1 TENDER NO. T ADDENDUM NO. 1 SCHEDULE OF QUANTITIES AND PRICES REPLACE A revised copy of the Schedule of Quantities and Prices with changes bolded in red has been posted online (pdf attached). DRAWINGS: REMOVE Drawing No Version No. 4 Mar 2018 Issued for Tender REPLACE Drawing No Version No. 5 Apr Re-issued for Tender; Storm Details Added A revised copy of the drawing set - IFT Westdale Sanitary Sewer Upgrade T rev2.pdf is posted online, including the drawing replacement above. NOTE: Please acknowledge receipt of this Addendum No. 1 by returning a signed copy of this document to City of Nanaimo, Construction Department constructioninfo@nanaimo.ca or fax Signature Company Name Date NOTE: Submit signed copy of this Addendum No. 1 with your tender submission and/or. Signature Company Name Date Date: 2018-APR-4
2 Section 2 General Conditions 2.1 Location of Works - Project Layout (Article 7) (not to exceed 5% of the total contract price) 1 lump sum Total Section 2 Section 3 General Requirements 3.1 Existing Structures and Utility Works (Section 3.70) a) Locate Existing Structures 3 ea b) Support Existing BC Hydro Pole 1 ea c) Support Existing TELUS/Hydro Ducts 1 ea 3.2 Control of Public Traffic (Section 3.73) 1 lump sum 3.3 Removal of Existing Pipe (Section 3.74) a) 150mm PVC 125 m b) 200mm AC 5 m c) 300mm Concrete (Addendum No. 1) m 3.4 Removal of Existing Structures (Section 3.75) a) Manholes (Addendum No. 1) 1 2 ea b) Manholes (> 2m deep) (Addendum No. 1) 6 4 ea c) Sandbag Headwall (Addendum No. 1) 5 4 ea 3.5 Abandon Existing Manhole (Section 3.77) 2 ea Total Section 3 Section 4 Trench Excavation, Bedding and Backfill 4.1 Imported Granular Fill (Section 4.73) 4350 tonne 4.2 Surface Restoration (Section 4.76) UNTRAVELLED a) Seeding w/topsoil (100mm Depth) 450 m 2 b) Bark Mulch 4 m 2 c) Ditch Re-grading 20 m 2 TRAVELLED d) Clean Crushed Gravel (100mm thick, 19mm minus) 50 m 2 e) Driveway Chips (50mm thick) 25 m 2 f) 50mm Asphalt & 100mm Base 515 m 2 g) Asphalt Curb (CS-12) 75mm 1.5 m h) Concrete Curb & Gutter (CS-1) 115 m i) Asphalt Driveway, 50mm thick c/w 100mm base 10 m 2 j) Concrete Driveway, 150mm thick c/w 100mm base 6 m 2 TEMPORARY k) Cold Mix (50mm thick) 300 m 2 l) RAP (50mm thick) 215 m 2 Total Section 4 Page 1 of 4
3 Section 5 Water Distribution System 5.1 Watermain Pipe (Section 5.70) a) 200mm PVC DR-18 1 LS Total Section 5 Section 6 Sanitary Sewer System 6.1 Piping (Section 6.70) PIPING a) 200mm dia. PVC DR m b) 250mm dia. PVC DR m c) 300mm dia. PVC DR m CAPS & PLUGS d) 100mm dia. (Addendum No. 1) 1 2 ea e) 200mm dia. (Addendum No. 1) ea f) 300mm dia. (Addendum No. 1) ea REDUCERS g) 100mm dia. x 150mm dia. VC/PVC Eccentric Reducer 1 ea 6.2 Service Junctions (Section 6.71) a) 100mm dia. (Addendum No. 1) 9 8 ea 6.3 Connections to Existing Piping and Appurtenances (Section 6.72) a) 100mm dia. 10 ea c) 200mm dia. 5 ea d) Tie-in to Existing Manhole 1 ea 6.4 Precast Manhole Sections (Section 6.73) a) 1050mm dia. 17 vm 6.5 Concrete Bases, Frames, and Covers (Section 6.74) a) 1050mm dia. 7 ea 6.6 Drop Structures (Section 6.75) 2.7 vm 6.7 Sewer Service Connection Piping (Section 6.79) a) 100mm PVC DR m b) 150mm PVC DR m 6.8 Service Connection Inspection Assembly (Section 6.80) a) 100mm dia. (Addendum No. 1) ea Total Section 6 Page 2 of 4
4 Section 7 Stormwater Management 7.1 Piping, Fittings and Services (Section 7.70) a) 200mm dia. PVC DR 35 3 m b) 375mm dia. PVC DR m 7.2 Service Junctions (Section 7.71) 7.3 Connections to Existing Piping and Appurtenances (Section 7.72) b) 200mm dia. 1 ea c) 375mm dia. Addendum No. 1 4 ea 7.4 Service Connection Piping (Section 7.80) a) 100mm dia. Addendum No. 1 5 m 7.5 Service Connection Inspection Assembly (Section Catchbasins SW-1 (Section 7.74) Addendum No. 1 1 ea Total Section 7 Page 3 of 4
5 SUMMARY SECTION 2 SECTION 3 SECTION 4 SECTION 5 SECTION 6 SECTION 7 SUBTOTAL GST TOTAL CONTRACT: NAME OF COMPANY: SIGNATURE OF SIGNING OFFICER: DATE: Page 4 of 4
BID FORM. Bid by: Name of Bidder. Address: Address: To the Texas Department of Transportation hereinafter called the Agent.
