Flight Efficiency: Addressing current Limitations.and taking more ownership? AO perspective. Rory Sergison, Aer Lingus Air Traffic Services Manager
|
|
- Emery Lambert
- 5 years ago
- Views:
Transcription
1 Flight Efficiency: Addressing current Limitations.and taking more ownership? AO perspective Rory Sergison, Aer Lingus Air Traffic Services Manager 1
2 Setting the Scene: Aer Lingus Perspective Coming off the back of the global economic downturn and shrinkage in our traditional domestic market Aer lingus recorded an operating loss of 93million in the first half A strategic review of the business model and the market conditions were conducted and the management team concluded that significant changes were required to ensure the viability of the company. Cost saving programmes were tasked with saving the company 97million in both staff and non staff costs from The same can be said for most of the AO community We all needed to work smarter and more efficiently to manage our DOC`s especially Fuel and Overflight charges As headcount began to be reduced it was aligned with significant investments in upgrading our sophisticated systems to maximise operational efficiency through automation and optimisation In 2014 Aer Lingus recorded a record 11 million passengers in a single year. 2 Flight efficiency: addressing current limitations... and taking more ownership?
3 Flight efficiency: System Efficiency- Automated Flight Planning The system is automatically populated with : Schedule information Dep/Dest Flight Couplings Payload MEL Requirements/restrictions Fuel and Overflight Charges 3
4 Flight efficiency: addressing current limitations... and taking more ownership?...we do! The system runs the flight plan based on the aircraft data file for the acft type looking at the following: Cost of operating the particular acft type/ per minute Fuel cost at the particular airport ( has an effect on tankering and route selection) Mel restrictions ie; HF inop RAD AUUP NOTAMS Overflight Costs SID /STAR restrictions i.e.flight levels, acft equipment Alternate airport availability Standing Level Agreements Weather Operational requirements Rwy in use /taxi times Plannable directs The system will automatically run, file and crew brief based on the most cost efficient route. The selected route maybe changed by operations to meet schedules,reduce delays etc Plannable directs Overflight Costs 4
5 Flight efficiency: What cannot be managed through automation? Flight are monitored in CHMI /NOP portal for any predicted slot delays/flight suspensions and if required will be re routed to avoid cost Issues With any changes to the AUUP it is difficult to identify airspace that becomes available. Scenarios / Cherry picking is a manual process Staffing issues Airport issues Incorrect Notams /Canx of Notams Rwy in use / Point merge Predictability of filed route and level MDI Scenarios Slots Holding Cherry Picking Level capping 5
6 Flight efficiency: the biggest challenges in 2014? Increase in mandatory scenarios- AO`s prefer flexibility Social unrest / strikes- high costs for fuel and enroute charges Structural staffing issues in some ACCs Political crises resulting in dramatic changes in traffic patterns (War in Palestine, Ukrainian crisis/downing of MH17 ) ATS System failures Natural hazards / weather events including floods, volcanoes and a large increase in Thunderstorm activity New ATS systems and procedures including Point Merge, increase costs and reduce predictability 6
7 Flight efficiency: The way forward? Predictability is key Smart data- SWIM CFSP`s also have a role to play UDPP??? Next steps The TMA environment will be the biggest challenge in the coming years EC691- evolution is influencing operator behaviour Are the performance schemes fit for purpose- do they drive the correct behaviour? 7
8 8 Thank you, any questions?
Flight Efficiency now: Addressing current Limitations.and taking more ownership? AO perspective
Flight Efficiency now: Addressing current Limitations.and taking more AO perspective Rory SERGISON Aer Lingus Air Traffic Services Manager 28/012015 Setting the Scene: Aer Lingus Perspective Coming off
More informationAIR TRAFFIC FLOW MANAGEMENT INDIA S PERSPECTIVE. Vineet Gulati GM(ATM-IPG), AAI
AIR TRAFFIC FLOW MANAGEMENT INDIA S PERSPECTIVE Vineet Gulati GM(ATM-IPG), AAI AIR TRAFFIC FLOW MANAGEMENT ATFM is a service provided with the objective to enhance the efficiency of the ATM system by,
More informationICAO ATFM SEMINAR. Dubai, UAE, 14 December 2016
ICAO ATFM SEMINAR Dubai, UAE, 14 December 2016 ICAO ATFM Seminar Session 2.2: ATFM Sub-regional and Regional Solutions Brian Flynn EUROCONTROL Network Manager Directorate 12 th December 2016 Central Flow
More informationRecurrent capacity flaws: a matter of fate? Giovanni Lenti Head of Network Operations 28/01/2015
Recurrent capacity flaws: a matter of fate? Giovanni Lenti Head of Network Operations 28/01/2015 Analysing the causes En-route and airport arrival delays are recurrent in certain airspaces and airports.
