1 Boston Redevelopment Authority 2/26/2014 Cassidy Playground Waterworks

2 Design revisions made since the DPIR submission March 2013 Massing - Reduced project 16,030 SF, for a total project area of 218,520 SF - Reconfigured massing plan to significantly shorten the building. (-170 less than existing Cinema) - Increased size of Courtyard and reconfigured traffic flow to mitigate possible congestion. - Changed residential structural system from wood frame to concrete/steel. Office Space - Eliminated all office space (18,000 SF) Hotel - Reduced room count from 196 to Hotel building now fronts Chestnut Hill Ave and has visibility from Cleveland Circle - Relocated pool & fitness to less public location along park and hotel meetings rooms to the 1 st floor at park edge.

3 Design revisions made since the DPIR submission March 2013 (cont.) Residential - Unit count increased from 74 to 92 units, 5% 3BR, 47% 2BR, 48% 1 BR, and 11 Affordable units - Units designed as condominium quality - Building setback at top floor with resident common roof terrace - Introduced balconies along park edge - Lessened overall shadow impacts on the park Retail - Provided for increased visual presence of corner restaurant - Introduced a raised dining area at park edge, and relocated restaurant entry from corner Traffic - Traffic reductions 21.7% reduction in daily trips and +/- 29% reduction in peak hour trips. - Developed plan to mitigate traffic impact on Cleveland Circle and improve traffic flow over the current conditions. - Developed plan to utilize only 10% of Waterworks Driveway capacity in peak hours of use at a LOS C/D threshold. Total capacity use including existing Waterworks traffic will be 19% to 35%..

4 Project Program Site Area +/-2.5 Acres Hotel Residential 162 Rooms 92 Units Retail +/-14,000 SF ** Total hotel room count has been reduced from 196 rooms to 162 rooms Parking 187 Spaces (95 at grade, 92 in garage)

5 .

6 Cassidy Playground Waterworks Site Area

7 Cassidy Playground Cassidy Playground Waterworks Waterworks Ground Floor Site Plan

8 Cassidy Playground Waterworks Birds Eye View from Cleveland Circle

9 Cassidy Playground Waterworks Birds Eye View from Park

10 FENCE PARKING GATE CAB STAND Site Plan showing Parking & Access

11 RESIDENTIAL ENTRY BOSTON CAB STAND Cassidy Playground HOTEL ENTRY BROOKLINE CAB STAND Waterworks RETAIL PARKING Enlarged Courtyard Plan

12 Cassidy Playground Waterworks Birds Eye View Site from Plan Water showing Works Waterworks 5 Story Hotel Exit Driveway & Proposed signage

13 Ground Floor Plan

14 Basement Floor Plan

15 Typical Floor Plan

16 Hotel Roof 6 th Floor Plan (Residential)

17 Roof Outline of existing Cinema Reduced in length by compared to Cinema Existing Cinema Comparison

18 Existing Conditions along Chestnut Hill Avenue

19 View From Cleveland Circle

20 Existing Conditions along Cassidy Park

21 Detail View of Restaurant From Cassidy Park

22 Proposed Park Sidewalk and Landscape Improvements Restaurant Dining Terrace Building/ Park Edge

23 Existing Conditions along the D Line

24 View from Chestnut Hill Avenue along the D Line

25 Elevation View From Chestnut Hill Ave

26 3 Streetscape along Chestnut Hill Ave

27 Courtyard Overview

28 View at Courtyard

29 View from Vestibule of Hotel

30 7/17/2013 Site Section through Hotel Parking Area Along Park

31 Transportation and Infrastructure Improvements Cassidy Playground Waterworks

32 Traffic & Offsite Improvements Transportation Study Comprehensive Study 12 intersections, Pedestrians, Bicycles, Passenger Vehicles Cassidy Playground Detailed Courtyard Design to Accommodate All Users Parking Demand/Supply Analysis Program Reduced from DPIR 18,000 sf Medical Office Removed 34 Hotel Rooms Removed Reduced Traffic and Parking Impacts (29% fewer Peak Hour Trips) Reviewed BTD Planning BETA Engineering

33 Traffic & Offsite Improvements Transportation Improvements Cleveland Circle Infrastructure All New Traffic Signal Equipment Cassidy Playground Audible Pedestrian Signal System Install Bike Lanes and Signage ADA/MAAB Accessible Wheelchair Ramps Additional Signage/Equipment at Rear Exit for Added Safety New Pedestrian Crossing at MBTA Entrance Traffic Operations Improvements Concurrent Pedestrian Phase Significantly Improves Operations Morning and Evening Peak Hours Improved from LOS F to LOS D Coordination with MBTA to Reduce Trolley Conflicts

34 Cassidy Playground Waterworks Driveway: AM peak traffic: 34.7% of max. Capacity * PM peak traffic: 18.5% of max. Capacity * *includes traffic from Waterworks Development

35 Cassidy Playground

36 Traffic & Offsite Improvements Cassidy Playground

37 Traffic & Offsite Improvements Cassidy Playground

38 End Cassidy Playground Waterworks

Lake Erie Commerce Center Traffic Analysis

Lake Erie Commerce Center Traffic Analysis LOCATION: East of NYS Route 5 at Bayview Road Town of Hamburg Erie County, New York PREPARED BY: Wendel Companies 140 John James Audubon Parkway Suite 200 Amherst, New York 14228 January 2012 i ii Table

More information

MONTGOMERY COUNTY PLANNING DEPARTMENT THE MARYLAND-NATIONAL CAPITAL PARK AND PLANNING COMMISSION

MONTGOMERY COUNTY PLANNING DEPARTMENT THE MARYLAND-NATIONAL CAPITAL PARK AND PLANNING COMMISSION MONTGOMERY COUNTY PLANNING DEPARTMENT THE MARYLAND-NATIONAL CAPITAL PARK AND PLANNING COMMISSION MCPB Item No. Date: 6/23/2016 Lucy V. Barnsley Elementary School Addition, Mandatory Referral MR2016027

