Dredging 101. Why, Who, How and So What! 2015 WAMSI Research Conference. 30 March 2015
|
|
- Jasmin Bennett
- 5 years ago
- Views:
Transcription
1 Dredging 101 Why, Who, How and So What! 2015 WAMSI Research Conference 30 March 2015
2 Presentation Contents Quick Oversight on Why we need to Dredge and Who Carries it out Global Context of some of our Projects How Dredges work and their Turbidity Generating Sources
3 Things Have Changed (improved?) Drilling Rock by hand ready for blasting, Swan River Mouth, now Fremantle Inner Harbour
4 Why? ~30% GDP for Australia generated via seaborne trade 1 Shipping Channels, like roads, need to be maintained and improved Dredging of shipping channels, for maintenance and capital deepening is necessary Dredging also required for other maritime development activities References: 1 Ports Australia, April 2014 Dredging and Australian Ports
5
6 Global Shipping Fleet is Growing in Size Sourced from Ports Australia
7 Who? A number of domestic players, generally with smaller sized equipment suited to minor capital and maintenance dredging projects Only five key International Companies who have recent track record to directly execute projects in Australia under our contracting, HSE and IR conditions o A couple of companies have completed works as part of a JV or sub contract For large projects proponents are competing globally for a limited fleet of equipment we generally can t pick and choose
8 International Trailer Suction Hopper Dredge Fleet Global Fleet Potentially Available to Australian Market Hopper Capacity (m 3 )
9 International Cutter Suction Dredge Fleet Global CSD Fleet Potentially Available to Australia Total Installed kw
10 So What? Recent Large Capital Dredging Projects-Australia Location Volume Dredged Duration Ichthys (NT) 16Mm3 ~14months Ichthys (NT) 16 Mm 3 14 months Gladstone (Qld) 25Mm3 Gladstone (Qld) 36 Mm 3 28 months Gorgon (WA) 8Mm3 Gorgon (WA) 8 Mm 3 6 months Wheatstone 25Mm3 Wheatstone (WA) 25 Mm 3 25 months Port Hedland (south west creek) (WA) 14 Mm 3 12 months Totals ~100Mm 3 ~85 months (100 Subiaco Football Stadiums)
11 Recent Capital Projects and Scale - Global Suez Canal Channel Duplication: 230Mm 3 of Dredging over 50km of Channel 17 Cutter Suction Dredges and 2 Trailer Suction Hopper Dredges Contract Signed October 2014, started soon after and to be completed by August 2015 (i.e. <10 months)! Panama Canal Expansion 1 ~ 60Mm 3 of Dredging and excavation on the Atlantic, Pacific Entrances and Gatun Lake References: 1
12 How - Types of dredgers Hydraulic (slurry formed to transport material) Mechanical (near insitu density removal) Cutter Suction Dredge Trailer Suction Hopper Dredge Water Injection Dredge Backhoe Dredge Grab/Clamshell Dredge Dipper Dredge Bucket Ladder Dredge Suction Dredge
13 CSD Typical Features Deck Crane Bridge Side Anchors Working/ Travelling Spud Fixed Spud Slurry Pumps + Pipework Suction Mouth Ladder Cutter Head Source: IADC Dredging for Development,
14 Cutter Suction Dredges Small and Large
15
16 Ground anchors Delta flippers (sand) Bruce Danforth Stevin Stevsharks (rock)
17 Gravity anchors Box anchors Concrete block Tripod platform?
18 Placement anchor booms
19 Cutting Teeth Before, and After
20
21 Blade Tooth Adaptor
22
23 Reclamation Areas In Theory
24 Reclamation Area In Practice Dredge Material Discharge Point Dredge and Pipeline Internal Bund Tailwater Discharge Point External Bund
25 Weir Boxes
26 Reclamation Area Lined
27 Trailer Suction Hopper Dredge
28 Bridge and Accommodation Draghead Suction Pipe Hopper Pump Ashore Connection
29 TSHD Dredging Cycle Hopper Overflow Losses Propellor Wash Draghead DREDGING SAILING LOADED TO DISPOSAL SITE Propellor Wash Propellor Wash SAILING EMPTY TO RECOMMENCE DREDGING DUMPING MATERIAL/ PUMPING ASHORE Fines Stripping from Dumped Material Fines within Tailwater Discharge Propellor Wash
30 Bridge Operations
31 Turbidity Hopper Overflow during dredging
32
33
34 TSHD - Draghead
35 Turtle Exclusion Chains
36 Loaded and Travelling to Disposal Site
37 TSHD Bottom Dumping via Split Hopper
38 TSHD Bottom Dumping via Doors
39 Plume Generation Bottom Dumping
40 Beach Renourishment Pumping Out
41 Backhoe and Grab Dredges
42 Backhoe Dredge
43
44 Backhoe Dredge
45
46 Online Resources PIANC CEDA (Central Dredging Association) - IADC (International Association of Dredging Companies) US Army Corp of Engineers - IHC Dredging -
Dredging in Figures 2008 This review of the global dredging market focuses on the situation in 2008 and was published in October 2009.
