1 ISU Associate Members' Day/ 16 March 2016 WRECK REMOVAL OF M.V. SMART
2 Agenda INTRODUCTION TO ARDENT THE OPERATION
3 WRECK REMOVAL OF M.V. SMART INTRODUCTION
4 Ardent Global Presence Aberdeen Copenhagen London Hamburg OPA-90 Alicante Genoa Athens Suez Seoul OPA-90 Houston Colón Miami Santo Domingo Dubai Singapore Visayas Balikpapan OPA-90 Ardent Location Ardent Subtech Location Macaé Buenos Aires Walvis Bay Cape Town Pemba Nacala Beira Maputo Durban Mauritius Karatha Cairns Sydney
5 Value Creation Through Three Pillars Emergency Management Projects Underwater Services Emergency response track record dating back to 1833 A global preparedness portfolio of more than 35 agreements and growing Services include training, standby and pre-arranged protocols Shallow and deep water wreck removal, pollutants recovery, environmental care projects, port clearance and offshore decommissioning Ground breaking WR project the raising of the Costa Concordia Innovative solution - safe, costeffective and minimize environmental impact One stop solution for Hull Cleaning, Propeller Polishing, Condition Inspections, Class Surveys, Grounding Inspections, and Underwater Repair Use of heavily vetted local expertise allowing for optimal cost efficiency which passes through to the client
6 WRECK REMOVAL OF M.V. SMART THE OPERATION
7 The Operation Wreck Removal of m.v. SMART I. The incident II. Time Scale III. Challenges IV. Project Phases V. Contractors VI. Conclusion
8 WRECK REMOVAL OF M.V. SMART I. THE INCIDENT
9 The Incident 19 August 2013 The 151,279 DWT bulk carrier ran onto a sand bar shortly after setting sail from Richards Bay coal terminal in a 7 m Indian Ocean swell. It was carrying 147,650 to of coal, 1,769 t of fuel oil and 129 t of diesel. All 23 crew members were safely rescued and, just a couple of days later, the 273 m long ship split in to three parts. August October 2013 (Smit Salvage) The fuel was removed without spillage, followed by 10,000 t of coal slurry in the ruptured no. 9 hold. The separated stern section was refloated and scuttled it offshore.
10 WRECK REMOVAL OF M.V. SMART II. TIME SCALE
11 Project Time Schedule Titan Salvage won the tendering process to perform the lightening, refloating and scuttling of the partially buried bow section Date Activity 8 th Dec 2013 First team member arrived in Richards Bay, South Africa. 11 th Dec 2013 BIMCO Wreckstage 2010 contract signed. 21 st Dec 2013 Day 01, Wreck taken over from Subtech, Subtech caretaker crew continues. 30 th Dec 2013 Start operational Phase, Subtech s diving team and floating assets arrive in Richards Bay. Overall delivered on Time and on Budget
12 Milestones June th Nov 2014 Coal discharge completed no. 2 hold de-watered and bow re-floated. Re-grounded due loss of tow. Finished discharging of coal out of cargo hold no. 1, overall abt. 26,300mt recovered and dumped 11 th / 12 th Dec st Dec 2014 Bow Section refloated and scuttled offshore in abt. 1000m water depths Commenced scrap steel removal of the midbody section, cargo holds no th Jun % of scrap steel protruding the seabed are removed, demobilization of equipment 01 st Sep 2015 After 01 st Sep Hole at Wreck Site backfilled, remains of wreck are covered with at least 2m of Sand The rehabilitation of the seabed completed immediately
13 WRECK REMOVAL OF M.V. SMART III. CHALLENGES
14 Challenges Complicated operations High risk with uncertain factors The weather conditions on the South African coast Winter Period Heavy lift assets
15 WRECK REMOVAL OF M.V. SMART IV. PROJECT PHASES
16 Principal Phases Mobilisation Remove Cargo Re-Float Bow (Bow back to Hold 3, part) and Scuttle Remove mid body piecemeal (Holds 4 6 ) Remediate Sea bed Demob.
