1 D runway of Tokyo International Airport DESIGN-BUILD PROCUREMENT SCHEME FOR THE EXPANSION OF THE TOKYO INTERNATIONAL AIRPORT Mitsuhiko OKADA The Overseas Coastal Area Development Institute of Japan (OCDI) Tama River D runway Tokyo Bay Tokyo International Airport (Haneda Airport) Background of the project Why was this project needed? When the expansion project was conceived: Busiest airport in Japan Caters for 55million passengers in 2000 (60% of the national total) Caters for 620 thousand tons of air freight in 2000 (66% of the national total) Provides 720 flights per day with three runways, linking with 47 airports in Japan 13 Nov 2012 CSIC-JSPS International Symposium 1
2 Haneda and the Metropolitan Area Haneda Airport in 2003 Haneda Airport West passenger terminal Runway A Runway B East passenger terminal (under construction) Runway C Need of further capacity expansion (Million) Haneda Airport Domestic Passenger Traffic The existing capacity was expected to be saturated in early 21 st century Preliminary survey was started in 2000 Re-expansion of Haneda and New-airport option were compared 9,000 8,000 7,000 6,000 5,000 4,000 3,000 2,000 1, Forecast Assuming that the expansion project will be completed between 2008 and (FY) 13 Nov 2012 CSIC-JSPS International Symposium 2
3 Haneda Airport Re-expansion Project Re-expansion of Haneda was found the most favorable option In 2001, the cabinet decided to construct a new runway of Haneda as soon as possible To make operational a 2,500m offshore runway and a taxiway bridge by the end of 2009 To increase the airport capacity by 50% and accommodate scheduled international flights Tama River Haneda Airport Expansion Project B-Runway 2,500m A-Runway 3,000m 多 摩 川 Connecting Taxiway C-Runway 3,000m Radio navigational aids New Waste Disposal Area Port of Tokyo New Runway 2,500m Challenges Completing the project before 2010 at a minimum cost Ensuring the smooth vessel traffic passing near the new runway Allowing the river flow to pass through the structure Protecting the environment of the adjacent residential area Alternative design concepts What were prospective designs? 13 Nov 2012 CSIC-JSPS International Symposium 3
4 Design concepts Land fill Land fill Pile-supported structure Floating structure Kansai International Airport (Osaka) Pile-support (1) Pile-support (2) Pile-supported deck LaGuardia Airport (New York) Funchal Airport (Portugal) 13 Nov 2012 CSIC-JSPS International Symposium 4
5 Floating structure Proposed design concepts (1) Pile-support (2) Hybrid (3) Float Reclamation Pile-support 2.5 year/608 billion yen 2.6 year/578 billion yen 2.5 year/590 billion yen Anchor Float Mega Float (600 billion yen =roughly US$7.5 billion) Hybrid structure Land Reclamation / Pile-supported Structure Boxed type Pontoon Semi-submerged type Pontoon Head of dolphin Mooring Dolphin Fender Guide frame Tama River Jacket Post North Side South (Tama River) Side Sand Mooring dolphin Mega-Float Rubber fender Side View Two-way stretchable joint 13 Nov 2012 CSIC-JSPS International Symposium 5
6 Evaluation criteria of the Expert Panel Safe airport operation throughout the project life Resilience against natural disasters Reasonable costs and time for construction Safe and reliable construction works Environmental impacts Impacts on vessel navigation Conclusions of the Expert Panel October, 2002 No fatal flaws in the three concepts ( Hybrid, Pile-support, Float) Project concepts should be limited to the three concepts Design-Build procedure is recommended to find the most economical solution and fix the project costs as proposed in the bidding process Requirements for the D/B scheme Design-build scheme What was required? Requirement To accommodate three different design concepts To fix the life cycle costs Response Performance specifications covering three concepts Winning bidder will carry out the maintenance of the runway for 30 years with the costs it proposed if the government so requests To hedge engineering risks of novel design concepts Sufficient amount of long-term defect liability Design-originated risks should be basically taken by contractors 13 Nov 2012 CSIC-JSPS International Symposium 6
7 Requirements for the D/B scheme (2) Long-term maintenance Requirement To save project costs/government spending To ensure the project completion within the schedule Response Winning bidder is the one who proposes the minimum amount of project costs, the sum of the construction costs and 30-year maintenance costs Tender price should be lower than the predetermined target price VE is encouraged before and after the signing of the contract 8-15 corporations covering five engineering areas are allowed to form a JV in bidding Each JV member is required to have previous track records in the respective engineering areas The D/B contract includes an optional clause for 30- year maintenance to fix the life-cycle costs as proposed in the bidding process Bidders are requested to propose 30-year maintenance costs based on the 100-year maintenance plan in its technical proposal (Serviceable life is 100 years but obligating the contractor for 100 years is impractical) Long-term maintenance (2) Maintenance works are stipulated in the optional clause because (a) open tender is norm in the Japanese public procurement and (b) the government cannot conclude a contract without budgetary alllocation approved by the Diet (singleyear basis budget system in Japan) The government requests the contractor to carry out maintenance works if it finds no eligible competitor from engineering viewpoints (Conformity with the Agreement on Government Procurement (GPA)) Design-build scheme How did it play out? 13 Nov 2012 CSIC-JSPS International Symposium 7
