1 TRAFFIC IMPACT STUDY for TOLLGATE VILLAGE Thompson s Staton, Tennessee February 25, 2015 Prepared for: MBSC TN HOMEBUILDERS, LLC 402 S. Gay Street, Sute 202 Knoxvlle, Tennessee Prepared by: RAGAN-SMITH-ASSOCIATES, INC. 315 Woodland Street, P.O. Box Nashvlle, Tennessee (615) / 9260

2 TOLLGATE VILLAGE TABLE OF CONTENTS PAGE EXECUTIVE SUMMARY... - ES-1 - I. INTRODUCTION II. PROPOSED DEVELOPMENT A. Project Descrpton B. Ste Access C. Phasng and Tmng III. EXISTING CONDITIONS A. Transportaton System B. Traffc Volumes C. Proposed Transportaton System IV. FORECASTED BACKGROUND TRAFFIC A. Introducton B. Annual Growth V. PROPOSED SITE TRAFFIC A. Proposed Ste Trp Generaton B. Trp Generaton Comparson B. Ste Trp Dstrbuton and Assgnment VI. TRANSPORTATION ANALYSIS A. Intersecton Capacty Analyss VII. CONCLUSIONS AND RECOMMENDATIONS A. Introducton B. Columba Pke at Tollgate Boulevard C. Secondary Access (North) D. Secondary Access (South) APPENDIX

3 LIST OF FIGURES FIGURE DESCRIPTION PAGE 1 LOCATION MAP TOLLGATE VILLAGE CONCEPT PLAN INTERSECTION TRAFFIC VOLUMES LIST OF TABLES TABLE DESCRIPTION PAGE 1 TOLLGATE VILLAGE SITE DATA TDOT HISTORICAL TRAFFIC COUNT DATA TOLLGATE VILLAGE UNADJUSTED TRIP GENERATION TOLLGATE VILLAGE ADJUSTED TRIP GENERATION TOLLGATE VILLAGE TRIP GENERATION COMPARISON INTERSECTION CAPACITY ANALYSIS RESULTS LEVEL OF SERVICE DESCRIPTIONS FOR UNSIGNALIZED INTERSECTIONS LEVEL OF SERVICE DESCRIPTIONS FOR SIGNALIZED INTERSECTIONS... 13

4 EXECUTIVE SUMMARY INTRODUCTION Tollgate Vllage s located on the west sde of Columba Pke (US Hghway 31 / State Route 6) between Independence Hgh School and the West Harpeth Rver n the Town of Thompson s Staton, Tennessee. An update to the Tollgate Vllage Concept Plan s proposed that ncludes changes to the proposed land uses and number of unts. BACKGROUND TRAFFIC Based upon antcpated development actvty, the horzon year 2020 wll be used to consder the full buld-out of the proposed concept plan at Tollgate Vllage. To account for background traffc growth wthn the area, TDOT hstorcal traffc count data and Nashvlle MPO transportaton model data was obtaned for the project area. Based upon the Nashvlle MPO data and a lnear regresson analyss of the hstorcal traffc count data, a 2.6 percent annual growth rate wll be appled to the exstng traffc volumes for the perod from 2014 to SITE TRAFFIC The traffc mpact of the development at Tollgate Vllage s based upon a calculaton of the number of vehcle trps that wll enter and/or ext the ste. The analyss perods of ths study are the mdday and p.m. peak hours of a typcal weekday on Columba Pke. Therefore, trps were generated accordng to the Insttute of Transportaton Engneers (ITE) Trp Generaton Manual, 9 th Edton. The trp generaton for Tollgate Vllage s shown n the table below. TOLLGATE VILLAGE TRIP GENERATION Land Use Total Unts Daly A.M. Peak Hour P.M. Peak Hour Enter Ext Total Enter Ext Total Sngle Famly Detached Homes 681 lots 5, Townhomes 231 unts 1, Multfamly 275 unts 1, Lve/Work 49 unts General Offce 30,000 sf Medcal Offce 46,800 sf 1, Commercal/Retal (Outparcels) (Prmary Trps Only) 54,000 sf 3, Hotel 50 rooms TOTAL 15, , ,342 TRAFFIC ANALYSIS The followng publc roadway ntersectons were analyzed for capacty defcences and mprovement needs: Columba Pke at Tollgate Boulevard ES - 1

5 For these ntersectons, the followng traffc scenaros were analyzed, where applcable: 2014 Exstng Traffc Condtons 2020 Total Traffc that contans all traffc projected n the study area, ncludng Tollgate Vllage CONCLUSIONS AND RECOMMENDATIONS Columba Pke at Tollgate Boulevard The capacty analyss results for the ntersecton of Columba Pke and Tollgate Boulevard ndcate that traffc operatons are currently characterzed by acceptable levels of servce durng the a.m. and p.m. peak hours. The eastbound left turn from Tollgate Boulevard onto Columba Pke northbound s the movement that experences the hghest delay durng peak hours. At unsgnalzed ntersectons on arteral roads, t s expected that the sde street left turn movement wll generally have a hgher delay than other turnng movements at the ntersecton. For exstng condtons, the analyss results ndcate acceptable levels of servce and the volumeto-capacty rato for Tollgate Boulevard ndcates that there s capacty avalable for addtonal traffc growth. In the horzon year 2020, the analyss was conducted for unsgnalzed control and for sgnalzed control. For the unsgnalzed control, the levels of servce and volume-to-capacty ratos for Tollgate Boulevard ndcate that the capacty of the ntersecton s exceeded at full buld-out wthout a traffc sgnal. Based on the TDOT revew of Columba Pke n the vcnty and the prelmnary ndcatons that a new traffc sgnal wll be nstalled as part of TDOT mprovements, the analyss of the ntersecton under traffc sgnal control ndcates that acceptable ntersecton operatons can be provded f the followng mprovements are mplemented. A southbound rght turn lane should be constructed on Columba Pke at Tollgate Boulevard. The storage length of ths turn lane should be 250 feet wth 100 feet of taper. It s mportant to note that the nstallaton of a traffc sgnal at ths ntersecton wll requre wdenng of Columba Pke north of Tollgate Boulevard to provde addtonal merge and lane drop transton length. Ths wdenng wll extend to the north of the brdge over the West Harpeth Rver and wll requre brdge wdenng to accomplsh. The schedule for desgn and constructon of a traffc sgnal at ths ntersecton by TDOT wll be mpacted by the need to wden the exstng brdge structure. Secondary Access (North) The Tollgate Vllage Concept Plan ncludes a proposed secondary access to Columba Pke approxmately 640 feet north of Tollgate Boulevard. Ths locaton wll provde access to portons of the multfamly and commercal uses (hotel, offce, and outparcels) from Columba Pke. Constructon of ths access would provde a benefcal ngress/egress for the multfamly and commercal uses located on the northeastern porton of the Tollgate Vllage ste. Ths access would be unsgnalzed and would serve a porton of the multfamly and commercal ste traffc orented to the north on Columba Pke or the Goose Creek Bypass. The proxmty of ths secondary access to the exstng brdge of Columba Pke over the West Harpeth Rver does mpact the feasblty tems noted below. The exstng northbound left turn lane on Columba Pke ends approxmately 240 feet south of the proposed locaton for ths access. In order to provde a left turn lane at ths access, the wdenng of Columba Pke would be necessary. If wdened, the length of lane transton tapers north of the secondary access on Columba Pke would result n the need to wden the brdge of Columba Pke over the West Harpeth Rver. If ths secondary access s moved approxmately 240 feet to the south on Columba Pke, the wdenng of Columba Pke to accommodate a left turn lane extenson s not necessary. ES - 2

6 The exstng brdge on Columba Pke over the West Harpeth Rver and exstng utlty poles on the west sde of Columba Pke mpact the ablty to construct a southbound rght turn lane on Columba Pke at ths secondary access. Secondary Access (South) The Tollgate Vllage Concept Plan ncludes a proposed connecton to Declaraton Way, the exstng access drve to Independence Hgh School. Ths locaton would provde a secondary route of access to a porton of the multfamly and commercal uses (medcal offce and outparcels) from Columba Pke va Declaraton Way. Access at ths locaton wll requre an agreement wth Wllamson County Schools because Declaraton Way s a prvate drve. Constructon of ths access would provde a margnally benefcal ngress/egress for the multfamly and commercal uses located on the southeastern porton of the Tollgate Vllage ste. Ths access would provde connectvty to the unsgnalzed ntersecton of Columba Pke and Declaraton Way. Whle a small porton of the multfamly and commercal ste traffc orented to the south on Columba Pke may use ths secondary access, t s reasonable to expect that traffc from Independence Hgh School would be more lkely to use ths connecton as a means to access the future traffc sgnal at the ntersecton of Columba Pke and Tollgate Boulevard. ES - 3

7 Tollgate Vllage Traffc Impact Study I. INTRODUCTION The purpose of ths study s to update the analyss of transportaton related mpacts at the Tollgate Vllage development located n Thompson s Staton, Tennessee. A traffc mpact study for Tollgate Vllage was prevously conducted and approved n Development s occurrng at Tollgate Vllage based upon the traffc study and prevously approved plans. At ths tme, an updated Concept Plan for Tollgate Vllage s beng prepared that ncludes land use and/or unt quantty adjustments to support the ongong development actvtes. Ths study has been requested by the Town of Thompson s Staton plannng staff n order to address transportaton mpacts and mtgatng measures as part of the updated concept plan revew process. In order to evaluate and quantfy the mpacts of ths development, an nventory of the exstng transportaton system was carred out, along wth an assessment of ts adequacy. Based on the project schedule, a desgn year was establshed and system-wde growth rates were appled to exstng traffc volumes. Ste traffc was generated, dstrbuted, and assgned to the roadway network to quantfy the ste mpact. Transportaton analyses were performed n order to assess any ste or non-ste related mpacts on the system. Fnally, recommendatons for roadway mprovements and/or transportaton system mprovements were offered

8 Tollgate Vllage Traffc Impact Study II. PROPOSED DEVELOPMENT A. Project Descrpton As shown n Fgure 1, Tollgate Vllage s located on the west sde of Columba Pke (US Hghway 31 / State Route 6) between Independence Hgh School and the West Harpeth Rver n the Tow of Thompson s Staton, Tennessee. The Tollgate Vllage Concept Plan ncludes a total area of acres. Table 1 below shows the currently approved and proposed ste data as represented on the concept plan for Tollgate Vllage. TABLE 1 TOLLGATE VILLAGE SITE DATA Land Use Currently Approved Plan Proposed Concept Plan Change n Unts Sngle Famly 669 lots (approx. 217 bult) 681 lots + 12 lots Townhome 88 unts 234 unts unts Multfamly 256 unts 275 unts + 19 unts Lve/Work - 49 unts (26,000 sf) + 49 unts Offce Medcal Offce 30,000 sf (100% bult) 46,800 sf (100% bult) 30,000 sf none 46,800 sf none Retal 193,000 sf ,000 sf Hotel acres acres Outparcels 11.2 acres acres acres The proposed Tollgate Vllage Concept Plan s shown n Fgure 2. B. Ste Access Access to Tollgate Vllage ncludes an exstng prmary access and future, proposed secondary accesses as descrbed below. Prmary Access - Prmary access to Tollgate Vllage s provded by Tollgate Boulevard. Tollgate Boulevard ntersects Columba Pke approxmately 1,875 feet north of the State Route 840 nterchange and approxmately 1,900 feet south of the Goose Creek Bypass (State Route 248). Tollgate Boulevard conssts of one (1) lane for traffc enterng Tollgate Vllage and two (2) lanes for traffc extng Tollgate Vllage. The extng lane assgnment on Tollgate Boulevard ncludes one (1) rght turn lane and one (1) left turn lane wth storage lengths of approxmately 250 feet. Ths access s unsgnalzed and two-way stop control s n place at Columba Pke