17 Mobilization 2013/ 2014 A Frame Barge UBHEJANE with Dredging Equipment
18 Mobilization 2013/ 2014 (First Bow Re-Float Operation) Dump Barge LADY GINA (ex PIPER) and Tug N DONGENI
19 Mobilization 2013/ 2014 Jack Up Barge KARLISSA B
20 Floating Assets Karlissa B Jack-Up Barge o 250mt Ringer Crane o T&T Marine DOP Pump o Salvage and Dive Equipment Karlissa A Jack-Up Barge o 100mt Crawler Crane o Salvage and Dive Equipment JUMBO Deck Barge (Coal) o 48.7m x 17.00m x 2.90m o Displacement 2200mt o Sidewalls JMC 3335 Deck Barge (Scrap) o m x 30.48m x 6.10m o Displacement 11000mt o 4-point mooring
21 Floating Assets AFON CADNANT Shoal Buster / AH Tug o Bollard Pull: 55 tons o LxB 36m x 11.5m; Draft 2.4m SMIT AMANDLA Salvage Tug o LxB: 94.6m x 15.8m; Draft: 7.5m o Horsepower: 19,200 o Bollard Pull: 185 tons
22 Bow Removal (Planning) Separation of Buoyant Bow Section Estimated Separation Line at abt. Frame # 230
23 Bow Removal (planning) Separation of Buoyant Bow Section Possible Use of Cutting Charges Explosives to break Bottom Structure Broco- Cutting Cutting Charges
24 Cargo Removal(No 2 Hold Initially) Dive Survey
25 Bow Removal Refloating 1st attempt, June 2014 SMIT AMANDLA Towing Wire failed; Attempt unsuccessful; Refloated Bow Section needed to be grounded again; Site abandoned for Winter Season, abt. 2 Month
26 Summary of Operations before Winter 2014 Discharged and dumped coal of cargo hold 2 with A-Frame barge UBHEJANE and dump barge LADY GINA Bow Section Refloated in June 2014 using a cofferdam to seal off and pump out water from cargo hold no. 2 Towing wire of Salvage Tug parted Bow Section settled with different direction on the seabed
27 Situation of the Bow Section after Winter 2014 Bow Section [frame ref: ] Heading 014 (before abt. 060 ) Trim 28 stern (before 19 ) Heel ~ 1.0 Port FP ~ 8m(S)/ ~ 9m(P) Water depth ~16.5 m June, 2014 June, 2014
28 Situation of the Bow Section after Winter 2014 The bow section remains embedded with no observable movement A dive survey in June reported the bulkhead between holds 2 and 3 to be severely compromised Remnants of the cofferdam creates a potential danger for diver inspections Observable damage during refloat implies the lower section of hold 3 to be discontinuous
29 Situation on Seabed after Winter 2014
30 Cargo Removal (Second Bow Re-Floating) Coal Loading and Dumping The Coal was pumped out of Cargo Hold 1 onto the Barge JUMBO, similar to loading former Dump Barge The Barge Jumbo was fitted with side walls on 3 sides. The forward opening was closed by crane mats for loading and opened for discharging the coal at the dump site. A Front End Loader discharged the coal with its bucket
31 Cargo Removal Discharging of Coal in No. 1 Cargo Hold
32 Bow Removal Refloat Operation (Second Re-Floating) Counter ballast may be added to #1 WBT P/S and the FPT during coal removal Pumping arrangement will be similar to previous attempt, (9) 6 Grindex submersible pumps or equivalent Jack-up barges may be repositioned once pumping water out of hold #1
33 Bow Removal Successfully Refloated the Bow Section
34 Bow Removal Scuttling of the Bow Section
35 Bow Removal Scuttling Position & Dumping Ground
36 Mid-Section Removal Both jack-ups positioned on either side o o o o Conventional upward chain cutting Downward and horizontal cuts with Harrisaw Piecemealing Repositioning of larger sections and scrapping while hanging in the chains with pullers
37 Mid-Section Removal Midbody-Section, Holds 4-6, Recovery from Seabed
38 Scrap Steel Handling Transport of Scrap Steel Ashore
39 Scrap Steel Handling Scrap Steel Disposal Ashore
40 The Remediation of the Seabed Progress on Seabed as Shown in Surveys
41 The Remediation of the Seabed Wreck had worked itself into the seabed Created a depression in the seabed Scouring effects caused steel to protrude from the seabed Condition of the Seabed Solution Backfilling the hole with comparable sand as found at the wrecksite
42 The Remediation of the Seabed Use of Transnet Dredging Services Local Dredger ISANDLWANA Backfilling of the Wreck Site Sand from the local sandtrap at the south breakwater of Richards Bay Harbour had been reclaimed ISANDLWANA has dumped about 71,200m3 of sand at the wreck site
43 WRECK REMOVAL OF M.V. SMART V. CONTRACTORS
44 Contractor Management Substantial Local Assistance including JV Partner Subtech and Transnet. Other South African Contractors: Premier Hydraulic, Land and Marine, Jolem Shipping, SMIT Amandla Marine, Transnet Dredging Services, Richard Bay Region Vendors, etc.
45 WRECK REMOVAL OF M.V. SMART VI. CONCLUSION
46 Conclusions Challenging Status and Conditions Global / Local Mix. Strong sub-contactor support Never fully engineered out damage status in dynamic environment Stakeholders strong drivers and active engagement essential Planning o o o o More formalised Risk Planning/ Assessment Developed with Client Named Key Team Members contractually BUT dynamic situations need adaptability Strong Desire of Client for Certainty Contractual Risk Certainty and Acceptance can be achieved -needs mutual understanding and cooperative approach.