Dredging in Figures 28 This review of the global dredging market focuses on the situation in 28 and was published in October 29. Maritime Solutions for a Changing World Dredging changes the world. Yet,
More informationTurnover global dredging market 2009 per driver in mln
Dredging in Figures 2009 This review of the global dredging market focuses on the situation in 2009 and was published in October 2010. IADC is always very thorough and precise in estimating the dredging
More informationNEW TECHNOLOGIES AND THEIR IMPACT ON PORT DEVELOPMENT IN JAMAICA. Christopher Hamilton May
Organization Of American States Second Hemispheric Conference On Inland Ports, Waterways & Dredging NEW TECHNOLOGIES AND THEIR IMPACT ON PORT DEVELOPMENT IN JAMAICA Christopher Hamilton May 18 2017 2.83
More informationPort of Durban. Entrance Channel Widening & Deepening Project Completion Function. 31 March 2010
Port of Durban Entrance Channel Widening & Deepening Project Completion Function 31 March 2010 Presented by: Theunis Steenkamp Project Director Natcor 1 The saying goes.. THE JOB IS NOT OVER UNTILL THE
More informationTurnover global dredging market 2009 per driver in mln %
Dredging in Figures 29 This review of the global dredging market focuses on the situation in 29 and was published in October 21. IADC is always very thorough and precise in estimating the dredging turnover.
More informationMarine Transportation Safety Investigation Report M17P0406
Marine Transportation Safety Investigation Report M17P0406 COLLISION Dredger FRPD 309 Fraser River, British Columbia 05 December 2017 About the investigation The Transportation Safety Board of Canada (TSB)
More informationDredging in Fowey Chapter 3 Post departure of the Lantic Bay
Dredging in Fowey Chapter 3 Post departure of the Lantic Bay Prior to the departure of the Lantic Bay the Harbour master Captain Mike Sutherland had obtained quotes from the main dredging contractors for
More informationGreg Steinepreis EXECUTIVE SUMMARY. Partner, Perth T
Greg Steinepreis Partner, Perth T +61 8 9429 7505 greg.steinepreis@squirepb.com Practice Focus Construction, engineering & infrastructure Services International and domestic dispute resolution Litigation
More informationManson Construction Co.
Manson Construction Co. Since 1905 Frederick Paup, Chairman of the Board & Executive Vice President About Manson Established in 1905, Manson began as a small, family-owned Puget Sound marine pile driving
More informationAmended Maintenance Dredge Spoil Management Plan. Shute Harbour Marina Resort
Amended Maintenance Dredge Spoil Management Plan Shute Harbour Marina Resort Amended Maintenance Dredge Spoil Management Plan Quality Information Document Ref Amended Maintenance Dredge and Spoil Maintenance
More informationU.S. Army Corps of Engineers Wilmington District
U.S. Army Corps of Engineers Wilmington District 2012 East Coast - WEDA October 9-11, 2012 Ongoing & Upcoming Contracts US Army Corps of Engineers Wilmington District Ongoing Contracts Project Quantity
More informationPRESENTATION ON CAIRNS SHIPPING DEVELOPMENT PROJECT
PRESENTATION ON CAIRNS SHIPPING DEVELOPMENT PROJECT CAIRNS A STRATEGIC PORT NORTH EAST NAVY BASE MAIN MARITIME ACTIVITY AND EMPLOYMENT : NORTHERN AUSTRALIA CARGO SHIPPING SERVICING LARGEST POPULATION :
More informationThis component includes dredging of both entrances to the Canal and the course of the Culebra Cut and Gatun Lake.
