1 VOLUSIA COUNTY MPO CITY OF NEW SMYRNA BEACH FINAL REPORT JUNE 30, 2009 Trail Feasibility Study What s inside? 1 Introduction 2 Project Purpose & Scope 3 Physical Inventory & Assessment of Right-of- Way 4 Trail Concept Plan 5 Financial Feasibility The 2000 census figures show that, of those that commute to work a total of 4.4% walk, take public transportation or use other means. 1. Introduction The City of New Smyrna Beach, Florida has previously completed a study to review the feasibility of the New Smyrna Beach Multi-Use Trail. The proposal was submitted to the Volusia County Metropolitan Planning Organization (MPO) for review of feasibility prior to funding approval. This proposal includes the addition of a twelve (12) foot wide multi-use trail and a ten (10) foot stabilized trail for equestrian use. The trail is proposed to be constructed on land owned by the City of New Smyrna Beach Utilities Commission, and exists today as a utility transmission corridor. The multi-use trail would extend from Sugarmill Drive to the Fire Station located on Pioneer Trail (2.2 miles) and is illustrated in Figure 1. The proposal to Volusia County MPO discussed a longer trail extending from the fire station across I-95 to Pell Road. This study analyzes only the first phase, to Sugarmill Road. The phased approach is a valuable option to minimize the strain on the resources available for this type of construction. In 2000, the Volusia County MPO completed an update to its 2020 Long Range Transportation Plan (LRTP) for the region. One of the priorities that emerged from the transportation plan was the importance of providing pedestrian and bicycle facilities as a means of expanding the travel opportunities for county residents. The 2020 LRTP also recognizes the importance of bicycle and pedestrian facilities as a tool for economic development and as an expansion of recreational activities for residents and visitors. The Volusia County Trail Plan represents approximately 76 miles of multi-use trails throughout the County. The 2020 LRTP describes the performance measures used to analyze and evaluate the need for improved or new bicycle and pedestrian facilities. The measures consider: bicycle and pedestrian injuries per million vehicle miles, connectivity of segments, proximity to attractions (such as: schools, parks, civic centers, etc.), and proximity to transit. The trail can serve as a link to the Sandspur Riding Club, where equestrian access can be provided. The club, as seen in Figure 2, is on the southwest side of the corridor, a short distance from the County Fire Station. As the trail system extends further beyond the limits of this study, both along the utility corridor and throughout the city and county, the quality of life of the residents and visitors will increase by accommodating activities such as walking, running, rollerblading, bicycling and horseback riding. This trail will provide more opportunities for recreational use as well as an alternate form of transportation throughout New Smyrna Beach. The 2000 census figures, for Volusia County, show that of those that commute to work a total of 4.8% walk, take public transportation or use other means. Providing extra transportation avenues, as well as modes, will prove beneficial especially to this group of people, as well as to others. 1 Volusia County Metropolitan Planning Organization, 2020 Long Range Transportation Plan, Chapter 5.

2 PAGE 2 Figure 1: Project Location Map

3 PAGE 3 The goal of this study is to determine the feasibility of the trail considering items such as project need, support of jurisdictional planning studies, and construction cost estimates. 2. Project Purpose & Scope The following sections provide an overview of the Scope of Work completed for this feasibility study. Study Purpose This study evaluated the eastern portion of the New Smyrna Beach Utility Commission utility corridor for use as multiuse trail right-of-way. The goal of this study is to determine the feasibility of the trail considering items such as project need, support of jurisdictional planning studies, and construction cost estimates. Physical Inventory & Assessment of Right-of- Way The New Smyrna Beach Trail Report (Summer 2002), GIS maps, and the white paper prepared by the City of New Smyrna Beach regarding this trail and the Cross Volusia Trail were reviewed to assess the physical inventory as it relates to the proposed improvements. GIS databases were utilized to create mapping for the project and were supplemented with local, municipal and county data. The Utility Commission s corridor consists of rightof-way ranging from feet and is just over seven (7) miles long, beginning northeast of the intersection of Ingam Road and State Road 44, and stretching to a point just east of North Samsula Road. The portion of the utility corridor under consideration for use in this study begins at the County Fire Station (about one (1) mile east of the eastern terminus of the corridor) and extends to Sugarmill Drive, an approximate distance of 2.2 miles. Upon review of the previously published studies, a field review and analysis was conducted of the proposed corridor. This analysis provided information that was used to make specific recommendations for construction, safety, signing, and access. Also identified were potential locations for connections to public facilities, parking areas, and connections to other facilities that are part of the bicycle and pedestrian network. New Smyrna Beach Utility Commission corridor maps and municipal land development plans were utilized to review the alignment and identify neighboring property owners. Trail Concept Plan The field analysis and mapping were used as a base for the planning of proposed construction elements. Mapping of the proposed corridors identified environmental and natural features, surrounding land uses, surrounding roads, community developments and assets, and construction element locations. The final graphics include notes, diagrams, and callouts identifying the trail, access points, trail features, mitigation efforts (if any), and enhancements to natural, cultural, and historic features. A concept plan of the trail project area was prepared and includes all of the features listed, as well as any other proposed enhancements. Financial Feasibility Detailed estimates for construction were prepared based on American Disabilities Act (ADA) compliance, Florida Department of Transportation standards for design, the City of New Smyrna Beach Standards and past construction bids for the construction of related projects.

4 PAGE 4 Figure 2: Riding Club and Bus Stops

5 PAGE 5 3. Physical Inventory & Assessment of Right-of-Way A physical inventory and assessment (via field review) for the corridor was conducted in order to document present conditions, assets, and obstacles throughout the area. Topographic and soils maps were used to supplement the field reviews. One field review was conducted to determine the conditions along the proposed corridor. The field review was conducted on August 18, The following persons attended the field review and represented the respective entities: City of New Smyrna Beach Mark Rakowski HNTB Corporation Luis Diaz, Kate Brady Based on the discussions among the participants, it was determined that the best alternative for the multi-use trail was to create a twelve (12) foot asphalt trail through the utility corridor and a 10 stabilized trail for equestrian use. A photographic inventory of the corridor is presented here to provide an understanding of the physical features of the corridor. Physical Description The corridor for the multi-use trail begins at the County Fire Station near Newcomb Street and continues west to Sugarmill Drive. The previous studies have identified that discussions have occurred leading to the possible relocation of the existing fire station facility, leaving the building available for use as a trail facility. The land on which the fire station sits includes a building and a wide expanse of undeveloped land which could be used as a trail head or provide parking access for the trail. The County Fire Station and surrounding land can be seen in Figure 3. As the utility corridor continues west, the land available for the proposed multi-use trail is approximately 100 feet wide with utility poles running generally down the centerline, similar to that of Figure 4. This corridor initially existed as the City s first railway (the old Orange City Blue Springs to New Smyrna Line). The rails have since been replaced with the addition of the utility poles. The corridor is lined with trees and various forms of native vegetation and wildlife. Grade crossings will exist along the trail as it crosses over two (2) streets, Pine Avenue and Glencoe Road. Several VOTRAN bus stops exist just south of the corridor that could create an ideal opportunity for persons wishing to access the trail without using personal transportation. The locations of the nearest bus stations are shown in Figure 2. The multi-use trail will also cross a tributary stream from Turnbull Creek. The crossing of the stream will require construction of a small bridge. The stream will also pass along the side of a private lake along the north side of the trail near Otter Boulevard. Approximately onequarter mile west of the Fire Station is Sandspur Riding Club. This equestrian facility creates an opportunity for semi-public access and a trail head for equestrian users. The other main feature of the existing corridor is the presence of a historic black cemetery, the Glencoe Geiger Cemetery. Currently, the cemetery is patrolled by city police Figure 3: County Fire Station and adjoining lot Figure 4: Typical look of utility corridor