More information

Cambridge Avenue. Cleveland Avenue. Chicago Avenue. Chicago Avenue. Curbed planters with groundcover,

Cambridge Avenue. Cleveland Avenue. Chicago Avenue. Chicago Avenue. Curbed planters with groundcover, THE HUDSON 1'-8" 1'-8" 4'-0"4'-3 4'-0"4'-3 1/2" 1/2" Street Street trees trees in in tree tree grates grates along along Kingsbury Kingsbury Street Street - - 3" 3" caliper caliper shade shade trees trees

More information

SK 1.0 SITE STATISTICS PRELIMINARY DOCUMENTS. PROPOSED APARTMENT BUILDING 115 & 117 ERB STREET EAST Waterloo, Ontario PROJECT: DATE: REFERENCE: -

SK 1.0 SITE STATISTICS PRELIMINARY DOCUMENTS. PROPOSED APARTMENT BUILDING 115 & 117 ERB STREET EAST Waterloo, Ontario PROJECT: DATE: REFERENCE: - SITE STATISTICS SCALE: N.T.S. SK 1.0 2442 PROPOSED APARTMENT BUILDING ERB STREET EAST R6000 R3000 BEFORE ROAD WIDENING AFTER ROAD WIDENING LANDSCAPED AREA T 4216 5000 5.0m MIN. FRONT YARD SETBACK (BY-LAW

More information

A. CONCLUSIONS OF THE FGEIS

A. CONCLUSIONS OF THE FGEIS Chapter 11: Traffic and Parking A. CONCLUSIONS OF THE FGEIS The FGEIS found that the Approved Plan will generate a substantial volume of vehicular and pedestrian activity, including an estimated 1,300

More information

Madison Metro Transit System

Madison Metro Transit System Madison Metro Transit System 1101 East Washington Avenue Madison, Wisconsin, 53703 Administrative Office: 608 266 4904 Fax: 608 267 8778 TO: FROM: SUBJECT: Plan Commission Timothy Sobota, Transit Planner,

More information

BOSTON, MA 171 TREMONT IMPACT ADVISORY GROUP 5/19/16

BOSTON, MA 171 TREMONT IMPACT ADVISORY GROUP 5/19/16 BOSTON, MA 171 TREMONT IMPACT ADVISORY GROUP 5/19/16 171 Tremont will continue the transformation of Downtown Crossing into a revitalized neighborhood where all Bostonians can live, work, and play. 171

More information

Honorable Members of the Mobility Solutions, Infrastructure and Sustainability Committee

Honorable Members of the Mobility Solutions, Infrastructure and Sustainability Committee Memorandum DATE August 10, 2018 CITY OF DALLAS TO Honorable Members of the Mobility Solutions, Infrastructure and Sustainability Committee SUBJECT Dallas Love Field Master Plan Update On Monday, August

More information

Fort Myers Downtown & Riverfront Redevelopment

Fort Myers Downtown & Riverfront Redevelopment Fort Myers Downtown & Riverfront Redevelopment Brought to you by the Fort Myers Community Redevelopment Agency (CRA) Fort Myers Community Redevelopment Agency The Fort Myers Community Redevelopment Agency

More information

7272 WISCONSIN AVENUE LOCAL AREA TRANSPORTATION REVIEW

7272 WISCONSIN AVENUE LOCAL AREA TRANSPORTATION REVIEW 7272 LOCAL AREA TRANSPORTATION REVIEW AND TRANSPORTATION POLICY AREA REVIEW MONTGOMERY COUNTY, MARYLAND Submitted on behalf of Carr Properties Prepared by: Wells + Associates, Inc. Submission: July 1,

More information

A BOAT RAMP TO NOWHERE

A BOAT RAMP TO NOWHERE A BOAT RAMP TO NOWHERE A PROPOSAL FOR ACCESS TO HARVIE PASSAGE A Presentation to the City of Calgary December 2017 Presented by: Peter Crowe-Swords Bow River Trout Foundation Background: The Bow River

More information

DRAFT TH AVE NE URBAN DESIGN MERIT PRESENTATION DPD# NOVEMBER 2017

DRAFT TH AVE NE URBAN DESIGN MERIT PRESENTATION DPD# NOVEMBER 2017 DRAFT 11.08.17 4801 24TH AVE NE URBAN DESIGN MERIT PRESENTATION 17-002 DPD#3027312 16 NOVEMBER 2017 PROJECT BACKGROUND URBAN DESIGN ANALYSIS VACATION / NO-VACATION COMPARISON URBAN DESIGN MERIT INTRODUCTION

More information

MOSCONE EXPANSION PROJECT Yerba Buena Alliance PRESENTATION FEBRUARY 06, 2014

MOSCONE EXPANSION PROJECT Yerba Buena Alliance PRESENTATION FEBRUARY 06, 2014 MOSCONE EXPANSION PROJECT Yerba Buena Alliance PRESENTATION FEBRUARY 06, 2014 MOSCONE EXPANSION PROJECT OBJECTIVES Expand the contiguous exhibition space increasing the quantity of highly flexible meeting

More information

N. Central St. & W. Jackson Ave. Streetscape Projects

N. Central St. & W. Jackson Ave. Streetscape Projects N. Central St. & W. Jackson Ave. Streetscape Projects October 13, 2016 Meeting Overview North Central Street City of Knoxville KUB History & Vision Plan Timing Project Area Overview Schedule Communications