9 Tollgate Vllage Traffc Impact Study Secondary Access (North) - The Tollgate Vllage Concept Plan ncludes a proposed secondary access to Columba Pke approxmately 640 feet north of Tollgate Boulevard. Ths locaton wll provde access to portons of the multfamly and commercal uses (hotel, offce, and outparcels) from Columba Pke. Secondary Access (South) - The Tollgate Vllage Concept Plan ncludes a proposed connecton to Declaraton Way, the exstng access drve to Independence Hgh School. Ths locaton would provde a secondary route of access to a porton of the multfamly and commercal uses (medcal offce and outparcels) from Columba Pke va Declaraton Way. Access at ths locaton wll requre an agreement wth Wllamson County Schools because Declaraton Way s a prvate drve. C. Phasng and Tmng The buld-out of Tollgate Vllage s occurrng n multple phases wth the development schedule largely nfluenced by market condtons. For the future traffc analyss n ths report, t wll be assumed that the full buld-out of Tollgate Vllage occurs n the year

10 TolgateVlage LocatonMap Fgure 1

11 Fgure 2

12 Tollgate Vllage Traffc Impact Study III. EXISTING CONDITIONS A. Transportaton System The exstng transportaton system n the area that provdes access to Tollgate Vllage conssts of arteral and collector roadways. The followng roadways are located wthn the project area and wll comprse the study area for consderaton of the updated concept plan at Tollgate Vllage. Columba Pke (US Hghway 31 / State Route 6) n the study area s classfed as an arteral roadway n the Town of Thompson s Staton Comprehensve Plan. Columba Pke transtons from a two-lane to a fve-lane roadway between the West Harpeth Rver and Tollgate Boulevard. The fve-lane secton of Columba Pke contnues to south of State Route 840. The posted speed lmt on Columba Pke s 45 mph. Tollgate Boulevard n the study area s classfed as a collector roadway n the Town of Thompson s Staton Comprehensve Plan. Tollgate Boulevard s two-lane roadway and provdes prmary access to Tollgate Vllage. Tollgate Boulevard ends wthn the Tollgate Vllage development and does not provde access to any area adjacent to or beyond the area ncluded on the Tollgate Vllage concept plan. The posted speed lmt on Tollgate Boulevard s 30 mph. B. Traffc Volumes In order to assess the adequacy of the local transportaton system, an evaluaton of the current operatonal qualty of ntersectons wthn the study area was requred. The peak hour of the adjacent street traffc was used to determne the mpact of the development plan at Tollgate Vllage on the exstng transportaton system. Peak hour traffc volumes for the exstng base condtons n 2014 were taken from a turnng movement traffc conducted by the Tennessee Department of Transportaton at the followng locaton. Columba Pke at Tollgate Boulevard Base traffc volumes for 2014 exstng traffc condtons are shown on page 11 n Fgure 3. C. Proposed Transportaton System The Tennessee Department of Transportaton (TDOT) s conductng a revew of Columba Pke between the Goose Creek Bypass and State Route 840. Based upon prelmnary nformaton from Town of Thompson s Staton and TDOT staff, a component of the revew beng conducted by TDOT ncluded an 8-hour turnng movement traffc and sgnal warrant analyss for the ntersecton of Columba Pke and Tollgate Boulevard. At the tme of ths study, the fnal report of TDOT s revew was not avalable. However, based upon dscussons wth Town of Thompson s Staton and TDOT staff, the TDOT revew dd ndcate that sgnal warrants could be satsfed at the ntersecton of Columba Pke and Tollgate Boulevard and that the nstallaton of a new traffc sgnal at ths ntersecton would be ntated by TDOT. The schedule for desgn and constructon of ths traffc sgnal s unknown

13 Tollgate Vllage Traffc Impact Study IV. FORECASTED BACKGROUND TRAFFIC A. Introducton Based upon antcpated development actvty, the horzon year 2020 wll be used to consder the full buld-out of the proposed concept plan at Tollgate Vllage. Before any mpacts to the study area can be addressed, some estmate of background traffc volumes must be establshed. Background traffc volumes were establshed by usng an annual growth rate based upon hstorcal traffc data and future traffc forecasts. B. Annual Growth To establsh background traffc volumes, TDOT hstorcal traffc was obtaned for the general study area. Table 2 below shows the avalable traffc data for the years 2010 to present. TABLE 2 HISTORICAL TRAFFIC COUNT DATA Year Wllamson County Staton 94 (1) Wllamson County Staton 95 (2) ,976 4, ,513 5, ,049 5, ,682 5, ,281 5,604 (1) Locaton - On Columba Pke north of the Goose Creek Bypass (2) Locaton - On the Goose Creek Bypass north of Columba Pke In addton to the hstorcal traffc count data for Columba Pke and the Goose Creek Bypass, the forecasted growth rate of the Nashvlle Metropoltan Organzaton (MPO) transportaton model was avalable as part of the traffc counts and traffc forecasts completed by TDOT. For the vcnty of Tollgate Vllage, the Nashvlle MPO transportaton model ndcates that a growth rate of 2.6 percent annually s expected. Based upon the Nashvlle MPO data and a lnear regresson analyss of the hstorcal traffc count data, a 2.6 percent annual growth rate wll be appled to the exstng traffc volumes. Background traffc volumes for the future horzon year 2020 are shown on page 11 n Fgure

14 Tollgate Vllage Traffc Impact Study V. PROPOSED SITE TRAFFIC A. Proposed Ste Trp Generaton In order to quantfy ste related mpacts wthn the study area, some estmates of ste traffc generaton and trp assgnment had to be establshed. Trp generaton rates for the development were establshed usng nformaton for the weekday p.m. peak hour of the adjacent street as shown n the ITE Trp Generaton Manual, 9 th Edton. Table 3 below shows the unadjusted trp generaton for the proposed Tollgate Vllage concept plan. TABLE 3 TOLLGATE VILLAGE UNADJUSTED TRIP GENERATION Land Use Total Unts Daly A.M. Peak Hour P.M. Peak Hour Enter Ext Total Enter Ext Total Sngle Famly Detached Homes 681 lots 6, Townhomes 234 unts 1, Multfamly 275 unts 1, Lve/Work 49 unts General Offce 30,000 sf Medcal Offce 46,800 sf 1, Commercal/Retal (Outparcels) 54,000 sf 4, Hotel 50 rooms TOTAL UNADJUSTED 16, , ,592 Retal-orented developments often attract trps from motorsts already passng by the development on an adjacent street. Ths s known as the pass-by trp phenomenon. Pass-by trps are made as ntermedate stops on the way from an orgn to a destnaton. Ths traffc wll be on the roadway system passng by the ste even f the proposed development s not constructed. Based upon the sze of retal uses at Tollgate Vllage, the ITE Trp Generaton Handbook reveals that a pass-by trp rate of approxmately 47 percent s approprate for the p.m. peak hour. The dervaton of pass-by traffc volumes s shown n the appendx of ths report. Snce Tollgate Vllage wll contan a mx of offce, retal, and resdental uses, some trp nteracton between these uses s expected. These types of trps between dfferent uses wthn a mxed use development are defned as nternal trps. The mpact and net effect of nternal trps can be establshed usng the methodology shown n the ITE Trp Generaton Handbook. For the retal, offce, and resdental land uses at Tollgate Vllage, the ITE Trp Generaton Handbook ndcates that approxmately 8 percent of the daly trps and 5 percent of the p.m. peak trps wll be nternal. The dervaton of nternal traffc s shown n the appendx of ths report

15 Tollgate Vllage Traffc Impact Study The Tollgate Vllage trp generaton, adjusted to account for the mpact of nternal trps, s shown below n Table 4. TABLE 4 TOLLGATE VILLAGE ADJUSTED TRIP GENERATION Land Use Total Unts Daly A.M. Peak Hour P.M. Peak Hour Enter Ext Total Enter Ext Total Sngle Famly Detached Homes 681 lots 5, Townhomes 234 unts 1, Multfamly 275 unts 1, Lve/Work 49 unts General Offce 30,000 sf Medcal Offce 46,800 sf 1, Commercal/Retal (Outparcels) (Prmary Trps Only) 54,000 sf 3, Hotel 50 rooms TOTAL ADJUSTED 15, , ,342 B. Trp Generaton Comparson As prevously dscussed, a traffc mpact study for Tollgate Vllage was completed n 2003 and development has been occurrng based on a prevously approved plan for Tollgate Vllage. Wth the proposal of an updated concept plan, a comparson of the trp generaton shown n the prevously completed traffc mpact study and the trp generaton of the proposed updated concept plan s approprate to dentfy the net mpact of new traffc generated by Tollgate Farms. Table 5 below summarzes the trp generaton for Tollgate Vllage as shown n the 2003 traffc mpact study and as calculated for the updated concept plan. TABLE 5 TOLLGATE VILLAGE TRIP GENERATION COMPARISON Trp Generaton Source Daly A.M. Peak Hour P.M. Peak Hour Enter Ext Total Enter Ext Total 2003 Traffc Impact Study 20, , ,260 2, Updated Concept Plan 15, , ,342 NET CHANGE - 5,

16 Tollgate Vllage Traffc Impact Study As shown n Table 5 above, the updated concept plan for Tollgate Vllage results n the net reducton of trps generated by the development on a daly bass and durng the a.m. and p.m. peak hours. C. Ste Trp Dstrbuton and Assgnment Ste trps were dstrbuted based upon the prevalent traffc patterns n the area ncludng the turnng movement data avalable from TDOT at the ntersecton of Columba Pke and Tollgate Boulevard. The dstrbuton of ste trps for Tollgate Vllage s shown on page 11 n Fgure 3. Ste traffc volumes generated by Tollgate Vllage n the horzon year 2020 are shown n Fgure 7. The accumulaton of exstng, background growth, and ste generated traffc for the horzon year 2020 are also shown n Fgure

17 224( 99) 40% 60% 410( 334) 336( 274) 0( 56) 0( 56) Col umb ap ke Tol l gat e Boul ev ar d Col umb ap ke 2020PassByS t etr af f cvol umes Tol l gat e Boul ev ar d 0( 37) 0( 56) 190( 330) 233( 404) 2020Pr mar ys t etr af f cvol umes 40% -40% 60% -60% Col umb ap ke Tol l gat e Boul ev ar d Col umb ap ke 55% 45% PassbyS t etr pd st r but on 45% 55% Pr mar ys t etr pd st r but on Tol l gat e Boul ev ar d Col umb ap ke 107( 166) Tol l gat e Boul ev ar d 0( 37) 0( 37) 97( 58) 73( 62) Col umb ap ke Tol l gat e Boul ev ar d 2020Backgr oundgr owt h 56( 45) 1344( 595) 48( 84) 642( 996) 2014Ex st ngtr af f cvol umes 410( 371) 336( 330) LongHol l owp ke Buc k ngham Boul ev ar d PeakHour s A. M. ( P. M. ) 190( 367) 1568( 657) 233( 460) 749( 1106) 2020Tot altr af f cvol umes Tol l gat ev l l age Col umb ap keattol l gat eboul evar d I nt er sect ontr af f cvol umes F gur e 3

18 Tollgate Vllage Traffc Impact Study VI. TRANSPORTATION ANALYSIS A. Intersecton Capacty Analyss In order to gauge the ste mpact and dentfy capacty defcent locatons, capacty analyses were conducted at crtcal roadway ntersectons wthn the study area. Capacty analyses were conducted accordng to the methodology and procedures outlned n the Hghway Capacty Manual, 2010, publshed by the Transportaton Research Board. In the study area, crtcal ntersectons were analyzed for capacty defcences and geometrc mprovements for the a.m. and p.m. peak hours for future condtons. Analyss consdered the transportaton system wth and wthout the ste. The followng ntersectons were analyzed: Columba Pke at Tollgate Boulevard Capacty analyss results for the exstng roadway network are shown below n Table 6. TABLE 6 INTERSECTION CAPACITY ANALYSIS RESULTS Locaton Year Development Condton Intersecton Control (1) Turnng Movement Level-of-Servce A.M. P.M. NB Left Turn A B 2014 Exstng TWSC EB Left Turn D D Columba Pke at Tollgate Boulevard 2020 Total TWSC EB Rght Turn B B NB Left Turn B F EB Left Turn F F EB Rght Turn C F 2020 Total Sgnal (1) Sgnal = Traffc Sgnal Control, TWSC = Two-way Stop Control (2) Wth Recommended Improvement Overall Intersecton (2) B C The ntersecton capacty analyss results presented above conservatvely nclude all Tollgate Vllage ste traffc usng Tollgate Boulevard for access. Whle the addton of a secondary access wll allow traffc to dsperse at two ngress/egress locatons, the analyss of the full buldout of Tollgate Vllage wth one access results n a more conservatve evaluaton of future traffc operatons. Level of servce (LOS) crtera for unsgnalzed ntersectons s shown n Table

