Cambridge Avenue. Cleveland Avenue. Chicago Avenue. Chicago Avenue. Curbed planters with groundcover,

Size: px
Start display at page:

Download "Cambridge Avenue. Cleveland Avenue. Chicago Avenue. Chicago Avenue. Curbed planters with groundcover,"

Transcription

1 THE HUDSON

2 1'-8" 1'-8" 4'-0"4'-3 4'-0"4'-3 1/2" 1/2" Street Street trees trees in in tree tree grates grates along along Kingsbury Kingsbury Street Street - - 3" 3" caliper caliper shade shade trees trees (Ginko) (Ginko) Street Trees - 3" caliper shade trees (Elm Street Cultivars, Trees - 3" Autumn caliper Blaze shade trees Maples, (Elm Cultivars, Lindens) Autumn Blaze Maples, Lindens) 5/8" 33'-6 5/8" 301'-11" 33'-6 301'-11" 5'-5" 5'-5" New Metal Fence to to Match Existing BRICK TOWNHOUSES 1,724.2 sq ft 1, sq ft 6, sq ft 10% DN 10% 10% 14.5% 14.5% 10% +0'-0" BALCONIES 10% UP sq ft BRICK TOWNHOUSES 14 Spaces 20 Spaces Residential 34 Spaces +0'-0" 30 Service Corridor spaces 1, sq ft Service Corridor Bike 40 BALCONIES 34 Data 111 Curbed planters with groundcover, Curbed perenials, planters and low with evergreen groundcover, shrubs perenials, along Chicago and low Avenue evergreen shrubs along Chicago Avenue Data Server / Security Elevator Lobby 101 Leasing Office 303 Move-In Trash / Move-In Trash Recycling / 112 Recycling 113 /Visitor 7 Spaces Package Closet Package Room Restroom Cart 43'-8 3/4" Bus Duct 15'-2" Mail Mail Existing Bus Stop Existing Bus Stop Residential Lobby +0'-0" Fire Panel Loading 10'X25' Loading BRICK TOWNHOUSES Note: No No crosswalks to to North side side of of Chicago Avenue from from the the East East end end of of property. 12'-2" 12'-2" 6'-6" 6'-6" 4'-0" 4'-0" 1'-8" 1'-8" Existing Existing Fire Fire Hydrant Hydrant Street Street trees trees in in tree tree grates grates along along Hudson Hudson Street Street - 3" - 3" caliper caliper shade shade trees trees (Ginko) (Ginko) Light Light Pole Pole to to be be Relocated These plans are schematic and are subject to further refinement for compliance with code required exiting, life safety improvements and coordination with existing systems. Cambridge Avenue Cleveland Avenue Hudson Avenue The Hudson An Onni Condominium Project Hudson & Chicago Chicago, Illinois 15'-8" 15'-8" 8'-6" 8'-6" 5'-6" 5'-6" 1'-8" 1'-8" Chicago Avenue Chicago Avenue Lane 8'-0" 5'-6" 1'-8" 8'-0" 5'-6" 1'-8" 15'-2" First Floor / Site Plan Scale: 1" = 30', 1:1.45 N Kingsbury Street North Kingsbury Street Property Property Line Line Existing Gate Open/Green Space 3,400 sq sq ft ft 1/8" 1/8" 119'-0" 119'-0" 1, sq ft 1, sq ft 1, sq ft 1, sq ft 1,592.9 sq ft 1, sq ft 13 Spaces Residential 17 Spaces Private Alley for Town Homes to South Private Alley for Town Homes to South /Visitor 8 Spaces Bike Residential Lobby Loading Existing Gate Existing Gate Entrance Entrance Lane Lane North Hudson Street Hudson Avenue Onni Group developer pappageorgehaymes partners 4/25/14 P/H # COPYRIGHT PAPPAGEORGE/HAYMES Ltd Sedgwick Street Superior Street Huron Street Context Plan

3 Previous West Perspective Current West Perspective Before & After: West Perspective

4 Previous East Perspective Before & After: East Perspective Current East Perspective

5 15'-7" 325'-1" 9'-0" 4'-4" 1'-8" 15'-0" Existing Bus Stop H Y D The Hudson An Onni Condominium Project Hudson & Chicago Chicago, Illinois 9'-11 1/2" 12'-2" Street trees in tree grates along Kingsbury Street - 3" caliper shade trees (Ginko) 1'-8" 4'-0" 4'-3 1/2" 6'-6" 4'-0" 1'-8" Street trees in tree grates along Hudson Street - 3" caliper shade trees (Ginko) First Floor / Site Plan Comparison Scale: 1" = 30', 1:1.45 North Kingsbury Street 119'-0" Entrance 10'X25' 10'X25' 8% Loading Trash 16% Ramp DN Residential Trash / Recycling Data, Controls, Security Service Corridor Freight Elevator Lobby 16% Ramp UP Residential Lobby +0'-0" 8% Ramp Residential Entrance North Hudson Street N Bicycle Residential Loading 10'X25' Previous First Floor Plan EXISTING GATE 15'-8" 8'-6" 5'-6" 1'-8" Private Alley for Town Homes to South 33'-6 5/8" 301'-11" 5'-5" 8'-0" 5'-6" 1'-8" 15'-2" Existing Bus Stop EXISTING GATE Existing Fire Hydrant Street trees in tree grates along Kingsbury Street - 3" caliper shade trees (Ginko) North Kingsbury Street 1'-8" 4'-0"4'-3 1/2" Current First Floor Plan Open/Green Space 3,400 sq ft Existing Gate 11 1/8" 119'-0" New Metal Fence to Match Existing 1, sq ft 1, sq ft 1, sq ft 1, sq ft 1,592.9 sq ft 1, sq ft 10% 14.5% 14.5% 10% 13 Spaces Residential +0'-0" 17 Spaces Before & After: First Floor Plan 10% DN 10% UP Service Corridor Private Alley for Town Homes to South Data Move-In Server / Security Bike Trash / Recycling /Visitor 8 Spaces Leasing Office Package Closet Restroom Cart 43'-8 3/4" Mail Bus Duct Residential Lobby Fire Panel +0'-0" Loading 10'X25' Loading Existing Gate 12'-2" 6'-6" 4'-0" 1'-8" Entrance Street trees in tree grates along Hudson Street - 3" caliper shade trees (Ginko) North Hudson Street Light Pole to be Relocated Onni Group developer pappageorgehaymes partners 4/25/14 P/H # These plans are schematic and are subject to further refinement for compliance with code required exiting, life safety improvements and coordination with existing systems. COPYRIGHT PAPPAGEORGE/HAYMES Ltd. 2014

6 West Perspective

7 East Perspective

8 Street Trees - 3" caliper shade trees (Elm Cultivars, Autumn Blaze Maples, Lindens) Chicago Avenue Curbed planters with groundcover, perenials, and low evergreen shrubs along Chicago Avenue Note: No crosswalks to North side of Chicago Avenue from the East end of property. N 15'-8" 8'-6" 5'-6" 1'-8" 33'-6 5/8" 301'-11" 5'-5" 8'-0" 5'-6" 1'-8" 15'-2" Existing Bus Stop Existing Fire Hydrant Street trees in tree grates along Kingsbury Street - 3" caliper shade trees (Ginko) North Kingsbury Street 1'-8" 4'-0"4'-3 1/2" Open/Green Space 3,400 sq ft Existing Gate 11 1/8" 119'-0" New Metal Fence to Match Existing 1, sq ft 1, sq ft 1, sq ft 1, sq ft 1,592.9 sq ft 1, sq ft 10% DN 10% 14.5% 14.5% 10% 13 Spaces Residential +0'-0" 17 Spaces BALCONIES 10% UP Service Corridor Private Alley for Town Homes to South BALCONIES Data Move-In Server / Security Bike Trash / Recycling /Visitor 8 Spaces Leasing Office Package Closet Restroom Cart 43'-8 3/4" Mail Bus Duct Residential Lobby Fire Panel +0'-0" Loading 10'X25' Loading Existing Gate 12'-2" 6'-6" 4'-0" 1'-8" Entrance Street trees in tree grates along Hudson Street - 3" caliper shade trees (Ginko) North Hudson Street Light Pole to be Relocated BRICK TOWNHOUSES BRICK TOWNHOUSES BRICK TOWNHOUSES Ground Floor Plan

