1 Port Hedland South-West Creek Dredge Plume Modelling Final Report Version 4 Prepared for Port Hedland Port Authority 12 References AME (2010). PHPA South West Creek Approvals Initial Plume Modelling Input. File Note, 13 July Berthot A. and Treloar P. D. (2009). The Use of Numerical Modeling in Assisting Port Development Case Study at Port Hedland. Proceedings of Coast and Ports Wellington, NZ. September Bridges T.S., Ells S., Hayes D, Mount D, Nadeau S.C., Palermo M.R., Patmont C., and Schroeder P.UASCE (2008). The Four Rs of Environmental Dredging:Resuspension, Release, Residual, and Risk. Published by USACE, Dredging Operations and Environmental Research Program, ERDC/EL TR Cardno Lawson Treloar (2010). Port Hedland Harbour Current Modelling Investigations for Proposed Development at Lumsden Point. Prepared for Port Hedland Port Authority. Ref: LJ2843, L March Global Environmental Modelling Systems (GEMS) RGP5 Port Facilities Dredging Program Simulation Studies at Harriet Point. Report July Port of Melbourne Corporation (2008). Turbidity Detailed Design (Channel Deepening Project). CDP_ENV_MD_024 Rev 2. January Postma, L., Stelling, G.S. and Boon, J., (1999). Three-dimensional water quality and hydrodynamic modelling in Hong Kong. Stratification and water quality. Proceedings of the 2nd Int. Symp. on Environmental Hydraulics, Hong Kong, Balkema, Rotterdam. December 1998, Provis D. and Aijaz S. (2009). Prediction of Plume Generation and Movement from Dredging Operations in Port Phillip Bay, Melbourne. Proceedings of Coast and Ports Wellington NZ, September SKM (2008). Dredging Verification Studies at Cape Lambert. Presentation prepared by SKM. March SKM (2010). Port Hedland Port Authority South West Creek Dredging - Geotechnical Interpretative Report. Prepared by SKM, Rev 0 October van Rijn, L. (1993): Principles of Sediment Transport in Rivers, Estuaries and Coastal Seas. AQUA Publications. van Rijn, L. (2006): Principles of Sediment Transport in Rivers, Estuaries and Coastal Seas Part II. AQUA Publications. Wolanski E., Jones M., and Bun J.S. (1980). Hydrodynamics of a Tidal Creek-Mangrove Swamp System. Australian Journal of Marine and Freshwater Research. Volume 31, pp Worley Parsons (2009). The Heng Shan Project - South West Creek Berths 1 and 2 (SWC1 and SWC2) Geotechnical Investigation. Prepared for FORTESCUE METALS GROUP LIMITED. Ref: P RP-GE November 2010 Cardno (NSW/ACT) Pty Ltd 35 Z:\Doc_CLT\2010\Reports.2010\Rep1017pv4.doc
2 Figure 1.1 Figure 3.1 Figure 3.2 Figure 4.1 Locality Plan Offshore Tide Gauge, Current meter and ADCP Locations Seabed Mounted ADCP Locations Model Grid Setup Figure 4.2 Model Grip Setup (Inner Harbour) Figure 4.3 Comparison Measured and Modelled Water Level Figure 4.4 Comparison Measured and Modelled Current (Cm3) Figure 4.5 Comparison Modelled and Measured Discharge ADCP Transects Figure 4.6 Comparison Modelled and Measured Current (ADCP2-2007) Figure 4.7 Comparison Modelled and Measured Current (ADCP ) Figure 4.8 Comparison Modelled and Measured Current (ADCP ) Figure 5.1 Output Points Map Figure 5.2 Dredging Locations Figure 6.1 Water Level, Current Speed and Direction Time Series-Spring Figure 6.2 Water Level, Current Speed and Direction Time Series Neap Figure 6.3 Tracer Concentration After 48-hours Figure 6.4 Tracer Concentration Time Series 8 Days Figure 6.5 E-folding Time Figure 7.1 TSS Average Concentration Contours - Surface Layer Figure 7.2 TSS Average Concentration Contours - Bottom Layer Figure 7.3 TSS Concentration Contours Exceeded 5% of the time - Surface Layer Figure 7.4 TSS Concentration Contours Exceeded 5% of the time - Bottom Layer Figure 7.5 Concentration Time Series - Bottom Layer Figure 7.6 Light Intensity Time Series Figure 7.7 Sediment Deposition (mass) Contours Figure 7.8 Cumulative Sediment Deposition Contours Figure mm Cumulative Sediment Deposition Contour DMMA Option 1 Figures 4 November 2010 Cardno (NSW/ACT) Pty Ltd A1 Z:\Doc_CLT\2010\Reports.2010\Rep1017pv4.Doc
3 Figure 7.10 Offshore TSS Concentration Contours Exceeded 5 % of the Time DMMA Option 1 Surface Layer Figure 7.11 Offshore TSS Concentration Contours Exceeded 5 % of the Time - DMMA Option 1 Bottom Layer Figure 8.1 TSS Average Concentration Contours DMMA Option 2- Surface Layer Figure 8.2 TSS Average Concentration Contours DMMA Option 2- Bottom Layer Figure 8.3 TSS Concentration Contours Exceeded 5% of the time DMMA Option 2 - Surface Layer Figure 8.4 TSS Concentration Contours Exceeded 5% of the time DMMA Option 2 - Bottom Layer Figure 8.5 Concentration Time Series DMMA Option 2- Bottom Layer Figure 8.6 Light Intensity Time Series DMMA Option 2 Figure 8.7 Sediment Deposition (mass) Contours DMMA Option 2 Figure 8.8 Cumulative Sediment Deposition Contours DMMA Option 2 