19 Tollgate Vllage Traffc Impact Study TABLE 7 DESCRIPTIONS OF LEVEL OF SERVICE FOR UNSIGNALIZED INTERSECTIONS Level of Servce Descrpton Control Delay (sec./veh.) A Usually no conflctng traffc 0-10 B Occasonally some delay due to conflctng traffc > C Delay s notceable but not nconvenencng > D Delay s notceable and rrtatng, ncreased rsk takng > E Delay approaches tolerance level, rsk takng lkely > F Delay exceeds tolerance level, hgh lkelhood of rsk takng > 50 Source: Hghway Capacty Manual, HCM 2010 Level of servce (LOS) crtera for sgnalzed ntersectons s shown n Table 8. TABLE 8 DESCRIPTIONS OF LEVEL OF SERVICE FOR SIGNALIZED INTERSECTIONS Level of Servce A B C D E F Descrpton Volume-to-capacty rato s low, progresson s extremely favorable, most vehcles travel through ntersecton wthout stoppng Volume-to-capacty rato s low, progresson s good and/or short cycle lengths s present, more vehcles stop than for LOS A Progresson s favorable and/or cycle length s moderate, number of vehcles stoppng s sgnfcant although many stll pass thru ntersecton wthout stoppng. Volume-to-capacty rato s hgh, progresson s neffectve, cycle length s long, many vehcles stop Volume-to-capacty rato s hgh, progresson s unfavorable, cycle length s long, many vehcles stop Volume-to-capacty rato s very hgh, progresson s very poor, cycle length s long, most cycles fal to clear the queue Control Delay (sec./veh.) #10 > > > > > 80 Source: Hghway Capacty Manual, HCM

20 Tollgate Vllage Traffc Impact Study VII. CONCLUSIONS AND RECOMMENDATIONS A. Introducton At full buld out, Tollgate Vllage wll contrbute approxmately 15,195 trps per day to the local roadway network. For ths development, a specfc revew of access and traffc operatons durng peak perods of ste traffc s warranted to provde effcency and acceptable levels of servce. Based upon a revew of the exstng and future proposed condtons wthn the study area, we offer the recommendatons shown below. These recommendatons have been developed to provde effcent movement of traffc to Tollgate Vllage whle mnmzng the mpact to non-ste trps on the roadway network. B. Columba Pke at Tollgate Boulevard The capacty analyss results for the ntersecton of Columba Pke and Tollgate Boulevard ndcate that traffc operatons are currently characterzed by acceptable levels of servce durng the a.m. and p.m. peak hours. The eastbound left turn from Tollgate Boulevard onto Columba Pke northbound s the movement that experences the hghest delay durng peak hours. At unsgnalzed ntersectons on arteral roads, t s expected that the sde street left turn movement wll generally have a hgher delay than other turnng movements at the ntersecton. For exstng condtons, the analyss results ndcate acceptable levels of servce and the volume-to-capacty rato for Tollgate Boulevard ndcates that there s capacty avalable for addtonal traffc growth. In the horzon year 2020, the analyss was conducted for unsgnalzed control and for sgnalzed control. For the unsgnalzed control, the levels of servce and volume-to-capacty ratos for Tollgate Boulevard ndcate that the capacty of the ntersecton s exceeded at full buld-out wthout a traffc sgnal. Based on the TDOT revew of Columba Pke n the vcnty and the prelmnary ndcatons that a new traffc sgnal wll be nstalled as part of TDOT mprovements, the analyss of the ntersecton under traffc sgnal control ndcates that acceptable ntersecton operatons can be provded f the followng mprovements are mplemented. A southbound rght turn lane should be constructed on Columba Pke at Tollgate Boulevard. The storage length of ths turn lane should be 250 feet wth 100 feet of taper. It s mportant to note that the nstallaton of a traffc sgnal at ths ntersecton wll requre wdenng of Columba Pke north of Tollgate Boulevard to provde addtonal merge and lane drop transton length. Ths wdenng wll extend to the north of the brdge over the West Harpeth Rver and wll requre brdge wdenng to accomplsh. The schedule for desgn and constructon of a traffc sgnal at ths ntersecton by TDOT wll be mpacted by the need to wden the exstng brdge structure. C. Secondary Access (North) The Tollgate Vllage Concept Plan ncludes a proposed secondary access to Columba Pke approxmately 640 feet north of Tollgate Boulevard. Ths locaton wll provde access to portons of the multfamly and commercal uses (hotel, offce, and outparcels) from Columba Pke

21 Tollgate Vllage Traffc Impact Study Constructon of ths access would provde a benefcal ngress/egress for the multfamly and commercal uses located on the northeastern porton of the Tollgate Vllage ste. Ths access would be unsgnalzed and would serve a porton of the multfamly and commercal ste traffc orented to the north on Columba Pke or the Goose Creek Bypass. The proxmty of ths secondary access to the exstng brdge of Columba Pke over the West Harpeth Rver does mpact the feasblty tems noted below. The exstng northbound left turn lane on Columba Pke ends approxmately 240 feet south of the proposed locaton for ths access. In order to provde a left turn lane at ths access, the wdenng of Columba Pke would be necessary. If wdened, the length of lane transton tapers north of the secondary access on Columba Pke would result n the need to wden the brdge of Columba Pke over the West Harpeth Rver. If ths secondary access s moved approxmately 240 feet to the south on Columba Pke, the wdenng of Columba Pke to accommodate a left turn lane extenson s not necessary. The exstng brdge on Columba Pke over the West Harpeth Rver and exstng utlty poles on the west sde of Columba Pke mpact the ablty to construct a southbound rght turn lane on Columba Pke at ths secondary access. D. Secondary Access (South) The Tollgate Vllage Concept Plan ncludes a proposed connecton to Declaraton Way, the exstng access drve to Independence Hgh School. Ths locaton would provde a secondary route of access to a porton of the multfamly and commercal uses (medcal offce and outparcels) from Columba Pke va Declaraton Way. Access at ths locaton wll requre an agreement wth Wllamson County Schools because Declaraton Way s a prvate drve. Constructon of ths access would provde a margnally benefcal ngress/egress for the multfamly and commercal uses located on the southeastern porton of the Tollgate Vllage ste. Ths access would provde connectvty to the unsgnalzed ntersecton of Columba Pke and Declaraton Way. Whle a small porton of the multfamly and commercal ste traffc orented to the south on Columba Pke may use ths secondary access, t s reasonable to expect that traffc from Independence Hgh School would be more lkely to use ths connecton as a means to access the future traffc sgnal at the ntersecton of Columba Pke and Tollgate Boulevard

22 APPENDIX A. BASE TRAFFIC DATA & TRAFFIC COUNTS B. TRIP GENERATION C. TRAFFIC ASSIGNMENT D. CAPACITY ANALYSIS WORKSHEETS

23 APPENDIX A BASE TRAFFIC DATA & TRAFFIC COUNTS

24

25 County: Wllamson Staton Number: Route: SR006 Staton Type: Other Rural Staton Out: NO Locaton: S OF FRANKLIN Average Average Annual Axle Weekday Daly Average Adjustment Month Year Traffc Traffc Daly Factor Remarks ,172 4,422 4, ,642 5,524 5, ,367 5,197 5, ,080 5, , , ACTUAL = , , ACTUAL = ,509 4,915 4, ,684 4,918 4, ,214 6,090 5, ,225 6,038 5, ,916 6,639 6, ,165 8,328 8, ,850 8,496 8, ,969 8,610 8, ,781 9,044 8, ,826 9,236 9, DIFF MONTH ,271 11,657 8, ACTUAL = ,633 9,922 9, ,458 14,602 10, ACTUAL = ,972 10,370 10, ,927 11,036 10, ,026 12,904 12, UP & DOWN ,185 13,618 13, ,071 11,830 11, , TAKEN FROM CLASS ,864 12,221 11, ,200 11,748 11, ,450 13,316 13, ,325 12,941 12, , EST Trend Lne based on years

26 COVERAGE COUNT DATA WITH 24 HOUR TOTALS Staton Number: County: 94 Wllamson Start Date: 01 / 16 / 2013 End Date: 01 / 17 / 2013 Start Tme: 12 : 00 End Tme: 12 : 00 Drecton: 0 (Coverage) Tme 12:00-13: :00-14:00 14:00-15: :00-16: :00-17: :00-18:00 1,000 18:00-19: :00-20: :00-21: :00-22: :00-23: :00-24: :00-01: :00-02: :00-03: :00-04: :00-05: :00-06: :00-07: :00-08:00 1,205 08:00-09: :00-10: :00-11: :00-12: Total: 12,325 x Varaton Factor: 1.05 = 12,941 x Truck Factor: 0.98 = AADT: 12,682.4 Peak AM Peak Total Peak Hour Factor Peak PM Peak Total Peak Hour Factor 06:45-07: :30-17: Peak AM % Dr Dst AM % Peak PM % Dr Dst PM % Daly Peak % Daly Dr Dst %

27 County: Wllamson Staton Number: Route: SR248 Staton Type: Other Rural Staton Out: NO Locaton: GOOSE CR BP - S OF FRANKLIN Average Average Annual Axle Weekday Daly Average Adjustment Month Year Traffc Traffc Daly Factor Remarks ,514 5,845 5, ,894 7,014 6, ,433 7,655 7, ,311 6, , , ACTUAL = ,777 3, SATURN PKWY OPEN ,287 3,583 3, ,895 3,011 2, ,625 3,553 3, ,392 3,290 3, ,600 4,416 4, ,947 4,944 4, ,380 5,165 5, ,061 5,819 5, ,584 6,782 6, ,273 6,837 6, DIFF MONTH ,536 10,959 6, ACTUAL = ,637 6,836 6, ,424 8,508 6, ACTUAL = ,874 8,110 7, HIGH 2 YRS - KEEP ,007 10,107 9, GOING UP ,466 8,709 8, SEE , EST ,373 5,266 8, ACTUAL = , EST ,787 4,548 4, LOW LAST 2 YRS COUNTED ,892 5,244 5, SEE 2008 ACTUAL ,074 6,013 5, ,234 5,496 5, , EST Trend Lne based on years

28 COVERAGE COUNT DATA WITH 24 HOUR TOTALS Staton Number: County: 94 Wllamson Start Date: 01 / 16 / 2013 End Date: 01 / 17 / 2013 Start Tme: 12 : 00 End Tme: 12 : 00 Drecton: 0 (Coverage) Tme 12:00-13: :00-14:00 14:00-15: :00-16: :00-17: :00-18: :00-19: :00-20: :00-21: :00-22: :00-23: :00-24: :00-01: :00-02: :00-03: :00-04: :00-05: :00-06: :00-07: :00-08: :00-09: :00-10: :00-11: :00-12: Total: 5,234 x Varaton Factor: 1.05 = 5,496 x Truck Factor: 0.99 = AADT: 5, Peak AM Peak Total Peak Hour Factor Peak PM Peak Total Peak Hour Factor 06:45-07: :30-16: Peak AM % Dr Dst AM % Peak PM % Dr Dst PM % Daly Peak % Daly Dr Dst %

29 APPENDIX B TRIP GENERATION

30 TOLLGATE VILLAGE TRIP GENERATION Sngle-Famly Detached Housng Dwellng Unts Use ITE Land Use Code 210 (Sngle-Famly Detached Housng) and assocated trp generaton rates for 24-hour total trps and peak hour trps. Average Daly Traffc Ln(T) = 0.92 Ln(X) Ln(T) = 0.92 Ln(681) T = 6134 A.M. Peak Hour of Adjacent Street Traffc T = 0.70(X) T = 0.70(681) T = 486 Enter = 0.25(486) = 122 Ext = 0.75(486) = 364 P.M. Peak Hour of Adjacent Street Traffc Ln(T) = 0.90 Ln(X) Ln(T) = 0.90 Ln(681) T = 591 Enter = 0.63(591) = 372 Ext = 0.37(591) = 219