More informationSESAR Solutions. Display Options
SESAR Solutions Outputs from the SESAR Programme R&I activities which relate to an Operational Improvement (OI) step or a small group of OI steps and its/their associated enablers, which have been designed,
More informationATFM Update - EUROCONTROL Day 1-16h45
ATFM Update - EUROCONTROL Day 1-16h45 Brian Flynn Head Performance Forecasts Relations Network Manager Directorate EUROCONTROL A Historical perspective From CFMU to Network Manager Initial database of
More informationREG ASP MIL APO USE INT IND NM
ECAC REG ASP MIL APO USE INT IND NM Subject matter and scope This objective is linked to ATM Functionality 3 of Commission Regulation (EU) No 716/2014 on the establishment of the Pilot Common Project,
More informationNetwork Manager Adding value to the Network 29 September 2011
Network Manager Adding value to the Network 29 September 2011 Alain FOURNIE Head of Operational Monitoring & Reporting Directorate Network Management EUROCONTROL The European Organisation for the Safety
More informationEUROCONTROL. An introduction to the EUROCONTROL Network Manager Operations Centre
EUROCONTROL An introduction to the EUROCONTROL Network Manager Operations Centre Since it started tactical operations in 1995*, the EUROCONTROL Network Manager is a key player in improving the overall
More informationSeen through an IATA lens A-CDM Globally
Seen through an IATA lens A-CDM Globally A-CDM Basics ATM Perspective Airport CDM is a part of the broader Collaborative Decision Making Focus: managing the turnaround of the aircraft fully transparent
More informationOlympics Managing Special Events Brendan Kelly, Head of Operational Policy
Olympics 2012 Managing Special Events Brendan Kelly, Head of Operational Policy Contents The shock and scale Olympics gives you 7 years notice, in ATM terms you need every minute Mobilisation It is not
More informationEfficiency and Automation
Efficiency and Automation Towards higher levels of automation in Air Traffic Management HALA! Summer School Cursos de Verano Politécnica de Madrid La Granja, July 2011 Guest Lecturer: Rosa Arnaldo Universidad
More informationTowards a Global ATFM Manual. Brian Flynn Head Network Operations
Towards a Global ATFM Manual Brian Flynn Head Network Operations ATM Structure in Europe 41 States One single ATFCM System over Europe >60 En-route centres = 1750 Sectors 1348 Aircraft Operators 450 Airports
More informationFederal Aviation Administration. Air Traffic Control System Command Center (ATCSCC)
Air Traffic Control System Command Center (ATCSCC) ATCSCC Mission Focal point for National Airspace System (NAS) issues and balance Air Traffic Demand System Capacity System Efficiency 2 FAA Air Traffic
More informationFlight Operations Officer Recurrent Training Syllabus
Page 1 Course Duration: 3 days per module 24 classroom hours Proficiency Requirements - Flight Dispatch Personnel (ICAO) Proficiency requirements for flight dispatch personnel, as well as acceptable methods
More informationHow CFSPs work. processes, requirements, difficulties. Tuesday, June 19th, 2018 CFPSG PRESENTATION FABEC SC OPS/AOG RADISSON ZURICH AIRPORT 1
How CFSPs work processes, requirements, difficulties FABEC MEETING JUNE, 19TH 2018, ZÜRICH Tuesday, June 19th, 2018 CFPSG PRESENTATION FABEC SC OPS/AOG RADISSON ZURICH AIRPORT 1 AGENDA 01 - Introduction
More informationART Workshop Airport Capacity
ART Workshop Airport Capacity Airport Research Bob Graham Head of Airport Research 21 st September 2016 Madrid Expectations The issues and opportunities for future research New solutions / directions for
More informationUser Forum Capacity Planning with DDR2 & NEST. Thierry Champougny / Laszlo Elbert / Stephanie Vincent
User Forum 2013 Capacity Planning with DDR2 & NEST Thierry Champougny / Laszlo Elbert / Stephanie Vincent Expert Operation Planning 24/01/2013 General view Capacity Planning functions, provided by NEST
More informationDynamic Airspace Overview concepts, complexities, benefits and outlook
KUNDENNAME NM User Forum 2018 Dynamic Airspace Overview concepts, complexities, benefits and outlook CFSP view Agenda 01 Concepts 03 Benefits 02 Complexities & Issues 04 Outlook & Recommendations 2 Concepts
More information2017 Overview and 2018 Outlook
2017 Overview and 2018 Outlook, Giovanni Lenti Head of Network Operation Services 24 Jan 2018 Traffic and ATFM delay 2017 vs 2016 YEAR TOTAL TRAFFIC TOTAL ATFM DELAY AVG DAILY DELAY 2017 10,605,942 flights