BID FORM TxDOT CSJ No. Project Description: This project includes reconstruction of a hangar access taxiway with trench drain and pipe drainage system; local reconstruction of failing pavement on Taxiway
More information2012 WATER & SEWER ALLEY CONSTRUCTION CONTRACT, PACKAGE II SAWS WATER JOB. NO /SAWS SEWER JOB NO SOLICITATION #B DD
BID PROPOSAL PROPOSAL OF, a Corporation organized and existing under the laws of the State of, a Partnership consisting of, an Individual doing business as. Enclosed with this bid are (1) Bid Bond, and
More informationADDENDUM NO. TWO AB
ADDENDUM NO. TWO AB2018-28 Notice is hereby given that on June 22, 2018 at 11:00 A.M. (Prevailing time), sealed bids will be opened and read in public by the Purchasing Department in the Mercer County
More informationKansas Department of Transportation DISTRICT TE / TA-T043(301) Project(s): Min: Max:
Page 1 of 20 518045 SECTION: 01 COMMON ITEMS 1 020100 CONTRACTOR CONSTRUCTION STAKING 2 025600 FIELD OFFICE AND LABORATORY (TYPE A) 3 012340 FOUNDATION STABILIZATION (SET PRICE) 4 025323 MOBILIZATION 5
More informationShallow IC of 5
Shallow IC 250 1 of 5 Description 250mm diameter polypropylene inspection chamber for adoptable and non-adoptable applications. Compliant with Sewers for Adoption 7th edition [SfA7]. Single unit with integral
More informationReport to Council. Report: COR Date: 25 Jul 2016
Report to Council To: Mayor Linton and Members of Council Prepared By: Mark Bradey, Financial Manager / Deputy Treasurer Report: COR2016-58 Date: 25 Jul 2016 RE: Recommendation for Award of Tender T-17-16
More information203.0100 Removing Small Pipe Culverts CATEGORY STATION LOCATION EACH 0010 2+00-16+50 0010 7+13-8+41 LT. 155 3 0010 4+42 CL 1 10,660 9+90-13+73 RT. 390 3 7+63'SB' 67' LT. 1 14+25'GV' 49' LT. 1 17+05'GV'
More informationADVANCED WARNING SYSTEM FOR SHARED USE CROSSING ON HOWARD STREET EAST OF NORDICA AVENUE
ADVANCED WARNING SYSTEM FOR SHARED USE CROSSING ON EAST RDICA AVENUE FOR THE LOCATION MAP STANDARD SYMBOLS FEATURE EISTING PROPOSED BENCHMARK BM/TBM SHEET INDE. BM/TBM TITLE SHEET CONCRETE R.O.W. MONUMENT
More informationTenders. Manitoba Infrastructure
Tenders Manitoba Heavy Construction Association Unit 3-1680 Ellice Ave. Winnipeg, MB R3H 0Z2 Tel: (204) 947-1379 Fax: (204) 943-2279 www.mhca.mb.ca Email: jocelyn@mhca.mb.ca Manitoba Infrastructure Reference
More informationHospital Link Project Project Update September 2015
Hospital Link Project Project Update September 2015 General The project provides a link between Riverside Drive and the Transitway to the Hospital Ring Road. This link is needed to improve transit service
More informationRiverside County Transportation Department Summary of Bids
COUNTY'S ESTIMATE HARDY & HARPER, INC. Schedule 1: Project No. B6-0472 Santa Ana, CA 92705 ITEM NO. ITEM CODE CONTRACT ITEM UNITS QUANTITY UNIT PRICE ENG ESTIMATE BID AMOUNT 1 731521 MINOR CONCRETE (SIDEWALK)
More informationTOWN OF OSOYOOS DIVIDEND RIDGE AND SPARTAN DRIVE/FUJI COURT STREET LIGHT INSTALLATION
TOWN OF OSOYOOS DIVIDEND RIDGE AND SPARTAN DRIVE/FUJI COURT STREET LIGHT INSTALLATION CONTRACT DOCUMENTS AND SPECIFICATIONS TRUE Consulting September 2012 Job No. 302-1322 PLANHOLDER REGISTRATION FORM
More informationRecommendation: THAT the Council of the Township of Centre Wellington award the following two tenders:
Report to Council To: Mayor Linton and Members of Council Prepared By: Wes Snarr, Managing Director of Corporate Services Report: COR-45 Date: 12 Jul RE: Recomendation for Award of Request for Tenders
More informationDATA BOOK IV : COST ESTIMATE
The Study on Comprehensive Disaster Prevention around Mayon Volcano DATA BOOK IV : COST ESTIMATE DT IV List of (1/5) Clearing and Grubbing ha 59,192.92 Excavation (Road way & Drainage) Mech. cu.m 80.55
More informationAPPROVED 10 LOT TENTATIVE TRACT MAP - OCEAN VIEWS