31 TOLLGATE VILLAGE TRIP GENERATION Resdental Condomnum/Townhouse Dwellng Unts Use ITE Land Use Code 230 (Resdental Condomnum/Townhouse) and assocated trp generaton rates for 24-hour total trps and peak hour trps. Average Daly Traffc Ln(T) = 0.87 Ln(X) Ln(T) = 0.87 Ln(234) T = 1348 A.M. Peak Hour of Adjacent Street Traffc T = 0.80(X) T = 0.80(234) T = 187 Enter = 0.17(187) = 32 Ext = 0.83(187) = 155 P.M. Peak Hour of Adjacent Street Traffc Ln(T) = 0.82 Ln(X) Ln(T) = 0.82 Ln(234) T = 121 Enter = 0.67(121) = 81 Ext = 0.33(121) = 40

32 TOLLGATE VILLAGE TRIP GENERATION Multfamly Dwellng Unts Use ITE Land Use Code 220 (Apartment) and assocated trp generaton rates for 24-hour total trps and peak hour trps. Average Daly Traffc T = 6.06(X) T = 6.06(275) T = 1790 A.M. Peak Hour of Adjacent Street Traffc T = 0.49(X) T = 0.49(275) T = 138 Enter = 0.20(138) = 28 Ext = 0.80(138) = 110 P.M. Peak Hour of Adjacent Street Traffc T = 0.55(X) T = 0.55(275) T = 169 Enter = 0.65(169) = 110 Ext = 0.35(169) = 59

33 TOLLGATE VILLAGE TRIP GENERATION Lve/Work Unts - 49 Dwellng Unts Use ITE Land Use Code 230 (Resdental Condomnum/Townhouse) and assocated trp generaton rates for 24-hour total trps and peak hour trps. Average Daly Traffc Ln(T) = 0.87 Ln(X) Ln(T) = 0.87 Ln(49) T = 346 A.M. Peak Hour of Adjacent Street Traffc T = 0.80(X) T = 0.80(49) T = 39 Enter = 0.17(39) = 7 Ext = 0.83(39) = 32 P.M. Peak Hour of Adjacent Street Traffc Ln(T) = 0.82 Ln(X) Ln(T) = 0.82 Ln(49) T = 33 Enter = 0.67(33) = 22 Ext = 0.33(33) = 11

34 TOLLGATE VILLAGE TRIP GENERATION General Offce Buldng - 30,000 Sq. Feet Gross Floor Area (X = GSF/1000) Use ITE Land Use Code 710 (General Offce Buldng) and assocated trp generaton rates for 24-hour total trps and peak hour trps. Average Daly Traffc Ln(T) = 0.76 Ln(X) Ln(T) = 0.76 Ln(30) T = 526 A.M. Peak Hour Ln(T) = 0.80 Ln(X) Ln(T) = 0.80 Ln(30) T = 73 Enter = 0.88(73) = 64 Ext = 0.12(73) = 9 P.M. Peak Hour T = 1.12 (X) T = 1.12 (30) T = 105 Enter = 0.17(105) = 18 Ext = 0.83(105) = 87 ITE Trp Generaton, 8th Edton

35 TOLLGATE VILLAGE TRIP GENERATION Medcal Offce Buldng - 46,800 Sq. Feet Gross Floor Area (X = GSF/1000) Use ITE Land Use Code 720 (Medcal Offce Buldng) and assocated trp generaton rates for 24-hour total trps and peak hour trps. Average Daly Traffc T = 40.89(X) T = 40.89(46.8) T = 1699 A.M. Peak Hour of Adjacent Street Traffc T = 2.39(X) T = 2.39(46.8) T = 112 Enter = 0.79(112) = 88 Ext = 0.21(112) = 24 P.M. Peak Hour of Adjacent Street Traffc Ln(T) = 0.90 Ln(X) Ln(T) = 0.90 Ln(46.8) T = 147 Enter = 0.28(147) = 41 Ext = 0.72(147) = 106

36 TOLLGATE VILLAGE TRIP GENERATION Shoppng Center - 54,000 Sq. Feet Gross Floor Area (X = GSF/1000) Use ITE Land Use Code 820 (Shoppng Center) and assocated trp generaton rates for 24-hour total trps and peak hour trps. Average Daly Traffc Ln(T) = 0.65 Ln(X) Ln(T) = 0.65 Ln(54) T = 4550 A.M. Peak Hour of Adjacent Street Traffc Ln(T) = 0.61 Ln(X) Ln(T) = 0.61 Ln(54) T = 107 Enter = 0.62(107) = 66 Ext = 0.38(107) = 41 P.M. Peak Hour of Adjacent Street Traffc Ln(T) = 0.67 Ln(X) Ln(T) = 0.67 Ln(54) T = 396 Enter = 0.48(396) = 190 Ext = 0.52(396) = 206

37 TOLLGATE VILLAGE TRIP GENERATION Hotel - 50 Rooms Use ITE Land Use Code 310 (Hotel) and assocated trp generaton rates for 24-hour total trps and peak hour trps. Average Daly Traffc T = 8.95(X) T = 8.95(50) T = 74 A.M. Peak Hour of Adjacent Street Traffc T = 0.53(X) T = 0.53(50) T = 27 Enter = 0.59(27) = 16 Ext = 0.41(27) = 11 P.M. Peak Hour of Adjacent Street Traffc T = 0.60(X) T = 0.60(50) T = 30 Enter = 0.51(30) = 15 Ext = 0.49(30) = 15

38 Analyst Date MULTI-USE DEVELOPMENT bsb TRIP GENERATION Name of Dvlpt Tollgate Vllage 2/25/2015 AND INTERNAL CAPTURE SUMMARY Tme Perod Daly Ext to External Enter from External LAND USE A ITE LU Code Resdental Sze Total Internal External Enter Ext Total % 100% 5% 95% 0% 0 33% % % % 0 11% % 22 9% 205 LAND USE B LAND USE C ITE LU Code Offce Demand Balanced Demand ITE LU Code Retal Ext to External Sze 15% % 68 Sze Ext to External 999 Total Internal External Total Internal External 1957 Enter Enter Ext % % 91 Ext Total Demand Balanced Demand Total Enter from External % 100% 8% 92% % 100% 13% 87% Enter from External Net External Trps for Mult-Use Development LAND USE A LAND USE B Land Use C Total Enter Ext Total INTERNAL CAPTURE -Use Trp. Gen. Est %

39 Analyst Date MULTI-USE DEVELOPMENT bsb TRIP GENERATION Name of Dvlpt Tollgate Vllage 2/25/2015 AND INTERNAL CAPTURE SUMMARY Tme Perod PM Peak Hour Ext to External Enter from External LAND USE A ITE LU Code Sze Resdental Total Internal External Enter Ext Total % 100% 3% 97% 0% 0 31% % 11 53% 169 0% 0 12% % 4 9% 9 LAND USE B LAND USE C ITE LU Code Offce Demand Balanced Demand ITE LU Code Retal Ext to External Sze 31% % 3 Sze Ext to External 187 Total Internal External Total Internal External 96 Enter Enter Ext % % 2 Ext Total Demand Balanced Demand Total Enter from External % 100% 4% 96% % 100% 13% 87% Enter from External Net External Trps for Mult-Use Development LAND USE A LAND USE B Land Use C Total Enter Ext Total INTERNAL CAPTURE Use Trp. Gen. Est %

40 APPENDIX C TRAFFIC ASSIGNMENT

41 224( 99) 40% 60% 410( 334) 336( 274) 0( 56) 0( 56) Col umb ap ke Tol l gat e Boul ev ar d Col umb ap ke 2020PassByS t etr af f cvol umes Tol l gat e Boul ev ar d 0( 37) 0( 56) 190( 330) 233( 404) 2020Pr mar ys t etr af f cvol umes 40% -40% 60% -60% Col umb ap ke Tol l gat e Boul ev ar d Col umb ap ke 55% 45% PassbyS t etr pd st r but on 45% 55% Pr mar ys t etr pd st r but on Tol l gat e Boul ev ar d Col umb ap ke 107( 166) Tol l gat e Boul ev ar d 0( 37) 0( 37) 97( 58) 73( 62) Col umb ap ke Tol l gat e Boul ev ar d 2020Backgr oundgr owt h 56( 45) 1344( 595) 48( 84) 642( 996) 2014Ex st ngtr af f cvol umes 410( 371) 336( 330) LongHol l owp ke Buc k ngham Boul ev ar d PeakHour s A. M. ( P. M. ) 190( 367) 1568( 657) 233( 460) 749( 1106) 2020Tot altr af f cvol umes Tol l gat ev l l age Col umb ap keattol l gat eboul evar d I nt er sect ontr af f cvol umes F gur e C1

42 APPENDIX D CAPACITY ANALYSIS WORKSHEETS

43 General Informaton Analyst bsb Agency/Co. Ragan-Smth Date Performed 2/25/2015 Analyss Tme Perod AM Peak Hour TWO-WAY STOP CONTROL SUMMARY Ste Informaton Intersecton Jursdcton Analyss Year Columba Tollgate Blvd Thompson's Staton 2014 Base Traffc Project Descrpton Tollgate Vllage East/West Street: Tollgate Blvd North/South Street: Columba Pke Intersecton Orentaton: North-South Study Perod (hrs): 0.25 Vehcle Volumes and Adjustments Major Street Northbound Southbound Movement L T R L T R Volume (veh/h) Peak-Hour Factor, PHF Hourly Flow Rate, HFR (veh/h) Percent Heavy Vehcles Medan Type Two Way Left Turn Lane RT Channelzed 0 0 Lanes Confguraton L T T TR Upstream Sgnal 1 0 Mnor Street Eastbound Westbound Movement L T R L T R Volume (veh/h) Peak-Hour Factor, PHF Hourly Flow Rate, HFR (veh/h) Percent Heavy Vehcles Percent Grade (%) 0 0 Flared Approach N N Storage 0 0 RT Channelzed 0 0 Lanes Confguraton L R Delay, Queue Length, and Level of Servce Approach Northbound Southbound Westbound Eastbound Movement Lane Confguraton L L R v (veh/h) C (m) (veh/h) v/c % queue length Control Delay (s/veh) LOS A D B Approach Delay (s/veh) Approach LOS C Copyrght 2010 Unversty of Florda, All Rghts Reserved HCS+ TM Verson 5.6 Generated: 2/25/2015 9:52 AM

44 General Informaton Analyst bsb Agency/Co. Ragan-Smth Date Performed 2/25/2015 Analyss Tme Perod PM Peak Hour TWO-WAY STOP CONTROL SUMMARY Ste Informaton Intersecton Jursdcton Analyss Year Columba Tollgate Blvd Thompson's Staton 2014 Base Traffc Project Descrpton Tollgate Vllage East/West Street: Tollgate Blvd North/South Street: Columba Pke Intersecton Orentaton: North-South Study Perod (hrs): 0.25 Vehcle Volumes and Adjustments Major Street Northbound Southbound Movement L T R L T R Volume (veh/h) Peak-Hour Factor, PHF Hourly Flow Rate, HFR (veh/h) Percent Heavy Vehcles Medan Type Two Way Left Turn Lane RT Channelzed 0 0 Lanes Confguraton L T T TR Upstream Sgnal 1 0 Mnor Street Eastbound Westbound Movement L T R L T R Volume (veh/h) Peak-Hour Factor, PHF Hourly Flow Rate, HFR (veh/h) Percent Heavy Vehcles Percent Grade (%) 0 0 Flared Approach N N Storage 0 0 RT Channelzed 0 0 Lanes Confguraton L R Delay, Queue Length, and Level of Servce Approach Northbound Southbound Westbound Eastbound Movement Lane Confguraton L L R v (veh/h) C (m) (veh/h) v/c % queue length Control Delay (s/veh) LOS B D B Approach Delay (s/veh) Approach LOS C Copyrght 2010 Unversty of Florda, All Rghts Reserved HCS+ TM Verson 5.6 Generated: 2/25/ :42 AM

