1 Project Project Status Update November
2 Project History Planning Alternatives Criteria Measured Project Benefits Structural Configurations Considered Structural Design Considerations The Preferred Option Architectural Heritage and Urban Design Features Next Steps
3 Project History In 1880 the road and rail network met at grade Starting in 1884 the grade separation was built By 1966 Metropolitan Toronto recognized the elimination of the jog as an important improvement to the road network In 1983 Metropolitan Toronto reaffirmed this via the Central Waterfront Transportation Study A Class C Environmental Assessment was undertaken in the 1990 s leading to publication of an Environmental Study Report in March 1992
4 Project History cont d February 1992, Queen St. West Underpass included on City of Toronto s Inventory of Heritage Structures The ESR recommended an alignment and structural configuration These were confirmed via ESR Update in January 2001 The project to eliminate the Dufferin Jog is now in detailed design with document preparation and tender imminent (Christmas 2007) Construction is scheduled for Spring 2008
5 Planning Alternatives Skew Dufferin east to miss the bridges Send Dufferin due south under the Bridges Skew Dufferin east and make a larger structure Send Dufferin due south and skew Queen St south to miss the bridges Raise the railway and leave to road at grade Do nothing
6 Criteria Measured The various alternatives were measured against several criteria. These included: Impact of through traffic on the neighbourhood and number of businesses affected Noise / Air quality Energy consumption Aesthetic/visual impact Traffic safety Emergency response / transit operations Pedestrian / bicycle travel Property cost and construction cost
7 Project Benefits The preferred option was that Dufferin continue straight south to meet an un-deflected Queen St. The ESR listed many benefits, some of interest to the larger transportation and transit network but several specific to the local neighbourhood. These included: Enhanced traffic safety Improved transportation efficiency (EMS and TTC) Reduced fuel consumption (250,000 litres per year) Improved air quality Reduced noise levels Minimal impacts to property and local businesses Improved pedestrian and bicycle circulation
8 Structural Configurations Considered The ESR and subsequent Update considered several planning and structural design alternatives. Structural alternatives included: Structural steel through trusses deck girders through plate girders (similar to the historical bridges) Reinforced concrete slab on abutment and piers twin single span portal frames two span portal frame twin single cell boxes / double cell box
9 Structural Design Considerations Several constrains affect the design. These include: Matching Queen St asphalt (and sewer) elevations to minimize disruption Minimizing possible movement to CN and GO tracks The road needs to climb rapidly north of the tunnel to meet Peel St. Minimizing roof depth The removal of the wall at the Queen St portal will leave some bridges bearing on air (requiring either long spans or intermediate support) CN Rail engineering and maintenance requirements Toronto Hydro lighting standards and maintenance requirements
10 Where We Are Today - The Preferred Option The preferred structural alternative was a reinforced concrete two span portal frame; offering the following additional benefits: minimum structural depth between rail and structural soffit minimum visual intrusion and material requirement minimum risk and construction period most cost effective solution greatest flexibility in selecting construction methodology
11 Structural Configuration - North and South Approaches
12 Where We Are Today - Other Related Work Several other portions of overall project need to be undertaken as the work of the main construction contract commences. These include: Property acquisition Building demolition and modification TTC signal and power relocation Lighting and traffic signals CN Rail realignment (complete) (complete) (design underway) (design underway) (getting underway) Main Construction Contract (Spring 2008)
13 Architectural Heritage and Urban Design Features One of the goals stated in the 1992 ESR: give due consideration to integration of the proposed undertaking within the existing physical environment including aesthetic and urban design treatments where appropriate
14 Architectural Heritage and Urban Design Features We are working with the City and advisors to find creative solutions to the following: Celebrate Neighbourhood Heritage Sensitivity to existing and changing context Identify opportunities for Public Art: Handrails Patterned concrete options for tunnel and retaining walls Define pedestrian and bicycle routes Lighting in the Tunnel and surroundings The steel portal at Queen Street Articulation of overhead CN Rail skew in the tunnel ceiling Consideration of alternate uses of the three adjacent vacant parcels of land
15 Neighbourhood Heritage
16 Context
17 Understanding the Site and Neighbourhood
18 Handrails as a Medium for Public Art
19 Concrete Finishes: Impressed Concrete Form Liners
20 Celebrate Neighbourhood History - Tunnel Picture Gallery with Impressed Concrete in Wall Recesses:
21 Focus on Tunnel for the Pedestrian and the Cyclist Bike Paths Details in and around the tunnel Green Spaces People Spaces Sketch looking North into Tunnel Sketch looking South into Tunnel
22 Lighting the Tunnel; Meeting Toronto Hydro Requirements Tunnel Lighting Pedestrian Scale Lighting
23 Views of the Tunnel Key Plan Five views: Dufferin Street looking North into Tunnel Dufferin Street looking South into Tunnel Bird s Eye View looking South on Dufferin Looking East on Queen across from the Dufferin Portal Looking West on Queen at the Portal
24 Dufferin Street Looking North into Tunnel
25 Dufferin Street Looking South into Tunnel
26 Looking South on Dufferin at the future Rail-to Trail Pedestrian and Bicycle Paths
27 Looking East on Queen across the road from the Dufferin Portal
28 Looking West on Queen at the Dufferin Portal
29 Three Adjacent Parcels of Land
30 Next Steps Tunnel to be tendered and awarded early in Construction is scheduled to start in the Spring of Finalization required for Architectural Heritage and Urban Design features We are asking for your input to assist us with making final decisions.