9 Landscape Details

10 1'-8" 1'-8" 4'-0"4'-3 4'-0"4'-3 1/2" 1/2" Street Street trees trees in in tree tree grates grates along along Kingsbury Kingsbury Street Street - - 3" 3" caliper caliper shade shade trees trees (Ginko) (Ginko) Street Trees - 3" caliper shade trees (Elm Street Cultivars, Trees - 3" Autumn caliper Blaze shade trees Maples, (Elm Cultivars, Lindens) Autumn Blaze Maples, Lindens) 5/8" 33'-6 5/8" 301'-11" 33'-6 301'-11" 5'-5" 5'-5" New Metal Fence to to Match Existing BRICK TOWNHOUSES 1,724.2 sq ft 1, sq ft 6, sq ft 10% DN 10% 10% 14.5% 14.5% 10% +0'-0" BALCONIES 10% UP sq ft BRICK TOWNHOUSES 14 Spaces 20 Spaces Residential 34 Spaces +0'-0" 30 Service Corridor spaces 1, sq ft Service Corridor Bike 40 BALCONIES 34 Data 111 Curbed planters with groundcover, Curbed perenials, planters and low with evergreen groundcover, shrubs perenials, along Chicago and low Avenue evergreen shrubs along Chicago Avenue Data Server / Security Elevator Lobby 101 Leasing Office 303 Move-In Trash / Move-In Trash Recycling / 112 Recycling 113 /Visitor 7 Spaces Package Closet Package Room Restroom Cart 43'-8 3/4" Bus Duct 15'-2" Mail Mail Existing Bus Stop Existing Bus Stop Residential Lobby +0'-0" Fire Panel Loading 10'X25' Loading BRICK TOWNHOUSES Note: No No crosswalks to to North side side of of Chicago Avenue from from the the East East end end of of property. 12'-2" 12'-2" 6'-6" 6'-6" 4'-0" 4'-0" 1'-8" 1'-8" Existing Existing Fire Fire Hydrant Hydrant Street Street trees trees in in tree tree grates grates along along Hudson Hudson Street Street - 3" - 3" caliper caliper shade shade trees trees (Ginko) (Ginko) Light Light Pole Pole to to be be Relocated These plans are schematic and are subject to further refinement for compliance with code required exiting, life safety improvements and coordination with existing systems. Cambridge Avenue Cleveland Avenue Hudson Avenue The Hudson An Onni Condominium Project Hudson & Chicago Chicago, Illinois 15'-8" 15'-8" 8'-6" 8'-6" 5'-6" 5'-6" 1'-8" 1'-8" Chicago Avenue Chicago Avenue Lane 8'-0" 5'-6" 1'-8" 8'-0" 5'-6" 1'-8" 15'-2" First Floor / Site Plan Scale: 1" = 30', 1:1.45 N Kingsbury Street North Kingsbury Street Property Property Line Line Existing Gate Open/Green Space 3,400 sq sq ft ft 1/8" 1/8" 119'-0" 119'-0" 1, sq ft 1, sq ft 1, sq ft 1, sq ft 1,592.9 sq ft 1, sq ft 13 Spaces Residential 17 Spaces Private Alley for Town Homes to South Private Alley for Town Homes to South /Visitor 8 Spaces Bike Residential Lobby Loading Existing Gate Existing Gate Entrance Entrance Lane Lane North Hudson Street Hudson Avenue Onni Group developer pappageorgehaymes partners 4/25/14 P/H # COPYRIGHT PAPPAGEORGE/HAYMES Ltd Sedgwick Street Superior Street Huron Street Context Plan

11 Traffic Totals

12 Recommended Traffic Operations

13 Collector/Heavier traffic volumes (+/- 600 vph) Lower traffic volumes (+/-200 vph) Access (+/-60 vph) Traffic Volumes

14 Existing Conditions SITE

15 1. Pedestrian upgrades & optimize traffic signal cycle length and timings to improve operation 2. Turn lane improvements on Chicago Hudson Avenue 3. Updated crosswalks on Superior Street Proposed Conditions

16 Unit 5 Unit 6 Unit 7 Unit 8 2 Bed 1 Bed 1 Bed 2 Bed 1, sq ft sq ft sq ft 1, sq ft Unit 4 1 Bed w/ sq ft Unit 3 1 Bed sq ft 1, sq ft Unit 9 1 Bed w/ sq ft Unit 10 1 Bed w/ sq ft Fire, Light & Vent 12' Setback Unit 2 2 Bed 1, sq ft Unit 1 Unit 12 Unit 11 1 Bed w/ 1 Bed w/ 2 Bed 1, sq ft sq ft sq ft Typical Floor Plan

17 85'-5" 10'-5" 22'-9" +1'-6" 3rd Floor Amenity Deck Private 22 Private 22 Private 22 Unit Bed 1, sq ft Private 25 Private Make-Up Air Unit , sq ft Ref/Frz Private 3 Private sq ft Unit 12 1 Bed w/ Unit 9Make-Up Air Unit 1 Bed w/ sq ft Cooling Tower 04 Unit 10 1 Bed w/ sq ft 1, sq ft Unit 11 2 Bed 05 1, sq ft Shallow soil green roof system with mixture of sedums, typ. +1'-6" DW Private 25 Private '-6" +3'-0" 297'-2" Roof Plan

18 Perspective of Chicago & Hudson

19 Perspective of Kingsbury

20 The Hudson An Onni Condominium Project Hudson & Chicago Chicago, Illinois 1 North Elevation Scale: 1: Zoning Height +240'-0" Material Legend Prefinished Aluminum Window System w/ Aluminum Slab Edge Cover Glass/Aluminum Balcony Rail System Elastomeric Coated Cast-in-Place Concrete Brick w/ Cast Stone Trim Prefinished Aluminum Storefront Glass/Aluminum Canopy Prefinished Aluminum Entrance Canopy Onni Group developer Amenity Floor +30'-6" 3rd Floor +18'-8" At Chicago Ave. pappageorgehaymes partners 1/31/14 P/H # These plans are schematic and are subject to further refinement for compliance with code required exiting, life safety improvements and coordination with existing systems. COPYRIGHT PAPPAGEORGE/HAYMES Ltd. 2014

21 The Hudson An Onni Condominium Project Hudson & Chicago Chicago, Illinois 1 South Elevation Scale: 1: Zoning Height +240'-0" Material Legend Prefinished Aluminum Window System w/ Aluminum Slab Edge Cover Glass/Aluminum Balcony Rail System Elastomeric Coated Cast-in-Place Concrete Brick w/ Cast Stone Trim Prefinished Aluminum Storefront Glass/Aluminum Canopy Prefinished Aluminum Entrance Canopy Recessed Down Aimed Security Lighting Typical Across Alley Onni Group developer 7 Amenity Floor +30'-6" pappageorgehaymes partners 3/6/14 P/H # These plans are schematic and are subject to further refinement for compliance with code required exiting, life safety improvements and coordination with existing systems. COPYRIGHT PAPPAGEORGE/HAYMES Ltd. 2014

