Monitoring Report: AIRAC January February No 03/1203. Edition: AIRAC 1203
|
|
- Bathsheba Maxwell
- 5 years ago
- Views:
Transcription
1 Mnitring Reprt: AIRAC 1301 N 03/ January February 2013 Editin: AIRAC 1203
2
3 EUROPEAN ORGANISATION FOR SAFETY OF AIR NAVIGATION E U R O C O N T R O L Eurpean Rute Netwrk Imprvement Plan (ERNIP) Implementatin Mnitring Mnitring Reprt: AIRAC January February 2013 DIRECTORATE NETWORK MANAGEMENT
4 Left blank intentinally
5 TABLE OF CONTENT TABLE OF CONTENT INTRODUCTION SUMMARY EVOLUTIONS TOWARDS THE ACHIEVEMENT OF THE EUROPEAN TARGET AIRSPACE DESIGN DEVELOPMENT AND IMPLEMENTATION MONITORING EXTERNAL DOCUMENT RELEASE LIST OF PROPOSALS IMPLEMENTED AIRAC 1301 (10 JANUARY 2013) SUMMARY OF MAJOR PROJECTS IMPLEMENTED ON 10 JANUARY AIRSPACE DESIGN INDICATOR FLIGHT EFFICIENCY INDICATORS EVOLUTION FLIGHT EFFICIENCY EVOLUTION PER AIRAC CYCLE EVOLUTION OF INDICATORS BENEFITS... 7 ANNEX A: DETAILED LIST OF PROJECTS IMPLEMENTED 10 JANUARY ANNEX B: ACRONYMS AND ABBREVIATIONS
6 Left blank intentinally - 2 -
7 1. INTRODUCTION 1.1 SUMMARY This Reprt infrms n the prgress achieved t further imprve the airspace design and utilisatin flight efficiency based n the imprvement prpsals implemented during the relevant AIRAC cycle. The methdlgy used fr assessing flight efficiency is included in the WP9 f RNDSG/64. This dcument can be cnsulted n: This editin fcuses n AIRAC 1301 (10 January 2013). 1.2 EVOLUTIONS TOWARDS THE ACHIEVEMENT OF THE EUROPEAN TARGET The Perfrmance Scheme fr air navigatin services and netwrk functins includes an envirnment/ flight efficiency Key Perfrmance area: Average hrizntal en-rute flight efficiency: the average hrizntal en-rute flight efficiency indicatr is the difference between the length f the en-rute part f the trajectry and the ptimum trajectry which, in average, is the great circle. en-rute is defined as the distance flwn utside a circle f 40 NM arund the airprt. the flights cnsidered fr the purpse f this indicatr are: - all cmmercial IFR flights within Eurpean airspace; - where a flight departs r arrives utside the Eurpean airspace, nly that part inside the Eurpean airspace is cnsidered; - circular flights and flights with a great circle distance shrter than 80NM between terminal areas are excluded. Fr the perfrmance reference perid starting n 1 st January 2012 and ending n 31 st December 2014, the Eurpean Unin-wide and EUROCONTROL perfrmance targets will be as fllws: Envirnment target: an imprvement by 0,75 percentage pints f the average hrizntal enrute flight efficiency indicatr in 2014 as cmpared t the situatin in AIRSPACE DESIGN DEVELOPMENT AND IMPLEMENTATION MONITORING The Netwrk Manager crdinates the fllwing activities t achieve the required imprvement in flight efficiency: Enhancing Eurpean enrute airspace design thrugh annual imprvements f Eurpean ATS rute netwrk, high pririty being given t: Implementatin f a cherent package f annual imprvements and shrter rutes; Imprving efficiency fr the mst penalised city pairs; Implementatin f additinal Cnditinal Rutes fr main traffic flws; Supprting initial implementatin f free rute airspace. Imprving airspace utilisatin and rute netwrk availability thrugh: Actively supprting and invlving aircraft peratrs and the cmputer flight plan service prviders in flight plan quality imprvements; Gradually applying rute availability restrictins nly where and when required; Imprving the use and availability f civil/military airspace structures. Efficient Terminal Maneuvring Area (TMA) design and utilisatin thrugh: Implementing advanced navigatin capabilities; Implementing Cntinuus Descent Operatins (CDO), imprved arrival/departure rutes, ptimised departure prfiles, etc. Imprving awareness f perfrmance
8 1.4 EXTERNAL DOCUMENT RELEASE The latest AIRAC reprt is available n the EUROCONTROL Airspace design website under the sub sectin ERNIP, ERNIP Implementatin Mnitring: as well as n the EUROCONTROL Netwrk Operatins Mnitring and Reprting website under Eurpean Rute Netwrk Imprvement Plan - Mnitring Reprt: The full list f mnitring reprts is available n the EUROCONTROL Media & Inf Centre website: A cpy f the AIRAC Reprt f the Eurpean Rute Netwrk Imprvement Plan is als available via the restricted OneSky Online websites fr access by ther interested members f the RNDSG, ASMSG and NETOPS (see ref sub-sectins under main sectin "LIBRARY"). EUROCONTROL OneSky Teams NETOPS, RNDSG and ASMSG Library:
9 2. LIST OF PROPOSALS IMPLEMENTED AIRAC 1301 (10 JANUARY 2013) 2.1 SUMMARY OF MAJOR PROJECTS IMPLEMENTED ON 10 JANUARY 2013 During the AIRAC cycle 7 packages f airspace imprvements c-rdinated at netwrk level have been implemented. The list belw prvides an verview f the majr imprvement prjects implemented n 10 JANUARY 2013: Austria: - Implementatin f a new DCT segment. Cratia/ Italy/ Slvenia: - Withdrawal f tw RAD restrictin t imprve flight efficiency. France: - Implementatin f new DCT segments t imprve flight planning ptins. Germany: - Implementatin f new/ mdified ATS rutes. Latvia: - Withdrawal f CDR 1/ H24 classificatins within EVRR FIR/UIR t make all rutes permanently available H24. Maastricht UAC: - Further expansin f Free Rute Airspace Maastricht (FRAM) while intrducing additinal DCT ptins available fr flight planning. UK: - Mdificatin f ATS rute W2D t imprve flight planning ptins. A detailed list f all imprvement measures implemented n 10 January 2013 is attached in Annex A. The list is an extract f the Eurpean Rute Netwrk Imprvement Plan database accessible via: A descriptin f the airspace imprvements tgether with rientatin maps due fr implementatin n the relevant AIRAC cycle is prvided in the RNDSG Airspace Imprvements Synpsis (RAIS)