8 Preparation Preparation (2) Ministry of Land, Infrastructure and Transport (MLIT) established a project team composed by: Civil Aviation Bureau Kanto Regional Development Bureau Project team prepared: Performance specifications Contract scheme Target price Technical specifications Site visits of pile-support runways (US, Portugal) Allowable movements of a floating runway (aircraft manufacturer) Specifications of new large aircraft (aircraft manufacturer) Anti-corrosion of 100-year durability Contract scheme Interview at the Utah State Government regarding the design-build scheme for I-15 (US$1.4billion) Timeline of the tender process Preparation of the upper limit price Process June 2004 Announcement of the contract scheme and performance specifications July 2004 Request for proposals September 2004 Notice of prequalification (experience records of similar projects) October 2004 Deadline of technical proposals February 2005 Notice of qualification (conformity to all the performance specifications is mandatory) March 2005 Bidding by qualified participants March 2005 Signing of the contract MLIT prepares designs/drawings for three design concepts and calculates D/B costs and 30-year maintenance costs The lowest D/B cost is determined as the upper limit for the D/B price The lowest total cost (D/B + maintenance) is determined as the upper limit for the total costs The bidder proposing the lowest total cost wins the contract on condition that its D/B price and total costs are lower than the respective upper limit 13 Nov 2012 CSIC-JSPS International Symposium 8
9 VE before bidding Cost saving efforts The bidder was allowed to propose additional VE before bidding on condition that its initial technical proposal was found conforming to The Specifications The JV proposed 43 VE proposals and MLIT approved 37 of them Bidding and project implementation Bidding and project implementation (2) JV s bidding price was within the upper limit MLIT and JV signed the contract at billion yen (approx. US$7.5 billion) in March 2005 Designs were carried out from 2005 to 2006 Start of on-site construction works was delayed until compensation to fishermen was settled Cost escalation due to the price increases of materials was reflected in the revision of the D/B costs D Runway started operation in October Nov 2012 CSIC-JSPS International Symposium 9
10 Contract including long-term maintenance MLIT concluded the contract with the JV at the D/B price of billion yen with the optional maintenance clause (14.9 billion yen for 30 years) The optional clause becomes effective upon fulfillment of the condition (No competitor from engineering viewpoint) The JV is carrying out maintenance works according to the contract Monitoring and maintenance Repair of bumps Bumps at the joint between decks and reclaimed area are monitored once a week at 20 points by 5-m interval Bumps are repaired before reaching 20 mm Observance of the slope limit After bump repair, longitudinal slope is made under 1.0 % by pavement overlay Monitoring and maintenance (2) Lessons learned Other major maintenance works (once in 30 years) Repainting of the inner surface of steel jackets to prevent corrosion Replacement of moisture controllers inside steel jackets Steel jacket Inside jacket Moisture controller Pros Cons Lessons Early completion and cost saving Project completion in 5.5 years with minimum cost escalation (12 %) Reliable maintenance The JV is carrying out maintenance works at the proposed price (14.9 billion yen for 30 years) For the project owner Preparation of the performance specification was timeconsuming and costly For the JV Preparation of the technical proposal was time-consuming and costly Recommendable for large-scale projects Compensation for proposal costs incurred by unsuccessful bidders would be fair 13 Nov 2012 CSIC-JSPS International Symposium 10
11 Thank you 13 Nov 2012 CSIC-JSPS International Symposium 11
Notice Concerning Change the Lease Contract of IIF Haneda Airport Maintenance Center, Tokyo
Industrial & Infrastructure Fund Investment Corporation (Tokyo Stock Exchange Company Code: 3249) News Release August 9, 2010 Notice Concerning Change the Lease Contract of IIF Haneda Airport Maintenance
More informationEstablishment of Kansai Airports Kobe and Signing of Project Agreement for Kobe Airport Concession
September 26, 2017 ORIX Corporation VINCI Airports S.A.S. Kansai Airports Establishment of Kansai Airports Kobe and Signing of Project Agreement for Kobe Airport Concession The consortium made up of ORIX
More informationChapter 4 Noise. 1. Airport noise
Chapter 4 Noise 1. Airport noise Airport noise includes the following: 1) Flight noise (engine noise during takeoff and landing) 2) Ground noise (i) Aircraft engine operation noise on the ground (ii) APU
More informationEx-Ante Evaluation (for Japanese ODA Loan)
Ex-Ante Evaluation (for Japanese ODA Loan) 1. Name of the Project Country: The People s Republic of Bangladesh Project: Hazrat Shahjalal International Airport Expansion Project (I) Loan Agreement: June
More informationIntroduction of HANEDA and Infrastructure investment by Japan. Oct 18, 2014 Japan Airport Terminal Co., Ltd.