More information

VI. ALTERNATIVES TO THE MASTER PLAN C. RENOVATED EAST BUILDING ALTERNATIVE

VI. ALTERNATIVES TO THE MASTER PLAN C. RENOVATED EAST BUILDING ALTERNATIVE VI. ALTERNATIVES TO THE MASTER PLAN C. RENOVATED EAST BUILDING ALTERNATIVE INTRODUCTION The Renovated East Building Alternative would include the continued use of the renovated West Building and the renovation

More information

Transportation Supporting Dulles Airport

Transportation Supporting Dulles Airport Transportation Supporting Dulles Airport Committee for Dulles Economic Development and Transportation Committee July 12, 2018 Tom Biesiadny, Director Fairfax County Multiple Transportation Improvements

More information

Former Middle School Site Green Space & Brecksville Road Streetscape. March 27, 2018

Former Middle School Site Green Space & Brecksville Road Streetscape. March 27, 2018 Former Middle School Site Green Space & Brecksville Road Streetscape March 27, 2018 Brecksville Streetscape & Downtown Greenspace Project Schedule City of Indepenence 2017 2018 Meeting Schedule Tasks/Deliverables

More information

IL 390 Station. Wood Dale Open House Summary 5/18/17

IL 390 Station. Wood Dale Open House Summary 5/18/17 Wood Dale Open House Summary 5/18/17 The first public open house for the Wood Dale Comprehensive Plan took place on May 18 th, 2017. The program was conducted as a fun community event and there were 216

More information

Clackamas County Development Agency

Clackamas County Development Agency Clackamas County Development Agency Development Services Building, 150 Beavercreek Rd., Oregon City, OR 97045 www.clackamas.us/transportation/renewal 503-742-4323 The Clackamas County Board of Commissioners

More information

LUDWIG RD. SUBDIVISION PROJECT TRAFFIC IMPACT ANALYSIS

LUDWIG RD. SUBDIVISION PROJECT TRAFFIC IMPACT ANALYSIS LUDWIG RD. SUBDIVISION PROJECT TRAFFIC IMPACT ANALYSIS Prepared for Skip Coddington GSC Development, Inc PO Box 1623 Woodinville WA 9872 Prepared by 1141 NE 124 th St., #59 Kirkland, WA 9834 425.522.4118

More information

Georgetown-Lewes Rail/Trail Study. Rail/Trail Study: Cool Spring to Cape Henlopen State Park New Road Extension (House Resolution No.

Georgetown-Lewes Rail/Trail Study. Rail/Trail Study: Cool Spring to Cape Henlopen State Park New Road Extension (House Resolution No. Georgetown-Lewes Rail/Trail Study Rail/Trail Study: Cool Spring to Cape Henlopen State Park New Road Extension (House Resolution No. 47) August 22, 2011 Presentation Outline Background Benefits Statewide

More information

Trails, steps, & P-Patch to be south of I- 5 Colonnade

Trails, steps, & P-Patch to be south of I- 5 Colonnade UW Campus Trails, steps, & P-Patch to be south of I- 5 Colonnade Blaine and Howe Street steps REI N new lighting existing features connector trail new features or improvements overhead freeway and support

More information

7393 EL CAJON BLVD. LA MESA, CALIFORNIA 7393 El Cajon Blvd, La Mesa, CA 91942

7393 EL CAJON BLVD. LA MESA, CALIFORNIA 7393 El Cajon Blvd, La Mesa, CA 91942 PROPERTY OVERVIEW KW Commercial is pleased to present 7393 El Cajon Blvd, a single parcel, 12,197 square foot development opportunity located in La Mesa, California. Property is central to La Mesa's commercial

More information

Second Avenue: Union Street to Lenora Street, Condominium Owners c/o Michael McQuaid 1521 Second Avenue Seattle, WA 98101

Second Avenue: Union Street to Lenora Street, Condominium Owners c/o Michael McQuaid 1521 Second Avenue Seattle, WA 98101 Second Avenue: Union Street to Lenora Street, Condominium Owners c/o Michael McQuaid 1521 Second Avenue Seattle, WA 98101 Subject: New Development - Cumulative Downtown Alley Traffic Congestion and Safety

More information

RESORT AREA STRATEGIC ACTION PLAN (RASAP) STEERING COMMITTEE MEETING - APRIL 3, 2019

RESORT AREA STRATEGIC ACTION PLAN (RASAP) STEERING COMMITTEE MEETING - APRIL 3, 2019 RESORT AREA STRATEGIC ACTION PLAN (RASAP) STEERING COMMITTEE MEETING - APRIL 3, 2019 Welcome & Introductions - Deb Zywna AGENDA FY 20 Resort CIP Proposed Projects - Kathy Warren ORDFBC Design Guidelines

More information

NOTICE OF OPPORTUNITY FOR PUBLIC COMMENT RELATED TO PASSENGER FACILITY CHARGE Posted March 25, 2019

NOTICE OF OPPORTUNITY FOR PUBLIC COMMENT RELATED TO PASSENGER FACILITY CHARGE Posted March 25, 2019 NOTICE OF OPPORTUNITY FOR PUBLIC COMMENT RELATED TO PASSENGER FACILITY CHARGE Posted March 25, 2019 The City of Atlanta is providing an opportunity for public comment until April 25, 2019 related to the

More information

Community Advisory Panel Meeting #

Community Advisory Panel Meeting # Community Advisory Panel Meeting # 6 02.13.19.. Agenda Welcome and Introductions Community Conversations City Council Meeting Debrief Review Citywide Tunnel Video (North Portal Only) Churchill Pedestrian

More information

WHY MOVE YOUR BUSINESS TO HOLLYWOOD?