Rare Development Opportunity in the Olde Carlsbad Neighborhood Ocean Views from Some Lots Lot Sizes 9,500-15,527 SF Area of New Home Prices From $1,000,000-$1,500,000 SUBMIT BEST OFFER - OFFERS DUE DECEMBER
More informationATTACHMENT C CITY OF FEDERAL WAY 2018 ASPHALT OVERLAY PROJECT BID SCHEDULE
ATTACHMENT C CITY OF FEDERAL WAY ASPHALT OVERLAY PROJECT SCHEDULE NOTE: Unit Prices for all items, all extensions, and the total amount of the bid must be shown. Show unit prices in legible figures. Where
More informationVillage of Lombard, Illinois Capital Improvement Plan FUNDING SOURCE SUMMARY
Village of Lombard, Illinois Capital Improvement Plan FY 15 FY 24 thru FUNDING SOURCE SUMMARY Source FY 15 FY 16 FY 17 FY 18 FY 19 FY 20 FY 21 FY 22 FY 23 FY 24 Construction Fund 6,318,700 2,354,800 2,430,800
More informationAnn Arbor Municipal Airport Ann Arbor, MI Date of Latest ALP ACIP Airport Code - A Airport Identifier - ARB
MICHIGAN AIRPORT DEVELOPMENT PROGRAM AIP CAPITAL IMPROVEMENT PLAN 20102019 FEDERAL/STATE/LOCAL Ann Arbor, MI Date of Latest ALP 2008 ACIP Airport Code A Airport Identifier ARB Prepared by: MDOTAERO Sponsor:
More informationMainelli Wagner & Associates, Inc.
www.mwaeng.com Mainelli Wagner & Associates, Inc. 6920 Van Dorn Street, Suite A, Lincoln, NE 68506 Phone: (402) 421-1717 Fax: (402) 421-6061 September 14, 2018 The Colfax County Board of Commissioners
More informationOff-Site Solutions. CPM Headwalls. Concrete for Life
Off-Site Solutions CPM Headwalls Concrete for Life Welcome to CPM CPM is a market leading manufacturer of concrete products with production facilities across the UK. This combined with a network of specialist
More informationCITY OF IMPERIAL TOTAL BID PROPOSAL. 1. Mobilization / Bonds / Insurances LS 1 $ $ 2. Preparation/Implementation Traffic Control Plan LS 1 $ $
CITY OF IMPERIAL PROPOSAL BID SHEET (02-06-2015) Page 1 of 2 FOR STREET IMPROVEMENT PROJECT PHASE 2 ASPHALT RUBBER COMPOSITE LAYER OVERLAY ON DESIGNATED STREETS BID NO. 2015-01 Item No. Description Units
More informationCounty of Fairfax, Virginia. Silver Line Update. Committee for Dulles March 2, Mark Canale Fairfax County Department of Transportation
Silver Line Update Committee for Dulles March 2, 2017 Mark Canale Fairfax County Department of Transportation Phase 1 Summary Old Meadow Road Realignment design work proceeding, construction to be completed
More informationThe lowering of the existing watermain was added to the Catenary B Contract through a change
Project 300-099 - Catenary B Replacement Utility Work at Rowayton Avenue Early in the project it was determined that the electric, telephone, and cable TV services hanger from the existing Rowayton Avenue
More informationApplication for Permit to Develop in a Floodplain Area
Application for Permit to Develop in a Floodplain Area The undersigned hereby makes application for a permit to develop in a designated floodplain area. The work to be performed is described below and
More informationMainelli Wagner & Associates, Inc.
www.mwaeng.com Mainelli Wagner & Associates, Inc. 6920 Van Dorn Street, Suite A, Lincoln, NE 68506 Phone: (402) 421-1717 Fax: (402) 421-6061 December 21, 2018 To whom it may concern: The Colfax County
More informationCity of Sarnia MEDIA RELEASE. Release of Four Reports from May 29, 2017 Agenda
City of Sarnia MEDIA RELEASE DATE: May 24, 2017 RELEASE DATE: Immediate FROM: SUBJECT: Margaret Misek-Evans, Chief Administrative Officer Release of Four Reports from May 29, 2017 Agenda The City of Sarnia
More informationCommon Ground Drainage Channel Diversion. Design Report
Common Ground Drainage Channel Diversion Design Report Resource Management International Inc Consulting Engineers May 2017 COMMON GROUND DRAINAGE CHANNEL DIVERSION PREPARED FOR: QUILL LAKES WATERSHED NO.