Introduction of HANEDA and Infrastructure investment by Japan Oct 18, 2014 Japan Airport Terminal Co., Ltd. INDEX 1. Overview of HANEDA Airport and Functional Enhancement of Japan s Metropolitan Airports
More informationANA HOLDINGS Financial Results for the Three Months ended June 30, 2015
ANA HOLDINGS NEWS ANA HOLDINGS Financial Results for the Three Months ended June 30, 2015 TOKYO, July 29, 2015 ANA HOLDINGS (hereinafter ANA HD ) today reports its financial results for the three months
More informationANA s Growth Strategy
ANA s Growth Strategy Shinya Katanozaka Member of the Board of Directors, Senior Executive Vice President All Nippon Airways Co., Ltd. January 08, 2013 ANA s History 2 Rising to the Challenges ~ Always
More informationBC FERRIES BOARD APPROVES $325 MILLION IN CONTRACTS Flensburger Shipyard of Germany wins bid to build three Super C vessels
For Immediate Release 04-071 September 17, 2004 BC FERRIES BOARD APPROVES $325 MILLION IN CONTRACTS Flensburger Shipyard of Germany wins bid to build three Super C vessels VICTORIA Following the completion
More information(i) Adopted or adapted airworthiness and environmental standards;
TECHNICAL ARRANGEMENT FOR THE ACCEPTANCE OF AIRWORTHINESS AND ENVIRONMENTAL APPROVAL OF CIVIL AERONAUTICAL PRODUCTS BETWEEN THE CIVIL AVIATION BUREAU, MINISTRY OF LAND, INFRASTRUCTURE AND TRANSPORT, JAPAN
More informationQuality Transport - Key to enhance Connectivity and Sustainability -
UNESCAP Regional EGM on Policy Options for Sustainable Transport Development, 27-29 Nov 2013, Incheon, Republic of Korea Quality Transport - Key to enhance Connectivity and Sustainability - 28 November,
More informationToward Japan-US Infrastructure Cooperation
Toward Japan-US Infrastructure Cooperation Japan s contributions through extensive PPP experience and advanced maintenance technologies November 7, 2018 Yasuhiro Shinohara Vice Minister for International
More informationThe Republic of Kazakhstan Ex-Post Evaluation of Japanese ODA Loan Project
The Republic of Kazakhstan Ex-Post Evaluation of Japanese ODA Loan Project Astana International Airport Reconstruction Project YAMAGUCHI Takao, Gyros Corporation 1. Project Description Russia Project Site
More informationEN-024 A Simulation Study on a Method of Departure Taxi Scheduling at Haneda Airport
EN-024 A Simulation Study on a Method of Departure Taxi Scheduling at Haneda Airport Izumi YAMADA, Hisae AOYAMA, Mark BROWN, Midori SUMIYA and Ryota MORI ATM Department,ENRI i-yamada enri.go.jp Outlines
More informationRunway Status Lights (RWSL) in Japan. July 2015
Ministry of Land, Infrastructure, Transport and Tourism CIVIL AVIATION BUREAU OF JAPAN Runway Status Lights (RWSL) in Japan July 2015 Table of contents Civil Aviation Bureau Japan What is RWSL Background
More informationSTANSTED AIRPORT LIMITED REGULATORY ACCOUNTS PERFORMANCE REPORT FOR THE YEAR ENDED 31 MARCH Financial Review...1. Performance Report...
PERFORMANCE REPORT CONTENTS Page Financial Review...1 Performance Report...3 Notes to the Performance Report...4 Stansted Regulatory Accounts PERFORMANCE REPORT Financial Review General overview Stansted
More informationFUTENMA REPLACEMENT FACILITY BILATERAL EXPERTS STUDY GROUP REPORT. August 31, 2010
FUTENMA REPLACEMENT FACILITY BILATERAL EXPERTS STUDY GROUP REPORT August 31, 2010 MANDATE AND SCOPE OF WORK: In order to achieve the earliest possible relocation of Marine Corps Air Station Futenma, the
More informationANA HOLDINGS Financial Results for FY2014
ANA HOLDINGS NEWS ANA HOLDINGS Financial Results for FY2014 TOKYO, April 30, 2015 ANA HOLDINGS (hereafter ANA HD ) today reports its consolidated financial results for fiscal year 2014 (April-March). Highlights
More informationBeaver Island Airport Terminal Building Project Q & A Prepared by Mead & Hunt
Beaver Island Airport Terminal Building Project Q & A Prepared by Mead & Hunt About the Consultant Q What services do you (Mead & Hunt) provide as the Island s airport consultant? A Mead & Hunt provides
More informationPartnership for Quality Infrastructure: Investment for Asia s Future (21 May 2015)
International Conference on Sustainable Development through Quality Infrastructure Japanese perspectives on Quality Infrastructure Investment - MLIT Initiative- Ministry of Land, Infrastructure, Transport
More informationSOME EXAMPLES OF PLAN AND ACTIVITY IN RE-CONSTRUCTION FROM THE 2011 GREAT EAST JAPAN EARTHQUAKE. Mitsuru Kawamura Nihon Sekkei, Inc.
Abstract SOME EXAMPLES OF PLAN AND ACTIVITY IN RE-CONSTRUCTION FROM THE 2011 GREAT EAST JAPAN EARTHQUAKE Mitsuru Kawamura Nihon Sekkei, Inc. Tokyo/Japan This report is trying to introduce some plans and
More informationThe Ever Evolving Naha Airport (Outline of Naha Airport Passenger Terminal Building) Naha Airport Building Co., Ltd.