WHY MOVE YOUR BUSINESS TO HOLLYWOOD? WHY MOVE YOUR BUSINESS TO HOLLYWOOD? Close to international airport and seaport Centrally located in 3.5 million population No personal income tax Diverse labor force and talent pool Waterfront executive

More information

FLORIDA S HOLLYWOOD BEACH AND DOWNTOWN BUSINESS AND REDEVELOPMENT OPPORTUNITIES CAPITAL IMPROVEMENT PLAN

FLORIDA S HOLLYWOOD BEACH AND DOWNTOWN BUSINESS AND REDEVELOPMENT OPPORTUNITIES CAPITAL IMPROVEMENT PLAN FLORIDA S HOLLYWOOD BEACH AND DOWNTOWN BUSINESS AND REDEVELOPMENT OPPORTUNITIES CAPITAL IMPROVEMENT PLAN 2015-2019 WHY MOVE YOUR BUSINESS TO HOLLYWOOD? Close to international airport and seaport Centrally

More information

Appendix 4.1 L. No-Build Project Descriptions

Appendix 4.1 L. No-Build Project Descriptions Appendix 4.1 L No-Build Project Descriptions No-Build Projects New Bedford A new traffic signal system was installed and activated in early 2009 at the intersection of King s Highway and Mount Pleasant

More information

Route 141 and I-44 Design-Build Project Community Involvement Group. March 21, 2016

Route 141 and I-44 Design-Build Project Community Involvement Group. March 21, 2016 Route 141 and I-44 Design-Build Project Community Involvement Group March 21, 2016 Purpose of CIG 1. Share information with major stakeholders 2. Keep stakeholders informed of the process 3. Reduce uncertainty

More information

HEARST GARDENS BERKELEY, CA 94702

HEARST GARDENS BERKELEY, CA 94702 APPLICANT: RHOADES PLANNING GROUP 1611 TELEGRAPH AVE. SUITE 200 OAKLAND, CA 94612 [510] 545-4341 PROJECT: BERKELEY, CA 94702 ARCHITECT: DEVI DUTTA-CHOUDHURY, AIA DEVI DUTTA ARCHITECTURE INC. 1958A UNIVERSITY

More information

25 th Avenue Grade Separation. September 13, 2017

25 th Avenue Grade Separation. September 13, 2017 25 th Avenue Grade Separation September 13, 2017 Agenda I. Overview II. III. IV. Project Description Project Benefits Project Construction V. Next Steps VI. Questions 2 Overview Project Location 4 E. 25

More information

IN THE HEART OF IT ALL

IN THE HEART OF IT ALL IN THE HEART OF IT ALL A N E W N E I G H BO R H O O D AWA I T S THE OPPORTUNITY As exclusive listing agent, Transwestern Consulting Group ( TCG ) and HFF are pleased to offer for sale Widett Circle, a

More information

Pedestrian Safety Review Spadina Avenue

Pedestrian Safety Review Spadina Avenue STAFF REPORT ACTION REQUIRED Pedestrian Safety Review Spadina Avenue Date: October 13, 2015 To: Toronto and East York Community Council From: Director, Transportation Services, Toronto and East York District

More information

Public Information Center August 12, 2010

Public Information Center August 12, 2010 Route 52 Causeway Bridge Replacement & Somers Point Circle Elimination Project Somers Point Atlantic County Public Information Center August 12, 2010 Ocean City Cape May County Presentation Overview General

More information

MassDOT Turnpike Air Rights Parcels CAC Working Meeting #25

MassDOT Turnpike Air Rights Parcels CAC Working Meeting #25 MassDOT Turnpike Air Rights Parcels 12-15 CAC Working Meeting #25 Wednesday, April 4, 2018, 6:00 p.m. Location: Saint Cecilia s Parish Hall CAC Attendees: Fritz Casselman, Neighborhood Association of the

More information

Memorandum / Letter of Intent

Memorandum / Letter of Intent VERONA WAUKESHA KENOSHA APPLETON WESTON Memorandum / Letter of Intent To: Adam Sayre, Director of Planning & Development, City of Verona From: Kevin Yeska, JSD Professional Services, Inc. www.jsdinc.com

More information

Construction Staging Adelaide Street West

Construction Staging Adelaide Street West REPORT FOR ACTION Construction Staging Adelaide Street West Date: October 6, 2016 To: Toronto and East York Community Council From: Acting Director, Transportation Services, Toronto and East York District

More information

Calgary River Access Strategy Priority Sites and Proposed Funding

Calgary River Access Strategy Priority Sites and Proposed Funding Calgary River Access Strategy Priority Sites and Proposed Funding CPS2017-0103 ATTACHMENT 2 A total of $7,660,000 (Class 5 estimate) is required to implement all sites within the Calgary River Access Strategy;

More information

Proposed Bicycle Lanes on Yonge Street from Queens Quay to Front Street

Proposed Bicycle Lanes on Yonge Street from Queens Quay to Front Street STAFF REPORT ACTION REQUIRED Proposed Bicycle Lanes on Yonge Street from Queens Quay to Front Street Date: March 12, 2007 To: From: Toronto and East York Community Council Director, Transportation Infrastructure

More information

THE MISSION. A PUBLIC PROCESS FROM BEGINNING TO END.

THE MISSION. A PUBLIC PROCESS FROM BEGINNING TO END. THE MISSION. A PUBLIC PROCESS FROM BEGINNING TO END. URBAN DESIGN PRINCIPLES. QUALCOMM STADIUM SITE. I-5 805 15 I-8 DEVELOPMENT PATTERNS. I-5 805 I-I5 I-8 EMBRACE THE RIVER AND PARK SYSTEM. FROM THE MOUNTAINS

More information

377 Spadina Rd & 17 Montclair Ave Zoning Amendment Application Final Report

377 Spadina Rd & 17 Montclair Ave Zoning Amendment Application Final Report STAFF REPORT ACTION REQUIRED 377 Spadina Rd & 17 Montclair Ave Zoning Amendment Application Final Report Date: September 14, 2016 To: From: Wards: Reference Number: Toronto and East York Community Council

More information

Southlake Villas Development

Southlake Villas Development Southlake Villas Development Visit our website at www.castledevgroup.com 1 TABLE OF CONTENTS PROPERTY DEVELOPMENT SUMMARY DEVELOPMENT SUMMARY... 3-4 PROPERTY DESCRIPTION AERIAL... 5 BIRD S EYE VIEW...