6 PAGE 6 Previous studies, for other trails, have indicated that crime rates, vandalism, and break-ins decrease in areas adjacent to trails based on the likely presence of users of the trail system. but seems to be poorly maintained. The presence of the trail alongside this designated historic site may spur enhancements to the cemetery. The western terminus of the trail is just before Sugarmill Drive. A turnaround is provided for all uses to continue east along the trail. Approximately four (4) miles of the entire seven (7) mile utility corridor lies within the jurisdiction of the City, while the rest remains within the County jurisdiction. Although the Utilities Commission intends to eventually annex the entire corridor into the City, annexation is contingent upon the prior annexation of the parcels that abut the corridor. This may create the need for a cooperative maintenance agreement for any maintenance necessary along the trail. Many private residences exist along the length of the trail. Based on public involvement programs implemented in the 2002 study of this corridor, property owners raised concerns regarding security along the corridor. Based on the field review, the corridor is currently being used unlawfully by people with all-terrain vehicles, on foot, and on horseback. The creation of this designated trail should help to limit these uses that existed while the land was undeveloped. Previous studies, for other trails, have indicated that crime rates, vandalism, and break-ins decrease in areas adjacent to trails, based on the likely presence of users of the trail system. The New Smyrna Beach Police Department is equipped for bicycle patrol and previously has shown a willingness to provide periodic patrolling of the multiuse trail. Unlike the fears of some property owners, a trail that is designed to enhance and beautify the area will promote community and neighborhood activity that are healthy for the population. The trail will be off-limits to motorized vehicles except those providing maintenance of the system, emergency services, maintenance of the utility corridor, or those with access easements, creating a serene place for outdoor activities. Currently some property owners have access easements to their property through the utility corridor area. All easements will be respected during final design, construction, and maintenance of the trail system. Light flooding through the corridor has been a concern in the past, as noted during the field review. Proper design of the system, as well as the accompanying drainage facilities, will be necessary to ensure that flooding through the corridor and on nearby properties does not become an issue after construction of the trail system. As previously discussed, the right-of-way along the corridor, that owned by the City of New Smyrna Beach Utilities Commission ranges in width from 60 to 110 feet. The trail corridor will utilize 60 feet of this corridor including the greenspace centered about the utility poles. Fencing should be added to both sides along the length of the corridor to limit access to the trail and to prohibit access to private lands. Those private lands with easement access will have gate access through the fence.

7 PAGE 7 4. Trail Concept Plan Establishing a trail system within Volusia County will offer residents and visitors a network of recreational facilities and alternative forms of transportations. This trail will provide a connection to other proposed systems throughout New Smyrna Beach, neighboring towns and cities and throughout Volusia County. Although most often wide concrete sidewalks can serve as multi-use trails for biking, walking, rollerblading, etc., it is important for this corridor that the multi-use trial be constructed of asphalt. The trail will be used for maintenance by the Utilities Commission and will require vehicles to traverse the length. Currently the maintenance vehicles travel along dirt paths that have been created over time by the same vehicles. After construction of the trail, the amount of right-ofway for these vehicles will be limited and therefore the asphalt area can be used by the motorized vehicles using caution. Figure 5 provides the proposed typical section for this trail along with its location through the utility corridor. The multi-use trail along this corridor offers a feasible option for use by the residents and visitors to the City of New Smyrna Beach. The surrounding land uses range from urban business, agricultural, to residential throughout this portion of the utility corridor. These land uses are not in conflict with the proposed trail and the area should not present design challenges that must be overcome prior to construction. Based on the current equestrian use of the utility corridor and the close proximity to the Sandspurs Riding Club, the trail would offer the club an additional amenity for its members and an opportunity for riders to safely use the corridor for recreational activities. Figure 6 provides an overview of the topography throughout the 2.2 mile corridor for the proposed multi-use trail. The map indicates a fairly flat area throughout the corridor with some minor vertical definition which will provide a pleasing atmosphere for the trail. Figure 7 indicates the soil types present in the areas surrounding the proposed trail. This map provided a basis for any considerations given to the infrastructure in this conceptual plan. The soils should be studied in more detail upon undertaking of the design of this system. The following trail amenities are proposed along this corridor: trailheads, benches and distance marker signs. Trailheads are main access areas to the trail that typically include parking space, restroom facilities, and drinking water facilities. As mentioned previously, the County Fire Station represents a feasible and probable location for a trailhead. This location may also serve as public access with parking options available. The parking area can remain as undeveloped land with only mowing maintenance required. Benches spaced appropriately along the length of the 2.2 mile trail will afford persons the opportunity to rest, gather, and socialize along the route. Next to the benches, the City may also want to include drinking water facilities either as water fountains or water stations for users to refill their personal water containers. Restroom facilities may not be necessary during this initial phase of the utility corridor trail. The multi-use trail along this corridor offers a feasible option for use by the residents and visitors of the City of New Smyrna Beach.

8 PAGE 8 The stabilized portion of the trail for equestrian uses has previously been studied, and it was determined that the favorable configuration for construction is ten (10) feet wide to allow for horse and carriage use side-by-side. However, as the trail is completed to include the remaining five (5) miles of the corridor, it may be necessary to make these facilities available. This may be accomplished on the eastern end of the utility corridor at the County Fire Station building, if abandoned. Distance marker signs should be placed every half (1/2) mile to guide emergency services and to assist users in gauging their length of travel. The stabilized portion of the trail for equestrian uses has previously been studied, and it was determined that the favorable configuration for construction is ten (10) feet wide to allow for horse and carriage use side-by-side. The stabilization of this trail will follow the same process that the Florida Department of Transportation utilizes for the stabilization of unpaved shoulders. Figures 8 through 11 are provided for more detail of the corridor in order to convey the full scope of the project and necessary construction items. Figure 5: Proposed Typical Section

9 PAGE 9 Figure 6: Topographic Map of Corridor

10 PAGE 10 Figure 7: Soils Map of Corridor

11

12

13

14

15 PAGE Financial Feasibility Table 1 provides a summary cost estimates for the design and construction of the multi-use trail. For the purposes of potential phasing, this cost summary has been broken down into segments for both the bicycle and pedestrian portion and the equestrian portion of the trail. A separate cost estimate of the bridge required over Turnbull Creek is also provided in Table 1. The item number and unit of measure are based on the Florida Department of Transportation Basis of Estimate manual. The unit prices are based on the average costs for each pay item as provided by the Florida Department of Transportation. The cost estimate is based on Florida Department of Transportation design for Bike Paths and Trails. The minimum construction standards call for 4 thick Portland concrete. However, for this project, as discussed previously, the pedestrian trail will be asphalt pavement. The proposed trail bridge will utilize a single 120- foot span to clear Turnbull Creek and associated wetlands. The bridge section consists of two (2) 54 deep prestressed concrete Florida I-Beams, supporting a 12-ft wide cast-in-place concrete deck. The bridge provides a 10-ft wide trail with 1-ft wide pedestrian parapets. The bridge will be founded on 18 prestressed concrete piles using a traditional pile-supported end bent substructure. As shown in Table 1, the total estimated cost for design and construction of the entire multi-use trail as detailed in the conceptual plan and discussed in this report is $1,160, The estimated cost of the bridge is $265, The estimated cost of the western portion of the multi-use trail, from Sugarmill Drive to Turnbull Creek, is $649, and the estimated cost of the eastern portion of the multi-use trail, from Turnbull Creek to the Fire Station, is $245, This project will be planned, designed and constructed with a variety of funds. The project is eligible for federal funds that will flow through the Florida Department of Transportation and will be matched by the City of New Smyrna Beach.