More informationInternational Civil Aviation Organization REVIEW OF STATE CONTINGENCY PLANNING REQUIREMENTS. (Presented by the Secretariat) SUMMARY
BBACG/16 WP/4 31/01/05 International Civil Aviation Organization The Special Coordination Meeting for the Bay of Bengal area (SCM/BOB) and The Sixteenth Meeting of the Bay of Bengal ATS Coordination Group
More informationInternational Civil Aviation Organization. PBN Airspace Concept. Victor Hernandez
International Civil Aviation Organization PBN Airspace Concept Victor Hernandez Overview Learning Objective: at the end of this presentation you should Understand principles of PBN Airspace Concept 2 Gate
More informationResponsibilities Document for the application of Air Traffic Flow Management (ATFM)
Responsibilities Document for the application of Air Traffic Flow Management (ATFM) Edition Number : 1.0 Edition Date : 25/10/2012 Status : Released Version Intended for : Category : ATFM IR Responsibilities
More informationAustralia s Favourite Airline Group. Leading through loyalty customers, partners and community
Flight Dispatcher Virgin Australia strategic objectives Australia s Favourite Airline Group. Leading through loyalty customers, partners and community 1. Impress our customers 2. Strengthen our relationships
More informationTWELFTH AIR NAVIGATION CONFERENCE DRAFT REPORT OF THE COMMITTEE ON AGENDA ITEM 4
26/11/12 TWELFTH AIR NAVIGATION CONFERENCE Montréal, 19 to 30 November 2012 DRAFT REPORT OF THE COMMITTEE ON AGENDA ITEM 4 The attached draft report on Agenda Item 4 is presented for approval by the Committee
More information2012 Performance Framework AFI
2012 Performance Framework AFI Nairobi, 14-16 February 2011 Seboseso Machobane Regional Officer ATM, ESAF 1 Discussion Intro Objectives, Metrics & Outcomes ICAO Process Framework Summary 2 Global ATM Physical
More informationREG ASP MIL APO USE INT IND NM
ECAC REG ASP MIL APO USE INT IND NM Subject matter and scope This objective is linked to ATM Functionality 3 of Commission Regulation (EU) No 716/2014 on the establishment of the Pilot Common Project,
More informationPerformance Based Navigation (PBN) Implementation Plan. The Gambia
Performance Based Navigation (PBN) Implementation Plan The Gambia Version 1.0 Table of contents 1. Executive summary.. 2 2. Introduction. 2 3. The need for PBN implementation 2 4. Benifit of PBN implementation
More informationFUA TEMPORARY INSTRUCTION Doc. ID : FTI/17-013
1. Introduction 1.1 The final procedures for P3 with Rolling UUP have been approved by NMB in November and inserted in the ERNIP Part 3 ASM Handbook V. 5.4 1.2 Detailed operational procedures are expected
More informationFuture Network Manager Methods
Future Network Manager Methods Workshop on Emerging Technologies Sonke Mahlich Project Manager, EUROCONTROL ATC Global Beijing, 12. Sep. 2016 Network Management A global scope with regional challenges
More informationEUROCONTROL Responsibilities Document for the application of Air Traffic Flow Management (ATFM)
EUROPEAN ORGANISATION FOR THE SAFETY OF AIR NAVIGATION Responsibilities Document for the application of Air Traffic Flow Management (ATFM) DOCUMENT IDENTIFIER: -SPEC-xxxx Edition Number : 0.41 Edition
More informationHosted by General Civil Aviation Authority (GCAA)
ICAO ATFM Seminar Hosted by General Civil Aviation Authority (GCAA) DFS experience related to ATFM from an individual state point of view Integration with the Network Manager Operation Center (NMOC, former
More informationWorkshop. SESAR 2020 Concept. A Brief View of the Business Trajectory
SESAR 2020 Concept A Brief View of the Business Trajectory 1 The Presentation SESAR Concept: Capability Levels Key Themes: Paradigm change Business Trajectory Issues Conclusion 2 ATM Capability Levels
More informationReport. Introduction. Plenary Session
Report The 18 th edition of the Network Manager User Forum was held on the 28 th & 29 th January 2015 in EUROCONTROL Headquarters, Brussels. It was attended by 230+ external visitors, from all over Europe
More informationSOUTH AFRICA PBN NEAR TERM IMPLEMENTATION PLAN PROJECT
PRE-PLANNING PHASE Nomination of the State Focal Point of Contact Appointment of the South Africa PBN Project Manager and Team Define the goals and objectives of Project Define the Terms of Reference for
More informationThe Third ATS Coordination Meeting of Bay of Bengal, Arabian Sea and Indian Ocean (BOBASIO) Region Hyderabad, India, 22 nd to 24 th October 2013.