31 Thank You
CONTENTS. 1 Introduction Always Moving Forward while Building on the Past A Dynamic Destination... 5
2010 STRUCTURE PLAN - 2 - CONTENTS 1 Introduction... 5 1.1 Always Moving Forward while Building on the Past... 5 1.2 A Dynamic Destination... 5 2 Map A... 6 Exhibition Place and its Neighbours... 7 3 Demonstration
More information5.7 Local road upgrades
5.7 Local road upgrades Local roads around the St Peters interchange and the intersection of Campbell Road and Euston Road would be upgraded to ensure safe and efficient connections with the New M5, and
More informationFORT YORK PEDESTRIAN & CYCLE BRIDGE
FORT YORK PEDESTRIAN & CYCLE BRIDGE November 2006 urban design landscape architecture architecture DTAH This is a new concept for the Fort York Pedestrian and Cycle Bridge linking Stanley Park (South)
More informationURBAN DESIGN REPORT. Proposed Residential Development, Old Church Road, Caledon East
Proposed Residential Development, Old Church Road, Caledon East TABLE CONTENTS: 1.0 DEVELOPMENT 1.1 Introduction-Analysis of Guiding Principles and Documents 1.2 Community Design and Architectural Design
More informationProposed Bicycle Lanes on Yonge Street from Queens Quay to Front Street
STAFF REPORT ACTION REQUIRED Proposed Bicycle Lanes on Yonge Street from Queens Quay to Front Street Date: March 12, 2007 To: From: Toronto and East York Community Council Director, Transportation Infrastructure
More informationHospital Link Project Project Update Winter 2018
Hospital Link Project Project Update Winter 2018 General The project provides a link from Riverside Drive and the Transitway to the Hospital Link Road. Construction of the Hospital Link facility is open
More informationUnion Station Rail Corridor East
Union Station Rail Corridor East Community Advisory Committee CAC Meeting #2: Overview of Track Expansion Plans March 6, 2018 PURPOSE OF CAC MEETING #2 Future service requirements Infrastructure needed
More informationDENISON STREET EXTENSION. Transportation Committee. January 14, Feasibility Study
DENISON STREET EXTENSION Feasibility Study January 14, 2014 Transportation Committee Markham Transportation Strategic Plan (MTSP) analysis completed in 2012 reviewed transportation requirements to accommodate
More informationFEASIBILITY CRITERIA
This chapter describes the methodology and criteria used to evaluate the feasibility of developing trails throughout the study areas. Land availability, habitat sensitivity, roadway crossings and on-street
More information3. COLTA / HUGA CONNECTIONS - PRELIMINARY
9 3. COLTA / HUGA CONNECTIONS - PRELIMINARY 3.1 COLTA The Chain of Lakes Trail Association (COLTA) trail, formerly identified as the Chester Spur Line, was completed and opened for use in June 2011. The
More informationUnion Station Rail Corridor East Enhancements Project
Union Station Rail Corridor East Enhancements Project Transit Project Assessment Process Public Meeting #1 Presentation Wednesday June 28, 2017 GRIDLOCK COSTS OUR ECONONY REGIONAL TRANSFORMATION GO EXPANSION
More informationTHAT the Board approve the final proposed concept plan for the Jericho Marginal Wharf site as shown in Figure C-4 of Appendix C.
Date: January 17, 2012 TO: Board Members Vancouver Park Board FROM: General Manager Parks and Recreation SUBJECT: Jericho Marginal Wharf Phase 2 Concept Plan RECOMMENDATION THAT the Board approve the final
More informationTORONTO TRANSIT COMMISSION REPORT NO.
Form Revised: February 2005 TORONTO TRANSIT COMMISSION REPORT NO. MEETING DATE: SUBJECT: Resubmitted December 19, 2012 November 21, 2012 MODERNIZING THE TTC A NEW APPROACH TO COMMUNICATIONS, COMMUNITY
More informationTORONTO TRANSIT COMMISSION REPORT NO.