22 The Hudson An Onni Condominium Project Hudson & Chicago Chicago, Illinois 1 East & West Elevations Scale: 1: Zoning Height +240'-0" Material Legend 1 Prefinished Aluminum Window System w/ Aluminum Slab Edge Cover 2 Glass/Aluminum Balcony Rail System 3 Elastomeric Coated Cast-in-Place Concrete 4 Brick w/ Cast Stone Trim 5 Prefinished Aluminum Storefront 6 Glass/Aluminum Canopy 7 Prefinished Aluminum Entrance Canopy 3 7 Onni Group developer 5 Amenity Floor +30'-6" 3rd Floor +18'-8" At Chicago Ave. pappageorgehaymes partners 1/ 31/ 14 P/H # These plans are schematic and are subject to further refinement for compliance with code required exiting, life safety improvements and coordination with existing systems. COPYRIGHT PAPPAGEORGE/HAYMES Ltd

Boston Redevelopment Authority 2/26/ Chestnut Hill Avenue Boston/Brookline, MA

Boston Redevelopment Authority 2/26/ Chestnut Hill Avenue Boston/Brookline, MA Boston Redevelopment Authority 2/26/2014 Cassidy Playground Waterworks Design revisions made since the DPIR submission March 2013 Massing - Reduced project 16,030 SF, for a total project area of 218,520

More information

SK 1.0 SITE STATISTICS PRELIMINARY DOCUMENTS. PROPOSED APARTMENT BUILDING 115 & 117 ERB STREET EAST Waterloo, Ontario PROJECT: DATE: REFERENCE: -

SK 1.0 SITE STATISTICS PRELIMINARY DOCUMENTS. PROPOSED APARTMENT BUILDING 115 & 117 ERB STREET EAST Waterloo, Ontario PROJECT: DATE: REFERENCE: - SITE STATISTICS SCALE: N.T.S. SK 1.0 2442 PROPOSED APARTMENT BUILDING ERB STREET EAST R6000 R3000 BEFORE ROAD WIDENING AFTER ROAD WIDENING LANDSCAPED AREA T 4216 5000 5.0m MIN. FRONT YARD SETBACK (BY-LAW

More information

Capitol Hill Prime Retail Space For Lease

Capitol Hill Prime Retail Space For Lease Capitol Hill Prime Retail Space For Lease,36-4,874 SF Billy Dean Poll, Altaras, CCIM CCIM + 45 + 45 586 586 5604 563 bpoll@nai-psp.com daltaras@nai-psp.com Billy Dean Poll, Altaras, CCIM CCIM + 45 + 586

More information

KING CONDOMINIUM RESIDENCES (REZONING)

KING CONDOMINIUM RESIDENCES (REZONING) Kohn Partnership Architects Inc. Spadina Avenue, Suite 0, Toronto ON MV K Tel.0.00 www.kohnarchitects.com COPYRIGHT 00 KOHN ARCHITECTS INC. 0/0/0 REZONING KING CONDOMINIUM RESIDENCES (REZONING) ONTARIO

More information

2600 COLORADO ENTRY DESIGN

2600 COLORADO ENTRY DESIGN 2600 COLORADO ENTRY DESIGN SANTA MONICA ARB REVIEW COVER 2600 COLORADO AVENUE, SANTA MONICA, CALIFORNIA 11/13/2017 A001 PROJECT DESCRIPTION 2600 COLORADO WILL SERVE AS A NEW HOME FOR ORACLE CORPORATION.

More information

HEARST GARDENS BERKELEY, CA 94702

HEARST GARDENS BERKELEY, CA 94702 APPLICANT: RHOADES PLANNING GROUP 1611 TELEGRAPH AVE. SUITE 200 OAKLAND, CA 94612 [510] 545-4341 PROJECT: BERKELEY, CA 94702 ARCHITECT: DEVI DUTTA-CHOUDHURY, AIA DEVI DUTTA ARCHITECTURE INC. 1958A UNIVERSITY

More information

Marymount University Ballston Center Redevelopment

Marymount University Ballston Center Redevelopment Marymount University Ballston Center Redevelopment October 28, 2013 SPRC #5 Team Owners: Academic Office Architect: Residential Architect: Land Use Counsel: Civil Engineer: Landscape Architect: Traffic

More information

MONTGOMERY COUNTY PLANNING DEPARTMENT THE MARYLAND-NATIONAL CAPITAL PARK AND PLANNING COMMISSION

MONTGOMERY COUNTY PLANNING DEPARTMENT THE MARYLAND-NATIONAL CAPITAL PARK AND PLANNING COMMISSION MONTGOMERY COUNTY PLANNING DEPARTMENT THE MARYLAND-NATIONAL CAPITAL PARK AND PLANNING COMMISSION MCPB Item No. Date: 6/23/2016 Lucy V. Barnsley Elementary School Addition, Mandatory Referral MR2016027

More information

AVAILABLE FOR SALE ENTITLED 53,228 SF BUILDING FOR SALE Washington Dr., Fontana. Property Features:

AVAILABLE FOR SALE ENTITLED 53,228 SF BUILDING FOR SALE Washington Dr., Fontana. Property Features: Property Features: Free - Standing; Entitled 53,8 SF;,311 SF Office (3) Dock High Loading Rare, New Planned Wholesale Warehouse Corner Location (Live Oak Ave. & Washington Dr.) 1 Block South Of Valley

More information

2

2 1 2 3 PUBLIC galleria looking OUT TO COUPLAND`S ART SCULPTURE 4 PUBLIC GALLERIA SHOWING COMMERCIAL USE 5 6 commercial revitalization - future marine drive commercial revitalization - future marine drive

More information

Town Hall Meeting. July 28, 2016 Sherwood School of Music 1312 S. Michigan Ave.

Town Hall Meeting. July 28, 2016 Sherwood School of Music 1312 S. Michigan Ave. Town Hall Meeting July 28, 2016 Sherwood School of Music 1312 S. Michigan Ave. Stay connected! 5046 S. State St. Chicago, IL. (773) 373-9273 ward03@cityofchicago.org www.dowellforthirdward.com Facebook.com/aldermanpat.dowell

More information

MBTA WOLLASTON. Station Improvements Public Meeting. January 14, 2016

MBTA WOLLASTON. Station Improvements Public Meeting. January 14, 2016 MBTA WOLLASTON Station Improvements Public Meeting January 14, 2016 Kleinfelder, Inc. Architectural Engineers, Inc. Code Red Consultants, LLC Keville Enterprises, Inc. Vertical Transportation Excellence

More information

Madison Metro Transit System

Madison Metro Transit System Madison Metro Transit System 1101 East Washington Avenue Madison, Wisconsin, 53703 Administrative Office: 608 266 4904 Fax: 608 267 8778 TO: FROM: SUBJECT: Plan Commission Timothy Sobota, Transit Planner,

More information

Kaufland, Chirnside Park

Kaufland, Chirnside Park Kaufland, Chirnside Park WRITTENCONSENT OF 66 Maroondah Highway, Chirnside Park, A TOWN PLANNING APPLICATION 9/6/8 SJE Victoria, 6 ARTISTS IMPRESSION DRAWING LIST SHEET NUMBER SHEET NAME TP- TITLE SHEET

