1 2600 COLORADO ENTRY DESIGN SANTA MONICA ARB REVIEW COVER 2600 COLORADO AVENUE, SANTA MONICA, CALIFORNIA 11/13/2017 A001
2 PROJECT DESCRIPTION 2600 COLORADO WILL SERVE AS A NEW HOME FOR ORACLE CORPORATION. THIS NEW PROPOSED ENTRY IS DESIGNED TO REFLECT THE ORACLE BRAND AND PROVIDE A PEDESTRIAN-FRIENDLY STREETSCAPE EXPERIENCE. THE EXISTING ENTRY CONSISTS OF AN ELEVATED PLINTH MARKED BY A CURVILINEAR CANOPY AND A BOAT-LIKE HOUSING ELEMENT THAT HIDES A GARAGE EXHAUST VENT AND AN S.C.E. TRANSFORMER. THE NEW DESIGN REMOVES THESE ELEMENTS AND CREATES A FRESH, OPEN, AND ENGAGING ENTRY. ALONG 26TH STREET, A TRELLIS PORTAL, AN ELEGANT CANOPY, AND AN ACCESSIBLE RAMP SERVE AS PRIMARY ENTRY ELEMENTS. WIDE-STAIRS WELCOME VISITORS UP TO THE LEVEL OF THE ENTRACE DOORS. A VARIETY OF PUBLIC SEATING OPTIONS ARE AVAILABLE AT THE SIDEWALK AND ENTRY LEVELS. THE EXISTING VENT AND TRANSFORMER ARE NOW HIDDEN BY A LOW, PLANTED WALL AND SEATING. ALONG COLORADO STREET, A SECOND SET OF WIDE STAIRS WELCOME VISITORS. PREVIOUSLY UNUSED LAWN ALONG COLORADO IS NOW ACTIVATED WITH A NEW OUTDOOR DECK WITH PUBLIC AND PRIVATE SEATING AREAS. AN ARTICULATED, LANDSCAPED SCREEN MARKS THE PERIMETER OF THE DECK, WHILE BOULDER LANDSCAPING ADDS A NATURE-LIKE QUALITY TO THE SIDEWALK AT THE CORNER. PROJECT DESCRIPTION 2600 COLORADO AVENUE, SANTA MONICA, CALIFORNIA 07/27/2017 A002
3 DESIGN TEAM ORACLE AMERICA, INC 2600 COLORADO AVENUE SANTA MONICA, CA CONTACT: RONDA GREEN PHONE: ARCHITECT GENSLER 500 S. FIGUEROA LOS ANGELES, CA CONTACT: MICHAEL WHITE / VIC FROGLIA PHONE: LANDSCAPE ARCHITECT BRIGHTVIEW TH STREET SANTA MONICA, CA CONTACT: MEGAN HORN PHONE: LIGHTING DESIGN HORTON LEES BROGDEN LIGHTING DESIGN 8580 WASHINGTON BOULEVARD CULVER CITY, CA CONTACT: TINA AGHASSIAN PHONE: DESIGN TEAM SIGNAGE DESIGN GENSLER 500 S. FIGUEROA LOS ANGELES, CA CONTACT: MICHAEL WHITE / VIC FROGLIA PHONE: COLORADO AVENUE, SANTA MONICA, CALIFORNIA 07/27/2017 A003
4 SECTIONS TABLE OF CONTENTS 2600 COLORADO AVENUE, SANTA MONICA, CALIFORNIA 07/27/2017 A004
5 EXISTING PLAN 2600 COLORADO AVENUE, SANTA MONICA, CALIFORNIA 07/27/2017 A007
6 AREA OF WORK SITE CONTEXT-NORTH ELEVATION 2600 COLORADO AVENUE, SANTA MONICA, CALIFORNIA 07/27/2017 A008
7 AREA OF WORK SITE CONTEXT-WEST ELEVATION 2600 COLORADO AVENUE, SANTA MONICA, CALIFORNIA 07/27/2017 A010
8 EXISTING CONDITIONS 2600 COLORADO AVENUE, SANTA MONICA, CALIFORNIA 07/27/2017 A013
9 EXISTING CONDITIONS-UTILITIES 2600 COLORADO AVENUE, SANTA MONICA, CALIFORNIA 07/27/2017 A014
10 RENDERING-NORTH-WEST CORNER 2600 COLORADO AVENUE, SANTA MONICA, CALIFORNIA 11/13/2017 A026
11 RENDERING-26TH STREET ENTRY 2600 COLORADO AVENUE, SANTA MONICA, CALIFORNIA 11/13/2017 A027
12 RENDERING-26TH STREET ENTRY 2600 COLORADO AVENUE, SANTA MONICA, CALIFORNIA 11/13/2017 A028
13 RENDERING-COLORADO ENTRY 2600 COLORADO AVENUE, SANTA MONICA, CALIFORNIA 11/13/ A032 A013
14 01. METAL PANEL-GLOSS / MATTE FINISH 02. METAL PANEL-MATTE FINISH WHITE CHARCOAL METAL PANEL-GLOSS FINISH 04. BRUSHED ALUMINIUM RED EXTRUDED STEEL -GLOSS PAINT FINISH 06. FABRICATED SIGN CABINET SEE A046 FOR DETAIL WHITE RED 07.METAL FENCE - PAINTED 08. WOOD DECK 09. ASH GREY WOOD BENCH 10. TOPCAST FINE AGGREGATE CONCRETE - SAWCUT JOINTS WHITE BUILDING MATERIALS 2600 COLORADO AVENUE, SANTA MONICA, CALIFORNIA 11/13/ A035
15 11. VISION GLASS, HIGH PERFORMANCE IGU, LOW REFLECTIVE 12. STAINLESS CABLE RAILING 13. BRICK WALL -PAINTED 14. PERFORATED METAL FENCE - PAINTED GREY GREY BUILDING MATERIALS 2600 COLORADO AVENUE, SANTA MONICA, CALIFORNIA 11/13/ A036