Figure mm Cumulative Sediment Deposition Contour DMMA Option 2 Figure 8.10 Offshore TSS Concentration Contours Exceeded 5 % of the Time DMMA Option 2 Surface Layer Figure 8.11 Offshore TSS Concentration Contours Exceeded 5 % of the Time DMMA Option 2 Bottom Layer Figure 9.1 Sensitivity Case BC Bathymetry Figure 9.2 Sensitivity Cases - TSS Average Concentration Contours - Surface Layer Figure 9.3 Sensitivity Cases - TSS Average Concentration Contours - Bottom Layer Figure 9.4 Sensitivity Cases - TSS Concentration Contours Exceeded 5% of the time - Surface Layer Figure 9.5 Sensitivity Cases - TSS Concentration Contours Exceeded 5% of the time - Bottom Layer Figure 9.6 Sensitivity Cases - Concentration Time Series - Bottom Layer Figure 9.7 Sensitivity Cases - Light Intensity Time Series Figure 9.8 Sensitivity Cases - Sediment Deposition (mass) Contours Figure 10.1 Water Depth Map Figure 10.2 Water Level Time Series Existing and Developed Cases Comparison Figure 10.3 Bed Shear Stress Map Erosion/Sedimentation Patterns Figures 4 November 2010 Cardno (NSW/ACT) Pty Ltd A2 Z:\Doc_CLT\2010\Reports.2010\Rep1017pv4.Doc
4 LJ15011 October 2010 Locality Map Port Hedland Figure 1.1
5 ADCP0 ADCP1 T2 T3 T4 T1 T5 ADCP2 T6 T9 T7 T8 WNI data March-April 1998: - Tidal Gauges TG1 and TG2 - Current meter CM1 and CM May-June 1998: - ADCP (ADCP 0 moored) CLT data March-April 2007: - ADCP Transects (T1-T4,T6) - ADCP (ADCP 1 moored) October-November 2007: - ADCP Transects (T4-T9) - ADCP ( ADCP moored) 2 LJ15011/Rep1017p September 2010 File: J:\CM\LJ15011-PH-SWCreek-DredgePlume\Figures\Final\Figures_3-1to4-7.cdr Port Hedland South-West Creek Dredge Plume Modelling Investigations STUDY AREA OFFSHORE TIDE GAUGE, CURRENTMETER AND ADCP LOCATIONs Figure 3.1
6 3 LJ15011/Rep1017p September 2010 File: J:\CM\LJ15011-PH-SWCreek-DredgePlume\Figures\Final\Figures_3-1to4-7.cdr Port Hedland South-West Creek Dredge Plume Modelling Investigations SEABED MOUNTED ADCP LOCATIONS 2007 and 2009 Figure 3.2
7 Port Hedland South-West Creek Dredge Plume Modelling Investigations MODEL GRID SETUP LJ15011/Rep1017p September 2010 File: J:\CM\LJ15011-PH-SWCreek-DredgePlume\Figures\Final\Figures_3-1to4-7.cdr Figure 4.1
8 LJ15011/Rep1017p September 2010 File: J:\CM\LJ15011-PH-SWCreek-DredgePlume\Figures\Final\Figures_3-1to4-7.cdr Port Hedland South-West Creek Dredge Plume Modelling Investigations MODEL GRID SETUP Inner Harbour Figure 4.2
9 LJ15011/Rep1017p September 2010 File: J:\CM\LJ15011-PH-SWCreek-DredgePlume\Figures\Final\Figures_3-1to4-7.cdr Port Hedland South-West Creek Dredge Plume Modelling Investigations COMPARISON MEASURED AND MODELLED WATER LEVEL Tg1 AND TG2 Figure 4.3
10 LJ15011/Rep1017p September 2010 File: J:\CM\LJ15011-PH-SWCreek-DredgePlume\Figures\Final\Figures_3-1to4-7.cdr Port Hedland South-West Creek Dredge Plume Modelling Investigations COMPARISON MEASURED AND MODELLED CURRENT Cm3 Figure 4.4
11 * Measured data - Model data T1 T4 T5 T6 LJ15011/Rep1017p September 2010 File: J:\CM\LJ15011-PH-SWCreek-DredgePlume\Figures\Final\Figures_3-1to4-7.cdr Port Hedland South-West Creek Dredge Plume Modelling Investigations COMPARISON MODELLED AND MEASURED DISCHARGE ADCP TRANSECTS Figure 4.5
12 LJ15011/Rep1017p September 2010 File: J:\CM\LJ15011-PH-SWCreek-DredgePlume\Figures\Final\Figures_3-1to4-7.cdr Port Hedland South-West Creek Dredge Plume Modelling Investigations COMPARISON MODELLED AND MEASURED CURRENT ADCP Figure 4.6
13 LJ15011/Rep1017p September 2010 File: J:\CM\LJ15011-PH-SWCreek-DredgePlume\Figures\Final\Figures_3-1to4-7.cdr Port Hedland South-West Creek Dredge Plume Modelling Investigations COMPARISON MODELLED AND MEASURED CURRENT ADCP Figure 4.7
14 LJ15011/Rep1017p September 2010 File: J:\CM\LJ15011-PH-SWCreek-DredgePlume\Figures\Final\Figures_3-1to4-7.cdr Port Hedland South-West Creek Dredge Plume Modelling Investigations COMPARISON MODELLED AND MEASURED CURRENT ADCP Figure 4.8
15 Case A Output Points Map Figure 5 1 A
16 Case B Output Points Map Figure 5 1 B
17 Case C Output Points Map Figure 5 1 C
18 Case D Output Points Map Figure 5 1 D
19 Case E Output Points Map Figure 5 1 E
20 Case F Output Points Map Figure 5 1 F
21 Case G Output Points Map Figure 5 1 G
22 Existing Case Output Points Map Figure 5 1 X
23 Case A Dredging Locations Figure 5 2 A
24 Case B Dredging Locations Figure 5 2 B
25 Case C Dredging Locations Figure 5 2 C
26 Case D Dredging Locations Figure 5 2 D
27 Case E Dredging Locations Figure 5 2 E
28 Case F Dredging Locations Figure 5 2 F
29 Case G Dredging Locations Figure 5 2 G
30 Water Level, Current Speed and Direction Time Series Spring Location Point: 1 Figure 6 1 1
31 Water Level, Current Speed and Direction Time Series Spring Location Point: 2 Figure 6 1 2
32 Water Level, Current Speed and Direction Time Series Spring Location Point: 3 Figure 6 1 3