10 3. AIRSPACE DESIGN INDICATOR 3.1 FLIGHT EFFICIENCY INDICATORS EVOLUTION The graphs belw shw the evlutin f the airspace design flight efficiency (RTE-DES) and f the last filed flight plan indicatr (RTE-FPL) between 2007 and 6 February % RTE-DES 6% RTE-FPL 5% 5% 4.91% 5.03% 4.90% 4.91% 4.73% 4.64% 4.60% 4% 3.53% 3.54% 3.45% 3.22% 3.04% 2.96% 2.88% 4% 3% 3% 2% % FLIGHT EFFICIENCY EVOLUTION PER AIRAC CYCLE The graph belw shws the evlutin per AIRAC cycle f the flight efficiency indicatrs between 2007 and 6 February Rute Efficiency KPI per AIRAC cycle RTE-DES RTE-FPL 5.5% % 0.8 Rute Extensin 4.5% 4.0% 3.5% 3.0% 2.5% AIRAC Nte: FPL: Flight Plan data prvided by CFMU, SAAM analysis perfrmed by DNM/COO/NOM/OPL. DES:Ttraffic demand prvided by CFMU, airspace envirnment data, prfile calculatins and SAAM analysis prvided by DNM/COO/NOM/OPL
11 3.3 EVOLUTION OF INDICATORS The current data indicates that, the rute extensin due t airspace design reduced between 2009 and February 2013 by 0.57 percentage pints. The evlutin f the airspace design indicatr is n the right trend and the cntributins f the airspace design prjects are key fr imprving flight efficiency. The current data indicates that, the rute extensin based n the last filed flight plan reduced between 2009 and February 2013 by 0.30 percentage pints. The difference between the airspace design indicatr and the last filed flight plan indicatr was 1.45 percentage pints in 2009 and is 1.75 percentage pints in February 2013, recrding a slight increase cmpared t the previus AIRAC cycle. The current data indicates that the rute extensin due t airspace design in February 2013 stayed at a histrically lw level f 2.87%. The current data indicates that, the rute extensin based n the last filed flight plan went slightly up frm 4.53% in January 2013 t 4.62% in February The differences between the tw indicatrs shwn abve clearly indicate that mre effrts must be made t imprve the efficiency f the airspace utilisatin and t ensure that the indicatr based n the latest filed flight plan fllws a similar trend like the airspace design indicatr. 3.4 BENEFITS Due t the airspace design imprvements, the ptential savings achieved during the AIRAC cycle 1301 amunt t NMs flwn less cmpared t the equivalent AIRAC cycle in This translates int 527 tns f fuel, r 1756 tns f CO2, r Eurs. Based n the last filed flight plan indicatr, the lsses calculated during the AIRAC cycle 1301 amunt t NMs flwn less cmpared t the equivalent AIRAC cycle in This translates int tns f fuel, r tns f CO2, r Eurs. The lsses recrded fr the last filed flight plan data during AIRAC cycle 1301 cmpared t the same AIRAC cycle in 2012 were caused n a certain extent by regulatins due t the industrial actin in France (Marseille ACC, Brest ACC and Paris ACC), the Interface Reims - Paris (IRP) airspace design prject in France and capacity issues in Cyprus. Several ther events like the implementatin f COOPANS in Sweden, the paperless strip system trial in France and the evacuatin f Zurich ACC due t a fire alarm have had an impact n netwrk efficiency as well as several weather regulatins applied due t very strng winds, jet stream ice and snw that might have caused re-rutings and diversins resulting in a negative impact n flight efficiency
12 FLIGHT EFFICIENCY SAVINGS COMPARED TO EQUIVALENT AIRAC CYCLE IN THE PREVIOUS YEAR (In Nautical Miles) NM NM DES NM FPL NM DES NM FPL AIRAC CYCLE FLIGHT EFFICIENCY SAVINGS COMPARED TO EQUIVALENT AIRAC CYCLE IN THE PREVIOUS YEAR (In Tns f Fuel) 4000 TONS OF FUEL TONS FUEL DES TONS FUEL FPL TONS FUEL DES TONS FUEL FPL AIRAC CYCLE - 8 -
13 FLIGHT EFFICIENCY SAVINGS COMPARED TO EQUIVALENT AIRAC CYCLE IN THE PREVIOUS YEAR (In CO2) TONS OF CO TONS CO2 DES TONS CO2 FPL TONS CO2 DES TONS CO2 FPL AIRAC CYCLE FLIGHT EFFICIENCY SAVINGS COMPARED TO EQUIVALENT AIRAC CYCLE IN THE PREVIOUS YEAR (In EURO) EURO EURO DES EURO FPL AIRAC CYCLE EURO DES EURO FPL - 9 -
14 Left blank intentinally
15 ANNEX A: DETAILED LIST OF PROJECTS IMPLEMENTED 10 JANUARY 2013 The fllwing table presents detailed infrmatin abut each f the imprvement prpsals develped within the RNDSG and implemented 10 January The descriptin f the prpsals is based n the infrmatin available frm different surces (e.g. AOs, ANSPs and EUROCONTROL). Fr the crrectness and verificatin f the relevant aernautical infrmatin cnsult fficial State AIP publicatin. The data frm this dcument shuld nt be used fr peratinal purpses. The table includes: Prpsal ID number: A reference number t identify each prpsal allwing t trace at which RNDSG it was initiated. Prject Name: Dedicated Name and Phase/ Step f the imprvement prject. Descriptin: A detailed descriptin f the planned imprvement prpsal. Objective: A brief descriptin f the purpse f the enhancement measure. Implementatin Status: The implementatin status defined as Prpsed, Planned, Cnfirmed r Implemented. Prject Grup: The Functinal Airspace Blck Grup (FAB), Reginal Fcus Grup (RFG), Sub-Grup (SG) r any ther Prject Grup(s) invlved directly r indirectly by the prpsed enhancement measure. Prject Categry: The nature f the prpsed enhancement measure defined thrugh Prject Categries referring t: Airspace Structure; ATC Sectrs; ATS Rutes; CDRs: Civil/Military Airspace; DCTs; Free Rute Airspace; Night Rutes; RAD; Rute Redesignatin; TMA. States and Organisatins: The States and/r Organisatins invlved directly r indirectly by the prpsed enhancement measure. Originatr(s): The States, Organisatins wh have riginated the prpsal. Cmments: The cnditins and/r pre-requisites which have t be met in rder t implement the prpsal r any ther relevant cmment(s). Nte: The list f implemented changes fr this AIRAC cycle des nt claim t be cmplete