16 UP 25' - 0" NOT IN SCOPE UP UP 67' - 1" UP 9' - 4" 20' - 9" 30' - 0" 2' - 7" 41' - 0" 34' - 11" 138' - 7" ADD NEW EXTERIOR METAL CLADDING TO EXISTING WALL (N) PEDESTRIAN RAMP 26TH ST (N) PUBLIC SEATIING (N) TOPCAST FIN AGGREGATE CONCRETE. SAWCUT JOINTS (N) CANOPY ABOVE (N) CONCRETE STAIR (E) EXHAUST VENT (N) PUBLIC SEATIING (E) TRANSFORMER (N) PAINTED STEEL TRELLIS 57' - 5" 20' - 6" 14' - 9" 18' - 11" 10' - 10" 122' - 5" PROPOSED ENTRY PLAN (N) SEATING AREA, FURNITURE TO BE FINALIZED (E) GAS METER COLORADO AVE (N) CONCRETE STAIR 3' 9' 21' SCALE: 1/16"=1'-0" 2600 COLORADO AVENUE, SANTA MONICA, CALIFORNIA 11/13/2017 A017-1
17 UP 25' - 0" NOT IN SCOPE UP UP 67' - 1" 9' - 4" 20' - 9" 73' - 7" 34' - 11" 138' - 7" ADD NEW EXTERIOR METAL CLADDING TO EXISTING WALL (N) PEDESTRIAN RAMP 26TH ST (N) TOPCAST FIN AGGREGATE CONCRETE. SAWCUT JOINTS (N) PAINTED STEEL TRELLIS (N) CANOPY (N) PUBLIC SEATIING (N) CONCRETE STAIR (E) EXHAUST VENT (N) PUBLIC SEATIING (E) TRANSFORMER BELOW 57' - 5" 20' - 6" 14' - 9" 18' - 11" 10' - 10" 122' - 5" PROPOSED ENTRY PLAN TOP VIEW (N) SEATING AREA, FURNITURE TO BE FINALIZED (E) GAS METER COLORADO AVE (N) CONCRETE STAIR 3' 9' 21' SCALE: 1/16"=1'-0" 2600 COLORADO AVENUE, SANTA MONICA, CALIFORNIA 11/13/2017 A017-2
18 17' - 0" 80' - 0" 27' - 0" 27' - 0" 9' - 0" 1 A A022-2 NORTH ELEVATION-ENTRY 2' 6' 14' SCALE: 3/32"=1'-0" 2600 COLORADO AVENUE, SANTA MONICA, CALIFORNIA 11/13/ A021
19 (N) PAINT ON EXISTING BRICK WALL (N) METAL PANEL OVER EXISTING WALL (N) METAL PANEL OVER EXISTING WALL (N) PAINTED STEEL TRELLIS (N) FABRICATED SIGN CABINET 2' - 6" (N) CANOPY 11' - 3" 9' - 9" (N) STAINLESS CABLE RAILING 17' - 0" (N) STOREFRONT (N) CONCRETE STAIR (N) PUBLIC SEATIING (N) PERFORATED METAL FENCE (N) PUBLIC SEATIING ENLARGED NORTH ELEVATION 2' 4' 8' SCALE: 1/4"=1'-0" 2600 COLORADO AVENUE, SANTA MONICA, CALIFORNIA 11/13/2017 A022-1
20 17' - 0" 27' - 0" 9' - 0" 80' - 0" 27' - 0" (E)ENTRY CANOPY FOR LIONSGATE BEYOND 1 A024 53' - 6" SCALE: 3/32"=1'-0" OVERALL WEST ELEVATION 2' 6' 14' 2600 COLORADO AVENUE, SANTA MONICA, CALIFORNIA 11/13/ A023
21 (N) PAINTED STEEL TRELLIS (N) METAL PANEL OVER EXISTING WALL (N) METAL PANEL OVER EXISTING WALL (N) FABRICATED SIGN CABINET 9' - 9" 11' - 3" 2' - 6" ENLARGED WEST ELEVATION (N) PERFORATED METAL FENCE BEHIND PLANTING (N) PUBLIC SEATIING (N) CONCRETE STAIR (N) STOREFRONT (N) CANOPY (N) STAINLESS CABLE RAILING SCALE: 1/4"=1'-0" 2' 4' 8' 2600 COLORADO AVENUE, SANTA MONICA, CALIFORNIA 11/13/2017 A024
22 RENDERING-NORTH-WEST CORNER 2600 COLORADO AVENUE, SANTA MONICA, CALIFORNIA 11/13/2017 A026
23 RENDERING-26TH STREET ENTRY 2600 COLORADO AVENUE, SANTA MONICA, CALIFORNIA 11/13/2017 A027
24 RENDERING-26TH STREET ENTRY 2600 COLORADO AVENUE, SANTA MONICA, CALIFORNIA 11/13/2017 A028
25 RENDERING-COLORADO ENTRY 2600 COLORADO AVENUE, SANTA MONICA, CALIFORNIA 11/13/2017 A032
26 BUILDING MATERIALS 2600 COLORADO AVENUE, SANTA MONICA, CALIFORNIA A035
27 BUILDING MATERIALS 2600 COLORADO AVENUE, SANTA MONICA, CALIFORNIA 11/13/2017 A036
28 UP 25' - 0" NOT IN SCOPE UP UP 67' - 1" UP 9' - 4" 20' - 9" 30' - 0" 2' - 7" 41' - 0" 34' - 11" 138' - 7" ADD NEW EXTERIOR METAL CLADDING TO EXISTING WALL (N) PEDESTRIAN RAMP 26TH ST (N) PUBLIC SEATIING (N) TOPCAST FIN AGGREGATE CONCRETE. SAWCUT JOINTS (N) CANOPY ABOVE (N) CONCRETE STAIR (E) EXHAUST VENT (N) PUBLIC SEATIING (E) TRANSFORMER (N) PAINTED STEEL TRELLIS 57' - 5" 20' - 6" 14' - 9" 18' - 11" 10' - 10" 122' - 5" PROPOSED ENTRY PLAN (N) SEATING AREA, FURNITURE TO BE FINALIZED (E) GAS METER COLORADO AVE (N) CONCRETE STAIR 3' 9' 21' SCALE: 1/16"=1'-0" 2600 COLORADO AVENUE, SANTA MONICA, CALIFORNIA 11/13/2017 A017-1