45 General Informaton Analyst bsb Agency/Co. Ragan-Smth Date Performed 2/25/2015 Analyss Tme Perod AM Peak Hour TWO-WAY STOP CONTROL SUMMARY Ste Informaton Intersecton Jursdcton Analyss Year Columba Tollgate Blvd Thompson's Staton 2020 Total Traffc Project Descrpton Tollgate Vllage East/West Street: Tollgate Blvd North/South Street: Columba Pk Intersecton Orentaton: North-South Study Perod (hrs): 0.25 Vehcle Volumes and Adjustments Major Street Northbound Southbound Movement L T R L T R Volume (veh/h) Peak-Hour Factor, PHF Hourly Flow Rate, HFR (veh/h) Percent Heavy Vehcles Medan Type Two Way Left Turn Lane RT Channelzed 0 0 Lanes Confguraton L T T TR Upstream Sgnal 1 0 Mnor Street Eastbound Westbound Movement L T R L T R Volume (veh/h) Peak-Hour Factor, PHF Hourly Flow Rate, HFR (veh/h) Percent Heavy Vehcles Percent Grade (%) 0 0 Flared Approach N N Storage 0 0 RT Channelzed 0 0 Lanes Confguraton L R Delay, Queue Length, and Level of Servce Approach Northbound Southbound Westbound Eastbound Movement Lane Confguraton L L R v (veh/h) C (m) (veh/h) v/c % queue length Control Delay (s/veh) LOS B F C Approach Delay (s/veh) Approach LOS F Copyrght 2010 Unversty of Florda, All Rghts Reserved HCS+ TM Verson 5.6 Generated: 2/25/2015 1:13 PM

46 General Informaton Analyst bsb Agency/Co. Ragan-Smth Date Performed 2/25/2015 Analyss Tme Perod PM Peak Hour TWO-WAY STOP CONTROL SUMMARY Ste Informaton Intersecton Jursdcton Analyss Year Columba Tollgate Blvd Thompson's Staton 2020 Total Traffc Project Descrpton Tollgate Vllage East/West Street: Tollgate Blvd North/South Street: Columba Pk Intersecton Orentaton: North-South Study Perod (hrs): 0.25 Vehcle Volumes and Adjustments Major Street Northbound Southbound Movement L T R L T R Volume (veh/h) Peak-Hour Factor, PHF Hourly Flow Rate, HFR (veh/h) Percent Heavy Vehcles Medan Type Two Way Left Turn Lane RT Channelzed 0 0 Lanes Confguraton L T T TR Upstream Sgnal 1 0 Mnor Street Eastbound Westbound Movement L T R L T R Volume (veh/h) Peak-Hour Factor, PHF Hourly Flow Rate, HFR (veh/h) Percent Heavy Vehcles Percent Grade (%) 0 0 Flared Approach N N Storage 0 0 RT Channelzed 0 0 Lanes Confguraton L R Delay, Queue Length, and Level of Servce Approach Northbound Southbound Westbound Eastbound Movement Lane Confguraton L L R v (veh/h) C (m) (veh/h) v/c % queue length Control Delay (s/veh) LOS F F Approach Delay (s/veh) Approach LOS Copyrght 2010 Unversty of Florda, All Rghts Reserved HCS+ TM Verson 5.6 Generated: 2/25/2015 1:13 PM

47 HCS 2010 Sgnalzed Intersecton Results Summary General Informaton Intersecton Informaton Agency Ragan-Smth Duraton, h 0.25 Analyst bsb Analyss Date Feb 25, 2015 Area Type Other Jursdcton Thompson's Staton Tme Perod AM Peak Hour PHF 0.92 Intersecton Columba Tollgate Blv Analyss Year 2020 Analyss Perod 1> 7:00 Fle Name 2020_Total_SR Tollgate_AM Peak.xus Project Descrpton Demand Informaton EB WB NB SB Approach Movement L T R L T R L T R L T R Demand (v), veh/h Sgnal Informaton Cycle, s 68.5 Reference Phase 2 Offset, s 0 Reference Pont End Uncoordnated Yes Smult. Gap E/W On Force Mode Fxed Smult. Gap N/S On Green Yellow Red Tmer Results EBL EBT WBL WBT NBL NBT SBL SBT Assgned Phase Case Number Phase Duraton, s Change Perod, (Y+Rc), s Max Allow Headway (MAH), s Queue Clearance Tme (gs), s Green Extenson Tme (ge), s Phase Call Probablty Max Out Probablty Movement Group Results EB WB NB SB Approach Movement L T R L T R L T R L T R Assgned Movement Adjusted Flow Rate (v), veh/h Adjusted Saturaton Flow Rate (s), veh/h/ln Queue Servce Tme (gs), s Cycle Queue Clearance Tme (gc), s Green Rato (g/c) Capacty (c), veh/h Volume-to-Capacty Rato (X) Avalable Capacty (ca), veh/h Back of Queue (Q), veh/ln (95th percentle) Queue Storage Rato (RQ) (95th percentle) Unform Delay (d1), s/veh Incremental Delay (d2), s/veh Intal Queue Delay (d3), s/veh Control Delay (d), s/veh Level of Servce (LOS) C C B B B B Approach Delay, s/veh / LOS 25.7 C B 15.7 B Intersecton Delay, s/veh / LOS 16.2 B Multmodal Results EB WB NB SB Pedestran LOS Score / LOS 2.9 C 2.9 C 0.7 A 2.3 B Bcycle LOS Score / LOS F 2.1 B 1.4 A Copyrght 2015 Unversty of Florda, All Rghts Reserved. HCS 2010 Streets Verson 6.65 Generated: 2/25/2015 1:14:03 PM

MEMORANDUM. Bob Zagozda, Chief Financial Officer Westside Community Schools. Mark Meisinger, PE, PTOE Felsburg Holt & Ullevig. DATE: June 11, 2018

MEMORANDUM. Bob Zagozda, Chief Financial Officer Westside Community Schools. Mark Meisinger, PE, PTOE Felsburg Holt & Ullevig. DATE: June 11, 2018 MEMORANDUM TO: Bob Zagozda, Chief Financial Officer Westside Community Schools FROM: Mark Meisinger, PE, PTOE Felsburg Holt & Ullevig DATE: June 11, 218 6-11-18 SUBJECT: Sunset Hills Elementary School

More information

Aldridge Transportation Consultants, LLC Advanced Transportation Planning and Traffic Engineering

Aldridge Transportation Consultants, LLC Advanced Transportation Planning and Traffic Engineering Aldridge Transportation Consultants, LLC Advanced Transportation Planning and Traffic Engineering John M.W. Aldridge, PE, PTOE, AICP 182 Chimney Rock Road Colorado Registered Professional Engineer Highlands

More information

UNIVERSITY AVE MADISON YARDS HILL FARMS (13.9 ACRES) THE NORMANDY APARTMENTS THE SOVEREIGN TOWER PARK TOWER AT HILLDALE FIGURE 1 - LOCATOR MAP

UNIVERSITY AVE MADISON YARDS HILL FARMS (13.9 ACRES) THE NORMANDY APARTMENTS THE SOVEREIGN TOWER PARK TOWER AT HILLDALE FIGURE 1 - LOCATOR MAP BLACKHAWK COUNTRY CLUB i UNVERSTY AVE EAU CLARE AVE AMERCAN RED CROSS STATE PARKNG STRUCTURE STATE OFFCE BULDNG L----- r;:'!fr"~~ ~; - ~... _., MADSON YARDS HLL FARMS (13.9 ACRES) OVERLOOK AT HLLDALE WESTON

More information

LUDWIG RD. SUBDIVISION PROJECT TRAFFIC IMPACT ANALYSIS

LUDWIG RD. SUBDIVISION PROJECT TRAFFIC IMPACT ANALYSIS LUDWIG RD. SUBDIVISION PROJECT TRAFFIC IMPACT ANALYSIS Prepared for Skip Coddington GSC Development, Inc PO Box 1623 Woodinville WA 9872 Prepared by 1141 NE 124 th St., #59 Kirkland, WA 9834 425.522.4118

More information

TABLE OF CONTENTS. Coral Springs Charter High School and Middle School Job No Page 2

TABLE OF CONTENTS. Coral Springs Charter High School and Middle School Job No Page 2 Job No. 15-019 Page 2 TABLE OF CONTENTS 1.0 INTRODUCTION... 4 2.0 EXISTING CONDITIONS... 5 3.0 TRAFFIC GENERATION... 7 4.0 TRIP DISTRIBUTION... 8 5.0 FUTURE CONDITIONS... 8 6.0 SITE ACCESS...13 7.0 CONCLUSION...13

More information

Contiguous to CHS Blue Ridge Hospital BURKE PRIMARY CARE PHIFER WELLNESS CENTER. Bush Drive EXIT 105 EL PASO MEXICAN QUALITY MART QUICK MART

Contiguous to CHS Blue Ridge Hospital BURKE PRIMARY CARE PHIFER WELLNESS CENTER. Bush Drive EXIT 105 EL PASO MEXICAN QUALITY MART QUICK MART 1.3 ACRES I-40 VISIBILITY Ext n Morganton, NC (828) 665-9085 WhtneyCRE.com 125 Bush Drve, Morganton, NC 28655 Contguous to CHS Blue Rdge Hosptal $550,000 1.3 Acres Hgh vsblty from I-40 wth 44,000 cars

More information

Allyn D. Rifkin, PE Rifkin Transportation Planning Group

Allyn D. Rifkin, PE Rifkin Transportation Planning Group Allyn D. Rfkn, PE Rfkn Transportaton Plannng Group 4455 Los Fclz Boulevard, Sute 1403 Los Angeles, CA 90027 (323) 664-2805 [t] (323) 697-1594 [cj May 1,2017 Rob Glushon Luna & Glushon 16255 Ventura Blvd,

More information

Airport Apron Capacity Estimation Model Enhancement

Airport Apron Capacity Estimation Model Enhancement Avalable onlne at www.scencedrect.com Proceda Socal and Behavoral Scences 0 (011) 1108 1117 14 th EWGT & 6 th MEC & 1 st RH Arport Apron Capacty Estmaton Model Enhancement Bojana Mrkovc a,* a Unversty

More information

Kinematics and Dynamics Simulation Research for Roller Coaster Multi-body System Gening Xu a, Hujun Xin b, Fengyi Lu c,mingliang Yang d

Kinematics and Dynamics Simulation Research for Roller Coaster Multi-body System Gening Xu a, Hujun Xin b, Fengyi Lu c,mingliang Yang d Advanced Materals Research Vol. 4 (0) pp 7-80 Onlne avalable snce 0/Dec/0 at www.scentfc.net (0) Trans Tech Publcatons, Swtzerland do:0.408/www.scentfc.net/amr.4.7 Knematcs and Dynamcs Smulaton Research

More information

HILLIARD AVE. MLS# Karnes/CPE: Loopnet:

HILLIARD AVE. MLS# Karnes/CPE: Loopnet: Downtown Ashevlle Land FOR SALE Or Jont Venture on Prme Corner Zoned CBD (828) 665-9085 WhtneyCRE.com 357 Hllard Avenue, Ashevlle, NC 28801 Corner Lot at Hllard and Clngman Avenues s Surrounded by Sold

More information

EXISTING CONDITIONS AND CHARACTER Cedar Field currently contains a play area, a basketball court with two back-to-back hoops, and an informal

EXISTING CONDITIONS AND CHARACTER Cedar Field currently contains a play area, a basketball court with two back-to-back hoops, and an informal P'111LUP5POOL&GYM 8MSf'H CEDAR AVENUE FELD LOCATON AND HSTORY Cedar Avenue sts on a porton of a block between Cedar and 18th Avenues n the East Phllps neghborhood. mmedately to the north s the Lttle Earth

More information

Quality Control. Ignacio Cascos Depto. Estadística, Universidad Carlos III 1

Quality Control. Ignacio Cascos Depto. Estadística, Universidad Carlos III 1 Qualty Control 5 Ignaco Cascos Depto. Estadístca, Unversdad Carlos III 1 Outlne 1. Introducton, control charts 2. Varables control charts (X-bar chart) 3. Attrbutes control charts (p and np charts) Ignaco

More information

MAY 10 Rev A

MAY 10 Rev A TERMASHIELD* Ferrule Crmpng Des for Tools 59500 and 69270-1 408-1662 26 MAY 10 PROPER USE GUIDELINES Cumulatve Trauma Dsorders can result from the prolonged use of manually powered hand tools. Hand tools

More information

Massachusetts Institute of Technology. Airport Systems Planning & Design

Massachusetts Institute of Technology. Airport Systems Planning & Design An Investgaton of Shared Gate Assgnment Case study n Termnal C of Boston s Logan Internatonal Arport nal Presentaton, 8 December 2009 Gerasmos Skaltsas An Investgaton of Shared Gate Assgnment Case study

More information

WELCOME. Please sign in. brampton.ca/lrtextension 3-1-1

WELCOME. Please sign in. brampton.ca/lrtextension 3-1-1 WELCE Please sgn n brampton.ca/lrtextenson -- Wllams Pkwy What s the LRT Extenson udy? Extendng the planned urontaro LRT from the at eeles Avenue to the G aton s a key transt prorty and ctybuldng project

More information

Estimated Time of Arrival (ETA) Based Elevator Group Control Algorithm with More Accurate Estimation

Estimated Time of Arrival (ETA) Based Elevator Group Control Algorithm with More Accurate Estimation Estmated Tme of Arrval (ETA) Based Elevator Group Control Algorthm wth More Accurate Estmaton Ayng Rong Unversty of Turu, Department of Informaton Technology, Lemmnäsenatu 14 A, FIN-20520 Turu, Fnland

More information

Planning. Proposed Development at the Southeast Corner of Lakeshore Road West and Brookfield Road Intersection FINAL.

