1 Page 1 of SECTION: 01 COMMON ITEMS CONTRACTOR CONSTRUCTION STAKING FIELD OFFICE AND LABORATORY (TYPE A) FOUNDATION STABILIZATION (SET PRICE) MOBILIZATION MOBILIZATION (DBE) REMOVAL OF EXISTING STRUCTURES CONCRETE FOR SEAL COURSE (SET PRICE) (1) LS (1) LS (1) LS (1) LS 7, , , , , , , , , , , , , , , , , , , , , , , , , , , , FLAGGER (SET PRICE) HOUR $54, $80, $132, Section Total with LCC: $54, $80, $132,777.12

2 Page 2 of SECTION: 02 ROAD ITEMS CLEARING AND GRUBBING COMMON EXCAVATION (URB) COMMON EXCAVATION (CONTRACTOR FURNISHED) ROCK EXCAVATION WATER (GRADING) (SET PRICE) COMPACTION OF EARTHWORK (TYPE B) (MR-90) CONCRETE (GRADE 4.0) (RCB) CONCRETE (GRADE 4.0) (AE) (RCB) BRIDGE BACKWALL PROTECTION SYSTEM REINFORCING STEEL (GRADE 60) (1) LS 2, , MGAL 3, SQYD , , , , , , , , , , , , , , , , , , , , , , , ,

3 Page 3 of SECTION: 02 ROAD ITEMS REINFORCING STEEL (GRADE 60) (EPOXY COATED) FOUNDATION STABILIZATION GRANULAR BACKFILL (WINGWALLS) BRIDGE PROJECT MARKER CROSS ROAD PIPE ( 18") (ACSP) CROSS ROAD PIPE ( 5.0 SQ.FT.) (CSMAC) CROSS ROAD PIPE (10.0 SQ.FT.) (CSMAC) END SECTION ( 18") (ACS) END SECTION ( 5.0 SQ.FT.) (CSMA) END SECTION (10.0 SQ.FT.) (CSMA) 3, , , , , , , , , , , , , , , , , , , , , , , , ,500.00

4 Page 4 of SECTION: 02 ROAD ITEMS ADJUSTMENT OF MANHOLES ADJUSTMENT OF VALVE BOX (WATER) INLET (TYPE 12 CURB) MANHOLE (REINFORCED CONCRETE) STORM SEWER (24") (RCP) STORM SEWER ( 7.0 SQ.FT.) (RCPHE) STORM SEWER (10.0 SQ.FT.) (RCPHE) STORM SEWER (14.0 SQ.FT.) (RCPHE) END SECTION (10.0 SQ.FT.) (RCHE) , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , ,500.00

5 Page 5 of SECTION: 02 ROAD ITEMS END SECTION (14.0 SQ.FT.) (RCHE) SIDEWALK CONSTRUCTION ( 4") (AE) SIDEWALK CONSTRUCTION ( 6") (AE) SIDEWALK RAMP HANDRAIL (STEEL) (3'-6") , SQYD SQYD SQYD (1) 2, , , , , , , , , , , , , , , , , , , , , , , , REMOVAL AND RECONSTRUCTION OF EXISTING STRUCTURES LS $497, $508, $590, Section Total with LCC: $497, $508, $590,165.07

6 Page 6 of SECTION: 03 RETAINING WALL ITEMS , , , , LANDSCAPE RETAINING WALL SQFT $22, $34, $52, Section Total with LCC: $22, $34, $52,128.00

7 Page 7 of SECTION: 04 TEMP PRJ WTR POL CTL TEMPORARY FERTILIZER ( ) TEMPORARY SEED (CANADA WILDRYE) TEMPORARY SEED (GRAIN OATS) TEMPORARY SEED (STERILE WHEATGRASS) SEDIMENT REMOVAL (SET PRICE) TEMPORARY BERM (SET PRICE) BIODEGRADABLE LOG (12") FILTER SOCK ( 8") SWPPP DESIGN SWPPP INSPECTION (1) LS , , , , , , , , , , , , , , ,250.00

8 Page 8 of SECTION: 04 TEMP PRJ WTR POL CTL WATER POLLUTION CONTROL MANAGER MULCHING TON , , , , , , WATER (EROSION CONTROL) (SET PRICE) MGAL $25, $26, $26, Section Total with LCC: $25, $26, $26,304.40

9 Page 9 of SECTION: 05 BR. STA CONCRETE (GRADE 4.0) (RCB BR) CONCRETE (GRADE 4.0) (AE) (RCB BR) BRIDGE BACKWALL PROTECTION SYSTEM REINFORCING STEEL (GRADE 60) REINFORCING STEEL (GRADE 60) (EPOXY COATED) CLASS III EXCAVATION (RCB) FOUNDATION STABILIZATION GRANULAR BACKFILL (WINGWALLS) BRIDGE PROJECT MARKER SQYD 1, , , , , , , , , , , , , , , , , , , , , , , ,

10 Page 10 of $103, $103, $102, Section Total with LCC: $103, $103, $102,737.90

11 Page 11 of SECTION: 06 CONCRETE SURFACING ITEMS CURB AND GUTTER, COMBINED (AE) CURB AND GUTTER, COMBINED (AE) (SPECIAL) CONCRETE PAVEMENT ( 8" UNIFORM) (AE) CRUSHED STONE SUBGRADE ( 6") WATER (CRUSHED STONE SUBGRADE) (SET PRICE) SQYD SQYD MGAL , , , , , , , , , , GEOSYNTHETIC REINFORCEMENT (FOR BASE) SQYD $45, $51, $58, Section Total with LCC: $45, $51, $58,332.00

12 Page 12 of SECTION: 07 ASPHALT SURFACING ITEMS , , , HMA-COMMERCIAL GRADE (CLASS A) TON $32, $23, $37, Section Total with LCC: $32, $23, $37,800.00

13 Page 13 of SECTION: 08 SIGNING ITEMS SIGN (FLAT SHEET) (HIGH PERFORMANCE) SIGN POST (1-3/4" PERFORATED SQUARE STEEL TUBE) SQFT SIGN POST FOOTING ( 1-3/4" PERFORATED SQUARE STEEL TUBE) $ $ $ Section Total with LCC: $ $ $757.00

14 Page 14 of SECTION: 09 PAVEMENT MARKING ITEMS PAVEMENT MARKING (INTERSECTION GRADE) (WHITE) (18") PAVEMENT MARKING (INTERSECTION GRADE) (WHITE) (24") PAVEMENT MRK SYM (INTERSECTION GRADE) (WHITE)(RAILROAD XING) , , , , , , , PAVEMENT MARKING REMOVAL $3, $4, $3, Section Total with LCC: $3, $4, $3,744.00