16 Prpsal ID : Impl. Status: State(s) & Org. Cmments: 1. Descriptin: 1. T implement new eastbund ATS rute Z225 TORPU - LASIS. 2. T change existing ATS rute L610 STAUB - MAMOR - UNKUL - UPALA frm westbund t bidirectinal. 3. T intrduce mdified utilizatin remarks t ATS rutes UL603, UM150, Y110 and Y700. Implemented 10 JAN 2013 Prject Categry: RAD ATS Rutes DEU Originatr(s): DEU 1. Withdrawal f DCT TORPU - LASIS in RAD Appendix 4. Objective: T further imprve the ATS rute netwrk within Munich FIR/ Rhein UIR. Prpsal ID : Impl. Status: State(s) & Org. Cmments: 2. Descriptin: T make existing bidirectinal ATS rute segment W2D POL - LBA permanently available by withdrawal f current flight planning restrictin. Objective: T further imprve the ATS rute netwrk within Lndn FIR/UIR. Implemented 10 JAN 2013 Prject Categry: ATS Rutes GBR Originatr(s): GBR Prpsal ID : Impl. Status: State(s) & Org. Cmments: 3. Descriptin: T implement new DCT ELMEM - MOGTI, as described in RAD Appendix 4. Objective: T further imprve flight planning ptins within Wien FIR. Implemented 10 JAN 2013 Prject Categry: RAD DCTs AUT Originatr(s): AUT Prpsal ID : Impl. Status: State(s) & Org. Cmments: 4. Prject Name: Free Rute Airspace Maastricht, FRAM Descriptin: T further expand the Free Rute Airspace Maastricht (FRAM) by intrducing three new DCT ptins available fr flight planning during specific times and sme mdificatins t existing DCTs available fr flight planning, as fully described in RAD Appendix 4. Objective: T implement FRA Cncept and further imprve flight efficiency within MUAC AR. Implemented 10 JAN 2013 Prject Categry: DCTs Free Rute Airspace MUAC Originatr(s): MUAC Related prpsals: a b c f g h
17 Prpsal ID : Impl. Status: State(s) & Org. Cmments: 5. Descriptin: T withdraw FL capping RAD restrictin LDLJ1000 and LDLI1000 by adapting them and insert in Appnedix 6. Objective: T further imprve the vertical flight efficiency between Zagreb ACC, Ljubljana ACC and Padva ACC. Implemented 10 JAN 2013 Prject Grup: RFG SE Prject Categry: RAD Vertical FE HRV ITA SVN Originatr(s): HRV ITA SVN These restrictins are applicable between MAY - OCT AIRACs. Prpsal ID : Impl. Status: State(s) & Org. Cmments: 6. Descriptin: T withdraw existing CDR 1 H24 classificatins within EVRR FIR/UIR making all rutes permanently available H24. Objective: T further imprve the ATS rute netwrk within Riga FIR. Implemented 10 JAN 2013 Prject Categry: CDRs LVA Originatr(s): LVA Prpsal ID : Impl. Status: State(s) & Org. Cmments: 7. Descriptin: 1. T implement the fllwing DCTs as described in RAD Appendix 4: a. ROLIR - AMFOU; b. MOU - ROLIR. 2. T intrduce sme mdificatins t existing DCTs available fr flight planning, as described in RAD Appendix 4. Objective: T further imprve flight planning ptins within Marseille FIR and Reims FIR, especially fr city pair LFPG-LFMN. Implemented 10 JAN 2013 Prject Grup: 50 MPCPEs Prject Categry: DCTs RAD FRA Originatr(s): FRA
18 - 14 -
19 ANNEX B: ACRONYMS AND ABBREVIATIONS 1. The fllwing ISO-3 cding f States is used in the clumn States and Organisatin: ALB Albania IRQ Iraq ARM Armenia ITA Italy AUT Austria LBY Libyan Arab Jamahiriya AZE Azerbaijan LTU Lithuania BEL Belgium LUX Luxemburg BGR Bulgaria LVA Latvia BIH Bsnia and Herzegvina MAR Mrcc BLR Belarus MDA Mldva, Republic f CHE Switzerland MKD The frmer Yugslav Republic f Macednia CYP Cyprus MLT Malta CZE Czech Republic MNE Mntenegr DEU Germany NLD Netherlands DNK Denmark NOR Nrway DZA Algeria POL Pland EGY Egypt PRT Prtugal ESP Spain ROU Rmania EST Estnia RUS Russian Federatin FIN Finland SRB Serbia FRA France SVK Slvakia GBR United Kingdm SVN Slvenia GEO Gergia SWE Sweden GRC Greece SYR Syrian Arab Republic HRV Cratia TUN Tunisia HUN Hungary TUR Turkey IRL Ireland UKR Ukraine IRN Iran, Islamic Republic f MUAC Maastricht UAC
20 2. BLUMED FAB, DANUBE FAB and FAB CE prpsals referenced in prpsal number bx are cded with a unique identificatin number abbreviated as BM r DN r CE, respectively, fllwing by fur digits (XXXX) (example BM0001 r DN0001 r CE0001). 3. Cntent f each prpsal is an indicatin f State s intentin t implement the relevant airspace imprvement but dn't represent a cpy f any fficial publicatin. Fr the crrectness and verificatin f the relevant aernautical infrmatin cnsult fficial State AIP publicatin. The data frm this dcument shuld nt be used fr peratinal purpses
21 - 17 -
Monitoring Report: AIRAC July August No 03/1203. Edition: AIRAC 1203
Monitoring Report: AIRAC 1508 No 03/1203 23 July 2015-19 August 2015 Edition: AIRAC 1203 European Route Network Improvement Plan (ERNIP) Implementation Monitoring Monitoring Report: AIRAC 1508 23 July
More informationMonitoring Report: AIRAC March March No 03/1203. Edition: AIRAC 1203
Monitoring Report: AIRAC 1603 No 03/1203 3 March 2016 30 March 2016 Edition: AIRAC 1203 European Route Network Improvement Plan (ERNIP) Implementation Monitoring Monitoring Report: AIRAC 1603 3 March
More informationMonitoring Report: AIRAC October November No 03/1203. Edition: AIRAC 1203