16 PAGE 16 Table 1: Cost Estimate PEDESTRIAN TRAIL SUGARMILL DRIVE TO TURNBULL CREEK TURNBULL CREEK TO FIRE STATION ITEM UNIT UNIT OF DESCRIPTION NUMBER PRICE MEASURE EST QTY 2009 COST 2010 COST 2011 COST 2012 COST EST QTY 2009 COST 2010 COST 2011 COST 2012 COST Mowing $46.85 AC 3.8 $ $ $ $ $67.00 $69.01 $71.08 $ Staked Silt Fence $0.69 LF 16,547.4 $11, $11, $12, $12, ,276.6 $4, $4, $4, $4, Clearing & Grubbing (18.2 acres) $4, LS 0.7 $2, $2, $3, $3, $1, $1, $1, $1, Regular Excavation $2.03 CY 6,322.7 $12, $13, $13, $14, ,398.3 $4, $5, $5, $5, Type B Stabilization $1.17 SY 12,531.6 $14, $15, $15, $16, ,753.4 $5, $5, $5, $6, Base, Optional (Group 1) $11.47 SY 12,531.6 $143, $148, $152, $157, ,753.4 $54, $56, $57, $59, Superpave Asphaltic Concrete $42.00 TN $19, $19, $20, $21, $7, $7, $7, $7, Pedestrian/Bicycle Railing (Aluminum, 42" 301 Picket Railing) $44.09 LF $6, $6, $6, $6, $2, $2, $2, $2, Patterened/Textured Pavement $ SY $15, $15, $16, $16, $5, $6, $6, $6, Fencing (Type B 220 Standard) $10.50 LF 15,858.7 $166, $171, $176, $181, ,015.4 $63, $65, $67, $69, Seeding & Mulching $0.25 SY 10,306.6 $2, $2, $2, $2, ,909.4 $ $1, $1, $1, Grass Seed (Permanent Type) $3.00 LB $1, $1, $1, $1, $ $ $ $ Mulch Material $50.00 TN 8.4 $ $ $ $ $ $ $ $ Water for Grassing $19.57 MG $1.23 $1.27 $1.31 $ $0.47 $0.48 $0.50 $0.51 N/A Water Facilities $ EA 4 $2, $2, $2, $2, $ $ $ $ N/A Benches $ EA 4 $1, $1, $1, $1, $ $ $ $ N/A Mile Markers $ EA 4 $ $ $ $ $ $ $ $ SUBTOTAL BEFORE MOBILIZATION $401, $413, $425, $438, $151, $156, $161, $165, Mobilization LS 10% $40, $41, $42, $43, % $15, $15, $16, $16, SUBTOTAL BEFORE DESIGN/CONSTRUCTION/SCOPE CREEP $441, $454, $468, $482, $166, $171, $177, $182, N/A Engineering & Design LS 15% $66, $68, $70, $72, % $25, $25, $26, $27, Initial Contingency LS 5% $22, $22, $23, $24, % $8, $8, $8, $9, Scope Creep LS 20% $88, $90, $93, $96, % $33, $34, $35, $36, TOTAL COST $618, $636, $655, $675, TOTAL $233, $240, $247, $255, EQUESTRIAN TRAIL SUGARMILL DRIVE TO TURNBULL CREEK TURNBULL CREEK TO FIRE STATION ITEM UNIT UNIT OF DESCRIPTION NUMBER PRICE MEASURE EST QTY 2009 COST 2010 COST 2011 COST 2012 COST EST QTY 2009 COST 2010 COST 2011 COST 2012 COST Mowing $46.85 AC 2.7 $ $ $ $ $47.67 $49.10 $50.57 $ Clearing & Grubbing (18.2 acres) $3, LS 0.7 $2, $2, $2, $2, $ $ $ $ Type B Stabilization $1.17 SY 9,448.3 $11, $11, $11, $12, ,583.8 $4, $4, $4, $4, Seeding & Mulching $0.25 SY 17,178.7 $4, $4, $4, $4, ,516.1 $1, $1, $1, $1, Grass Seed (Permanent Type) $3.00 LB $1, $1, $2, $2, $ $ $ $ Mulch Material $50.00 TN 14.2 $ $ $ $ $ $ $ $ Water for Grassing $19.57 MG $2.09 $2.15 $2.21 $ $0.79 $0.81 $0.84 $0.86 SUBTOTAL BEFORE MOBILIZATION $20, $20, $21, $22, $7, $7, $8, $8, Mobilization LS 10% $2, $2, $2, $2, % $ $ $ $ SUBTOTAL BEFORE DESIGN/CONSTRUCTION/SCOPE CREEP $22, $22, $23, $24, $8, $8, $8, $9, N/A Engineering & Design LS 15% $3, $3, $3, $3, % $1, $1, $1, $1, Initial Contingency LS 5% $1, $1, $1, $1, % $ $ $ $ Scope Creep LS 20% $4, $4, $4, $4, % $1, $1, $1, $1, TOTAL COST $31, $32, $33, $34, $11, $12, $12, $12, BRIDGE ITEM NUMBER DESCRIPTION UNIT PRICE UNIT OF MEASURE EST QTY 2009 COST BRIDGE OVER TURNBULL CREEK 2010 COST 2011 COST 2012 COST Class II Concrete (Superstructure) $ CY 37.8 $32, $33, $34, $35, Class II Concrete (Substructure) $ CY 10.9 $10, $10, $10, $11, Reinforcing Steel (Superstructure) $1.10 LB 7,744.4 $8, $8, $9, $9, Reinforcing Steel (Substructure) $1.12 LB 1,470.0 $1, $1, $1, $1, Prestressed Beams (FIB ") $ LF $52, $54, $56, $57, Prestressed Concrete Piling (18" Sq.) $80.00 LF $38, $39, $40, $41, Concrete Parapet $ LF $28, $29, $30, $31, SUBTOTAL BEFORE MOBILIZATION $172, $177, $183, $188, Mobilization LS 10% $17, $17, $18, $18, SUBTOTAL BEFORE DESIGN/CONSTRUCTION/SCOPE CREEP $189, $195, $201, $207, N/A Engineering & Design LS 15% $28, $29, $30, $31, Initial Contingency LS 5% $9, $9, $10, $10, Scope Creep LS 20% $37, $39, $40, $41, TOTAL COST $265, $273, $282, $290, TOTAL PROJECT COST DESCRIPTION 2009 COST 2010 COST 2011 COST 2012 COST Pedestrian Trail, Sugarmill Drive to Turnbull Creek Pedestrian Trail, Turnbull Creek to Fire Station Equestrian Trail, Sugarmill Drive to Turnbull Creek Equestrian Trail, Turnbull Creek to Fire Station Bridge over Turnbull Creek TOTAL COST Multi-Use Trail (no bridge), Sugarmill Drive to Turnbull Creek Multi-Use Trail (no bridge), Turnbull Creek to Fire Station $618, $636, $655, $675, $233, $240, $247, $255, $31, $32, $33, $34, $11, $12, $12, $12, $265, $273, $282, $290, $1,160, $1,195, $1,231, $1,268, $649, $668, $689, $709, $245, $252, $260, $268,331.59

FINAL. Bicycle/Pedestrian Feasibility Study City of DeBary Dirksen Drive Trail. Prepared For: Volusia County MPO

FINAL. Bicycle/Pedestrian Feasibility Study City of DeBary Dirksen Drive Trail. Prepared For: Volusia County MPO City of DeBary Dirksen Drive Trail FINAL Prepared By: Reynolds, Smith and Hills, Inc. Prepared For: Volusia County MPO September 2007 Table of Contents INTRODUCTION...1 PROJECT PURPOSE AND SCOPE...2 PHYSICAL