EXPANSION PROGRAM COMPONENTS Third Set of Locks The project consists of the design and build of new Post-Panamax locks in the Pacific and Atlantic sides of the Panama Canal. Each complex will feature three
More informationNorfolk District North Atlantic Division
Norfolk District North Atlantic Division Eastern Chapter of WEDA Fall Conference October 26, 2016 Stephen J. Powell, P.E. (757) 201-7788 US Army Corps of Engineers Norfolk District FY-17 Dredging Program
More informationPorts. Water and Environment Solutions
Ports Water and Environment Solutions BMT WBM in Ports The Company BMT WBM and Ports BMT WBM Pty Ltd is a leading edge water and environmental consultancy with more than 40 years national and international
More informationCOMMONWEALTH OF THE BAHAMAS MINISTRY OF PUBLIC WORKS & TRANSPORT NASSAU HARBOUR PORT IMPROVEMENT PROJECT. Nassau Harbour Port Improvement Project
COMMONWEALTH OF THE BAHAMAS MINISTRY OF PUBLIC WORKS & TRANSPORT NASSAU HARBOUR PORT IMPROVEMENT PROJECT AUGUST 2009 OVERALL VIEW OF NASSAU HARBOUR AERIAL VIEW OF NASSAU HARBOUR PROJECT HISTORY 1960 s
More informationPIANC-World Congress Panamá City, Panamá, 2018
Contractual Model for Dredging Projects to Avoid Disputes: Case Studies of the application of Performance Based Contracts in dredging projects around the world. ABSTRACT Prieto-Portar, L. 1, Prins, J.
More informationBINBIRRI CONTRACTING PTY LTD CAPABILITY STATEMENT 2016
BINBIRRI CONTRACTING PTY LTD CAPABILITY STATEMENT 2016 P: 08 91722341 E: binbirricontracting@hotmail.com ABN: 42 151 996 913 PO Box 2233 South Hedland WA 6722 Binbirri Contracting was established in 2010
More information2017 Major Projects Pipeline Report Adrian Hart, Senior Manager Infrastructure & Mining
2017 Major Projects Pipeline Report Adrian Hart, Senior Manager Infrastructure & Mining Major Projects Pipeline Report - 2017 Presentation Outline Overview and key findings of the 2017 Pipeline Report
More informationPort Hedland South-West Creek Dredge Plume Modelling Final Report Version 4 Prepared for Port Hedland Port Authority
Port Hedland South-West Creek Dredge Plume Modelling Final Report Version 4 Prepared for Port Hedland Port Authority 12 References AME (2010). PHPA South West Creek Approvals Initial Plume Modelling Input.
More informationCoastal Management: Treasure Island - Long Key Nourishment
Coastal Management: Treasure Island - Long Key Nourishment Project Completed - October 20, 2010 The nourishment of Treasure Island and Long Key (TI/LK) beaches began in late July of 2010. The previous
More informationJason J. Hull, P.E. Director of Engineering. Port Freeport 1100 Cherry Street Freeport, Texas
Jason J. Hull, P.E. Director of Engineering Port Freeport 1100 Cherry Street Freeport, Texas 77541 979.233.2667 hull@portfreeport.com Port Freeport s History Feb. 1913 Corps Hopper Dredge Comstock sank
More informationThe Thomas Series of. Dredge Pumps. thomas dredge pumps
The Thomas Series of Dredge Pumps thomas dredge pumps 1 Thomas Simplicity Dredge Pumps The Thomas Simplicity dredge pump is engineered for your specific operation. Years of operation and many design improvements
More information30 November Randall G. Hintz Chief, Operations Support Branch Operations Division. US Army Corps of Engineers BUILDING STRONG
30 November 2011 Randall G. Hintz Chief, Operations Support Branch Operations Division US Army Corps of Engineers Overview MAINTENANCE PROJECTS Deep Draft Channels Shallow Draft Channels Coastal Inlets
More informationNorfolk District North Atlantic Division
Norfolk District North Atlantic Division Eastern Chapter of WEDA Fall Conference October 9, 2012 Stephen J. Powell, P.E. (757) 201-7788 US Army Corps of Engineers 5-Year Dredging Schedule (By dredge type)
More informationEUDA S 20 TH ANNIVERSARY CONFERENCE
EUDA S 20 TH ANNIVERSARY CONFERENCE The European Dredging Industry: A Maritime Success Story! Thursday, 7 th November 2013, 10.00 in Bibliothèque Solvay, Brussels EUDA 2013 AGM CONFERENCE PROGRAMME Thursday,
More informationPrivatisation of Ports in New Zealand
Heini Evers and Roy Weaver Privatisation of Ports in New Zealand Abstract The New Zealand economy has undergone significant change in the last ten years. The Ports Industry is one of the many areas affected