Monitoring Report: AIRAC 1511 No 03/1203 15 October 2015-11 November 2015 Edition: AIRAC 1203 European Route Network Improvement Plan (ERNIP) Implementation Monitoring Monitoring Report: AIRAC 1511 15
More informationAgenda Item 8: RNAV routes data quality monitoring status report
Agenda Item 8: RNAV routes data quality monitoring status report 2 nd 12 th nd ICAO EUR PBN TF & EUROCONTROL RAiSG 12 th - 14 th March 2014 EUROCONTROL Airspace Design Section Operations Planning Unit
More informationMonitoring Report: AIRAC March March No 03/1203. Edition: AIRAC 1203
Monitoring Report: AIRAC 1703 No 03/1203 2 March 2017 29 March 2017 Edition: AIRAC 1203 European Route Network Improvement Plan (ERNIP) Implementation Monitoring Monitoring Report: AIRAC 1703 2 March
More informationMonitoring Report: AIRAC June July No 03/1203. Edition: AIRAC 1203
Monitoring Report: AIRAC 1407 No 03/1203 26 June 2014-23 July 2014 Edition: AIRAC 1203 European Route Network Improvement Plan (ERNIP) Implementation Monitoring Monitoring Report: AIRAC 1407 26 June 2014-23
More informationENSURE YOUR STATE S INFORMATION IS UP TO DATE
ENSURE YOUR STATE S INFORMATION IS UP TO DATE Ensure your State focal points file their Air Services Agreements and traffic data. To address any discrepancies found in ICAO s WASA table or map, please
More information3. Definitions: North-East Atlantic:
General Guidance n the Vluntary Interim Applicatin f the D1 Ballast Water Exchange Standard by vessels perating between the Mediterranean Sea and the Nrth-East Atlantic and/r the Baltic Sea 1. In anticipatin
More informationATM Network Performance Report
Netwrk Perfrmance Reprt ATM Netwrk Perfrmance Reprt 2018. Page 1 f 17 Netwrk Perfrmance Reprt 2018 Table f cntents Summary... 3 Netwrk Wide Perfrmance... 7 Airbrne delay... 7 Netwrk Delay Rati: 2018...
More informationDIRECTORS GENERAL OF CIVIL AVIATION-MIDDLE EAST REGION. First Meeting (DGCA-MID/1) (Abu Dhabi, UAE, March 2011)
13/03/2011 DIRECTORS GENERAL OF CIVIL AVIATION-MIDDLE EAST REGION First Meeting (DGCA-MID/1) (Abu Dhabi, UAE, 22-24 March 2011) Agenda Item 4: Air Navigatin Issues AIRSPACE AND PBN ACTIVITIES IN THE UAE
More informationMonitoring Report: AIRAC March April No 03/1203. Edition: AIRAC 1203
Monitoring Report: AIRAC 1604 No 03/1203 31 March 2016 27 April 2016 Edition: AIRAC 1203 European Route Network Improvement Plan (ERNIP) Implementation Monitoring Monitoring Report: AIRAC 1604 31 March
More informationWhy functional airspace blocks?
FACTS AND FIGURES Why create functinal airspace blcks? The FABEC area The partners The prgramme The bjectives FABEC gvernance The feasibility study Other FABs in Eurpe Why functinal airspace blcks? At
More informationMonitoring Report: AIRAC June July No 03/1203. Edition: AIRAC 1203
Monitoring Report: AIRAC 1307 No 03/1203 27 June 2013-24 July 2013 Edition: AIRAC 1203 EUROPEAN ORGANISATION FOR SAFETY OF AIR NAVIGATION E UROCONTROL European Route Network Improvement Plan (ERNIP) Implementation
More informationCEPEJ 2014 Evaluation report on European Judicial Systems (2012 data) 1
CEPEJ 2014 Evaluation report on European Judicial Systems (2012 data) www.coe.int/cepej 1 Presentation of the main results By the European Commission for the Efficiency of Justice (CEPEJ) www.coe.int/cepej
More informationRunway 35 South and West (Jet) Departure Flight Path Amendment
Pst Implementatin Review CANBERRA AIRPORT Runway 35 Suth and West (Jet) Departure Flight Path Amendment Versin 1 Effective February 2016 Airservices Australia 2015 1 f 5 Intrductin In 2014 at the request
More informationMonitoring Report: AIRAC March April No 03/1203. Edition: AIRAC 1203
Monitoring Report: AIRAC 1704 No 03/1203 30 March 2017 26 April 2017 Edition: AIRAC 1203 European Route Network Improvement Plan (ERNIP) Implementation Monitoring Monitoring Report: AIRAC 1704 30 March
More informationPBN Route Structure Alaska Sub-Committee AACA Co-Chair Dennis Parrish
ALASKA AIR CARRIERS ASSOCIATION 2301 Merrill Field Drive A-3, Anchrage, Alaska 99501 907-277-0071 www.alaskaaircarriers.rg PBN Rute Structure Alaska Sub-Cmmittee AACA C-Chair Dennis Parrish d.parrish@cp.cm
More informationWhite Paper Network Video Management System Ensuring end-to-end protection of video integrity
White Paper Netwrk Vide Management System Ensuring end-t-end prtectin f vide integrity Netwrk Vide Management System Octber 7, 2016 NVMSWP002 Revisin 1.0.0 White Paper Netwrk Vide Management System Ensuring
More informationAgenda Item 5: PBN en-route AIP publication issues
Agenda Item 5: PBN en-route AIP publication issues First Combined ICAO EUR PBN TF & EUROCONTROL RAiSG Meeting 11 th - 13 th September 2013 ICAO EUR/NAT Office - Paris Mr. Tihomir Todorov Head of Section
More informationFLIGHTS OF FANCY How Wing Shape Affects Flight
FLIGHTS OF FANCY Hw Wing Shape Affects Flight Summary/Purpse: The purpse f this activity is t simulate bird flight using mdel paper planes. Students will be able t differentiate between high and lw aspect
More informationFree Route Airspace Workshop Conclusions and Future Projects Outlook
Free Route Airspace Workshop Conclusions and Future Projects Outlook FRA Workshop EUROCONTROL HQ, Brussels 24-25 May 2018 Razvan Bucuroiu Head of Network Strategy and Development & Operations Planning
More informationCamp Caillet Crisis Response Plan
Camp Caillet Crisis Respnse Plan The Camp Caillet Operatinal Cmmittee recgnises Scuts Canada Plicy n having a Crisis Respnse Plan in place. In Charge Scuters that run prgrams n Camp Caillet prperty are