More information

2. Goals and Policies. The following are the adopted Parks and Trails Goals for Stillwater Township:

2. Goals and Policies. The following are the adopted Parks and Trails Goals for Stillwater Township: D. PARKS AND TRAILS 1. Introduction Stillwater Township s population is relatively low, with most residents living on rural residences on large lots. The need for active park space has been minimal in

More information

AGENDA ITEM 5 D WAKULLA ENVIRONMENTAL INSTITUTE (WEI) TRAIL FEASIBILITY STUDY

AGENDA ITEM 5 D WAKULLA ENVIRONMENTAL INSTITUTE (WEI) TRAIL FEASIBILITY STUDY March 19, 2018 AGENDA ITEM 5 D WAKULLA ENVIRONMENTAL INSTITUTE (WEI) TRAIL FEASIBILITY STUDY TYPE OF ITEM: Action STATEMENT OF ISSUE The Wakulla Environmental Institute (WEI) Trail is one of several trails

More information

Georgetown-Lewes Rail/Trail Study. Rail/Trail Study: Cool Spring to Cape Henlopen State Park New Road Extension (House Resolution No.

Georgetown-Lewes Rail/Trail Study. Rail/Trail Study: Cool Spring to Cape Henlopen State Park New Road Extension (House Resolution No. Georgetown-Lewes Rail/Trail Study Rail/Trail Study: Cool Spring to Cape Henlopen State Park New Road Extension (House Resolution No. 47) August 22, 2011 Presentation Outline Background Benefits Statewide

More information

Auburn Trail / Ontario Pathways Trail Connector Feasibility Study Public Information Meeting Wednesday, August 22, 2012

Auburn Trail / Ontario Pathways Trail Connector Feasibility Study Public Information Meeting Wednesday, August 22, 2012 Auburn Trail / Ontario Pathways Trail Connector Feasibility Study Public Information Meeting Wednesday, August 22, 2012 Purpose of Feasibility Study Purpose Evaluate the feasibility of constructing a multiuse

More information

EXECUTIVE SUMMARY FALL Introduction. Findings

EXECUTIVE SUMMARY FALL Introduction. Findings EXECUTIVE SUMMARY FALL 2004 Introduction Trails are one of the most popular and highly desirable recreational resources in communities of all sizes throughout the country. In addition to providing a safe

More information

Chapter 6: POLICY AND PROCEDURE RECOMMENDATIONS

Chapter 6: POLICY AND PROCEDURE RECOMMENDATIONS Chapter 6 POLICY AND PROCEDURE RECOMMENDATIONS FOR SRRA Below are seven policy elements that should be considered for adoption by the Southwest Regional Recreation Authority of Virginia: 1. Develop strategies

More information

MORGAN CREEK GREENWAY Final Report APPENDICES

MORGAN CREEK GREENWAY Final Report APPENDICES APPENDICES MORGAN CREEK GREENWAY Appendix A Photos of Existing Conditions in Trail Corridor Photos of existing conditions Main trail corridor - February 2009 Photos of existing conditions south bank Morgan

More information

City of Durango 5.8 FUNDING TRAILS DEVELOPMENT

City of Durango 5.8 FUNDING TRAILS DEVELOPMENT 5.8 FUNDING TRAILS DEVELOPMENT The City has been successful in establishing dedicated local funding sources as well as applying for grants to develop the City s trail system, having received nearly $2.4

More information

2016 Regional Transportation Alternatives Program (TAP) Grant Application

2016 Regional Transportation Alternatives Program (TAP) Grant Application 2016 Regional Transportation Alternatives Program (TAP) Grant Application PROJECT TITLE: Yelm-Tenino Trail Extension Feasibility Study TRPC use only GENERAL PROJECT INFORMATION Agency or Organization City

More information

Northaven Trail Phase 2 Initial Project Overview

Northaven Trail Phase 2 Initial Project Overview Northaven Trail Phase 2 Initial Project Overview Partnership Project to extend existing Northaven Trail Improve Bike/Ped Connectivity On Dallas Trail Network Plan City and County Funding Oncor Texas Trails

More information

FEASIBILITY CRITERIA

FEASIBILITY CRITERIA This chapter describes the methodology and criteria used to evaluate the feasibility of developing trails throughout the study areas. Land availability, habitat sensitivity, roadway crossings and on-street

More information

ANCLOTE COASTAL TRAIL ALTERNATIVES ANALYSIS STUDY

ANCLOTE COASTAL TRAIL ALTERNATIVES ANALYSIS STUDY ANCLOTE COASTAL TRAIL ALTERNATIVES ANALYSIS STUDY PASCO COUNTY MPO JULY 2015 PROJECT OVERVIEW... INTRODUCTION EXECUTIVE SUMMARY CONTEXT... TAMPA BAY AREA, PINELLAS, & PASCO COUNTY S MULTI-USE TRAIL PLANS

More information

Citrus Heights Creek Corridor Trail Project Trail Advisory Group Field Trip #2 September 11, :00 11:00 am Trellis Hall, Citrus Heights

Citrus Heights Creek Corridor Trail Project Trail Advisory Group Field Trip #2 September 11, :00 11:00 am Trellis Hall, Citrus Heights September 11, 2013 9:00 11:00 am Trellis Hall, Citrus Heights Project Overview The City of Citrus Heights is studying the feasibility of establishing a multi use trail system within the City s 26 miles

More information

CITY COUNCIL AGENDA MEMORANDUM

CITY COUNCIL AGENDA MEMORANDUM To: Mayor and City Council From: Charles Ozaki, City and County Manager Prepared By: Kevin Standbridge, Deputy City and County Manager Katie Allen, City and County Engineer David Shinneman, Community Development

More information

ALBANY-HUDSON ELECTRIC TRAIL FEASIBILITY STUDY. Final Report OCTOBER 2011

ALBANY-HUDSON ELECTRIC TRAIL FEASIBILITY STUDY. Final Report OCTOBER 2011 ALBANY-HUDSON ELECTRIC TRAIL FEASIBILITY STUDY Final Report OCTOBER 2011 ALBANY-HUDSON ELECTRIC TRAIL FEASIBILITY STUDY Prepared for: Town of East Greenbush 225 Columbia Turnpike Rensselaer, New York 12144

More information

Regional Wayfinding Sign Strategy Thurston County Trails 2017

Regional Wayfinding Sign Strategy Thurston County Trails 2017 Regional Wayfinding Sign Strategy Thurston County Trails 2017 Partners: Members and partnering organizations of the Thurston Thrives Community Design Action Team City of Lacey, City of Olympia, City of

More information

Understanding user expectations And planning for long term sustainability 1

Understanding user expectations And planning for long term sustainability 1 Understanding user expectations And planning for long term sustainability 1 What is a natural surface trail? It can be as simple has a mineral soil, mulched or graveled pathway, or as developed as elevated

More information

Longmont to Boulder Regional Trail Jay Road Connection DRAFT FINAL REPORT

Longmont to Boulder Regional Trail Jay Road Connection DRAFT FINAL REPORT Longmont to Boulder Regional Trail Jay Road Connection DRAFT FINAL REPORT December 2018 Project Summary Boulder County, Colorado, in partnership with the City of Boulder, is evaluating options for multi-use

More information

Trail # NW Tuesday, June DESIGN. Provide an Review the Provide an. Project Goals: System system. wayfinding

Trail # NW Tuesday, June DESIGN. Provide an Review the Provide an. Project Goals: System system. wayfinding I. Welcome / Introductions Bethany Creek Trail #2 Segment 3 Neighborhood Meeting #1 Bethany Presbyterian Church 15505 NW Springville Road, Portland, OR 97229 Tuesday, June 26, 2018 @ 6:00PM Meeting Minutes

More information

Appendix 3. Greenway Design Standards. The Whitemarsh Township Greenway Plan

Appendix 3. Greenway Design Standards. The Whitemarsh Township Greenway Plan Appendix 3 Greenway Design Standards This chapter discusses two design standards for the greenway types discussed above. First, trail design standards are presented together with trailhead facilities and

More information

Business Item No XXX. Proposed Action That the Metropolitan Council approve the Coon Creek Regional Trail Master Plan.