29 UP 25' - 0" NOT IN SCOPE UP UP 67' - 1" 9' - 4" 20' - 9" 73' - 7" 34' - 11" 138' - 7" ADD NEW EXTERIOR METAL CLADDING TO EXISTING WALL (N) PEDESTRIAN RAMP 26TH ST (N) TOPCAST FIN AGGREGATE CONCRETE. SAWCUT JOINTS (N) PAINTED STEEL TRELLIS (N) CANOPY (N) PUBLIC SEATIING (N) CONCRETE STAIR (E) EXHAUST VENT (N) PUBLIC SEATIING (E) TRANSFORMER BELOW 57' - 5" 20' - 6" 14' - 9" 18' - 11" 10' - 10" 122' - 5" PROPOSED ENTRY PLAN TOP VIEW (N) SEATING AREA, FURNITURE TO BE FINALIZED (E) GAS METER COLORADO AVE (N) CONCRETE STAIR 3' 9' 21' SCALE: 1/16"=1'-0" 2600 COLORADO AVENUE, SANTA MONICA, CALIFORNIA 11/13/2017 A017-2
30 27' - 0" 17' - 0" 80' - 0" 27' - 0" 9' - 0" 1 A022-2 NORTH ELEVATION-ENTRY 2' 6' 14' SCALE: 3/32"=1'-0" 2600 COLORADO AVENUE, SANTA MONICA, CALIFORNIA 11/13/2017 A021
31 (N) PAINT ON EXISTING BRICK WALL (N) METAL PANEL OVER EXISTING WALL (N) METAL PANEL OVER EXISTING WALL (N) PAINTED STEEL TRELLIS (N) FABRICATED SIGN CABINET 2' - 6" (N) CANOPY 11' - 3" 9' - 9" (N) STAINLESS CABLE RAILING 17' - 0" (N) STOREFRONT (N) CONCRETE STAIR (N) PUBLIC SEATIING (N) PERFORATED METAL FENCE (N) PUBLIC SEATIING ENLARGED NORTH ELEVATION 2' 4' 8' SCALE: 1/4"=1'-0" 2600 COLORADO AVENUE, SANTA MONICA, CALIFORNIA 11/13/2017 A022-1
32 17' - 0" 27' - 0" 80' - 0" 9' - 0" 27' - 0" (E)ENTRY CANOPY FOR LIONSGATE BEYOND 1 A024 53' - 6" SCALE: 3/32"=1'-0" OVERALL WEST ELEVATION 2' 6' 14' 2600 COLORADO AVENUE, SANTA MONICA, CALIFORNIA 11/13/2017 A023
33 (N) PAINTED STEEL TRELLIS (N) METAL PANEL OVER EXISTING WALL (N) METAL PANEL OVER EXISTING WALL (N) FABRICATED SIGN CABINET 9' - 9" 11' - 3" 2' - 6" ENLARGED WEST ELEVATION (N) PERFORATED METAL FENCE BEHIND PLANTING (N) PUBLIC SEATIING (N) CONCRETE STAIR (N) STOREFRONT (N) CANOPY (N) STAINLESS CABLE RAILING SCALE: 1/4"=1'-0" 2' 4' 8' 2600 COLORADO AVENUE, SANTA MONICA, CALIFORNIA 11/13/2017 A024
Astoria Boulevard ADA Upgrade and Station Renewal. January 7, 2019
Astoria Boulevard ADA Upgrade and Station Renewal January 7, 2019 Major Scope of Work Replace Street and Platform Stairs Work Description Install Two Street-to-Mezzanine Elevators Install Two Mezzanine-to-Platform
More informationcreative chemistry doesn t happen by accident.
creative chemistry doesn t happen by accident. 1301 goes beyond the adaptive reuse of a 1980 s industrial building to the edge of modern style. Surrounded by top tech and media firms, the 16,837 sf single-story
More informationMarymount University Ballston Center Redevelopment
Marymount University Ballston Center Redevelopment October 28, 2013 SPRC #5 Team Owners: Academic Office Architect: Residential Architect: Land Use Counsel: Civil Engineer: Landscape Architect: Traffic
More informationExpo E-News. Santa Monica s Getting Ready for Expo! Phase 2 Update Page 2. Keeping Our Community Informed
Expo E-News Keeping Our Community Informed Winter 2014 Santa Monica s Getting Ready for Expo! Phase 2 Update Page 2 In this Issue : Page 4: Construction Update Page 6: Artist Profiles For more information
More informationCambridge Avenue. Cleveland Avenue. Chicago Avenue. Chicago Avenue. Curbed planters with groundcover,
THE HUDSON 1'-8" 1'-8" 4'-0"4'-3 4'-0"4'-3 1/2" 1/2" Street Street trees trees in in tree tree grates grates along along Kingsbury Kingsbury Street Street - - 3" 3" caliper caliper shade shade trees trees
More informationAstoria Boulevard ADA and Station Renewal Track Improvements. January 30, 2019
Astoria Boulevard ADA and Station Renewal Track Improvements January 30, 2019 Major Scope of Work Replace Street and Platform Stairs Work Description Install Two Street-to-Mezzanine Elevators Install Two
More informationSan Francisco International Terminal 3 /Boarding Area E San Francisco International Airport Civic Design Review Informational Package.
