Port of Durban. Entrance Channel Widening & Deepening Project Completion Function. 31 March 2010

Size: px
Start display at page:

Download "Port of Durban. Entrance Channel Widening & Deepening Project Completion Function. 31 March 2010"

Transcription

1 Port of Durban Entrance Channel Widening & Deepening Project Completion Function 31 March 2010 Presented by: Theunis Steenkamp Project Director Natcor 1

2 The saying goes.. THE JOB IS NOT OVER UNTILL THE FAT LADY SINGS 2

3 The (Fat) Lady arrived on 23 March.. 3

4 The Lady arrived on 23 March.. The Fat Lady has sung 4

5 The Lady arrived on 23 March.. So I guess the job is complete. 5

6 CONTENTS 1 2 Historical Background Reasons for Widening 3 Design Considerations 4 5 Project Team 6 7 Project Statistics 8 9 Repairs: South Bank Access Road Dredging Revetments Pre-Cast Operations & Rock Storage Temporary Sand Supply 18 Project Elements Contract Particulars Detailed Scope Demolition North Bank & North Groyne South Breakwater Old Sub-Aqueous Tunnel Removal Aids to Navigation 6

7 HISTORICAL BACKGROUND

8 HISTORICAL BACKGROUND 8

9 HISTORICAL BACKGROUND 9

10 MAIN PROJECT OBJECTIVES - SAFETY Primary Objective : Safe Navigation Channel Grounding Incidents Number Year 10

11 MAIN PROJECT OBJECTIVES INCREASE CAPACITY Improve the safety of navigation for ships currently using the channel Provide for future generation of ships Design ships : 6600 TEU L = 347m, B= 42.8m, Dr = 14m (Post Panamax) 99% availability 9200 TEU L = 350m B = 45.6m, Dr = 14.5m (Super Post Panamax) 95% availability 11

12 DESIGN CONSIDERATIONS Sand ingress control Wave energy penetration control Life cycle cost Environmental compliance Constructability Allowance for traffic during construction Protection and rerouting of services 12

13 PROJECT SAFETY RECORD Total manhours worked 6.5 million 1 million injury free hours achieved in Jul 2009 Project ended on approx injury free hours Project now 6-months without any incidents 13

14 PROJECT ELEMENTS Elements completed prior to DHEW Project Caissons removed Municipality constructed new services tunnel Elements completed as part of DHEW Project Removal of redundant services tunnel Strengthening of south breakwater Demolition of buildings on north bank Demolition of structures on north bank Demolition of existing north breakwater Construction of new north groyne Construction of new north bank revetment Provision of aids to navigation (temporary and permanent) Undertaking dry excavation and dredging Maintenance of shipping movements Provision of a temporary sand bypassing facility 14

15 PROJECT TEAM Employer Transnet Capital Projects, acting on behalf of Transnet National Ports Authority EPCM Contractor HMG Joint Venture : Hatch (Pty) Ltd, Mott MacDonald, Goba (Pty) Ltd PRDW (Design of Entrance Works and involvement in construction supervision with HMG JV) Main Contractor (Entrance Widening Contract) Dredging International / Group 5 Consortium Primary Subcontractor Subtech T&T Marine Holcim Batch plants and concrete 15

16 ENTRANCE WIDENING CONTRACT PARTICULARS Overall Project Current Total Forecast Final Cost : Approx. R 2.85 billion (excluding new Sand Bypass Scheme) Budget : R billion Entrance Widening and Deepening Form of Contract NEC 3 ECC Contract Option B, Priced Bill of Quantities Entrance Widening Contract Details Main Contract Value : Approx. R 2.23 billion Contract Duration : 150 weeks (Entrance Widening component only) Completion due March 2010 Actual Completion end-february

17 PROJECT STATISTICS North Breakwater and Revetment Breakdown & rebuild m 3 Buildings demolished 12 buildings 20t dolosse fabrication 550 units 5t cubes fabrication units 10t cubes fabrication units South Breakwater Breakdown and refurbish m 3 30t Antifer cubes fabrication units 45t Antifer cubes fabrication units Dredging Total dredged quantity m 3 Main channel m 3 New North Groyne m 3 South Breakwater m 3 Sand Trap m 3 Sub Aqueous Tunnel m 3 17

18 DETAILED SCOPE North Side Demolition of existing buildings Removal of the old services tunnel Removal of existing Quay and Jetty structures Excavation of ±140m behind the structures Removal of existing breakwater Construct new breakwater using demolished/graded/sorted materials and imported quarry rock South Side Raising height of existing breakwater by 2m Increasing the cap width from 9,5m to 11,5m to accommodate construction/maintenance crane Reinforcing sea side with 30t & 45t Antifers Reinforcing and shaping the lee side 18

19 DETAILED SCOPE Dredging Dredge to new depth in inner channel, main channel and outer channel Dredge to expose toe of South Breakwater Dredge footprint of New North Groyne Dredge to expose old sub-aqueous tunnel Sand Trap dredging Continued supply of sand to beaches Channel bottom width increased to approx 220 m Navigation Aids New Breakwater Lights to North Groyne and South Breakwater New 205 deg Marker Temporary and Permanent PEL Light Towers and optics Fairway buoys Old Sub Aqueous Tunnel Removal of old Sub Aqueous Services Tunnel (possible world first) 19

20 REPAIRS TO SOUTH BREAKWATER ACCESS ROAD Storm and resulting damage March 2007 View of South Breakwater Access Road required to be re-constructed following storm damage in March

21 DEMOLITIONS OCTOBER

22 DEMOLITIONS 22

23 DREDGING OVERVIEW 23

24 DREDGING TSHD MARIEKE TSHD dredger Marieke was mobilised and arrived on site in June 2007 Built in 2006 stateof-art vessel Hopper capacity 5,600 m 3 Used to dredge the bulk of the 5,000,000 m 3 in the main channel 24

25 DREDGING UNEXPLODED ORDINANCE Approximate line of new revetment Unexploded ordinance recovered in the drag-head of the dredger Marieke on 24 June and 08 July 07 25