33 Water Level, Current Speed and Direction Time Series Spring Location Point: 4 Figure 6 1 4
34 Water Level, Current Speed and Direction Time Series Spring Location Point: 5 Figure 6 1 5
35 Water Level, Current Speed and Direction Time Series Spring Location Point: SWC1 Figure 6 1 SWC1
36 Water Level, Current Speed and Direction Time Series Spring Location Point: SWC3 Figure 6 1 SWC3
37 Water Level, Current Speed and Direction Time Series Neap Location Point: 1 Figure 6 2 1
38 Water Level, Current Speed and Direction Time Series Neap Location Point: 2 Figure 6 2 2
39 Water Level, Current Speed and Direction Time Series Neap Location Point: 3 Figure 6 2 3
40 Water Level, Current Speed and Direction Time Series Neap Location Point: 4 Figure 6 2 4
41 Water Level, Current Speed and Direction Time Series Neap Location Point: 5 Figure 6 2 5
42 Water Level, Current Speed and Direction Time Series Neap Location Point: SWC1 Figure 6 2 SWC1
43 Water Level, Current Speed and Direction Time Series Neap Location Point: SWC3 Figure 6 2 SWC3
44 J:\CM\LJ15011 PH SWCreek Dredge Plume\FlushMaps\ Port Hedland South West Creek Dredge Plume Modelling Tracer Concentration After 48h Case A Figure 6 3 A
45 J:\CM\LJ15011 PH SWCreek Dredge Plume\FlushMaps\ Port Hedland South West Creek Dredge Plume Modelling Tracer Concentration After 48h Case B Figure 6 3 B
46 J:\CM\LJ15011 PH SWCreek Dredge Plume\FlushMaps\ Port Hedland South West Creek Dredge Plume Modelling Tracer Concentration After 48h Case C Figure 6 3 C
47 J:\CM\LJ15011 PH SWCreek Dredge Plume\FlushMaps\ Port Hedland South West Creek Dredge Plume Modelling Tracer Concentration After 48h Case D Figure 6 3 D
48 J:\CM\LJ15011 PH SWCreek Dredge Plume\FlushMaps\ Port Hedland South West Creek Dredge Plume Modelling Tracer Concentration After 48h Case E Figure 6 3 E
49 J:\CM\LJ15011 PH SWCreek Dredge Plume\FlushMaps\ Port Hedland South West Creek Dredge Plume Modelling Tracer Concentration After 48h Case F Figure 6 3 F
50 J:\CM\LJ15011 PH SWCreek Dredge Plume\FlushMaps\ Port Hedland South West Creek Dredge Plume Modelling Tracer Concentration After 48h Case G Figure 6 3 G
51 J:\CM\LJ15011 PH SWCreek Dredge Plume\FlushMaps\ Port Hedland South West Creek Dredge Plume Modelling Tracer Concentration After 48h Existing Case Figure 6 3 X
52 J:\CM\LJ15011 PH SWCreek DredgeFlush\FlushMaps\ Port Hedland South West Creek Dredge Plume Modelling Tracer Concentration Time Series 8 Days Location:F1 Figure 6 4 F1
53 J:\CM\LJ15011 PH SWCreek DredgeFlush\FlushMaps\ Port Hedland South West Creek Dredge Plume Modelling Tracer Concentration Time Series 8 Days Location:F2 Figure 6 4 F2
54 J:\CM\LJ15011 PH SWCreek DredgeFlush\FlushMaps\ Port Hedland South West Creek Dredge Plume Modelling Tracer Concentration Time Series 8 Days Location:F3 Figure 6 4 F3
port of brisbane Information Guide
port of brisbane Information Guide A B O U T U S The Port of Brisbane, managed by the Port of Brisbane Pty Ltd, is Queensland s largest general cargo and container port, and a driver of economic growth
More informationPorts. Water and Environment Solutions
Ports Water and Environment Solutions BMT WBM in Ports The Company BMT WBM and Ports BMT WBM Pty Ltd is a leading edge water and environmental consultancy with more than 40 years national and international
More informationHuman-induced stresses on mangrove swamps along the Kenyan Coast
University of Wollongong Research Online Faculty of Science - Papers (Archive) Faculty of Science, Medicine and Health 2001 Human-induced stresses on mangrove swamps along the Kenyan Coast P. A. O. Abuodha
More informationThe Past, Present, and Future of Nortek and Glider Measurements
The Past, Present, and Future of Nortek and Glider Measurements Peter J. Rusello Scientist Nortek Since 2005, Nortek has collaborated with leading researchers to develop specialized acoustic Doppler current
More informationAmended Maintenance Dredge Spoil Management Plan. Shute Harbour Marina Resort
Amended Maintenance Dredge Spoil Management Plan Shute Harbour Marina Resort Amended Maintenance Dredge Spoil Management Plan Quality Information Document Ref Amended Maintenance Dredge and Spoil Maintenance
More informationClam Framework Map Book NEFMC Habitat Advisory Panel Meeting, April 3, 2018
#3 Clam Framework Map Book NEFMC Habitat Advisory Panel Meeting, April 3, 218 Page 4 Management areas relevant to Clam dredge framework. Includes Great South Channel Habitat Management Area, divided into
More informationHYDRAULIC DESIGN OF THE TOURISTIC BERTHING IN ASWAN CITY
HYDRAULIC DESIGN OF THE TOURISTIC BERTHING IN ASWAN CITY Dr. Hossam El-Sersawy Researcher, Nile Research Institute (NRI), National Water Research Center (NWRC), Egypt E-mail: h_sersawy@hotmail.com Dr.