Form Revised: February 2005 TORONTO TRANSIT COMMISSION REPORT NO. MEETING DATE: October 29, 2009 SUBJECT: TORONTO-YORK SPADINA SUBWAY EXTENSION PROJECT STEELES WEST STATION APPROVAL OF CONCEPTUAL DESIGN
More informationPattullo Bridge Replacement Project
Pattullo Bridge Overview This document will: Explain the challenges facing the Pattullo Bridge today Share how we propose moving forward translink.ca PAGE 1 History By Order of the Lieutenant Governor
More informationGold Coast. Rapid Transit. Chapter twelve Social impact. Chapter content
Gold Coast Rapid Transit Chapter twelve Social impact Chapter content Social impact assessment process...235 Existing community profile...237 Consultation...238 Social impacts and mitigation strategies...239
More informationLongmont to Boulder Regional Trail Jay Road Connection DRAFT FINAL REPORT
Longmont to Boulder Regional Trail Jay Road Connection DRAFT FINAL REPORT December 2018 Project Summary Boulder County, Colorado, in partnership with the City of Boulder, is evaluating options for multi-use
More informationDesign Meeting Presentation
Contract No. 17ECS-TI-05SP April November 2017 Design Meeting Presentation November 2015 Agenda Items: Introduction (5 min) Overview (10 min) Scope of work (60 min): Schedule and Traffic Staging / Closures
More informationSpadina Avenue Built Form Study Preliminary Report
STAFF REPORT ACTION REQUIRED Spadina Avenue Built Form Study Preliminary Report Date: July 9, 2014 To: From: Wards: Reference Number: Toronto and East York Community Council Director, Community Planning,
More informationPhoenix Sky Harbor transit guideway bridge
Phoenix Sky Harbor transit guideway bridge by David A. Burrows, Gannett Fleming The evolution of the PHX Sky Train s crossing of Taxiway Romeo At one of the 10 busiest airports in the United States, cast-in-place,
More informationHospital Link Project Project Update September 2015
Hospital Link Project Project Update September 2015 General The project provides a link between Riverside Drive and the Transitway to the Hospital Ring Road. This link is needed to improve transit service
More informationAppendix B Connecting Track Options Evaluation Criteria
Appendix B Connecting Track Options Evaluation Criteria 608979-853_ra_July5-0_App Title Pages.Docx TTC ASHBRIDGES BAY MAINTENANCE AND STORAGE FACILITY CONNECTING TRACK ROUTE ALTERNATIVE - EVAULATION MATRIX.0
More informationAirport Planning Area
PLANNING AREA POLICIES l AIRPORT Airport Planning Area LOCATION AND CONTEXT The Airport Planning Area ( Airport area ) is a key part of Boise s economy and transportation network; it features a multi-purpose
More informationTORONTO TRANSIT COMMISSION REPORT NO.
Form Revised: February 2005 TORONTO TRANSIT COMMISSION REPORT NO. MEETING DATE: March 1, 2011 SUBJECT: PROCUREMENT AUTHORIZATION AMENDMENT CONTRACT AMENDMENT NO. 8 ACTION ITEM RECOMMENDATION It is recommended
More informationOssington Station Easier Access Project - Construction & Public Art Concept Update
Ossington Station Easier Access Project Construction & Public Art Concept Update Open House College/Shaw Library 1 Easier Access Program Wide Committed to making all stations accessible by 2025 34 stations
More informationFirst Steps Towards Sustainable Operation of Road Tunnels. George Mavroyeni Australia
First Steps Towards Sustainable Operation of Road Tunnels George Mavroyeni Australia Road Tunnel Operations First steps towards sustainable operation of road tunnels Available on PIARC website here PIARC
More informationPSP 75 Lancefield Road. Northern Jacksons Creek Crossing Supplementary Information
PSP 75 Lancefield Road Northern Jacksons Creek Crossing Supplementary Information September 2017 The northern crossing of Jacksons Creek proposed within the Lancefield Road PSP is a key part of the ultimate
More informationBUILD. In this issue: NEW AERIALS OF CONSTRUCTION NEW PROJECT IN CONSTRUCTION PAC K AG E 4. August 2018
BUILD C O N ST R U C T I O N Update August 2018 In this issue: NEW AERIALS OF CONSTRUCTION NEW PROJECT IN CONSTRUCTION PAC K AG E 4 AVENUE 12 CEDAR VIADUCT A VIEW FROM ROAD 27 ABOVE HSR CONSTRUCTION FRESNO