26 DREDGING UNEXPLODED ORDINANCE Approximate line of new revetment 26

27 DREDGING SAND TRAP ON OUTSIDE OF SOUTH BREAKWATER (TSHD Orwell) 27

28 DREDGING EXCAVATION OF NORTH BANK Approximate line of new revetment 28

29 DREDGING EXCAVATION OF NORTH BANK 29

30 DREDGING - BACKHOE DREDGER PINOCCHIO AND BARGES 30

31 DREDGING BARGES TRANSPORTING DREDGED MATERIAL TO DUMP SITE 31

32 DREDGING DISPOSAL AT OFFSHORE DUMP SITE 32

33 DREDGING OSPREY TRANSPORT SHIP 33

34 DREDGING OSPREY TRANSPORT SHIP 34

35 DREDGING DEPARTURE OF DREDGERS ON OSPREY 35

36 DREDGING OFFSHORE DUMP SITE 36

37 DREDGING MAGNETIC ANOMALIES 37

38 DREDGING MAGNETIC ANOMALIES 38

39 DREDGING MAGNETIC ANOMALIES Approximate line of new revetment 39

40 DREDGING - ENVIRONMENTAL MONITORING Initial monitoring sites Plume characterisation sites during New North Groyne pre-dredging 40

41 DREDGING CROSS SECTION OF CHANNEL EXISTING CHANNEL NEW CHANNEL 41

42 OLD NORTH GROYNE Approximate line of new revetment 42

43 OLD NORTH GROYNE - DEMOLITION AND REMOVAL 1. Demolition of concrete cap (approx. Jan 08) 2. Attempted blasting of North Groyne Approximate line of new revetment 43

44 OLD NORTH GROYNE - DEMOLITION AND REMOVAL 3. Removal of root of groyne and armouring (Jul 08) 4. Removal of remaining portion underwater (Aug 08) 44

45 NEW NORTH GROYNE 45

46 New North Groyne 46

47 47

48 NORTH BANK REVETMENT CONSTRUCTION 48

49 NORTH BANK DEMOLITIONS & REVETMENT CONSTRUCTION TUG JETTY FERRY WHARF REPAIR QUAY FUTURE REVETMENT LINE REVETMENT ARMOURING 49

50 NORTH BANK DECEMBER

51 NORTH BANK JULY

52 NORTH BANK OCTOBER

53 NORTH BANK DECEMBER

54 NORTH BANK FEBRUARY

55 NORTH BANK JUNE

56 REVETMENTS SIDE STONE DUMPING VESSEL POMPEII 56

57 REVETMENTS STONE DUMPING Placing 53mm -4.0m CD Approx = 1,375m3 57

58 SOUTH BREAKWATER ANTIFER CUBE STOCKPILE JET PROBES RAISING CAP SAND TRAP DREDGING 58

59 SOUTH BREAKWATER VOID FILLING Large cracks Cap settlement 59

60 SOUTH BREAKWATER VOID FILLING Measurement of voids under cap foundation 60

61 SOUTH BREAKWATER RAISING & WIDENING CAP 61

62 Existing breakwater profile Seabed level Area to be dredged to be able to place units 62

63 SOUTH BREAKWATER ARMOUR PLACEMENT 63

64 SOUTH BREAKWATER ARMOUR PLACEMENT 64

65 SOUTH BREAKWATER ARMOUR PLACEMENT 65

66 SOUTH BREAKWATER WEATHER RISK Future Light to Moderate Overtopping Existing Light to Moderate Overtopping 66

67 SOUTH BREAKWATER WEATHER RISK 67

68 SOUTH BREAKWATER WEATHER RISK 68

69 SOUTH BREAKWATER WEATHER RISK 69

70 PRE-CAST OPERATIONS (SOUTH SIDE) 70

71 PRE-CAST OPERATIONS (NORTH SIDE) 71

72 ROCK STORAGE NORTH SIDE 72

73 OLD SUB-AQUEOUS TUNNEL REMOVAL 73

74 OLD SUB-AQUEOUS TUNNEL REMOVAL 74

75 OLD SUB-AQUEOUS TUNNEL REMOVAL 75

76 AIDS TO NAVIGATION CHANNEL SWITCHOVER PREVIOUS LEAD LIGHTS (STILL IN USE) FINAL PEL LIGHTS TEMPORARY PEL LIGHTS INTERIM CHANNEL CENTRELINE PREVIOUS CHANNEL CENTRELINE FINAL CHANNEL CENTRELINE 76

77 AIDS TO NAVIGATION PORT ENTRY LIGHT Fl R 3s R Alt R/W W Alt G/W G Fl G 3s 77

78 TEMPORARY SAND SUPPLY 78

79 DURBAN HARBOUR ENTRANCE VISIT BY THE QUEEN MARY 2 23 MARCH

80 THANK YOU 80

TNPA 2 nd Strategic Customer Forum Update on Infrastructure Projects. 13 August

TNPA 2 nd Strategic Customer Forum Update on Infrastructure Projects. 13 August TNPA 2 nd Strategic Customer Forum Update on Infrastructure Projects 13 August 2014 1 THE TNPA WORLD OF PORT INFRASTRUCTURE Complete Pixman Images 2010 Dredging International - Pallieter Overview of Presentation

More information

Dredging 101. Why, Who, How and So What! 2015 WAMSI Research Conference. 30 March 2015

Dredging 101. Why, Who, How and So What! 2015 WAMSI Research Conference. 30 March 2015 Dredging 101 Why, Who, How and So What! 2015 WAMSI Research Conference 30 March 2015 Presentation Contents Quick Oversight on Why we need to Dredge and Who Carries it out Global Context of some of our

More information

U.S. Army Corps of Engineers Wilmington District

U.S. Army Corps of Engineers Wilmington District U.S. Army Corps of Engineers Wilmington District 2012 East Coast - WEDA October 9-11, 2012 Ongoing & Upcoming Contracts US Army Corps of Engineers Wilmington District Ongoing Contracts Project Quantity

More information

APPENDIX 20 EFFECTS ON NAVIGATIONAL SAFETY

APPENDIX 20 EFFECTS ON NAVIGATIONAL SAFETY APPENDIX 20 EFFECTS ON NAVIGATIONAL SAFETY Effects of Lyttelton Port Recovery Plan on Navigational Safety November 2014 INTRODUCTION Lyttelton Port of Christchurch (LPC) utilises an integrated health

More information

MANAGING COASTAL HAZARDS THROUGH BENEFICIAL REUSE OF DREDGED SAND AND AN ADAPTIVE WORKS STRATEGY

MANAGING COASTAL HAZARDS THROUGH BENEFICIAL REUSE OF DREDGED SAND AND AN ADAPTIVE WORKS STRATEGY MANAGING COASTAL HAZARDS THROUGH BENEFICIAL REUSE OF DREDGED SAND AND AN ADAPTIVE WORKS STRATEGY Isabelle Ghetti 1, B.Morgan 2, R.Massie 1, Gary Blumberg 2 1 Shoalhaven City Council, Nowra, NSW 2 Royal

