U.S Army Floating Bridge Crossing the Keweenaw Waterway in an Emergency with a U.S Army Floating Bridge Photo: John Kiefer William Leder, Adjunct Professor (Ret.) Department of Civil and Environmental Engineering Contributions

More information

Presented to: City of Petaluma City Council

Presented to: City of Petaluma City Council Agenda Item #1.A REVISED Presented to: City of Petaluma City Council Presented By: Dan St. John, F.ASCE, Director Jason Beatty, P.E., Senior Engineer James 'Jody' Boyette, USACE Project Manager November

More information

Comparison Study between Vault Seismometers and a New Posthole Seismometer

Comparison Study between Vault Seismometers and a New Posthole Seismometer Comparison Study between Vault Seismometers and a New Posthole Seismometer Presented in Salt Lake City, Utah at the Seismological Society of America s Annual Meeting, April 2013 250 Herzberg Road, Kanata,

More information

Renewable energy activities and new jobs in ports. Athanasios Vatistas EcoWindWater Ltd. GREECE

Renewable energy activities and new jobs in ports. Athanasios Vatistas EcoWindWater Ltd. GREECE Renewable energy activities and new jobs in ports Athanasios Vatistas EcoWindWater Ltd. GREECE Outlines Introduction Cold ironing systems Shipyards in Green constructions Practical applications Use of

More information

Port Everglades Master/Vision Plan Update

Port Everglades Master/Vision Plan Update 1 Port Everglades Master/Vision Plan Update 3 rd Tenant & Stakeholder Meeting November 21, 2013 2 Agenda Project Process Overview Summary of the Market Assessments October 30 th Charrette Summary Industry

More information

Small Boat Harbor Update UAA Science-to-Engineering Workshop January 8, 2004

Small Boat Harbor Update UAA Science-to-Engineering Workshop January 8, 2004 Small Boat Harbor Update UAA Science-to-Engineering Workshop January 8, 2004 CONSTRUCTION GENERAL CONSTRUCTION GENERAL S NOME HARBOR ST PAUL HARBOR ST GEORGE HARBOR CHIGNIK HARBOR SEWARD HARBOR EXPANSION

More information

PortMiami Director and CEO Juan M. Kuryla PUBLIC-PRIVATE PARTNERSHIPS (P3)

PortMiami Director and CEO Juan M. Kuryla PUBLIC-PRIVATE PARTNERSHIPS (P3) PortMiami Director and CEO Juan M. Kuryla PUBLIC-PRIVATE PARTNERSHIPS (P3) PORTMIAMI QUICK FACTS PortMiami is located in Miami-Dade County, one of the most diverse, multilingual populations in the U.S.

More information

2- Pilotage Cost Tonnage. 1- Pilotage Cost Tonnage. Currency

2- Pilotage Cost Tonnage. 1- Pilotage Cost Tonnage. Currency 2- Pilotage Cost Tonnage 3* 4* Currency Harbor Pilot in the Port area And Docks (Egyptian 45 30 Until 999 60 40 1000-4999 90 60 5000-9999 112.5 75 10000-19999 217.5 145 20000-29999 322.5 215 30000-39999

More information

Santa Cruz Wharf Improvement Project. Briefing Paper. Prepared by City of Santa Cruz. for

Santa Cruz Wharf Improvement Project. Briefing Paper. Prepared by City of Santa Cruz. for Santa Cruz Wharf Improvement Project Briefing Paper Prepared by City of Santa Cruz for U.S. Army Corps of Engineers Interagency Meeting 12 November 2014 Santa Cruz Wharf Improvement Project Constructed

More information

Harbor Holdings - Seward

Harbor Holdings - Seward Blood Bank of Alaska AIDEA provided funding to complete construction of the Blood Bank of Alaska s new state of the art facility in Anchorage. The 57,000 square foot laboratory and collection facility