More informationRotterdam, the Netherlands 12 March 2014
PRESS RELEASE 30% higher profit for Van Oord Rotterdam, the Netherlands 12 March 2014 Van Oord Dredging and Marine Contractors bv Schaardijk 211 3063 NH Rotterdam The Netherlands T +31 88 8260000 E info@vanoord.com
More informationSPECIFICATION OF TUG VISION 6 (3300 HP)
Open Sea Open seas was registered as a company in the kingdom of Bahrain in 2000. The company specializes in providing in company or chartering to other parties a large array of marine equipment. Open
More informationThe History & Management of the Atlantic Intracoastal Waterway in Florida
The History & Management of the Atlantic Intracoastal Waterway in Florida THE BEGINNING OF THE INTRACOASTAL WATERWAY IN FLORIDA CONSTRUCTED BY A PRIVATE COMPANY, THE FLORIDA EAST COAST CANAL COMPANY BETWEEN
More informationOhio Freight Conference Great Lakes Commercial Navigation
Ohio Freight Conference Great Lakes Commercial Navigation Roger E. Haberly Regional Economist Buffalo New York 13 September 2013 US Army Corps of Engineers Presentation Overview 1. GL Physical System Description
More informationCORPS OF ENGINEERS ALASKA DISTRICT Dredging Projects. Michael Tencza, PE Operations Project Manager November 4, 2015
CORPS OF ENGINEERS ALASKA DISTRICT 2016 Dredging Projects Michael Tencza, PE Operations Project Manager November 4, 2015 US Army Corps of Engineers Building and Preserving Alaska s Future AWARDED CONTRACTS
More informationThe Panama Canal: A Challenge to Efficiency in the 21st Century
The Panama Canal: A Challenge to Efficiency in the 21st Century Intertanko Chemical Conference April 8, 2008 Silvia de Marucci Leader, Liquid Bulk Segment smarucci@pancanal.com Physical Profile of the
More informationMaximising Beneficial Reuse through the use of a Novel Dredging Contract
Maximising Beneficial Reuse through the use of a Novel Dredging Contract Nicola Clay & Katherine Harris Port of London Authority Nick Bray Dredging Research Paul Hesk Van Oord UK CEDA Dredging Days 2007
More informationSPIEDR Deluge Structure Protection System. We appreciate the opportunity to support the protection of your valuable infrastructure.
WET FUEL WON T BURN Bob Swart, President Box 63, Quilchena, BC, V0E 2R0 fire.storm@shaw.ca June 29, 2016 Mr. Ken Bayers E-mail: ktbayers@gmail.com Phone # (604) 898 2803 SPIEDR Deluge Structure Protection
More informationTechnology working for you. From the Small Hand Feed Operation to Complete Engineered Plastic Granulator Systems
Reprocessing Plastic Scrap into Valuable Regrind From the Small Hand Feed Operation to Complete Engineered Plastic Granulator Systems Technology working for you. Screenless Granulators Low speed (27 rpm)
More informationDATA BOOK IV : COST ESTIMATE
The Study on Comprehensive Disaster Prevention around Mayon Volcano DATA BOOK IV : COST ESTIMATE DT IV List of (1/5) Clearing and Grubbing ha 59,192.92 Excavation (Road way & Drainage) Mech. cu.m 80.55
More informationThe Huizen Municipality Port Decree
No. 9 The Council of Huizen Municipality; having read the proposal of the Municipal Executive dated 26 October 2010; with a view to Section 149 of the Dutch Municipalities Act (Gemeentewet) d e c r e e
More informationJhan Schmitz. Executive Sponsor Panama Canal Expansion Program
Jhan Schmitz Executive Sponsor Panama Canal Expansion Program Capacity constraints need to double the capacity of the existing canal Accommodate post-panamax vessels Enhance Panama s strategic position
More informationExploration Updates. Spring Issue 1
Exploration Updates Spring 2006 Issue 1 Welcome to the first issue of SCRET s newsletter for 2006. Our goal is to publish the newsletter twice each year. Each issue will focus on SCRET s efforts to explore
More informationSite Formation Works of the Kai Tak Cruise Terminal Project
Site Formation Works of the Kai Tak Cruise Terminal Project Presented by Ian Muir MIEAust, CPEng Maritime Business Unit Head Asia Pacific and Deputy Project Director for the Kai Tak Cruise Terminal Site
More informationTHE ICs INTERNATIONAL BRISBANE AREA AQUA PARK PROPOSAL
Contacts: Mr Evan Pryor, Ph 38702756, evanpryor2002@yahoo.com.au Mr Bob Beatty, Ph 32883101, BobBeatty@BOSMIN.com Web Address: http://www.bosmin.com/ics/icharter.htm Postal Address: GPO Box 2927, Brisbane,