Business Item No XXX. Proposed Action That the Metropolitan Council approve the Coon Creek Regional Trail Master Plan. Business Item No. 2015-XXX Metropolitan Parks and Open Space Commission Meeting date: July 7, 2015 For the Community Development Committee meeting of July 20, 2015 For the Metropolitan Council meeting

More information

Blueways: Rivers, lakes, or streams with public access for recreation that includes fishing, nature observation, and opportunities for boating.

Blueways: Rivers, lakes, or streams with public access for recreation that includes fishing, nature observation, and opportunities for boating. Parks, Open Space and Trails PRINCE WILLIAM COUNTY 2008 COMPREHENSIVE PLAN TRAILS PLAN CONTENTS The components of the trails plan are: Intent Definitions Goals, Policies, and Action Strategies Trails Map

More information

Welcome to the Cross County Trail Public Input Session!

Welcome to the Cross County Trail Public Input Session! Welcome to the Cross County Trail Public Input Session! Please sign in on the table below! What are we doing here? Camden County has proposed a bicycle and pedestrian trail spanning across the entire county.

More information

Community Development Committee

Community Development Committee C Community Development Committee For the Metropolitan Council meeting of October 31, 2012 Committee Report Item:2012-316 ADVISORY INFORMATION October 16, 2012 Date Prepared: Subject: Intercity Regional

More information

METROPOLITAN COUNCIL 390 North Robert Street, St. Paul, MN Phone (651) TDD (651)

METROPOLITAN COUNCIL 390 North Robert Street, St. Paul, MN Phone (651) TDD (651) METROPOLITAN COUNCIL 390 North Robert Street, St. Paul, MN 55101 Phone (651) 602 1000 TDD (651) 291 0904 DATE: June 19, 2007 TO: Metropolitan Parks and Open Space Commission FROM: Jan Youngquist, Senior

More information

CHAPTER III: TRAIL DESIGN STANDARDS, SPECIFICATIONS & PERMITS

CHAPTER III: TRAIL DESIGN STANDARDS, SPECIFICATIONS & PERMITS CHAPTER III Trail Design Standards, Specifications & Permits This chapter discusses trail standards, preferred surface types for different activities, permits, and other requirements one must consider

More information

Little River Trail Feasibility Study

Little River Trail Feasibility Study Final April, 2014 Prepared for the State Coastal Conservancy By the Natural Resources Services Division of Redwood Community Action Agency Table of Contents Executive Summary... 1 1. Project Purpose and

More information

Committee Report. Community Development Committee For the Metropolitan Council meeting of August 12, Business Item No.

Committee Report. Community Development Committee For the Metropolitan Council meeting of August 12, Business Item No. Committee Report Business Item No. 2015-168 Community Development Committee For the Metropolitan Council meeting of August 12, 2015 Subject: Coon Creek Regional Trail Master Plan, Anoka County Proposed

More information

ETOBICOKE CREEK NORTH TRAIL PROJECT. May 18, 2017 at Michael Power High School 105 Eringate Drive, Etobicoke ON M9C 3Z7

ETOBICOKE CREEK NORTH TRAIL PROJECT. May 18, 2017 at Michael Power High School 105 Eringate Drive, Etobicoke ON M9C 3Z7 ETOBICOKE CREEK NORTH TRAIL PROJECT May 18, 2017 at Michael Power High School 105 Eringate Drive, Etobicoke ON M9C 3Z7 1 Purpose of Open House The purpose of today s open house is to present the design

More information

The Baker/Carver Regional Trail is intended to

The Baker/Carver Regional Trail is intended to Section V Design Guidance The Baker/Carver Regional Trail is intended to safely accommodate 183,000 annual visits, an array of non-motorized uses, a variety of skill levels, and persons with special needs.

More information

Airport Planning Area

Airport Planning Area PLANNING AREA POLICIES l AIRPORT Airport Planning Area LOCATION AND CONTEXT The Airport Planning Area ( Airport area ) is a key part of Boise s economy and transportation network; it features a multi-purpose

More information

Blue River Trail Master Plan JSA to Town Hall June 2004

Blue River Trail Master Plan JSA to Town Hall June 2004 Blue River Trail Master Plan JSA to Town Hall June 2004 Prepared for: Silverthorne Town Council Silverthorne SPORT Committee Department of Recreation and Culture Silverthorne Public Works Silverthorne

More information

Non-Motorized Transportation

Non-Motorized Transportation Non-Motorized Transportation Non-motorized facilities are important components to the transportation system. They provide an environmentally-friendly, low-cost mode of travel. Some of the facilities can

More information

COMMENT PERIOD INTRODUCTION

COMMENT PERIOD INTRODUCTION To: Interested Persons From: Tom Buford File: Del Rio Trail Project Date: June 8, 2018 Community Development Department Reference: NOTICE OF PREPARATION OF AN ENVIRONMENTAL IMPACT REPORT FOR THE DEL RIO

More information

Business Item No

Business Item No Metropolitan Parks and Open Space Commission Meeting date: February 6, 2018 For the Community Development Committee meeting of February 20, 2018 For the Metropolitan Council meeting of February 28, 2018

More information

Classifications, Inventory and Level of Service

Classifications, Inventory and Level of Service Classifications, Inventory and Level of Service Section 3 Kenmore Park, Recreation and Open Space Plan 1 P a g e Classifications and Inventory Park Classifications Kenmore classifies its parks based upon

More information

Railroad Safety Trail

Railroad Safety Trail 2.1 INTRODUCTION AND PROJECT SETTING 2.1 Introduction & Project Setting Introduction This study is the result of a directed effort on the part of the City of San Luis Obispo to carry out previously established

More information

A CASE FOR COMPLETING THE JORDAN RIVER PARKWAY: A

A CASE FOR COMPLETING THE JORDAN RIVER PARKWAY: A A CASE FOR COMPLETING THE JORDAN RIVER PARKWAY: A safe crossing at 9000 South and 850 West Proposed 9000 South Underpass Parkway Timeline Parkway, Trail, and Tourism Facts Blueprint Jordan River 1971 1973

More information

3. COLTA / HUGA CONNECTIONS - PRELIMINARY

3. COLTA / HUGA CONNECTIONS - PRELIMINARY 9 3. COLTA / HUGA CONNECTIONS - PRELIMINARY 3.1 COLTA The Chain of Lakes Trail Association (COLTA) trail, formerly identified as the Chester Spur Line, was completed and opened for use in June 2011. The

More information

LONG TERM (OPERATION) IMPACTS AND POTENTIAL MITIGATION

LONG TERM (OPERATION) IMPACTS AND POTENTIAL MITIGATION 3.6 This chapter provides a project-level analysis of potential impacts to recreation sites in the study area including parks, natural areas, open spaces, trails, and playfields, as well as amenities such

More information

Macleod Trail Corridor Study. Welcome. Macleod Trail Corridor Study Open House. Presentation of Proposed Design Concepts

Macleod Trail Corridor Study. Welcome. Macleod Trail Corridor Study Open House. Presentation of Proposed Design Concepts Macleod Trail Corridor Study Welcome Macleod Trail Corridor Study Open House Presentation of Proposed Design Concepts Study Purpose Develop a corridor plan for Macleod Trail that aligns with The City s:

More information

CHAPTER ONE LITERATURE REVIEW

CHAPTER ONE LITERATURE REVIEW CHAPTER ONE LITERATURE REVIEW LITERATURE REVIEW This chapter summarizes the most recently published community impact studies and articles that relate to multiuse trails. The review focuses on publications

More information

At the time, the portion of the line through Eagle County remains wholly under the ownership of Union Pacific Railroad (UP).