The Ever Evolving Naha Airport (Outline of Naha Airport Passenger Terminal Building) August 2018 Naha Airport Building Co., Ltd. 1. Current Naha Airport Hours of Operation: 24 hours Runway: One 3,000 meter
More informationBetter Access to Tokyo Metropolitan Gateways
Ministry of Land, Infrastructure, Transport and Tourism CIVIL AVIATION BUREAU, JAPAN Better Access to Tokyo Metropolitan Gateways Facility Improvement, Procedural Improvement, and Capacity Increase at
More informationANA HOLDINGS Financial Results for the Six Months Ended September 30, 2018
ANA HOLDINGS NEWS ANA HOLDINGS Financial Results for the Six Months Ended September 30, 2018 TOKYO, Nov. 2, 2018 ANA HOLDINGS INC. (hereinafter ANA HD ) today reports its financial results for the six
More informationA Challenge to Large-Scale Projects
Features A Heritage Reaching back over 120 Years A Challenge to Large-Scale Projects D-Runway of Tokyo International Airport (Haneda Airport), Tokyo Metropolitan Construction Period: March 2005 to August
More informationCommission on the Promotion of Business Jets. Interim Report
Commission on the Promotion of Business Jets Interim Report June 2011 Contents Introduction 1 1. Current Situation Regarding Business Jets 2 2. Specific Initiatives to Promote Business Jets 7 3. Working
More informationANA Reports Record Profits for FY2012
ANA HOLDINGS NEWS ANA Reports Record Profits for FY2012 TOKYO April 30, 2013 - ANA Holdings today reports consolidated financial for the fiscal year ended March, 2013. Financial and Operational Highlights
More informationEx-Ante Evaluation Southeast Asia Division 5 Southeast Asia and Pacific Department, JICA 1. Name of the Project
Ex-Ante Evaluation Southeast Asia Division 5 Southeast Asia and Pacific Department, JICA 1. Name of the Project Country: Republic of the Philippines Project: New Bohol Airport Construction and Sustainable
More informationCreating Happiness. Business Model. Business Mission
Business Model Creating Happiness Oriental Land Co., Ltd. (OLC) was established with a strong aspiration to create a large-scale recreational facility, right here in Japan when Maihama was still a part
More informationImplementation Policy on. the Qualified Project, etc., for Airport Operation of. the Four National Airports in Hokkaido
(TRANSLATION) (for Reference Only) Implementation Policy on the Qualified Project, etc., for Airport Operation of the Four National Airports in Hokkaido The original of this document shall be prepared
More informationREPUBLIC OF BULGARIA MINISTRY OF TRANSPORT, INFORMATION TECHNOLOGY AND COMMUNICATIONS
REPUBLIC OF BULGARIA MINISTRY OF TRANSPORT, INFORMATION TECHNOLOGY AND COMMUNICATIONS TO ALL INTERESTED PERSONS IN THE PROCEDURE FOR GRANTING A CONCESSION FOR SERVICE FOR THE OBJECT CIVIL AIRPORT FOR PUBLIC
More informationBasic Policies on Operation of National Airports Utilizing Skills of the Private Sector
(TRANSLATION)(for Reference Only) Basic Policies on Operation of National Airports Utilizing Skills of the Private Sector I. The Purpose and Objectives in Operating etc. National Airports etc. by Utilizing
More informationRequest for Proposal (RFP) Fixed Wing Aircraft Transportation Services. For Matawa First Nations
Request for Proposal (RFP) Fixed Wing Aircraft Transportation Services For Matawa First Nations TABLE OF CONTENTS SECTION I INTRODUCTION 3 SECTION II PROPOSED SCHEDULE 4 SECTION III BACKGROUND 5 SECTION
More informationBOARD OF AIRPORT COMMISSIONERS
1 8/17/2018 8/21/2018 8/16/2018 i ElY MY Y I : JH MT BY...01,, III1*.ji,"1.111Los Angeles World Airports REPORT TO THE BOARD OF AIRPORT COMMISSIONERS Meeting Date: la Approved by: e1. "ampbell, Chief Airports
More informationTHE BURBANK-GLENDALE-PASADENA AIRPORT AUTHORITY S UPDATE REGARDING ITS NOISE IMPACT AREA REDUCTION PLAN AND ITS PART 161 STUDY SECOND QUARTER 2017
THE BURBANK-GLENDALE-PASADENA AIRPORT AUTHORITY S UPDATE REGARDING ITS NOISE IMPACT AREA REDUCTION PLAN AND ITS PART 161 STUDY SECOND QUARTER 2017 Pursuant to the California Department of Transportation
More informationMeasures for Earthquake-Resistance Enhancement of Industrial Complexes around The Tokyo Bay
Measures for Earthquake-Resistance Enhancement of Industrial Complexes around The Tokyo Bay Masanori Hamada Waseda University, Tokyo, Japan 2016/1/12 International Symposium on Natural and Technological
More informationANA HOLDINGS Financial Results for the Three Months Ended June 30, 2018
ANA HOLDINGS NEWS ANA HOLDINGS Financial Results for the Three Months Ended June 30, 2018 TOKYO, July 31, 2018 ANA HOLDINGS INC. (hereinafter ANA HD ) today reports its financial results for the three
More informationRodrigues Regional Assembly Chief Commissioner s Office
Ref: CCO/CAV/1/2013 Rodrigues Regional Assembly Invitation for Expressions of Interest Consultancy Services for the Design of Runway Extension & Ancillary Works at Sir Gaetan Duval Airport Plaine Corail,Rodrigues
More informationImplications of Construction Cost Escalation
Implications of Construction Cost Escalation 2007 ACI-NA Economics and Finance Conference James Gill, CPA Deputy Airport Director Finance, Business & Administration Raleigh-Durham Airport Authority Presentation