More information

February 2006 COA Report

February 2006 COA Report February 2006 COA Report Date 2/21/2006 957 East 4th Street, Long Beach, California 90802 Coffee Pot Café 2/28/2006 225 West Anaheim Street, Long Beach, California 90813 Windows, install new single light

More information

Astoria Boulevard ADA Upgrade and Station Renewal. January 7, 2019

Astoria Boulevard ADA Upgrade and Station Renewal. January 7, 2019 Astoria Boulevard ADA Upgrade and Station Renewal January 7, 2019 Major Scope of Work Replace Street and Platform Stairs Work Description Install Two Street-to-Mezzanine Elevators Install Two Mezzanine-to-Platform

More information

Introduction BACKGROUND THE PUBLIC EXHIBITION

Introduction BACKGROUND THE PUBLIC EXHIBITION Introduction Thank you for taking the time to come along and view our proposals for 333 Kingsland Road, which will provide a permanent home for Hackney New Primary School, alongside new housing and retail

More information

ADVANCED WARNING SYSTEM FOR SHARED USE CROSSING ON HOWARD STREET EAST OF NORDICA AVENUE

ADVANCED WARNING SYSTEM FOR SHARED USE CROSSING ON HOWARD STREET EAST OF NORDICA AVENUE ADVANCED WARNING SYSTEM FOR SHARED USE CROSSING ON EAST RDICA AVENUE FOR THE LOCATION MAP STANDARD SYMBOLS FEATURE EISTING PROPOSED BENCHMARK BM/TBM SHEET INDE. BM/TBM TITLE SHEET CONCRETE R.O.W. MONUMENT

More information

NFTA Access Enhancement Study for Canalside and Cobblestone Alternatives Discussion. Alternative A South Park Avenue

NFTA Access Enhancement Study for Canalside and Cobblestone Alternatives Discussion. Alternative A South Park Avenue Alternative A South Park Avenue Alternative A Summary Alternative A extends Metro Rail service around the foot of Main Street east along South Park Avenue to serve a new station platform located along

More information

Retail Available in South Lake Union. 9th and Lenora, Seattle, WA

Retail Available in South Lake Union. 9th and Lenora, Seattle, WA Retail Available in South Lake Union 9th and Lenora, Seattle, WA Retail in South Lake Union 9th and Lenora A well-planned approach to transportation, sustainability, retail, and recreation make South Lake

More information

25 th Avenue Grade Separation. December 13, 2017

25 th Avenue Grade Separation. December 13, 2017 25 th Avenue Grade Separation December 13, 2017 Agenda I. Overview II. III. IV. Project Description Project Benefits Project Construction V. Next Steps VI. Questions 2 Overview Project Location 4 E. 25

More information

Leidesdorff Village D&S Developement 2277 Fair Oaks Boulevard, Studio 220 Sacramento, California

Leidesdorff Village D&S Developement 2277 Fair Oaks Boulevard, Studio 220 Sacramento, California PERSPECTIVE 96 99-800 www.hrgarchitects.com 09/5/ ' - 0" SOUTH BUILDING_SOUTH ELEVATION_BW SOUTH BUILDING_EAST ELEVATION_BW ' - 0" SOUTH BUILDING_NORTH ELEVATION_BW S SOUTH BUILDING_WEST ELEVATION_BW EXTERIOR

More information

Capital Projects Funds

Capital Projects Funds Capital Projects Funds Adopted Adopted Actuals Budget Actuals Budget REVENUES 2016-2017 2017-2018 2017-2018 2018-2019 State sources CO&DS distributed to district $ 590,527 $ 494,812 $ 586,059 $ 494,812

More information

CLIPPER COVE PROMENADE & MARINA DEVELOPMENT

CLIPPER COVE PROMENADE & MARINA DEVELOPMENT CLIPPER COVE PROMENADE & MARINA DEVELOPMENT Treasure Island / Yerba Buena Island Citizen Advisory Board Review May 05 2015 CLIPPER COVE PROMENADE & MARINA DEVELOPMENT TREASURE ISLAND TI YBI CAB Review

More information

CONSTRUCTION PROJECTS IN CUYAHOGA COUNTY CLEVELAND EUCLID 3/9/18 RICHMOND MAYFIELD HIGHLAND HEIGHTS HEIGHTS SOUTH EAST MAYFIELD EUCLID CLEVELAND

CONSTRUCTION PROJECTS IN CUYAHOGA COUNTY CLEVELAND EUCLID 3/9/18 RICHMOND MAYFIELD HIGHLAND HEIGHTS HEIGHTS SOUTH EAST MAYFIELD EUCLID CLEVELAND BAY VILLAGE WESTLAKE OLMSTED NORTH TOWNSHIP OLMSTED FALLS OLMSTED BEREA STRONGSVILLE ROYALTON NORTH BROOK PARK PARMA PARMA BROADVIEW BRECKSVILLE HILLS SEVEN INDEPENDENCE BROOKLYN RIVER ROCKY LAKEWOOD PARK

More information

Exhibit 18A ANDERSON STREET DETAIL LECOUNT SQUARE New Rochelle, New York

Exhibit 18A ANDERSON STREET DETAIL LECOUNT SQUARE New Rochelle, New York 0 25 Exhibit 18A ANDERSON STREET DETAIL SOURCE: Kellard Engineering 0 25 SOURCE: Kellard Engineering Exhibit 18B LECOUNT PLACE DETAIL NORTH AVENUE 0 25 HUGUENOT STREET Exhibit 18C NORTH AVENUE/ HUGUENOT

More information

PARKS & BEACHES PROJECTS

PARKS & BEACHES PROJECTS #18 72ND STREET PARK, LIBRARY, #19 BLUEWAYS & AQUATIC CENTER $1.1 MILLION $60 MILLION New facility to include: Create Kayak Launches with All Wheels Skate Park Floating Docks and Seating at: Library/Media

More information

Bellevue South Park. Located between E 26th and E 28th at Mt. Carmel Place, in the Borough of Manhattan.

Bellevue South Park. Located between E 26th and E 28th at Mt. Carmel Place, in the Borough of Manhattan. Bellevue South Park Located between E 26th and E 28th at Mt. Carmel Place, in the Borough of Manhattan. Community Board 6 Review January 2, 2018 Christopher M. Crowley, RLA NYC Parks Total Budget: Project

More information

1 TP-08 3 TP-08 TP-06 EX.RL SPRINKLER STORAGE TANKS SPRINKLER PUMP ROOM RETAINING WALL WITH HANDRAIL TOW

1 TP-08 3 TP-08 TP-06 EX.RL SPRINKLER STORAGE TANKS SPRINKLER PUMP ROOM RETAINING WALL WITH HANDRAIL TOW TP- EX.RL+. EX.RL+. // SJE EX.RL+. TP- M PYLON SIGN - TYPE NEIGHBOURING SITE TP- EXISTING CARWASH EX.RL+. EX.RL+. A A TP- EX.RL+. EX.RL+. EX.RL+. TOW. EX.RL+. EX.RL+. EX.RL+. EX.RL+. EXISTING DAN MURPHY'S

More information

Brand New Prestigious Main Floor Retail Space

Brand New Prestigious Main Floor Retail Space Brand New Prestigious Main Floor Retail Space Downtown Edmonton s best location on the corner of 104 St. and 102 Ave. Occupancy August 2017 Marino Padoan B.Ed., L.Aud.Eng., Ph.D Direct +1 780 917 8340

More information

FOR LEASE. OFFICE & RETAIL Street, Edmonton, AB AVAILABLE NOW! RENTS STARTING AT $12/SF. Completed showsuites, move in ready!