At the time, the portion of the line through Eagle County remains wholly under the ownership of Union Pacific Railroad (UP). Chapter 5 The Railroad Corridor as a Trail Corridor The intent of this chapter is to identify how the rail corridor, if available for lease or purchase in all or part, could be incorporated into the core

More information

University Region Non-Motorized Plan 2015

University Region Non-Motorized Plan 2015 Non-Motorized Transportation Non-motorized facilities are important components to the transportation system. They provide an environmentally-friendly, low-cost mode of travel. Some of the facilities can

More information

Section II. Planning & Public Process Planning for the Baker/Carver Regional Trail began in 2010 as a City of Minnetrista initiative.

Section II. Planning & Public Process Planning for the Baker/Carver Regional Trail began in 2010 as a City of Minnetrista initiative. Section II Planning & Public Process Planning for the began in 2010 as a City of initiative. city staff began discussions with the Park District on the possibility of a north/south regional trail connection

More information

Lincoln Village Pedestrian Bicycle Bridge Community Meeting September 13th, 2016

Lincoln Village Pedestrian Bicycle Bridge Community Meeting September 13th, 2016 Lincoln Village Pedestrian Bicycle Bridge Community Meeting September 13th, 2016 Purpose of the Meeting Introduce the project and the proposed improvements Review existing conditions Discuss the needs

More information

I. INTRODUCTION EAST COAST GREENWAY STUDY PURPOSE

I. INTRODUCTION EAST COAST GREENWAY STUDY PURPOSE I. INTRODUCTION STUDY PURPOSE The purpose of this study is to determine the engineering feasibility of developing the Eastern Trail. It was initiated at the request of the and funded by the Maine Department

More information

Rule Governing the Designation and Establishment of All-Terrain Vehicle Use Trails on State Land

Rule Governing the Designation and Establishment of All-Terrain Vehicle Use Trails on State Land Rule Governing the Designation and Establishment of All-Terrain Vehicle Use Trails on State Land 1.0 Authority 1.1 This rule is promulgated pursuant to 23 V.S.A. 3506. Section 3506 (b)(4) states that an

More information

MASTER PLAN EXECUTIVE SUMMARY

MASTER PLAN EXECUTIVE SUMMARY Biscuit Run State Park Scottsville Road (State Route 20) Charlottesville, VA 22902 Biscuit Run State Park MASTER PLAN EXECUTIVE SUMMARY Department of Conservation and Recreation Division of Planning and

More information

Committee Report. Community Development Committee For the Metropolitan Council meeting of April 13, Business Item No.

Committee Report. Community Development Committee For the Metropolitan Council meeting of April 13, Business Item No. Committee Report Business Item No. 2016-48 Community Development Committee For the Metropolitan Council meeting of April 13, 2016 Subject: Harriet Island-South St. Paul Regional Trail Master Plan, Saint

More information

Birthplace of the Oil Industry Trail Town Crawford County, Pennsylvania. for the Titusville Redevelopment Authority.

Birthplace of the Oil Industry Trail Town Crawford County, Pennsylvania. for the Titusville Redevelopment Authority. TITUSVILLE Birthplace of the Oil Industry - 1895 Trail Town - 2013 City of Titusville Fleming Park Crawford County, Pennsylvania for the Authority By: STIFFLER McGRAW Engineers Surveyors Architects & TABLE

More information

CHAPTER 4 -- THE LAND USE PLAN: DESCRIPTIONS AND POLICIES FOR THIRTEEN PLANNING AREAS

CHAPTER 4 -- THE LAND USE PLAN: DESCRIPTIONS AND POLICIES FOR THIRTEEN PLANNING AREAS CHAPTER 4 -- THE LAND USE PLAN: DESCRIPTIONS AND POLICIES FOR THIRTEEN PLANNING AREAS NORTH CENTRAL CAC AREA LITTLE VALLEY ROAD TO JUG HANDLE CREEK PLANNING AREA This planning area includes Cleone, Noyo,

More information

SOUTH INTERCHANGE AREA

SOUTH INTERCHANGE AREA Santaquin City General Plan 1 Location and Characteristics The South Interchange Area of Santaquin is located west of Interstate 15 and south of 500 South (Figure 1). It includes properties already annexed

More information

MUNICIPALITY OF ANCHORAGE

MUNICIPALITY OF ANCHORAGE MUNICIPALITY OF ANCHORAGE ANCHORAGE PARKS & RECREATION Memorandum PRC 08-56 DATE: 5 August 2008 TO: FROM: SUBJECT: Parks & Recreation Commission Holly Spoth-Torres, Park Planner PRC 08-56 Far North Bicentennial

More information

EAST DON TRAIL ENVIRONMENTAL ASSESSMENT. Community Liaison Committee Meeting #3 July 15, :30 to 8:30 pm Flemingdon Park Library

EAST DON TRAIL ENVIRONMENTAL ASSESSMENT. Community Liaison Committee Meeting #3 July 15, :30 to 8:30 pm Flemingdon Park Library EAST DON TRAIL ENVIRONMENTAL ASSESSMENT Community Liaison Committee Meeting #3 July 15, 2013 6:30 to 8:30 pm Flemingdon Park Library Agenda 1. Welcome 2. Housekeeping and Updates a) Housekeeping b) CLC

More information

METROPOLITAN COUNCIL 390 North Robert Street, St. Paul, MN Phone (651) TDD (651)

METROPOLITAN COUNCIL 390 North Robert Street, St. Paul, MN Phone (651) TDD (651) DATE: March 27, 2012 METROPOLITAN COUNCIL 390 North Robert Street, St. Paul, MN 55101 Phone (651) 602-1000 TDD (651) 291-0904 TO: Metropolitan Parks and Open Space Commission FROM: Arne Stefferud, Planning

More information

TRAIL MASTER PLAN DRAFT. Broken Bow, Nebraska Adopted: Month, JEO Project No.:

TRAIL MASTER PLAN DRAFT. Broken Bow, Nebraska Adopted: Month, JEO Project No.: TRAIL MASTER PLAN DRAFT Broken Bow, Nebraska Adopted: Month, 2017 JEO Project No.: 161982.00 City of Broken Bow Mayor Cecil Burt City Council Members Rod Sonnichsen, President Neal Neth Chris Myers Jacob

More information

Header i

Header i Header i 048285014.10 Header Sub Title Body Text here. Body text here. Body text here. Section 1... 1 Executive Summary... 1 Opportunities and Constraints... 3 Overall Opportunities and Constraints Map

More information

Becker County Trail Routing Feasibility Study

Becker County Trail Routing Feasibility Study 2016 Becker County Trail Routing Feasibility Study CONNECTING DETROIT MOUNTAIN AND MOUNTAIN VIEW RECREATIONAL AREA TO THE HEARTLAND TRAIL BECKER COUNTY ULTEIG ENGINEERS Contents Acknowledgements...2 INTRODUCTION...3

More information

Silver Lake Park An Environmental Jewel for the Citizens of Prince William County

Silver Lake Park An Environmental Jewel for the Citizens of Prince William County Silver Lake Park An Environmental Jewel for the Citizens of Prince William County The Prince William Park Authority Mission Statement states: The Prince William County Park Authority will create quality

More information

Environmental Assessment and Final Section 4(f)

Environmental Assessment and Final Section 4(f) Environmental Assessment and Final Section 4(f) South Pleasant View Road, City of Madison County Highway M Reconstruction Cross Country Road to Prairie Hill Road Project ID 5992-09-81 September 16, 2016

More information

Who is Beneficial Designs?