More information

SRT system stabilizes levee at power plant

SRT system stabilizes levee at power plant SRT system stabilizes levee at power plant M.E. Smith, Ph.D., P.E. Geopier SRT, Reno, Nevada USA Y. Prashar, P.E., G.E. Geopier SRT, Danville, California USA R.D. Short, P.E.. G.E. Geopier SRT, Danville,

More information

Board of Trustees of the Galveston Wharves June 23, 2008 Meeting

Board of Trustees of the Galveston Wharves June 23, 2008 Meeting Port E-News July 2, 2008 Board of Trustees of the Galveston Wharves June 23, 2008 Meeting Cristina Galego Public Relations Department Port of Galveston PH: 409.766.6119 May 2008 Financial Results: Regular

More information

HARBOR INFRASTRUCTURE INVENTORIES Duluth-Superior Harbor, Minnesota/Wisconsin

HARBOR INFRASTRUCTURE INVENTORIES Duluth-Superior Harbor, Minnesota/Wisconsin HARBOR INFRASTRUCTURE INVENTORIES Duluth-Superior Harbor, Minnesota/Wisconsin Harbor Location: Duluth-Superior Harbor is located at the westernmost tip of Lake Superior. Authority: River & Harbor Act of

More information

SUMMARY OF THE MEETING OF THE WOODS HOLE, MARTHA S VINEYARD AND NANTUCKET STEAMSHIP AUTHORITY. September 25, 2018

SUMMARY OF THE MEETING OF THE WOODS HOLE, MARTHA S VINEYARD AND NANTUCKET STEAMSHIP AUTHORITY. September 25, 2018 SUMMARY OF THE MEETING OF THE WOODS HOLE, MARTHA S VINEYARD AND NANTUCKET STEAMSHIP AUTHORITY September 25, 2018 The members of the Woods Hole, Martha s Vineyard and Nantucket Steamship Authority ( SSA

More information

CURRENT PORT CHARGES AND TARIFFS FROM 01/01/2016 TO

CURRENT PORT CHARGES AND TARIFFS FROM 01/01/2016 TO Ministry of Public Works and Transport STATE-OWNED PORTS PORT AUTHORITY OF CARTAGENA CURRENT PORT CHARGES AND TARIFFS FROM 01/01/2016 TO This is an unofficial document. Official port charges and tariffs

More information

Port Everglades Master Plan Update Tenant Workshop. July 12, Port Everglades Master Plan Update 2006

Port Everglades Master Plan Update Tenant Workshop. July 12, Port Everglades Master Plan Update 2006 Tenant Workshop July 12, 2007 1 Original 2026 Year Vision Plan DYNEGY PROPERTY SHARED AIRPORT/SUPPORT FACILITY 12 12 2 Input from Tenants Northport Convention Center carve out Expanded cruise berth at

More information

Geotechnics. Curriculum Vita MARINE WORK RELATED PROJECTS.

Geotechnics. Curriculum Vita MARINE WORK RELATED PROJECTS. Geotechnics Curriculum Vita MARINE WORK RELATED PROJECTS Who We Are Geotechnics is a group of engineering consultants specialized in combined Geotechnical, Structural and Marine Projects. Mission Our design

More information

GALVESTON DISTRICT Dredging Schedules

GALVESTON DISTRICT Dredging Schedules GALVESTON DISTRICT Dredging Schedules Christopher Frabotta Chief, Navigation Branch Southwestern Division - Galveston District November 2, 2016 Galveston District Dredging Meeting Custodians of the Texas

More information

INDEX NAVIGATION SUPPORT RATE (T0) 3 VESSEL RATE (T1) 4 1. ZONE I: SHORT STAY BERTHING 4 2. ZONE I: PROLONGED STAY BERTHING 5

INDEX NAVIGATION SUPPORT RATE (T0) 3 VESSEL RATE (T1) 4 1. ZONE I: SHORT STAY BERTHING 4 2. ZONE I: PROLONGED STAY BERTHING 5 Port s & fees 2016 Summary of s applicable by the Port of Algeciras Bay Authority at facilities for purposes, for maritime signalling and fees for electricity and water supply, occupation of surface area,