47 NORTH P&I DELIVERS MV SMART SALVAGE ON BUDGET THROUGH A COLLABORATIVE APPROACH Titan Salvage has successfully completed the complex and difficult removal of the wreck of the cape-size MV Smart coal carrier in South Africa. This was especially challenging given the prevailing weather conditions that prevail on the South African coast, especially during the winter period. The removal of the vessel, which was entered in The North of England P&I Association Ltd (North) by Owners Alpha Marine, has been accomplished on time and on budget due to a high level of collaboration with the South African Maritime Safety Authority (SAMSA), contractors Titan and North Extract from Joint Press Release: North P&I and SAMSA
48 THANK YOU
PRESS RELEASE WRECK REMOVAL OPERATION OF M/V GOODFAITH, ANDROS ISL. GREECE
PRESS RELEASE September 28, 2015 WRECK REMOVAL OPERATION OF M/V GOODFAITH, ANDROS ISL. GREECE On February 10 th, M/V GOODFAITH amid severe weather run aground on the north coast of Andros. Bulk Carrier
More informationYour Global Emergency Response Partner
Your Global Emergency Response Partner Today s Agenda Resolve Introduction How can we help the gas industry? Case Study (Wreck Removal) LPG Carrier OBERON Case Study 2 (Em. Response) M/V CHESHIRE RESOLVE
More informationDealing with a wreck stranded on a port breakwater: THE CORAL BULKER. Raul H. I. Valente Captain (PO NAVY)
Dealing with a wreck stranded on a port breakwater: THE CORAL BULKER Raul H. I. Valente Captain (PO NAVY) THE LOCATION OF THE WRECK Viana do Castelo Oporto Spain Portugal Lisbon VIANA DO CASTELO HARBOUR
More informationTUGS TOWING & OFFSHORE NEWS SPECIAL
17 th Volume, Special Dated 21 May 2016 BUYING, SALES, NEW BUILDING, RENAMING AND OTHER TUGS TOWING & OFFSHORE INDUSTRY NEWS TUGS TOWING & OFFSHORE NEWS SPECIAL 40 YEARS IN SERVICE A MARITIME ICON: SMIT
More informationSunken Barge ARTHUR J & Tug MADISON Case Study. LCDR Chico Knight, DBA, M.S.
Sunken Barge ARTHUR J & Tug MADISON Case Study by LCDR Chico Knight, DBA, M.S. July 19, 2012 Background On 19JUL, Sector Detroit was notified by the tug DRUMMOND ISLANDER II that the 110 dredge barge ARTHUR
More informationADVICE ON MOZAMBIQUE PORTS. P&I ASSOCIATES (PTY) LTD
ADVICE ON MOZAMBIQUE PORTS. P&I ASSOCIATES (PTY) LTD All the ports in Mozambique are owned by CFM (Caminhos de Ferro de Mozambique). Many of the ports have been given to private companies to manage the
More informationINCIDENTS INVOLVING THE IOPC FUNDS 1992 FUND
Agenda Item 3 IOPC/OCT17/3/15 Date 17 October 2017 Original English 1992 Fund Assembly 92A22 1992 Fund Executive Committee 92EC69 Supplementary Fund Assembly SA14 INCIDENTS INVOLVING THE IOPC FUNDS 1992
More informationEX USS SHADWELL Disposal Wreck in Place
20 February 2018 EX USS SHADWELL Disposal Wreck in Place EX USS SHADWELL, a decommissioned CASA GRANDE Class Dock Landing Ship has had a long history supporting the US Navy. She was built by Newport News
More informationPort of Durban. Entrance Channel Widening & Deepening Project Completion Function. 31 March 2010
Port of Durban Entrance Channel Widening & Deepening Project Completion Function 31 March 2010 Presented by: Theunis Steenkamp Project Director Natcor 1 The saying goes.. THE JOB IS NOT OVER UNTILL THE
More informationKEN ELLAM PARTNER, MASTER MARINER EMPLOYMENT HISTORY. Master Mariner STCW 95 A II/2
KEN ELLAM PARTNER, MASTER MARINER Master Mariner STCW 95 A II/2 k.ellam@solis-marine.com T: +65 6221 8568 M: +65 9012 4644 Solis Marine Consultants Pte. Ltd, 20 McCallum Street, #19-01 Tokio Marine Centre,
More informationThe 3 platforms are called Tchatamba-A (MOPU), Tchatamba South and the Tchatamba West and the FSO is called MADIELA and is owned by MODEC.
MADIELA DISCONNECTION & REMOVAL MARATHON PETROLEUM (GABON) Text / photo s : Piet Sinke Marathon Oil of Houston operates offshore Gabon 3 platforms and 1 FSO at the Tachamba Field about 120 nm SSW of Port
More informationASL Marine Holdings Ltd.
ASL Marine Holdings Ltd. SHIPBUILDING SHIPREPAIR SHIPCHARTERING Pulse of Asia 2008 - Presentation 8 th July 2008 1 Presentation Outline Company Profile 9M FY2008 Financial Review Business Review - Shipbuilding
More informationOCIMF Report Template OVID OVPQ
OCIMF Report Template 7120 1.0.00 General Information General 1.1.1 1.1.2 1.1.3 1.1.4 1.1.5 1.1.6 1.1.7 Date this OVPQ document completed Name of vessel/unit Vessel Identification IMO Number VIN Number
More informationCoral reefs are in trouble; they are being stressed on a global scale by diverse factors many of which are related to human stressors which are now
Coral reefs are in trouble; they are being stressed on a global scale by diverse factors many of which are related to human stressors which are now compounded by environmental change. Today increasing
More informationwww.mastershipyard.co.in State-of-the-art facilities at Kochi and Honavar Master Shipyard Pvt. Ltd., is one of India's premier builders of barges, passenger vessels, yachts and seagoing & inland vessels.