More informationCommunity Park Capital Project. February 6, 2017
Community Park Capital Project February 6, 2017 Construction Budget Estimate Bid Recommended $10,318,690 $7,725,000 Staff Recommended +$1.1M $8,850,000 +$2.6M -$1.47M Pre-Bid Estimate 11/22/2016
More informationFinal Drainage Letter Pikes Peak Community College Downtown Parking Lot Colorado Springs, Colorado
Final Drainage Letter Pikes Peak Community College Downtown Parking Lot Colorado Springs, Colorado Prepared for: Pikes Peak Community College 5775 South Academy Boulevard Colorado Springs, CO 80906-5422
More informationPond Decant Kit KIT INCLUDES
42 SEDIMENT RETENTION PONDS & DECANTING EARTH BUNDS Pond Decant Kit Pond Decant Kits are installed in Decanting Earth Bunds or Sediment Retention Ponds. They allow the clean water on the top of the pond
More informationGARFIELD BRIDGE. Building A Bridge to No-Where
GARFIELD BRIDGE Building A Bridge to No-Where OCEANA COUNTY LOCATION Garfield Road leads to Stony Lake Outlet, a Benona Township park and popular Lake Michigan access GARFIELD BRIDGE OVER STONY CREEK
More informationTenders. Manitoba Heavy Construction Association Unit Ellice Ave. Winnipeg, MB R3H 0Z2 Tel: (204) Fax: (204)
Tenders Manitoba Infrastructure Manitoba Heavy Construction Association Unit 3-1680 Ellice Ave. Winnipeg, MB R3H 0Z2 Tel: (204) 947-1379 Fax: (204) 943-2279 www.mhca.mb.ca Reference No. 0000087389 SUPPLY
More informationMEMORANDUM VILLAGE OF NORTHBROOK
MEMORANDUM VILLAGE OF NORTHBROOK TO: Staff COPY: Village President & Board of Trustees Department Heads FROM: Richard Nahrstadt, Village Manager DATE: April 29, 2016 SUBJECT: STAFF BRIEFING WEEK OF April
More informationIP3 IP4 LP7 IP5 IP6 IP2 IP1. Phase 1
? AMENDMENT No. SITUATED IN THE SW OF SECTION 8, T.S, R.W. OF THE TH P.M IP IP LP IP IP A C Phase APPROVED UNDER SEPARATE SUBMITTAL B IP IP INV IN=09.8 INV OUT=09.± MDP0-0080 No. REVISION BY Highlands
More informationAgenda Report. Spruce Street Outlet Drainage Improvements Tower Road Relief Sewer
Agenda Report Subject: Prepared By: Spruce Street Outlet Drainage Improvements Tower Road Relief Sewer Steven M. Saunders, Director of Public Works/Village Engineer Date: August 12, 2012 On March 8, 2012
More informationADDENDUM 2 APPENDIX D STANDARD DRAWINGS
ADDENDUM 2 APPENDIX D STANDARD DRAWINGS Overview This Addendum to Appendix D Standard Drawings replaces Standard Drawing Figures 001 to 020 with new Standard Drawings EDCM 301 to EDCM 704 - as listed below.
More information14.1.a. Attachment: Engineering Standards Manual Draft (2016 : Approval of the Engineering Standards Manual) Packet Pg. 216
Packet Pg. 216 City of Fort Walton Beach Manual November 2012 14.1.a City of Fort Walton Beach Manual TABLE OF CONTE SECTION 1.00 INTRODUCTION... 3 SECTION 2.00 POLICY... 3 SECTION 3.00 - EROSION AND SEDIMENTATION
More informationTownship of Centre Wellington Special Council Agenda Wednesday, July 12, :00 pm Council Chamber, 1 MacDonald Square, Elora Page
Township of Centre Wellington Special Council Agenda Wednesday, July 12, 2017 1:00 pm Council Chamber, 1 MacDonald Square, Elora Page 1. CALL TO ORDER 2. DISCLOSURE OF PECUNIARY INTEREST UNDER THE MUNICIPAL
More informationThird Parties/Crossing
Third Parties/Crossing Presentation by Bill Scheers Canadian Association of Petroleum Land Administration Surface Land Administration Advisory Committee November 29, 2011 Agenda EAPUOC Guide for Working
More informationUniversal 10 x 27 Canopy
Universal 10 x 27 Canopy C81027PC Size: 10 8 x 27 x 6 8 (side) x 9 9 (center) With 10 Legs, Frame, and Cover Powell & Powell Supply Company Distributed by: 1730 Five Points Lane Fuquay-Varina, North Carolina
More informationEAGLE RIVER UNION AIRPORT HANGAR CONSTRUCTION GUIDELINES Approved 1/29/2008
EAGLE RIVER UNION AIRPORT HANGAR CONSTRUCTION GUIDELINES Approved 1/29/2008 SECTION 1 - PURPOSE AND SCOPE 1.1 Purpose This document is designed to serve as a guide for private and commercial hangar construction
More informationDRAFT. Dorabelle Campground Rehabilitation
DRAFT Dorabelle Campground Rehabilitation September 2012 1.1 REGIONAL SETTING AND PROJECT LOCATION The Dorabelle Campground is located on the western shore of Shaver Lake in Fresno County, California (Section
More informationTXT :250 1:500 Plan and Profile Drawings. Layer Description
1:250 1:500 Plan and Profile Drawings Layer Description TXT - 013 Layer Category Layer Identifier 1) The layer category indicates what type of information is to be placed on this layer. In the above-noted
More informationMIAMI-DADE AVIATION DEPARTMENT. Civil Environmental Engineering Division