San Francisco International Terminal 3 /Boarding Area E San Francisco International Airport Civic Design Review Informational Package Terminal 1 March, 2012 Civic Design Review_Schematic Design June 10,
More informationLeidesdorff Village D&S Developement 2277 Fair Oaks Boulevard, Studio 220 Sacramento, California
PERSPECTIVE 96 99-800 www.hrgarchitects.com 09/5/ ' - 0" SOUTH BUILDING_SOUTH ELEVATION_BW SOUTH BUILDING_EAST ELEVATION_BW ' - 0" SOUTH BUILDING_NORTH ELEVATION_BW S SOUTH BUILDING_WEST ELEVATION_BW EXTERIOR
More information1 TP-08 3 TP-08 TP-06 EX.RL SPRINKLER STORAGE TANKS SPRINKLER PUMP ROOM RETAINING WALL WITH HANDRAIL TOW
TP- EX.RL+. EX.RL+. // SJE EX.RL+. TP- M PYLON SIGN - TYPE NEIGHBOURING SITE TP- EXISTING CARWASH EX.RL+. EX.RL+. A A TP- EX.RL+. EX.RL+. EX.RL+. TOW. EX.RL+. EX.RL+. EX.RL+. EX.RL+. EXISTING DAN MURPHY'S
More informationPROJECT TEAM VICINITY PLAN NTS LOCATION PLANS NTS. Mark Petrella, A.I.A. Kimberly McCarron, NCARB
LOCATION PLAN RENDERING NTS 00 Atlantic Avenue Atlantic City, NJ 0840 07/4/07 CAFRA SUBMISSION COVER SHEET - RENDERING, LOCATION PLANS DRAWING INDEX & PROJECT TEAM 45 West 57th Street New York, NY 009
More informationKaufland, Chirnside Park
Kaufland, Chirnside Park WRITTENCONSENT OF 66 Maroondah Highway, Chirnside Park, A TOWN PLANNING APPLICATION 9/6/8 SJE Victoria, 6 ARTISTS IMPRESSION DRAWING LIST SHEET NUMBER SHEET NAME TP- TITLE SHEET
More informationNew Orleans Municipal Yacht Harbor
New Orleans Municipal Yacht Harbor 2018 Capital Projects Construction Updates MYH Floating Marina Community Sailing Center (Coordination with) MYH Boat Launch (MYHMC) MYH Administration Building (CPA &
More informationROSEVILLE INNOVATION PARK 8040 FOOTHILLS BOULEVARD, ROSEVILLE CA ±160,000 SQUARE FEET AVAILABLE
ROSEVILLE INNOVATION PARK 8040 FOOTHILLS BOULEVARD, ROSEVILLE CA ±160,000 SQUARE FEET AVAILABLE ROSEVILLE INNOVATION PARK As one of the premier submarkets in the Greater Sacramento region, Roseville offers
More information25 th Avenue Grade Separation. September 13, 2017
25 th Avenue Grade Separation September 13, 2017 Agenda I. Overview II. III. IV. Project Description Project Benefits Project Construction V. Next Steps VI. Questions 2 Overview Project Location 4 E. 25
More informationPIKE INDUSTRIAL PARK. 423 Hopewell Road Waverly, Ohio INDUSTRIAL SPACE AVAILABLE. ONNO STEGER Director of Real Estate
INDUSTRIAL SPACE AVAILABLE PIKE INDUSTRIAL PARK 423 Hopewell Road Waverly, Ohio 45690 ONNO STEGER Director of Real Estate Phone (614) 571-0012 E-mail osteger@industrialrealtygroup.com DARRELL BOSSERT Vice
More informationNFTA Access Enhancement Study for Canalside and Cobblestone Alternatives Discussion. Alternative A South Park Avenue
Alternative A South Park Avenue Alternative A Summary Alternative A extends Metro Rail service around the foot of Main Street east along South Park Avenue to serve a new station platform located along
More informationMOSCONE EXPANSION AND IMPROVEMENT PROJECT
MOSCONE EXPANSION AND IMPROVEMENT PROJECT PLANNING COMMISSIONERS INFORMATIONAL MEETING 24 JULY 2014 EXPAND WITHIN THE EXISTING FOOTPRINT The project will result in 525,000 SF of new and repurposed space.
More informationTORONTO TRANSIT COMMISSION REPORT NO.
Form Revised: February 2005 TORONTO TRANSIT COMMISSION REPORT NO. MEETING DATE: August 23, 2010 SUBJECT: TORONTO-YORK SPADINA SUBWAY EXTENSION PROJECT VAUGHAN CORPORATE CENTRE STATION APPROVAL OF FINISHES
More informationHEARST GARDENS BERKELEY, CA 94702
APPLICANT: RHOADES PLANNING GROUP 1611 TELEGRAPH AVE. SUITE 200 OAKLAND, CA 94612 [510] 545-4341 PROJECT: BERKELEY, CA 94702 ARCHITECT: DEVI DUTTA-CHOUDHURY, AIA DEVI DUTTA ARCHITECTURE INC. 1958A UNIVERSITY
More informationEXCEPTIONAL, FULLY RENOVATED CORPORATE HEADQUARTERS FACILITY
28903 AVENUE PAINE CLASS A // INDUSTRIAL // 111,935 SF // FOR LEASE EXCEPTIONAL, FULLY RENOVATED CORPORATE HEADQUARTERS FACILITY 28903 Avenue Paine seamlessly mixes efficiency with elegance in this thoughtful
More informationTORONTO TRANSIT COMMISSION REPORT NO.
Form Revised: February 2005 TORONTO TRANSIT COMMISSION REPORT NO. MEETING DATE: February 2, 2011 SUBJECT: TORONTO-YORK SPADINA SUBWAY EXTENSION PROJECT STEELES WEST STATION APPROVAL OF FINAL DESIGN, FINISHES
More informationBoston Redevelopment Authority 2/26/ Chestnut Hill Avenue Boston/Brookline, MA
Boston Redevelopment Authority 2/26/2014 Cassidy Playground Waterworks Design revisions made since the DPIR submission March 2013 Massing - Reduced project 16,030 SF, for a total project area of 218,520
More informationBRUNSWICK'S BOWLING 350 MCHENRY ROAD, BUFFALO GROVE, IL
EXHIBIT C 7 6 4 2 7 5 8 1 5 7 6 4 2 8 9 1 1 CULTURED STONE COLUMN BASE 4 NEW PORCELAIN TILE FINISH 7 NEW METAL SIDING 2 EXISTING PAINTED METAL STANDING SEAM ROOF 5 NEW LIGHT FIXTURES 8 NEW TRELLIS WITH
More informationTown Hall Meeting. July 28, 2016 Sherwood School of Music 1312 S. Michigan Ave.