More informationVolume 10 Issue 6 February/March 2013
Volume 10 Issue 6 February/March 2013 Underwater Repairs is of the highest importance. Hydrex team members are trained to carry out the approved procedures within a short time frame. Only a skilled and
More informationExtensive doubler plate repair in Ivory Coast allows bulker to sail after collision
Extensive doubler plate repair in Ivory Coast allows bulker to sail after collision A190-meter bulker suffered severe collision damage in Lagos, Nigeria. A large hole in the hull plating prevented the
More informationSAMSA. South African Maritime Safety Authority
SAMSA South African Maritime Safety Authority CAPE DISASTER DEBRIEF 2004 SAMSA [Sam..what?????] SEALAND EXPRESS INCIDENT BRIEF COMPARISONS SAMSA ACT 1998 CONTAINS 3 OBJECTIVES Ensure safety of life and
More informationTNPA 2 nd Strategic Customer Forum Update on Infrastructure Projects. 13 August
TNPA 2 nd Strategic Customer Forum Update on Infrastructure Projects 13 August 2014 1 THE TNPA WORLD OF PORT INFRASTRUCTURE Complete Pixman Images 2010 Dredging International - Pallieter Overview of Presentation
More informationVessel s name: MV TANAIS DREAM
Vessel s name: MV TANAIS DREAM Main Details Place and Date of built 23.01.2013 IMARBI SHIPBUILDING CO.,LTD / IMARBI, JAPAN Flag: BELIZE Port of Registry and Official N.: BELIZE CITY 371330076 IMO N.: 9283899
More informationSEA DUBAI. By Rasiena
SEA DUBAI By Rasiena 1 Progress in Dubai s maritime sector Ideally located between Europe and Asia, Dubai has attracted sailors and traders for centuries. Over the years, Dubai has established itself on
More informationMARITIME. Protect Your Assets. Lay-up seminar MOU - CEFOR. Dec. 2016, Oslo, Ungraded SAFER, SMARTER, GREENER
MARITIME Protect Your Assets Lay-up seminar MOU - CEFOR Dec. 2016, Oslo, 1 SAFER, SMARTER, GREENER Contents Market situation A challenge ahead New revised Class Guideline Advisory V.S Class Service 2 Market
More informationPort dues and charges Free port of Ventspils
Port dues and charges Free port of Ventspils Adopted by the Ventspils Freeport Board s Decision No.3/11 of 22.02.2008 Board s Decision No.7/8 of 19.06.2009 Board s Decision No.15/24 of 20.11.2009 Board
More informationSection ~ 6 : Avoidance of Pollution. This document, and more, is available for download from Martin's Marine Engineering Page -
Section ~ 6 : Avoidance of Pollution Famous Ships List a few famous ships and why are they famous? Infamous Ships Infamous Ships News extract The oil tanker Prestige sank off Spain's NW coast, taking more
More informationNumber 162. Underwater bow thruster replacement in harsh conditions Fast underwater hull repairs save time and money for ship owners..
Number 162 Underwater bow thruster replacement in harsh conditions......... 4-7 Fast underwater hull repairs save time and money for ship owners.. 9-11 Class Accepted underwater stern tube seal repairs
More informationOUR SERVICES SHIP REPAIR & SHIPBUILDING METAL CONSTRUCTIONS
OUR SERVICES SHIP REPAIR & SHIPBUILDING Hull repair works Vessel modernization; Repair of hull coating and set; Repair of main diesel engines; Repair of auxiliary diesel engines; Boiler, heat exchange
More information1. Enclosure (1) i s forwarded to accordance with referance (a).
USS GRAPPLE (ARS-53) CIO FPO NEW YORK. NEW YORK 09570-3223 5750 From: Commanding Officer, USS GRAPPLE (ARS 53) To: Director of Naval History (OP-098~) Subj: COMMAND HISTORY OF USS GRAPPLE (ARS 53) Ref:
More information748 Ramirez Avenue Phone: Florida 32159
Terry R. Upson 748 Ramirez Avenue Phone: 352 259 7699 Lady Lake E-mail: terry_upson@yahoo.com Florida 32159 QUALIFICATIONS AND COURSES ATTENDED Unlimited British Masters license with dangerous cargo endorsement
More informationEMERGENCY TOWING CAPABILITIES IN LITHUANIA. Igor Kuzmenko Lietuvos maritime academy
EMERGENCY TOWING CAPABILITIES IN LITHUANIA Igor Kuzmenko Lietuvos maritime academy Introductory words It is axiomatic that lifesaving takes precedence over salvage but saving the ship may also be the best
More informationServing the Tampa Bay Maritime Community Since Celebrating over 125 Years of Service
Serving the Tampa Bay Maritime Community Since 1886 Celebrating over 125 Years of Service Tampa Bay Pilots Association Piloting is an essential service of such paramount importance that its continued existence
More informationImprovements in Podded Thrusters Bollard pull measurements & market response to Azipod DZ thrusters