More informationGold Coast. Rapid Transit. Chapter content. Chapter four Route selection and staging
Chapter four Route selection and staging Gold Coast Rapid Transit Chapter four Route selection and staging Chapter content Route selection...73 Section one: Helensvale to Griffith University...74 Section
More informationRailroad Safety Trail
2.1 INTRODUCTION AND PROJECT SETTING 2.1 Introduction & Project Setting Introduction This study is the result of a directed effort on the part of the City of San Luis Obispo to carry out previously established
More informationEAST DON TRAIL ENVIRONMENTAL ASSESSMENT. Community Liaison Committee Meeting #3 July 15, :30 to 8:30 pm Flemingdon Park Library
EAST DON TRAIL ENVIRONMENTAL ASSESSMENT Community Liaison Committee Meeting #3 July 15, 2013 6:30 to 8:30 pm Flemingdon Park Library Agenda 1. Welcome 2. Housekeeping and Updates a) Housekeeping b) CLC
More informationWelcome to the Illinois High-Speed Rail Chicago to St. Louis Construction Update Meeting. Today s meeting will provide an overview of the Program,
Welcome to the Illinois High-Speed Rail Chicago to St. Louis Construction Update Meeting. Today s meeting will provide an overview of the Program, updates on construction to be held in this area, and how
More informationGUIDELINES RAILWAY LANDS WEST AND CENTRAL LOCATION URBAN DESIGN GUIDELINES
Re-development in the former railway lands will be consistent with the following urban design guidelines. The guidelines correspond to the Railways Lands West and Central in Sections 18 and 19 of Chapter
More informationLincoln Village Pedestrian Bicycle Bridge Community Meeting September 13th, 2016
Lincoln Village Pedestrian Bicycle Bridge Community Meeting September 13th, 2016 Purpose of the Meeting Introduce the project and the proposed improvements Review existing conditions Discuss the needs
More informationUpdate Report - Etobicoke Creek and South Mimico Creek Trails
REPORT FOR ACTION Update Report - Etobicoke Creek and South Mimico Creek Trails Date: October 23, 2017 To: Etobicoke York Community Council From: General Manager, Parks Forestry and Recreation Wards: Ward
More informationWelcome. Green Line in Your Community
Welcome Green Line in Your Community Today s session will provide you with information on options The City is exploring for connecting the Green Line in the Beltline to the future Inglewood/Ramsay station.
More informationCrystal City Station Improvements. Project Overview. Table 2: North Entrance. Table 1: South Entrance. 20th St. S 18th St. S.
Table 1: South Entrance Table 2: North Entrance 20th St. S 18th St. S Proposed Second Entrance Crystal Drive Existing Station Location Platform Future 4 th Track Future New Airport Connection (by others)
More informationWarehouse case study. Cargo Facility, Stansted. 35 million, transit warehouse cargo facility pre-let to Federal Express at Stansted Airport
Warehouse case study Cargo Facility, Stansted 35 million, transit warehouse cargo facility pre-let to Federal Express at Stansted Airport This new facility shows how BAA Lynton can deliver large complex
More information4. Safety Concerns Potential Short and Medium-Term Improvements
NH Route 104 Access Management Study Page 19 4. Safety Concerns Potential Short and Medium-Term Improvements Potential safety improvement strategies are listed by priority based on field observations by
More informationPart four. In this part you will find: The next steps to deliver the master plan
Part four NEXT STEPS In this part you will find: The next steps to deliver the master plan 6. How COULD the Master Plan be delivered? There are a number of steps required to take the proposals in the master
More informationBlackburn Road Blackburn Level Crossing Removal. Frequently Asked Questions August 2014 GENERAL
Frequently Asked Questions August 2014 Blackburn Road Blackburn Level Crossing Removal GENERAL What is the project? The Victorian Government has committed to eliminating a number of the busiest level crossings