MIAMI-DADE AVIATION DEPARTMENT MIA Runway 8R8R-26L Pavement Pavement Rehabilitation Civil Environmental Engineering Division The Project Team Mission Statement C EXPERTISE + COMMITMENT = OWNERSHIP Project
More informationLAKE MOUNTAIN PRELIMINARY
VICINITY MAP VICINITY MAP PREPARED FOR:. THE EXISTENCE AND LOCATION OF ANY UNDERGROUND UTILITY PIPES, CONDUITS OR STRUCTURES SHOWN ON THESE S WERE OBTAINED BY A SEARCH OF THE AVAILABLE RECORDS, TO THE
More informationAPPENDIX L -4 RECREATIONAL TRAIL CROSSING PLANS
Atlantic Sunrise Project PA DEP Chapter 105 Joint Permit Application Transcontinental Gas Pipe Line Company, LLC Lancaster County APPENDIX L -4 RECREATIONAL TRAIL CROSSING PLANS Atlantic Sunrise Project
More informationPROJECT UPDATES February 1, 2018
PROJECT UPDATES February 1, 2018 40 th Street Water Tower Painting Project: On September 12, 2017, City Council awarded a contract to Allied Painting, of Cherry Hill, New Jersey, in the amount of $667,500
More informationCAMBRIDGESHIRE ROAD WORKS & EVENTS INFORMATION: SOUTH CAMBS
KEY: Organisation/Contractor Road Locality Traffic UK POWER NETWORKS EASTERN& LONDON HIGH STREET BABRAHAM TWO-WAY CAMBRIDGESHIRE SHEPRETH ROAD BARRINGTON TWO-WAY CAMBRIDGESHIRE HALL CLOSE BOURN SOME C/W
More informationSecond Street Improvements Project Project Update Archive
Second Street Improvements Project Project Update Archive 12/03/18: In observance of the Holiday Moratorium, crews have paused a majority of construction activity on 2nd Street until January 2, 2019. A
More informationPROJECT UPDATES: March 15, th Street Water Tower Painting Project:
PROJECT UPDATES: March 15, 2018 40th Street Water Tower Painting Project: On September 12, 2017, City Council awarded a contract to Allied Painting of Cherry Hill, New Jersey in the amount of $667,500
More informationLESLIE BARNS & CONNECTION TRACK. Project Update Construction and Traffic Management Consultation
LESLIE BARNS & CONNECTION TRACK Project Update Construction and Traffic Management Consultation PRESENTATION SUMMARY Part 1 Brief Project Update (New Streetcars & Streetscape Improvements) Part 2 Construction
More informationMembers of the Administrative Staff Committee. Award of Tender T Trans Canada Trail Extension
To: From: Members of the Administrative Staff Committee W.H. Jackson, Director of Utility Services Meeting Date: August 26, 2015 Subject: Report USEC15-021 Award of Tender T-54-15 - Trans Canada Trail
More informationJuly 5, Re: Contract ID Plan, & Proposal July 11, 2017 Letting. The Contractor is hereby advised of modifications to the bid documents.
July 5, 2017 Dear Prospective Bidders: Re: Contract ID 2688050 Plan, & Proposal July 11, 2017 Letting The Contractor is hereby advised of modifications to the bid documents. The Proposal has been modified:
More informationLOST HILLS ROAD INTERCHANGE PROJECT CONSTRUCTION UPDATE. CALABASAS CITY COUNCIL April 26, 2017
LOST HILLS ROAD INTERCHANGE PROJECT CONSTRUCTION UPDATE CALABASAS CITY COUNCIL LOST HILLS ROAD INTERCHANGE PROJECT UPDATES Construction of CIDH piles for the soundwall foundation commenced on March 20
More informationREPORT. Pavement Evaluation Summary Brookshire Way & Duluth Park Gwinnett County Duluth, Georgia. Project Number
REPORT Pavement Evaluation Summary Brookshire Way & Duluth Park Duluth, Georgia Project Number 2013.4154.01 February 11, 2014 Revised March 20, 2014 UNITED CONSULTING 625 Holcomb Bridge Road Norcross,
More informationFINAL. Bicycle/Pedestrian Feasibility Study City of DeBary Dirksen Drive Trail. Prepared For: Volusia County MPO
City of DeBary Dirksen Drive Trail FINAL Prepared By: Reynolds, Smith and Hills, Inc. Prepared For: Volusia County MPO September 2007 Table of Contents INTRODUCTION...1 PROJECT PURPOSE AND SCOPE...2 PHYSICAL
More informationPublic Meeting Information Report Development Approval and Planning Policy Department
Public Meeting: February 16, 2016 at 7:00 pm in Council Chambers, Town Hall Applicant: Gagnon & Law Urban Planners Ltd. on behalf of Flato Palgrave Mansions Inc. File No.: 21T-90034C & RZ 88-07 The Purpose
More information9' - 0" Locker Bay 237 SF. Elementary Reception 741 SF. Receptionist 82 SF. Work room 105 SF. In School Suspension 89 SF. Conference room 349 SF
Bu i l d i n g Co mmi t t e e T u e s d a y Au g u s t 1 3, 2 0 1 3 9' - 0" Remove Windows Fire Wall Remove Windows 1 First Floor Plan 1/8" = 1'-0" Locker Bay 237 SF Lobby 393 SF Main Vestibule 227 SF
More informationProject Start Date: Project Completion Date: July 1, Contractor: Mattson Construction Contact Information: Nate Lillemon
Date: 06-24-16 To: Derek Hackett, Public Information Officer From: Sunil Jeboo, Traffic Engineer Re: Road Closure for the Week of 06-27-16 (3236.1) 6 th Pump Station Western Ave. and 6 th SW Western Ave.