FOR LEASE. OFFICE & RETAIL Street, Edmonton, AB AVAILABLE NOW! RENTS STARTING AT $12/SF. Completed showsuites, move in ready! FOR LEASE AVAILABLE NOW! RENTS STARTING AT $12/SF OFFICE & RETAIL 9707 110 Street, Edmonton, AB Completed showsuites, move in ready! 7 6 5 4 2 8 9 UNIT 406,77 sq ft UNIT 414 710 sq ft UNIT 605,41 sq ft

More information

AREA TENANTS CONTACT Dan Clark DEMOGRAPHICS

AREA TENANTS CONTACT Dan Clark DEMOGRAPHICS Siena 4437-4449 Hastings Street, Burnaby, BC SUMMARY Siena is a proposed new mixed-use development, located on Hastings St in North Burnaby just west of Willingdon Ave. Hastings & Willingdon is the highest

More information

Purpose of Presentation. Outline of Presentation. Preliminary Design Presentation HIGHTSTOWN MUNICIPAL BUILDING Hightstown, NJ

Purpose of Presentation. Outline of Presentation. Preliminary Design Presentation HIGHTSTOWN MUNICIPAL BUILDING Hightstown, NJ Preliminary Design Presentation HIGHTSTOWN BUILDING Hightstown, NJ September 16, 2013 Eli Goldstein, AIA, PP, LEED Managing Partner, Architects 1 Purpose of Presentation The primary purpose of this Presentation

More information

RESORT AREA STRATEGIC ACTION PLAN (RASAP) STEERING COMMITTEE MEETING - APRIL 3, 2019

RESORT AREA STRATEGIC ACTION PLAN (RASAP) STEERING COMMITTEE MEETING - APRIL 3, 2019 RESORT AREA STRATEGIC ACTION PLAN (RASAP) STEERING COMMITTEE MEETING - APRIL 3, 2019 Welcome & Introductions - Deb Zywna AGENDA FY 20 Resort CIP Proposed Projects - Kathy Warren ORDFBC Design Guidelines

More information

BOSTON, MA 171 TREMONT IMPACT ADVISORY GROUP 5/19/16

BOSTON, MA 171 TREMONT IMPACT ADVISORY GROUP 5/19/16 BOSTON, MA 171 TREMONT IMPACT ADVISORY GROUP 5/19/16 171 Tremont will continue the transformation of Downtown Crossing into a revitalized neighborhood where all Bostonians can live, work, and play. 171

More information

Dufferin Jog Elimination Project

Dufferin Jog Elimination Project Project Project Status Update November 14 2007 Project History Planning Alternatives Criteria Measured Project Benefits Structural Configurations Considered Structural Design Considerations The Preferred

More information

Astoria Boulevard ADA and Station Renewal Track Improvements. January 30, 2019

Astoria Boulevard ADA and Station Renewal Track Improvements. January 30, 2019 Astoria Boulevard ADA and Station Renewal Track Improvements January 30, 2019 Major Scope of Work Replace Street and Platform Stairs Work Description Install Two Street-to-Mezzanine Elevators Install Two

More information

FLORIDA S HOLLYWOOD BEACH AND DOWNTOWN BUSINESS AND REDEVELOPMENT OPPORTUNITIES CAPITAL IMPROVEMENT PLAN

FLORIDA S HOLLYWOOD BEACH AND DOWNTOWN BUSINESS AND REDEVELOPMENT OPPORTUNITIES CAPITAL IMPROVEMENT PLAN FLORIDA S HOLLYWOOD BEACH AND DOWNTOWN BUSINESS AND REDEVELOPMENT OPPORTUNITIES CAPITAL IMPROVEMENT PLAN 2015-2019 WHY MOVE YOUR BUSINESS TO HOLLYWOOD? Close to international airport and seaport Centrally

More information

M E S T I Z O C U R T I S P A R K

M E S T I Z O C U R T I S P A R K ARAPAHOE CONNECTION TO BUS ROUTE AT ND AND LAWRENCE, FUTURE LIGHT RAIL STATION LEGEND SOCIAL TRAIL FLAGSTONE PAVING TO RESTORE/MAINTAIN CONCRETE PAVING DIAGONAL CURVILINEAR SOCIAL ROUTE IS OUT OF HISTORIC

More information

IREDALE GROUP A R C H I T E C T U R E

IREDALE GROUP A R C H I T E C T U R E 3 0 Oct, 2007 Development Permit 2 0 Sep, 2007 Design Panel RAMP TO LEVEL 5 LEVEL 4 PARKING (34 COVERED STALLS) RAMP TO LEVEL 2 Falls Hotel Level 8 Plan 8 viewport /6" = '-0" 3 AH0B Ramp to Level 24 2

More information

25 th Avenue Grade Separation. September 13, 2017

25 th Avenue Grade Separation. September 13, 2017 25 th Avenue Grade Separation September 13, 2017 Agenda I. Overview II. III. IV. Project Description Project Benefits Project Construction V. Next Steps VI. Questions 2 Overview Project Location 4 E. 25

More information

Chicago St. Louis High-Speed Rail. Braidwood Construction. Local Officials Briefing August 7, 2014

Chicago St. Louis High-Speed Rail. Braidwood Construction. Local Officials Briefing August 7, 2014 Chicago St. Louis High-Speed Rail Braidwood Construction Local Officials Briefing August 7, 2014 1 Chicago-St. Louis Corridor Goals and Benefits» Reduction in travel time by about an hour» Enhanced reliability»

More information

Pedestrian Safety Review Spadina Avenue

Pedestrian Safety Review Spadina Avenue STAFF REPORT ACTION REQUIRED Pedestrian Safety Review Spadina Avenue Date: October 13, 2015 To: Toronto and East York Community Council From: Director, Transportation Services, Toronto and East York District

More information

Welcome to the Illinois High-Speed Rail Chicago to St. Louis Construction Update Meeting. Today s meeting will provide an overview of the Program,

Welcome to the Illinois High-Speed Rail Chicago to St. Louis Construction Update Meeting. Today s meeting will provide an overview of the Program, Welcome to the Illinois High-Speed Rail Chicago to St. Louis Construction Update Meeting. Today s meeting will provide an overview of the Program, updates on construction to be held in this area, and how

More information

SUNSET NORTH BELLEVUE, WA

SUNSET NORTH BELLEVUE, WA Spectacular Western Views On-site Deli SUNSET FEATURES 3-Building Class A office complex totaling 477,118 SF Immediate access to I-90 Adjacent to HYATT House and Eastgate Park & Ride On-site fitness center

More information

200 Liberty Street 225 Liberty Street 200 Vesey Street 250 Vesey Street 300 Vesey Street

200 Liberty Street 225 Liberty Street 200 Vesey Street 250 Vesey Street 300 Vesey Street 200 Liberty Street 225 Liberty Street 200 Vesey Street 250 Vesey Street 300 Vesey Street We are pleased to offer availabilities of contiguous space as large as 150,000 square feet to partial floors as

More information

SWEDISH FIRST HILL MEDICAL CENTER

SWEDISH FIRST HILL MEDICAL CENTER SWEDISH FIRST HILL MEDICAL CENTER BLOCK 95 ALLEY VACATION / URBAN DESIGN MERIT JULY 16, 2015 CONTENTS INTRODUCTION NEIGHBORHOOD CONTEXT EXISTING CONDITIONS DESIGN COMPARISON 2 07 / INTRODUCTION 3 PROJECTS