Planning. Proposed Development at the Southeast Corner of Lakeshore Road West and Brookfield Road Intersection FINAL. Project No. 121-22908 N o v e m b e r 2 0 1 2 Traffic Impact Study Transportation Planning th GENIVAR Inc., 600 Cochrane Drive, 5 Floor, Markham, Ontario L3R 5K3 Telephone: 905.475.7270 Fax: 905.475.5994

More information

Freymond Aggregates Quarry 2287 Bay Lake Road Twp. of Faraday, Hastings County

Freymond Aggregates Quarry 2287 Bay Lake Road Twp. of Faraday, Hastings County Freymond Aggregates Quarry 2287 Bay Lake Road Twp. of Faraday, Hastings County Traffic Impact Study Prepared by: Tranplan Associates PO Box 455 Lakefield, ON K0L 2H0 www.tranplan.com Prepared for: Freymond

More information

FIGURE 1-1 RECOMMENDED CIP PROJECTS

FIGURE 1-1 RECOMMENDED CIP PROJECTS CTY OF VSTA & BUENA SANTATON DSTRCT CTY OF VSTA CP PROJECTS CAPACTY DEFCENT CONDTON RELATED MATERAL RELATED AGE RELATED MMMUM SZE VALLECTOS NTERCEPTOR SEWER COLLECTON SYSTEM GRAVTY LNE FORCE MAN CTY OF

More information

Town of Twisp Council Minutes - 08/23/2016

Town of Twisp Council Minutes - 08/23/2016 Town of Twsp Councl Mnutes - 08/23/2016 Mayor ng-moody called the meetng to order at 5:31 pm. Councl Members present: Bob Lloyd Alan Caswell John Flemng Hans Smth Councl Member absent: Aaron Studen! Pledge

More information

NORTHWINDS SUMMIT LEASING INFORMATION

NORTHWINDS SUMMIT LEASING INFORMATION ORTHWND LEASNG NFORMATON Kerry Armstrong 0.980.0808 karmstrong@popeandland.com popeandland.com Jennifer Koontz 0.980.0808 jkoontz@popeandland.com popeandland.com PROPERTY HGHLGHTS 1 2 1000 SUMMT PLACE

More information

FINAL TERMINAL TRAFFIC MONITORING STUDY

FINAL TERMINAL TRAFFIC MONITORING STUDY FINAL TERMINAL 91 216 TRAFFIC MONITORING STUDY Prepared for: Port of Seattle February 15, 217 Prepared by: 12131 113 th Avenue NE, Suite 23 Kirkland, WA 9834-712 Phone: 425-821-3665 www.transpogroup.com

More information

APPENDIX H MILESTONE 2 TRAFFIC OPERATIONS ANALYSIS OF THE AT-GRADE CROSSINGS

APPENDIX H MILESTONE 2 TRAFFIC OPERATIONS ANALYSIS OF THE AT-GRADE CROSSINGS Draft Environmental Impact Statement/Environment Impact Report Appendix H Milestone 2 Traffic Operations Analysis of the At-Grade Crossings APPENDIX H MILESTONE 2 TRAFFIC OPERATIONS ANALYSIS OF THE AT-GRADE

More information

Estimation of Arrival-Departure Capacity Tradeoffs in Multi-Airport Systems

Estimation of Arrival-Departure Capacity Tradeoffs in Multi-Airport Systems Estmaton of Arrval-Departure Capacty Tradeoffs n Mult-Arport Systems The MIT Faculty has made ths artcle openly avalable. Please share how ths access benefts you. Your story matters. Ctaton As Publshed

More information

The effect of the High Aswan Dam on the hydrological regime of the River Nile

The effect of the High Aswan Dam on the hydrological regime of the River Nile The nfluence of man on the hydrologcal regme wth specal reference to representatve and expermental basns L'nfluence de l'homme sur le régme hydrologque avec référence partculère aux études sur les bassns

More information

Southern Oregon Transportation Engineering, LLC

Southern Oregon Transportation Engineering, LLC Southern Oregon Transportation Engineering, LLC 112 Monterey Drive - Medford, Or. 97504 Office 541.608.9923 Cell 541.941.4148 Email: Kwkp1@Q.com August 12, 2013 Mike Faught, Public Works Department City

More information

Study on the economic disparity and convergence of urban agglomeration in the middle reaches of the Yangtze River

Study on the economic disparity and convergence of urban agglomeration in the middle reaches of the Yangtze River 2017 4th Internatonal Conference on Busness, Economcs and Management (BUSEM 2017) Study on the economc dsparty and convergence of urban agglomeraton n the mddle reaches of the Yangtze Rver Chao Wen, Jngjng

More information

MEMORANDUM. Lynn Hayes LSA Associates, Inc.

MEMORANDUM. Lynn Hayes LSA Associates, Inc. MEMORANDUM To: Lynn Hayes LSA Associates, Inc. Date: May 5, 217 From: Zawwar Saiyed, P.E., Senior Transportation Engineer Justin Tucker, Transportation Engineer I Linscott, Law & Greenspan, Engineers LLG

More information

Specialist's Factual Report of Investigation Cockpit Voice Recorder

Specialist's Factual Report of Investigation Cockpit Voice Recorder nondsclosure NATIONAL TRANSPORTATION SAFETY BOARD Vehcle Recorders Dvson Washngton, D.C. 20594 Aprl 30, 2002 Specalst's Factual Report of Investgaton Cockpt Voce Recorder NTSB Number: DCA0MA064 A. EVENT

More information

Long Term Preventive Generation Maintenance Scheduling with Network Constraints Ali Badri a*, Ahmad Norozpour Niazi b, Seyyed Mehdi Hoseini c

Long Term Preventive Generation Maintenance Scheduling with Network Constraints Ali Badri a*, Ahmad Norozpour Niazi b, Seyyed Mehdi Hoseini c Avalable onlne at www.scencedrect.com Energy Proceda 14 (2012) 1889 1895 ICAEE2011 Long Term Preventve Generaton Mantenance Schedulng wth Network Constrants Al Badr a*, Ahmad Norozpour Naz b, Seyyed Mehd

More information

m a r k e t % +/- average house price [s.a. 150,257] % owner occupied [s.a ] railway station % growth

m a r k e t % +/- average house price [s.a. 150,257] % owner occupied [s.a ] railway station % growth housng connectons growth % +/- average house prce [s.a. 150,257] % owner occuped [s.a. 62.59] ralway staton wthn thrty mles of large settlement % growth 1954-2006 m a r k e t 35 59.37 43.95 39 performance

More information

A. CONCLUSIONS OF THE FGEIS

A. CONCLUSIONS OF THE FGEIS Chapter 11: Traffic and Parking A. CONCLUSIONS OF THE FGEIS The FGEIS found that the Approved Plan will generate a substantial volume of vehicular and pedestrian activity, including an estimated 1,300

More information

Yellowstone National Park

Yellowstone National Park 'NOTE: Rates and arrangements shown heren apply at HOTELS only. Cascade Ral Foundaton www.mlwelectrc.org ILWAUKEE! ROAD / Chcago, Burlngton & Quncy Ralroad Company Northern Pacfc Ralway Company Unon Pacfc

More information

Traffic Analysis Final Report

Traffic Analysis Final Report SR-71 Widening Project Project Approval/Environmental Documentation Traffic Analysis Final Report Prepared for Caltrans District 7 August 2012 6 Hutton Centre Drive, Suite 700 Santa Ana, California 92707

More information

South Park Blocks Framework Master Plan: Property Owner Interview Summary

South Park Blocks Framework Master Plan: Property Owner Interview Summary Portland State Unversty PDXScholar Portland Cty Archves Oregon Sustanable Communty Dgtal Lbrary --980 South Park Blocks Framework Master Plan: Property Owner ntervew Summary Portland (Or.). Development

More information

COMING SOON SUMMER 2017

COMING SOON SUMMER 2017 FOR LEASE > LUXURY RETAL LFESTYLE CENTER CRYSTAL COVE COMMONS 1201 US HGHWAY 1 NORTH PALM BEACH, FLORDA HONEY BRYAN SENOR VCE PRESDENT +1 561 308 8266 honey.bryan@colliers.com COMNG SOON SUMMER 2017 OVERVEW

More information

Lake Erie Commerce Center Traffic Analysis

Lake Erie Commerce Center Traffic Analysis LOCATION: East of NYS Route 5 at Bayview Road Town of Hamburg Erie County, New York PREPARED BY: Wendel Companies 140 John James Audubon Parkway Suite 200 Amherst, New York 14228 January 2012 i ii Table

More information

MEMORANDUM. Open Section Background. I-66 Open Section Study Area. VDOT Northern Virginia District. I-66 Project Team. Date: November 5, 2015

MEMORANDUM. Open Section Background. I-66 Open Section Study Area. VDOT Northern Virginia District. I-66 Project Team. Date: November 5, 2015 MEMORANDUM To: VDOT Northern Virginia District From: I-66 Project Team Date: November 5, 2015 Subject: Open Section Background The purpose of this technical memorandum is to provide narrative and technical

More information

A Small Aircraft Transportation System (SATS) Demand Model

A Small Aircraft Transportation System (SATS) Demand Model NASA/CR-2001-210874 A Small Arcraft Transportaton System (SATS) Demand Model Dou Long, Davd Lee, Jesse Johnson, and Peter Kostuk Logstcs Management Insttute, McLean, Vrgna June 2001 The NASA STI Program

More information

Government of Kerala. Department of Factories And Boilers Boiler Operation Engineers' Examinationo July 2012 Paper-1 Maximum:100.

Government of Kerala. Department of Factories And Boilers Boiler Operation Engineers' Examinationo July 2012 Paper-1 Maximum:100. Government of Kerala gco At 9 Department of Factores And Bolers Boler Operaton Engneers' Examnatono July 2012 Paper-1 Maxmum:100 Part-A (Answer all questons) Each queston carres 5 marks,1. What are the

More information

COAL-WATER SLURRY FUEL COMBUSTION TESTING IN AN OIL-FIRED INDUSTRIAL BOILER. Semiannual Technical Progress Report

COAL-WATER SLURRY FUEL COMBUSTION TESTING IN AN OIL-FIRED INDUSTRIAL BOILER. Semiannual Technical Progress Report COAL-WATER SLURRY FUEL COMBUSTON TESTNG N AN OL-FRED NDUSTRAL BOLER Semannual Techncal Progress Report for the Perod 2/15/1994 to 8/15/1994 Bruce G. Mller, Co-Prncpal nvestgator Alan W. Scaron, Project

More information

Western Development Lands Transportation Brief Richmond Village, (Ottawa), ON Mattamy Homes. Prepared By: Stantec Consulting Ltd.