More information

Port of Los Angeles IAPH Green Port Survey

Port of Los Angeles IAPH Green Port Survey Port of Los Angeles IAPH Green Port Survey Geraldine Knatz, Ph.D. Executive Director Port of Los Angeles American Association of Port Authorities Harbors, Navigation and Environment Seminars Vancouver,

More information

Staff Report. Re: National Park Service Ferry Landing Facilities at Piers 31, 31½ and 33 Joint Meeting with BCDC Design Review Board

Staff Report. Re: National Park Service Ferry Landing Facilities at Piers 31, 31½ and 33 Joint Meeting with BCDC Design Review Board Port of San Francisco Waterfront Design Advisory Committee Agenda Item No. 1 Meeting Date: Staff Report To: From: Waterfront Design Advisory Committee: Laura Crescimano Jeff Joslin Marsha Maytum Kathrin

More information

Permeable RECREATIONAL TRAILS

Permeable RECREATIONAL TRAILS SMART EARTH SOLUTIONS Permeable RECREATIONAL TRAILS GEOWEB GEOPAVE GEOTERRA Innovative Solutions for Designing & Building Trails. Trail Surface Stabilization The key to planning and building trails into

More information

Port Everglades Overview

Port Everglades Overview Port Everglades Overview Broward County Charter Review Infrastructure Subcommittee June 7, 2017 Steven M. Cernak, P.E., PPM Chief Executive & Port Director Jurisdictional Area Located in the cities of:

More information

Rockfall Protection SAMPHIRE HOE IN DOVER, GB

Rockfall Protection SAMPHIRE HOE IN DOVER, GB Rockfall Protection SAMPHIRE HOE IN DOVER, GB SAMPHIRE HOE IN DOVER Rockfall Protection Project Place Country/Region Samphire Hoe in Dover Kent United Kingdom Year of installation 2015 Customer Engineering

More information

Forth Ports Limited. Ruling Depths & Under Keel Clearances

Forth Ports Limited. Ruling Depths & Under Keel Clearances Forth Ports Limited - Forth Vessels are scheduled into / out of ports on the Forth & Tay in accordance with the under keel clearance criteria specified in this section of the Marine Guidelines & Port Information.

More information

Carnival Spirit (SP)

Carnival Spirit (SP) Carnival Spirit (SP) Carnival Spirit sails from Sydney, Australia and Singapore. Cruise departures through December 2020 are open for sale and are booked through Carnival Australia. Itineraries listed

More information

Zoom Out Zoom In I D E A S I N T O R E A L I T Y

Zoom Out Zoom In I D E A S I N T O R E A L I T Y Zoom Out IDEAS INTO REALIT Y Zoom In BergerABAM BergerABAM is a leader in the analysis, evaluation, underwater and above-water inspection, repair, upgrade, and design of waterfront and marine facilities

More information

ASTM E 1886 and ASTM E 1996 TEST REPORT. Report No.: A Rendered to: CORAL ARCHITECTURAL PRODUCTS Tuscaloosa, Alabama

ASTM E 1886 and ASTM E 1996 TEST REPORT. Report No.: A Rendered to: CORAL ARCHITECTURAL PRODUCTS Tuscaloosa, Alabama Architectural Testing ASTM E 1886 and ASTM E 1996 TEST REPORT Report No.: A2651.02 401 44 Rendered to: CORAL ARCHITECTURAL PRODUCTS Tuscaloosa, Alabama PRODUCT TYPE: 90 Corner Curtain Wall SERIES/MODEL:

More information

1 Terminal Street and 5 Terminal Street South Boston, MA Latitude Longitude Address. Site Size

1 Terminal Street and 5 Terminal Street South Boston, MA Latitude Longitude Address. Site Size Massachusetts Clean Energy Center Massachusetts Offshore Wind Ports & Infrastructure Assessment Parcel C-1 and C-2, Raymond L. Flynn Marine Park, South Boston, MA Address 1 Terminal Street and 5 Terminal