15 Page 15 of SECTION: 10 TRAFFIC SIGNAL ITEMS (K-15) (1) 19, , , , , , TRAFFIC SIGNAL LS $19, $19, $19, Section Total with LCC: $19, $19, $19,710.00

16 Page 16 of SECTION: 11 TRAFFIC SIGNAL ITEMS (CLIFTON) (1) 50, , , , , , TRAFFIC SIGNAL LS $50, $50, $50, Section Total with LCC: $50, $50, $50,910.00

17 Page 17 of SECTION: 12 SEEDING ITEMS FERTILIZER ( ) SEED (BLUE GRAMA GRASS) (LOVINGTON) SEED (BUFFALO GRASS) (TREATED) SEED (RYEGRASS) (PERENNIAL) SEED (PRAIRIE JUNE GRASS) SEED (SIDE OATS GRAMA) (EL RENO) SEED (FESCUE) (TALL) (ENDOPHYTE-FREE) SEED (FESCUE) (TALL TURF TYPE BLEND) SEED (KENTUCKY) (BLUEGRASS) (BARON) , , , , , , , , ,

18 Page 18 of SECTION: 12 SEEDING ITEMS MULCHING TACKING SLURRY $9, $5, $5, Section Total with LCC: $9, $5, $5,882.80

19 Page 19 of SECTION: 13 TRAFFIC CONTROL ITEMS WORK ZONE SIGNS ( 9.26 TO SQ.FT.) WORK ZONE WARNING LIGHT (TYPE "A" LOW INTENSITY) PORTABLE CHANGEABLE MESSAGE SIGN , EADA EADA EADA (1) , , , , , , , , , TRAFFIC CONTROL (INITIAL SETUP) LS $12, $8, $12, Section Total with LCC: $12, $8, $12, Contract Item Totals $877, $918, $1,093, Contract Time Totals Contract Life Cycle Costs Totals $0.00 $0.00 $0.00 Contract Grand Totals ( ) indicates item is bid as Lump Sum $877, $918, ,093,775.29

20 Page 20 of

21 Vendor Ranking Page 1 of 1 TA-T043(301) Rank Vendor ID/Name Total Bid Percent Of Low Bid CONSPEC INC DBA $877, % PEARSON $918, % CORNEJO & SONS LLC $1,093, %

203.0100 Removing Small Pipe Culverts CATEGORY STATION LOCATION EACH 0010 2+00-16+50 0010 7+13-8+41 LT. 155 3 0010 4+42 CL 1 10,660 9+90-13+73 RT. 390 3 7+63'SB' 67' LT. 1 14+25'GV' 49' LT. 1 17+05'GV'

More information

ADDENDUM NO. TWO AB

ADDENDUM NO. TWO AB ADDENDUM NO. TWO AB2018-28 Notice is hereby given that on June 22, 2018 at 11:00 A.M. (Prevailing time), sealed bids will be opened and read in public by the Purchasing Department in the Mercer County

More information

CITY OF IMPERIAL TOTAL BID PROPOSAL. 1. Mobilization / Bonds / Insurances LS 1 $ $ 2. Preparation/Implementation Traffic Control Plan LS 1 $ $

CITY OF IMPERIAL TOTAL BID PROPOSAL. 1. Mobilization / Bonds / Insurances LS 1 $ $ 2. Preparation/Implementation Traffic Control Plan LS 1 $ $ CITY OF IMPERIAL PROPOSAL BID SHEET (02-06-2015) Page 1 of 2 FOR STREET IMPROVEMENT PROJECT PHASE 2 ASPHALT RUBBER COMPOSITE LAYER OVERLAY ON DESIGNATED STREETS BID NO. 2015-01 Item No. Description Units

More information

Riverside County Transportation Department Summary of Bids

Riverside County Transportation Department Summary of Bids COUNTY'S ESTIMATE HARDY & HARPER, INC. Schedule 1: Project No. B6-0472 Santa Ana, CA 92705 ITEM NO. ITEM CODE CONTRACT ITEM UNITS QUANTITY UNIT PRICE ENG ESTIMATE BID AMOUNT 1 731521 MINOR CONCRETE (SIDEWALK)

More information

BID FORM. Bid by: Name of Bidder. Address: Address: To the Texas Department of Transportation hereinafter called the Agent.

BID FORM. Bid by: Name of Bidder. Address:  Address: To the Texas Department of Transportation hereinafter called the Agent. BID FORM TxDOT CSJ No. Project Description: This project includes reconstruction of a hangar access taxiway with trench drain and pipe drainage system; local reconstruction of failing pavement on Taxiway

More information

TENDER NO. T WESTDALE ROAD SANITARY SEWER UPGRADE ADDENDUM NO. 1

TENDER NO. T WESTDALE ROAD SANITARY SEWER UPGRADE ADDENDUM NO. 1 TENDER NO. T-2170-2018 ADDENDUM NO. 1 SCHEDULE OF QUANTITIES AND PRICES REPLACE A revised copy of the Schedule of Quantities and Prices with changes bolded in red has been posted online (pdf attached).

More information

22-23 Pavement Marking Items. (Pages 7 & 8 removed)

22-23 Pavement Marking Items. (Pages 7 & 8 removed) 22-23 Pavement Marking Items (Pages 7 & 8 removed) SUMMARY OF TRAFFIC CONTROL DEVICES (FOR INFORMATION ONLY) All traffic control devices shall be placed in accordance with the applicable

More information

9' - 0" Locker Bay 237 SF. Elementary Reception 741 SF. Receptionist 82 SF. Work room 105 SF. In School Suspension 89 SF. Conference room 349 SF

9' - 0 Locker Bay 237 SF. Elementary Reception 741 SF. Receptionist 82 SF. Work room 105 SF. In School Suspension 89 SF. Conference room 349 SF Bu i l d i n g Co mmi t t e e T u e s d a y Au g u s t 1 3, 2 0 1 3 9' - 0" Remove Windows Fire Wall Remove Windows 1 First Floor Plan 1/8" = 1'-0" Locker Bay 237 SF Lobby 393 SF Main Vestibule 227 SF

More information

ADVANCED WARNING SYSTEM FOR SHARED USE CROSSING ON HOWARD STREET EAST OF NORDICA AVENUE

ADVANCED WARNING SYSTEM FOR SHARED USE CROSSING ON HOWARD STREET EAST OF NORDICA AVENUE ADVANCED WARNING SYSTEM FOR SHARED USE CROSSING ON EAST RDICA AVENUE FOR THE LOCATION MAP STANDARD SYMBOLS FEATURE EISTING PROPOSED BENCHMARK BM/TBM SHEET INDE. BM/TBM TITLE SHEET CONCRETE R.O.W. MONUMENT

More information

DATA BOOK IV : COST ESTIMATE

DATA BOOK IV : COST ESTIMATE The Study on Comprehensive Disaster Prevention around Mayon Volcano DATA BOOK IV : COST ESTIMATE DT IV List of (1/5) Clearing and Grubbing ha 59,192.92 Excavation (Road way & Drainage) Mech. cu.m 80.55

More information

Mainelli Wagner & Associates, Inc.