DP ASIA CONFERENCE, 28 JUNE 2018 Improvements in Podded Thrusters Bollard pull measurements & market response to Azipod DZ thrusters Kimmo Kokkila, Product Manager, 2018 3AFV6055900 A Azipod gearless thruster
More informationAfter a long-awaited anticipation, we are pleased to offer you the following information to supply LB
ATTN. Lionel Ferreira Caspian Sea: Liftboat Support Subject: Estimates After a long-awaited anticipation, we are pleased to offer you the following information to supply LB Petite for your project. In
More informationHERMAN EIJKELENBOOM. Suite K 5 th Floor East Hope Plaza 1777 Century Avenue Pudong Shanghai, P.R. China
Marine Engineer Office Location Brookes Bell LLP Brookes Bell Shanghai Suite K 5 th Floor East Hope Plaza 1777 Century Avenue Pudong Shanghai, 200122 P.R. China Telephone +86 21 5860 2868 E-mail he@brookesbell.com
More informationWÄRTSILÄ VISION ON SUSTAINABLE SHIPPING
WÄRTSILÄ VISION ON SUSTAINABLE SHIPPING VESA-PEKKA VIRKKI DIRECTOR, STRATEGY & BUSINESS DEVELOPMENT IMSF ANNUAL MEETING, MAY 20. 2014, COPENHAGEN 1 Wärtsilä 22 July 2014 Wärtsilä vision on sustainable
More informationHATCH OPENINGS AND ALLOWABLE LOADS HATCH OPENINGS
KEY IN HEAVY LIFT JIB LENGTH 34 m 01 INTRODUCTION 02 HAPPY SKY 03 HAPPY STAR HAPPY SKY Happy Sky has excellent lifting and handling capabilities and is a well-tuned heavy lift vessel offering efficient
More informationCasualty Incident Report
Casualty Incident Report Safety investigation into the collision involving the St Kitts & Nevis registered high speed craft LOVELY 1 and the Antigua & Barbuda registered passenger catamaran ONE LOVE, in
More informationWRECK REMOVAL SALVAGE. Kasel Salvage MOORING TOWAGE
WRECK REMOVAL Kasel Salvage SALVAGE MOORING TOWAGE W e at Kasel Salvage have the creativity, flexibility, determination and resources to undertake any salvage job no matter how tough or challenging it
More informationUnderwater removal and reinstallation of bow thruster on container vessel
Number 165 Underwater removal and reinstallation of bow thruster on container vessel............................................................................ 4-6 Class Accepted underwater stern tube
More informationMarine Salvors, Divers & Constructors
Fred Devine Diving & Salvage Co. 6211 N Ensign Portland, Oregon 97217 Marine Salvors, Divers & Constructors Tel: (503) 283-5285 24 HOURS A DAY Fax: (503) 286-2871 Email: devinesalv@msn.com www.freddevinedivingandsalvage.com
More informationSuez Canal Transit. Characteristics of the current canal lengths
Suez Canal Transit The Suez Canal connects the Mediterranean Sea and the Red Sea and extends for a total length of 192 kilometres. The Mediterranean entrance is situated at Port Said and the Red Sea entrance
More informationSummary Report. Contact with Wharf General Villa. 5 March 2006
Summary Report Contact with Wharf 5 March 2006 NARRATIVE arrived at Napier pilot station at 0442 hours on 5 March 2006, having sailed from Bluff two days earlier The Pilot boarded at 0457 hours The Master
More informationMechanized Recovery of the CSS Georgia
Mechanized Recovery of the CSS Georgia Jeffrey Pardee Panamerican Consultants Inc. SHA Conference 2016 Washington, D.C. US Army Corps of Engineers BUILDING STRONG CSS Georgia Site Location Wreck site sits
More informationCorroded pipe causing oil spill
June 2013 Corroded pipe causing oil spill The 15 year-old bulk carrier was having its third special survey completed in dry-dock. As usual there were also many other jobs being carried out at the time.
More informationThe History of the tug Polmear
The History of the tug Polmear Previous names:- Polmear Built:- Toms Yard, Polruan Scrapped:- In service Jenkins in Poole Period in Fowey:- 1960-1968 Name of Vessel in Fowey Polmear In 2003 with the coming
More informationVessels for Charter and/or Purchase 17 November 2017 update Text in red shows updates from the previous newsletter
Vessels for Charter and/or Purchase 17 November 2017 update Text in red shows updates from the previous newsletter LATEST NEWS 4 x Jackup Rigs 65.25m x 62.00m x 8.00m Open for Sale JUR/2479 Dims: 65.25m
More information3 Pilbara ports provide gateways
COMMUNITY AND STAKEHOLDERS Community Consultation Committees 8 meetings each year across our 3 port locations Dampier, Port Hedland and Ashburton Community Support Initiative >$295,000 a year in financial
More informationPort of Sydney: Ships End Here?