Who is Beneficial Designs? Who is Beneficial Designs? Beneficial Designs works towards universal access through research, design, and education. We believe all individuals should have access to the physical, intellectual, and spiritual

More information

TRAFALGAR PARK. 78: p.140 W 99th St FLAT ROCK CREEK PARK. W 103rd St OVERLAND PARK. Quivira Rd. College Blvd. Shared use path. Mountain bike trail

TRAFALGAR PARK. 78: p.140 W 99th St FLAT ROCK CREEK PARK. W 103rd St OVERLAND PARK. Quivira Rd. College Blvd. Shared use path. Mountain bike trail Lenexa: overview TRAFALGAR PARK 78: p.140 As the Westport Route crosses over Lenexa's boundaries with Olathe and Overland Park several times, approximately 2.75 or 3 miles of the historic route of the

More information

Appendix E: Railroad Route Evaluation, Maps and Tables

Appendix E: Railroad Route Evaluation, Maps and Tables Appendix E: Railroad Route Evaluation, Maps and Tables LandPeople E-1 Table of Contents 1.0 Railroad Operations...3 2.0 Rails-with-Trails...3 3.0 Methodology...3 4.0 Trail Design Assumptions...4 5.0 Typical

More information

DRAFT - APRIL 13, 2007 ROUTING STUDY FOR TRAIL CONNECTIONS BETWEEN CALAIS AND AYERS JUNCTION

DRAFT - APRIL 13, 2007 ROUTING STUDY FOR TRAIL CONNECTIONS BETWEEN CALAIS AND AYERS JUNCTION DRAFT - APRIL 13, 2007 ROUTING STUDY FOR TRAIL CONNECTIONS BETWEEN CALAIS AND AYERS JUNCTION Abstract The vision for the East Coast Greenway is an off-road urban trail system running from Calais, Maine

More information

The Chu property is a 6.57 acre parcel located in the Town of Superior on the west side of McCaslin Boulevard. In 2014, the Town of Superior acquired

The Chu property is a 6.57 acre parcel located in the Town of Superior on the west side of McCaslin Boulevard. In 2014, the Town of Superior acquired 1 The Chu property is a 6.57 acre parcel located in the Town of Superior on the west side of McCaslin Boulevard. In 2014, the Town of Superior acquired the Chu property for open space with a contribution

More information

PLANNING COMMISSION AGENDA REPORT May 10, Members of the Planning Commission. Joyce Parker-Bozylinski, Contract Planner

PLANNING COMMISSION AGENDA REPORT May 10, Members of the Planning Commission. Joyce Parker-Bozylinski, Contract Planner PLANNING COMMISSION AGENDA REPORT May 10, 2007 TO: FROM: PROPOSAL: APPLICANT: RECOMMENDATION: Members of the Planning Commission Joyce Parker-Bozylinski, Contract Planner Approval of the Calabasas Trails

More information

Gardner: overview. Santa Fe, Oregon, and California National Historic Trails UNINCORPORATED JOHNSON COUNTY OLATHE UNINCORPORATED JOHNSON COUNTY

Gardner: overview. Santa Fe, Oregon, and California National Historic Trails UNINCORPORATED JOHNSON COUNTY OLATHE UNINCORPORATED JOHNSON COUNTY Santa Fe, Oregon, and California ational Historic Trails : overview 99: p.134 100: p.135 GARDER JUCTIO 102: p.137 56: p.126 EDGERTO Burlington orthern Intermodal and Logistics 98: p.133 101: p.136 S Waverly

More information

Northeast Quadrant Distinctive Features

Northeast Quadrant Distinctive Features NORTHEAST QUADRANT Northeast Quadrant Distinctive Features LAND USE The Northeast Quadrant includes all the area within the planning area that is east of Interstate 5 and to the north of State Route 44.

More information

Chapter 4.0 Alternatives Analysis

Chapter 4.0 Alternatives Analysis Chapter 4.0 Alternatives Analysis Chapter 1 accumulated the baseline of existing airport data, Chapter 2 presented the outlook for the future in terms of operational activity, Chapter 3 defined the facilities

More information

CHAPTER 5. Chapter 5 Recreation Element

CHAPTER 5. Chapter 5 Recreation Element CHAPTER 5 Recreation Element Chapter 5 Recreation Element The Recreation Element of the Meyers Area Plan is a supplement to the Recreation Element of the TRPA Regional Plan and the El Dorado County General

More information

COASTAL CONSERVANCY. Staff Recommendation December 2, 2004 COYOTE HELLYER COUNTY PARK BAY AREA RIDGE TRAIL

COASTAL CONSERVANCY. Staff Recommendation December 2, 2004 COYOTE HELLYER COUNTY PARK BAY AREA RIDGE TRAIL COASTAL CONSERVANCY Staff Recommendation December 2, 2004 COYOTE HELLYER COUNTY PARK BAY AREA RIDGE TRAIL File No. 04-057 Project Manager: Amy Hutzel RECOMMENDED ACTION: Authorization to disburse up to

More information

Trails. Lois Jensen Nature Preserve is a 30 acre parcel on the north end of the city. It provides unspoiled wooded paths.

Trails. Lois Jensen Nature Preserve is a 30 acre parcel on the north end of the city. It provides unspoiled wooded paths. Trails Lois Jensen Nature Preserve is a 30 acre parcel on the north end of the city. It provides unspoiled wooded paths. TRAIL S, PATHS, ROUTES AND CONNECTORS Citizen input pointed to trails, paths, bike

More information

MERRYMEETING TRAIL A&B. Topsham. Head of Tide Park Trail (Tedford Road to Cathance Road) Length: 1.79 Miles Anticipated Cost: $719,000.

MERRYMEETING TRAIL A&B. Topsham. Head of Tide Park Trail (Tedford Road to Cathance Road) Length: 1.79 Miles Anticipated Cost: $719,000. 1 MERRYMEETING TRIL Head of Tide Park Trail (Tedford Road to athance Road) Topsham Length: 1.79 Miles nticipated ost: $719,000 D athance Road athance Road Section 1 connects residential neighborhoods and

More information

Memo. Orange City Trail Plan Becky Mendez, AICP Jamie Krzeminski, PE, PTOE Matt Wiesenfeld, PE, AICP. Development of the Existing and Proposed Network

Memo. Orange City Trail Plan Becky Mendez, AICP Jamie Krzeminski, PE, PTOE Matt Wiesenfeld, PE, AICP. Development of the Existing and Proposed Network Memo Date: Friday, December 22, 2017 Project: To: From: Subject: Trail Plan Becky Mendez, AICP Jamie Krzeminski, PE, PTOE Matt Wiesenfeld, PE, AICP Development of the Existing and Proposed Network HDR

More information

B10. Agate Beach State Recreation Site

B10. Agate Beach State Recreation Site B10. Agate Beach State Recreation Site Location Within the City of Newport, just south of the Yaquina Head Outstanding Natural Area. The park is located along the west side of Highway 101 at the mouth

More information

Coast to Coast Connector Summit

Coast to Coast Connector Summit Project Partners Welcome to the Coast to Coast Connector Summit Winter Garden, Florida City Hall October 1, 2014 1 Why are we here? Objectives 1. Inform key stakeholders on the current state of the C2C

More information

Lafourche Parish Government REQUEST FOR QUALIFICATIONS. Landscape Architectural Services