Mainelli Wagner & Associates, Inc. www.mwaeng.com Mainelli Wagner & Associates, Inc. 6920 Van Dorn Street, Suite A, Lincoln, NE 68506 Phone: (402) 421-1717 Fax: (402) 421-6061 September 14, 2018 The Colfax County Board of Commissioners

More information

Mainelli Wagner & Associates, Inc.

Mainelli Wagner & Associates, Inc. www.mwaeng.com Mainelli Wagner & Associates, Inc. 6920 Van Dorn Street, Suite A, Lincoln, NE 68506 Phone: (402) 421-1717 Fax: (402) 421-6061 December 21, 2018 To whom it may concern: The Colfax County

More information

2012 WATER & SEWER ALLEY CONSTRUCTION CONTRACT, PACKAGE II SAWS WATER JOB. NO /SAWS SEWER JOB NO SOLICITATION #B DD

2012 WATER & SEWER ALLEY CONSTRUCTION CONTRACT, PACKAGE II SAWS WATER JOB. NO /SAWS SEWER JOB NO SOLICITATION #B DD BID PROPOSAL PROPOSAL OF, a Corporation organized and existing under the laws of the State of, a Partnership consisting of, an Individual doing business as. Enclosed with this bid are (1) Bid Bond, and

More information

Ann Arbor Municipal Airport Ann Arbor, MI Date of Latest ALP ACIP Airport Code - A Airport Identifier - ARB

Ann Arbor Municipal Airport Ann Arbor, MI Date of Latest ALP ACIP Airport Code - A Airport Identifier - ARB MICHIGAN AIRPORT DEVELOPMENT PROGRAM AIP CAPITAL IMPROVEMENT PLAN 20102019 FEDERAL/STATE/LOCAL Ann Arbor, MI Date of Latest ALP 2008 ACIP Airport Code A Airport Identifier ARB Prepared by: MDOTAERO Sponsor:

More information

Community Park Capital Project. February 6, 2017

Community Park Capital Project. February 6, 2017 Community Park Capital Project February 6, 2017 Construction Budget Estimate Bid Recommended $10,318,690 $7,725,000 Staff Recommended +$1.1M $8,850,000 +$2.6M -$1.47M Pre-Bid Estimate 11/22/2016

More information

Hospital Link Project Project Update September 2015

Hospital Link Project Project Update September 2015 Hospital Link Project Project Update September 2015 General The project provides a link between Riverside Drive and the Transitway to the Hospital Ring Road. This link is needed to improve transit service

More information

HOST KA

HOST KA W PLAINS E ZENITH E 00 RD E 000 RD W 00 RD W 00 RD W 00 RD W 0 RD W 00 RD W 00 RD W 000 RD W 00 RD W 00 RD W 00 RD W 00 RD W 00 RD W 00 RD W 0 RD W 00 RD E 00 RD E 00 RD E 0 RD E 00 RD E 00 RD E 00 RD

More information

ATTACHMENT C CITY OF FEDERAL WAY 2018 ASPHALT OVERLAY PROJECT BID SCHEDULE

ATTACHMENT C CITY OF FEDERAL WAY 2018 ASPHALT OVERLAY PROJECT BID SCHEDULE ATTACHMENT C CITY OF FEDERAL WAY ASPHALT OVERLAY PROJECT SCHEDULE NOTE: Unit Prices for all items, all extensions, and the total amount of the bid must be shown. Show unit prices in legible figures. Where

More information

IS A BUDGET ONLY DESCRIPTION QUANTITY UNIT

IS A BUDGET ONLY DESCRIPTION QUANTITY UNIT Miller Creek Consultants LLC CONCRETE RECAP 1/29/2009 ESTIMATE DATE: 1-Jan-09 Project: 4000 psi 95.00 Location: 3000 psi 88.00 PROJECT DATA PROJECT NAME: Concrete Estimate THIS IS A BUDGET ONLY DESCRIPTION

More information

LAKE MOUNTAIN PRELIMINARY

LAKE MOUNTAIN PRELIMINARY VICINITY MAP VICINITY MAP PREPARED FOR:. THE EXISTENCE AND LOCATION OF ANY UNDERGROUND UTILITY PIPES, CONDUITS OR STRUCTURES SHOWN ON THESE S WERE OBTAINED BY A SEARCH OF THE AVAILABLE RECORDS, TO THE

More information

LOST HILLS ROAD INTERCHANGE PROJECT CONSTRUCTION UPDATE. CALABASAS CITY COUNCIL April 26, 2017

LOST HILLS ROAD INTERCHANGE PROJECT CONSTRUCTION UPDATE. CALABASAS CITY COUNCIL April 26, 2017 LOST HILLS ROAD INTERCHANGE PROJECT CONSTRUCTION UPDATE CALABASAS CITY COUNCIL LOST HILLS ROAD INTERCHANGE PROJECT UPDATES Construction of CIDH piles for the soundwall foundation commenced on March 20

More information

City of Madison, Buckeye Road Monona Drive to Stoughton Road County AB Dane County Public Involvement Meeting

City of Madison, Buckeye Road Monona Drive to Stoughton Road County AB Dane County Public Involvement Meeting City of Madison, Buckeye Road Monona Drive to Stoughton Road County AB Dane County Public Involvement Meeting Wednesday, May 31, 2017 6:30 to 8 P.M. Frank Allis Elementary School 4201 Buckeye Road Madison,

More information

CAUTION - NOTICE TO CONTRACTOR

CAUTION - NOTICE TO CONTRACTOR WINDSOCK 7. 7.7 CPP TOP.. 7.7 INV CPP EL..7...7.7.... 7....... CNT BOX NOEL CNT BOX.. CNT BOX NOEL CNT BOX NOEL.7 7........ 7...7.. 7..7. 7..7 TOP. TOP TOP TOP. TOP. 7.7.. TOP. TOP.7 TOP. TOP.7 TOP. PVC

More information

FINAL. Bicycle/Pedestrian Feasibility Study City of DeBary Dirksen Drive Trail. Prepared For: Volusia County MPO