More informationThe Panama Canal An Engineering Wonder
The Panama Canal An Engineering Wonder By Priyanka Ann Saini, Sea News - November 28, 2017 The Panama Canal is a modern day engineering wonder. It is approximately 80 kilometers long between the Atlantic
More informationOPTIMIZATION STUDY OF THE NAUTICAL DEPTH OF THE APPROACH CHANNEL TO THE PORT OF PALEMBANG, INDONESIA
OPTIMIZATION STUDY OF THE NAUTICAL DEPTH OF THE APPROACH CHANNEL TO THE PORT OF PALEMBANG, INDONESIA by Ir. R. Groenveld and Ir. J. Mutsaers, Delft University of Technology The Netherlands ABSTRACT The
More informationWelcome to ICN s accessing resources seminar
Welcome to ICN s accessing resources seminar Michael Fairbairn - ICN Victoria 2013 FORMULA 1 ROLEX AUSTRALIAN GRAND PRIX Wednesday 13 March 2013, 1.00pm 6.30pm ICN Victoria Resources Program Michael Fairbairn
More informationPanama Canal Outlook. Jorge L. Quijano Administrator/CEO Panama Canal Authority
Panama Canal Outlook Jorge L. Quijano Administrator/CEO Panama Canal Authority Japan November 21, 2014 Yesterday PANAMA AT A GLANCE GDP growth rate last 10 years 7.5% GDP (P) 2013 (billion of dollars)
More informationCONTACT US. Heron Construction Company PO Box Papakura 2244 New Zealand P +64 (09) E
CONTACT US Heron Construction Company PO Box 72561 Papakura 2244 New Zealand P +64 (09) 299 9767 E info@heronconstruction.co.nz www.heronconstruction.co.nz Heron Construction Company has been proudly family
More informationEcosystem context in the Environmental Impact Assessment of the Dredging Operations in the Argentina s Santa Fe
Ecosystem context in the Environmental Impact Assessment of the Dredging g Operations in the Argentina s Santa Fe Confluencia Waterway (Paraná River) Authors: Claudio Daniele (Estudio de Ambiente y Desarrollo
More informationIT S JUST NOT NEEDED
IT S JUST NOT NEEDED 07 IT S JUST NOT NEEDED On Wednesday August 29th a panel of port and logistics experts gave their opinions on and answered questions from the community about our states current and
More informationThe Trusts Dredging Strategy
NAG Meeting 21st September 2012 Graham Holland Head of Asset Management Current Review Why Now? Previous practices not always well defined Processes required greater clarity The need to apply asset management
More informationThe Panama Canal Expansion: Myths and Realities for the North American Economy
2015 Center for Transportation Studies Research Conference, University of Minnesota The Panama Canal Expansion: Myths and Realities for the North American Economy Jean-Paul Rodrigue Professor, Dept. of
More informationLong Range Motor Yacht - Price Reduced! Listing ID:
Australia - Chile - Indonesia - Great Britain - New Zealand - Panama - Philippines - South Korea - Thailand - USA E: sales@seaboats.net (sales) - E: admin@seaboats.net (accounts) Long Range Motor Yacht
More informationINTERNATIONAL JOURNAL OF DESIGN AND MANUFACTURING
INTERNATIONAL JOURNAL OF DESIGN AND MANUFACTURING Proceedings of the International Conference on Emerging Trends in Engineering and Management TECHNOLOGY (ICETEM14) (IJDMT) 30-31,December, 2014, Ernakulam,
More informationport of brisbane Information Guide
port of brisbane Information Guide A B O U T U S The Port of Brisbane, managed by the Port of Brisbane Pty Ltd, is Queensland s largest general cargo and container port, and a driver of economic growth
More informationOver $1 bn INVESTED IN AUSTRALIAN OPERATIONS
Boeing s largest presence outside the US Broadest portfolio in Australian aerospace A trusted partner for global customers $1.3 bn BOEING S TOTAL CONTRIBUTION TO AUSTRALIAN GDP IN 2016 Over $1 bn INVESTED
More informationOCCUPATIONAL TOOL AND EQUIPMENT LIST
OCCUPATIONAL TOOL AND EQUIPMENT LIST Ironworker (Generalist) Government of Newfoundland Labrador Department of Advanced Education and Skills March 2012 Preface This document is intended as a companion
More informationCAIRNS A STRATEGIC PORT
CAIRNS A STRATEGIC PORT CURRENT ISSUES AS AT 25 SEPTEMBER 2017 Cairns Port Development Inc. is not-for-profit and community based. We live and work beside the Great Barrier Reef, applying world's best
More informationCNC Freight Services Sdn. Bhd.