Lafourche Parish Government REQUEST FOR QUALIFICATIONS. Landscape Architectural Services Lafourche Parish Government REQUEST FOR QUALIFICATIONS Landscape Architectural Services Bayou Lafourche Parish Multi-Use Path Feasibility Study Phase 1 And Bayou Lafourche Parish Multi-Use Path Feasibility

More information

CHAPTER FOUR AIRPORT ALTERNATIVES

CHAPTER FOUR AIRPORT ALTERNATIVES 4.0 INTRODUCTION CHAPTER FOUR The goal of the master planning process is to provide the City of New Smyrna Beach with an assessment of the adequacy and capabilities of the Airport as well as to identify

More information

Logo Department Name Agency Organization Organization Address Information 5700 North Sabino Canyon Road

Logo Department Name Agency Organization Organization Address Information 5700 North Sabino Canyon Road Logo Department Name Agency Organization Organization Address Information United States Forest Coronado National Forest 5700 North Sabino Canyon Road Department of Service Santa Catalina Ranger District

More information

Lawrence Loop SWOT Analysis

Lawrence Loop SWOT Analysis Alignment: D1 (Map Color: Dark Blue) Description: This alignment connects to the north end of the Burroughs Creek Trail and continues along the west side of the Railroad to 8 th Street. Strengths: - This

More information

RUSHMORE CONNECTOR TRAIL PROPOSAL

RUSHMORE CONNECTOR TRAIL PROPOSAL PURPOSE AND NEED Background The U.S. Forest Service, Black Hills National Forest (Forest Service) has received a special use permit application from the State of South Dakota Department of Game, Fish and

More information

ROAD AND TRAIL PROJECT APPROVAL

ROAD AND TRAIL PROJECT APPROVAL ROAD AND TRAIL PROJECT APPROVAL www.marincountyparks.org Marin County Parks, 3501 Civic Center Dr, Suite 260, San Rafael, CA 94903 DATE: July 12, 2017 PRESERVE: Gary Giacomini Open Space Preserve PROJECT:

More information

Former Middle School Site Green Space & Brecksville Road Streetscape. March 27, 2018

Former Middle School Site Green Space & Brecksville Road Streetscape. March 27, 2018 Former Middle School Site Green Space & Brecksville Road Streetscape March 27, 2018 Brecksville Streetscape & Downtown Greenspace Project Schedule City of Indepenence 2017 2018 Meeting Schedule Tasks/Deliverables

More information

Port Gamble Shoreline Area Conceptual Trail Proposal

Port Gamble Shoreline Area Conceptual Trail Proposal The North Kitsap Trails Association is pleased to be a partner to the Kitsap Forest and Bay Project and assist Kitsap County, Forterra, Olympic Property Group, Great Peninsula Conservancy and the Port

More information

Tallahassee-St. Marks Historic Railroad Trail

Tallahassee-St. Marks Historic Railroad Trail Revitalizing a Historic Trail Designated as a National Recreation Trail, the 16-mile Tallahassee-St. Marks Historic Railroad Trail has been enjoyed by countless bicyclists, runners, and outdoor enthusiasts

More information

River Parks Trail: Tulsa, Oklahoma

River Parks Trail: Tulsa, Oklahoma River Parks Trail: Tulsa, Oklahoma Purpose: The purpose of the River Parks Trail is to maintain, preserve, develop, and promote the Arkansas River for the economic and cultural benefit of the community.

More information

Dungeness Recreation Area County Park Master Plan

Dungeness Recreation Area County Park Master Plan Dungeness Recreation Area County Park Public Outreach Meeting October 10, 2007 Project Overview USFWS Site Dungeness Recreation Area County Park Meeting Objectives: Re-Introduce project; provide status

More information

11. Recreational Trails and Pathways Needs

11. Recreational Trails and Pathways Needs 11. Recreational Trails and Pathways Needs Background Walking, biking, hiking, in-line skating, canoeing, and other trail- and pathway-related activities are important to Boiseans. This importance is demonstrated

More information

4.19 Parks, Recreation, and Conservation Lands

4.19 Parks, Recreation, and Conservation Lands interchange would have on the Reed Paige Clark Homestead located on the north side of Stonehenge Road. Alternative D would also affect Palmer Homestead, E.F. Adams House, and Knapp Brothers Shoe Manufacturing

More information

MPRB: Southwest LRT Community Advisory Committee Issues and Outcomes by Location Current to: 12 November 2010

MPRB: Southwest LRT Community Advisory Committee Issues and Outcomes by Location Current to: 12 November 2010 MPRB: Southwest LRT Community Advisory Committee Issues and Outcomes by Location Current to: 12 November 2010 This is a compilation of issues and outcomes identified by the CAC. It is a work in progress,

More information

Flow Stand Up Paddle Board Parkway Plan Analysis

Flow Stand Up Paddle Board Parkway Plan Analysis Regional Parks Department Jeffrey R. Leatherman, Director County of Sacramento Divisions Administration Golf Leisure Services Maintenance Rangers Therapeutic Recreation Services Flow Stand Up Paddle Board

More information

Parkland County Municipal Development Plan Amendment Acheson Industrial Area Structure Plan

Parkland County Municipal Development Plan Amendment Acheson Industrial Area Structure Plan Parkland County Municipal Development Plan Amendment Acheson Industrial Area Structure Plan New Plan Acheson Industrial Area Structure Plan Amendment Parkland County Municipal Development Plan Board Reference

More information

China Creek North Park Upgrades and Glen Pump Station. Park Board Committee Meeting Monday, July 10, 2017

China Creek North Park Upgrades and Glen Pump Station. Park Board Committee Meeting Monday, July 10, 2017 China Creek North Park Upgrades and Glen Pump Station Park Board Committee Meeting Monday, July 10, 2017 Purpose The purpose of this presentation is to: Share the results of the public engagement processes;

More information

Safety, Infrastructure, and Tenant Improvement Project. Public Hearing Informational Brochure February 26, 2013

Safety, Infrastructure, and Tenant Improvement Project. Public Hearing Informational Brochure February 26, 2013 New York State Department of Transportation Safety, Infrastructure, and Tenant Improvement Project Public Hearing Informational Brochure February 26, 2013 This DEIS/Draft EA evaluates the potential impacts

More information

Citrus Heights Creek Corridor Trail Project. Trail Advisory Group Meeting #3 July 8, 2013

Citrus Heights Creek Corridor Trail Project. Trail Advisory Group Meeting #3 July 8, 2013 Citrus Heights Creek Corridor Trail Project Trail Advisory Group Meeting #3 July 8, 2013 Agenda Introductions Recap: Community Workshop, Survey Findings, and TAG Field Trip Community Concern Discussion:

More information

Welcome to the Illinois High-Speed Rail Chicago to St. Louis Construction Update Meeting. Today s meeting will provide an overview of the Program,

Welcome to the Illinois High-Speed Rail Chicago to St. Louis Construction Update Meeting. Today s meeting will provide an overview of the Program, Welcome to the Illinois High-Speed Rail Chicago to St. Louis Construction Update Meeting. Today s meeting will provide an overview of the Program, updates on construction to be held in this area, and how

More information

Dufferin Jog Elimination Project

Dufferin Jog Elimination Project Project Project Status Update November 14 2007 Project History Planning Alternatives Criteria Measured Project Benefits Structural Configurations Considered Structural Design Considerations The Preferred

More information

Mt. Hood National Forest

Mt. Hood National Forest United States Department of Agriculture Forest Service Mt. Hood National Forest Zigzag Ranger District 70220 E. Highway 26 Zigzag, OR 97049 503-622-3191 Fax: 503-622-5622 File Code: 1950-1 Date: June 29,