More informationREQUEST FOR COMPETITIVE SEALED PROPOSALS AIRPORT MANAGEMENT SERVICES MARV SKIE/LINCOLN COUNTY AIRPORT
REQUEST FOR COMPETITIVE SEALED PROPOSALS AIRPORT MANAGEMENT SERVICES MARV SKIE/LINCOLN COUNTY AIRPORT March 26, 2019 LINCOLN COUNTY BOARD OF COMMISSIONERS 104 N. MAIN, STE. 110 CANTON, SD 57013-1703 (605)764-5732
More informationTunnel design underneath the operating runway of Incheon airport
Geotechnical Aspects of Underground Construction in Soft Ground Yoo, Park, Kim & Ban (Eds) 2014 Korean Geotechnical Society, Seoul, Korea, ISBN 978-1-138-02700-8 Tunnel design underneath the operating
More informationCity Council Report. Mayor and City Council Susan Cline, Director, Public Works, Civil Engineering
City Council Report To: From: Mayor and City Council Susan Cline, Director, Public Works, Civil Engineering City Council Meeting: February 28, 2017 Agenda Item: 3.H Subject: Award of Feasibility/Design-Build
More informationEarnings Explanatory Meeting April 1, 2010 to March 31, Reference Material
Earnings Explanatory Meeting April 1, 2010 to March 31, 2011 Reference Material 1. Overview and characteristics of Japan Air Terminal s Business 2. Efforts related to the Tokyo International Airport Re-expansion
More informationTHE BURBANK-GLENDALE-PASADENA AIRPORT AUTHORITY S UPDATE REGARDING ITS NOISE IMPACT AREA REDUCTION PLAN AND ITS PART 161 STUDY SECOND QUARTER 2015
THE BURBANK-GLENDALE-PASADENA AIRPORT AUTHORITY S UPDATE REGARDING ITS NOISE IMPACT AREA REDUCTION PLAN AND ITS PART 161 STUDY SECOND QUARTER 2015 Pursuant to the California Department of Transportation
More informationFlexible and Effective measures - Market Base Approach -
Destination Green ICAO Symposium on Aviation and Climate Change, Destination Green, 14 16 May 2013 Flexible and Effective measures - Market Base Approach - Takashi Hongo Senior Fellow Mitsui Global Strategic
More informationKorea Eco-Label Program and Green Supply Chain Related Activities
2015/SOM2/CTI/DIA1/007 Korea Eco-Label Program and Green Supply Chain Related Activities Submitted by: Japan Dialogue on APEC Cooperation Network on Green Supply Chain Boracay, Philippines 11 May 2015
More informationREQUEST FOR COMPETITIVE SEALED PROPOSALS AIRPORT MANAGEMENT SERVICES MARV SKIE/LINCOLN COUNTY AIRPORT
REQUEST FOR COMPETITIVE SEALED PROPOSALS AIRPORT MANAGEMENT SERVICES MARV SKIE/LINCOLN COUNTY AIRPORT March 13, 2012 LINCOLN COUNTY BOARD OF COMMISSIONERS 104 N. MAIN, STE. 110 CANTON, SD 57013-1703 (605)764-5732
More informationPlanned Procurement Opportunities Report. January 2019
HILLSBOROUGH COUNTY AVIATION AUTHORITY Planned Procurement Opportunities Report Prepared by the Procurement Department Overview The Planned Procurement Opportunities Report is updated and posted on the
More informationANA HOLDINGS Financial Results for the Year ended March 31, 2016
ANA HOLDINGS NEWS ANA HOLDINGS Financial Results for the Year ended March 31, 2016 TOKYO, April 28, 2016 ANA HOLDINGS (hereafter ANA HD ) today reports its consolidated financial results for fiscal year
More informationBadgery s Creek Airport Presention. Revised from NAN 2015 AGM
Badgery s Creek Airport Presention Revised from NAN 2015 AGM Contents History Badgery s Creek Objectives Why is another airport required? Badgery s Creek Airport key facts, approval process and timeline
More informationTHE BURBANK-GLENDALE-PASADENA AIRPORT AUTHORITY S UPDATE REGARDING ITS NOISE IMPACT AREA REDUCTION PLAN AND ITS PART 161 STUDY FIRST QUARTER 2015
THE BURBANK-GLENDALE-PASADENA AIRPORT AUTHORITY S UPDATE REGARDING ITS NOISE IMPACT AREA REDUCTION PLAN AND ITS PART 161 STUDY FIRST QUARTER 2015 Pursuant to the California Department of Transportation
More informationGREAT EARTHQUAKE DISASTER NILIM, JAPAN
EAST- JAPAN GREAT EARTHQUAKE DISASTER 11 MARCH in 2011 NILIM, JAPAN CONTENTS 1. Outline of the EARTHQUAKE DISASTER 2. History of EARTHQUAKE/TSUNAMI occurred in Japan 3. Disaster Prevention Policy and Strategy
More informationFederal Aviation Administration Flight Plan Presented at the Canadian Aviation Safety Seminar April 20, 2004
Federal Aviation Administration Flight Plan 2004-2008 Presented at the Canadian Aviation Safety Seminar April 20, 2004 Challenges Reducing an Already Low Commercial Accident Rate Building an Air Traffic
More informationNotice regarding expected tender
1 1 Notice regarding expected tender Section I: Contracting entity Name and address Kalaallit Airports A/S Aqqusinersuaq 48A, P.O. Box 2000 GL-3900 Nuuk Greenland Contact person: Jesper Nordskilde E-mail:
More informationCIVIL AVIATION AUTHORITY
CIVIL AVIATION AUTHORITY INFRASTUCTRE DEVELOPMENT: BOTTLENECKS AND SOLUTIONS IN AVIATION SECTOR by the Presentation to the ICPAU 5 th Economic Director Finance, Civil Aviation Authority, U 20 July Overview
More informationImplementation Policy on. the Qualified Project Etc. for Fukuoka Airport Operation
(TRANSLATION) (for Reference Only) Implementation Policy on the Qualified Project Etc. for Fukuoka Airport Operation The original of this document shall be prepared in Japanese language, and this is the
More informationSales increased and income will be on a recovery track in the second half of the fiscal year.