More informationStakeholder Meeting #1. An Introduction to the Blind Pass Inlet Management Study
Stakeholder Meeting #1 An Introduction to the Blind Pass Inlet Management Study April 21, 2016 5:30 PM, The Sanctuary, Sanibel Island A World of Solutions 0 Agenda Introductions Study Overview Study Status
More informationNEW ZEALAND TEMPORARY AND PRELIMINARY NOTICES IN FORCE (NZ NTM Edition No. 1 dated 11 January 2019)
NEW ZEALAND TEMPORARY AND PRELIMINARY NOTICES IN FORCE (NZ NTM Edition No. 1 dated 11 January 2019) NZ Notice T/P Charts Affected Locality and Subject 93/17 T NZ 82 (T 82), NZ 827 (T 827), NZ 8275 (T 8275),
More informationOPTIMIZATION STUDY OF THE NAUTICAL DEPTH OF THE APPROACH CHANNEL TO THE PORT OF PALEMBANG, INDONESIA
OPTIMIZATION STUDY OF THE NAUTICAL DEPTH OF THE APPROACH CHANNEL TO THE PORT OF PALEMBANG, INDONESIA by Ir. R. Groenveld and Ir. J. Mutsaers, Delft University of Technology The Netherlands ABSTRACT The
More informationDredging 101. Why, Who, How and So What! 2015 WAMSI Research Conference. 30 March 2015
Dredging 101 Why, Who, How and So What! 2015 WAMSI Research Conference 30 March 2015 Presentation Contents Quick Oversight on Why we need to Dredge and Who Carries it out Global Context of some of our
More informationMaximising Beneficial Reuse through the use of a Novel Dredging Contract
Maximising Beneficial Reuse through the use of a Novel Dredging Contract Nicola Clay & Katherine Harris Port of London Authority Nick Bray Dredging Research Paul Hesk Van Oord UK CEDA Dredging Days 2007
More informationThirteenth International Water Technology Conference, IWTC , Hurghada, Egypt 1249
Thirteenth International Water Technology Conference, IWTC 13 2009, Hurghada, Egypt 1249 EVALUATION OF LOCAL SCOUR AROUND BRIDGE PIERS (RIVER NILE BRIDGES AS CASE STUDY) Sherine Ismail Assoc. Prof., Survey
More informationC. Area of operation: Columbia River and Columbia River Estuary between mouth of estuary and Portland, Oregon.
R/V Barnes Cruise Plan July 2008 Cruise dates: July 7 24 Captain: Ray McQuin Lead scientist: Joseph Needoba (needobaj@stccmop.org) Funding source: NSF PI Antonio Baptista Organization: NSF Center for Coastal
More informationNavigation and operation 20. port procedures manual 22. communication 22. port security 23. Services
SERVICES Navigation and operation 20 port procedures manual 22 communication 22 DGTRAC Dangerous Goods Tracking 23 port security 23 Services navigation and operation Harbour Master Under the Transport
More informationEFFECT OF THE COASTAL CONSERVATION DUE TO BEACH NOURISHMENT OF TOTORI SAND DUNE COAST
Proceedings of the 7 th International Conference on Asian and Pacific Coasts (APAC 203) Bali, Indonesia, September 2-26, 203 EFFECT OF THE COASTAL CONSERVATION DUE TO BEACH NOURISHMENT OF TOTORI SAND DUNE
More informationCOMMONWEALTH OF THE BAHAMAS MINISTRY OF PUBLIC WORKS & TRANSPORT NASSAU HARBOUR PORT IMPROVEMENT PROJECT. Nassau Harbour Port Improvement Project
COMMONWEALTH OF THE BAHAMAS MINISTRY OF PUBLIC WORKS & TRANSPORT NASSAU HARBOUR PORT IMPROVEMENT PROJECT AUGUST 2009 OVERALL VIEW OF NASSAU HARBOUR AERIAL VIEW OF NASSAU HARBOUR PROJECT HISTORY 1960 s
More informationEstuaries of South America
Gerardo M.E. Perillo Maria Cintia Piccolo Mario Pino-Quivira (Eds.) Estuaries of South America Their Geomorphology and Dynamics With 102 Figures and 20 Tables Springer 1 What Do We Know About the Geomorphology
More information3 Pilbara ports provide gateways
COMMUNITY AND STAKEHOLDERS Community Consultation Committees 8 meetings each year across our 3 port locations Dampier, Port Hedland and Ashburton Community Support Initiative >$295,000 a year in financial
More informationThe area involved 19th annual report
The area involved 19th annual report MARINE AGGREGATE EXTRACTION 216 1: Introduction & Summary information Contents 1: Introduction Summary information 2-3: Summary statistics for 216 4-5: Humber region
More informationAPPENDIX 20 EFFECTS ON NAVIGATIONAL SAFETY
APPENDIX 20 EFFECTS ON NAVIGATIONAL SAFETY Effects of Lyttelton Port Recovery Plan on Navigational Safety November 2014 INTRODUCTION Lyttelton Port of Christchurch (LPC) utilises an integrated health
More informationPilbara Ports Authority. Port Hedland Maintenance Dredging Long Term Dredge Management Plan
Pilbara Ports Authority Port Hedland Maintenance Dredging Long Term Dredge Management Plan April 2018 Table of contents 1. Background... 1 1.1 Purpose and Content of this Plan... 1 1.2 Management Framework...
More informationNEW SOUTH WALES. Both METRIC and Feet and Inches TIMES: am/pm Sunrise/Sunset Moon Phases Moon Rise/Set DIARY NOTES.
2016 2014 November 28, 2013 November 26, 2015 TO to January 4, 7, 2017 2015 Both METRIC and Feet and Inches TIMES: am/pm Sunrise/Sunset Moon Phases Moon Rise/Set DIARY NOTES NEW SOUTH WALES Public Works
More informationThe area involved 20th annual report
The area involved 2th annual report MARINE AGGREGATE EXTRACTION 217 Contents 1: Introduction Summary information 2-3: Summary statistics for 217 4-5: Humber region 6-7: East Coast region 8-9: Thames Estuary
More informationSupplemental Project Report
Portland District ERDC/CHL TR-16-xxx Supplemental Project Report Evaluating Opportunities to Reduce Shoaling within the Federal Navigation Channel at Port Orford: A Relative Comparison of Breakwater Repair
More informationThe area involved 17th annual report
The area involved 17th annual report MARINE AGGREGATE EXTRACTION 2014 Contents 01: Introduction Summary information 02-03: Summary statistics for 2014 04-05: Humber region 06-07: East Coast region 08-09:
More informationTHE ICs INTERNATIONAL BRISBANE AREA AQUA PARK PROPOSAL
Contacts: Mr Evan Pryor, Ph 38702756, evanpryor2002@yahoo.com.au Mr Bob Beatty, Ph 32883101, BobBeatty@BOSMIN.com Web Address: http://www.bosmin.com/ics/icharter.htm Postal Address: GPO Box 2927, Brisbane,
More information$6.60 NEW SOUTH WALES. Both METRIC and Feet and Inches TIMES: am/pm Sunrise/Sunset Moon Phases Moon Rise/Set DIARY NOTES.