CNC Freight Services Sdn. Bhd. Competent & Committed SIXTH EDITION NEWSLETTER JANUARY DECEMBER 2011 Dear reader, It s already another new year. 2011 has been an interesting year for us and you will find
More informationSUBJECT: Newark Bay Study Area Coordination Team Meeting, 9 October 2012
CENAN-PP-H 9 Oct 12 MEMORANDUM FOR RECORD SUBJECT: Newark Bay Study Area Coordination Team Meeting, 9 October 2012 1. The regularly scheduled monthly interagency coordination meeting was held on 9 Oct
More informationNC Dredge Studies. Sterling Baker, P.E. NCDOT James Gregson NCDEQ April 5, 2018
NC Dredge Studies Study of the Use and Efficiency of the Dredge Manteo Study of Acquisition of Dedicated Dredging Capacity Study of Dredging Services Cost-Benefit Analysis Sterling Baker, P.E. NCDOT James
More informationNC Dredge Studies NCBIWA Spring Conference April 23, 2018
NC Dredge Studies Study of the Use and Efficiency of the Dredge Manteo Study of Acquisition of Dedicated Dredging Capacity Study of Dredging Services Cost-Benefit Analysis 2018 NCBIWA Spring Conference
More informationSAN FRANCISCO DISTRICT FY 2018 NAVIGATION PROGRAM
SAN FRANCISCO DISTRICT FY 2018 NAVIGATION PROGRAM 1 255 255 255 237 237 237 0 0 0 217 217 217 163 163 163 200 200 200 WEDA PACIFIC CHAPTER 2017 ANNUAL MEETING 131 132 122 PORTLAND, OREGON 239 65 53 80
More informationASL Marine Holdings Ltd.
ASL Marine Holdings Ltd. SHIPBUILDING SHIPREPAIR SHIPCHARTERING Pulse of Asia 2008 - Presentation 8 th July 2008 1 Presentation Outline Company Profile 9M FY2008 Financial Review Business Review - Shipbuilding
More informationThe Holes Creek Bridge Replacement By Bradley McClelland
The Holes Creek Bridge Replacement By Bradley McClelland Each time there is a heavy rainstorm, the folks along Sheffield Road in the Dayton, Ohio suburb of West Carrollton have cause to be concerned. Holes
More informationSydney Airport s Parallel Runway: The Beneficial Use of Sand Dredged in Botany Bay
Terra et Aqua Number 62 March 1996 Christopher Herbert, Jean-Louis Betbeder Matibet, and Jean De Wilde Sydney Airport s Parallel Runway: The Beneficial Use of Sand Dredged in Botany Bay Christopher Herbert
More informationSOUTHERN PORTS AUTHORITY PORT OF BUNBURY PORT COMMUNITY LIAISON COMMITTEE HELD AT 5:10pm WEDNESDAY 11 FEBRUARY 2015
SOUTHERN PORTS AUTHORITY PORT OF BUNBURY PORT COMMUNITY LIAISON COMMITTEE HELD AT 5:10pm WEDNESDAY 11 FEBRUARY 2015 1. PRESENT: John Saunders (Chair), Brian Price (Deputy Chair), Rob Liley (A/COO PoB),
More informationPort of Kalama, New Approach to Maintenance Dredging
Port of Kalama, New Approach to Maintenance Dredging Vladimir Shepsis, Coast @ Harbor Engineering, Inc. John Dawson, Coast @ Harbor Engineering, Inc. Mark Wilson, Port of Kalama Tabitha Reeder, Port of
More informationPublic Submissions in response to the Bill closed on 2 July 2015 and Council lodged a copy of the submission provided as Attachment 1.
54 PLANNING AND ECONOMIC COMMITTEE 8 JULY 2015 3 SUSTAINABLE PORTS DEVELOPMENT BILL Neil Quinn 1/58/14 #4771706 RECOMMENDATION: That Council endorses the Submission made to the Infrastructure, Planning
More informationWaterway Access and the Atlantic Intracoastal Waterway in Florida
Waterway Access and the Atlantic Intracoastal Waterway in Florida Issues: Maintenance - Funding (costs), Infrastructure needs, permitting Management Consideration of the M-95 system, Cooperation among
More informationCurragh Operational Tour
Curragh Operational Tour Analyst Briefing Wednesday 17 May 2006 Curragh Operational Tour 17 May 2006 1 Overview Stewart Butel Director Coal Operations Wesfarmers Energy Curragh Operational Tour 17 May
More informationService charter incident reporting
Service CharTer INCIDent reporting This Service Charter was developed in consultation with AMSA s stakeholders and staff. It covers the Maritime Operations Division (MOD) regarding incident reporting and
More informationF6. Coastal Ferry Terminal Zone
F6. Coastal Ferry Terminal Zone F6.1. Zone description The purpose of the Coastal Ferry Terminal Zone is to provide for the integrated and efficient operation and development of ferry terminal facilities.