Town Hall Meeting July 28, 2016 Sherwood School of Music 1312 S. Michigan Ave. Stay connected! 5046 S. State St. Chicago, IL. (773) 373-9273 ward03@cityofchicago.org www.dowellforthirdward.com Facebook.com/aldermanpat.dowell
More informationRETAIL & RESTAURANT SPACE AVAILABLE NOW
RETAIL & RESTAURANT SPACE AVAILABLE NOW 231 SOUTH DELACEY & 168 WEST GREEN STREET PASADENA, CA 91105 mixed-use retail/restaurant space available executive summary RESIDENCES AT WESTGATE APARTMENTS, PASADENA
More informationLincoln Village Pedestrian Bicycle Bridge Community Meeting September 13th, 2016
Lincoln Village Pedestrian Bicycle Bridge Community Meeting September 13th, 2016 Purpose of the Meeting Introduce the project and the proposed improvements Review existing conditions Discuss the needs
More informationA PPEARANCE REVIEW BOARD
ARB Staff Report A PPEARANCE REVIEW BOARD NOVEMBER 11, 2014 Case Number AGENDA ITEM 1 450 S. ORANGE AVE. R ED LOBSTER MONUMENT SIGN ARB2014-00104 Applicant John J. McNertney Red Lobster Management, LLC
More informationTREASURE ISLAND FERRY SHELTER & BUS SHELTERS. Arts Commission Civic Design Review APRIL 18, 2016
TREASURE ISLAND FERRY SHELTER & BUS SHELTERS PHASE 3 - CD Arts Commission Civic Design Review APRIL 18, 2016 PHASE 2 COMMENTS/INFORMAL SESSION FOLLOW UP 1. Lighten up the concrete base of the Ferry Shelter
More informationTweed City Fitout Guidelines. Issue date : July 2011 Rev : 2
Tweed City Fitout Guidelines Issue date : July 2011 Rev : 2 The purpose of this guide is to ensure that you have the necessary information required to design and build your shop at Tweed City Each tenancy
More informationThe Orchid OPTIONAL CRAFTSMAN ELEVATION. *Rendering is an artist s conception and is for illustrative purposes only.
The Orchid OPTIONAL CRAFTSMAN ELEVATION *Rendering is an artist s conception and is for illustrative purposes only. Elevations INCLUDED SCHELL STYLE A OPTIONAL SCHELL STYLE B OPTIONAL BEACH STYLE OPTIONAL
More informationSCHEMATIC PACKAGE SHEET INDEX
SCHEMATIC PACKAGE SHEET INDEX GENERAL PLANS 0 COVER 0 DEMO PLANS 0 PHASING PLANS 04 PROPOSED FLOOR PLANS 05 PROPOSED ENLARGED ST FLOOR PLAN 06 PROPOSED ENLARGED ST FLOOR PLAN 07 PROPOSED ENLARGED ND FLOOR
More informationIS A BUDGET ONLY DESCRIPTION QUANTITY UNIT
Miller Creek Consultants LLC CONCRETE RECAP 1/29/2009 ESTIMATE DATE: 1-Jan-09 Project: 4000 psi 95.00 Location: 3000 psi 88.00 PROJECT DATA PROJECT NAME: Concrete Estimate THIS IS A BUDGET ONLY DESCRIPTION
More informationMIAMI RIVER COMMISSION
COMMISSION July 13, 2015 CG LLC L-0 1.1 PROJECT TEAM OWNERSHIP CG, LLC 3200 STIRLING ROAD HOLLYWOOD, FL 33021 ARCHITECT KOBI KARP AND 2915 BISCAYNE BLVD SUITE 200 MIAMI, FL 33137 ER CG LLC ROMAN AND WILLIAMS
More informationCapilano Substation Upgrade
Capilano Substation Upgrade Community Engagement Summary MAY 206 NOVEMBER 208 BCH8-278 Contents.0 Introduction............................................................................. 2.0 Methodology...........................................................................
More informationMemorable Designs, Unforgettable places
Memorable Designs, Unforgettable places We create environments that connect people, introduce nature into life s moments and provide a backdrop against which unforgettable experiences unfold. DELRAY BEACH
More informationHIGH LINE VENUES. Chelsea Market Passage
HIGH LINE VENUES Chelsea Market Passage 1 CONTENTS Overview Visitation + Promotion Opportunities CHELSEA MARKET PASSAGE DILLER VON FURSTENBERG SUNDECK 14TH STREET PASSAGE 3 4 5 21 31 10TH AVENUE SQUARE
More information3317 EXPO- SITION PL LOS ANGELES
FOR LEASE CREATIVE OFFICE 24,913 TOTAL SF 3317 EXPO- SITION PL LOS ANGELES INDUSTRYPARTNERS.COM 310 395 5151 CA BRE No. 01900833 RICH MALOOF rm@industrypartners.com CA BRE No. 01435225 JIM JACOBSEN jj@industrypartners.com
More informationCrenshaw/LAX Transit Project Construction Update Community Meeting September 27 th, 2017
Crenshaw/LAX Transit Project Construction Update Community Meeting September 27 th, 2017 1 Project Overview Mainline Design-Build Contractor: Walsh Shea Corridor Constructors (WSCC) Southwestern Yard Maintenance
More informationThe Revere. Independence Single-Family Homes OPTIONAL ELEVATION C. *Rendering is Artist s Conception.
The Revere OPTIONAL ELEVATION C *Rendering is Artist s Conception. Independence Single-Family Homes Elevation INCLUDED ELEVATION A *Renderings are artist s conception. All information is subject to change
More information4 Storage cupboards SCALA
Our SCALA laboratory furniture system provides a vast selection of storage variants for fast access and safe storage. All storage cupboards can be variably equipped and provide optimum space utilisation
More informationMetro ExpressLanes April 5, 2011 Community Meeting re: Adams Blvd Improvements
Metro ExpressLanes April 5, 2011 Community Meeting re: Adams Blvd Improvements Jan Perry Councilwoman, District 9 Welcome Remarks Arthur T. Leahy Chief Executive Officer, Metro Metro ExpressLanes Overview
More information25 th Avenue Grade Separation. December 13, 2017
25 th Avenue Grade Separation December 13, 2017 Agenda I. Overview II. III. IV. Project Description Project Benefits Project Construction V. Next Steps VI. Questions 2 Overview Project Location 4 E. 25
More informationHomes in Yauhanna Landing Overview
FLOOR PLAN BED/BATH Homes in Yauhanna Landing Overview Land and Homes Packages starting from $109,900 HEATED SQFT* PRICE** Includes Standard Home site THE AUGUSTUS 3 Bed 2 Bath 1223 $119,999 No Garage
More informationExhibit 18A ANDERSON STREET DETAIL LECOUNT SQUARE New Rochelle, New York
0 25 Exhibit 18A ANDERSON STREET DETAIL SOURCE: Kellard Engineering 0 25 SOURCE: Kellard Engineering Exhibit 18B LECOUNT PLACE DETAIL NORTH AVENUE 0 25 HUGUENOT STREET Exhibit 18C NORTH AVENUE/ HUGUENOT
More informationAMS MU800 Mullion Drained Curtain Walling
SPECIFICATION AMS MU800 Mullion Drained Curtain Walling The AMS MU800 mullion drained curtain walling system offers unique architectural design features combined with market leading weather performance.