Sales increased and income will be on a recovery track in the second half of the fiscal year. Contents I. Results for the First Half of Fiscal Year Ending March 2019 Profit decreased mainly due to temporary
More informationCity of Lafayette. Request for Proposals Municipal Airport Fixed Based Operator
City of Lafayette Request for Proposals Municipal Airport Fixed Based Operator NOTICE PROPOSERS The City of Lafayette is seeking an experienced, reliable professional to establish and operate a fullservice
More informationProgramme initiative.pt 2.0 Regulations
Programme initiative.pt 2.0 Regulations Article 1 Object 1. The object of the present Regulations is the definition of the terms of the support granting to projects aimed at attracting or developing air
More informationRepublic of Kosova Ministry of Economy and Finance. CAPACITY BUILDING CONFERENCE ON PUBLIC PRIVATE PARTNERSHIP (PPPs)
Republic of Kosova Ministry of Economy and Finance Presentation By: Donat Alaj Partnerships Kosovo CAPACITY BUILDING CONFERENCE ON PUBLIC PRIVATE PARTNERSHIP (PPPs) Zagreb, Croatia February, 2011 PRISHTINA
More informationPROCUREMENT REVIEW PANEL
P.SH 174/18 PROCUREMENT REVIEW PANEL, appointed by the President Pursuant to the article 105 as well article 106 of the Law on Public Procurement of the Republic of Kosova no.04/l-042, amended and supplemented
More informationPost tsunami Recovery of Port and Harbor areas in Japan from the 2011 Great East Japan Earthquake Tsunami
Date : 18 Nov., 2015 Venue : Furama Ballroom 1 SESSION 1 : A Decade of Partnerships in Sustainable Development of the Seas of East Asia: Synergies and Achievements WORKSHOP 1.1 : Managing Risks in Climate
More informationPresentation to the British Irish Airport s EXPO John Heffernan Chief Development Officer, Dublin Airport
Presentation to the British Irish Airport s EXPO John Heffernan Chief Development Officer, Dublin Airport 1 DUBLIN-LONDON 28.4 No.1 +2,200 MILLION PASSENGERS BUSIEST ROUTE IN EUROPE &No. 2 IN THE WORLD
More informationHokkaido 7 Bundled Airport Concession Project Implementation Policy Briefing Handout
Hokkaido 7 Bundled Airport Concession Project Implementation Policy Briefing Handout 5 April 2018 Civil Aviation Bureau, MLIT Asahikawa City Obihiro City Hokkaido Prefecture Ministry of Land, Infrastructure,
More informationPlanned Procurement Opportunities Report. November 2018
HILLSBOROUGH COUNTY AVIATION AUTHORITY Planned Procurement Opportunities Report Prepared by the Procurement Department Overview The Planned Procurement Opportunities Report is updated and posted on the
More informationCoastal vessels The number of insurance accidents and accident rate fluctuation 8.0%
1 2 3 4 5 6 1 In November 2013, a Loss & Prevention Seminar under the theme of Prevention of damage to harbour facilities was held at the following five areas: Tokyo, Kobe, Imabari, Fukuoka and Saeki.