More information

COMMONWEALTH OF THE BAHAMAS MINISTRY OF PUBLIC WORKS & TRANSPORT NASSAU HARBOUR PORT IMPROVEMENT PROJECT. Nassau Harbour Port Improvement Project

COMMONWEALTH OF THE BAHAMAS MINISTRY OF PUBLIC WORKS & TRANSPORT NASSAU HARBOUR PORT IMPROVEMENT PROJECT. Nassau Harbour Port Improvement Project COMMONWEALTH OF THE BAHAMAS MINISTRY OF PUBLIC WORKS & TRANSPORT NASSAU HARBOUR PORT IMPROVEMENT PROJECT AUGUST 2009 OVERALL VIEW OF NASSAU HARBOUR AERIAL VIEW OF NASSAU HARBOUR PROJECT HISTORY 1960 s

More information

March 2, The Honorable Mayor Williams D. Sessoms, Jr. Members of City Council. Subject: Coastal CIP Presentation to City Council - March 6, 2018

March 2, The Honorable Mayor Williams D. Sessoms, Jr. Members of City Council. Subject: Coastal CIP Presentation to City Council - March 6, 2018 OFFICE OF THE CITY MANAGER (757) 385-4242 (757) 427-5626 FAX MUNICIPAL CENTER BUILDING 1, ROOM 234 2401 COURTHOUSE DRIVE VIRGINIA BEACH, VA 23456-9001 March 2, 2018 The Honorable Mayor Williams D. Sessoms,

More information

Jason J. Hull, P.E. Director of Engineering. Port Freeport 1100 Cherry Street Freeport, Texas

Jason J. Hull, P.E. Director of Engineering. Port Freeport 1100 Cherry Street Freeport, Texas Jason J. Hull, P.E. Director of Engineering Port Freeport 1100 Cherry Street Freeport, Texas 77541 979.233.2667 hull@portfreeport.com Port Freeport s History Feb. 1913 Corps Hopper Dredge Comstock sank

More information

New Orleans Municipal Yacht Harbor

New Orleans Municipal Yacht Harbor New Orleans Municipal Yacht Harbor 2018 Capital Projects Construction Updates MYH Floating Marina Community Sailing Center (Coordination with) MYH Boat Launch (MYHMC) MYH Administration Building (CPA &

More information

UK Port Infrastructure Project Pipeline Analysis Report

UK Port Infrastructure Project Pipeline Analysis Report UK Port Infrastructure Project Pipeline Analysis Report Prepared by Moffatt & Nichol, for the British Ports Association, March 2018 Following release of the Analysis of the National Infrastructure and

More information

Maximising Beneficial Reuse through the use of a Novel Dredging Contract

Maximising Beneficial Reuse through the use of a Novel Dredging Contract Maximising Beneficial Reuse through the use of a Novel Dredging Contract Nicola Clay & Katherine Harris Port of London Authority Nick Bray Dredging Research Paul Hesk Van Oord UK CEDA Dredging Days 2007

More information

Alexandria Port, Egypt

Alexandria Port, Egypt Alexandria Port, Egypt Source: This information has been extracted from the WFP Logistics Capacity Assessment for Egypt. This LCA is a work in progress and not all sections are complete. This material

More information

Real Property Institute of Canada: Marine Infrastructure National Workshop January 28, 2014

Real Property Institute of Canada: Marine Infrastructure National Workshop January 28, 2014 Arctic Canada 1 Public Works and Government Services Canada (PWGSC) Real Property Institute of Canada: Marine Infrastructure National Workshop January 28, 2014 Jerome MacGillivray, P. Eng John Davidson,

More information

VERSION DATE OF ISSUE DESCRIPTION PREPARED CHECKED APPROVED Technical note HHP DKA OYBE

VERSION DATE OF ISSUE DESCRIPTION PREPARED CHECKED APPROVED Technical note HHP DKA OYBE DRAMMENREGIONENS VIRKESTERMINALER DEVELOPMENT OF NEW TIMBER TERMINAL NAVIGATION AND BERTH LOCATION STUDY ADDRESS COWI A/S Parallelvej 2 2800 Kongens Lyngby Denmark TEL +45 56 40 00 00 FAX +45 56 40 99

More information

CORPS OF ENGINEERS ALASKA DISTRICT Dredging Projects. Michael Tencza, PE Operations Project Manager November 4, 2015

CORPS OF ENGINEERS ALASKA DISTRICT Dredging Projects. Michael Tencza, PE Operations Project Manager November 4, 2015 CORPS OF ENGINEERS ALASKA DISTRICT 2016 Dredging Projects Michael Tencza, PE Operations Project Manager November 4, 2015 US Army Corps of Engineers Building and Preserving Alaska s Future AWARDED CONTRACTS

More information

Chapter 26 Route Window SE6A Manor Wharf. Transport for London

Chapter 26 Route Window SE6A Manor Wharf. Transport for London Chapter 26 Route Window SE6A Manor Wharf Transport MANOR WHARF 26 Route Window SE6A Manor Wharf Transport Introduction 26.1 The route window lies within the London Borough of Bexley. The works in the

More information

Report to the Strategic Development Committee. Ronald Reagan Washington National Airport Project Journey. June 2018

Report to the Strategic Development Committee. Ronald Reagan Washington National Airport Project Journey. June 2018 Report to the Strategic Development Committee Ronald Reagan Washington National Airport Project Journey June 2018 Secure National Hall Secure National Hall Project Cost Summary Prior Month Expenditures

More information

Site Formation Works of the Kai Tak Cruise Terminal Project

Site Formation Works of the Kai Tak Cruise Terminal Project Site Formation Works of the Kai Tak Cruise Terminal Project Presented by Ian Muir MIEAust, CPEng Maritime Business Unit Head Asia Pacific and Deputy Project Director for the Kai Tak Cruise Terminal Site

More information

Proposed Cherry Grove Canals Dredging Project

Proposed Cherry Grove Canals Dredging Project Proposed Cherry Grove Canals Dredging Project 1 Development of Cherry Grove C.D. Nixon inherited 9,940 acres of land 1924 Nixon family began planning subdivision of Cherry Grove 1950 Mr. Nixon closed natural