More informationCorridor Management Committee Meeting. April 2, 2014
Corridor Management Committee Meeting April 2, 2014 1 Today s Topics Welcome Approval of Minutes Resolutions Response to March 26 CMC Questions Staff Recommendation on Project Scope and Budget Public Testimony
More informationConstruction Staging Area Blue Jays Way (357 King Street West)
REPORT FOR ACTION Construction Staging Area Blue Jays Way (357 King Street West) Date: June 8, 2018. To: Toronto and East York Community Council From: Acting Director, Transportation Services, Toronto
More informationCreating Connections in Niagara Region
Creating Connections in Niagara Region GERRY CHAPUT, CHIEF CAPITAL OFFICER - METROLINX ERIN MOROZ, DIRECTOR OF COMMUNICATIONS AND COMMUNITY RELATIONS - METROLINX METROLINX PRESENTATION TO NIAGARA REGION
More informationNOTICE OF OPPORTUNITY FOR PUBLIC COMMENT RELATED TO PROPOSED PASSENGER FACILITY CHARGE APPLICATION NOVEMBER 9 TH, 2018
NOTICE OF OPPORTUNITY FOR PUBLIC COMMENT RELATED TO PROPOSED PASSENGER FACILITY CHARGE APPLICATION NOVEMBER 9 TH, 2018 LAWTON-FORT SILL REGIONAL AIRPORT LAWTON, OKLAHOMA PASSENGER FACILITY CHARGE PROPOSED
More informationRESORT AREA STRATEGIC ACTION PLAN (RASAP) STEERING COMMITTEE MEETING - APRIL 3, 2019
RESORT AREA STRATEGIC ACTION PLAN (RASAP) STEERING COMMITTEE MEETING - APRIL 3, 2019 Welcome & Introductions - Deb Zywna AGENDA FY 20 Resort CIP Proposed Projects - Kathy Warren ORDFBC Design Guidelines
More informationKING STREET PILOT STUDY PUBLIC MEETING
KING STREET PILOT STUDY PUBLIC MEETING 2017.02.13 PUBLIC WORK with GEHL STUDIO / NEW YORK SWERHUN ASSOCIATES SAM SCHWARTZ CONSULTING LLC STARTING POINTS 17 1 - TRANSIT FIRST! Transit service is beyond
More informationTHE ALBERTA GAZETTE, SEPTEMBER
VILLAGE OF CEREAL Order No. 16915 IN THE MATTER OF THE "Municipal Government Act": File No. 241(A)3 AND IN THE MATTER OF an application by the Council of the Village of Cereal, in the Province of Alberta,
More informationCITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF JANUARY 25, 2011
Item 1, Report No. 1, of the Priorities and Key Initiatives Committee, which was adopted without amendment by the Council of the City of Vaughan on January 25,. 1 RAPID TRANSIT UPDATE TORONTO-YORK SPADINA
More informationTORONTO TRANSIT COMMISSION REPORT NO.
Revised: March/13 TORONTO TRANSIT COMMISSION REPORT NO. MEETING DATE: November 18, 2013 SUBJECT: YONGE-EGLINTON AND EGLINTON WEST INTERCHANGE STATIONS METROLINX EGLINTON CROSSTOWN LIGHT RAIL TRANSIT PROJECT
More informationNorthwest Triangle. Redevelopment Proposal. Property Acquisition, Engineering, and Demolition. December, 2005 REDEVELOPMENT AUTHORITY OF THE
Northwest Triangle Redevelopment Proposal Property Acquisition, Engineering, and Demolition December, 2005 REDEVELOPMENT AUTHORITY OF THE CITY OF YORK York City Redevelopment Authority 14 West Market Street,
More informationFINCH HYDRO CORRIDOR TRAIL PROJECT
FINCH HYDRO CORRIDOR TRAIL PROJECT Pharmacy Avenue to Birchmount Road January 29 th, 2018 L Amoreaux Community Centre (2000 McNicoll Avenue) 1 Purpose of Drop In Event The purpose of today s drop-in event
More informationFLINDERS STREET STATION DESIGN COMPETITION STATEMENT OF KEY OBJECTIVES
FLINDERS STREET STATION DESIGN COMPETITION STATEMENT OF KEY OBJECTIVES Page 2 of 28 Flinders Street Station and environs (looking west) INTRODUCTION Page 3 of 28 First built in 1854, Flinders Street Station
More information2 SITE ANALYSIS AND DESIGN CRITERIA
2 SITE ANALYSIS AND DESIGN CRITERIA PRELIMINARY DEVELOPMENT CRITERIA 12 URBAN CONTEXT 13 VIEW 14 SITE GRADING 16 EXISTING STRUCTURES 16 STRUCTURAL AND SEISMIC CONSTRAINTS 18 CRUISE INDUSTRY AND ACTIVITY
More informationGeorgetown-Lewes Rail/Trail Study. Rail/Trail Study: Cool Spring to Cape Henlopen State Park New Road Extension (House Resolution No.
Georgetown-Lewes Rail/Trail Study Rail/Trail Study: Cool Spring to Cape Henlopen State Park New Road Extension (House Resolution No. 47) August 22, 2011 Presentation Outline Background Benefits Statewide
More informationTORONTO TRANSIT COMMISSION REPORT NO.