More information

Spadina Avenue Built Form Study Preliminary Report

Spadina Avenue Built Form Study Preliminary Report STAFF REPORT ACTION REQUIRED Spadina Avenue Built Form Study Preliminary Report Date: July 9, 2014 To: From: Wards: Reference Number: Toronto and East York Community Council Director, Community Planning,

More information

URBAN DESIGN REPORT. Proposed Residential Development, Old Church Road, Caledon East

URBAN DESIGN REPORT. Proposed Residential Development, Old Church Road, Caledon East Proposed Residential Development, Old Church Road, Caledon East TABLE CONTENTS: 1.0 DEVELOPMENT 1.1 Introduction-Analysis of Guiding Principles and Documents 1.2 Community Design and Architectural Design

More information

CONTENTS. 1 Introduction Always Moving Forward while Building on the Past A Dynamic Destination... 5

CONTENTS. 1 Introduction Always Moving Forward while Building on the Past A Dynamic Destination... 5 2010 STRUCTURE PLAN - 2 - CONTENTS 1 Introduction... 5 1.1 Always Moving Forward while Building on the Past... 5 1.2 A Dynamic Destination... 5 2 Map A... 6 Exhibition Place and its Neighbours... 7 3 Demonstration

More information

Longmont to Boulder Regional Trail Jay Road Connection DRAFT FINAL REPORT

Longmont to Boulder Regional Trail Jay Road Connection DRAFT FINAL REPORT Longmont to Boulder Regional Trail Jay Road Connection DRAFT FINAL REPORT December 2018 Project Summary Boulder County, Colorado, in partnership with the City of Boulder, is evaluating options for multi-use

More information

BEACH & DOWNTOWN VisiTOr MAp & GuiDE Revised July 2017

BEACH & DOWNTOWN VisiTOr MAp & GuiDE Revised July 2017 BEACH & DOWNTOWN Visitor Map & Guide Revised July 2017 How to get here DRIVING DIRECTIONS From North Take Interstate 95 South to Exit 20 Turn left onto Hollywood Boulevard (east) Proceed east 2 miles to

More information

Major Projects Overview

Major Projects Overview Major Projects Overview Miami-Dade Expressway Authority February 2018 About MDX MDX operates 5 roads in Miami Dade County SR 924, SR 112, SR 836, SR 874 and SR 878 MDX Primary Source of Revenue: User Fees-Tolls

More information

Meeting Notes Public Open House

Meeting Notes Public Open House Meeting Notes Public Open House, 5:30-8:00 pm Fairbanks Pipeline Training Center, 3605 Cartwright Court, Fairbanks, Alaska= Agenda: Open House: 30 minutes Presentation: 45 minutes Question and Answers:

More information

Pegasus Building 2 / BMW

Pegasus Building 2 / BMW 2 / BMW BMW South Africa Presentation 2014.03.17 Sheer Driving Pleasure ents cont LOCALITY Menlyn Maine is situated in the heart of Pretoria s eastern suburbs and is ideally located to make full usage

More information

Bonita to Bridgeport January 24, 2019

Bonita to Bridgeport January 24, 2019 Thank you for participating 6:00-6:05 Welcome 6:05-6:55 Presentation; clarifying questions 7:00-7:30 Talk with staff; write comments Concerns with Locally Preferred Alternative (LPA) route between Bonita

More information

RETAIL SPACE AVAILABLE Corner of 12th Street and Imjin ± 8,213 (Divisible) to ± 10,710 SF

RETAIL SPACE AVAILABLE Corner of 12th Street and Imjin ± 8,213 (Divisible) to ± 10,710 SF RETAIL SPACE AVAILABLE 2nd Avenue RETAIL SPACE AVAILABLE!+,,-+&,+"#. /)01+(+2!"#$%$#&'()*+ 3"04 #$12 3+"3$4+ Light Fighter Drive THE DUNES PHASE II RETAIL Highway 1 THE DUNES REGIONAL CENTER Imjin Parkway

More information

Downtown to Defiance Trolley Key Messages Jan. 2017

Downtown to Defiance Trolley Key Messages Jan. 2017 Downtown to Defiance Trolley Key Messages Jan. 2017 Overarching Messages This is a demonstration (pilot) project for one summer. We will evaluate how it went to see if we can offer it again in the future.

More information

4. Proposed Transit Improvements

4. Proposed Transit Improvements 4. Proposed Transit Improvements The following proposed transit improvements have been assembled based on input received from the community meetings and from review and coordination with the TAC as well

More information

TREASURE ISLAND AND YERBA BUENA ISLAND Treasure Island Development Authority Board. April 8, 2015

TREASURE ISLAND AND YERBA BUENA ISLAND Treasure Island Development Authority Board. April 8, 2015 TREASURE ISLAND AND YERBA BUENA ISLAND Treasure Island Development Authority Board April 8, 2015 AGENDA Ongoing Engineering & Design Activities Upcoming Construction Activities TREASURE ISLAND TIDA Board