BOBASIO 3-WP/10 22-24/10/2013 The Third ATS Coordination Meeting of Bay of Bengal, Arabian Sea and Indian Ocean (BOBASIO) Region Hyderabad, India, 22 nd to 24 th October 2013. Agenda 7: Green Initiatives
More informationTraffic Flow Management
Traffic Flow Management Traffic Flow Management The mission of traffic management is to balance air traffic demand with system capacity to ensure the maximum efficient utilization of the NAS 2 Traffic
More informationB0 FRTO, B0-NOPS, B0-ASUR and B0-ACAS Implementation in the AFI and MID Regions
B0 FRTO, B0-NOPS, B0-ASUR and B0-ACAS Implementation in the AFI and MID Regions Seboseso Machobane RO ATM/SAR ICAO ESAF Regional Office, Nairobi Elie El Khoury RO ATM/SAR ICAO MID Regional Office, Cairo
More informationBenefits of NEXTT. Nick Careen SVP, APCS. Will Squires Project Manager, Atkins. Anne Carnall Program Manager, NEXTT
Benefits of NEXTT Nick Careen SVP, APCS Anne Carnall Program Manager, NEXTT Will Squires Project Manager, Atkins 12 December 2018 1 Our industry continues to grow Our forecasts predict there will be 8.2
More informationSAMPLE TEMPLATE APPENDIX 3.5C-1
APIRG/19 Appendix 3.5 C1-C3 SAMPLE TEMPLATE APPENDIX 3.5C-1 AIR NAVIGATION REPORT FORM (ANRF) ASBU METHODOLOGY Regional and National planning for all ASBU Modules REGIONAL/NATIONAL PERFORMANCE OBJECTIVE
More informationAIRSPACE INFRINGEMENTS
AIRSPACE INFRINGEMENTS Eurocontrol Airspace Infringements Workshop 24 January 2008 Dave Drake UK CAA Directorate of Airspace Policy The Problem Can lead to disruption to traffic Can lead to adverse economic
More informationPerformance Based Navigation Operational End-State 2023
Performance Based Navigation Operational End-State 2023 A Regulatory View Organisation Civil Aviation Authority of New Zealand Date of this Document November 2018 Authored by: Primary Author: Ray Harvey,
More informationAvinor. Southern Norway Airspace Project SNAP. Flyoperativt Forum. Per Arnt Auen, project manager. Gardermoen,
Avinor Southern Norway Airspace Project SNAP Flyoperativt Forum Gardermoen, 2013-04-10 Per Arnt Auen, project manager SNAP 1. Background, objectives and schedule 2. Airspace organization 3. RTS results
More informationColombian PBN implementation: El Dorado case study
Colombian PBN implementation: El Dorado case study SDM WORKSHOP ON PBN 19.10.2017 XAVIER OUTTERS SME & PROJECT MANAGER NAVBLUE SAS Electronic Flight Bag Dispatch Pre-flight Airport Databases - FlySmart+
More informationLarge Airtanker Scenario (Scenario 1: Regional Fire)
Large Airtanker Scenario (Scenario 1: Regional Fire) ABN 96 105 736 392 Level 5 / 340 Albert Street EAST MELBOURNE VICTORIA 3002 AUSTRALIA tenders@nafc.org.au Copyright 2012, All rights reserved. Copyright
More informationAirspace Organization and Management
Airspace Organization and Management Asia and Pacific Regional Sub Office 2014 17 November 2014 Page 1 CONTENTS Concept of Flexible Use of Airspace (FUA) Flexible and adaptable airspace structure Conditional
More informationAlternate WX SIDs And Routes Ernst Potzel / Klaus Lang, DFS ACC Munich
Ernst Potzel / Klaus Lang, DFS ACC Munich Background: In order to reduce the operational impact and the arising thereby delay due to adverse weather, new alternate WX SIDs and routings will be established.