More informationEUROCONTROL. Visit of the Transport Attachés. 10 April Frank Brenner. Director General EUROCONTROL
EUROCONTROL Visit of the Transport Attachés 10 April 2015 Frank Brenner Director General EUROCONTROL One day s traffic EUROCONTROL - Visit of the Transport Attachés - 10 April 2015 2 ATM Today Air Transport
More informationALI ZAGHARI Deputy District Director Caltrans, District 7 Division of Traffic Operations
ALI ZAGHARI Deputy District Directr Caltrans, District 7 Divisin f Traffic Operatins Backgrund Califrnia law permits ILEV (Inherently Lw Emissin Vehicles) and previusly hybrid vehicles t access HOV lanes
More informationASISA STANDARD ON UNCLAIMED ASSETS
ASISA STANDARD ON UNCLAIMED ASSETS 1. Backgrund This Standard prvides guidance fr members n the treatment f unclaimed assets. The LOA Cde n Unclaimed Assets was used as the basis t develp this Standard
More informationFree Route Airspace Maastricht (FRAM)
Free Route Airspace Maastricht (FRAM) Maastricht Upper Area Control Centre Dirk De Herdt Airspace and Network Planning 24 th 25 th May 2018 MUAC implements FRA on behalf of four countries MUAC FRA is laterally
More informationNACC/WG/4 WP/31 20/03/14 Fourth North American, Central American and Caribbean Working Group Meeting (NACC/WG/4) Ottawa, Canada, 24 to 28 March 2014
2/3/14 Furth Nrth American, Central American and Caribbean Wrking Grup Meeting (NACC/WG/4) Ottawa, Canada, 24 t 28 March 214 Agenda Item 3: Fllw-up n the NAM/CAR Reginal Perfrmance-Based Air Navigatin
More informationMonitoring Report: AIRAC May June No 03/1203. Edition: AIRAC 1203
Monitoring Report: AIRAC 1206 No 03/1203 31 May 2012-27 June 2012 Edition: AIRAC 1203 EUROPEAN ORGANISATION FOR SAFETY OF AIR NAVIGATION E U R O C O N T R O L European Route Network Improvement Plan (ERNP)
More informationNational Search and Rescue Committee (NSARC) Secretariat Issue Paper
Natinal Search and Rescue Cmmittee (NSARC) Secretariat Issue Paper Status: Cntingency Airspace and Air Missin Management during a Disaster Respnse (13 June 2012) Issue The fllwing issue paper prvides infrmatin
More informationTasmanian Tourism Snapshot
Tasmanian Turism Snapsht Year ending December 2014 Intrductin The Tasmanian Turism Snapsht is published every quarter, using the latest figures frm the Tasmanian Visitr Survey, the Internatinal Visitr
More informationCHAPTER 1: INTRODUCTION
CHAPTER 1: INTRODUCTION Purpse and Scpe The infrmatin presented in this reprt represents the study findings fr the 2015 Grand Frks Internatinal Airprt Master Plan Update prepared fr the Grand Frks Reginal
More informationРоссия/Russia + Important roads of Europe 2013 FX
1 Road coverage CD-ROM 1 CD-ROM 2 ~100 % detailed street Important road of Europe Important road 2 Sales arguments CD-ROM 1 provides updated navigation data with a coverage of ~100 % of important roads
More informationSES Performance Scheme
SES Performance Scheme 12 th Florence Rail Forum 2 May 2016 Rolf TUCHHARDT European Commission, DG MOVE The Single European Sky policy initiative to improve the overall performance of air traffic management
More informationEuropean Performance Scheme
European Performance Scheme Global Challenges to Improve Air Navigation Performance Asilomar Conference Grounds, Pacific Grove, CA 12 February 2015 Rolf TUCHHARDT European Commission, DG MOVE The SES policy
More informationERA AIR SAFETY GROUP REPORT FOR 2016
ERA AIR SAFETY GROUP REPORT FOR 2016 Objectives f the Air Safety Grup The bjective f the Air Safety Grup (ASG) is t assist members f ERA t maintain and imprve the safety f peratins thrugh the analysis
More informationMonitoring Report: AIRAC May May No 03/1203. Edition: AIRAC 1203
Monitoring Report: AIRAC 1405 No 03/1203 01 May 2014-28 May 2014 Edition: AIRAC 1203 EUROPEAN ORGANISATION FOR SAFETY OF AIR NAVIGATION E U R O C O N T R O L European Route Network Improvement Plan (ERNIP)
More informationReference: How to fly legally with a Hang Glider or Paraglider within Austrian airspace?
To the Community of Hang Glider and Paraglider Pilots Vienna, 21 MAR 2017 Reference: How to fly legally with a Hang Glider or Paraglider within Austrian airspace? Dear all, By the 1 st of March 2017 the
More informationcommittee report Network Rail: Route Utilisation Strategy: Stations Draft for Consultation
cmmittee reprt Netwrk Rail: Rute Utilisatin Strategy: Statins Draft fr Cnsultatin Cmmittee Strategy and Prgrammes Date f Meeting 24 June 2011 Date f reprt 31 May 2011 Reprt by Assistant Chief Executive
More informationNew York Action Team SWAP Federal Aviation Administration. Teterboro User Group Brief. Leo Prusak, Manager of Tactical Operations.
New Yrk Actin Team SWAP 2013 Teterbr User Grup Brief By: Le Prusak, Manager f Tactical Operatins Date: March 21, 2013 New Yrk Actin Team bjectives Imprve the flw f traffic and airprt peratins in the New
More informationEpisode 3 D Simulation Report on Airspace Organization and Management EPISODE 3
EPISODE 3 Single Eurpean Sky Implementatin supprt thrugh Validatin Dcument infrmatin Prgramme Sixth framewrk prgramme Pririty 1.4 Aernautics and Space Prject title Episde 3 Prject N 037106 Prject Crdinatr
More informationReport on the Operation of the Route Charges System in Central Route Charges Office (CRCO)
European Organisation for the Safety of Air Navigation Central Route Charges Office (CRCO) Report on the Operation of the Route Charges System in 2010 March 2011 - 3 - TABLE OF CONTENTS TABLE OF CONTENTS...