$6.60 (incl. GST) 2018 2014 November 28, 2013 November 23, 2017 TO to January 2, 7, 2019 2015 Both METRIC and Feet and Inches TIMES: am/pm Sunrise/Sunset Moon Phases Moon Rise/Set DIARY NOTES NEW SOUTH
More informationSabine Neches Waterway: Smiths Bluff to Beaumont Turning Basin
Sabine Neches aterway: -ft.ft 3 8 3 5 5 6 6 4 ' 8 6 ' 93 ' 93 ' Print Date: 4//8 Side Slope Ratio: (Rise : Run Authorized Depth: -ft. Survey Date(s: March 8 SUN MARINE TERMINALS LAY BERTHS AND RIVER MARINE
More informationPlatte West Well Field A Protective Modeling Approach
Platte West Well Field A Protective Modeling Approach Presented to: 2007 Eastern South Dakota Water Conference / 52 nd Annual Midwest Ground Water Conference June 25, 2007 Presented by: Luca DeAngelis,
More information$6.60 NEW SOUTH WALES. Both METRIC and Feet and Inches TIMES: am/pm Sunrise/Sunset Moon Phases Moon Rise/Set DIARY NOTES.
$6.60 (incl. GST) 2019 2014 November 28, 2013 November 22, 2018 TO to January 1, 7, 2020 2015 Both METRIC and Feet and Inches TIMES: am/pm Sunrise/Sunset Moon Phases Moon Rise/Set DIARY NOTES NEW SOUTH
More informationPort of Durban. Entrance Channel Widening & Deepening Project Completion Function. 31 March 2010
Port of Durban Entrance Channel Widening & Deepening Project Completion Function 31 March 2010 Presented by: Theunis Steenkamp Project Director Natcor 1 The saying goes.. THE JOB IS NOT OVER UNTILL THE
More informationSeagrassNet Monitoring in Great Bay, New Hampshire, 2016
University of New Hampshire University of New Hampshire Scholars' Repository PREP Reports & Publications Institute for the Study of Earth, Oceans, and Space (EOS) 9-28-2017 SeagrassNet Monitoring in Great
More informationGeorgia Coastal Ecosystems Long Term Ecological Research Project Marsh Hammock Research 2008
Georgia Coastal Ecosystems Long Term Ecological Research Project Marsh Hammock Research 2008 Participating Investigators: M. Alber 1, C. Alexander 2, S. Pennings 3, S. Joye 1, C. Meile 1, A. Burd 1, W.
More informationAbstract. 1 Introduction
Transactions on Ecology and the Environment vol 4, 997 WIT Press, www.witpress.com, ISSN 74-54 Environmental impact on the surface sediments of the bay and the gulf of Thessaloniki (Greece) according to
More informationPORT OF PORT HEDLAND COMMUNITY CONSULTATION COMMITTEE
Minutes of meeting held at the Sealanes Facility, Anderson Street, Port Hedland Thursday, 22 March 2018 ITEM 1 WELCOME AND INTRODUCTION OF MEMBERS The Chair welcomed all present and declared the meeting
More informationTsunami Survey Results in the NPS and Reproduction Analysis Using Tsunami Inversion
Technical Workshop on the Accident of TEPCO s Fukushima Dai-ichi NPS Tsunami Survey Results in the NPS and Reproduction Analysis Using Tsunami Inversion July 24, 2012 Tomoyuki Tani Agenda 1. Overview of
More informationMonitoring the marine environment
Monitoring the marine environment D. Velaoras & E. Krasakopoulou Hellenic Center for Marine Research (HCMR) Seasera Mediterranean Workshop 27-28 September 2012 Ifremer Toulon POSEIDON multi parametric
More informationJason SPROTT. Owner & Director KEY CAREER HIGHLIGHTS EXPERTISE QUALIFICATIONS AWARDS CONTACT
KEY CAREER HIGHLIGHTS Jason SPROTT Owner & Director EXPERTISE seaport land use / master / spatial planning port governance major project approvals port sustainability development codes & environmental
More informationJanice Sendt Thales Underwater Systems, Thales Australia, 274 Victoria Road, Rydalmere nsw 2116 Australia
AN ANALYSIS OF GLIDER data AS AN INPUT to A SONAR RANGE DEPENDENT ACOUSTIC PERFORMANCE PREDICTION MODEL Janice Sendt Thales Underwater Systems, Thales Australia, 274 Victoria Road, Rydalmere nsw 2116 Australia
More informationBudi Hadi Narendra Harris Herman Siringoringo Chairil Anwar Siregar. Research and Development Center for Forest
Budi Hadi Narendra Harris Herman Siringoringo Chairil Anwar Siregar Research and Development Center for Forest Background Coastal management should be wisely done as a part of watershed management. Typologically,
More informationJason SPROTT. Owner & Director KEY CAREER HIGHLIGHTS EXPERTISE QUALIFICATIONS AWARDS CONTACT
KEY CAREER HIGHLIGHTS Jason SPROTT Owner & Director EXPERTISE seaport land use / master / spatial planning port governance major project approvals port sustainability development codes & environmental
More informationDilution of Wastewater Discharges from Moving Cruise Ships
Dilution of Wastewater Discharges from Moving Cruise Ships E. Heinen 1, K. Potts 1, L. Snow 1, W. Trulli 2, D. Redford 1 1 U.S. Environmental Protection Agency 1200 Pennsylvania Ave., N.W. Mail Code 4504T
More informationPRESENTATION ON CAIRNS SHIPPING DEVELOPMENT PROJECT
PRESENTATION ON CAIRNS SHIPPING DEVELOPMENT PROJECT CAIRNS A STRATEGIC PORT NORTH EAST NAVY BASE MAIN MARITIME ACTIVITY AND EMPLOYMENT : NORTHERN AUSTRALIA CARGO SHIPPING SERVICING LARGEST POPULATION :
More informationNational Report by AUSTRALIA
IHO Hydrographic Commission on Antarctica (HCA) National Report by AUSTRALIA Perspective Perspective Charting progress in Antarctica since HCA-14 (June 2016) A new edition of paper chart Approaches to
More informationThe world s largest bulk export
The world s largest bulk export port authority AUGUST 2018 The ports of Dampier and Port Hedland are two of the world s largest bulk export ports, responsible for approximately 75 per cent of Western Australia
More informationPORT OF PORT HEDLAND - VESSEL MOVEMENT PROTOCOLS
TABLE OF CONTENTS DISTRIBUTION LIST... 2 1. INTRODUCTION... 3 2. DEFINITIONS... 3 3. GUIDING PRINCIPLES... 7 3.1 OVERALL FRAMEWORK... 7 3.2 CRUISE SHIP VISITS... 9 4. VESSEL BERTHING... 9 4.1 VESSEL BERTHING
More informationAmerican Institute of Marine Underwriters
American Institute of Marine Underwriters Mr. Scott Bergeron Chief Executive Officer, Liberian Registry Commissioner, Virginia Port Authority May 8, 2013 1 Existing Lock Dimensions vs. Expanded Lock Dimensions
More informationManaging Growth and Channel Risk - Port Hedland
Managing Growth and Channel Risk - Port Hedland Why is the Port Hedland Channel so important Western Australia produces over one quarter of the World s iron ore (26% in 2012) Importantly WA export volumes
More informationForth Ports Limited. Ruling Depths & Under Keel Clearances
Forth Ports Limited - Forth Vessels are scheduled into / out of ports on the Forth & Tay in accordance with the under keel clearance criteria specified in this section of the Marine Guidelines & Port Information.