More informationJOIN s Investment for Urban Development Projects in Indonesia
JOIN s Investment for Urban Development Projects in Indonesia September 5, 2017 Indonesia - Japan Urban Development & Housing seminar 2017 JOIN (Japan Overseas Infrastructure Investment Corporation for
More informationANA Holdings Financial Results for the Third Quarter of FY2013
ANA HOLDINGS NEWS ANA Holdings Financial Results for the Third Quarter of FY2013 TOKYO January 31, 2014 - ANA Holdings (hereafter ANA HD ) today reports its consolidated financial for the third quarter
More informationMinistry of Land, Infrastructure, Transport and Tourism. Civil Aviation Bureau. Improvements in Business Aviation in Japan
Ministry of Land, Infrastructure, Transport and Tourism Civil Aviation Bureau Improvements in Business Aviation in Japan Ministry of Land, Infrastructure, Transport and Tourism April 2016 ABACE2016 Asian
More informationINCENTIVE PROGRAM
LIMAK KOSOVO INT L AIRPORT J.S.C. PRISTINA INTERNATIONAL AIRPORT "ADEM JASHARI" INCENTIVE PROGRAM 2018 2020 (25 March 2018 28 March 2020) 1 ARTICLE 1: OBJECTIVE The objective of the Incentive Program is
More informationParticipation in the FrankfurtRheinMain Region
Participation in the FrankfurtRheinMain Region Ludger Stüve Director Regional Authority FrankfurtRheinMain Content Mediation Regional Dialogue Forum Airport and Region Forum (ARF) ARF s recent and current
More informationImplementation Policy on. the Qualified Project, etc., for Kumamoto Airport Operation
(TRANSLATION) (for Reference Only) Implementation Policy on the Qualified Project, etc., for Kumamoto Airport Operation The original of this document shall be prepared in Japanese language, and this is
More informationEarnings Explanatory Meeting April 1, 2011 to March 31, Reference Material
Earnings Explanatory Meeting April 1, 2011 to March 31, 2012 Reference Material 1. Overview and Characteristics of Japan Air Terminal (JAT) s Business 2. Efforts Related to the Tokyo International Airport
More informationState Aviation Administration of Ukraine
State Aviation Administration of Ukraine Views of neighboring country to the EU: needs, expectations, perspectives, achievements Presented by Dmytro Babeichuk Director ATM/ANS & ER Implementation of the
More informationGlobal UTM Conference UTM Project in Japan. June Hiroyuki Ushijima Ministry of Economy, Trade and Industry (METI)
Global UTM Conference 2017 UTM Project in Japan June 26 2017 Hiroyuki Ushijima Ministry of Economy, Trade and Industry (METI) Overview 1. UAS Industry in Japan 2. Roadmap of UAS Industry promotion 3. UTM
More information1. Material terms of the major related-party transaction (a series of interrelated transactions).
Conclusion of a major related-party transaction (a series of interrelated transactions) between PJSC Aeroflot, LLC Aviakapital-Service, PJSC Irkut Corporation and State Corporation Rostec, regarding operating
More informationPresented to the: NCTCOG Air Transportation Advisory Committee. Presented to the: NCTCOG Air Transportation Advisory Committee
...while at FAA By: Kelvin L. Solco, P.E., MBA, President, The Solco Group Presented to the: NCTCOG Air Transportation Advisory Committee Presented to the: NCTCOG Air Transportation Advisory Committee
More informationANA Holdings Financial Results for FY2013
ANA HOLDINGS NEWS ANA Holdings Financial Results for FY2013 TOKYO April 30, 2014 - ANA Holdings (hereafter ANA HD ) today reports its consolidated financial for fiscal year 2013 (April, 2013 March, 2014).
More informationREPUBLIC OF LATVIA. State Joint-stock Company Latvijas Gaisa Satiksme Aeronautical Information Service Riga Int. Airport, LV-1053, Latvia
REPUBLIC OF LATVIA Phone: +371 67300664 Fax: +371 67300660 Email: ais@lgs.lv AFS: EVRAYNYX State Joint-stock Company Latvijas Gaisa Satiksme Aeronautical Information Service Riga Int. Airport, LV-1053,
More informationSTUDY ON SOEKARNO HATTA INTERNATIONAL AIRPORT EXPANSION AND UPGRADING PROJECT IN JAKARTA IN THE REPUBLIC OF INDONESIA
STUDY ON PRIVATE-INITIATIVE INFRASTRUCTURE PROJECTS IN DEVELOPING COUNTRIES IN FY2011 STUDY ON SOEKARNO HATTA INTERNATIONAL AIRPORT EXPANSION AND UPGRADING PROJECT IN JAKARTA IN THE REPUBLIC OF INDONESIA
More informationPolicies for Establishing the Term of Validity of Airworthiness Certificate for Aircraft of Air Carrier
Circular No. 4-007 Policies for Establishing the Term of Validity of Airworthiness Certificate for Aircraft of Air Carrier September 5, 2000 March 30, 2001 June 19, 2008 September 17, 2009 April 15, 2011
More informationINTERNAL AUDIT DIVISION REPORT 2017/051. Audit of the aviation safety programme in the African Union-United Nations Hybrid Operation in Darfur
INTERNAL AUDIT DIVISION REPORT 2017/051 Audit of the aviation safety programme in the African Union-United Nations Hybrid Operation in Darfur There was a need to effectively address issues identified and
More informationOverview of Japan s Sustainable Tourism Development
Overview of Japan s Sustainable Tourism Development UNWTO Conference at Hyderabad, India Kazuyoshi Hasegawa Director of the Board & Secretary General Japan Association of Travel Agents April 2013 Index