More informationBUSINESS AVIATION TRAFFIC TRACKER EUROPE. April 2017
BUSINESS AVIATION TRAFFIC TRACKER EUROPE April 2017 DEPARTURES, ARRIVALS, INTERNALS AND OVERFLIGHTS (DAIO) REPORT TOTAL FLIGHTS Business Aviation (Single European Sky Area) Month Previous Arrival Departure
More informationBUSINESS AVIATION TRAFFIC TRACKER EUROPE. September 2018
BUSINESS AVIATION TRAFFIC TRACKER EUROPE September 2018 EXECUTIVE SUMMARY September 2018 Back to Business With 66.133 flights, September 2018 marks a slight slow down (-0,7%) compared with September 2017
More informationNetwork Management, building on our experience of flow management and network planning.
Network Management, building on our experience of flow management and network planning. Giovanni Lenti Head of Network Operation Services The European Organisation for the Safety of Air Navigation Air
More informationLegal and Institutional Aspects of ATM in Europe. Roderick D. van Dam Head of Legal Service EUROCONTROL
Legal and Institutional Aspects of ATM in Europe Roderick D. van Dam Head of Legal Service EUROCONTROL EUROCONTROL: European Organisation for the Safety of Air Navigation Coordination and integration -
More informationDraft Evaluation Criteria for the Tonto National Forest Wilderness Recommendation Process
fr the Tnt Natinal Frest Wilderness Recmmendatin Prcess Intrductin When revising the Frest Plan, the Tnt Natinal Frest is required t identify and evaluate lands that may r may nt be suitable fr inclusin
More informationDenver International Airport Air Traffic Control Tower. and. Denver Approach D01 LETTER OF AGREEMENT
Denver Internatinal Airprt Air Traffic Cntrl Twer and Denver Apprach D01 LETTER OF AGREEMENT Subject: Standard Operatin and Cntrl Jurisdictin Effective: 12/20/2016 Purpse: This letter f agreement establishes
More informationLife Expectancy for Administrative Areas within Scotland,
General Register Office fr S C O T L A N D infrmatin abut Sctland s peple Life Expectancy fr Administrative Areas within Sctland, 2005-2007 Published n 25 September 2008 A Natinal Statistics publicatin
More informationCarbon Offsetting and Reduction Scheme for International Aviation (CORSIA) Overview Kurt Edwards Director General, IBAC NBAA BACE October 2018
Carbn Offsetting and Reductin Scheme fr Internatinal Aviatin (CORSIA) Overview Kurt Edwards Directr General, IBAC NBAA BACE Octber 2018 Agenda CORSIA Brief Histry CORSIA in cntext Key dates fr CORSIA Am
More informationBUSINESS AVIATION TRAFFIC TRACKER EUROPE. January 2018
BUSINESS AVIATION TRAFFIC TRACKER EUROPE January 2018 EXECUTIVE SUMMARY January starts a 2018 with the continuation of traffic growth AMAC Insurance Subcommittee Meeting Milano, 1 st of February January
More informationReport to the Minister for Planning
Reprt t the Minister fr Planning N 8: fr the perid ending 31 March 2018 Lucy Turnbull Chief Cmmissiner Sarah Hill Chief Executive Officer 1 Greater Sydney Cmmissin Reprt 31 March 2018 Intrductin Since
More informationMonitoring Report: AIRAC May June No 03/1203. Edition: AIRAC 1203
Monitoring Report: AIRAC 1506 No 03/1203 28 May 2015-24 June 2015 Edition: AIRAC 1203 European Route Network Improvement Plan (ERNIP) Implementation Monitoring Monitoring Report: AIRAC 1506 28 May 2015-24
More informationAPPENDIX D Safety Performance Review
APPENDIX D Safety Perfrmance Review Safety Perfrmance Review Curtneypark Drive East Class EA & Preliminary Design Prepared fr: City f Mississauga Prepared by: Stantec Cnsulting Ltd. 300-675 Cchrane Dr,
More informationBUSINESS AVIATION TRAFFIC TRACKER EUROPE. June 2018
BUSINESS AVIATION TRAFFIC TRACKER EUROPE June 2018 EXECUTIVE SUMMARY June 2018 traffic figures stable With in average 280 additional daily flights compared with May 2018, June 2018 marks the traditional
More informationUSE OF DURABLE PAVEMENT MARKINGS
Page 1 f 6 RECOMMENDED PRACTICES PART SECTION SUB-SECTION General Pavement markings prvide mtrists with valuable guidance and radway infrmatin. Pavement markings have specific functins; they guide the
More informationBUSINESS AVIATION TRAFFIC TRACKER EUROPE. May 2018
BUSINESS AVIATION TRAFFIC TRACKER EUROPE May 2018 EXECUTIVE SUMMARY May 2018 traffic figures stable With in average 320 additional daily flights compared with April 2018, May 2018 marks the traditional
More informationAgenda Joint Meeting of The Park Board & City Council
Agenda Jint Meeting f The Park Bard & City Cuncil Parks & Recreatin Bard Visin A city with utstanding parks and recreatinal pprtunities within a valued natural envirnment. Parks & Recreatin Bard Missin
More informationLufthansa (LH) Group OB Fee on Apollo
Prduct Advisry Number: 1335 Versin: 01 Lad T Prductin: 10-Nv-11 23:00 EST 04:00 (11-Nv) GMT On Nvember 2 nd 2011, the Lufthansa Grup airlines (Austrian Airlines, bmi British Midland Airways, Brussels Airlines,
More informationNational Business Ethics Survey 2013 Summary - US
INSTITUTE OF BUSINESS ETHICS Natinal Business Ethics Survey 2013 Summary - US Institute f Business Ethics 24 Greencat Place Lndn SW1P 1BE www.ibe.rg.uk The Natinal Business Ethics Survey f the US wrkfrce
More informationATFCM OPERATIONS MANUAL. Network Manager
Netwrk Manager Editin Number : 22.0 Editin Validity Date : 03/05/2018 DOCUMENT CHARACTERISTICS Dcument Title Dcument Subtitle (ptinal) Editin Number Editin Validity Date ATFCM OPERATIONS MANUAL Netwrk
More informationAn overview of Tallinn tourism trends
An overview of Tallinn tourism trends August 2015 The data is collected from Statistics Estonia, Tallinn Airport and Port of Tallinn. In August 2015, 179,338 stayed overnight in Tallinn s accommodation