More information

Dredging in Fowey Chapter 3 Post departure of the Lantic Bay

Dredging in Fowey Chapter 3 Post departure of the Lantic Bay Dredging in Fowey Chapter 3 Post departure of the Lantic Bay Prior to the departure of the Lantic Bay the Harbour master Captain Mike Sutherland had obtained quotes from the main dredging contractors for

More information

NEW TECHNOLOGIES AND THEIR IMPACT ON PORT DEVELOPMENT IN JAMAICA. Christopher Hamilton May

NEW TECHNOLOGIES AND THEIR IMPACT ON PORT DEVELOPMENT IN JAMAICA. Christopher Hamilton May Organization Of American States Second Hemispheric Conference On Inland Ports, Waterways & Dredging NEW TECHNOLOGIES AND THEIR IMPACT ON PORT DEVELOPMENT IN JAMAICA Christopher Hamilton May 18 2017 2.83

More information

ICN Gateway Breakfast (SA) Jon Whelan A/Manager Project Delivery 9 July 2015

ICN Gateway Breakfast (SA) Jon Whelan A/Manager Project Delivery 9 July 2015 ICN Gateway Breakfast (SA) Jon Whelan A/Manager Project Delivery 9 July 2015 78 km running between Old Noarlunga and Gawler Adelaide s North South Corridor Torrens Road to River Torrens [due for completion

More information

Corporate Presentation 5 March 2003

Corporate Presentation 5 March 2003 Corporate Presentation 5 March 2003 Agenda Investment Highlights Business Overview Financial Highlights Competitive Strengths Business Strategies & Future Plans Growth Prospects Corporate Presentation

More information

Great Lakes Navigation System Buffalo District

Great Lakes Navigation System Buffalo District Great Lakes Navigation System Buffalo District Josh Feldmann U.S. Army Corps of Engineers Chief, Operations Branch 9 FEB 2016 US Army Corps of Engineers BUILDING STRONG Key FY16/17 Buffalo District O&M

More information

BUSINESS CASE EXECUTIVE SUMMARY CHANNEL CAPACITY UPGRADE

BUSINESS CASE EXECUTIVE SUMMARY CHANNEL CAPACITY UPGRADE www.channelcapacityupgrade.com.au 2 $10 BILLION in trade value Introduction The Port of Townsville is the largest container and automotive port in Northern Australia and last financial year handled around

More information

HERMAN EIJKELENBOOM. Suite K 5 th Floor East Hope Plaza 1777 Century Avenue Pudong Shanghai, P.R. China

HERMAN EIJKELENBOOM. Suite K 5 th Floor East Hope Plaza 1777 Century Avenue Pudong Shanghai, P.R. China Marine Engineer Office Location Brookes Bell LLP Brookes Bell Shanghai Suite K 5 th Floor East Hope Plaza 1777 Century Avenue Pudong Shanghai, 200122 P.R. China Telephone +86 21 5860 2868 E-mail he@brookesbell.com

More information

Geotechnics. Curriculum Vita MARINE WORK RELATED PROJECTS.

Geotechnics. Curriculum Vita MARINE WORK RELATED PROJECTS. Geotechnics Curriculum Vita MARINE WORK RELATED PROJECTS Who We Are Geotechnics is a group of engineering consultants specialized in combined Geotechnical, Structural and Marine Projects. Mission Our design

More information

This component includes dredging of both entrances to the Canal and the course of the Culebra Cut and Gatun Lake.

This component includes dredging of both entrances to the Canal and the course of the Culebra Cut and Gatun Lake. EXPANSION PROGRAM COMPONENTS Third Set of Locks The project consists of the design and build of new Post-Panamax locks in the Pacific and Atlantic sides of the Panama Canal. Each complex will feature three

More information

PORT OF CORPUS CHRISTI BUILDING FOR THE FUTURE

PORT OF CORPUS CHRISTI BUILDING FOR THE FUTURE Frank C. Brogan P.E., R.P.L.S. Director of Engineering Services PORT OF CORPUS CHRISTI BUILDING FOR THE FUTURE TRANSPORTATION RESEARCH BOARD Galveston, Texas June 25, 2001 PORT OF CORPUS CHRISTI AUTHORITY

More information

HARBOR INFRASTRUCTURE INVENTORIES Duluth-Superior Harbor, Minnesota/Wisconsin

HARBOR INFRASTRUCTURE INVENTORIES Duluth-Superior Harbor, Minnesota/Wisconsin HARBOR INFRASTRUCTURE INVENTORIES Duluth-Superior Harbor, Minnesota/Wisconsin Harbor Location: Duluth-Superior Harbor is located at the westernmost tip of Lake Superior. Authority: River & Harbor Act of

More information

ISU Associate Members' Day/ 16 March 2016 WRECK REMOVAL OF M.V. SMART

ISU Associate Members' Day/ 16 March 2016 WRECK REMOVAL OF M.V. SMART ISU Associate Members' Day/ 16 March 2016 WRECK REMOVAL OF M.V. SMART Agenda INTRODUCTION TO ARDENT THE OPERATION WRECK REMOVAL OF M.V. SMART INTRODUCTION Ardent Global Presence Aberdeen Copenhagen London

More information

NEW ZEALAND TEMPORARY AND PRELIMINARY NOTICES IN FORCE (NZ NTM Edition No. 1 dated 11 January 2019)

NEW ZEALAND TEMPORARY AND PRELIMINARY NOTICES IN FORCE (NZ NTM Edition No. 1 dated 11 January 2019) NEW ZEALAND TEMPORARY AND PRELIMINARY NOTICES IN FORCE (NZ NTM Edition No. 1 dated 11 January 2019) NZ Notice T/P Charts Affected Locality and Subject 93/17 T NZ 82 (T 82), NZ 827 (T 827), NZ 8275 (T 8275),

More information

Our local knowledge teamed with our global expertise provides our customer base with the complete heavylift and transportation solution across

Our local knowledge teamed with our global expertise provides our customer base with the complete heavylift and transportation solution across Our local knowledge teamed with our global expertise provides our customer base with the complete heavylift and transportation solution across Australia. www.ale-ecr.com.au OVERVIEW ALE ECR Heavylift is

More information

October 7, 2016 Hurricane Matthew Rakes the East Coast of Flagler County for 18.1 Miles