More informationAmerican Institute of Marine Underwriters
American Institute of Marine Underwriters Mr. Scott Bergeron Chief Executive Officer, Liberian Registry Commissioner, Virginia Port Authority May 8, 2013 1 Existing Lock Dimensions vs. Expanded Lock Dimensions
More informationPort dues and charges Free port of Ventspils
Port dues and charges Free port of Ventspils Adopted by the Ventspils Freeport Board s Decision No.3/11 of 22.02.2008 Board s Decision No.7/8 of 19.06.2009 Board s Decision No.15/24 of 20.11.2009 Board
More information( vs )
Cruise Down Under Conference 2009: Riding the Cruise Boom Port and Terminal Developments August 27, 2009 Growth of Cruising in Australia (2006 2007 vs. 2007 2008) Australian ports increased by 13% Passenger
More informationWooden Model kit by Artesania Latina
SPECIAL ISSUE # 10 AUGUST 2018 All photographs and articles published remain the copyright property of the contributor and SMSC unless released. HMS Endeavour - Bark 1768 Wooden Model kit by Artesania
More informationMarine Consultants & Specialist Brokers. We are exclusively authorized to offer : WORK BARGE MAJOR
Marine Consultants & Specialist Brokers We are exclusively authorized to offer : WORK BARGE MAJOR D E T A I L E D S P E C I F I C A T I O N page Main data sheet 3 and 4 Crawler crane load-chart 5 Various
More informationAPPENDIX 20 EFFECTS ON NAVIGATIONAL SAFETY
APPENDIX 20 EFFECTS ON NAVIGATIONAL SAFETY Effects of Lyttelton Port Recovery Plan on Navigational Safety November 2014 INTRODUCTION Lyttelton Port of Christchurch (LPC) utilises an integrated health
More informationLet us help you with your manure handling, few know m
Manure handling Svea Agri manure handling systems are designed to provide many solutions and still be easy to work with. They are cow-friendly, durable and reliable. Scraper system Press system Cow safety
More informationMr. Jeff Keever Deputy Executive Director Virginia Port Authority May 2, 2012
Management of Dredged Materials: Challenges and Opportunities Mr. Jeff Keever Deputy Executive Director Virginia Port Authority May 2, 2012 1 Craney Island Eastward Expansion and Marine Terminal NNMT Hampton
More informationMayo WRF ENR Upgrade and Expansion. Mayo-Glebe Heights Pump Station & Force Main Project Updates
Mayo WRF ENR Upgrade and Expansion. Mayo-Glebe Heights Pump Station & Force Main Project Updates Glebe Heights and Loch Haven Community Outreach Meeting South River High School May 17, 2016 Agenda Mayo
More informationBYZANTINE MARITIME CORPORATION
BYZANTINE MARITIME CORPORATION Background of BMC Established 1972 All operations done in house including crewing, which allows BMC to retain key crew members for up to 20 years in some cases. All vessels
More informationSTAYING ALIVE. Sorting pictures to examine what settlements need to survive.
STAYING ALIVE Sorting pictures to examine what settlements need to survive. STAYING ALIVE TABLE CLOTHES COMMUNICATIONS EDUCATION FOOD FUEL HEALTH AND SAFETY LEISURE SHELTER WATER WORK Why do some settlements
More informationThe Lufthansa Group in Panama A Successful Launch of Operations a six month retrospective
The Lufthansa Group in Panama A Successful Launch of Operations a six month retrospective Felipe Bonifatti General Manager for Central America & the Caribbean Panama Business Day Hamburg, October 20 th,
More informationHARBOUR DUES. The Port of Helsingborg
HARBOUR DUES The Port of Helsingborg Valid 1 January -- 31 December, 2018 1 Contents 1 Ships dues 2 Environmental discounts 3 Waste and environmental charge 4 Pumping charge 5 Harbour dues 6 Advance notification
More informationpanama canal expansion program
panama canal expansion program september 2013 EXPANSION PROGRAM COMPONENTS Post-Panamax Locks Construction of the new locks complexes on the Pacific and Atlantic sides. Each one of the locks complexes
More informationGETTING HIGH IN SYDNEY
GETTING HIGH IN SYDNEY Shannan Ponton goes to great heights to see his hometown of Sydney from some new angles that are available to everyone. He climbs up to a crows nest of a tall ship to see the harbour
More information[tips & tricks for modelmakers] Plate 4 Decks. Required tools
Plate 4 Decks 2 4 18 3 Required tools 13 12 25 11 25 1 24 6 7 15 14 21 22 26 19 17 5 22 25 17 25 10 27 20 19 26 21 9 8 1 Gun locks 1 Do not cut the small link from the lock to the fret as it provides good
More informationAn aerial view shows the progress made at the Bladin Point construction site last year (left) compared with the end of 2016 (right).