More information

CLIPPER COVE PROMENADE & MARINA DEVELOPMENT

CLIPPER COVE PROMENADE & MARINA DEVELOPMENT CLIPPER COVE PROMENADE & MARINA DEVELOPMENT Treasure Island / Yerba Buena Island Citizen Advisory Board Review May 05 2015 CLIPPER COVE PROMENADE & MARINA DEVELOPMENT TREASURE ISLAND TI YBI CAB Review

More information

Jack-Up Barge THE CLIMBING DUTCHMAN THE INDEPENDENT MAGAZINE FOR PROFESSIONALS IN THE ONSHORE AND OFFSHORE OIL AND GAS INDUSTRY volume 2 ISSUE 4

Jack-Up Barge THE CLIMBING DUTCHMAN THE INDEPENDENT MAGAZINE FOR PROFESSIONALS IN THE ONSHORE AND OFFSHORE OIL AND GAS INDUSTRY volume 2 ISSUE 4 THE INDEPENDENT MAGAZINE FOR PROFESSIONALS IN THE ONSHORE AND OFFSHORE OIL AND GAS INDUSTRY 2009 volume 2 ISSUE 4 Jack-Up Barge THE CLIMBING DUTCHMAN Jack-Up Barge B.V. Krausstraat 14-16 NL-3364 AD Sliedrecht

More information

PULTRUDED FRP INDUCED DRAFT COUNTERFLOW COOLING TOWERS

PULTRUDED FRP INDUCED DRAFT COUNTERFLOW COOLING TOWERS Series CF3 PULTRUDED FRP INDUCED DRAFT COUNTERFLOW COOLING TOWERS CF3 12-Dec-2017 PAHARPUR SERIES CF3 FIBREGLASS COUNTERFLOW COOLING TOWER Paharpur's series CF3 induced draft cooling tower represents the

More information

British Virgin Islands

British Virgin Islands www.smithsgore.com Beef Island Guest House & De Loose Mongoose Bar & Restaurant Smiths Gore Overseas Ltd Britannic Hall PO Box 135 Road Town Tortola t (284) 494 2446 f (284) 494 2141 info@smithsgore.com

More information

Ohio Freight Conference Great Lakes Commercial Navigation

Ohio Freight Conference Great Lakes Commercial Navigation Ohio Freight Conference Great Lakes Commercial Navigation Roger E. Haberly Regional Economist Buffalo New York 13 September 2013 US Army Corps of Engineers Presentation Overview 1. GL Physical System Description

More information

Alexandria Port, Egypt

Alexandria Port, Egypt Alexandria Port, Egypt Source: This information has been extracted from the WFP Logistics Capacity Assessment for Egypt. This LCA is a work in progress and not all sections are complete. This material

More information

The Galveston Seawall

The Galveston Seawall Coastal and Ocean Engineering ENGI.8751 Undergraduate Student Forum Faculty of Engineering and Applied Science, Memorial University, St. John s, NL, Canada. March, 2013 The Galveston Seawall Mark Harvey

More information

MEMORANDUM. June 7, 2007

MEMORANDUM. June 7, 2007 MEMORANDUM June 7, 2007 TO: FROM: SUBJECT: MEMBERS, PORT COMMISSION Hon. Ann Lazarus, President Hon. Kimberly Brandon, Vice President Hon. Rodney Fong Hon. Michael Hardeman Hon. Stephanie Shakofsky Monique

More information

Lecture 12. Layout & Securing

Lecture 12. Layout & Securing Lecture 12 Layout & Securing LAYOUT & SECURING LECTURE STRUCTURE Section 1 Section 2 Section 3 Ship Layout Demolition Container Securing SHIP LAYOUT FULLY CELLULAR Details Total 13,344 TEU 800 Reefer points

More information

State of the Waterway 2017

State of the Waterway 2017 State of the Waterway 2017 Steven W. Nerheim Director VTS Houston/Galveston Lone Star Harbor Safety Committee 2 FEBRUARY 2018 U.S. Port Rankings 2015 1 South Louisiana, LA, Port of 259.1-3.07% 15 Texas