More information

1339, 1431, TH AVENUE NE TH STREET NE

1339, 1431, TH AVENUE NE TH STREET NE 1339, 1431, 1435 40 TH AVENUE NE 3950 12 TH STREET NE INDUSTRIAL 3583, 3481, SPACE 3459, 3407 FOR Mount Lehman SALE Road, AND Abbotsford FOR LEASE 10 MINS HUNTINGTON HILLS DEERFOOT TRAIL CALGARY INTERNATIONAL

More information

REDEVELOPMENT HIGHLIGHTS

REDEVELOPMENT HIGHLIGHTS REDEVELOPMENT HIGHLIGHTS $50m comprehensive redevelopment > New lobby integrated with dramatic interior arcade > New plaza with abundant green space > New perimeter induction unit covers > Redesigned façade

More information

Lincoln Village Pedestrian Bicycle Bridge Community Meeting September 13th, 2016

Lincoln Village Pedestrian Bicycle Bridge Community Meeting September 13th, 2016 Lincoln Village Pedestrian Bicycle Bridge Community Meeting September 13th, 2016 Purpose of the Meeting Introduce the project and the proposed improvements Review existing conditions Discuss the needs

More information

SCHEMATIC PACKAGE SHEET INDEX

SCHEMATIC PACKAGE SHEET INDEX SCHEMATIC PACKAGE SHEET INDEX GENERAL PLANS 0 COVER 0 DEMO PLANS 0 PHASING PLANS 04 PROPOSED FLOOR PLANS 05 PROPOSED ENLARGED ST FLOOR PLAN 06 PROPOSED ENLARGED ST FLOOR PLAN 07 PROPOSED ENLARGED ND FLOOR

More information

MINUTES DESIGN & REVIEW BOARD. September 8, 2015

MINUTES DESIGN & REVIEW BOARD. September 8, 2015 MINUTES DESIGN & REVIEW BOARD September 8, 2015 MEMBERS PRESENT: STAFF PRESENT: John Campbell, Keith Speirs, Dick Kinder, Louise Keating, Sandra Hull, Dick Deffenbaugh and Susan Bates Andrew Dutton I.

More information

635 Wilmer Ave. Orlando, Fl Ph Fx

635 Wilmer Ave. Orlando, Fl Ph Fx Where Function And Elegance Meet Under The Sun 635 Wilmer Ave. Orlando, Fl. 32808 Ph. 407.898.6001 Fx. 407.852.1313 www.theawningfactory.com info@theawningfactory.com DEDICATION For over 30 years, The

More information

FOR SALE OR LEASE. Industrial / Office / Warehouse Building. McCartney Cabinet Building 1330 Burlington, North Kansas City, Missouri

FOR SALE OR LEASE. Industrial / Office / Warehouse Building. McCartney Cabinet Building 1330 Burlington, North Kansas City, Missouri FOR SALE OR LEASE Industrial / Office / Warehouse Building McCartney Cabinet Building 40,000 sq ft, two-story, brick building 20,000 sq ft of office and 20,000 sq ft of warehouse Estimated Population 13,299

More information

gables station s dixie hwy & ponce de leon blvd coral gables, fl 33133

gables station s dixie hwy & ponce de leon blvd coral gables, fl 33133 Coral gables & SITE overview Gables Station is located in the beautiful city of Coral Gables, FL. The city is known for its tree-lined boulevards, ivy-covered mansions and historical landmarks such as

More information

Elevate your Environment Westlake.

Elevate your Environment Westlake. Elevate your Environment. 1101 Westlake. 1101 Westlake Lobby 1101 Westlake Lobby 1101 Westlake Views Fact Sheet BUILDING INFORMATION 1101 Westlake Avenue North Seattle, WA 98109 New Building: Completed

More information

SWAN CREEK VILLAGE HOMEOWNERS ASSOCIATION. P.O. Box Bountiful, UT

SWAN CREEK VILLAGE HOMEOWNERS ASSOCIATION. P.O. Box Bountiful, UT RV PARK REQUIREMENTS SWAN CREEK VILLAGE HOMEOWNERS ASSOCIATION P.O. Box 1188 Bountiful, UT 84011-118 The following RV Park requirements were voted on and approved by the Swan Creek Village HOA Board of

More information

PIONEER PARK. City of Des Peres Parks Master Plan. SWT Design 46 INTRODUCTION

PIONEER PARK. City of Des Peres Parks Master Plan. SWT Design 46 INTRODUCTION PIONEER PARK INTRODUCTION Pioneer Park is a 7 acre neighborhood park located east of Interstate 270 and south of Manchester Road along Tallie Road. The park is situated in a residential neighborhood with

More information

FLOOR PLANS. Georgia World Congress Center Centennial Olympic Park

FLOOR PLANS. Georgia World Congress Center Centennial Olympic Park FLOOR PLANS Georgia World Congress Center Centennial Olympic Park How can we accommodate you? Whether it s the right size room to excite your sales force about a new innovation or the perfect area to generate

More information

Development Agreement No. DA16-002

Development Agreement No. DA16-002 STAFF REPORT Planning Commission AGENDA ITEM NUMBER 5 MEETING DATE April 13, 2016 CASE NUMBER PROPERTY OWNER PROJECT PROPONENTS City of Buena Park as Successor Agency to the former Community Redevelopment

More information

CA CA CA CA CA CA CA CA CA CA Educational facilities - public elementary and high schools and private schools with a curriculum similar to public

CA CA CA CA CA CA CA CA CA CA Educational facilities - public elementary and high schools and private schools with a curriculum similar to public (Y = Permitted) TABLE A (CA = Contract Agreement) PERMITTED USES BY DISTRICT Agricultural Uses (Light) Farming & Livestock related activities Y Y Y Y Y Y Agricultural Uses (Heavy) Commercial Type Animal

More information

Greenville-Spartanburg International Airport RFP - Janitorial Services Contract Space Exhibits 8/22/17

Greenville-Spartanburg International Airport RFP - Janitorial Services Contract Space Exhibits 8/22/17 Greenville-Spartanburg International Airport RFP - Janitorial Services Contract Space Exhibits 8/22/17 1 Airline/Airport Use & Lease Agreement Greenville-Spartanburg International Airport Cost Center Boundaries

More information

Landscape Architect: Peter D Brandow, AIA, ASLA 1537 Monrovia Avenue Newport Beach, CA cell:

Landscape Architect: Peter D Brandow, AIA, ASLA 1537 Monrovia Avenue Newport Beach, CA cell: Project Site 3 Camino Capistrano Camino Capistrano Capistrano Adult School Acjachema St Mission Basilica San Juan Capistrano Mission Basilica School Legal Description: Lot : Lot Coverage: THAT PORTION

More information

ROSEVILLE INNOVATION PARK 8040 FOOTHILLS BOULEVARD, ROSEVILLE CA ±160,000 SQUARE FEET AVAILABLE

ROSEVILLE INNOVATION PARK 8040 FOOTHILLS BOULEVARD, ROSEVILLE CA ±160,000 SQUARE FEET AVAILABLE ROSEVILLE INNOVATION PARK 8040 FOOTHILLS BOULEVARD, ROSEVILLE CA ±160,000 SQUARE FEET AVAILABLE ROSEVILLE INNOVATION PARK As one of the premier submarkets in the Greater Sacramento region, Roseville offers

More information

FOR SALE Rare Mid-Town Location

FOR SALE Rare Mid-Town Location FOR SALE Rare Mid-Town Location 1590 Willamette Street, Eugene Oregon 1590 WILLAMETTE STREET 2 Rare Mid-Town Location Address 1590 Willamette Street Eugene, Oregon 97402 This Building is located on a high

More information

I-70/I-71 Project Public Meeting Presented By

I-70/I-71 Project Public Meeting Presented By I-70/I-71 Project Public Meeting Presented By Ohio Department of Transportation ms consultants, inc. engineers, architects, planners MSI Design June 9, 2010 W e l c o m e Thom Slack Planning Administrator,

More information

No 30 x 48 space is provided for a wheelchair under the picnic table.