FINAL. Bicycle/Pedestrian Feasibility Study City of DeBary Dirksen Drive Trail. Prepared For: Volusia County MPO City of DeBary Dirksen Drive Trail FINAL Prepared By: Reynolds, Smith and Hills, Inc. Prepared For: Volusia County MPO September 2007 Table of Contents INTRODUCTION...1 PROJECT PURPOSE AND SCOPE...2 PHYSICAL

More information

Item Description Unit Quantity Unit Price Total Unit Price Total Unit Price Total Unit Price Total Unit Price Total Unit Price Total

Item Description Unit Quantity Unit Price Total Unit Price Total Unit Price Total Unit Price Total Unit Price Total Unit Price Total AGENCY: KENDALL Builders Paving D Construction, Inc. Gallagher Asphalt Corp. Geneva Construction Co. P. T. Ferro Construction Co. SECTION: 16-00000-00-GM, Plainfield Road, HMA Resurfacing, CMF 4413 Roosevelt

More information

- Countywide - Roadway Cone Zone / Lane Closure / Sidewalk Repair Schedule

- Countywide - Roadway Cone Zone / Lane Closure / Sidewalk Repair Schedule Report for Monday, September 10, 2018 through Monday, September 17, 2018 S. Perry Park Rd. (DC105) and Red Rocks Dr. Intersection Improvements Safety improvements on the S. Perry Park Road (DC 105) and

More information

APPROVED 10 LOT TENTATIVE TRACT MAP - OCEAN VIEWS

APPROVED 10 LOT TENTATIVE TRACT MAP - OCEAN VIEWS Rare Development Opportunity in the Olde Carlsbad Neighborhood Ocean Views from Some Lots Lot Sizes 9,500-15,527 SF Area of New Home Prices From $1,000,000-$1,500,000 SUBMIT BEST OFFER - OFFERS DUE DECEMBER

More information

Project Start Date: Project Completion Date: July 1, Contractor: Mattson Construction Contact Information: Nate Lillemon

Project Start Date: Project Completion Date: July 1, Contractor: Mattson Construction Contact Information: Nate Lillemon Date: 06-24-16 To: Derek Hackett, Public Information Officer From: Sunil Jeboo, Traffic Engineer Re: Road Closure for the Week of 06-27-16 (3236.1) 6 th Pump Station Western Ave. and 6 th SW Western Ave.

More information

Second Street Improvements Project Project Update Archive

Second Street Improvements Project Project Update Archive Second Street Improvements Project Project Update Archive 12/03/18: In observance of the Holiday Moratorium, crews have paused a majority of construction activity on 2nd Street until January 2, 2019. A

More information

COON CREEK WATERSHED DISTRICT Request for Board Action

COON CREEK WATERSHED DISTRICT Request for Board Action Item 13: Request to Award Work on Woodcrest Creek Bank Stabilization Project Page 1 of 6 COON CREEK WATERSHED DISTRICT Request for Board Action MEETING DATE: December 8, 2014 AGENDA NUMBER: 13 ITEM: Request

More information

Longitudinal Joint Construction. Mike Robinson, PE

Longitudinal Joint Construction. Mike Robinson, PE Longitudinal Joint Construction Mike Robinson, PE Inherently weaker than surrounding pavement Prone to deterioration Often drives rehabilitation FOD Longitudinal Joints Two predictors of success Density

More information

ABINGDON v ELEMENTARY SCHOOL

ABINGDON v ELEMENTARY SCHOOL JULY 31 2017 ABINGDON v ELEMENTARY SCHOOL FCA LISTENING SESSION CONSTRUCTION UPDATE PROJECT UPDATE SUMMARY 1. Two four-plex relocatables removed, ten to stay in place; Temporary Parking lot in place and

More information

Capital Improvement Plan

Capital Improvement Plan PROGRAM DESCRIPTION: The represents City Council approved projects and includes each of the project's total costs and the estimated funding requirements for the next five years. Projects are funded by

More information

BID RESULTS. May 12, Award Date May 19, COMMISSION DISTRICT 1 Bob Ruwart - Commissioner

BID RESULTS. May 12, Award Date May 19, COMMISSION DISTRICT 1 Bob Ruwart - Commissioner BID RESULTS May 12, 2016 Award Date May 19, 2016 COMMISSION DISTRICT 1 Bob Ruwart - Commissioner Job 1 Federal Project NHPPI-I806199 involving grading, draining, milling plant mix and concrete, placing

More information

Fort Bend County Tabulation BID Term Contract for Traffic Signs Posts and Supplies. Term: 1 October 2010 through 30 September 2011

Fort Bend County Tabulation BID Term Contract for Traffic Signs Posts and Supplies. Term: 1 October 2010 through 30 September 2011 Vendor Section 1: Complete Signs 3M Company St Paul MN Allied Tube Harey IL Custom Products Jackson MS Hall Signs Bloomington IN Interstate Highway Little Rock AR Ibis Signs Butler PA MD Solutions Plain

More information

Recommendation: THAT the Council of the Township of Centre Wellington award the following two tenders:

Recommendation: THAT the Council of the Township of Centre Wellington award the following two tenders: Report to Council To: Mayor Linton and Members of Council Prepared By: Wes Snarr, Managing Director of Corporate Services Report: COR-45 Date: 12 Jul RE: Recomendation for Award of Request for Tenders

More information

CAUTION - NOTICE TO CONTRACTOR

CAUTION - NOTICE TO CONTRACTOR 7. WINDSOCK 7.7 CPP TOP.. 7.7 INV CPP EL..7...7.7.... 7...... CNT BOX NOEL. CNT BOX. CNT BOX NOEL. CNT BOX NOEL..7... 7. 7.......7. 7. 7..7. TOP. TOP. TOP TOP.7 7.. TOP TOP.7. TOP TOP..7 TOP. TOP.7. PVC

More information

Ohio Department of Transportation Construction Update

Ohio Department of Transportation Construction Update Ohio Department of Transportation Construction Update DISTRICT 5 DAVE RAY, P.E., P.S., DISTRICT DEPUTY DIRECTOR 9600 Jacksontown Road Jacksontown, OH 43030 www.transportation.ohio.gov/dist5 ODOT District

More information

Mason Street Bike/Pedestrian Trail Project

Mason Street Bike/Pedestrian Trail Project Construction of the much-anticipated Mason Trail is underway! Mountain Constructors was awarded the contract in September but had to go through a 2- month process to obtain construction clearance permits

More information

CONSTRUCTION COMMITTEE MEETING AGENDA

CONSTRUCTION COMMITTEE MEETING AGENDA CONSTRUCTION COMMITTEE MEETING AGENDA DATE: Tuesday, December 19, 2017 TIME: 8:30 a.m. PLACE: GOAA ANNEX BUILDING, 1ST FLOOR - CONFERENCE ROOMS (APOLLO/GEMINI/TAURUS), 5855 CARGO ROAD, ORLANDO INTERNATIONAL