October 7, 2016 Hurricane Matthew Rakes the East Coast of Flagler County for 18.1 Miles October 7, 2016 Hurricane Matthew Rakes the East Coast of Flagler County for 18.1 Miles Hammock Dunes Suffers Penetration of the Ocean into the Community; has a 15-30 ft. Wide Triangular Section of the

More information

Project Update 3. Carpentaria Rail. Port Carpentaria Railway Project. Carpentaria Rail. 21 Second Ave, Mount Isa, Queensland, Australia, 4825

Project Update 3. Carpentaria Rail. Port Carpentaria Railway Project. Carpentaria Rail. 21 Second Ave, Mount Isa, Queensland, Australia, 4825 Project Update 3 Carpentaria Rail Port Carpentaria Railway Project Carpentaria Rail 21 Second Ave, Mount Isa, Queensland, Australia, 4825 Tel 0413178182 Port Carpentaria community consultation commenced

More information

CHAPTER 14. MARINE TRANSPORTATION

CHAPTER 14. MARINE TRANSPORTATION CHAPTER 14. MARINE TRANSPORTATION 14.1 AFFECTED ENVIRONMENT 14.1.1 Definition of Resource Marine transportation refers to marine vessels and facilities used to support commercial, military, and recreational

More information

Bigger, Deeper, Wider

Bigger, Deeper, Wider Bigger, Deeper, Wider About Port Freeport Government entity created by voters in 1925 Local sponsor for the Freeport Harbor Channel and engages with the U.S. Army Corps of Engineers Significant responsibilities

More information

Gruyere Gold Project Development Update

Gruyere Gold Project Development Update ASX Announcement 25 September 2017 Highlights Mining contract tenders shortlisted Gruyere Gold Project Development Update ACJV concrete works at process plant site commenced Fabrication of the steel plates

More information

Runaway pet collared onsite

Runaway pet collared onsite Community Bulletin #161 JKC Australia LNG Pty Ltd Runaway pet collared onsite Top left: Litchfield Council Ranger setting the trap. Bottom left: An early morning check on the cage found the efforts to

More information

MIAMI INTERNATIONAL REAL ESTATE CONGRESS ERIC OLAFSON MANAGER TRADE DEVELOPMENT

MIAMI INTERNATIONAL REAL ESTATE CONGRESS ERIC OLAFSON MANAGER TRADE DEVELOPMENT MIAMI INTERNATIONAL REAL ESTATE CONGRESS ERIC OLAFSON MANAGER TRADE DEVELOPMENT Economic Impact One of Miami-Dade County s Principal Economic Engines 207,000 jobs $27 Billion annually 2 Cruise Capital

More information

Urgent Decision: Y Implementation Date: 27 November If not on Forward Plan Procedure 15 or 16 used?

Urgent Decision: Y Implementation Date: 27 November If not on Forward Plan Procedure 15 or 16 used? Report to: Cabinet Date: 27 November 2013 Title: Portfolio Holder(s) Divisions Affected St Mary s and Penzance Harbours Improvements Bert Biscoe CC - Transport and Waste Penzance Central Relevant Scrutiny

More information

Click to edit Master title style

Click to edit Master title style Click to edit Master title style OPERATION PHAKISA Heading heading heading TRANSNET NATIONAL PORTS AUTHORITY (TNPA) B2B NETWORKING FORUM 28 JUNE 2016 Date HYATT REGENCY HOTEL, ROSEBANK Contents Transnet

More information

TANJONG PAGAR/KEPPEL/BRANI TERMINALS. DEPTH A/S (m)

TANJONG PAGAR/KEPPEL/BRANI TERMINALS. DEPTH A/S (m) TANJONG PAGAR/KEPPEL/BRANI TERMINALS BERTH DEPTH A/S (m) APPROACH DEPTH (m) T01 13.6 14.0 T02 13.6 14.5 T03 13.6 13.8 T04 11.0 9.7 T05 14.8 15.0 T06 13.6 14.2 REMARKS T07 12.4 12.6 Shallower depths exist

More information

Dredging in Figures 2008 This review of the global dredging market focuses on the situation in 2008 and was published in October 2009.

Dredging in Figures 2008 This review of the global dredging market focuses on the situation in 2008 and was published in October 2009. Dredging in Figures 28 This review of the global dredging market focuses on the situation in 28 and was published in October 29. Maritime Solutions for a Changing World Dredging changes the world. Yet,

More information

MOSE PROJECT: STATE-OF-THE-ART AND FUTURE DEVELOPMENT

MOSE PROJECT: STATE-OF-THE-ART AND FUTURE DEVELOPMENT AIPCN-France Third Mediterranean Days of Coastal and Harbour Engineering Troisièmes journées méditerranéennes de génie côtier et portuaire 23/05/2013 Marseille MOSE PROJECT: STATE-OF-THE-ART AND FUTURE

More information

Ohio Freight Conference Great Lakes Commercial Navigation

Ohio Freight Conference Great Lakes Commercial Navigation Ohio Freight Conference Great Lakes Commercial Navigation Roger E. Haberly Regional Economist Buffalo New York 13 September 2013 US Army Corps of Engineers Presentation Overview 1. GL Physical System Description

More information

Manigurr-ma Palmerston partnership showcases city

Manigurr-ma Palmerston partnership showcases city Community Bulletin #76 JKC Australia LNG Pty Ltd (JKC) Manigurr-ma Palmerston partnership showcases city It s hoped that Manigurr-ma Village residents will be enticed to Palmerston following the production

More information

CHAPTER 241. SAND BYPASSING TO "PLAYA DE CASTILLA" (HUELVA SPAIN) Jose Fernandez (1) Gregorio Gomez Pina (2) Angel Mufloz (3)

CHAPTER 241. SAND BYPASSING TO PLAYA DE CASTILLA (HUELVA SPAIN) Jose Fernandez (1) Gregorio Gomez Pina (2) Angel Mufloz (3) CHAPTER 241 SAND BYPASSING TO "PLAYA DE CASTILLA" (HUELVA SPAIN) Jose Fernandez (1) Gregorio Gomez Pina (2) Angel Mufloz (3) Abstract The "Sand bypassing to Playa de Castilla" project consists of a sand

More information

Volume 10 Issue 6 February/March 2013

Volume 10 Issue 6 February/March 2013 Volume 10 Issue 6 February/March 2013 Underwater Repairs is of the highest importance. Hydrex team members are trained to carry out the approved procedures within a short time frame. Only a skilled and