No 30 x 48 space is provided for a wheelchair under the picnic table. ITEM: LLOYD PARK PICNIC TABLE ADA GUIDELINE: 305, 902.2 No 30 x 48 space is provided for a wheelchair under the picnic table. Remove one of the picnic table arms. Photo of Picnic Table on the bluff PARK:

More information

Trails, steps, & P-Patch to be south of I- 5 Colonnade

Trails, steps, & P-Patch to be south of I- 5 Colonnade UW Campus Trails, steps, & P-Patch to be south of I- 5 Colonnade Blaine and Howe Street steps REI N new lighting existing features connector trail new features or improvements overhead freeway and support

More information

PLAN COMMISSION VILLAGE OF DEERFIELD

PLAN COMMISSION VILLAGE OF DEERFIELD APPROVED PLAN COMMISSION VILLAGE OF DEERFIELD The Plan Commission of the Village of Deerfield held a Public Hearing Meeting at 7:30 P.M. on at the Village Hall, 850 Waukegan Road, Deerfield, Illinois.

More information

WEST ADDISON DEVELOPMENT

WEST ADDISON DEVELOPMENT 1111 W ADDISON ST N WILTON AVE N WILTON AVE W ADDISON ST 2 ST RK LA NC W EDDY ST N RACINE AVE N WILTON AVE N SHEFFIELD AVE ST SITE N SHEFFIELD AVE RK LA NC N RACINE AVE SITE LOCATION AND CONTEXT W WAVELAND

More information

PROJECT TEAM VICINITY PLAN NTS LOCATION PLANS NTS. Mark Petrella, A.I.A. Kimberly McCarron, NCARB

PROJECT TEAM VICINITY PLAN NTS LOCATION PLANS NTS. Mark Petrella, A.I.A. Kimberly McCarron, NCARB LOCATION PLAN RENDERING NTS 00 Atlantic Avenue Atlantic City, NJ 0840 07/4/07 CAFRA SUBMISSION COVER SHEET - RENDERING, LOCATION PLANS DRAWING INDEX & PROJECT TEAM 45 West 57th Street New York, NY 009

More information

City of Durango 5.8 FUNDING TRAILS DEVELOPMENT

City of Durango 5.8 FUNDING TRAILS DEVELOPMENT 5.8 FUNDING TRAILS DEVELOPMENT The City has been successful in establishing dedicated local funding sources as well as applying for grants to develop the City s trail system, having received nearly $2.4

More information

,271

,271 Reserve Analysis by Berrera and Company (January 2016) Page 1 Section I: Capital Reserve Funding - Estimated Cash Reserve Balances And Unfunded Liability: Effective 1/1/2019 Assumption Table: Interest

More information

CAPITAL PROGRAM SUMMARY

CAPITAL PROGRAM SUMMARY 2017 2018 CAPITAL PROGRAM SUMMARY MISC A 2017 NEIGHBOURHOOD REHABILITATION Pitt River Road - Mary Hill to Kingsway Victoria Drive - Toronto to Holtby Pooley Avenue - High Pressure Watermain Culvert Replacement

More information

change your view 200 South Wacker Drive Chicago, IL

change your view 200 South Wacker Drive Chicago, IL change your view 200 South Wacker Drive 200 South Wacker Drive offers superb views of the city and a unique central location on the banks of the Chicago River. Situated in the West Loop part of Chicago

More information

AND AND ALL OF SAID LANDS SITUATE, LYING AND BEING IN THE CITY OF HOLLYWOOD, BROWARD COUNTY, FLORIDA, CONTAINING 326,439 SQUARE FEET ( ACRES).

AND AND ALL OF SAID LANDS SITUATE, LYING AND BEING IN THE CITY OF HOLLYWOOD, BROWARD COUNTY, FLORIDA, CONTAINING 326,439 SQUARE FEET ( ACRES). PROPOSED DEALERSHIP AND FOR: 11 NORTH STATE ROAD, FLORIDA. 3301 INDEX OF DRAWINGS ARCHITECTURAL A-0 COVER SHEET SHEET 1 OF BOUNDARY AND TOPOGRAPHIC SURVEY SHEET OF BOUNDARY AND TOPOGRAPHIC SURVEY A-1.1

More information

2433 Dufferin Street Zoning By-law Amendment Application - Preliminary Report

2433 Dufferin Street Zoning By-law Amendment Application - Preliminary Report STAFF REPORT ACTION REQUIRED 2433 Dufferin Street Zoning By-law Amendment Application - Preliminary Report Date: July 22, 2014 To: From: Wards: Reference Number: North York Community Council Director,

More information

CIDNA&Resolution&Re.&Trammell&Crow&Company& April&9,&2014&Amended&

CIDNA&Resolution&Re.&Trammell&Crow&Company& April&9,&2014&Amended& CEDAR@ISLES@DEANNEIGHBORHOODASSOCIATION(CIDNA) RESOLUTION*NOT*TO*OPPOSE*THE*TRAMMELL*CROW*COMPANY*APARTMENTS* PROPOSED*AT*3118*WEST*LAKE*STREET* APRIL9,2014 1. WHEREASHighStreetResidential,awhollyownedsubsidiaryofTrammellCrow

More information

Claremont Project Background and Update Community Meeting September 11, 2017

Claremont Project Background and Update Community Meeting September 11, 2017 Claremont Project Background and Update Community Meeting September 11, 2017 Topics Project Background Claremont Segment Information Project Timeline Upcoming Discussion Items Upcoming Meetings Questions

More information

Chicago St. Louis High-Speed Rail. Enos Park Neighborhood Association May 13, 2014

Chicago St. Louis High-Speed Rail. Enos Park Neighborhood Association May 13, 2014 Chicago St. Louis High-Speed Rail Enos Park Neighborhood Association May 13, 2014 1 Illinois High-Speed Rail Program 2 Chicago-St. Louis Corridor» IDOT has actively developed the corridor since the mid1980

More information

CONFERENCES & EVENTS

CONFERENCES & EVENTS CONFERENCES & EVENTS LOADING DOCKS/ FREIGHT ELEVEARS Four-bay loading dock on Wabash Avenue. All cars support a maximum capacity of 20,000 lbs. BAY 1: Serviced by Car #28. Access from Wabash Avenue. Dimensions

More information

WHY MOVE YOUR BUSINESS TO HOLLYWOOD?