More informationBuild for New Zealand conditions, our units come with a 2 year warranty and look great on any site.
About Our Range Build for New Zealand conditions, our units come with a 2 year warranty and look great on any site. All units comply with the Camp Ground Act with Wheels and drew bars for ease of movement
More informationFOR SALE. Los Angeles, CA 90064
FOR SALE Los Angeles, CA 90064 1 price $14,995,000 LEED Gold Certified 100% of the showroom s electricity is generated by solar photovoltaics. Building 10,177 SF (8,490 SF 1st floor and 1,687 SF mezzanine)
More informationMarymount University Ballston Center Redevelopment
Marymount University Ballston Center Redevelopment October 17, 2013 SPRC #4 Team Owners: Academic Office Architect: Residential Architect: Land Use Counsel: Civil Engineer: Landscape Architect: Traffic
More informationMINUTES OF THE REGULAR MEETING WORTHINGTON ARCHITECTURAL REVIEW BOARD WORTHINGTON MUNICIPAL PLANNING COMMISSION. January 12, 2012
MINUTES OF THE REGULAR MEETING WORTHINGTON ARCHITECTURAL REVIEW BOARD WORTHINGTON MUNICIPAL PLANNING COMMISSION January 12, 2012 The regular meeting of the Worthington Architectural Review Board and the
More informationKaren Ginsberg, Director of Community & Cultural Services
Information Item Date: April 22, 2013 To: From: Subject: Mayor and City Council Karen Ginsberg, Director of Community & Cultural Services Update on Give Santa Monica Program Introduction This report provides
More informationSOUTHEAST BOULEVARD Planning Study Washington, DC. Progress Drawings October 6, 2014
Existing Conditions Site Plan CONGRESSIONAL CEMETERY SOUTHEAST BOULEVARD Planning Study Concept A (formerly A-1) Site Plan Concept A (formerly A-1) Concept A proposes an expansion of the Capitol Hill neighborhood
More informationFOR LEASE. OFFICE & RETAIL Street, Edmonton, AB AVAILABLE NOW! RENTS STARTING AT $12/SF. Completed showsuites, move in ready!
FOR LEASE AVAILABLE NOW! RENTS STARTING AT $12/SF OFFICE & RETAIL 9707 110 Street, Edmonton, AB Completed showsuites, move in ready! 7 6 5 4 2 8 9 UNIT 406,77 sq ft UNIT 414 710 sq ft UNIT 605,41 sq ft
More informationPARKS & BEACHES PROJECTS
#18 72ND STREET PARK, LIBRARY, #19 BLUEWAYS & AQUATIC CENTER $1.1 MILLION $60 MILLION New facility to include: Create Kayak Launches with All Wheels Skate Park Floating Docks and Seating at: Library/Media
More informationNorth Metro Rail Line Elected Officials Briefing. November 16, 2017
North Metro Rail Line Elected Officials Briefing November 16, 2017 Henry Stopplecamp, RTD Assistant General Manager, Capital Programs Eagle P3 Project The first transit project of its kind in the U.S.
More informationSHOPS ON PALM CANYON DOWNTOWN PALM SPRINGS, CA PROJECT DESCRIPTION MARKET HIGHLIGHTS PROJECT HIGHLIGHTS
SHOPS ON PALM CANYON DOWNTOWN PALM SPRINGS, CA PROJECT DESCRIPTION The Shops on Palm Canyon are integrated into a mixed-use luxury resort hotel development situated along Palm Canyon Drive at Alejo Road,
More informationTREASURE ISLAND PUBLIC RESTROOM DEVELOPMENT DESIGN PHASE 2. Arts Commission Civic Design Review OCTOBER 17, 2016
TREASURE ISLAND PUBLIC RESTROOM DEVELOPMENT DESIGN PHASE 2 Arts Commission Civic Design Review TREASURE ISLAND Arts Commission CDR Meeting EXISTING CONDITION 2 TREASURE ISLAND Arts Commission CDR Meeting
More informationWelcome to our exhibition
Welcome to our exhibition We are bringing forward a new, employment-led scheme for the Vauxhall Cross Island site in the heart of Vauxhall. We are keen to hear local views on our proposals ahead of submitting
More informationTREASURE ISLAND PUBLIC RESTROOM DESIGN DEVELOPMENT PHASE TIDA ITC OCTOBER 19, 2016
TREASURE ISLAND PUBLIC RESTROOM DESIGN DEVELOPMENT PHASE TIDA ITC TREASURE ISLAND TIDA ITC EXISTING CONDITION 2 TREASURE ISLAND TIDA ITC EXISTING SITE CONDITION LOOKING SOUTH 3 BUILDING 1 CALIFORNIA AVE.