More informationAEROTHAI Air Traffic Management Network Management Centre IATA ICAO Cross Border ATFM Workshop
AEROTHAI Air Traffic Management Network Management Centre IATA ICAO Cross Border ATFM Workshop 17 18 November 2015 Bangkok, Thailand Piyawut Tantimekabut (Toon) Air Traffic Management Network Manager Network
More informationNext Generation Airspace Developments: Key Operational Trends and Enablers
Next Generation Airspace Developments: Key Operational Trends and Enablers ICNS 2013, Day 1 Plenary Nikos Fistas EUROCONTROL Herdon, VA, 23/04/13 Agenda Key goals of future European ATM system 4D Trajectory
More informationTHE DEVELOPMENT OF NATIONAL PERFORMANCE FRAMEWORK FOR AIR NAVIGATION SYSTEMS MAURITIUS
THE DEVELOPMENT OF NATIONAL PERFORMANCE FRAMEWORK FOR AIR NAVIGATION SYSTEMS MAURITIUS 2011-2015 Presented by Ahmed Mosaheb Chief Officer ATM MAURITIUS Characteristics of the Industry FIR- 9,000,000 sq
More informationENAIRE DEVELOPMENTS NM B2B WEB SERVICES TECHNICAL FORUM. enaire.es. Network Manager nominated by the European Commission
ENAIRE DEVELOPMENTS NM B2B WEB SERVICES TECHNICAL FORUM Network Manager nominated by the European Commission Development Guidelines GOAL: to develop tools that help solving operational issues in ACCs,
More informationCivil/Military Cooperation ICAO Workshop. Civil/Military Cooperation in Ukraine
Civil/Military Cooperation ICAO Workshop Civil/Military Cooperation in Ukraine October 2013 Ukraine Gained independence in 1991 Population: 47 million Total area: 603,700 sq.km Land boundaries: 4,558 km
More informationDefining and Managing capacities Brian Flynn, EUROCONTROL
Defining and Managing capacities Brian Flynn, EUROCONTROL Some Capacity Guidelines Capacity is what you know you can handle today Capacity = safe throughput capability of an individual or small team All
More informationATM STRATEGIC PLAN VOLUME I. Optimising Safety, Capacity, Efficiency and Environment AIRPORTS AUTHORITY OF INDIA DIRECTORATE OF AIR TRAFFIC MANAGEMENT
AIRPORTS AUTHORITY OF INDIA ATM STRATEGIC PLAN VOLUME I Optimising Safety, Capacity, Efficiency and Environment DIRECTORATE OF AIR TRAFFIC MANAGEMENT Version 1 Dated April 08 Volume I Optimising Safety,
More informationSingle European Sky Benefits for the airline industry. Warsaw, 28 November 2011
Single European Sky Benefits for the airline industry Warsaw, 28 November 2011 SES finally starts to gain momentum But continues to be slowed down by EU Member States After nearly 50 years of talk! 2009
More informationFAA Update Society of American Military Engineers
FAA Update Society of American Military Engineers May 8, 2013 Presented by Joseph Miniace Regional Administrator FAA Central Region Current FAA FAA Mission is to provide the safest, most efficient aerospace
More informationATM REGIONAL CONTINGENCY PLAN FOR.. CTA/UTA/FIR
ATM REGIONAL CONTINGENCY PLAN FOR.. CTA/UTA/FIR OBJECTIVE: This ATS Contingency plan s objective is to ensure the continued safety and supplies of air navigation services in the event of partially or total
More informationPBN Performance. Based Navigation. - PBN & Airspace Concepts - ICAO PBN Seminar Introduction to PBN
PBN Performance Based Navigation - PBN & Airspace Concepts - Introduction to PBN 1 Learning Objectives PBN Concept within the context of an Airspace (Operational) Concept. Introduction to PBN 2/37 Components
More informationBeijing, 18 h of September 2014 Pierre BACHELIER Head of ATM Programme. Cockpit Initiatives. ATC Global 2014