Port of Sydney: Ships End Here? A plan, apparently 12 years in the making, to bring the shipbreaking firm Marine Recycling Corporation to the Sydport Marine Industrial Park in Point Edward seems to be
More informationB2B JOINT PLAN FOR AN OIL & GAS SERVICE COMPLEX IN THE PORT OF SALDANHA BAY, SOUTH AFRICA 11 th February 2015
Images sourced courtesy of DCD Marine & Dormac B2B JOINT PLAN FOR AN OIL & GAS SERVICE COMPLEX IN THE PORT OF SALDANHA BAY, SOUTH AFRICA 11 th February 2015 THIS DOCUMENT IS THE COPYRIGHT OF THE SALDANHA
More informationCapability Statement Connecting global markets
Maputo Capability Statement Connecting global markets June 2016 Table of Contents 1 DP World at a glance 2 Our Firm 3 Our Service Offerings 1. DP World at a glance DP World is a global marine terminals
More informationLecture 11. Container Ships
Lecture 11 Container Ships CONTAINER SHIPS LECTURE STRUCTURE Section 1 Section 2 Section 3 Section 4 Construction Stability Classification Ships Carrying Containers CONSTRUCTION SHIP YARDS CONSTRUCTION
More informationProject MYWREMS (MalaYsian WREckManagement System) 6 th Cooperative Forum Project 1: Wreck Removal 7 th 8 th October 2013 Bali, Indonesia
CF6-6.3 the 6 th Co-Operation Forum 7-8 October 2013, Bali, Indonesia Project MYWREMS (MalaYsian WREckManagement System) 6 th Cooperative Forum Project 1: Wreck Removal 7 th 8 th October 2013 Bali, Indonesia
More informationCASUALTY-RELATED MATTERS 1 REPORTS ON MARINE CASUALTIES AND INCIDENTS
INTERNATIONAL MARITIME ORGANIZATION 4 ALBERT EMBANKMENT LONDON SE1 7SR Telephone: 020 7587 3152 Fax: 020 7587 3210 Ref. T1/12.01 IMO E MSC-MEPC.3/Circ.1 26 September 2005 CASUALTY-RELATED MATTERS 1 REPORTS
More informationGreening of the Straits of Malacca
Greening of the Straits of Malacca 9 th Cooperation Forum Co-operative Mechanism on Safety of Navigation and Environmental Protection in the Straits of Malacca and Singapore Yogyakarta 26 27 September
More informationMarine Transportation Safety Investigation Report M17P0406
Marine Transportation Safety Investigation Report M17P0406 COLLISION Dredger FRPD 309 Fraser River, British Columbia 05 December 2017 About the investigation The Transportation Safety Board of Canada (TSB)
More informationWORLDWIDE BUSINESS WITH SEFİNE SHIPYARD NEW BUILDING SHIP REPAIR CONVERSION MEGA STEEL CONSTRUCTION
www.sefine.com.tr WORLDWIDE BUSINESS WITH SEFİNE SHIPYARD NEW BUILDING SHIP REPAIR CONVERSION MEGA STEEL CONSTRUCTION Welcome Sefine Shipyard is a customer-focused, international shipbuilder building innovative
More informationNotice To Mariner No. 147 PORT OF FUJAIRAH & VHFL TERMINAL BERTH CONSTRUCTION & DESIGN CRITERIA
To: Attn: From: All Agents / Bunkering Companies / De-Sloping Companies / National Transport Authority / Federal Environment Agency / Hydrographic Office-UK General Manager / Operations Manager Capt. Tamer
More informationU.S. Coast Guard - American Waterways Operators Annual Safety Report
American Waterways Operators U.S. Coast Guard - American Waterways Operators Annual Safety Report National Quality Steering Committee Meeting December 12, 2017 Established Safety Metrics For 17 years,
More informationW.. T. CROOKS DEPARTMENTOFTHENAVY USS GRAPPLE (ARS-53) C/O FPO NEW YORK. NEW YORK Ser 03/ MAR 1992
DEPARTMENTOFTHENAVY USS GRAPPLE (ARS-53) C/O FPO NEW YORK. NEW YORK 09570-3223 From: Commanding Officer, USS GRAPPLE (ARS 53) To : Director of Naval History (OP-098H) 5750 Ser 03/ 066 1 2 MAR 1992 Subj:
More informationSMIT INTERNATIONALE (GABON) S.A. Part 2 Left : The 1975 build Makokou seen here departing from Port Gentil.
SMIT INTERNATIONALE (GABON) S.A. Part 2 Left : The 1975 build Makokou seen here departing from Port Gentil. The Makokou measures 22,1 mtr in length and have a beam of 6.8 mtr. The vessel is powered by
More informationMARITIME AND PORT AUTHORITY OF SINGAPORE SHIPPING CIRCULAR NO. 3 OF 2014
MARITIME AND PORT AUTHORITY OF SINGAPORE SHIPPING CIRCULAR NO. 3 OF 2014 MPA Shipping Division 460 Alexandra Road 21 st Storey PSA Building Singapore 119963 Fax: 63756231 http://www.mpa.gov.sg 21 January
More informationNOMADIC. Tender to TITANIC. Synopsis
NOMADIC Tender to TITANIC Synopsis NOMADIC was ordered by the White Star Line in 1910 to serve as a tender for a trio of huge ocean liners...including the ill-fated TITANIC...which were too large to dock
More information56m Multipurpose Vessel / Icebreaker Listing ID:
Australia - Chile - Indonesia - Great Britain - New Zealand - Panama - Philippines - South Korea - Thailand - USA E: sales@seaboats.net (sales) - E: admin@seaboats.net (accounts) 56m Multipurpose Vessel
More informationUK Port Infrastructure Project Pipeline Analysis Report
UK Port Infrastructure Project Pipeline Analysis Report Prepared by Moffatt & Nichol, for the British Ports Association, March 2018 Following release of the Analysis of the National Infrastructure and
More information1994 HSC Code HSC Code
1 SOLAS 74 1.1 Certificates Exemption Certificate Reg. I / 12 Cargo s a 500 GT Passenger s Document of Compliance with the special Requirements for Ships Reg. II - 2 / 19.4 carrying Dangerous Goods 1994
More informationAlexandria Port, Egypt
Alexandria Port, Egypt Source: This information has been extracted from the WFP Logistics Capacity Assessment for Egypt. This LCA is a work in progress and not all sections are complete. This material
More informationSHIPBUILDING INDUSTRY
0 SHIPBUILDING INDUSTRY Turkey is surrounded by sea on three sides, is a natural bridge between Asia and Europe. Turkey borders the Black Sea, the Mediterranean, the Aegean and the Sea of Marmara. The
More informationNew generation mobdock used for fast underwater stern tube seal replacement in Port Everglades.. 3
NEWS Number 187 LETTER 198 New generation mobdock used for fast underwater stern tube seal replacement in Port Everglades.. 3 Rapid underwater bow thruster removal avoids drydocking... 6 Underwater propeller
More information"Amastra" mined Nha Trang Vietnam. picture by Barney Boylan, with permission. Vietnam, Nha Trang bay, POL station.