More information

WORLDWIDE BUSINESS WITH SEFİNE SHIPYARD NEW BUILDING SHIP REPAIR CONVERSION MEGA STEEL CONSTRUCTION

WORLDWIDE BUSINESS WITH SEFİNE SHIPYARD NEW BUILDING SHIP REPAIR CONVERSION MEGA STEEL CONSTRUCTION www.sefine.com.tr WORLDWIDE BUSINESS WITH SEFİNE SHIPYARD NEW BUILDING SHIP REPAIR CONVERSION MEGA STEEL CONSTRUCTION Welcome Sefine Shipyard is a customer-focused, international shipbuilder building innovative

More information

Economic and Social Council

Economic and Social Council United Nations Economic and Social Council ECE/TRANS/SC.3/2017/16 Distr.: General 24 July 2017 English Original: Russian Economic Commission for Europe Inland Transport Committee Working Party on Inland

More information

Jhan Schmitz. Executive Sponsor Panama Canal Expansion Program

Jhan Schmitz. Executive Sponsor Panama Canal Expansion Program Jhan Schmitz Executive Sponsor Panama Canal Expansion Program Capacity constraints need to double the capacity of the existing canal Accommodate post-panamax vessels Enhance Panama s strategic position

More information

Turnover global dredging market 2009 per driver in mln %

Turnover global dredging market 2009 per driver in mln % Dredging in Figures 29 This review of the global dredging market focuses on the situation in 29 and was published in October 21. IADC is always very thorough and precise in estimating the dredging turnover.

More information

ADVICE ON MOZAMBIQUE PORTS. P&I ASSOCIATES (PTY) LTD

ADVICE ON MOZAMBIQUE PORTS. P&I ASSOCIATES (PTY) LTD ADVICE ON MOZAMBIQUE PORTS. P&I ASSOCIATES (PTY) LTD All the ports in Mozambique are owned by CFM (Caminhos de Ferro de Mozambique). Many of the ports have been given to private companies to manage the

More information

Panama Canal Stakeholder Working Group Meeting

Panama Canal Stakeholder Working Group Meeting Panama Canal Stakeholder Working Group Meeting POHA, Bayport Container Terminal, Houston, Texas August 27, 2012 TOTAL ECONOMIC IMPACT 9,749 Texas jobs are in some way related to the Port Of the 9,749

More information

Construction Staging Area Blue Jays Way (357 King Street West)

Construction Staging Area Blue Jays Way (357 King Street West) REPORT FOR ACTION Construction Staging Area Blue Jays Way (357 King Street West) Date: June 8, 2018. To: Toronto and East York Community Council From: Acting Director, Transportation Services, Toronto

More information

INNOVATIVE MARINE DESIGNS PND ENGINEERS, INC. January 14, 2016

INNOVATIVE MARINE DESIGNS PND ENGINEERS, INC. January 14, 2016 INNOVATIVE MARINE DESIGNS PND ENGINEERS, INC. January 14, 2016 PND Engineers, Inc. Founded in 1979 Headquartered in Anchorage, Alaska with offices in Juneau, Seattle, Houston and Vancouver, B.C. International

More information

SHIPBUILDING INDUSTRY CORPORATION (SBIC) VIETNAM MARITIME INDUSTRY (Presentation at ASEF 9 th Forum)

SHIPBUILDING INDUSTRY CORPORATION (SBIC) VIETNAM MARITIME INDUSTRY (Presentation at ASEF 9 th Forum) SHIPBUILDING INDUSTRY CORPORATION (SBIC) VIETNAM MARITIME INDUSTRY (Presentation at ASEF 9 th Forum) VIETNAM MARITIME INDUSTRY (Presentation at ASEF 9 th Forum) Contents Vietnam Overview Vietnam Maritime

More information

Dalian VTS Guide for Users

Dalian VTS Guide for Users Dalian VTS Guide for Users 3 rd Edition DALIAN MARITIME SAFETY ADMINISTRATION OF P.R.CHINA DALIAN VESSEL TRAFFIC SERVICE CENTER Introduction The aim of this Guide is to provide vessel traffic service users

More information

N25 New Ross Bypass PPP Project

N25 New Ross Bypass PPP Project Presentation to TII National Roads Conference 2017 29 th September 2017 N25 New Ross Bypass PPP Project History & Construction Progress Joe Shinkwin & Pierre O Loughlin Presentation Content 1. Project

More information

Coastal protection and development of Alexandria

Coastal protection and development of Alexandria Coastal protection and development of Alexandria R,M. Hassan* Coastal and Port Development Division, Water Engineering Dept,, IHE De~t, The Netherlands, Abstract Alexandria City is the main beach resort

More information

PORT EVERGLADES SAND BYPASS PROJECT

PORT EVERGLADES SAND BYPASS PROJECT 28 th Annual National Conference on Beach Preservation Technology February 4, 2015 Clearwater Beach, FL PORT EVERGLADES SAND BYPASS PROJECT AN IMPORTANT FUTURE SAND SOURCE FOR SOUTHEAST FLORIDA BEACHES

More information

Port Everglades: Making The Last Mile Count. AAPA Annual Convention November 3, 2015

Port Everglades: Making The Last Mile Count. AAPA Annual Convention November 3, 2015 Port Everglades: Making The Last Mile Count AAPA Annual Convention November 3, 2015 Port Everglades Overview Enterprise Fund of Broward County Government Operations are supported 100% by user fees; no

More information

Port Everglades Overview

Port Everglades Overview Port Everglades Overview Broward County Charter Review Infrastructure Subcommittee June 7, 2017 Steven M. Cernak, P.E., PPM Chief Executive & Port Director Jurisdictional Area Located in the cities of:

More information

Port of Newcastle Schedule of Port Pricing

Port of Newcastle Schedule of Port Pricing Port of Newcastle Schedule of Port Pricing Port of Newcastle Operations Pty Ltd (ACN 165 332 990) as Trustee for the Port Of Newcastle Unit Trust (ABN 97 539 122 070) (trading as Port of Newcastle) Effective

More information

panama canal expansion program

panama canal expansion program panama canal expansion program september 2013 EXPANSION PROGRAM COMPONENTS Post-Panamax Locks Construction of the new locks complexes on the Pacific and Atlantic sides. Each one of the locks complexes

More information

Port Everglades 2014 Master/Vision Plan Update

Port Everglades 2014 Master/Vision Plan Update 1 Port Everglades 2014 Master/Vision Plan Update Public Meeting May 28, 2014 2 Agenda Port Everglades Mission Project Background 2014 Master/Vision Plan Update Process Status of 2009 5-Year Master Plan

More information

Manson Construction Co.