More information

REPORT. Pavement Evaluation Summary Brookshire Way & Duluth Park Gwinnett County Duluth, Georgia. Project Number

REPORT. Pavement Evaluation Summary Brookshire Way & Duluth Park Gwinnett County Duluth, Georgia. Project Number REPORT Pavement Evaluation Summary Brookshire Way & Duluth Park Duluth, Georgia Project Number 2013.4154.01 February 11, 2014 Revised March 20, 2014 UNITED CONSULTING 625 Holcomb Bridge Road Norcross,

More information

APPENDIX L -4 RECREATIONAL TRAIL CROSSING PLANS

APPENDIX L -4 RECREATIONAL TRAIL CROSSING PLANS Atlantic Sunrise Project PA DEP Chapter 105 Joint Permit Application Transcontinental Gas Pipe Line Company, LLC Lancaster County APPENDIX L -4 RECREATIONAL TRAIL CROSSING PLANS Atlantic Sunrise Project

More information

RELEASE: IMMEDIATE Oct. 6, 2017 CONTACT: Darragh Copley Frye (office) (cell)

RELEASE: IMMEDIATE Oct. 6, 2017 CONTACT: Darragh Copley Frye (office) (cell) RELEASE: IMMEDIATE Oct. 6, 2017 CONTACT: Darragh Copley Frye 540-899-4019 (office) 540-907-8409 (cell) Darragh.Frye@VDOT.Virginia.Gov VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT October 8 October 14,

More information

Weekly construction update

Weekly construction update November 4, 2011 For more information, contact: Kim A. Rudat, Regional Communications Manager Kim.Rudat@dot.wi.gov, (920) 492-5743 For US 41 Expansion Project information, contact: Kris Schuller, US 41

More information

VICINITY MAP END PROJECT BEGIN PROJECT Middle Fork Campground Middle. Lake. Moolock. Fork. Trailhead. Lake Nadeau SMC.

VICINITY MAP END PROJECT BEGIN PROJECT Middle Fork Campground Middle. Lake. Moolock. Fork. Trailhead. Lake Nadeau SMC. htr $PATH$ $DATE$ Designed by: B. W ACKER o ~ 63.4m.i Bend BEGI 7+65.00 REFERECE: APPLICAT: Federal Highway Administration ADJACET PROPERTY OWERS:. Washington Department of atural Resources (7+65 to 487+0)

More information

FULL DEPTH RECLAMATION (FDR)

FULL DEPTH RECLAMATION (FDR) FULL DEPTH RECLAMATION (FDR) Virginia Experience Past and Present Michael Wells, P.E. March 2, 2018 Outline What is Full Depth Reclamation (FDR) VDOT Experience Full Depth Reclamation (FDR) Bound layers

More information

Universally Accessible Canoe and Kayak Launch John H. Kerr Reservoir Tailrace Park, Mecklenburg County, VA

Universally Accessible Canoe and Kayak Launch John H. Kerr Reservoir Tailrace Park, Mecklenburg County, VA Accessible Canoe an Kayak Launch John H. Kerr Reservoir Tailrace Park, Mecklenburg County, VA Launch was constructe through a partnership with the U.S. Army Corps Engineers an Roanoke River Basin Association

More information

VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT

VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT RELEASE: IMMEDIATE July 27, 2018 CONTACT: Tina Bundy 540 899 4560 (office) 540 907 8325 (cell) Tina.Bundy@VDOT.Virginia.gov VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT July 29 August 4, 2018 All work

More information

May 1, 2015 Meredith Cruz, (561) Palm Beach County Traffic Report May 1 through May 8, 2015

May 1, 2015 Meredith Cruz, (561) Palm Beach County Traffic Report May 1 through May 8, 2015 May 1, 2015 Meredith Cruz, (561) 641-6440 mcruz@corradino.com Palm Beach County Traffic Report May 1 through May 8, 2015 Palm Beach County Palm Beach County traffic will be affected this week by ongoing

More information

Final Drainage Letter Pikes Peak Community College Downtown Parking Lot Colorado Springs, Colorado

Final Drainage Letter Pikes Peak Community College Downtown Parking Lot Colorado Springs, Colorado Final Drainage Letter Pikes Peak Community College Downtown Parking Lot Colorado Springs, Colorado Prepared for: Pikes Peak Community College 5775 South Academy Boulevard Colorado Springs, CO 80906-5422

More information

City of Grand Island

City of Grand Island City of Grand Island Tuesday, January 09, 2007 Council Session Item G7 #2007-6 - Approving Certificate of Final Completion for Asphalt Maintenance Project 2006-AC-1; Various Locations Throughout Grand

More information

CHICAGO DEPARTMENT OF AVIATION. Current Construction Projects AND THE O HARE MODERNIZATION PROGRAM. May 2, 2014

CHICAGO DEPARTMENT OF AVIATION. Current Construction Projects AND THE O HARE MODERNIZATION PROGRAM. May 2, 2014 CHICAGO DEPARTMENT OF AVIATION AND THE O HARE MODERNIZATION PROGRAM Current Construction Projects May 2, 2014 O HARE INTERNATIONAL AIRPORT CURRENT CONFIGURATION 2 PHASE 1 & COMPLETION PHASE 9L-27R Completed

More information

RECONSTRUCT/REHABILITATE TRANSIENT APRON AND TAXIWAY 'A' PHASING PLAN - PHASE 1

RECONSTRUCT/REHABILITATE TRANSIENT APRON AND TAXIWAY 'A' PHASING PLAN - PHASE 1 PHASING PLAN - PHASE 1 2 Weeks PHASE 1 SCOPE OF WORK Phase 1 consists of the reconstruction of a portion of Taxiway 'A' and the crack seal and seal coat of the North Apron. The portion of Taxiway 'A' to

More information

LAS VIRGENES MUNICIPAL WATER DISTRICT AIR-VACUUM POTABLE WATER DEVICE RELOCATION PROJECT

LAS VIRGENES MUNICIPAL WATER DISTRICT AIR-VACUUM POTABLE WATER DEVICE RELOCATION PROJECT TOPANGA CANYON BLVD. LOS ANGELES COUNTY, CALIFORNIA CONSTRUCTION PLANS FOR AIRVACUUM POTABLE WATER DEVICE RELOCATION PROJECT ROSCOE BLVD. PROJECT AREA CIP JOB NO. 0236 SHEET INDEX SHEET NO. DESCRIPTION