More informationAppendix A3 Dredge and Spoil Disposal Management Plan
Appendix A3 Dredge and Spoil Disposal Management Plan Table of Contents 1. INTRODUCTION... 1 1.1 PROPOSED OUTER HARBOUR DEVELOPMENT... 1 1.2 PROPONENT... 1 1.3 THIS DSDMMP... 1 1.3.1 Objectives... 3 1.3.2
More informationc. 1 inch = 0.6 miles e. 1:100,000 f. 1:250,000 f. 1 inch = 4.0 miles
High School Advance Geology Map Test 2014 Name Use the information on each map to provide the best answer to the questions. Fill in the bubble of the best answer on your answer sheet. Answer questions
More informationLong term morphological analysis and simulations
Long term morphological analysis and simulations Dr.-Ing. Markus Promny Bundesanstalt für Gewässerkunde / Federal Institute of Hydrology GESINUS 2010 - Liège - 29./30.07.2010 page 1 1D-models of German
More informationCase Study: 1. The Clarence River Catchment
Case Study: 1. The Clarence River Catchment The NSW coastline is a great natural asset, making an enormous contribution to the economy. The resources of coastal catchments such as the Clarence River Catchment,
More informationInfluence of Amur River discharge on hydrological conditions of the Amurskiy Liman and Sakhalin Bay of the Sea of Okhotsk during a spring summer flood
Influence of Amur River discharge on hydrological conditions of the Amurskiy Liman and Sakhalin Bay of the Sea of Okhotsk during a spring summer flood Anastasiya Abrosimova, Igor Zhabin and Vyacheslav
More information7. Services Navigation and Operation
7. Services Navigation and Operation 7.1. Regional Harbour Master Role at Port of Gladstone Shipping legislation in Queensland is controlled by the State Government agency, Maritime Safety Queensland (MSQ).
More informationADVICE ON MOZAMBIQUE PORTS. P&I ASSOCIATES (PTY) LTD
ADVICE ON MOZAMBIQUE PORTS. P&I ASSOCIATES (PTY) LTD All the ports in Mozambique are owned by CFM (Caminhos de Ferro de Mozambique). Many of the ports have been given to private companies to manage the
More informationOptimising throughput of rail dump stations, via simulation and control system changes. Rob Angus BMT WBM Pty Ltd Brisbane 5 June 2013
Optimising throughput of rail dump stations, via simulation and control system changes Rob Angus BMT WBM Pty Ltd Brisbane 5 June 2013 Presentation Overview Introduction Volumetric vs. DEM Modelling Coal
More informationProject Update 3. Carpentaria Rail. Port Carpentaria Railway Project. Carpentaria Rail. 21 Second Ave, Mount Isa, Queensland, Australia, 4825
Project Update 3 Carpentaria Rail Port Carpentaria Railway Project Carpentaria Rail 21 Second Ave, Mount Isa, Queensland, Australia, 4825 Tel 0413178182 Port Carpentaria community consultation commenced
More informationAcid Sulfate Soil Management Advisory Committee, 1998, Acid Sulfate Soil Manual
REFERENCES Acid Sulfate Soil Management Advisory Committee, 1998, Acid Sulfate Soil Manual ANZECC / ARMCANZ, 2000a, National Water Quality Management Strategy Paper No. 4: Australian and New Zealand Guidelines
More informationNew Zealand Hydrographic Authority HYPLAN. Version April 2017
New Zealand Hydrographic Authority Version 1.0 18 April 2017 This page is intentionally blank Land Information New Zealand Crown Copyright 18 April 2017 2 Preface The following document is certified by
More informationMechanisms Controlling Hypoxia: Integrated Coastal Modeling Field Year 2010
Mechanisms Controlling Hypoxia: Integrated Coastal Modeling Field Year 2010 Survey cruises on R/V Manta The cruises decribed Dates of cruises: 14 19 June 2010, one half day mobilization. 1 6 August 2010,
More informationBRISBANE HEAD OFFICE. PILOT BASE THURSDAY ISLAND (Torres Strait & Great North East Channel)
Address: Postal Address: Director: Email: Telephone: Fax: BRISBANE HEAD OFFICE 26 Love Street, Bulimba, Q 4171 PO Box 674, Bulimba Q 4171 Perry Sutton operations@torrespilots.com.au +61 7 3217 9544 (24
More informationGeorgia Coastal Ecosystems Long Term Ecological Research Project Marsh Hammock Research 2009
Georgia Coastal Ecosystems Long Term Ecological Research Project Marsh Hammock Research 2009 Participating Investigators: M. Alber 1, C. Alexander 2, S. Pennings 3, S. Joye 1, C. Meile 1, A. Burd 1, W.