More informationConcur Travel Tips and Tricks
Cncur Travel Tips and Tricks Items cvered in this dcument: (can use the link t mve t the specific sectin) Main Search Page Air Results Page Upcming Trips Keybard / Tabbing Optin Time f day Identifiers
More informationELEVENTH AIR NAVIGATION CONFERENCE. Montreal, 22 September to 3 October 2003
4/8/03 English, French, Russian and Spanish only * ELEVENTH AIR NAVIGATION CONFERENCE Montreal, 22 September to 3 October 2003 Agenda Item 3: 3.1 : Air traffic management (ATM) performance targets for
More informationEuropean Organisation for the Safety of Air Navigation Central Route Charges Office (CRCO) Report on the Operation of the Route Charges System in 2016
European Organisation for the Safety of Air Navigation Central Route Charges Office (CRCO) Report on the Operation of the Route Charges System in 2016 March 2017 TABLE OF CONTENTS EUROCONTROL CHARGING
More informationEMERGENCY MANAGEMENT FOR AERODROME CONTROLLER
1. ntrductin EMERGENCY MNGEMEN FOR ERODROME CONROLLER is a simple set f acrnyms which may make it easier fr cntrllers t remember the immediate actins, r sequence f actins, t be fllwed n initial ntificatin
More informationPORTER AIRLINES INC. GENERAL CONDITIONS OF CARRIAGE
PORTER AIRLINES INC. GENERAL CONDITIONS OF CARRIAGE REVIEW ITINERARY UPON RECEIPT Please review yur travel itinerary prvided by Prter upn receipt. Yu shuld cntact Prter within 24 hurs f receipt f yur itinerary
More informationCommunity Noise Consortium Meeting (CNC)
Cmmunity Nise Cnsrtium Meeting (CNC) September 8, 2016 Hillsbrugh Cunty Aviatin Authrity 1 Agenda Open Cmments (15 minutes) Taxiway J Update (5 minutes) Onging Cmmunity Engagement (15 minutes) Survey Respnse
More informationGeneral Manager, Engineering General Manager, Parks, Recreation & Culture
CORPORATE REPORT NO: R069 COUNCIL DATE: MAY 11, 2015 REGULAR COUNCIL TO: Mayr & Cuncil DATE: May 6, 2015 FROM: General Manager, Engineering General Manager, Parks, Recreatin & Culture FILE: 0930-30/093
More informationNetwork Manager Adding value to the Network 29 September 2011
Network Manager Adding value to the Network 29 September 2011 Alain FOURNIE Head of Operational Monitoring & Reporting Directorate Network Management EUROCONTROL The European Organisation for the Safety
More informationRunway Expansion Impact Assessment Oshawa Municipal Airport. Presentation To Development Services Committee City of Oshawa May 30, 2011
Runway Expansin Impact Assessment Oshawa Municipal Airprt Presentatin T Develpment Services Cmmittee City f Oshawa May 30, 2011 2 Agenda Airprt s Ecnmic Imprtance Backgrund Scpe f Wrk Prpsed Runway Expansin
More informationAviation Business Development Program. Economic Development Committee May 18, 2015
Aviatin Business Develpment Prgram Ecnmic Develpment Cmmittee May 18, 2015 Dallas Airprt System Develpment Aviatin Business Develpment Prgram Cmpanies cnsidering a relcatin r expansin r new aernautical
More informationATFCM Operations Manual NETWORK MANAGER
NETWORK MANAGER Editin Number : 1.0 Editin Validity Date : 10 March 2015 DOCUMENT CHARACTERISTICS Dcument Title Dcument Subtitle (ptinal) Editin Number Editin Validity Date Netwrk Manager 1.0 10 Mar 2015
More informationManresa Island Reuse and Economic Impact Analysis Study Public Involvement Process & Summary June 2017
Manresa Island Reuse and Ecnmic Impact Analysis Study June 2017 The public invlvement prcess fr the Manresa Island Reuse Study used a variety f methds t engage key stakehlders and the public. The elements
More informationAlien Flight Student Program
Instructins t cmplete the applicatin prcess 1. Visit the TSA website at www.flightschlcandidates.gv 2. In the tp right f the screen click n Create New Student Accunt 3. Fill ut and submit the brief applicatin
More informationMonday 1 st October. Registration and Document Checks
Octber 2018 Welcme t the Cventry University Lndn Internatinal Study Centre (CULISC). Please attend all f the activities and settle in t life in Lndn s that yu are ready t begin yur studies n Mnday 8 th
More informationIntroduction. European Airspace Concept Workshops for PBN Implementation
Introduction European Airspace Concept Workshops for PBN Implementation OBJECTIVES The objective of this workshop is to provide an overview of the development of a PBN Airspace Concept, To introduce the
More informationDOT 3 Hour Rule GoJet SOC Master Plan
DOT 3 Hur Rule GJet SOC Master Plan Backgrund The Department f Transprtatin s (DOT) rule establishes a hard time limit f three hurs after which airlines must allw passengers t deplane. While the rule applies
More informationContact Details for Visa Information
Imprtant: This Drp Bx facility at Blue dart Centre in Guwahati is nly fr applicants wh d nt need t appear fr Bimetrics. This can be as fllws: 1. Applicants applying fr Lng Term (D-Visa) wh des NOT need
More informationQUT Digital Repository:
QUT Digital Repsitry: http://eprints.qut.edu.au/27550 CRC fr Cnstructin Innvatin (2006) Submissin t Brisbane City Cuncil : Draft Brisbane Ecnmic Develpment Plan. The Participants f the CRC fr Cnstructin
More informationifly GPS Version Release Notes
ifly GPS Versin Release Ntes Versin 7.5 Sftware 10/15/2012 Prtrait Mde Supprt The additin f Prtrait Mde will allw the ifly GPS t be rtated fr vertical munting and imprved reference f Apprach Plates. Prtrait
More informationCONOPS Implementation of IFR procedures in the Czech Republic / CZCAA IFR Study. Change History
CONOPS Implementatin f IFR prcedures in the Czech Republic / CZCAA IFR Study Change Histry Versin Status Date Affected Pages Authr Cause and Summary f the Change 00.01 draft 2017-02-13 all I. Agüi First