More informationHedges Farm. LLC 602 Town Line Road Applicant proposes re-construction of a pre-existing carpenter s shop/garage
MINUTES OF MEETING OF THE ARCHITECTURAL AND HISTORIC REVIEW BOARD OF THE VILLAGE OF SAGAPONACK IN THE TOWN OF SOUTHAMPTON, COUNTY OF SUFFOLK AND STATE OF NEW YORK A meeting of the Architectural and Historic
More informationBuilding the transportation network we need for the future in Niagara Region
Building the transportation network we need for the future in Niagara Region Niagara@metrolinx.com Metrolinx.com/Niagara Metrolinxengage.com INSERT FOOTER 1 WHO IS METROLINX? Metrolinx was created in 2006
More informationWelcome to the 2018 range of Delta Holiday Homes
Welcome to the 2018 range of Delta Holiday Homes Our philosophy at Delta is to give our customers what they want, when they want it, at an affordable price. To achieve this, we constantly incorporate out
More informationVILLAGE OF WINNETKA, ILLINOIS DEPARTMENT OF COMMUNITY DEVELOPMENT
AWN VILLAGE OF WINNETKA, ILLINOIS DEPARTMENT OF COMMUNITY DEVELOPMENT AWNING PERMIT APPLICATION Important note regarding Awning Code changes Effective March 4, 2003, awning regulations were modified to
More informationPORTER S BAY HEATED SQFT*
PORTER S BAY FLOOR PLAN BED/BATH HEATED SQFT* PRICE** Includes Standard Home site THE DRAWBRIDGE 3 Bed 2 Bath 1235 $127,499 2 Car Garage THE PALACE 3 Bed 2 Bath 1305 $132,499 2 Car Garage THE OAK 3 Bed
More informationRANCHO CIENEGA SPORTS COMPLEX
OCTOBER 21, 2015 VOLUNTEER NEIGHBORHOOD OVERSITE COMMITTEE DESIGN DATE SCHEMATIC DESIGN PHASE TICKET OFFICE CUSTODIAL SHOWER (W) TOILETS (M/W) STORAGE STAIRS STAIR TOILET (W) OFFICE GYM ADMIN BLEACHERS
More information1 Gildersleeve Wood (DHR # )
GILDERSLEEVE WOOD 1 Gildersleeve Wood (DHR # 104-5092-0012) STREET ADDRESS: 1 Gildersleeve Wood MAP & PARCEL: 11-20 PRESENT ZONING: R-1U ORIGINAL OWNER: Lindsay Family ORIGINAL USE: PRESENT USE: PRESENT
More informationCrenshaw/LAX Transit Project Construction Update Community Meeting. November 15, 2018
Crenshaw/LAX Transit Project Construction Update Community Meeting November 15, 2018 Project Overview Walsh Shea Corridor Constructors (WSCC) Main Line & Stations Contractor Hensel Phelps Herzog (HPH)
More informationThe Panache, Trem Elai Penarth Heights Penarth CF64 1TF. 599,950 Freehold
The Panache, Trem Elai Penarth Heights Penarth CF64 1TF 599,950 Freehold pablack.co.uk Penarth - PA Black 02920 703799 The Panache, Trem Elai Penarth Heights Penarth CF64 1TF Contemporary living at its
More informationKING CONDOMINIUM RESIDENCES (REZONING)
Kohn Partnership Architects Inc. Spadina Avenue, Suite 0, Toronto ON MV K Tel.0.00 www.kohnarchitects.com COPYRIGHT 00 KOHN ARCHITECTS INC. 0/0/0 REZONING KING CONDOMINIUM RESIDENCES (REZONING) ONTARIO
More informationCLAREMONT CLUB, SPA & RESIDENCES
LANDMARKS SUBMITTAL LOCATION MAP PROJECT DIRECTORY SHEET INDEX VICINITY MAP Ashby Ave PROJECT SITE Tunnel Rd PROJECT SITE Claremont Ave OWNER Claremont Hotel Properties, LP 41 Tunnel Road Oakland, CA 94705
More informationFort Myers Downtown & Riverfront Redevelopment
Fort Myers Downtown & Riverfront Redevelopment Brought to you by the Fort Myers Community Redevelopment Agency (CRA) Fort Myers Community Redevelopment Agency The Fort Myers Community Redevelopment Agency
More informationChange dormers and main entry on the river side of the house. Site: 43 Riverbank Road, Block 10 Lot 3
City of Burlington Historic Preservation Commission Meeting Minutes: December 2, 2015 The City of Burlington Historic Preservation Commission held its regular monthly meeting on Wednesday, December 2,
More informationWORLD CLASS CIT Y. WORLD CLASS ASSET. WORLD CLASS TENANTS.
WORLD CLASS CITY. WORLD CLASS ASSET. WORLD CLASS TENANTS. BUILDING INFORMATION PROPERTY HIGHLIGHTS 1.6 Million square foot office and retail complex 42-Story Spear Tower and 27-story Steuart Tower bridged
More informationSpiral staircases. Practical staircase solutions, outside and indoors
Spiral staircases Practical staircase solutions, outside and indoors 2 www.weland.se +46 (0) 371-344 00 Spiral staircases represent in most cases a very useful staircase solution Architecturally attractive
More informationThe Benefits of a Whittier Blvd. Alignment for the Metro Eastside Extension
The Benefits of a Whittier Blvd. Alignment for the Metro Eastside Extension by Bart Reed The Transit Coalition P.O. Box 567 San Fernando, CA 91341-0567 (818) 367-1661 1 Introduction Metro has released
More informationFIRST FLOOR LIVING: 1,557 SQ.FT. GARAGE & PORCH: 786 SQ.FT. TOTAL: 2,343 SQ.FT.
4 1 Room Options Options Room Options 5'-2" 29'-6" x 2 10A Room Room with Direct Vent Fireplace with no stack Front Porch Options 6A room with pair 3'-0" French doors. Loggia required 1 x 18'-4" x 1 x
More informationGREENCREST PLACE DOLLIS HILL LANE LONDON NW2 6HF
GREENCREST PLACE DOLLIS HILL LANE LONDON NW2 6HF Computer Generated Image DOLLIS HILL LANE LONDON NW2 6HF Originally built in the 1980s, the building has been completely refurbished and extended to create
More informationTORONTO TRANSIT COMMISSION REPORT NO.
Form Revised: February 2005 TORONTO TRANSIT COMMISSION REPORT NO. MEETING DATE: July 14, 2010 SUBJECT: TORONTO-YORK SPADINA SUBWAY EXTENSION PROJECT HIGHWAY 407 STATION APPROVAL OF FINISHES AND ARTWORK
More informationif you think five-star luxury is the ultimate indulgence, think again. has arrived ...six-star luxury on Fort lauderdale beach.
if you think five-star luxury is the ultimate indulgence, think again....six-star luxury has arrived on Fort lauderdale beach. beachfront elevation A setting of incredible natural beauty with perfect subtropical
More informationTENDABOX BX3000. Cassette awning with folding arms BX3000. Description. Options:
TENDABOX Description One-piece U-shaped protective cover (Dimension 179 x 145 mm), as from 500 cm total width protective cover inner reinforcement (Dimension 179 x 145 mm), of extruded aluminium profile
More information301 7½ Street SW
301 7½ Street SW 104-0213-0072 Primary Resource Information: Single Dwelling, Stories 2.00, Style: Other, ca 1890 July 2006: This late-19th-century, 3-bay, 2-story, hip-roofed frame I-house features projecting
More informationCommunity Advisory Panel Meeting #
Community Advisory Panel Meeting # 6 02.13.19.. Agenda Welcome and Introductions Community Conversations City Council Meeting Debrief Review Citywide Tunnel Video (North Portal Only) Churchill Pedestrian
More informationPAcific center. the gateway to palos verdes
PAcific center the gateway to palos verdes THE GATEWAY TO PALOS VERDES about PAcific center Just two miles from the Pacific Ocean you will find the serene and unique office building, Pacific Center. From
More informationPRIME RETAIL SPACE AVAILABLE
PRIME 505, 550, AND 606 N. FIGUEROA STREET DOWNTOWN LOS ANGELES ±1,000 ±10,000 SF Zachary Card Lic 01717802 t: +1 310 550 2542 e: zachary.card@cbre.com ORSINI Downtown Los Angeles is evolving. Our City
More informationHARP AUTHORITY GATEWAY CENTER BOATHOUSE & CHANNEL EXTENSION TO SANTA FE AVENUE. Pueblo City Council Presentation September 17, 2018
HARP AUTHORITY GATEWAY CENTER BOATHOUSE & CHANNEL EXTENSION TO SANTA FE AVENUE Pueblo City Council Presentation September 17, 2018 PROJECT: 1A HARP Expansion FUNDING 1A Ballot Issue Pueblo County : $3,000,000
More informationAND AND ALL OF SAID LANDS SITUATE, LYING AND BEING IN THE CITY OF HOLLYWOOD, BROWARD COUNTY, FLORIDA, CONTAINING 326,439 SQUARE FEET ( ACRES).