Issue #207 16 December 2016 An aerial view shows the progress made at the Bladin Point construction site last year (left) compared with the end of 2016 (right). Strong progress has been made in 2016 across
More informationSHIPBUILDING INDUSTRY
0 SHIPBUILDING INDUSTRY Turkey is surrounded by sea on three sides, is a natural bridge between Asia and Europe. Turkey borders the Black Sea, the Mediterranean, the Aegean and the Sea of Marmara. The
More informationShallow IC of 5
Shallow IC 250 1 of 5 Description 250mm diameter polypropylene inspection chamber for adoptable and non-adoptable applications. Compliant with Sewers for Adoption 7th edition [SfA7]. Single unit with integral
More informationOriginal artwork commissioned by DeGrey Civil and completed by employee Carl Garlett. Boodarie Contracting.
Original artwork commissioned by DeGrey Civil and completed by employee Carl Garlett Boodarie Contracting www.degreycivil.com.au Marapikurrinya This country is the traditional land of the Kariyarra people.
More informationFritz Pinnock EXECUTIVE DIRECTOR CARIBBEAN MARITIME INSTITUTE
CARIBBEAN LOGISTICS: THE ROAD AHEAD CARTAGENA, October 20, 2015 Fritz Pinnock EXECUTIVE DIRECTOR CARIBBEAN MARITIME INSTITUTE CARIBBEAN SHIPPING ASSOCIATION 2 The Caribbean at a Crossroads! There is a
More informationProjectConnect News Update
www.projectconnect.com.au ProjectConnect News Update 18 July 2011 This Fortnight s Topics WA Mining and Energy Infrastructure Conference 2011 Workforce Strategies in the Resources Sector Dates for your
More informationare greasable that the units *Positive indexing for raising roll down the track on and
We at the Thomas family have deep roots in the Maine tradition of craftsmanship and innovation. Dale Thomas began working with steel in 1959 and for almost five decades gained extensive experience in steel
More informationHARBOR INFRASTRUCTURE INVENTORIES Cleveland Harbor, OH
HARBOR INFRASTRUCTURE INVENTORIES Cleveland Harbor, OH Harbor Location: Cleveland Harbor is located at the mouth of the Cuyahoga River on the southern shore of Lake Erie in the city of Cleveland, OH. Authority:
More informationHUDSON LEADER. Classification society: American Bureau of Shipping. Recognized Organization: American Bureau of Shipping
HUDSON LEADER IMO no.: 8607749 Flag: Panama Ship type: Car carrier MMSI: 355123000 Call sign: H9JS Gross tonnage: 47307 Ship length: 180 m Keel laying date: 20.03.1987 Deadweight: 14104 Classification
More informationCAPABILITY STATEMENT
CAPABILITY STATEMENT COMPANY PROFILE Having been in operation for more than 70 years, Hall Contracting has developed a reputation for delivering practical solutions that set the bar in quality. We have
More information[tips & tricks for modelmakers] Plate 4 Decks. Required tools 19
Plate 4 Decks 25 13 1 11 12 8 9 21 20 27 10 21 15 25 6 14 7 24 18 Required tools 19 19 26 26 22 2 22 17 3 4 17 25 5 25 1 Gun locks 1 Do not cut the small link from the lock to the sprue as it provides
More informationTNPA 2 nd Strategic Customer Forum Update on Infrastructure Projects. 13 August
TNPA 2 nd Strategic Customer Forum Update on Infrastructure Projects 13 August 2014 1 THE TNPA WORLD OF PORT INFRASTRUCTURE Complete Pixman Images 2010 Dredging International - Pallieter Overview of Presentation
More information