WHY MOVE YOUR BUSINESS TO HOLLYWOOD? WHY MOVE YOUR BUSINESS TO HOLLYWOOD? Close to international airport and seaport Centrally located in 3.5 million population No personal income tax Diverse labor force and talent pool Waterfront executive

More information

01. PRIMARY MONUMENT WAYFINDING, TYP. 03. RULES/REGULATIONS, INTERPRETIVE SIGN, TYP. PARK MAP, WAYFINDING

01. PRIMARY MONUMENT WAYFINDING, TYP. 03. RULES/REGULATIONS, INTERPRETIVE SIGN, TYP. PARK MAP, WAYFINDING Skateboard Park Picnic Area Reading Nest Story Tree and Fire Pit 5 River Access 6 Wetlands 7 Picnic Area YOU ARE HERE This park is open sunrise to sunset. 6 5 7 PARK ICON GREY CONCRETE SKATEABLE CAP WITH

More information

11101 NE 9th Street Bellevue, WA

11101 NE 9th Street Bellevue, WA 5 11101 NE 9th Street Bellevue, WA Urban life done right in downtown Bellevue Tap an underserved market In the midst of a bustling downtown setting, Alley111 offers access to a built-in, diverse customer

More information

NOTICE OF PUBLIC HEARING

NOTICE OF PUBLIC HEARING 1 Zoning Administrator NOTICE OF PUBLIC HEARING Planning and Building Service s Manager, or its designee BODY: Zoning Administrator DATE: Thursday, December 20, 2012 TIME: 2:30 pm (please see the agenda

More information

Historical Information Market Location

Historical Information Market Location ANDRES PROPERTIES Historical Information Market Location Lower Greenville is a neighborhood in east Dallas, west of Lakewood. Specifically, the neighborhood is the area adjacent to Greenville nue south

More information

Innerbelt Bridge Contract Group 2 Tremont / Towpath Trail and Gateway January 8, 2013

Innerbelt Bridge Contract Group 2 Tremont / Towpath Trail and Gateway January 8, 2013 Innerbelt Bridge Contract Group 2 Tremont / Towpath Trail and Gateway January 8, 2013 Cleveland Innerbelt Construction Schedule former schedule 2011 Winter Begin Construction Innerbelt CCG1 (WB Bridge)

More information

THE MOMENT YOUR MEETING FOUND A HOME

THE MOMENT YOUR MEETING FOUND A HOME THE MOMENT YOUR MEETING FOUND A HOME Fairmont Austin will be Austin s transcendent city center hotel, uniquely situated alongside Palm Park and Waller Creek and directly connected to the Austin Convention

More information

FLOORS 17, 18 & 19 NOW LET TO FLOORS 16 & 15 UNDER OFFER CROWN AGENTS BANK SUTTON 6,200 43,400 SQ FT OFFICES THE QUADRANT SUTTON SURREY SM2 5AS

FLOORS 17, 18 & 19 NOW LET TO FLOORS 16 & 15 UNDER OFFER CROWN AGENTS BANK SUTTON 6,200 43,400 SQ FT OFFICES THE QUADRANT SUTTON SURREY SM2 5AS FLOORS 17, 18 & 19 NOW LET TO CROWN AGENTS BANK FLOORS 16 & 15 UNDER OFFER 6,200 43,400 SQ FT OFFICES SUTTON THE QUADRANT SUTTON SURREY SM2 5AS QUADRANT HOUSE, HEADQUARTERS OFFICES 6,200 43,400 SQ FT Quadrant

More information

BRUNSWICK'S BOWLING 350 MCHENRY ROAD, BUFFALO GROVE, IL

BRUNSWICK'S BOWLING 350 MCHENRY ROAD, BUFFALO GROVE, IL EXHIBIT C 7 6 4 2 7 5 8 1 5 7 6 4 2 8 9 1 1 CULTURED STONE COLUMN BASE 4 NEW PORCELAIN TILE FINISH 7 NEW METAL SIDING 2 EXISTING PAINTED METAL STANDING SEAM ROOF 5 NEW LIGHT FIXTURES 8 NEW TRELLIS WITH

More information

THE HIGHPOINT East 7800 South. Sandy, Utah Fully Furnished & Move In Ready! Tenant Improvements Available to Suit

THE HIGHPOINT East 7800 South. Sandy, Utah Fully Furnished & Move In Ready! Tenant Improvements Available to Suit THE HIGHPOINT 1220 East 7800 South Sandy, Utah 84047 Fully Furnished & Move In Ready! Tenant Improvements Available to Suit 1 Property Overview Fully Furnished Modern Office Building Move In Ready Total

More information

3. COLTA / HUGA CONNECTIONS - PRELIMINARY

3. COLTA / HUGA CONNECTIONS - PRELIMINARY 9 3. COLTA / HUGA CONNECTIONS - PRELIMINARY 3.1 COLTA The Chain of Lakes Trail Association (COLTA) trail, formerly identified as the Chester Spur Line, was completed and opened for use in June 2011. The

More information

The Royal Atlantis. Hotel + Residences. Dubai, UAE

The Royal Atlantis. Hotel + Residences. Dubai, UAE The Royal Atlantis Hotel + Residences Dubai, UAE The Royal Atlantis New York, USA New York, USA The Royal Atlantis The Royal Atlantis The Royal Atlantis innovates on typical hotel and residential design

More information

NEW STADIUM LUXURY SUITES

NEW STADIUM LUXURY SUITES NEW STADIUM LUXURY SUITES BE A PART OF SAN FRANCISCO 49ERS HISTORY IMAGINE THE REACTION FROM YOUR CLIENTS AND PROSPECTS when you host them in your luxury suite in the most spectacular stadium in the world.

More information

Beyond the Door... Experience Artesia s Excitement..you are only a stone s throw away

Beyond the Door... Experience Artesia s Excitement..you are only a stone s throw away Beyond the Door... Beyond the Door... Canyonstone is the doorway to your new lifestyle in Southeastern New Mexico. The Southwest is quickly becoming one of the country s hottest tourist and relocation

More information

FOR LEASE TH AVENUE San Diego, CA 92101

FOR LEASE TH AVENUE San Diego, CA 92101 FOR LEASE 615 8 TH AVENUE San Diego, CA 92101 Property Highlights 2,900 SF basement space Located neath Bootlegger and Lucky D s Hostel Situated at the corner of 8 th Avenue and Street in San Diego s East

More information

Imagery 2017 Google, Map data 2017 Google Commercial Land with finished offsites

Imagery 2017 Google, Map data 2017 Google Commercial Land with finished offsites 6/7/2017 Google Maps Highway & Monterey Road, Gilroy, CA Gilroy, CA 5980 Travel Park Circle, Gilroy, CA ±1.87 Acres of Freeway Imagery 2017 Google, Map data 2017 Google Commercial Land with finished offsites

More information

COLLEGE STREET STUDY Community Consultation Meeting. December 2015

COLLEGE STREET STUDY Community Consultation Meeting. December 2015 COLLEGE STREET STUDY Community Consultation Meeting December 2015 2 Agenda 6:30 pm Introductions, Agenda Review and Welcome 6:40 pm Presentation Planning Recommendations 7:30 pm Questions and Discussion

More information

Schedule of Finishes - Internal. South (Memorial Drive) Building - Memorial Drive Apartments Typical Apartments

Schedule of Finishes - Internal. South (Memorial Drive) Building - Memorial Drive Apartments Typical Apartments Schedule of Finishes - Internal South (Memorial Drive) Building - Memorial Drive Apartments Typical Apartments Memorial Drive Apartments GENERAL Electrical Hot Water Instantaneous Electric Garbage Removal

More information

DRAFT TH AVE NE URBAN DESIGN MERIT PRESENTATION DPD# NOVEMBER 2017

DRAFT TH AVE NE URBAN DESIGN MERIT PRESENTATION DPD# NOVEMBER 2017 DRAFT 11.08.17 4801 24TH AVE NE URBAN DESIGN MERIT PRESENTATION 17-002 DPD#3027312 16 NOVEMBER 2017 PROJECT BACKGROUND URBAN DESIGN ANALYSIS VACATION / NO-VACATION COMPARISON URBAN DESIGN MERIT INTRODUCTION

More information