More information

Corktown Parks. Public Meeting. City of Toronto

Corktown Parks. Public Meeting. City of Toronto Corktown Parks Public Meeting City of Toronto 15-04-20 Agenda 1. Reasons for Study 2. Consultation to Date 3. Parks Evaluation 4. Community Context 5. Bright St. Playground 6. Orphans Green (Dog Off Leash)

More information

Long water shutdown scheduled for Tuesday, September 18

Long water shutdown scheduled for Tuesday, September 18 Thank you for your interest in the Center City Connector Streetcar. In this weekly update, you ll find information about ongoing construction for the 1st phase of utility work in Pioneer Square. Utility

More information

4-foot Economy Sign Post. 4-foot post is rated at 2 pounds per foot. 7-foot Economy Sign Post

4-foot Economy Sign Post. 4-foot post is rated at 2 pounds per foot. 7-foot Economy Sign Post Introduction: ComplianceSigns.com offers a variety of sign posts, sign mounting hardware, sign bases, mounting tape and more to mount your safety signs indoors or out. We offer three styles of sign posts,

More information

KDOT announces approved December bids

KDOT announces approved December bids FOR IMMEDIATE RELEASE Dec. 30, 2013 News Contact: Kim Stich, 785-296-3585 KDOT announces approved December bids The Kansas Department of Transportation announces approved bids for state highway construction

More information

CAPITAL IMPROVEMENT PLAN

CAPITAL IMPROVEMENT PLAN CITY OF SOLDOTNA CITY HALL 77 N BIRCH ST. SOLDOTNA, AK 99669 STEPHANIE QUEEN, AICP SOLDOTNA CITY MANAGER SQUEEN@SOLDOTNA.ORG 907.714.1240 866.593.6994 KYLE KORNELIS, P. E., PUBLIC WORKS DIRECTOR KKORNELIS@SOLDOTNA.ORG

More information

Trail Feasibility Study

Trail Feasibility Study VOLUSIA COUNTY MPO CITY OF NEW SMYRNA BEACH FINAL REPORT JUNE 30, 2009 Trail Feasibility Study What s inside? 1 Introduction 2 Project Purpose & Scope 3 Physical Inventory & Assessment of Right-of- Way

More information

DATE: April 19, 2016 REPORT NO. PW Chair and Members Committee of the Whole Operations and Administration

DATE: April 19, 2016 REPORT NO. PW Chair and Members Committee of the Whole Operations and Administration PUBLIC WORKS COMMISSION DATE: April 19, 2016 REPORT NO. PW2016-034 TO: FROM: Chair and Members Committee of the Whole Operations and Administration E. (Beth) Goodger General Manager, Public Works Commission

More information

Report to Council. Report: COR Date: 25 Jul 2016

Report to Council. Report: COR Date: 25 Jul 2016 Report to Council To: Mayor Linton and Members of Council Prepared By: Mark Bradey, Financial Manager / Deputy Treasurer Report: COR2016-58 Date: 25 Jul 2016 RE: Recommendation for Award of Tender T-17-16

More information

Page 1. Rennillo Deposition & Discovery A Veritext Company

Page 1. Rennillo Deposition & Discovery A Veritext Company Page 1 1 IN RE: 2 3 4 Ohio Department of Transportation 5 Pre-Bid Meeting 6 REVISED TRANSCRIPT 7 8 9 July 5, 2011 10 9:05 a.m. 11 12 13 14 15 Taken at: 16 Ohio Department of Transportation 17 906 Clark

More information

PROJECT UPDATES: March 15, th Street Water Tower Painting Project:

PROJECT UPDATES: March 15, th Street Water Tower Painting Project: PROJECT UPDATES: March 15, 2018 40th Street Water Tower Painting Project: On September 12, 2017, City Council awarded a contract to Allied Painting of Cherry Hill, New Jersey in the amount of $667,500

More information

Sample Estimate Reports Estimate Reports were created in XL-Pro Software

Sample Estimate Reports Estimate Reports were created in XL-Pro Software Sample Estimate Reports Estimating Pro Software Estimate Reports were created in XL-Pro Software / TIME EQUIP.. COST* AMOUNT - 1 GENERAL REQUIREMENTS 1.00 LSUM - INSURANCE - general liability 1.00 lsum

More information

FDOT Treasure Coast Traffic Impact Report June 19 through June 26, 2015

FDOT Treasure Coast Traffic Impact Report June 19 through June 26, 2015 June 19, 2015 Chuck McGinness, 954-777-4302 chuck.mcginness@dot.state.fl.us FDOT Treasure Coast Traffic Impact Report June 19 through June 26, 2015 TREASURE COAST Construction and maintenance-related lane

More information

Village of Lombard, Illinois Capital Improvement Plan FUNDING SOURCE SUMMARY

Village of Lombard, Illinois Capital Improvement Plan FUNDING SOURCE SUMMARY Village of Lombard, Illinois Capital Improvement Plan FY 15 FY 24 thru FUNDING SOURCE SUMMARY Source FY 15 FY 16 FY 17 FY 18 FY 19 FY 20 FY 21 FY 22 FY 23 FY 24 Construction Fund 6,318,700 2,354,800 2,430,800

More information

14.1.a. Attachment: Engineering Standards Manual Draft (2016 : Approval of the Engineering Standards Manual) Packet Pg. 216

14.1.a. Attachment: Engineering Standards Manual Draft (2016 : Approval of the Engineering Standards Manual) Packet Pg. 216 Packet Pg. 216 City of Fort Walton Beach Manual November 2012 14.1.a City of Fort Walton Beach Manual TABLE OF CONTE SECTION 1.00 INTRODUCTION... 3 SECTION 2.00 POLICY... 3 SECTION 3.00 - EROSION AND SEDIMENTATION

More information

AKINS DRIVE REMOVE EXISTING BASKETBALL COURT SLAB (5,901 SF) AND GOALS (2 EA) REMOVE EXISTING SWINGSET REMOVE EXISTING PLAYSCAPE AND "SANDBOX"

AKINS DRIVE REMOVE EXISTING BASKETBALL COURT SLAB (5,901 SF) AND GOALS (2 EA) REMOVE EXISTING SWINGSET REMOVE EXISTING PLAYSCAPE AND SANDBOX 6 2 24"X36" SHEET: "=6' 23 4 2 2 8 2 5 6 6 2 28 8 26 2 2 8 22 9 Yellowstone Drive Texas Firm Registration Taylor, Texas 654 No. F36 (52) 5-4328 6 25 2 Portland, TX 834 23 8 9 illy G. Webb Drive Portland,

More information

Planning & Development Group

Planning & Development Group Planning & Development Group LAX Airside Technical Committee Meeting January 9, 2018 Mark Vicelja, P.E. 1 Airside Element Projects LAX AIRSIDE ELEMENT PROJECTS CONSTRUCTION SCHEDULE (as of January 1, 2018)