More information

City of Rolling Hills INCORPORATED JANUARY 24, 1957

City of Rolling Hills INCORPORATED JANUARY 24, 1957 City of Rolling Hills INCORPORATED JANUARY 24, 1957 NO. 2 PORTUGUESE BEND ROAD ROLLING HILLS, CA 90274 (310) 377-1521 FAX (310) 377-7288 INSTRUCTIONS FOR COMPLETION OF THE LOT COVERAGE FORMS TOTAL STRUCTURES

More information

MOSCONE EXPANSION PROJECT PUBLIC MEETING 2 OCTOBER 16, 2013

MOSCONE EXPANSION PROJECT PUBLIC MEETING 2 OCTOBER 16, 2013 MOSCONE EXPANSION PROJECT PUBLIC MEETING 2 OCTOBER 16, 2013 WHY EXPAND MOSCONE? Moscone Center is at capacity Clients are demanding additional contiguous exhibition space The center is San Francisco s

More information

LESLIE BARNS & CONNECTION TRACK. Project Update Construction and Traffic Management Consultation

LESLIE BARNS & CONNECTION TRACK. Project Update Construction and Traffic Management Consultation LESLIE BARNS & CONNECTION TRACK Project Update Construction and Traffic Management Consultation PRESENTATION SUMMARY Part 1 Brief Project Update (New Streetcars & Streetscape Improvements) Part 2 Construction

More information

King s College Upland Road Wing and Learning Centre Extension

King s College Upland Road Wing and Learning Centre Extension Project: King s College Upland Road Wing and Learning Centre Extension Consideration: King s College is seeking to commence the first stage of its 10-year master plan. The first stage project includes

More information

%g 109 %g 9. %g 99. %g 9. %g 4. %g 4 %g ,95 (/ 1. Route 109 Corridor Study. %g 35. Corridor Study Area Study Area. Sanford.

%g 109 %g 9. %g 99. %g 9. %g 4. %g 4 %g ,95 (/ 1. Route 109 Corridor Study. %g 35. Corridor Study Area Study Area. Sanford. %g 4A %g 109 %g 4 Sanford %g 4 %g 109 %g 99 North Berwick Wells 3 0 3 Miles Route 109 Corridor Study %g 9 %g 109 %g 9A %g9a %g 9 Kennebunk.-,95 W N S E EXIT 2 MEETING HOUSE RD BRAGDO N RD 20 2 %g1 1 (/

More information

Welcome. Welcome to our public exhibition which explains our proposed changes to the Brentford Community Stadium development, at Lionel Road South.

Welcome. Welcome to our public exhibition which explains our proposed changes to the Brentford Community Stadium development, at Lionel Road South. Welcome Recent aerial view of the site with Griffin Park, the existing stadium, in the background. Welcome to our public exhibition which explains our proposed changes to the Brentford Community Stadium

More information

SWEDISH FIRST HILL MEDICAL CENTER

SWEDISH FIRST HILL MEDICAL CENTER SWEDISH FIRST HILL MEDICAL CENTER BLOCK 95 ALLEY VACATION / URBAN DESIGN MERIT JULY 16, 2015 CONTENTS INTRODUCTION NEIGHBORHOOD CONTEXT EXISTING CONDITIONS DESIGN COMPARISON 2 07 / INTRODUCTION 3 PROJECTS

More information

BUSINESS OF THE CITY COUNCIL CITY OF MERCER ISLAND, WA

BUSINESS OF THE CITY COUNCIL CITY OF MERCER ISLAND, WA BUSINESS OF THE CITY COUNCIL CITY OF MERCER ISLAND, WA December 1, 2008 Public Hearing TOWN CENTER PARKING TIME LIMITS (FIRST READING) Proposed Council Action: Conduct public hearing and first reading

More information

This submission strongly objects to the following aspects of the proposed development:

This submission strongly objects to the following aspects of the proposed development: 1 May 2017 Ms Bridget McNamara Senior Planner City of Sydney Council GPO Box 1591 Sydney NSW 2001 Dear Ms McNamara, DA/2017/349 SUBMISSION FOR STATE SIGNIFICANT DEVELOPMENT APPLICATION FOR STAGE 1 CONCEPT

More information

SANTA MONICA AIRPORT VISIONING PROCESS: PHASE III FINDINGS AND NEXT STEP RECOMMENDATIONS APRIL 30, 2013

SANTA MONICA AIRPORT VISIONING PROCESS: PHASE III FINDINGS AND NEXT STEP RECOMMENDATIONS APRIL 30, 2013 SANTA MONICA AIRPORT VISIONING PROCESS: PHASE III FINDINGS AND NEXT STEP RECOMMENDATIONS APRIL 30, 2013 Visioning Process: Overview SMO in 1917 (Cloverfield) Grass Landing Strip WWI Pilot Training Visioning

More information

Site Location and Setting

Site Location and Setting Memorandum Date: To: From: Subject: Kristy Le, Gary Black Steve Orem Santa Teresa County Park Historic Area Traffic and Parking Study Hexagon Transportation Consultants, Inc. has completed a traffic and

More information

Marymount University Ballston Center Redevelopment

Marymount University Ballston Center Redevelopment Marymount University Ballston Center Redevelopment October 28, 2013 SPRC #5 Team Owners: Academic Office Architect: Residential Architect: Land Use Counsel: Civil Engineer: Landscape Architect: Traffic

More information

Add-A-Lane Contract V. along a Section of I-95 includes 6 Bridges

Add-A-Lane Contract V. along a Section of I-95 includes 6 Bridges Newton Needham Chamber of Commerce Add-A-Lane Contract V along a Section of I-95 includes 6 Bridges Project File No. 603711 July 29, 2014 1 Agenda Project Update Overview Bid and Contract Award Schedule

More information

Transportation TRANSPORTATION PROJECTS

Transportation TRANSPORTATION PROJECTS Transportation TRANSPORTATION PROJECTS Balls Ford Road Interchange Total Project Cost $142.9M This project includes the construction of a new diverging diamond interchange at Route 234 Bypass (Prince William