Form Revised: February 2005 TORONTO TRANSIT COMMISSION REPORT NO. MEETING DATE: August 23, 2010 SUBJECT: TORONTO-YORK SPADINA SUBWAY EXTENSION PROJECT VAUGHAN CORPORATE CENTRE STATION APPROVAL OF FINISHES
More information2433 Dufferin Street Zoning By-law Amendment Application - Preliminary Report
STAFF REPORT ACTION REQUIRED 2433 Dufferin Street Zoning By-law Amendment Application - Preliminary Report Date: July 22, 2014 To: From: Wards: Reference Number: North York Community Council Director,
More informationSCOPING INFORMATION PACKET
SCOPING INFORMATION PACKET Project Description The proposed project would provide a direct link connecting several light rail lines in operation or in construction, including the Metro Gold Line to Pasadena,
More information2016 Regional Transportation Alternatives Program (TAP) Grant Application
2016 Regional Transportation Alternatives Program (TAP) Grant Application PROJECT TITLE: Yelm-Tenino Trail Extension Feasibility Study TRPC use only GENERAL PROJECT INFORMATION Agency or Organization City
More informationuser s guide to Transportation Improvements in Astoria Planning Efforts outside Astoria for more information, contact:
The Miles Crossing/ Jeffers Garden transportation plan (underway), will identify needed improvements to the Warrenton Astoria Highway and local street improvements to serve expected growth in the Miles
More information95 KING STREET EAST, TORONTO
95 KING STREET EAST, TORONTO OFFICE FOR LEASE LOCATED ON KING STREET EAST, AT CHURCH STREET FOR MORE INFORMATION PLEASE CONTACT ASHLAR URBAN REALTY INC. Real Estate Brokerage 166 Pearl Street, Suite 300
More informationTown of Markham Yonge and Steeles Corridor Study and City of Vaughan Yonge Street Area Study
STAFF REPORT ACTION REQUIRED Town of Markham Yonge and Steeles Corridor Study and City of Vaughan Yonge Street Area Study Date: August 14, 2009 To: From: Wards: Reference Number: North York Community Council
More informationNEWBORO AND PORTLAND HARBOUR REDVELOPMENT PLANS
INTRODUCTION The Municipal docks in both Newboro and Portland were transferred to the Township of Rideau Lakes by Parks Canada in 2002. Little has been done to improve the docks physical condition or role
More informationMason Street Bike/Pedestrian Trail Project
Construction of the much-anticipated Mason Trail is underway! Mountain Constructors was awarded the contract in September but had to go through a 2- month process to obtain construction clearance permits
More informationLaxon Terrace - Sarawia. Click to add title. Street Rail Level Crossing. Public Forum. December
Laxon Terrace - Sarawia Click to add title Street Rail Level Crossing Public Forum December 2012 www.aucklandtransport.govt.nz Overview of Presentation Objectives and Reasons for Separation Project Background
More informationSpencer Environmental Appendix A: Alternative Analysis for Construction Access Route
Spencer Environmental Appendix A: Alternative Analysis for Construction Access Route February 2015 Valley ine-stage 1 RT EISA Update FINA REPORT Page A1 Memorandum AECOM ConnectEd Transit Partnership 10235
More informationFERRY TERMINAL ST LUCIA
Consideration: FERRY TERMINAL ST LUCIA The floods in January 2011 severely damaged the CityCat and City Ferry terminals along the Brisbane River. Directly after the event a huge effort was made to provide
More informationNeighbourhood Committee NDG - Westmount. September 12, 2016
Neighbourhood Committee NDG - Westmount September 12, 2016 2 Presentation Outline Requests from the committee members Feedback on previous questions Work update and hindrance of the Turcot Project Ministry
More informationDATE: April 19, 2016 REPORT NO. PW Chair and Members Committee of the Whole Operations and Administration
PUBLIC WORKS COMMISSION DATE: April 19, 2016 REPORT NO. PW2016-034 TO: FROM: Chair and Members Committee of the Whole Operations and Administration E. (Beth) Goodger General Manager, Public Works Commission
More informationI-70/I-71 Project Public Meeting Presented By
I-70/I-71 Project Public Meeting Presented By Ohio Department of Transportation ms consultants, inc. engineers, architects, planners MSI Design June 9, 2010 W e l c o m e Thom Slack Planning Administrator,
More informationSection 4(f) and Section 6(f) Technical Analysis
WESTSIDE SUBWAY EXTENSION PROJECT Contract No. PS-4350-2000 Section 4(f) and Section 6(f) Technical Analysis Prepared for: Prepared by: WSP USA 851 SW Sixth Avenue, Suite 1600 Portland, Oregon 97204 FEBRUARY
More informationSt. Clair West Station Easier Access Project Community Update Open House