More informationDenver International Airport CONCOURSE B WEST GSE PAVEMENT REHABILITATION - PHASE I
Denver International Airport DIA Project No. WEST - PHASE I ISSUED FOR BID ISSUE : JANUARY 8, 2013 4700 S. SYRACUSE ST., SUITE 300, COLORADO 80237 PHONE 303.409.9700 FAX 303.409.9701 S.H.C. GEOTECHNICAL
More informationAPPENDIX F. Structural Design Report
APPENDIX F Structural Design Report CONSULTANT SERVICES FOR AN ENVIRONMENTAL ASSESSMENT (EA) STUDY OF WHARNCLIFFE ROAD WIDENING FROM BECHER STREET TO COMMISSIONERS ROAD CNR SUBWAY BRIDGE REPLACEMENT STRUCTURAL
More informationPallet Feet & Fittings SQUARE
SQUARE 1410 Thickness: 2.3 Weight (Kg/100): 25 Post size(mm): 40 per ft (Tonne): 2.46 PALLET FOOT 89MM SQUARE X 2.3 mm THICK 0138 Thickness: 2.3 Weight (Kg/100): 50 per ft (Tonne): 2.19 PALLET FOOT 127MM
More informationVISTA AZUL- APPROVED 20 LOT TENTATIVE MAP
Expansive Views Entitlements for 20 Residential Lots Previously Graded Entitled for 14 Detached Lots, 6 Townhome Units DOWNTOWN SAN DIEGO ASKING PRICE: $1,395,000 - OFFERS DUE JULY 14, 2017 Monterey Heights
More informationCONSTRUCTION COMMITTEE MEETING AGENDA
CONSTRUCTION COMMITTEE MEETING AGENDA DATE: Tuesday, December 19, 2017 TIME: 8:30 a.m. PLACE: GOAA ANNEX BUILDING, 1ST FLOOR - CONFERENCE ROOMS (APOLLO/GEMINI/TAURUS), 5855 CARGO ROAD, ORLANDO INTERNATIONAL
More informationCity of Madison, Buckeye Road Monona Drive to Stoughton Road County AB Dane County Public Involvement Meeting
City of Madison, Buckeye Road Monona Drive to Stoughton Road County AB Dane County Public Involvement Meeting Wednesday, May 31, 2017 6:30 to 8 P.M. Frank Allis Elementary School 4201 Buckeye Road Madison,
More informationBuilding Permit Application
Building Permit Application Co-Owner Name Lot # Address City State Zip Phone (home) (cell) Contractor (if applicable) The above named co-owner hereby makes application to Cedar Shores Campground Condominium
More informationCOATING AND STRUCTURAL CONCRETE COATING (ANTI-GRAFFITI) 1'-3" FINISHED GRADE 1'-3" 3" VENEER ALLOWANCE LEDGER W/ MECHANICAL ANCHOR BOLT
R "W" PAY LIMITS OF ITEM 601 PAY LIMITS OF ITEM 601 STRUCTURAL CONCRETE STRUCTURAL CONCRETE 1'3" PCBC END SEGMENT B C 1'3" COATING AND STRUCTURAL CONCRETE COATING (ANTIGRAFFITI) 1'3" CURB FINISHED GRADE
More informationNORMACLAMP TORRO ASSEMBLY FIXTURE NORMACLAMP COBRA PNEUMATIC PLIERS NORMACLAMP FBS PNEUMATIC PLIERS TYPE S NORMACLAMP FBS PNEUMATIC PLIERS TYPE W
MOUNTING TOOLS NORMACLAMP TORRO Assembly fixture NORMACLAMP TORRO ASSEMBLY FIXTURE ASSEMBLY FIXTURE 06 9900 00 NORMACLAMP COBRA Pneumatic pliers These pneumatically assisted pliers are available in a short
More informationPart 8 Street lighting DISTRIBUTION CONSTRUCTION STANDARDS HANDBOOK
Part 8 Street lighting DISTRIBUTION CONSTRUCTION STANDARDS HANDBOOK Drawing Register Number Revision Description S2 D Minor Road, Wood or Concrete Pole with Crossarm S3 D Arterial Road, Wood Pole with
More informationFEDERAL AIRPORT IMPROVEMENT PROGRAM (AIP) PRE-APPLICATION FFY 2017 CHECKLIST
Form 291111wd (09-15) Storm Lake Municipal Airport Airport FEDERAL AIRPORT IMPROVEMENT PROGRAM (AIP) PRE-APPLICATION FFY 2017 SLB FAA Identifier CHECKLIST Please attach the following documents with your
More informationMATERIALS AND PROCUREMENT DEPARTMENT 1900 YONGE STREET PAGE 1 OF 1 TORONTO, ONTARIO M4S 1Z2
TORONTO TRANSIT COMMISSION ADDENDUM NO._1 MATERIALS AND PROCUREMENT DEPARTMENT 1900 YONGE STREET PAGE 1 OF 1 TORONTO, ONTARIO M4S 1Z TITLE: PRINTING AND SUPPLY OF RIDE GUIDES FOR UP TO A THREE () YEAR
More informationFront Carport Design Standards, Requirements & Application
Front Carport Design Standards, Requirements & Application THIS PAGE INTENTIONALLY LEFT BLANK. Carport: A structure designed or used to shelter vehicles that is open on at least two sides. Carport shall
More informationPhotographic Log Client: Project Number: Site Location: Site Name: Photograph ID: Date: Location: Direction: Comments: Photograph ID:
Photograph ID: 1 west View of one of the monitoring well and the large parking lot on the south side of Center Street. Photograph ID: 2 Monitoring well located in the middle of the parking lot located
More informationProject Management, Environmental Assessment, Stormwater Management. Hydrologic Modelling. Natural Heritage. Fluvial Geomorphology
Welcome PUBLIC INFORMATION CENTRE # 1 KROSNO CREEK DIVERSION PROJECT February 19, 2014 6:30 p.m. to 8:30 p.m. Please sign in on the sheet provided. Then feel free to walk around and view the displays.