Western Development Lands Transportation Brief Richmond Village, (Ottawa), ON Mattamy Homes. Prepared By: Stantec Consulting Ltd. Western Development Lands Transportation Brief Richmond Village, (Ottawa), ON Mattamy Homes Prepared By: Stantec Consulting Ltd. March 2012 RICHMOND VILLAGE, OTTAWA, ON TRANSPORTATION BRIEF APRIL 2013

More information

Transportation Improvement District (TID) Exercise New Castle County Unified Development Code

Transportation Improvement District (TID) Exercise New Castle County Unified Development Code Transportation Improvement District (TID) Exercise New Castle County Unified Development Code Churchmans Crossing TID How should New Castle County deploy Transportation Improvement Districts (TIDs)? Site

More information

City evelopment Sites and ghway Projects Outline

City evelopment Sites and ghway Projects Outline 2 2 of 80 e Cty evelopment Stes and ghway Projects Outlne Prepared by the Department of Plannng Economc Development DSO Numercal Lstnq 2002 P P 2 P 3 P 4 P 5 P 6 P 7 P 8 P 9 P 0 P P 2 P 3 P 4 P 5 P 6 P

More information

TECHNICAL MEMORANDUM. DATE: August 31, Pamela Dalcin-Walling/Dokken Engineering. Daniel Yau and Victor Baltazar/Y&C

TECHNICAL MEMORANDUM. DATE: August 31, Pamela Dalcin-Walling/Dokken Engineering. Daniel Yau and Victor Baltazar/Y&C DATE: August 31, 2017 TECHICAL MEMORADUM Y&C Transportation Consultants, Inc. 3250 Ramos Circle Sacramento, CA 95827 Phone: (916) 366-8000 Fax (916) 366-8008 TO: FROM: SUBJECT: Pamela Dalcin-Walling/Dokken

More information

RESOURCE MANAGEMENT PLANNING & INSPECTIONS ANNUAL REPORT 2018

RESOURCE MANAGEMENT PLANNING & INSPECTIONS ANNUAL REPORT 2018 RESOURCE MANAGEMENT PLANNNG & NSPECTONS ANNUAL REPORT 218 Stan Shawver Director Resource Management is a department under the oversight of the Boone County Commission. t is comprised of three service areas:

More information

booked( checki GUESTFORROOM AND TAX.

booked( checki GUESTFORROOM AND TAX. Fr ontdes kpol c esandpr ocedur es Room t ypet hegues thas booked( 1bed,2bedorROH) Check nandcheckoutdat e HTBonusoffer ( whenappl cabl e) S ngl eusecr ed tcar d nf or mat ont obechar gedat check n Amountt

More information

Watts St westbound thru

Watts St westbound thru Executive Summary At the request of the Hudson Square Business Improvement District, Sam Schwartz Engineering, DPC (Sam Schwartz) has completed a technical analysis of various congestion pricing and/or

More information

EXISTING CONDITIONS A. INTRODUCTION. Route 107 Corridor Study Report

EXISTING CONDITIONS A. INTRODUCTION. Route 107 Corridor Study Report II. EXISTING CONDITIONS A. INTRODUCTION The Route 107 study area extends from the south at Chestnut Street in Lynn approximately 3.7 miles to the north to Boston Street in Salem. The study area has three

More information

MT- RJ Fiber Optic Connector Kits

MT- RJ Fiber Optic Connector Kits MT- RJ Fber Optc Connector Kts Instructon Sheet For 1.8- mm Mn Zpcord Cable and 408-4540 2.8- mm DUALAN* Fber Optc Cable Assembles 04 NOV 13 Crmp Eyelet for DUALAN Fber Optc Cable Assembly Stran Relef

More information

DOGWOOD AT VILLA AVENUE PROJECT

DOGWOOD AT VILLA AVENUE PROJECT TRANSPORTATION IMPACT ANALYSIS DOGWOOD AT VILLA AVENUE PROJECT El Centro, California September 4, 2018 LLG Ref. 3-17-2782 TABLE OF CONTENTS SECTION PAGE Appendices... ii List of Figures... i List of Tables...

More information

2006 WEEKDAY TRAFFIC PROFILE. June 15, 2007

2006 WEEKDAY TRAFFIC PROFILE. June 15, 2007 June 15, 2007 Mr. Gary Stobb, P.E. Director of Planning/Operations Harris County Toll Road Authority 330 Meadowfern, Suite 200 Houston, TX 77067 Re: Westpark Tollway Value Pricing Analysis Dear Mr. Stobb:

More information

Airline Route Structure Competition and Network Policy

Airline Route Structure Competition and Network Policy TI 2013-189/VIII Tnbergen Insttute Dscusson Paper Arlne Route Structure Competton and Network Polcy Hugo Emlo Slva Erk Verhoef Vncent van den Berg Faculty of Economcs and Busness Admnstraton, VU Unversty

More information

MASSACHUSETTS RHODE ISLAND CONNECTICUT. Figure 3-1. Legend. Screening Level I - Candidate Alternatives: Study Area. T.F.

MASSACHUSETTS RHODE ISLAND CONNECTICUT. Figure 3-1. Legend. Screening Level I - Candidate Alternatives: Study Area. T.F. Essex Frankln Berkshre MASSACHUSETTS Mddlesex Hampshre Worcester Suffolk Boston Hampden Norfolk Plymouth Ltchfeld Hartford Hartford Tolland CONNECTICUT Wndham Provdence RHODE ISLAND Kent Provdence Brstol

More information

NOYO CENTER FOR SCIENCE AND EDUCATION CITY COUNCIL PRESENTATION A Project of the City of Fort Bragg and Sonoma State University

NOYO CENTER FOR SCIENCE AND EDUCATION CITY COUNCIL PRESENTATION A Project of the City of Fort Bragg and Sonoma State University A Project of the City of Fort Bragg and Sonoma State University NOYO CENTER FOR SCENCE AND EDUCATON CTY COUNCL PRESENTATON 08.23.2010 AGENDA /// PROCESS /// /// PREMSES /// DESGN /// VSON VSON STATEMENT

More information

Caliber Charter School VALLEJO, CA

Caliber Charter School VALLEJO, CA Traffic Impact Study Final Report Caliber Charter School VALLEJO, CA 21 June 2016 Prepared for: Prepared by: Traffic Engineering & Transportation Planning This report has been prepared and certified by

More information

University of Toronto Department of Economics. A Dynamic Game of Airline Network Competition: Hub-and-Spoke Networks and Entry Deterrence

University of Toronto Department of Economics. A Dynamic Game of Airline Network Competition: Hub-and-Spoke Networks and Entry Deterrence Unversty of Toronto Department of Economcs Workng Paper 379 A Dynamc Game of Arlne Network Competton: Hub-and-Spoke Networks and Entry Deterrence By Vctor Agurregabra and Chun-Yu Ho October 28, 2009 A

More information

~ CODED NOTES: r.: R"" "' t- DDPand ~

~ CODED NOTES: r.: R ' t- DDPand ~ o CODED NOTES: ""t- D z "t EAST MAN STREET SDE""ALK PATRON PARKNG V "' t- ' v '" - --- - - R"" - --- - 41'-0'1" - - ---f:--- - ~9- - - - R~~ -~~ ~ EMPLOYEE PARKNG ENCLOSED FRE ~NAC DUMPSTER ESCAPE TO REMAN

More information

Treasure Island Supplemental Information Report Addendum

Treasure Island Supplemental Information Report Addendum 1 1 1 1 0 1 0 1 0 1 Treasure Island Supplemental Information Report Addendum Introduction Purpose The purpose of this Supplemental Information Report (SIR) Addendum is to determine if the current land

More information

DISTRICT EXPRESS LANES ANNUAL REPORT FISCAL YEAR 2017 JULY 1, 2016 JUNE 30, FloridaExpressLanes.com

DISTRICT EXPRESS LANES ANNUAL REPORT FISCAL YEAR 2017 JULY 1, 2016 JUNE 30, FloridaExpressLanes.com DISTRICT EXPRESS LANES ANNUAL REPORT FISCAL YEAR 2017 JULY 1, 2016 JUNE 30, 2017 FloridaExpressLanes.com This page intentionally left blank. TABLE OF CONTENTS List of Figures... ii List of Tables.... ii

More information

Municipal Services (Public Works) projects collectively encompass a wide

Municipal Services (Public Works) projects collectively encompass a wide 5 Mun c pa l Se r v c e s 1 6 J o s e p he. Bo n a d ma n&as s o c a t e s, I n c.st a t e me n t o f Qu a l f c a t o n s Muncpal Servces (Publc Works) projects collectvely encompass a wde varety of engneerng

More information

APPENDIX J TRAFFIC AND PARKING DEMAND STUDIES

APPENDIX J TRAFFIC AND PARKING DEMAND STUDIES APPENDIX J TRAFFIC AND PARKING DEMAND STUDIES Table of Contents Executive Summary... iv 1.0 Introduction... 1 2.0 Traffic Analysis Methodology and Significance Criteria... 4 2.1 Study Area Criteria...

More information

Washington St. & Ash Coulee Dr./43 rd Ave Intersection Study

Washington St. & Ash Coulee Dr./43 rd Ave Intersection Study 430 IACC Building Fargo, ND 58105 Tel 701-231-8058 Fax 701-231-1945 www.ugpti.org www.atacenter.org Washington St. & Ash Coulee Dr./43 rd Ave Intersection Study Final Report April 2007 Prepared for: City

More information

Mercer SCOOT Adaptive Signal Control. Karl Typolt, Transpo Group PSRC RTOC July 6th, 2017

Mercer SCOOT Adaptive Signal Control. Karl Typolt, Transpo Group PSRC RTOC July 6th, 2017 Mercer SCOOT Adaptive Signal Control Karl Typolt, Transpo Group PSRC RTOC July 6th, 2017 Our mission, vision, and core values Mission: deliver a high-quality transportation system for Seattle Vision: connected

More information

SANTA CLARA COUNTY I-280 CORRIDOR STUDY

SANTA CLARA COUNTY I-280 CORRIDOR STUDY SANTA CLARA COUNTY I-280 CORRIDOR STUDY Appendix B 2 Technical Memorandum Existing Transportation Condition Memo SANTA CLARA VALLEY TRANSPORTATION AUTHORITY (VTA) 1-1 Introduction The I-280 Corridor Study

More information

KING STREET TRANSIT PILOT

KING STREET TRANSIT PILOT KING STREET TRANSIT PILOT Update toronto.ca/kingstreetpilot #kingstreetpilot HIGHLIGHTS TRANSIT RIDERSHIP TRANSIT CAPACITY To respond to this growth in ridership, the TTC has increased the capacity of

More information

STAR Bond Development

STAR Bond Development STR ond Development Traffic Impact Study Goddard, Kansas Prepared for: Kansas Department of Transportation City of Goddard, Kansas Prepared by TranSystems November 218 November 3, 218 Kansas Department

More information

Mills Pecos River Ranch 7800 Acres Val Verde County, Texas Situated along both sides of the Pecos River

Mills Pecos River Ranch 7800 Acres Val Verde County, Texas Situated along both sides of the Pecos River Mlls Pecos Rver Ranch 7800 Acres Val Verde, exas Stuated along both sdes of the Pecos Rver James Kng, Agent Offce 432-426-2024 Cell 432-386-2821 James@KngLandWater.com Kng Land & Water LLC P.O. Box 109,

More information

HOV LANE PERFORMANCE MONITORING: 2000 REPORT EXECUTIVE SUMMARY

HOV LANE PERFORMANCE MONITORING: 2000 REPORT EXECUTIVE SUMMARY Final Report Research Project Agreement No. T1803, Task 4 HOV Monitoring V HOV LANE PERFORMANCE MONITORING: 2000 REPORT EXECUTIVE SUMMARY by Jennifer Nee TRAC Research Engineer John Ishimaru TRAC Senior

More information

Pedestrian Safety Review Spadina Avenue

Pedestrian Safety Review Spadina Avenue STAFF REPORT ACTION REQUIRED Pedestrian Safety Review Spadina Avenue Date: October 13, 2015 To: Toronto and East York Community Council From: Director, Transportation Services, Toronto and East York District

More information

TRANSPORTATION ELEMENT

TRANSPORTATION ELEMENT Transportation TRANSPORTATION ELEMENT Data, Inventory, and Analysis Prepared by Contents 1.0 INTRODUCTION... 1 2.0 EXISTING CONDITIONS... 1 2.1 Roadways... 1 2.1.1 Jurisdiction... 1 2.1.2 Functional Classification...