Beijing, 18 h of September 2014 Pierre BACHELIER Head of ATM Programme Cockpit Initiatives for ATM ATC Global 2014 Page 2 Cockpit Initiatives for ATM Airbus vision on ATM transformation Airbus position
More informationFABEC Operations. From a project-driven approach to continuous operational improvements
FABEC Operations From a project-driven approach to continuous operational improvements Andreas Pötzsch Chairman FABEC Operations and DFS Director En-route and Approach. Madrid, 07 March 2017 0 FABEC at
More informationFlight Efficiency Initiative
Network Manager nominated by the European Commission EUROCONTROL Flight Efficiency Initiative Making savings through improved flight planning Flight efficiency The Network Manager is playing a pivotal
More informationATFM/CDM ICAO s Perspective
ATFM/CDM ICAO s Perspective Elie El Khoury ICAO Regional Officer, ATM/SAR Middle East Office, Cairo Cairo/3-4 April 2016 Outline Traffic Growth in the MID Region What is ATFM/CDM Main Objectives ICAO Guidance
More information2
1 2 3 4 Why are pilots so focussed on safety? because: The pilots are always the first at an accident scene! 6 COUNCIL REGULATION (EEC) No 3922/91 Annex III, Subpart B 7 In addition to being the final
More informationOperations Control Centre perspective. Future of airline operations
Operations Control Centre perspective Future of airline operations This brochure was developed based on the results provided by the OCC project as part of the SESAR programme. This project was managed
More information- Establish criteria and procedures providing for the creation and use of adjustable lateral and vertical limits of the airspace
- Establish criteria and procedures providing for the creation and use of adjustable lateral and vertical limits of the airspace ot yet, however planned. Criteria and procedures for the creation and use
More informationOperations Manual. FS Airlines Client User Guide Supplement A. Flight Operations Department
Restricted Circulation Edition 1.0 For use by KORYO Air & KORYO Connect Pi Operations Manual FS Airlines Client User Guide Supplement 1. 1022 14A This manual has been approved by and issued on behalf of:
More informationA-CDM from the Flight Crew Perspective. Francisco Hoyas
A-CDM from the Flight Crew Perspective Francisco Hoyas A-320 pilot 22 September 2015 Impact of A-CDM during different phases of flight Before getting to the aircraft Climb, En_route, Descend, Approach,
More informationSafety / Performance Criteria Agreeing Assumptions Module 10 - Activities 5 & 6
Safety / Performance Criteria Agreeing Assumptions Module 10 - Activities 5 & 6 European Airspace Concept Workshops for PBN Implementation Why have safety and performance criteria? Measure performance
More informationCATFM CENTRAL AIR TRAFFIC FLOW MANAGEMENT ( C-ATFM ) INDIA. ATFM TF 1 Meeting September 2018
CATFM CENTRAL AIR TRAFFIC FLOW MANAGEMENT ( C-ATFM ) INDIA ATFM TF 1 Meeting September 2018 Topics Topics. The Need C-ATFM Network C-ATFM Operations Current Status and Activities Challenges in Implementation
More informationCOMMISSION REGULATION (EU) No 255/2010 of 25 March 2010 laying down common rules on air traffic flow management
L 80/10 Official Journal of the European Union 26.3.2010 COMMISSION REGULATION (EU) No 255/2010 of 25 March 2010 laying down common rules on air traffic flow management (Text with EEA relevance) THE EUROPEAN
More informationFUEL MANAGEMENT FOR COMMERCIAL TRANSPORT
FUEL MANAGEMENT FOR COMMERCIAL TRANSPORT 1. Introduction An aeroplane shall carry a sufficient amount of usable fuel to complete the planned flight safely and to allow for deviation from the planned operation.