"Amastra" mined Nha Trang Vietnam picture by Barney Boylan, with permission. Vietnam, Nha Trang bay, POL station. Picture shows Barney Boylan on the left, with hands in pockets. The Amastra's crew is returning
More informationCUSTOMER SEGMENTS IN SHIP POWER TIMO KOPONEN VP FINANCE&CONTROL, SHIP POWER
CUSTOMER SEGMENTS IN SHIP POWER TIMO KOPONEN VP FINANCE&CONTROL, SHIP POWER 1 Wärtsilä Customer segments/ Timo Koponen, Ship Power Why Customer segments? Background and objectives Package sales of Total
More informationMERCHANT SHIPPING (PREVENTION OF OIL POLLUTION) (RECORDS) REGULATIONS 1986
Government Circular 216/86 OIL POLLUTION MERCHANT SHIPPING (PREVENTION OF OIL POLLUTION) (RECORDS) REGULATIONS 1986 The Merchant Shipping (Prevention of Oil Pollution) (Records) Regulations 1986 were made
More informationBulk Singapore (all details are about)
Bulk Singapore (all details are about) GENERAL INFORMATION Compiling date 29/10/2012 (Last updated date 30/10/2012) Head Owner s full style Disponent Owner full style Managing company MAIN PARTICULAR Name
More informationTHE STYLE OF OUR COMPANY IS BASED ON SAFETY, RELIABILITY AND QUALITY
THE STYLE OF OUR COMPANY IS BASED ON SAFETY, RELIABILITY AND QUALITY BASIC INFORMATION is a group of companies, the development of which begun in 1999. The corporation provides integrated project management
More informationLIFTIng HEAVY CARgO FOR WORLDWIDE TRAnSPORT
LIFTIng HEAVY CARgO FOR WORLDWIDE TRAnSPORT 01 INTRODUCTION 02 happy star 03 happy sky InTRODUCTIOn BigLift Shipping is one of the world s leading heavy lift shipping companies, specialized in worldwide
More informationMV ANSCHÜTZ FOR SALE
MV ANSCHÜTZ FOR SALE Former special pupose vessel of German maritime authorities for employment or conversion as researchvessel, supportvessel for offshore windfarms, diver basic vessel, as guard vessel
More informationNEWS LETTER 202. Fast underwater bow thruster repairs keep ships out of drydock... 3
NEWS Number 187 LETTER 202 Fast underwater bow thruster repairs keep ships out of drydock... 3 No drydocking needed thanks to quick underwater stern tube seal repair in Port Gentil... 10 Contents Page
More informationThe Last Years of Sun Ship
The Last Years of Sun Ship In the early 1980 s Sun decided to get out of the new construction business. At the time they had three vessels contracted to build. One 823 45,408 gross ton Ro/Ro ship for Waterman
More informationExploration Updates. Spring Issue 1
Exploration Updates Spring 2006 Issue 1 Welcome to the first issue of SCRET s newsletter for 2006. Our goal is to publish the newsletter twice each year. Each issue will focus on SCRET s efforts to explore
More information67.55m Icebreaker Listing ID:
Australia - Great Britain - Indonesia - New Zealand - Philippines - Thailand - USA E: sales@seaboats.net (sales) - E: admin@seaboats.net (accounts) 67.55m Icebreaker Listing ID: 613641 DESCRIPTION: 67.55m
More informationPort Dues in Hong Kong
Port Dues in Hong Kong Principal Legislation Shipping and Port Control Ordinance (Cap 313) Shipping and Port Control Regulations (Cap 313A) Pilotage Ordinance (Cap 82) Pilotage (Dues) Order (Cap 84D) Who
More informationNEW TECHNOLOGIES AND THEIR IMPACT ON PORT DEVELOPMENT IN JAMAICA. Christopher Hamilton May
Organization Of American States Second Hemispheric Conference On Inland Ports, Waterways & Dredging NEW TECHNOLOGIES AND THEIR IMPACT ON PORT DEVELOPMENT IN JAMAICA Christopher Hamilton May 18 2017 2.83
More information400 Man / 8 Point / 300MT+25MT Crane / Accommodation/Work Barge
z Eastern WB400 400 Berths in en-suite cabins 8 Point Mooring System Built 2016 300MT, Man Riding Main Crane 25MT, Man Riding Auxiliary Crane 1,950 m 2 Open Deck Space 1,100 m 2 Covered Deck Space Helideck
More informationREPORT INTO THE FIRE AND SUBSEQUENT GROUNDING OF THE MV "PATRIARCH" ON 1ST SEPTEMBER, 2004
REPORT INTO THE FIRE AND SUBSEQUENT GROUNDING OF THE MV "PATRIARCH" ON 1ST SEPTEMBER, 2004 The Marine Casualty Investigation Board was established on the 25 th March, 2003 under The Merchant Shipping (Investigation
More informationPort Dues and Charges of the Freeport of Riga
Approved by Decree No 38, 16.06.2000 of Board of the Freeport With amendments of: 22.09.2000 22.12.2000 27.04.2001 08.06.2001 19.10.2001 17.12.2001 18.12.2002 Port Dues and Charges of the Freeport of Riga
More informationImplementation Status & Results Africa GEF-Western Indian Ocean Marine Highway Development and Coastal and Marine Contamination Prevention (P078643)