More information

Township of Centre Wellington Special Council Agenda Wednesday, July 12, :00 pm Council Chamber, 1 MacDonald Square, Elora Page

Township of Centre Wellington Special Council Agenda Wednesday, July 12, :00 pm Council Chamber, 1 MacDonald Square, Elora Page Township of Centre Wellington Special Council Agenda Wednesday, July 12, 2017 1:00 pm Council Chamber, 1 MacDonald Square, Elora Page 1. CALL TO ORDER 2. DISCLOSURE OF PECUNIARY INTEREST UNDER THE MUNICIPAL

More information

Palm Beach County Traffic Report July 13 through July 20, 2012

Palm Beach County Traffic Report July 13 through July 20, 2012 For Immediate Release July 13, 2012 Meredith Cruz, (561) 641-6440 mcruz@corradino.com Palm Beach County Traffic Report July 13 through July 20, 2012 Palm Beach County Palm Beach County traffic will be

More information

APPENDIX D: SUSTAINABLE TRAIL DESIGN. APPENDICES Town of Chili Parks and Recreation Master Plan Update

APPENDIX D: SUSTAINABLE TRAIL DESIGN. APPENDICES Town of Chili Parks and Recreation Master Plan Update APPENDIX D: SUSTAINABLE TRAIL DESIGN APPENDICES Town of Chili Parks and Recreation Master Plan Update Sustainable Trail Construction Sustainable trails are defined by the US Forest Service as trails having

More information

BID RESULTS. April 14, Award Date April 21, COMMISSION DISTRICT 1 Bob Ruwart - Commissioner

BID RESULTS. April 14, Award Date April 21, COMMISSION DISTRICT 1 Bob Ruwart - Commissioner BID RESULTS April 14, 2016 Award Date April 21, 2016 COMMISSION DISTRICT 1 Job 1 Federal Project HSIP-B151109 involving installing Shur-Tite delineators and miscellaneous work at various locations in Transportation

More information

June 2013: Capital Improvements Update. through $ 126,196,202 Available Funding through 2018 $ 149,783,656. Staff s Recommendation

June 2013: Capital Improvements Update. through $ 126,196,202 Available Funding through 2018 $ 149,783,656. Staff s Recommendation Capital Improvements Update June 2013: Pl dp j t Planned Projects through 2018 - $ 126,196,202 Available Funding through 2018 $ 149,783,656 pp p,, Un-appropriated - $ 23,587,454 Staff s Recommendation

More information

MINUTES OF THE SEPTEMBER 26, 2018, MONTHLY MEETING OF THE BAYLES LAKE HOMEOWNERS ASSOCIATION

MINUTES OF THE SEPTEMBER 26, 2018, MONTHLY MEETING OF THE BAYLES LAKE HOMEOWNERS ASSOCIATION MINUTES OF THE SEPTEMBER 26, 2018, MONTHLY MEETING OF THE BAYLES LAKE HOMEOWNERS ASSOCIATION The regular meeting of the Bayles Lake Homeowners Association Board of Directors was held at Lakeview Country

More information

Birthplace of the Oil Industry Trail Town Crawford County, Pennsylvania. for the Titusville Redevelopment Authority.

Birthplace of the Oil Industry Trail Town Crawford County, Pennsylvania. for the Titusville Redevelopment Authority. TITUSVILLE Birthplace of the Oil Industry - 1895 Trail Town - 2013 City of Titusville Fleming Park Crawford County, Pennsylvania for the Authority By: STIFFLER McGRAW Engineers Surveyors Architects & TABLE

More information

Town of Luray ADA Status Research

Town of Luray ADA Status Research ID PROBLEM DESCRIP SEPARA COMPLE 1 S Sidewalk - 1005 E. Main St. EAST MAIN ST 2 A Meter Box Gap - 1016 E. Main St. 32" EAST MAIN ST 3 S Sidewalk - 1005 E. Main St. EAST MAIN ST 4 S Sidewalk - across from

More information

City of Durango 5.8 FUNDING TRAILS DEVELOPMENT

City of Durango 5.8 FUNDING TRAILS DEVELOPMENT 5.8 FUNDING TRAILS DEVELOPMENT The City has been successful in establishing dedicated local funding sources as well as applying for grants to develop the City s trail system, having received nearly $2.4

More information

DRAFT. Dorabelle Campground Rehabilitation

DRAFT. Dorabelle Campground Rehabilitation DRAFT Dorabelle Campground Rehabilitation September 2012 1.1 REGIONAL SETTING AND PROJECT LOCATION The Dorabelle Campground is located on the western shore of Shaver Lake in Fresno County, California (Section

More information

New Orleans Municipal Yacht Harbor

New Orleans Municipal Yacht Harbor New Orleans Municipal Yacht Harbor 2018 Capital Projects Construction Updates MYH Floating Marina Community Sailing Center (Coordination with) MYH Boat Launch (MYHMC) MYH Administration Building (CPA &

More information

KDOT announces approved November bids

KDOT announces approved November bids IMMEDIATE RELEASE Nov. 27, 2018 For more information: Kim Stich 785.296.3585 KDOT announces approved November bids The Kansas Department of Transportation announces approved bids for state highway construction

More information

April 4, 2014 Chuck McGinness, FDOT TREASURE COAST TRAFFIC REPORT April 4 through April 11, 2014

April 4, 2014 Chuck McGinness, FDOT TREASURE COAST TRAFFIC REPORT April 4 through April 11, 2014 April 4, 2014 Chuck McGinness, 954-777-4090 Chuck.McGinness@dot.state.fl.us FDOT TREASURE COAST TRAFFIC REPORT April 4 through April 11, 2014 TREASURE COAST Construction and maintenance-related lane closures

More information

Work Zone. Steve Hubbard: Lane Construction Safety Training Manager. Michael Grey: Rea Contracting Project Superintendent

Work Zone. Steve Hubbard: Lane Construction Safety Training Manager. Michael Grey: Rea Contracting Project Superintendent Access and Egress Into the Work Zone Steve Hubbard: Lane Construction Safety Training Manager Michael Grey: Rea Contracting Project Superintendent Access and Egress Into the Work Zone THE TYPICAL INTERSTATE

More information

NDG/Westmount Neighbourhood Committee. May 16, 2016

NDG/Westmount Neighbourhood Committee. May 16, 2016 NDG/Westmount Neighbourhood Committee May 16, 2016 2 Presentation Outline Feedback on previous questions What s new on the Turcot website Public consultations online Reconstruction of Saint-Jacques overpass

More information

PART 4 : TYPICAL SCHEDULES OF QUANTITIES SECTION L CONTENTS. Page Number SECTION : MEDTUM-PRESSURE PIPELINES... 1 SCHEDULE