More information

5.1 Traffic and Transportation

5.1 Traffic and Transportation 5.1 When it opens in 2009, the Bellevue Nickel Improvement Project will increase the number of vehicles able to travel through the study area, improve travel speeds, and improve safety by reducing the

More information

UNCLASSIFIED AD NUMBER LIMITATION CHANGES

UNCLASSIFIED AD NUMBER LIMITATION CHANGES TO: UNCLASSFED AD NUMBER AD039437 LMTATON CHANGES Approved for publc release; dstrbuton s unlmted. FROM: Dstrbuton authorzed to U.S. Gov't. agences and ther contractors; Admnstratve/Operatonal Use; JUN

More information

7272 WISCONSIN AVENUE LOCAL AREA TRANSPORTATION REVIEW

7272 WISCONSIN AVENUE LOCAL AREA TRANSPORTATION REVIEW 7272 LOCAL AREA TRANSPORTATION REVIEW AND TRANSPORTATION POLICY AREA REVIEW MONTGOMERY COUNTY, MARYLAND Submitted on behalf of Carr Properties Prepared by: Wells + Associates, Inc. Submission: July 1,

More information

TRAFFIC & PARKING STUDY FOR PROPOSED BIRMINGHAM BOUTIQUE HOTEL

TRAFFIC & PARKING STUDY FOR PROPOSED BIRMINGHAM BOUTIQUE HOTEL TRAFFIC & PARKING STUDY FOR PROPOSED BIRMINGHAM BOUTIQUE HOTEL Prepared for LORIENT CAPTIAL LLC Birmingham, MI By GIFFELS WEBSTER Washington Township, MI April 2017 i CONTENTS EXECUTIVE SUMMARY. ii INTRODUCTION.

More information

KING STREET TRANSIT PILOT

KING STREET TRANSIT PILOT KING STREET TRANSIT PILOT Update toronto.ca/kingstreetpilot #kingstreetpilot UPDATE Average streetcar travel times in continued to show similar trends as first observed in November. The most significant

More information

Welcome to the first census in the Faroe Islands in 34

Welcome to the first census in the Faroe Islands in 34 Skerlnja 11. november 2011 HAGSTOVA FØROYA The future s bult on the present Welcome to the frst census n the Faroe Islands n 34 years. All households and everyone resdng n the country wll complete ths

More information

B. Congestion Trends. Congestion Trends

B. Congestion Trends. Congestion Trends B. Congestion Trends Congestion Trends There are two types of congestion that impact mobility: recurring and non-recurring congestion. Recurring congestion is related to segments of roadway that are over

More information

Interstate 90 and Mercer Island Mobility Study APRIL Commissioned by. Prepared by

Interstate 90 and Mercer Island Mobility Study APRIL Commissioned by. Prepared by Interstate 90 and Mercer Island Mobility Study APRIL 2017 Commissioned by Prepared by Interstate 90 and Mercer Island Mobility Study Commissioned by: Sound Transit Prepared by: April 2017 Contents Section

More information

Transport Impact Assessment

Transport Impact Assessment Transport Impact Assessment Springbok Hotel Erf 5206, Springbok Northern Cape March 2018 5th Floor Imperial Terraces Carl Cronje Drive Tyger Waterfront Bellville, 7530 (021) 914 6211 (T) e mail: mail@itsglobal.co.za

More information

APPENDIX J MODIFICATIONS PERFORMED TO THE TOR

APPENDIX J MODIFICATIONS PERFORMED TO THE TOR APPENDIX J MODIFICATIONS PERFORMED TO THE TOR This appendix summarizes the modifications that were performed in years 2012 and 2017 to rectify calculation errors that were observed in the data presented

More information

SuperCoat. Air Powered Airless Sprayer Mit Druckluft betriebenes Airless-Spritzgerät Pulvérisateur sans air pneumatique

SuperCoat. Air Powered Airless Sprayer Mit Druckluft betriebenes Airless-Spritzgerät Pulvérisateur sans air pneumatique GB D F Operatng manual Betrebsanletung...p. 6 Mode d emplo... p. 5 SuperCoat Ar Powered Arless Sprayer Mt Druckluft betrebenes Arless-Sprtzgerät Pulvérsateur sans ar pneumatque Models: 0556730W 0556745W

More information

Opportunistic Maintenance in Aircraft using Relevant Condition Parameter based Approach

Opportunistic Maintenance in Aircraft using Relevant Condition Parameter based Approach Opportunstc Mantenance n Araft usng Relevant Condton Parameter based Approach Hartha Saranga * Indan Insttute of Management Calcutta P O Box 16757, Alpore (Post) Calcutta 700 027, INDIA Emal:hartha@mcal.ac.n

More information

10.0 Recommendations Methodology Assumptions

10.0 Recommendations Methodology Assumptions 10.0 Recommendations To accommodate the projected growth of the I-526 corridor, this report has summarized potential improvement strategies that were separated into four categories, TDM, Modal, Traffic

More information

PELICAN LANDING RAPTOR BAY REZONING TRANSPORTATION METHODOLOGY OUTLINE

PELICAN LANDING RAPTOR BAY REZONING TRANSPORTATION METHODOLOGY OUTLINE PELICAN LANDING RAPTOR BAY REZONING TRANSPORTATION METHODOLOGY OUTLINE Project No. 15534 Prepared by: DAVID PLUMMER & ASSOCIATES, INC. 2149 McGregor Boulevard June 24, 2016 Fort Myers, Florida 33901 Pelican

More information

CONTACT: Nichole Lawrence CELL: FOR IMMEDIATE RELEASE Wednesday March 28, 2018

CONTACT: Nichole Lawrence CELL: FOR IMMEDIATE RELEASE Wednesday March 28, 2018 FOR IMMEDIATE RELEASE Wednesday March 28, 2018 CONTACT: Nichole Lawrence CELL: 731-225-6041 West Tennessee Construction March 28-April 4, 2018 Per TDOT Specifications, there will be no temporary lane closures

More information

Sky Temporary Car Park Transport Statement

Sky Temporary Car Park Transport Statement 001 Issue 26 August 2016 This report takes into account the particular instructions and requirements of our client. It is not intended for and should not be relied upon by any third party and no responsibility

More information

Fuzzy Expert System For The Selection Of Tourist Hotels

Fuzzy Expert System For The Selection Of Tourist Hotels INRNAIONAL JOURNAL OF SCINIFIC & CHNOGY RSARCH VOLUM, ISSU 09, SPMBR 06 ISSN 77-866 Fuzzy pert System For he Selecton Of ourst Hotels PAL SINGH Abstract : In the present work, a smple and very effectve

More information

HDR itrans Consulting Inc. 100 York Blvd., Suite 300 Richmond Hill, ON L4B 1J8 Tel: (905) Fax: (905)

HDR itrans Consulting Inc. 100 York Blvd., Suite 300 Richmond Hill, ON L4B 1J8 Tel: (905) Fax: (905) !" # $ !" # $ Consulting Inc. 100 York Blvd., Suite 300 Richmond Hill, ON L4B 1J8 Tel: (905) 882-4100 Fax: (905) 882-1557 www.itransconsulting.com November 2009 %&'('$&$ 1. West Brampton Road Network...

More information

THE CORPORATION OF THE CITY OF BRAMPTON BY-LAW. To amend By-law to regulate use of highways and parking in the City of Brampton

THE CORPORATION OF THE CITY OF BRAMPTON BY-LAW. To amend By-law to regulate use of highways and parking in the City of Brampton THE CORPORATON OF THE CTY OF BRAMPTON BY-LAW Vulnber ~~5-~9~4~ To amend By-law 93-93 to regulate use of hghways and parkng n the Cty of The councl of the Corporaton of the Cty of hereby ENACfS as follows:.

More information

Vietnam Swim Mission APRIL JULY TOLL FREE MORE INFORMATION

Vietnam Swim Mission APRIL JULY TOLL FREE MORE INFORMATION Vetnam Swm Msson 15 28 APRIL 2017 1 14 JULY 2017 TOLL FREE 1300 554 654 MORE INFORMATION www.mssontravel.com.au n o s s M m w S Vetnam Travel to Vetnam and spend tme teachng vulnerable chldren how to swm

More information

InstructionSheet LightCrimp*XTC/NeXTC FiberOpticConnectorKits

InstructionSheet LightCrimp*XTC/NeXTC FiberOpticConnectorKits InstructonSheet LghtCrmp*XTC/NeXTC 408-9860 FberOptcConnectorKts 21APR11 RevL For Procedure on Inspectng the Fber, Refer to Secton 6 VerfythatInstructonSheet(408-Seres) PertanstoConnectorKtBengTermnated

More information

Operating Instructions

Operating Instructions EN Operatng Instructons Ol bolers Uno-3 / Mega-3 / Max-3 / Cosmo / ST-plus / Ttan-3 E Gas bolers CompactGas (1000-2800) / Cosmo alufer / ST-plus alufer Hoval Unted Kngdom Hoval Ltd. Northgate Newark Nottnghamshre

More information

TRAFFIC IMPACT STUDY REPORT FOR PROPOSED OFFICE PROJECT AT 959 SEWARD STREET IN HOLLYWOOD SNYDER PARTNERS

TRAFFIC IMPACT STUDY REPORT FOR PROPOSED OFFICE PROJECT AT 959 SEWARD STREET IN HOLLYWOOD SNYDER PARTNERS DRAFT TRAFFIC IMPACT STUDY REPORT FOR PROPOSED OFFICE PROJECT AT 959 SEWARD STREET IN HOLLYWOOD Prepared for: SNYDER PARTNERS Prepared by: Crain & Associates 2007 Sawtelle Boulevard, Suite 4 Los Angeles,

More information

Section 106 Update Memo #1 Attachment D. Traffic Diversion & APE Expansion Methodology & Maps

Section 106 Update Memo #1 Attachment D. Traffic Diversion & APE Expansion Methodology & Maps Section 106 Update Memo #1 Attachment D Traffic Diversion & APE Expansion Methodology & Maps I-65/I-70 North Split Interchange Reconstruction Project (Des. Nos. 1592385 & 1600808) Traffic Diversion and

More information

FEASIBILITY STUDY REFINED CONCEPT 1 PROJECT A

FEASIBILITY STUDY REFINED CONCEPT 1 PROJECT A VIRGINIA DEPARTMENT OF TRANSPORTATION I-85 / I-95 INTERCHANGE FEASIBILITY STUDY REFINED CONCEPT 1 PROJECT A Columbia Rd REFINED CONCEPT 1 PROJECT A Bellevue Rd COST: $3.3M Siege Rd Eliminate the loop ramp

More information

Operator's Manual. PCB Separator MAESTRO 3E

Operator's Manual. PCB Separator MAESTRO 3E Operator's Manual PCB Separator MAESTRO 3E 2 Operator's Manual - Translaton of the Orgnal Verson 2 for the followng products Descrpton Type PCB Separator MAESTRO 3E/450 PCB Separator MAESTRO 3E/600 Edton:

More information

Installation & Servicing Instructions

Installation & Servicing Instructions Installaton & Servcng Instructons Hgh effcency condensng gas boler E50CRN E75CRN/E110CRN Pctured: E50CRN E75CRN, E110CRN E75CRP, E110CRP E75CRP/E110CRP CAUTION! Read ths manual thoroughly before nstallng,

More information

V. DATA COLLECTION PROGRAM

V. DATA COLLECTION PROGRAM V. DATA COLLECTION PROGRAM As discussed in Section IV, an extensive data assembly and data collection program was undertaken to develop the data necessary to calibrate the existing Portway Extensions model

More information

According to FAA Advisory Circular 150/5060-5, Airport Capacity and Delay, the elements that affect airfield capacity include:

According to FAA Advisory Circular 150/5060-5, Airport Capacity and Delay, the elements that affect airfield capacity include: 4.1 INTRODUCTION The previous chapters have described the existing facilities and provided planning guidelines as well as a forecast of demand for aviation activity at North Perry Airport. The demand/capacity

More information