PROPOSED DEALERSHIP AND FOR: 11 NORTH STATE ROAD, FLORIDA. 3301 INDEX OF DRAWINGS ARCHITECTURAL A-0 COVER SHEET SHEET 1 OF BOUNDARY AND TOPOGRAPHIC SURVEY SHEET OF BOUNDARY AND TOPOGRAPHIC SURVEY A-1.1
More informationSmart W induction chafing dishes
Smart W induction chafing dishes Benefits All parts replaceable (handle, lid, hinge etc) Hydraulic motion lid 100,000 uses guarantee on Hinge mechanism Condensation returns to water bath Premium brand
More information60 South Market, San Jose ±234,439 SF. 15-story Class A office tower centrally located in downtown San Jose, CA. From 4,354 SF - 6,632 SF Available
SO MUCH MORE. 60 South Market, San Jose ±234,439 SF 15-story Class A office tower centrally located in downtown San Jose, CA. From 4,354 SF - 6,632 SF Available Rooted in tradition but on the cusp of cutting-edge,
More information359 36' 16" 57.592 12"WIDE GRAVEL STRIP C/W 2"X4" PT WOOD CEDGE Y CONC. SLAB. EL. 1.98M ONC. PAVER STANDARD 2.8Mx5.5M B B B A212"WIDE GRAVEL STRIP C/W 2"X4" PT WOOD EDGE EL. FOR CONTINUEATION SEE 3b R
More informationB-LINE SERIES. Safety Grating GSMSG-17. Safety gratings. product line overview. Safety gratings. product line overview
Safety Grating GSMSG-17 B-LINE SERIES Safety gratings product line overview Safety gratings product line overview Safety for every walk of life Eaton offers a wide range of grating products for various
More informationWORLD CLASS CITY. WORLD CLASS ASSET. WORLD CLASS TENANTS.
WORLD CLASS CITY. WORLD CLASS ASSET. WORLD CLASS TENANTS. BUILDING INFORMATION PROPERTY HIGHLIGHTS 1.6 Million square foot office and retail complex 42-Story Spear Tower and 27-story Steuart Tower bridged
More informationHOSPITALITY & CLUBS brownjordanoutdoorkitchens.com
HOSPITALITY & CLUBS 203.626.5625 brownjordanoutdoorkitchens.com WHO WE ARE Since the late 1990 s, Brown Jordan Outdoor Kitchens has led the transformation of outdoor living spaces from simple barbeque
More informationThe Plaza at 505. Joe Anderson LIC #
The Plaza at 505 1000 Aviara Parkway, Suite 100 Carlsbad, CA 92011 P +1 760 431 4200 F +1 760 454 3869 cushmanwakefi eld.com Information contained herein has been obtained from sources we deem reliable.
More informationBENEFITS OF YOUR FUTURE RIDE
BENEFITS OF YOUR FUTURE RIDE How long will my trip from Lynnwood take? One train every 4MINUTES during peak weekday commutes EAST 50 MINUTES 60 MINUTES LYNNWOOD 20 MINUTES 28 MINUTES DOWNTOWN BELLEVUE
More informationMINUTES KNOXVILLE DOWNTOWN DESIGN REVIEW BOARD MEETING OF MAY 19, 2010 SMALL ASSEMBLY ROOM. Business Representative
MINUTES KNOXVILLE DOWNTOWN DESIGN REVIEW BOARD MEETING OF MAY 19, 2010 SMALL ASSEMBLY ROOM Present: Kim Henry David Dewhirst Anne Wallace John Sanders Joe Petre Bob Alcorn Jeffrey Nash Mark Donaldson Steve
More informationPioneer and trendsetter
E Columbus History Pioneer and trendsetter Innovation, design and quality these three words have characterised Westfalia for more than 60 years. Thanks to these characteristics we have also become a reliable
More informationDESIGN AND CONSTRUCTION OPEN HOUSE
DESIGN AND CONSTRUCTION OPEN HOUSE The purpose of tonight s meeting is to provide: Design progress of the new Operations and Maintenance Facility in Bellevue. Agenda 6:00 p.m. Open House Approved transit
More informationNOW DIVISIBLE TO 2,500 SF
NOW DIVISIBLE TO 2,500 SF FOR LEASE 222 E. Carrillo Street, Suite 101, Santa Barbara, California 93101 HayesCommercial.com Property Overview Located in the Cabrillo Business Park, this remodeled, two-story
More informationHollywood Creative Bow Truss Office Building For Lease Santa Monica Boulevard
Hollywood Creative Bow Truss Office Building For Lease 6910-6912 Santa Monica Boulevard Colliers Brokerage NATHAN PELLOW Executive Vice President License No. 01215721 213 532 3213 nathan.pellow@colliers.com
More informationTORONTO TRANSIT COMMISSION REPORT NO.
Form Revised: February 2005 TORONTO TRANSIT COMMISSION REPORT NO. MEETING DATE: SUBJECT: Resubmitted December 19, 2012 November 21, 2012 MODERNIZING THE TTC A NEW APPROACH TO COMMUNICATIONS, COMMUNITY
More informationSWR PRODUCT OVERVIEW SWR
SWR PRODUCT OVERVIEW SWR SWR family business established 1989 At SWR we offer a comprehensive range of garage and entrance doors from all of the leading brands including fully insulated high security sectional
More information