More informationEUROCONTROL. Centralised Services Workshop. Peter Matern CS#5 EAIMS 5 March 2014
EUROCONTROL Centralised Services Workshop Peter Matern CS#5 EAIMS 5 March 2014 European AIS Database (EAD) A EUROCONTROL Service of which the provision of the service is outsourced, a real partnership
More informationExtending the Reach of Your Flight Department Team
D e d i c a t e d t o h e l p i n g b u s i n e s s a c h i e v e i t s h i g h e s t g o a l s. GA Desk Extending the Reach of Your Flight Department Team Introducing NBAA s GA Desk How often do your
More informationEFFICIENCY PFFs FOR ENROUTE, TERMINAL & COMMUNICATION UGANDA-CIVIL AVIATION AUTHORITY
EFFICIENCY PFFs FOR ENROUTE, TERMINAL & COMMUNICATION UGANDA-CIVIL AVIATION AUTHORITY INTERNATIONAL CIVIL AVIATION ORGANIZATION EASTERN AND SOUTHERN AFRICAN OFFICE WORKSHOP ON THE DEVELOPMENT OF NATIONAL
More informationProcedures for Air Navigation Services Aerodromes (PANS-AGA) ICAO Doc. 9981
Procedures for Air Navigation Services Aerodromes (PANS-AGA) ICAO Doc. 9981 Introduction The First Edition of Doc. 9981 was approved by the President of the Council on 20 October 2014 The document becomes
More informationCross-border Free Route Airspace Implementation Workshop Conclusions and Recommendations
Cross-border Free Route Airspace Implementation Workshop Conclusions and Recommendations 29 30 JUN 2015 Item 1: Cross-border expansion of FRA (1) Harmonised CONOPS PMP and management structure Important
More informationSeychelles Civil Aviation Authority. Telecomm & Information Services Unit
Seychelles Civil Aviation Authority Telecomm & Information Services Unit 12/15/2010 SCAA 1 WORKSHOP EXERCISE Workshop on the development of National Performance Framework 6 10 Dec 2010 10/12/2010 SCAA
More informationUser Forum ASM Recent Improvements. Anders HALLGREN Manager, ASM/ATFCM Procedures EUROCONTROL Network Management
User Forum 011 ASM Recent Improvements Anders HALLGREN Manager, ASM/ATFCM Procedures EUROCONTROL Network Management The European Organisa for the Safety of Air Naviga ASM Improvement Initiative ADR Improved
More informationImplementation of the Performance-Based Air Navigation Systems for the CAR Region ICAO Regional TC Project RLA/09/801 Agenda Item 6 WP/14
of the Performance-Based Air Navigation Systems for the CAR Region ICAO Regional TC Project RLA/09/801 Agenda Item 6 WP/14 Julio Garriga, RO/TA International Civil Aviation Organization North American,
More informationTHE DEVELOPMENT OF NATIONAL PERFORMANCE FRAMEWORK FOR ANS IN ERITREA Presented by Ghebreab Ghebremedhin Director ANS/AGA Division
THE DEVELOPMENT OF NATIONAL PERFORMANCE FRAMEWORK FOR ANS IN ERITREA 2011-2015 Presented by Ghebreab Ghebremedhin Director ANS/AGA Division DEVELOPMENT OF NATIONAL PERFORMANCE FRAMEWORK FOR AIR NAVIGATION
More informationREPUBLIC OF SINGAPORE AERONAUTICAL INFORMATION SERVICES CIVIL AVIATION AUTHORITY OF SINGAPORE SINGAPORE CHANGI AIRPORT P.O. BOX 1, SINGAPORE
Telephone: (65) 6595 6051 AFS: WSSSYNYX Facsimile: (65) 6441 0221 caas_singaporeais@caas.gov.sg www.caas.gov.sg REPUBLIC OF SINGAPORE AERONAUTICAL INFORMATION SERVICES CIVIL AVIATION AUTHORITY OF SINGAPORE
More informationAnnex III to ED Decision 2017/023/R. AMC and GM to Part-CAT Issue 2, Amendment 13
Annex III to ED Decision 2017/023/R AMC and GM to Part-CAT Issue 2, Amendment 13 The Annex to Decision 2014/015/R is amended as follows: The text of the amendment is arranged to show deleted text, new
More informationACI EUROPE POSITION PAPER
ACI EUROPE POSITION PAPER November 2018 Cover / Photo: Stockholm Arlanda Airport (ARN) Introduction Air traffic growth in Europe has shown strong performance in recent years, but airspace capacity has
More informationFF-ICE A CONCEPT TO SUPPORT THE ATM SYSTEM OF THE FUTURE. Saulo Da Silva
International Civil Aviation Organization SIP/2012/ASBU/Dakar-WP/19 FF-ICE A CONCEPT TO SUPPORT THE ATM SYSTEM OF THE FUTURE Saulo Da Silva Workshop on preparations for ANConf/12 ASBU methodology (Dakar,
More informationStandards and procedures for the approval of performance-based navigation operations. (Presented by Colombia) SUMMARY
216 INTERNATIONAL CIVIL AVIATION ORGANIZATION SAM/IG/9-WP/15 South American Regional Office Regional Project RLA/06/901 12/04/12 Assistance for the implementation of a regional ATM system according to
More informationATFM IMPLEMENATION IN INDIA PROGRESS THROUGH COLLABORATION PRESENTED BY- AIRPORTS AUTHORITY OF INDIA