losure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Africa GEF-Western Indian Ocean Marine Highway Development
More informationport of brisbane Information Guide
port of brisbane Information Guide A B O U T U S The Port of Brisbane, managed by the Port of Brisbane Pty Ltd, is Queensland s largest general cargo and container port, and a driver of economic growth
More informationU. S. Coast Guard Sector Boston. November 2016 April 2017
U. S. Coast Guard Sector Boston November 2016 April 2017 Pollution Statistics for Port of Boston NOV 2016 APR 2017 Reports Received: 38 OSLTF funded responses: 4 Amount Discharged (water & land impact):
More informationPORT OF MIIDURANNA PORT RULES
PORT OF MIIDURANNA PORT RULES Est. 2017 I General data of the Port. 1. Business form of the Port Authority. The owner and the keeper of Port of Miiduranna is AS Miiduranna Sadam. Address: Miiduranna tee
More informationRed Lilly (all details are about)
Red Lilly (all details are about) GENERAL INFORMATION Compiling date (Last updated date 30/10/2012) Head Owner s full style Disponent Owner full style Managing company MAIN PARTICULAR Name Red Lilly Ex-names
More informationRepublic of Turkey - Ministry of Economy,
Republic of Turkey - Ministry of Economy, 2012 0 SHIPBUILDING INDUSTRY Turkey is surrounded by sea on three sides, is a natural bridge between Asia and Europe. Turkey borders the Black Sea, the Mediterranean,
More informationMAPUTO PORT DEVELOPMENT COMPANY
MAPUTO PORT DEVELOPMENT COMPANY PORT OF MAPUTO MAY 2015 Concession Information MPDC has the concession rights to operate the Port of Maputo and the approved concession period ends in 2033 with an option
More informationVERSION DATE OF ISSUE DESCRIPTION PREPARED CHECKED APPROVED Technical note HHP DKA OYBE
DRAMMENREGIONENS VIRKESTERMINALER DEVELOPMENT OF NEW TIMBER TERMINAL NAVIGATION AND BERTH LOCATION STUDY ADDRESS COWI A/S Parallelvej 2 2800 Kongens Lyngby Denmark TEL +45 56 40 00 00 FAX +45 56 40 99
More informationUnderwater hull repairs save time and money
Underwater hull repairs save time and money Our teams fly all over the world to perform a wide range of hull repairs on any type of vessel. In this article we give you a summary of the more recent operations.
More informationShips designed by Wartsila, a powerful proposition. Wilco van der Linden Sales director Wärtsilä Ship Design
Ships designed by Wartsila, a powerful proposition Wilco van der Linden Sales director Wärtsilä Ship Design This is Wärtsilä SHIP POWER POWER PLANTS SERVICES Our mission and vision Mission We provide lifecycle
More informationDedicated to Electric & Hybrid Propulsion. A Future-Oriented Automation Platform. Scaldis Fully Self-Propelled Crane Vessel
SBI VOL. 12 ISSUE 3 2018 ShipBuilding i n d u s t r y Dedicated to Electric & Hybrid Propulsion electric & hybrid marine world expo 2018 A Future-Oriented Automation Platform shipboard automation & marine
More informationMalta Maritime Law Association
Malta Maritime Law Association Tug Boats and the Towage Industry 1. Introduction: 1.1 Tug boats are a necessary evil and as a result Shipowners and other Users [eg. ship agents, terminal operators and
More informationShip Disaster Investigation Teacher s Manual
Marine Kit 4 Ship Disaster Investigation Teacher s Manual Contents Teacher s Instructions Check Sheet for Investigation Assessment Sheet Agent s Manual Ship Disaster Cases Answer Key This activity was
More informationGolden Ocean Group Limited Q results March 1, 2007
Golden Ocean Group Limited Q4 2006 results March 1, 2007 PROFIT & LOSS 2005 2006 (in thousands of $) 2006 2005 Oct-Dec Oct-Dec Jan - Dec Jan - Dec Operating Revenues 37 292 91 253 Time charter revenues
More informationMoorMaster, automated mooring for ports automation
Click Cavotec to edit MoorMaster Master title style MoorMaster, automated mooring for ports automation AAPA Facilities Engineering Seminar and Expo 2015 Presented by: Mike Howie Group Product Manager,
More informationLIFTing HEAVY CARGO FOR WORLDWIDE TRANSPORT
LIFTing HEAVY CARGO FOR WORLDWIDE TRANSPORT Newbuilding Happy D-type Happy Delta, Happy Diamond, Happy Dover, Happy Dragon, Happy Dynamic HATCH OPENINGS AND ALLOWABLE LOADS CRANES PRINCIPAL DIMENSIONS
More informationAPPLICATION FOR REVALIDATION OF A CERTIFICATE OF COMPETENCY
APPLICATION FOR REVALIDATION OF A CERTIFICATE OF COMPETENCY A. PERSONAL PARTICULARS OF APPLICANT SURNAME:... FIRST NAMES:... DATE OF BIRTH:... COUNTRY OF BIRTH:... NATIONALITY:... ID/PASSPORT NO.: HEIGHT:...EYE
More information