More informationPort of Newcastle Schedule of Port Pricing
Port of Newcastle Schedule of Port Pricing Port of Newcastle Operations Pty Ltd (ACN 165 332 990) as Trustee for the Port Of Newcastle Unit Trust (ABN 97 539 122 070) (trading as Port of Newcastle) Effective
More informationPHY 133 Lab 6 - Conservation of Momentum
Stony Brook Physics Laboratory Manuals PHY 133 Lab 6 - Conservation of Momentum The purpose of this lab is to demonstrate conservation of linear momentum in one-dimensional collisions of objects, and to
More informationsuperseded by 2008 nhc report
Steveston North Jetty Steveston South Jetty Georgia Strait Middle Arm West Vancouver UEL Legend Vancouver North Vancouver City North Arm Richmond Canoe Pass Fraser Valley Regional District North Vancouver
More informationTitle. Author(s)ISHII, K.; KIKUCHI, M.; SHIRAI, K. Issue Date Doc URL. Type. Note. File Information HIGASHI-HONGANJI HAKODATE BETSUIN
Title STRUCTURAL CHARACTERISTICS OF A HISTORICAL REINFORCE HIGASHI-HONGANJI HAKODATE BETSUIN Author(s)ISHII, K.; KIKUCHI, M.; SHIRAI, K. Issue Date 2013-09-12 Doc URL http://hdl.handle.net/2115/54344 Type
More informationA-100- Rev7-28 June Head Office: Perth, Western Australia. Machine Condition Monitoring Structural Dynamics
PROPOSED OUTER HARBOUR DEVELOPMENT PILE DRIVING NOISE ASSESSMENT REPORT BHP BILLITON IRON ORE 075063--6A-100- Rev7-28 June 2010 www.svt.com.au Head Office: Perth, Western Australia Kuala Lumpur, Malaysia
More informationDRAFT DREDGING AND SPOIL DISPOSAL MANAGEMENT & MONITORING PLAN
5.3 ZONES OF IMPACT In addition to outlining LAU boundaries, the State assessment process requires the definition of impact zones in accordance with requirements of EAG No. 7. The zones required are: Zone
More informationKajak Sediment Sampler Model Manual. KC Denmark. Research Equipment Limnology Oceanography Hydrobiology
Kajak Sediment Sampler Model 13.030 Manual KC Denmark Research Equipment Limnology Oceanography Hydrobiology Manual for Kajak sediment corer Model no. 13.030 The KC Kajak Sediment Core sampler is based
More informationRIVER TYNE OFFICIAL TIDE TABLES
RIVER TYNE OICIAL TIDE TABLES 2018 1 RIVER TYNE TIDE TABLES OR THE YEAR 2018 Issued by the PORT O TYNE aritime House, Tyne Dock, South Shields NE34 9PT Tel: +44 (0)191 455 2671 ax: +44 (0)191 455 4687
More informationAustralian Network of Environmental Defender s Offices
Australian Network of Environmental Defender s Offices Submission on draft Regulation Impact Statement to ban disposal of capital dredge spoil material in the Great Barrier Reef Marine Park 27 March 2015
More informationTitle/Name of the area: Chwaka Bay, Zanzibar
Title/Name of the area: Chwaka Bay, Zanzibar Presented by: Dr. Charles Lugomela, Ag. Head, Department of Aquatic Sciences and Fisheries, University of Dar es Salaam, P.O. Box 35064 Dar es Salaam, Tanzania
More informationMod. MONTANA WOOD BURNING STOVE USAGE AND MAINTENANCE INSTRUCTIONS
Mod. MONTANA WOOD BURNING STOVE USAGE AND MAINTENANCE INSTRUCTIONS Nutrients Ashes Fertilizer Wood: an ecological fuel Wood is a renewable source of energy which answers the energy and environmental demands
More informationGPD Australia Pty Ltd COMPANY PROFILE
GPD Australia Pty Ltd COMPANY PROFILE January 2011 GPD Australia Pty Ltd Naval Architects ABN 132 122 458 048 160 Pittwater road Manly 2095 NSW AUSTRALIA Mobile : 0403 009935 Email : gap1006@gmail.com
More information2.0 Description of the Site and its Surroundings
2.0 Description of the Site and its Surroundings 2.1 Regional Description Les Salines is situated in the district of Port Louis. Port Louis is the smallest district of Mauritius with an area of 42.7 km
More informationREPUBLIC OF SOUTH AFRICA
REPUBLIC OF SOUTH AFRICA SAN HYDROGRAPHIC OFFICE NATIONAL REPORT TO THE IHO HYDROGRAPHIC COMMISSION ON ANTARCTICA (HCA) 11 TH MEETING, HOBART, AUSTRALIA 05-07 OCTOBER 2011 2 11 TH HCA MEETING REPORT BY
More informationBlocking Sea Intrusion in Brackish Karstic Springs
European Water 1/2: 17-23, 3. 3 E.W. Publications Blocking Sea Intrusion in Brackish Karstic Springs The Case of Almiros Spring at Heraklion Crete, Greece A. Maramathas, Z. Maroulis, D. Marinos-Kouris
More informationMODELING OF SEDIMENTATION PROCESS IN ASWAN HIGH DAM RESERVOIR
ABSTRACT MODELING OF SEDIMENTATION PROCESS IN ASWAN HIGH DAM RESERVOIR By Prof. Dr. Mohammed El-Moattassem 1 Assoc. Prof. Dr. Tarek M. Abdel-Aziz Dr. Hossam EL-Sersawy 3 The River Nile is the second longest
More informationDOCKING AND ROUTING PLAN
DOCKING AND ROUTING PLAN TABLE OF CONTENT Contents Table of content... 2 1 Introduction... 3 1.1 Background... 3 1.2 Document Scope... 3 1.3 Harbour dues... 3 2 ROUTING TO SHIPYARD... 4 2.1 General...