More informationWelcome KROSNO CREEK DIVERSION PROJECT CLASS ENVIRONMENTAL ASSESSMENT
Welcome KROSNO CREEK DIVERSION PROJECT PUBLIC INFORMATION CENTRE # 1 Tonight s Presentation Study Overview Background Existing Conditions Alternative Solutions Preliminary Preferred Solution Next Steps
More informationTenders. Manitoba Infrastructure
Manitoba Heavy Construction Association Unit 3-1680 Ellice Ave. Winnipeg, MB R3H 0Z2 Tel: (204) 947-1379 Fax: (204) 943-2279 www.mhca.mb.ca Email: jocelyn@mhca.mb.ca Tenders Manitoba Infrastructure Reference
More informationAction Recommendation: Budget Impact:
City of Fayetteville Staff Review Form Matt Mihalevich 1/16/2019 DEVELOPMENT SERVICES (620) Submitted By 2019 0050 Legistar File ID February 5th, 2019 City Council Meeting Date Agenda Item Only N/A for
More informationThe Owners of Strata Plan BCS3635 Council Meeting Agenda Jan 24, 2017
The Owners of Strata Plan BCS3635 Council Meeting Agenda Jan 24, 2017 Date: Jan 24, 2017 Time: 6 PM Room: Port Coquitlam Legion Veterans Room Committee members present: Guests Present: Regrets: Recorder
More informationDEVELOPMENT PLAN REVIEW PROCESS and APPLICANT GUIDELINES
DEVELOPMENT PLAN REVIEW PROCESS and APPLICANT GUIDELINES DEVELOPMENT DEPARTMENT 120 Gary Wade Boulevard Sevierville, TN 37862 (865) 453-5504 seviervilletn.org Pamela S. Caskie, Development Director Judith
More information,271
Reserve Analysis by Berrera and Company (January 2016) Page 1 Section I: Capital Reserve Funding - Estimated Cash Reserve Balances And Unfunded Liability: Effective 1/1/2019 Assumption Table: Interest
More informationLong water shutdown scheduled for Tuesday, September 18
Thank you for your interest in the Center City Connector Streetcar. In this weekly update, you ll find information about ongoing construction for the 1st phase of utility work in Pioneer Square. Utility
More informationLESLIE BARNS & CONNECTION TRACK. Construction Liaison Group Meeting #6 January 30, 2014
LESLIE BARNS & CONNECTION TRACK Construction Liaison Group Meeting #6 January 30, 2014 Construction Liaison Group Jan 30 2014 1 OVERVIEW HAPPY BELATED NEW YEAR Works to Date Underground Utilities Bell
More informationDublin Airport Update Presented by Pat Molloy
Dublin Airport Update Presented by Pat Molloy daa Actions from Previous Meetings Action Item Summary 1. PM to confirm the type of fencing that will be erected around the Toberburr road site 2. daa and
More informationINFORMATION PAPER TO THE STRATEGIC DEVELOPMENT COMMITTEE
INFORMATION PAPER TO THE STRATEGIC DEVELOPMENT COMMITTEE BRIEFING ON RONALD REAGAN WASHINGTON NATIONAL AND WASHINGTON DULLES INTERNATIONAL AIRPORTS CAPITAL CONSTRUCTION PROGRAM APRIL 2015 2015 Use & Lease
More informationDOWNPIPE AND FITTINGS. Including Clips, Brackets and Droppers
B DOWNPIPE AND FITTINGS Including Clips, Brackets and Droppers RAINWATER SYSTEMS DOWNPIPE SIZE CODE COMMENT 65mm x 3m RP65-3mi OD = 67mm 80mm x 3m RP80-3mi OD = 81mm Note: Pipe and fittings for 90mm- 315mm
More informationRequired. When application not signed by owner Permit Fee V As per Fee By-law
'41411i ft* -41... 457iensifip of ethnic, BUILDING PERMIT GUIDELINES - SPECIAL EENT TENTS A tent or group of tents is exempt from the requirements to obtain a permit provided they are: (a) not more than
More informationInstallation Instructions Traditional Awnings in a box Classic Awnings in a Box
Installation Instructions Traditional Awnings in a box Classic Awnings in a Box Basic Tools Required (not included) Tape Measure & Pencil Level Phillips Screwdriver Drill with ¼ bit (Cement or Masonry
More informationCHICAGO DEPARTMENT OF AVIATION. Current Construction Projects AND THE O HARE MODERNIZATION PROGRAM. May 2, 2014