Manson Construction Co. Manson Construction Co. Since 1905 Frederick Paup, Chairman of the Board & Executive Vice President About Manson Established in 1905, Manson began as a small, family-owned Puget Sound marine pile driving

More information

The Events Structure Product Guide

The Events Structure Product Guide Product Description The Axion range offers a extremely strong semi permanent event structure, these units can be used in all weathers and can be installed in any location. Providing a contemporary space

More information

PORT OF GALVESTON PORT DIRECTOR S REPORT. May 22, 2018

PORT OF GALVESTON PORT DIRECTOR S REPORT. May 22, 2018 PORT OF GALVESTON PORT DIRECTOR S REPORT May 22, 2018 AT A GLANCE APRIL 2018 The Port is up 37.7% in total cargo over 2017 The Port is up 207.7% in lay vessel port calls (40-13 Y-T-D) The Port is up 30.5%

More information

MOVING TO THE NEXT STAGE

MOVING TO THE NEXT STAGE MOVING TO THE NEXT STAGE MOVING TO THE NEXT STAGE Over the past years Europort has established itself as the leading maritime meeting place in Istanbul, bringing together the Turkish and international

More information

PRESENTATION ON CAIRNS SHIPPING DEVELOPMENT PROJECT

PRESENTATION ON CAIRNS SHIPPING DEVELOPMENT PROJECT PRESENTATION ON CAIRNS SHIPPING DEVELOPMENT PROJECT CAIRNS A STRATEGIC PORT NORTH EAST NAVY BASE MAIN MARITIME ACTIVITY AND EMPLOYMENT : NORTHERN AUSTRALIA CARGO SHIPPING SERVICING LARGEST POPULATION :

More information

The History & Management of the Atlantic Intracoastal Waterway in Florida

The History & Management of the Atlantic Intracoastal Waterway in Florida The History & Management of the Atlantic Intracoastal Waterway in Florida THE BEGINNING OF THE INTRACOASTAL WATERWAY IN FLORIDA CONSTRUCTED BY A PRIVATE COMPANY, THE FLORIDA EAST COAST CANAL COMPANY BETWEEN

More information

30 November Randall G. Hintz Chief, Operations Support Branch Operations Division. US Army Corps of Engineers BUILDING STRONG

30 November Randall G. Hintz Chief, Operations Support Branch Operations Division. US Army Corps of Engineers BUILDING STRONG 30 November 2011 Randall G. Hintz Chief, Operations Support Branch Operations Division US Army Corps of Engineers Overview MAINTENANCE PROJECTS Deep Draft Channels Shallow Draft Channels Coastal Inlets

More information

Post tsunami Recovery of Port and Harbor areas in Japan from the 2011 Great East Japan Earthquake Tsunami

Post tsunami Recovery of Port and Harbor areas in Japan from the 2011 Great East Japan Earthquake Tsunami Date : 18 Nov., 2015 Venue : Furama Ballroom 1 SESSION 1 : A Decade of Partnerships in Sustainable Development of the Seas of East Asia: Synergies and Achievements WORKSHOP 1.1 : Managing Risks in Climate

More information

Turnover global dredging market 2009 per driver in mln

Turnover global dredging market 2009 per driver in mln Dredging in Figures 2009 This review of the global dredging market focuses on the situation in 2009 and was published in October 2010. IADC is always very thorough and precise in estimating the dredging

More information

Innovation based development of Klaipeda Port technologies

Innovation based development of Klaipeda Port technologies Discover a proven way! Innovation based development of Klaipeda Port technologies Mr. Artūras Drungilas Marketing and Corporate Affairs Director Klaipeda State Seaport Authority PortofKlaipeda.lt 1 Management

More information

The Huizen Municipality Port Decree

The Huizen Municipality Port Decree No. 9 The Council of Huizen Municipality; having read the proposal of the Municipal Executive dated 26 October 2010; with a view to Section 149 of the Dutch Municipalities Act (Gemeentewet) d e c r e e

More information

FURTHER TO AUTHORITY MEETING #5/13 To Be Held June 21, 2013

FURTHER TO AUTHORITY MEETING #5/13 To Be Held June 21, 2013 FURTHER TO AUTHORITY MEETING #5/13 To Be Held June 21, 2013 FURTHER TO: Pages AUTH7. SECTION I - ITEMS FOR AUTHORITY ACTION AUTH7.4 AUTH7.5 AUTH7.6 COATSWORTH CUT PROJECT Contract RSD13-080 - Channel Dredging

More information

Our world. the Gladstone region. What will it do for industry?

Our world. the Gladstone region. What will it do for industry? The Gladstone Globe Imagine See Learn Enter Our world. the Gladstone region. Site of 21st century industry, sustainability, conservation, tourism, arts, culture and heritage. In partnership with QUT, the

More information

Outer Banks Bridges Update:

Outer Banks Bridges Update: Outer Banks Bridges Update: Outer Banks Chamber of Commerce Economic Summit Jerry D. Jennings, PE - Division Engineer April 12, 2018 Mid-Currituck Bridge Currituck Sound (Wright Memorial Bridge) Alligator

More information

ADELAIDE OVAL REDEVELOPMENT

ADELAIDE OVAL REDEVELOPMENT ADELAIDE OVAL REDEVELOPMENT 2015 AUSTRALIAN CONSTRUCTION ACHIEVEMENT AWARD Technical Paper Stage 2 Entry / February 2015 / ELECTRONIC COPY CONTENTS Introduction Brief Summary Scope Design Challenges &

More information

Ports. Water and Environment Solutions

Ports. Water and Environment Solutions Ports Water and Environment Solutions BMT WBM in Ports The Company BMT WBM and Ports BMT WBM Pty Ltd is a leading edge water and environmental consultancy with more than 40 years national and international

More information

PortMiami Director and CEO Juan M. Kuryla PUBLIC-PRIVATE PARTNERSHIPS (P3)

PortMiami Director and CEO Juan M. Kuryla PUBLIC-PRIVATE PARTNERSHIPS (P3) PortMiami Director and CEO Juan M. Kuryla PUBLIC-PRIVATE PARTNERSHIPS (P3) PORTMIAMI QUICK FACTS PortMiami is located in Miami-Dade County, one of the most diverse, multilingual populations in the U.S.