PART 4 : TYPICAL SCHEDULES OF QUANTITIES SECTION L CONTENTS. Page Number SECTION : MEDTUM-PRESSURE PIPELINES... 1 SCHEDULE Licensed exclusively to. 0120 : Part 4 Mediu-pressure pipelines PART 4 : TYPICAL SCHEDULES OF QUANTITIES SECTION L CONTENTS Page Nuber SCHEDULE SECTION : MEDTUM-PRESSURE PIPELINES... 1 First Revision March

More information

Great Pond Mountain Conservation Trust Request for Bids Wildlands Hillside Trail Relocation and Restoration Project

Great Pond Mountain Conservation Trust Request for Bids Wildlands Hillside Trail Relocation and Restoration Project Great Pond Mountain Conservation Trust Request for Bids Wildlands Hillside Trail Relocation and Restoration Project Project Description: Great Pond Mountain Conservation Trust (GPMCT), a nonprofit land

More information

MUNICIPALITY OF MONROEVILLE PLANNING COMMISSION SEPTEMBER 20, 2006 MINUTES. The meeting was called to order at 8 p.m. by Vice-Chairman Frank Bole.

MUNICIPALITY OF MONROEVILLE PLANNING COMMISSION SEPTEMBER 20, 2006 MINUTES. The meeting was called to order at 8 p.m. by Vice-Chairman Frank Bole. MUNICIPALITY OF MONROEVILLE PLANNING COMMISSION SEPTEMBER 20, 2006 MINUTES The meeting was called to order at 8 p.m. by Vice-Chairman Frank Bole. PLEDGE OF ALLEGIANCE AND PRAYER The Pledge of Allegiance

More information

Fall 2016 Tender Release

Fall 2016 Tender Release Tender Close 001-05-00 001-05-80 Hwy. 1, Grade & Pave, Indian Head, km 54.77 to 55.53 & km 0.00 to 0.33 Grade and Pave Southern November 2016 November 2016 Length = 1.09 km Base = 12 000 t Asphalt Concrete

More information

Hospital Link Project Project Update Winter 2018

Hospital Link Project Project Update Winter 2018 Hospital Link Project Project Update Winter 2018 General The project provides a link from Riverside Drive and the Transitway to the Hospital Link Road. Construction of the Hospital Link facility is open

More information

Minimum Specifications/Questionnaire Bid Results for One (1) New Fuel Dispensing System-Helvetia Shop 12/19/2017

Minimum Specifications/Questionnaire Bid Results for One (1) New Fuel Dispensing System-Helvetia Shop 12/19/2017 Minimum Specifications/Questionnaire Bid Results for One (1) New Fuel Dispensing System-Helvetia Shop 12/19/2017 Winning Bid PERMIT FEES, FORMS, PLANS and NOTIFICATIONS Secure all necessary state and local

More information

MONTANA CONSTRUCTION REPORT 06 / 14 / 2016

MONTANA CONSTRUCTION REPORT 06 / 14 / 2016 MONTANA CONSTRUCTION REPORT 06 / 14 / 2016 ROAD INCIDENTS DUE TO FIRES AND FLOODING PLEASE CHECK OUR WEBSITE FOR MORE UP TO DATE CLOSURES AND INFORMATION http://www.mdt.mt.gov/travinfo/scripts/alerts.pl

More information

PRELIMINARY PLANS END PROJECT NW 16TH AVE NW 13TH ST. BEGIN PROJECT NW 10TH AVE ALACHUA 329 W UNIVERSITY AVE MAIN ST. ALACHUA 331 LOCATION MAP

PRELIMINARY PLANS END PROJECT NW 16TH AVE NW 13TH ST. BEGIN PROJECT NW 10TH AVE ALACHUA 329 W UNIVERSITY AVE MAIN ST. ALACHUA 331 LOCATION MAP PREPARED FOR: NW 16TH AVE. PRELIMINARY PLANS INDEX OF DRAWINGS COVER SHEET CITY OF GAINESVILLE PUBLIC WORKS DEPARTMENT END PROJECT NW 16TH AVE NW 8TH AVE. UNIVERSITY OF FLORIDA 0 2000' 4000' NW 13TH ST.

More information

RELEASE: IMMEDIATE September 14, 2012 CONTACT: Sandy Myers (office) STA (cell)

RELEASE: IMMEDIATE September 14, 2012 CONTACT: Sandy Myers (office) STA (cell) RELEASE: IMMEDIATE September 14, 2012 CONTACT: Sandy Myers 540-332-9201 (office) STA12-130 540-292-2500 (cell) Sandy.Myers@VDOT.Virginia.gov Marshall Barnhill 540-332-9264 (office) 540-414-5670 (cell)

More information

Disaster Skokomish Indian Tribe. Photos of Roads around the Core Reservation Area. December 2007 Storm: Skokomish Tribe

Disaster Skokomish Indian Tribe. Photos of Roads around the Core Reservation Area. December 2007 Storm: Skokomish Tribe Disaster 1734 Skokomish Indian Tribe Photos of Roads around the Core Reservation Area Monday, 12/03/07: Agency Road / Tribal Center Road intersection. Monday, 12/03/07: Flood waters rising in front of

More information

ADA Compliance Projects Summary Sheet

ADA Compliance Projects Summary Sheet District Letter Dated Project % to ADA Amount Granted Buffalo Grove March 10, 2014 Woodland Park - asphalt path 100% $4,500.00 Buffalo Grove March 10, 2014 Wellington Commons Bike path repairs including:

More information

VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT

VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT RELEASE: IMMEDIATE Aug. 10, 2018 CONTACT: Darragh Frye 540 899 4119 (office) 540 907 8409 (cell) Darragh.Frye@VDOT.Virginia.gov VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT August 12 August 18, 2018 All

More information

PROJECT UPDATES February 1, 2018

PROJECT UPDATES February 1, 2018 PROJECT UPDATES February 1, 2018 40 th Street Water Tower Painting Project: On September 12, 2017, City Council awarded a contract to Allied Painting, of Cherry Hill, New Jersey, in the amount of $667,500

More information

The Events Structure Product Guide

The Events Structure Product Guide Product Description The Axion range offers a extremely strong semi permanent event structure, these units can be used in all weathers and can be installed in any location. Providing a contemporary space

More information

LANDER COUNTY RAIL ASSESSMENT NOVEMBER 2006

LANDER COUNTY RAIL ASSESSMENT NOVEMBER 2006 of hydrologic features. A substantial proportion of the land between and north of the railroad tracks contain wetlands, as identified by the US Fish and Wildlife Service National Wetlands Inventory (NWI).

More information