More informationCCBE LAWYERS STATISTICS 2016
Austria 31/12/2015 6.057 1.242 Belgium (OBFG) How many s are 81-2 Bulgaria - 2 Croatia - 5 Czech Republic - 40 Germany - 1 Greece - 3 Hungary - 6 Italy - 1 Liechtenstein - 1 Lithuania - 2 The Netherlands
More informationMarch 2015 compared with February 2015 Volume of retail trade down by 0.8% in euro area Down by 0.6% in EU28
03-2006 06-2006 09-2006 12-2006 03-2007 06-2007 09-2007 12-2007 03-2008 06-2008 09-2008 12-2008 03-2009 06-2009 09-2009 12-2009 03-2010 06-2010 09-2010 12-2010 03-2011 06-2011 09-2011 12-2011 03-2012 06-2012
More informationReview of the previous CARSAMMA and Scrutiny Group meetings Conclusions and Recommendations
Internatinal Civil Aviatin Organizatin GTE/17-WP/02 Seventeenth Meeting f the GREPECAS 16/10/17 Scrutiny Wrking Grup (GTE/17) Lima, Peru, 30 Octber t 03 Nvember 2017 Agenda Item 1: Review f the previus
More informationImportant Information about this Release
Imprtant Infrmatin abut this Release Dear MSC Nastran Custmer, MSC is prud t prvide yu with the MSC Nastran 2013.1 release, part f the virtual prduct develpment (VPD) tls available frm MSC Sftware. T help
More informationCCI Resource and Construction Conference And Construction Industry Dinner 28 June 2018
CCI Resurce and Cnstructin Cnference And Cnstructin Industry Dinner 28 June 2018 CCI Resurce and Cnstructin Cnference and Cnstructin Industry Dinner Thursday, 28 June 2018, Crwn Perth Event Overview CCI
More informationPERFORMANCE REPORT CAPACITY
PERFORMANCE REPORT 2015-2019 CAPACITY January 2019 Contents Description & Analysis 3 FABEC TRAFFIC DEVELOPMENT (en-route) 4 FABEC TRAFFIC DEVELOPMENT (arrival) 5 KPI #1: En-route ATFM delay per controlled
More informationRevenue up 4.8% in the first nine months of Quarterly financial information for the first nine months of
n 12/1/2009 at 4:25 PM Paris, 13 Nvember 2009 Revenue up 4.8% in the first nine mnths f 2009 Quarterly financial infrmatin fr the first nine mnths f 2009 1 4.8% increase in cnslidated revenue t 1,976.5
More informationThis section outlines travel policies and procedures for international and in-country travel and related meals and incidental expenses payments.
10. TRAVEL Cntents 10. Travel... 1 10.1 Rles and Respnsibilities... 1 10.2 Internatinal Travel... 1 10.2.A Air Travel Standards... 1 10.2.B Air Travel Arrangements... 2 10.2.C Travel Dcumentatin... 3 10.2.
More informationAccess control and (pre-)registration
Access cntrl and (pre-)registratin Nte n ISPS Since July 1, 2004, passenger ships and carg ships (GT 500 and upward) n internatinal vyages and prt facilities serving such ships n internatinal vyages, have
More informationCHAPTER 1.0 INTRODUCTION
CHAPTER 1.0 INTRODUCTION 1.1 PROPOSED AIR SERVICE AND FAA RESPONSIBILITY This dcument is the Envirnmental Assessment (EA) prepared by the Twn f Mammth Lakes and United Airlines t analyze, dcument, and
More informationSLOVAKIA. Table 1. FDI flows in the host economy, by geographical origin. (Millions of US dollars)
Table 1. FDI flows in the host economy, by geographical origin World 1 271 4 095 1 060 1 058 714 4 693 3 267 4 692-6 1 769 3 491 2 825 Developed economies 1 204 4 050 1 036 1 113 485 4 265 1 001 5 084-881
More informationEpisode 3 D Detailed Operational Description - Apron & Taxiways Management - E2/3. Episode 3
Episde 3 Single Eurpean Sky Implementatin supprt thrugh Validatin Dcument infrmatin Prgramme Sixth framewrk prgramme Pririty 1.4 Aernautics and Space Prject title Episde 3 Prject N 037106 Prject Crdinatr
More informationINTIME: Intelligent and Efficient Travel Management for European Cities, an ICT PSP Pilot B project
Intelligent and efficient travel management fr Eurpean cities INTIME: Intelligent and Efficient Travel Management fr Eurpean Cities, an ICT PSP Pilt B prject Marc Ber, Sftec Sismat srl Implementing the
More informationTRAFFIC ANALYSIS AND SYNTHETIC SCENARIO GENERATION FOR ATM OPERATIONAL CONCEPTS EVALUATION
TRAFFIC ANALYSIS AND SYNTHETIC SCENARIO GENERATION FOR ATM OPERATIONAL CONCEPTS EVALUATION Juan A. Besada, Javier Prtill, Gnzal de Miguel, Rafael de Andrea, U. Plitécnica de Madrid, Madrid, Spain Jse M.
More informationFlight Information Exchange Model Operational Data Description
Flight Infrmatin Exchange Mdel Operatinal Descriptin Octber 31, 2016 Versin: 4.0.0 The Flight Infrmatin Exchange Mdel (FIXM) is an exchange mdel capturing Flight and Flw infrmatin that is glbally standardised.
More informationIRELAND. AERONAUTICAL INFORMATION SERVICE IRISH AVIATION AUTHORITY CONTROL TOWER SHANNON AIRPORT CO. CLARE Tel Fax
IRELAND AERONAUTICAL INFORMATION SERVICE IRISH AVIATION AUTHORITY CONTROL TOWER SHANNON AIRPORT CO. CLARE Tel +353 61 703750 Fax +353 61 366245 AIC Nr 18 /14 11 DEC Guidance n VFR flight in Airspace Classes
More informationPERFORMANCE REPORT CAPACITY
PERFORMANCE REPORT 2015-2019 CAPACITY June 2018 Contents Description & Analysis 3 FABEC TRAFFIC DEVELOPMENT (en-route) 4 FABEC TRAFFIC DEVELOPMENT (arrival) 5 KPI #1: En-route ATFM delay per controlled
More informationBACKGROUNDER Vancouver International Airport - Economic Generator for British Columbia
BACKGROUNDER Vancuver Internatinal Airprt - Ecnmic Generatr fr British Clumbia Vancuver Internatinal Airprt (YVR) emplys mre than 23,600 peple and is hme t 400 businesses. In 2010 it cntributed $1.9 billin
More informationTerra Nova Development
Canada-Newfundland and Labradr Industrial Benefits Public Quarterly Reprt April 01, 2013 June 30, 2013 Table f Cntents Sectin 1.0 Intrductin... 3 Sectin 2.0 Prject Activity and Benefits Accmplishments...
More information