More informationKaruah Hard Rock Quarry. Summary of Environmental Monitoring Data
Karuah Hard Rock Summary of Environmental Monitoring Data For the Period: September 2014 1. Introduction This report has been completed to meet the requirements of Section 66(6) of the Protection of the
More informationSt. Augustine Port, Waterway & Beach District. St. Augustine Inlet 2013 draft Inlet Management Plan. March 19, 2013
Division of Water Resource Management St. Augustine Port, Waterway & Beach District St. Augustine Inlet 2013 draft Inlet Management Plan March 19, 2013 Discussion Outline Florida Statutes Florida Inlets
More informationProject: Profiling Float Observations in the Aegean Sea
Project: Profiling Float Observations in the Aegean Sea Cruise I CRUISE REPORT 1. Introduction and objectives The Profiling Float Observations in the Aegean Sea - Cruise I experiment is a joint effort
More informationNotice To Mariner No. 147 PORT OF FUJAIRAH & VHFL TERMINAL BERTH CONSTRUCTION & DESIGN CRITERIA
To: Attn: From: All Agents / Bunkering Companies / De-Sloping Companies / National Transport Authority / Federal Environment Agency / Hydrographic Office-UK General Manager / Operations Manager Capt. Tamer
More informationCAIRNS A STRATEGIC PORT
CAIRNS A STRATEGIC PORT CURRENT ISSUES AS AT 25 SEPTEMBER 2017 Cairns Port Development Inc. is not-for-profit and community based. We live and work beside the Great Barrier Reef, applying world's best
More informationReal Property Institute of Canada: Marine Infrastructure National Workshop January 28, 2014
Arctic Canada 1 Public Works and Government Services Canada (PWGSC) Real Property Institute of Canada: Marine Infrastructure National Workshop January 28, 2014 Jerome MacGillivray, P. Eng John Davidson,
More informationINDOCHINES CONSULTANT & COMMERCIAL JSC
INDOCHINES CONSULTANT & COMMERCIAL JSC DC Tower, 111D Ly Chinh Thang Street, District 3, Ho Chi Minh City, Vietnam Tel: 84 8 38469349 Fax: 84 8 38469349 E-mail: chanh.truongminh@indochinesconsul.com Website:
More informationIntroduction. The System. Model Limitations, Assumptions, and Parameters. Optional Services Tech Memo
Optional Services Tech Memo Introduction This technical memo evaluates the impact of a tide gate to be installed at the confluence of the Left Bank Tributary of Thalia Creek and Lake Windsor. Specifically,
More informationNumerical Study of Group Effects for Large Pile Groups in Sands
INTERNATIONAL JOURNAL FOR NUMERICAL AND ANALYTICAL METHODS IN GEOMECHANICS Int. J. Numer. Anal. Meth. Geomech. 21; 1:1 6 [Version: 2/3/22 v1.] Numerical Study of Group Effects for Large Pile Groups in
More informationProposed Outer Harbour Development, Port Hedland Public Environmental Review/ Draft Environmental Impact Statement
Executive Summary Proposed Outer Harbour Development, Port Hedland Public Review/ Draft Impact Statement Public Review/Draft Impact Statement Contents Executive Summary 2 1.1 Overview of the Proposed
More informationFOR SALE Belize s World Heritage
FOR SALE Belize s World Heritage The Pelican Cayes A Hotspot of Biodiversity and Destruction In the Belize Barrier Reef Reserve World Heritage Site March 2003 In the Pelican Cays, mangrove cays exhibit
More informationPIANC. The World Association for Waterborne Transport Infrastructure. Presentation by Mr Geoffroy CAUDE President of PIANC
PIANC The World Association for Waterborne Transport Infrastructure Presentation by Mr Geoffroy CAUDE President of PIANC at the occasion of the NordPIANC meeting in Stockholm Stockholm- NordPIANC-September,
More informationTHE TANZANIAN SEA LEVEL NETWORK: A NATIONAL REPORT (DRAFT)
THE TANZANIAN SEA LEVEL NETWORK: A NATIONAL REPORT (DRAFT) Shigalla B. Mahongo Tanzania Fisheries Research Institute P.O. Box 9750, Dar es Salaam, Tanzania [Tel: +255 51 650045; Fax: +255 51 650043; Email:
More informationPorts WA Forum Best practice environmental initiatives CEO Roger Johnston
Ports WA Forum Best practice environmental initiatives CEO Roger Johnston PPA at a Glance World s largest bulk export port authority PPA accounts for approximately 50% of world s seaborne iron ore exports
More informationClyde Cruising Club. Amendments to Sailing Directions
Clyde Cruising Club Amendments to Sailing Directions Clyde Cruising Club Publications Ltd. Orkney and Shetland Islands (2016) This PDF file contains all the amendments for the above volume of the CCC Sailing
More informationTufts University Water: Systems, Science, and Society (WSSS) Program
To: From: John Foster, Elbow Cay, the Bahamas; Friends of the Environment, Marsh Harbor, the Bahamas Alex Bedig, Amanda Garfield, Shonda Gaylord, Jack Melcher, Melissa Ng, Nathan Rawding, Kendall Webster,
More informationINNOVATIVE TECHNIQUES USED IN TRAFFIC IMPACT ASSESSMENTS OF DEVELOPMENTS IN CONGESTED NETWORKS
INNOVATIVE TECHNIQUES USED IN TRAFFIC IMPACT ASSESSMENTS OF DEVELOPMENTS IN CONGESTED NETWORKS Andre Frieslaar Pr.Eng and John Jones Pr.Eng Abstract Hawkins Hawkins and Osborn (South) Pty Ltd 14 Bree Street,
More informationCruise Report R/V "HEINCKE" Cruise- No. HE-316 ( 06HK1001 ) 27 January - 05 February This report is based on preliminary data!
Cruise Report R/V "HEINCKE" Cruise- No. HE-31 ( HK11 ) January - 5 February 1 This report is based on preliminary data! an der Universität Rostock Seestraße 15 D-1119 Rostock- GERMANY Tel +9-31-519- Fax
More informationThe History & Management of the Atlantic Intracoastal Waterway in Florida
The History & Management of the Atlantic Intracoastal Waterway in Florida THE BEGINNING OF THE INTRACOASTAL WATERWAY IN FLORIDA CONSTRUCTED BY A PRIVATE COMPANY, THE FLORIDA EAST COAST CANAL COMPANY BETWEEN