ATFM IMPLEMENATION IN INDIA PROGRESS THROUGH COLLABORATION PRESENTED BY- AIRPORTS AUTHORITY OF INDIA CONTENTS 1 India Civil Aviation Scenario 2 C-ATFM Concepts 3 C-ATFM Implementation 4 4 Road Value Ahead
More informationOperational implementation of new ATM automated systems and integration of the existing systems ADS-B IMPLEMENTATION IN GUYANA. (Presented by Guyana)
International Civil Aviation Organization SAM/IG/22-IP/19 South American Regional Office 12/11/2018 Twenty Second Workshop/Meeting of the SAM Implementation Group (SAM/IG/22) - Regional Project RLA/06/901
More informationANNUAL NETWORK OPERATIONS REPORT 2016 ANNEX I - USERS VIEW
ANNUAL NETWORK OPERATIONS REPORT 2016 ANNEX I - USERS VIEW 1 Airspace Users Key Points on Network Performance Summary of Airspace Users views presented at the 89th meeting of the Route Network Development
More informationCurriculum for AIM Training Module 2: ARO Officer
Curriculum for AIM Training Module 2: ARO Officer 1. THE AERONAUTICAL INFORMATION SERVICES The general objectives are to enable students to: Appreciate how the aeronautical information services function;
More informationFlight Efficiency Plan 2012
Flight Efficiency Plan 2012 Foreword... 2 Targets and Outcomes... 3 En-route Airspace Design and Network Availability... 5 Design and Use of Terminal Areas... 8 Airport Operations... 11 Operational staff
More informationATFCM OPERATING PROCEDURES FOR FLOW MANAGEMENT POSITION
ATFCM OPERATING PROCEDURES FOR FLOW MANAGEMENT POSITION Edition N : 18.1 Edition validity date : 23 Sep 2014 http://www.eurocontrol.int 2014 The European Organisation for the Safety of Air Navigation (EUROCONTROL).
More informationCivil Instrument Flight Rules at Military Aerodromes or in Military Controlled Airspace
Federal Departement of the Environment, Transport, Energy and Communications DETEC Federal Office of Civil Aviation FOCA Safety Division - Flight Operations FOCA GM/INFO Guidance Material / Information
More informationExcerpts from ICAO PBCS Manual
IBAC Bulletin - 8 Dec. 2017 Attachment A Excerpts from ICAO PBCS Manual Chapter 4. Complying with and RCP/RSP specification 4-8 4.3.1.7 The ANSP should establish the following, subject to a bilateral,
More informationIRISH AVIATION AUTHORITY DUBLIN POINT MERGE. Presented by James O Sullivan PANS-OPS & AIRSPACE INSPECTOR Irish Aviation Authority
IRISH AVIATION AUTHORITY DUBLIN POINT MERGE Presented by James O Sullivan PANS-OPS & AIRSPACE INSPECTOR Irish Aviation Authority 2012 Holding Holding Before Point Merge No Pilot anticipation of distance
More informationGANP 2019/ASBUs. Olga de Frutos. Marrakesh/10 th December Technical Officer Air Navigation
GANP 2019/ASBUs Olga de Frutos Technical Officer Air Navigation Marrakesh/10 th December 2018 Agenda Background information GANP 2019 Global Strategic level Global Technical level BBB and ASBU framework
More informationRussian Federation ATM modernization program
Russian Federation ATM modernization program Alexander Vedernikov Deputy Director of Federal Air Transport Agency 20-21 March, 2012, Moscow Main strategic directions of Russian Air Navigation System development
More informationNATS. SAIP AD3 Jersey Interface Change Stage 1 Assessment Meeting. Friday 2 nd February x NATS presenters.
NATS SAIP AD3 Jersey Interface Change Stage 1 Assessment Meeting Friday 2 nd February 2018 3x NATS presenters Agenda Revised Statement of need Background Issues and benefits arising from proposed change
More informationICAO Big Data Project ADS-B Data as a source for analytical solutions for traffic behaviour in airspace
ICAO Big Data Project ADS-B Data as a source for analytical solutions for traffic behaviour in airspace ICAO/IATA/CANSO PBN/2 San Jose December 8, 2016 Big Data process Quantitative Quantitative / Qualitative
More information(RN R A N V A V & & RN R P N
PBN (RNAV & RNP) 1 What is the Perfect Flight? 2 Conventional Navigation [1920s] Ground-based navigation aids (NAVAIDs) Aircraft Overfly NAVAID or Intersection Display Accuracy is a Function of Distance
More informationHow IACA carriers do volcanic ash risk assessment. Erik Moyson Volcanic Ash Operations Workshop EASA, Cologne, 20 January 2011.
How IACA carriers do volcanic ash risk assessment Erik Moyson Volcanic Ash Operations Workshop EASA, Cologne, 20 January 2011 IACA carriers 1 Profile of IACA carriers original low-cost carriers high seat
More information