More information

Background of the project

Background of the project D runway of Tokyo International Airport DESIGN-BUILD PROCUREMENT SCHEME FOR THE EXPANSION OF THE TOKYO INTERNATIONAL AIRPORT Mitsuhiko OKADA The Overseas Coastal Area Development Institute of Japan (OCDI)

More information

DOVER WESTERN DOCKS REVIVAL (DWDR) NEWSLETTER. The single biggest investment ever undertaken in Dover

DOVER WESTERN DOCKS REVIVAL (DWDR) NEWSLETTER. The single biggest investment ever undertaken in Dover DOVER WESTERN DOCKS REVIVAL (DWDR) NEWSLETTER The single biggest investment ever undertaken in Dover Spring 2017 WELCOME The Port handles 12 million passengers, 2.6 million freight vehicles, 2.3m tourist

More information

The project comprises the design of the following works:

The project comprises the design of the following works: An integrated approach to the design of the port and marina infrastructure of the island of Mykonos D. Avgoustinos, N. Panagopoulos, I. Sioris TRITON Consulting Engineers Ltd, 10 Makedonon Str., 11521

More information

COSCO CORPORATION. (SINGAPORE) LTD FY2003 Full Year Results. Presentation

COSCO CORPORATION. (SINGAPORE) LTD FY2003 Full Year Results. Presentation COSCO CORPORATION (SINGAPORE) LTD FY2003 Full Year Results Presentation 11 February 2004 1 Outline of Presentation 1. Background & Corporate Restructuring Exercise 2. Operations Review 3. Financial Review

More information

For personal use only

For personal use only Iron Ore Holdings Ltd Investor Presentation July 2014 IOH - Company Status 2 Corporate Overview Background ASX listed in 2005 1.6 billion tonnes JORC Mineral Resources Iron Valley Project production in

More information

Bye-Laws for the Port of of Gothenburg

Bye-Laws for the Port of of Gothenburg 1 (7) Bye-Laws for the Port of of Gothenburg Göteborg THE MUNICIPALITY OF GÖTEBORG THE MUNICIPALITY OF GOTHENBURG THE COUNTY ADMINI- STRATIVE BOARD OF VÄSTRA GÖTALAND THE COUNTY ADMINISTRATIVE BOARD OF

More information

BINBIRRI CONTRACTING PTY LTD CAPABILITY STATEMENT 2016

BINBIRRI CONTRACTING PTY LTD CAPABILITY STATEMENT 2016 BINBIRRI CONTRACTING PTY LTD CAPABILITY STATEMENT 2016 P: 08 91722341 E: binbirricontracting@hotmail.com ABN: 42 151 996 913 PO Box 2233 South Hedland WA 6722 Binbirri Contracting was established in 2010

More information

Leptis Magna. 9 LEPTIS MAGNA s NORTH COAST

Leptis Magna. 9 LEPTIS MAGNA s NORTH COAST 9 LEPTIS MAGNA s NORTH COAST The following observations were made on August 24, 25 and 26, 2000, thanks to the kind hospitality of the late Professor André Laronde during his year 2000 campaign of the

More information

Introduction. Ichthys LNG Project 2014 highlights. INPEX.com.au

Introduction. Ichthys LNG Project 2014 highlights. INPEX.com.au Community Engagement in the Northern Territory 2014 Introduction In 2014, INPEX and our joint venture partners celebrated the Ichthys LNG Project s 50 per cent completion milestone. Nowhere is our progress

More information

Contracting maintenance services. Contracting of dredging activitites on the Bulgarian section of the Danube River rkm 610 rkm 374.

Contracting maintenance services. Contracting of dredging activitites on the Bulgarian section of the Danube River rkm 610 rkm 374. Contracting maintenance services Contracting of dredging activitites on the Bulgarian section of the Danube River rkm 610 rkm 374.100 2 Contract specifics According to an agreement between MTITC and EAEMDR

More information

KEEL MARINE LTD Naval Architects, Marine Engineers and Surveyors

KEEL MARINE LTD Naval Architects, Marine Engineers and Surveyors 2608 (2015) 2607 (2015) 2606 (2015) 2600 (2015) 2599 (2015) 2595 (2014) 2592 (2014) 2585 (2014) 2582 (2014) 2578 (2014) 2575 (2014) 2571 (2014) Milford Haven Port Williams Shipping Land & Water / Williams

More information

Discover a proven way! PORT of KLAIPEDA. Klaipeda Port Extensive Business Opportunities Artūras Drungilas. Marketing and Corporate Affairs Director

Discover a proven way! PORT of KLAIPEDA. Klaipeda Port Extensive Business Opportunities Artūras Drungilas. Marketing and Corporate Affairs Director Discover a proven way! PORT of KLAIPEDA Klaipeda Port Extensive Business Opportunities Artūras Drungilas Marketing and Corporate Affairs Director Klaipeda Port Advantages of Klaipėda Port Convenient geographical

More information

The area involved 20th annual report

The area involved 20th annual report The area involved 2th annual report MARINE AGGREGATE EXTRACTION 217 Contents 1: Introduction Summary information 2-3: Summary statistics for 217 4-5: Humber region 6-7: East Coast region 8-9: Thames Estuary

More information

IRONTON-RUSSELL BRIDGE REPLACEMENT

IRONTON-RUSSELL BRIDGE REPLACEMENT IRONTON-RUSSELL BRIDGE REPLACEMENT 2012-2016 District 9 Ohio Department of Transportation Ironton-Russell Bridge Replacement Existing Ironton-Russell Bridge Ironton-Russell Bridge Replacement Existing

More information

Kirkcaldy Sea Wall Improvements. Non-technical Summary. For illustration purposes only to give an indicative representation of the scheme.

Kirkcaldy Sea Wall Improvements. Non-technical Summary. For illustration purposes only to give an indicative representation of the scheme. ENVIRONMENTAL STATEMENT Non-technical Summary For illustration purposes only to give an indicative representation of the scheme. Kirkcaldy Sea Wall Improvements Introduction A concrete sea wall fronts

More information

The area involved 17th annual report

The area involved 17th annual report The area involved 17th annual report MARINE AGGREGATE EXTRACTION 2014 Contents 01: Introduction Summary information 02-03: Summary statistics for 2014 04-05: Humber region 06-07: East Coast region 08-09:

More information