More information

FINCH HYDRO CORRIDOR TRAIL PROJECT

FINCH HYDRO CORRIDOR TRAIL PROJECT FINCH HYDRO CORRIDOR TRAIL PROJECT Pharmacy Avenue to Birchmount Road January 29 th, 2018 L Amoreaux Community Centre (2000 McNicoll Avenue) 1 Purpose of Drop In Event The purpose of today s drop-in event

More information

Final Environmental Impact Statement for the Merced Wild and Scenic River. Comprehensive Management Plan, Yosemite National Park, Madera and Mariposa

Final Environmental Impact Statement for the Merced Wild and Scenic River. Comprehensive Management Plan, Yosemite National Park, Madera and Mariposa This document is scheduled to be published in the Federal Register on 02/26/2014 and available online at http://federalregister.gov/a/2014-04061, and on FDsys.gov DEPARTMENT OF THE INTERIOR 4312-FF NATIONAL

More information

user s guide to Transportation Improvements in Astoria Planning Efforts outside Astoria for more information, contact:

user s guide to Transportation Improvements in Astoria Planning Efforts outside Astoria for more information, contact: The Miles Crossing/ Jeffers Garden transportation plan (underway), will identify needed improvements to the Warrenton Astoria Highway and local street improvements to serve expected growth in the Miles

More information

Treasure Island Supplemental Information Report Addendum

Treasure Island Supplemental Information Report Addendum 1 1 1 1 0 1 0 1 0 1 Treasure Island Supplemental Information Report Addendum Introduction Purpose The purpose of this Supplemental Information Report (SIR) Addendum is to determine if the current land

More information

3450 Dufferin Street - Official Plan Amendment, Zoning Amendment and Draft Plan of Subdivision Applications Request for Directions Report

3450 Dufferin Street - Official Plan Amendment, Zoning Amendment and Draft Plan of Subdivision Applications Request for Directions Report STAFF REPORT ACTION REQUIRED 3450 Dufferin Street - Official Plan Amendment, Zoning Amendment and Draft Plan of Subdivision Applications Request for Directions Report Date: March 15, 2017 To: From: Wards:

More information

CLEVELAND PARK LOCATION AND HISTORY EXISTING CONDITIONS AND CHARACTER LOCATION

CLEVELAND PARK LOCATION AND HISTORY EXISTING CONDITIONS AND CHARACTER LOCATION CLEVELAND PARK LOCATION LOCATION AND HISTORY Attempts to create a neighborhood park and playground in the Cleveland neighborhood began in 1926, when the park board designated for acquisition the block

More information

Area Surrounding Maplewood Manor

Area Surrounding Maplewood Manor BAY CITY, MICHIGAN HOUSING COMMISSION Neighborhood Revitalization Plan Area Surrounding Maplewood Manor January 13, 2014 CITY COMMISSION DRAFT PLAN PRESENTATION BAY CITY, MICHIGAN 1 Planners Phil McKenna,

More information

Los Angeles International Airport (LAX) Airside $907M

Los Angeles International Airport (LAX) Airside $907M Los Angeles International Airport (LAX) $3,948M Airside $907M Airfield Electrical Systems Rehabilitation Bradley West Core Renovation, East Ramp and Concourse Demolition Imperial Terminal Aircraft Parking

More information

Bloor Street West Rezoning Application for a Temporary Use By-law Final Report

Bloor Street West Rezoning Application for a Temporary Use By-law Final Report STAFF REPORT ACTION REQUIRED 3741 3751 Bloor Street West Rezoning Application for a Temporary Use By-law Final Report Date: June 12, 2007 To: From: Wards: Reference Number: Etobicoke York Community Council

More information

City of Durango 5.8 FUNDING TRAILS DEVELOPMENT

City of Durango 5.8 FUNDING TRAILS DEVELOPMENT 5.8 FUNDING TRAILS DEVELOPMENT The City has been successful in establishing dedicated local funding sources as well as applying for grants to develop the City s trail system, having received nearly $2.4

More information

Northeast Corridor Transportation Update

Northeast Corridor Transportation Update Northeast Corridor Transportation Update Presented by: Stuart Basham Division 10 Planning Engineer North Carolina Department of Transportation October 2, 2014 Today s presentation includes: I-485 Outer

More information

KING CONDOMINIUM RESIDENCES (REZONING)

KING CONDOMINIUM RESIDENCES (REZONING) Kohn Partnership Architects Inc. Spadina Avenue, Suite 0, Toronto ON MV K Tel.0.00 www.kohnarchitects.com COPYRIGHT 00 KOHN ARCHITECTS INC. 0/0/0 REZONING KING CONDOMINIUM RESIDENCES (REZONING) ONTARIO

More information

PROGRESS PARK CONNECTOR

PROGRESS PARK CONNECTOR PROGRESS PARK CONNECTOR Project No. 9999 098 R65, P102 ALTERNATIVES ANALYSIS 6 April 2015 Revised for updated dates PROGRESS PARK CONNECTOR ROAD ALTERNATIVES ALTERNATIVE # 1 West from the intersection

More information

401, and 415 King Street West - Zoning Amendment Application - Preliminary Report

401, and 415 King Street West - Zoning Amendment Application - Preliminary Report STAFF REPORT ACTION REQUIRED 401, 407-409 and 415 King Street West - Zoning Amendment Application - Preliminary Report Date: January 27, 2011 To: From: Wards: Reference Number: Toronto and East York Community

More information

FORMER GERST HAUS RESTAURANT

FORMER GERST HAUS RESTAURANT FOR SALE: 6,500 SF BLDG 0.72 ACRES FORMER GERST HAUS RESTAURANT 301 Woodland Street, Nashville, TN EXECUTIVE SUMMARY The subject property for sale is the former Gerst Haus restaurant which was built in