St. Clair West Station Easier Access Project Community Update Open House 1 Easier Access Program Wide Committed to making all 69 stations accessible by 2025 31 stations completed - almost halfway there
More information1 PROJECT STATUS UPDATE 2 ND CONCESSION FROM BRISTOL ROAD TO DOANE ROAD TOWNS OF EAST GWILLIMBURY AND NEWMARKET
Report No. 3 of the Regional Council Meeting of March 28, 2013 1 PROJECT STATUS UPDATE 2 ND CONCESSION FROM BRISTOL ROAD TO DOANE ROAD TOWNS OF EAST GWILLIMBURY AND NEWMARKET The recommends: 1. Receipt
More informationSR 934 Project Development And Environment (PD&E) Study
SR 934 Project Development And Environment (PD&E) Study Project Advisory Group Meeting March 1, 2018 State Road 934/NE/NW 79th Street from west of I-95 (NW 13th CT) to N. Bayshore Drive PD&E STUDY SR 934/NE/NW
More informationAirdrie - Bathgate Railway and Linked Improvements Bill. Environmental Statement Page 1
Environmental Statement Page 1 1.0 INTRODUCTION 1.1 The Scheme Proposal The scheme proposals are to re-open the Airdrie to Bathgate section of the former Bathgate and Coatbridge Railway (Monklands Railway)
More informationCOLLEGE STREET STUDY Community Consultation Meeting. December 2015
COLLEGE STREET STUDY Community Consultation Meeting December 2015 2 Agenda 6:30 pm Introductions, Agenda Review and Welcome 6:40 pm Presentation Planning Recommendations 7:30 pm Questions and Discussion
More information2 ROADS CAPITAL CONSTRUCTION PROGRAM UPDATE
Report No. 8 of the Transportation Services Committee Regional Council Meeting of October 20, 2011 2 ROADS CAPITAL CONSTRUCTION PROGRAM UPDATE The Transportation Services Committee recommends: 1. Receipt
More informationFlying Cloud Airport (FCM) Zoning Process: Informing a Mn/DOT Path Forward
: Informing a Mn/DOT Path Forward A Review of the Flying Cloud Airport (FCM) Joint Airport Zoning Board (JAZB) Process and the Draft Airport Zoning Ordinance B A RPZ RPZ A B C Zone Chad E. Leqve Director
More informationMAP AMENDMENT/HEIGHT MAP AMENDMENT SUMMARY. Three stories above River Street Two stories above River Street
MPC STAFF REPORT TEXT AMENDMENT Historic District Height Map MAP AMENDMENT/HEIGHT MAP AMENDMENT SUMMARY Report Status Initial Report- Petitioner, Property Owner, Agent Information SRD, LLC d/b/a The Kessler
More informationShadow Impact Assessment & 2323 Lake Shore Boulevard West. Etobicoke, Ontario
Shadow Impact Assessment 2313 & 2323 Lake Shore Boulevard West Etobicoke, Ontario REPORT: GWE12-099-SHADOWS-2014 Prepared For: Peter Swinton, B.Arch., MCIP, RPP PMG Planning Consultants 227 Bridgeland
More informationTransportation Supporting Dulles Airport
Transportation Supporting Dulles Airport Committee for Dulles Economic Development and Transportation Committee July 12, 2018 Tom Biesiadny, Director Fairfax County Multiple Transportation Improvements
More informationTORONTO TRANSIT COMMISSION REPORT NO.
Form Revised: February 2005 TORONTO TRANSIT COMMISSION REPORT NO. MEETING DATE: February 2, 2011 SUBJECT: TORONTO-YORK SPADINA SUBWAY EXTENSION PROJECT STEELES WEST STATION APPROVAL OF FINAL DESIGN, FINISHES
More informationA63 Castle Street, Hull HullBID Network Lunch 24 August 2017
A63 Castle Street, Hull HullBID Network Lunch 24 August 2017 James D Leeming Senior Project Manager What we will cover today? Introduction to Highways England and the Road Investment Strategy A63 Scheme
More information10,000SF-150,000SF No Cotenancy No Common Area Factor FREE Parking All Ground Floor/No Elevators
10,000SF-150,000SF No Cotenancy No Common Area Factor FREE Parking All Ground Floor/No Elevators Jeff Heckman 614-221-4736 jheckman@evbco.com www.evbco.com 10,000SF-100,000SF Available in Downtown Columbus
More informationDraft Concept Alternatives Analysis for the Inaugural Airport Program September 2005
Section 10 Preferred Inaugural Airport Concept 10.0 Introduction The Preferred Inaugural Airport Concept for SSA was developed by adding the preferred support/ancillary facilities selected in Section 9
More informationEP8.2 Presentation Exhibition GO Station Improvements
EP8.2 Presentation Exhibition GO Station Improvements JANUARY 30, 2018 WORKING TOGETHER Metrolinx is working collaboratively with the City of Toronto, Exhibition Place, and the TTC to co-ordinate efforts
More informationBUILD. Update CONSTRUCTION. In this issue: FEATURED PROJECT: KENT AVENUE ARCH CONSTRUCTION AT THE SJ RIVER VIADUCT FEBRUARY 2019
BUILD CONSTRUCTION Update FEBRUARY 2019 In this issue: ARCH CONSTRUCTION AT THE SJ RIVER VIADUCT FEATURED PROJECT: KENT AVENUE * Featured Project KENT AVENUE CP 2-3 CONSTRUCTION UPDATE February 2019 At
More informationSpadina Avenue which would include two new underground stations located at Yonge Street and at University Avenue.