More information

FOR SALE Joyner Marina 401 Marina Street Carolina Beach, NC Contact Kelvin Dumas, CCIM OFFER REALTY (919)

FOR SALE Joyner Marina 401 Marina Street Carolina Beach, NC Contact Kelvin Dumas, CCIM OFFER REALTY (919) FOR SALE Joyner Marina 401 Marina Street Carolina Beach, NC 28428 Contact Kelvin Dumas, CCIM OFFER REALTY (919) 832-1572 PROPERTY OVERVIEW ± 5.58 acres ; ± 1.5 Acres of uplands; ± 4.08 Acres of submerged

More information

WAIMAKARIRI DISTRICT COUNCIL REPORT. Craig Sargison, Manager Community and Recreation

WAIMAKARIRI DISTRICT COUNCIL REPORT. Craig Sargison, Manager Community and Recreation WAIMAKARIRI DISTRICT COUNCIL REPORT FILE NO: GOV-26-01-07, CPR-04-04-01 / 150609090834 REPORT TO: Kaiapoi Community Board DATE OF MEETING: 15 June 2015 FROM: SUBJECT: Craig Sargison, Manager Community

More information

Required Navigation Performance at Alaska Airlines

Required Navigation Performance at Alaska Airlines Required Navigation Performance at Alaska Airlines Sarah Dalton Director, Airspace and Technology Kotzebue Nome Barrow Prudhoe Bay Adak Bethel Dillingham Dutch King Salmon Fairbanks Anchorage Cordova Harbor

More information

Buffalo District Navigation Program Overview

Buffalo District Navigation Program Overview Buffalo District Navigation Program Overview 16 FEB 2011 US Army Corps of Engineers Buffalo District Area of Operations Our Facilities District Headquarters 2 Area Offices 3 Regulatory Field Offices Lake

More information

P3 & Design-Build. 101 st Annual THE Conference February 25 th, Speaker: Andrew Gensch, P.E.

P3 & Design-Build. 101 st Annual THE Conference February 25 th, Speaker: Andrew Gensch, P.E. P3 & Design-Build 101 st Annual THE Conference February 25 th, 2015 Speaker: Andrew Gensch, P.E. Presentation Outline Ohio River Bridges Project Overall Discussion Downtown Crossing and East End Locations

More information

LINUS. Vineyard Poles. LINUS Vineyard Poles quality wins. voestalpine Präzisionsprofil GmbH

LINUS. Vineyard Poles. LINUS Vineyard Poles quality wins. voestalpine Präzisionsprofil GmbH LINUS Vineyard Poles LINUS Vineyard Poles quality wins voestalpine Präzisionsprofil GmbH www.vineyardpoles.com Precisely planted rows are not just a sign of a well managed vineyard; they also present an

More information

Waterfront Plan Working Group Meeting Maritime & Water-Dependent Uses Meeting Agenda

Waterfront Plan Working Group Meeting Maritime & Water-Dependent Uses Meeting Agenda Waterfront Plan Working Group Meeting Maritime & Water-Dependent Uses Meeting Agenda Overview of Port Maritime & Water-Dependent Uses Summary of Maritime Planning and Policies Q&A and Discussion of Operational

More information

Southeast Alaska by the Numbers 2016

Southeast Alaska by the Numbers 2016 Rain Coast Data SOUTHEAST CONFERENCE S Annual Economic Report to the Region Southeast Alaska by the Numbers 2016 Yakutat MAP OF SOUTHEAST ALASKA Southeast Alaska & AMHS FERRY ROUTE Klukwan 1,000+ Islands

More information

Mr. Michael Malone CPS Energy 145 Navarro Street San Antonio, Texas Project No

Mr. Michael Malone CPS Energy 145 Navarro Street San Antonio, Texas Project No January 15, 2016 Mr. Michael Malone 145 Navarro Street San Antonio, Texas 78205 Project No. 0328985 Environmental Resources Management CityCentre Four 840 West Sam Houston Pkwy N. Suite 600 Houston, Texas

More information