CHICAGO DEPARTMENT OF AVIATION AND THE O HARE MODERNIZATION PROGRAM Current Construction Projects May 2, 2014 O HARE INTERNATIONAL AIRPORT CURRENT CONFIGURATION 2 PHASE 1 & COMPLETION PHASE 9L-27R Completed
More informationMINUTES OF THE SEPTEMBER 26, 2018, MONTHLY MEETING OF THE BAYLES LAKE HOMEOWNERS ASSOCIATION
MINUTES OF THE SEPTEMBER 26, 2018, MONTHLY MEETING OF THE BAYLES LAKE HOMEOWNERS ASSOCIATION The regular meeting of the Bayles Lake Homeowners Association Board of Directors was held at Lakeview Country
More informationGarden Party 13ft X 13ft 12ft 9in Wide x 12ft 9in Deep x 6ft3in Side Height / 10ft4in Center Height
Garden Party 13ft X 13ft 12ft 9in Wide x 12ft 9in Deep x 6ft3in Side Height / 10ft4in Center Height King Canopy Item #: GP1313 With 4 Legs, Foot Pads, Cover & Screens. Distributed by: PIC America, LTD.
More informationSandbag Barrier. Suitable Applications Sandbag barriers may be suitable: As a linear sediment control measure:
Categories EC Erosion Control SE Sediment Control TC Tracking Control WE Wind Erosion Control Non-Stormwater NS Management Control Waste Management and WM Materials Pollution Control Legend: Primary Category
More informationCity of Redding Airports
City of Redding Airports Benton Airpark Redding Municipal Airport DEVELOPMENT AND USE GUIDELINES FOR GENERAL AVIATION HANGARS April 7, 2009 PREFACE The City of Redding, as owner of federally obligated
More informationCity of Grand Island
City of Grand Island Tuesday, January 09, 2007 Council Session Item G7 #2007-6 - Approving Certificate of Final Completion for Asphalt Maintenance Project 2006-AC-1; Various Locations Throughout Grand
More informationPoly Shelters. Instruction Manual. Sunblocker Shade House 10' Wide x 30' Long SKU #1030SPC. Note: Photo may be of a different but similar model
Poly Shelters Note: Photo may be of a different but similar model Instruction Manual Sunblocker Shade House 10' Wide x 30' Long SKU #1030SPC 2004 ClearSpan TM All rights reserved. Reproduction prohibited
More informationCAUTION - NOTICE TO CONTRACTOR
7. WINDSOCK 7.7 CPP TOP.. 7.7 INV CPP EL..7...7.7.... 7...... CNT BOX NOEL. CNT BOX. CNT BOX NOEL. CNT BOX NOEL..7... 7. 7.......7. 7. 7..7. TOP. TOP. TOP TOP.7 7.. TOP TOP.7. TOP TOP..7 TOP. TOP.7. PVC
More informationPUMICE TRADE PRICE LIST 2013 UPDATED RANGE INCLUDING THE NEW CE APPROVED MAGNUM FIRECHEST. Part of the MONIER GROUP. April 2013
PUMICE TRADE PRICE LIST 2013 UPDATED RANGE INCLUDING THE NEW CE APPROVED MAGNUM FIRECHEST April 2013 Part of the MONIER GROUP Double Module DM 36 Double Module DM 44 DM36 S-803636 360mm square casing 250mm
More informationConstruction Staging Adelaide Street West
REPORT FOR ACTION Construction Staging Adelaide Street West Date: October 6, 2016 To: Toronto and East York Community Council From: Acting Director, Transportation Services, Toronto and East York District
More informationDWV AND STORMWATER SYSTEMS. Fittings / Pipes
A DWV AND STORMWATER SYSTEMS Fittings / Pipes PLAIN BEND F+F SIZE CODE COMMENT 32mm x 45 101-32-45 32mm x 88 101-32-88 40mm x 15 101-40-15 40mm x 45 101-40-45 40mm x 88 101-40-88 40mm x 88 101-40-88W Inspection
More informationCITY OF PEMBROKE 2004 BUDGET. July 6, 2004
2004 BUDGET July 6, 2004 2004 TAX RATES Municipal Education Total Residential 0.01434078 0.00296000 0.01730078 Multi-residential 0.02674555 0.00296000 0.02970555 Commercial 0.02940061 0.02268611 0.05208672
More informationAbandoned Mine Sites Policy
SUBJECT: Abandoned Mine Sites Policy Policy Number: MRE 006 2004 C. R. File Number: 565 00 0002 Effective Date: September 1, 2004 To Be Reviewed: September 1, 2008 Approval: Original signed by W. David
More information