TORONTO TRANSIT COMMISSION REPORT No S7 MEETING DATE June 4, 1968 FROM: General Manager Subway Construction Date June 3, 1968 Subject: QUEEN STREET SUBWAY FOR STREETCAR OPERATION The Commission, at its
More informationEglinton-Scarborough Crosstown LRT Update
Eglinton-Scarborough Crosstown LRT Update Councillor Matlow and Councillor Stintz Town Hall February 28 2012 Presented by: Anna Pace, Director Strategic Partnerships, TTC Transit Expansion Department 2/28/2012
More informationExecutive Summary This document contains the Master Plan for T. F. Green Airport. The goal of a master plan is to provide a framework of potential future airport development in a financially feasible manner,
More informationMacleod Trail Corridor Study. Welcome. Macleod Trail Corridor Study Open House. Presentation of Proposed Design Concepts
Macleod Trail Corridor Study Welcome Macleod Trail Corridor Study Open House Presentation of Proposed Design Concepts Study Purpose Develop a corridor plan for Macleod Trail that aligns with The City s:
More informationMetro Gold Line Eastside Extension Review Advisory Committee October 9, 2008
Review Advisory Committee October 9, 2008 6 Mile Alignment 1.7 Miles of Tunnel 8 Stations (6 At-grade & 2 Underground) Park & Ride Facility Direct Connection to the Pasadena Metro $898.8 million On-Time/Within
More information95 KING STREET EAST, TORONTO
95 KING STREET EAST, TORONTO OFFICE FOR LEASE LOCATED ON KING STREET EAST, AT CHURCH STREET FOR MORE INFORMATION PLEASE CONTACT ASHLAR URBAN REALTY INC. Real Estate Brokerage 166 Pearl Street, Suite 300
More informationMetrolinx Projects: Temporary Delegation for Long- Term Road Closures
PW29.1 REPORT FOR ACTION Metrolinx Projects: Temporary Delegation for Long- Term Road Closures Date: April 24th, 2018 To: Public Works and Infrastructure Committee From: General Manager, Transportation
More information377 Spadina Rd & 17 Montclair Ave Zoning Amendment Application Final Report
STAFF REPORT ACTION REQUIRED 377 Spadina Rd & 17 Montclair Ave Zoning Amendment Application Final Report Date: September 14, 2016 To: From: Wards: Reference Number: Toronto and East York Community Council
More informationBACKCOUNTRY TRAIL FLOOD REHABILITATION PROGRAM
BACKCOUNTRY TRAIL FLOOD REHABILITATION PROGRAM Backcountry Trail Flood Rehabilitation A June 2013 Flood Recovery Program Summary In June 2013, parts of Southern Alberta were devastated from significant
More informationTORONTO TRANSIT COMMISSION REPORT NO.
Form Revised: February 2005 TORONTO TRANSIT COMMISSION REPORT NO. MEETING DATE: July 14, 2010 SUBJECT: TORONTO-YORK SPADINA SUBWAY EXTENSION PROJECT HIGHWAY 407 STATION APPROVAL OF FINISHES AND ARTWORK
More informationCANADIAN NATIONAL RAILWAY STATION
Conservation Review Board Ministry of Tourism, Culture and Recreation Commission des biens culturels Ministère du Tourisme, de la Culture et des Loisirs 4th floor 4e ètage 400 University Ave 400 avenue
More informationPresentation Overview
DON NARROWS Historical and Existing Conditions March 29, 2008 Presentation Overview 1. Project Location and Background 2. Historical Context How did the Don Narrows Come to Be? 3. The Today 4. Next Steps
More informationCHAPTER 4 -- THE LAND USE PLAN: DESCRIPTIONS AND POLICIES FOR THIRTEEN PLANNING AREAS
CHAPTER 4 -- THE LAND USE PLAN: DESCRIPTIONS AND POLICIES FOR THIRTEEN PLANNING AREAS NORTH CENTRAL CAC AREA LITTLE VALLEY ROAD TO JUG HANDLE CREEK PLANNING AREA This planning area includes Cleone, Noyo,
More information