More information

4 VIVA PHASE 2 YONGE STREET - Y2, AND HIGHWAY 7 - H3 CORRIDORS PRELIMINARY ENGINEERING UPDATE

4 VIVA PHASE 2 YONGE STREET - Y2, AND HIGHWAY 7 - H3 CORRIDORS PRELIMINARY ENGINEERING UPDATE 4 VIVA PHASE 2 YONGE STREET - Y2, AND HIGHWAY 7 - H3 CORRIDORS PRELIMINARY ENGINEERING UPDATE The Rapid Transit Public/Private Partnership Steering Committee recommends the following: 1. The presentation

More information

2433 Dufferin Street Zoning By-law Amendment Application - Preliminary Report

2433 Dufferin Street Zoning By-law Amendment Application - Preliminary Report STAFF REPORT ACTION REQUIRED 2433 Dufferin Street Zoning By-law Amendment Application - Preliminary Report Date: July 22, 2014 To: From: Wards: Reference Number: North York Community Council Director,

More information

Route 29 Solutions Projects

Route 29 Solutions Projects Your guide to the Route 29 Solutions Projects For full details & continued engagement please visit www.route29solutions.org The Route 29 Solutions Package is a $230 million investment into the improvement

More information

TEMPE BEACH PARK - RECOMMENDATIONS

TEMPE BEACH PARK - RECOMMENDATIONS TEMPE BEACH PARK - RECOMMENDATIONS Tempe Beach Park has the potential to become a regional destination park, but it suffers from a host of physical and operational problems, as well as structural flaws.

More information

Auburn Trail / Ontario Pathways Trail Connector Feasibility Study Public Information Meeting Wednesday, August 22, 2012

Auburn Trail / Ontario Pathways Trail Connector Feasibility Study Public Information Meeting Wednesday, August 22, 2012 Auburn Trail / Ontario Pathways Trail Connector Feasibility Study Public Information Meeting Wednesday, August 22, 2012 Purpose of Feasibility Study Purpose Evaluate the feasibility of constructing a multiuse

More information

ONONDAGA CREEKWALK PHASE II. Public Information Meeting Series 1

ONONDAGA CREEKWALK PHASE II. Public Information Meeting Series 1 ONONDAGA CREEKWALK PHASE II Public Information Meeting Series 1 Andrew Maxwell Director, Syracuse-Onondaga County Planning Agency Owen Kerney Assistant Director for City Planning Russell Houck, PE City

More information

CHULA VISTA DEVELOPMENT OPPORTUNITY. For Additional Information: Sean Bascom Lic#

CHULA VISTA DEVELOPMENT OPPORTUNITY. For Additional Information: Sean Bascom Lic# CHULA VISTA DEVELOPMENT OPPORTUNITY For Additional Information: Sean Bascom 619.916.9179 bascom@scc1031.com Lic# 01862044 Image TAVA Third Avenue Village is the heart of Chula Vista s historic downtown.

More information

Airlake Airport 2035 Long Term Comprehensive Plan (LTCP)

Airlake Airport 2035 Long Term Comprehensive Plan (LTCP) Airlake Airport 2035 Long Term Comprehensive Plan (LTCP) Public Informational Meetings August 9 & 10, 2017 Draft LTCP Overview Briefing Agenda Airport Role & Context Existing Conditions & Previous Plan

More information

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY THIS PRINT COVERS CALENDAR ITEM NO. : 10.4 DIVISION: Sustainable Streets BRIEF DESCRIPTION: SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY Approving various parking and traffic modifications associated

More information

Crystal City Station Improvements. Project Overview. Table 2: North Entrance. Table 1: South Entrance. 20th St. S 18th St. S.

Crystal City Station Improvements. Project Overview. Table 2: North Entrance. Table 1: South Entrance. 20th St. S 18th St. S. Table 1: South Entrance Table 2: North Entrance 20th St. S 18th St. S Proposed Second Entrance Crystal Drive Existing Station Location Platform Future 4 th Track Future New Airport Connection (by others)

More information

OFFICE INVESTMENT OR OWNER/USER OPPORTUNITY Long Beach, California / Long Beach Suburban Market. Capital Markets Investment Properties

OFFICE INVESTMENT OR OWNER/USER OPPORTUNITY Long Beach, California / Long Beach Suburban Market. Capital Markets Investment Properties OFFICE INVESTMENT OR OWNER/USER OPPORTUNITY Long Beach, California / Long Beach Suburban Market Capital Markets Investment Properties Property Facts Property Address 3229 East Spring Street, Long Beach,

More information

STAR Bond Development

STAR Bond Development STR ond Development Traffic Impact Study Goddard, Kansas Prepared for: Kansas Department of Transportation City of Goddard, Kansas Prepared by TranSystems November 218 November 3, 218 Kansas Department

More information

Public Workshop Preliminary Plans Review. Projects PW 1605, 1701, & 1702

Public Workshop Preliminary Plans Review. Projects PW 1605, 1701, & 1702 Queens Mirror Circle Pedestrian Safety Improvements Quail Pond Circle Complete Street/Pedestrian Connectivity Improvements Southcot Drive Bicycle/Pedestrian Improvements Public Workshop Preliminary Plans

More information

Allston Yards. Allston Yards. May 29, Allston Yards Allston, Massachusetts

Allston Yards. Allston Yards. May 29, Allston Yards Allston, Massachusetts Allston Yards Allston Yards May 29, 2018 Allston Yards Site Plan Enhancements MBTA Commuter Rail Busses Shuttles Parking Allston Yards April 30, 2018 plan Braintree Street Extension Arthur Street Extension

More information