More informationJAL Group Announces its FY Medium-Term Business Plan
JAL Group Announces its FY2006-2010 Medium-Term Business Plan -Mobilize the Group s Strengths to Regain Trust - Tokyo, Thursday March 2, 2006: The JAL Group today announced its medium-term business plan
More informationImprovements for Business Aviation in Japan
Ministry of Land, Infrastructure, Transport and Tourism Civil Aviation Bureau Improvements for Business Aviation in Japan Ministry of Land, Infrastructure, Transport and Tourism October 21, 2014 NBAA2014
More informationSubpart H. 2042/2003
AIRWORTHINESS NOTICE Issue of Certificate of Airworthiness No 12 Issue 3 May 2014 1 Purpose and scope The Civil Aviation Directive CAD-AIRW/8(1)-1 incorporates the Annex Part 21 to the European Commission
More informationPlanned Procurement Opportunities Report. July 2018
HILLSBOROUGH COUNTY AVIATION AUTHORITY Planned Procurement Opportunities Report Prepared by the Procurement Department Overview The Planned Procurement Opportunities Report is updated and posted on the
More informationJAPAN OUTLOOK. 1- KANSAI deal 2-KOBE deal 4- Future projects
JAPAN OUTLOOK 1- KANSAI deal 2-KOBE deal 4- Future projects 1. THE KANSAI DEAL Kansai Deal at a Glance Assets & Transactions Key Features Kansai Airports International - KIX Opening in 1994 and located
More informationP Foodservice Operations for the Peterborough Airport, Air Terminal. Mandatory Site Meeting December 8, 2014
Attachment 5 P-29-14 Foodservice Operations for the Peterborough Airport, Air Terminal Mandatory Site Meeting December 8, 2014 12/16/2014 1 Peterborough Airport The Objective The City is seeking to establish
More informationWyoming Valley Airport Proposed Improvements. Presented June 26, 2012 By The WBW Airport Advisory Board & FBO
Wyoming Valley Airport Proposed Improvements Presented June 26, 2012 By The WBW Airport Advisory Board & FBO Contents Purpose of meeting Airport overview Background of proposed improvements SWOT analysis
More informationMaximising Beneficial Reuse through the use of a Novel Dredging Contract
Maximising Beneficial Reuse through the use of a Novel Dredging Contract Nicola Clay & Katherine Harris Port of London Authority Nick Bray Dredging Research Paul Hesk Van Oord UK CEDA Dredging Days 2007
More informationCurrent Status of Airport PPP Projects
Current Status of Airport PPP Projects Presented by Aerodrome Standards & Safety Division DEPARTMENT OF CIVIL AVIATION MINISTRY OF TRANSPORT 1 Contents 1 Backgroud 2 Condition and Requirements of Project
More informationSite Formation Works of the Kai Tak Cruise Terminal Project
Site Formation Works of the Kai Tak Cruise Terminal Project Presented by Ian Muir MIEAust, CPEng Maritime Business Unit Head Asia Pacific and Deputy Project Director for the Kai Tak Cruise Terminal Site
More informationSetting the Stage for an Independent and Vibrant Life
Chapter 4: Setting the Stage for an Independent and Vibrant Life Coping with a falling birth rate and a graying population Steady progress has been made toward barrier-free buildings, public facilities
More informationINFORMATION FOR STANWELL MOOR AND STANWELL COMMUNITIES
Proposed north west runway Stanwell Moor Stanwell All maps contain OS data Crown copyright and database right 2018 INFORMATION FOR STANWELL MOOR AND STANWELL COMMUNITIES JANUARY 2018 Airport Expansion
More informationBUY AMERICAN PREFERENCE A1.1 SOURCE A1.2 APPLICABILITY. Title 49 USC 50101
A1 BUY AMERICAN PREFERENCE A1.1 SOURCE Title 49 USC 50101 A1.2 APPLICABILITY The Buy American Preference requirement in 49 USC 50101 requires that all steel and manufactured goods used on AIP projects
More informationEx-post Monitoring of Completed ODA Loan Project
Ex-post Monitoring of Completed ODA Loan Project The Philippines Nationwide Air Navigation Facilities Modernization Project Phase III External Evaluator: George Terahara (International Development Center
More informationTable of Contents. Overview Objectives Key Issues Process...1-3
Table of Contents Chapter One Introduction Overview...1-1 Objectives...1-1 Key Issues...1-2 Process...1-3 Chapter Two Inventory of Existing Conditions Airport Setting...2-1 Locale...2-1 Airport Surroundings...2-5
More informationHutchinson Regional Airport Request for Proposals for Hangar Lease RFP #15-163
Hutchinson Regional Airport Request for Proposals for Hangar Lease RFP #15-163 INTRODUCTION The City of Hutchinson is issuing a Request For Proposal (RFP) for the private or commercial use of the Hangar
More informationMitsubishi Estate Announces Participation in Melbourne Quarter East Tower Development Project in Australia
PRESS RELEASE November 24, 2017 Mitsubishi Estate Co., Ltd. Mitsubishi Jisho Residence Co., Ltd. Mitsubishi Estate Announces Participation in Melbourne Quarter East Tower Development Project in Australia
More informationB.C. MINISTRY OF TRANSPORTATION. SA17 Local Area Specification #2 SMALL AIRPORT WINTER MAINTENANCE
1. OBJECTIVE B.C. MINISTRY OF TRANSPORTATION SA17 SMALL AIRPORT WINTER MAINTENANCE To ensure the Anahim Lake airport is kept open and safe for small airport users. 2. GENERAL PERFORMANCE SPECIFICATIONS
More information