1 216 INTERNATIONAL CIVIL AVIATION ORGANIZATION SAM/IG/9-WP/15 South American Regional Office Regional Project RLA/06/901 12/04/12 Assistance for the implementation of a regional ATM system according to the ATM operational concept and the corresponding technological support for CNS Ninth Workshop/Meeting of the SAM Implementation Group (SAM/IG/9) (Lima, Peru, May 2012) Agenda Item 4: Standards and procedures for the approval of performance-based navigation operations (Presented by Colombia) SUMMARY This working paper shows the process followed by the Civil Aviation Security Secretariat of Colombia (Secretaría de Seguridad Aérea de la Aeronáutica Civil de Colombia) for the approval of conventional procedures based on radio aids using approved RNP systems even when the radio aid is out of service. References: - Airbus A320 AFM - Boeing B AFM - Embraer 170 AFM ICAO Objectives: Strategic A Safety B - Security C Environmental protection 1. Background 1.1 RNAV routes and some RNAV arrival and departure procedures as well as RNP approach procedures have already been officially published for major airports and at airports lacking conventional aids in Colombia as of 20 October However, although our main operators are already RNAV/RNP approved under the PBN concept, there is a large number of airports and aerodromes throughout the Colombian territory, and many of them only have procedures based on conventional aids such as NDB, VOR/DME. 2. Discussion 2.1 A technical study of aircraft operating in Colombia, specifically those FMS-equipped, revealed that some of these systems support procedures based on radio aids even if the such radio aids are out of service and even if the airborne equipment is inoperative.

2 SAM/IG/9-WP/ For example, the Rionegro airport has a VOR arrival procedure for runway 36. The Avianca A320 FMS always flies GPS Primary by default, meaning that even if the VOR is inoperative, the FMS algorithm supported by the database knows the exact position of the VOR and, through the GPS, can plot radials from that position, just like the VOR would do if operative. The FMS retrieves the procedure from the database and executes it regardless of whether the VOR station is operative or not. Even if the VOR receiver is inoperative, the FMS executes the procedure provided the GPS is working properly with RAIM availability. 2.3 Let us see some examples of aircraft limitations in the AFM: AIRBUS A As may be seen, this AFM clearly and explicitly states that procedures based on radio aids may be executed even if the station or the airborne equipment is inoperative, and even if the equipment is not installed on board, except for procedures based on ILS or LOC alone.

3 - 3 - SAM/IG/9-WP/15 - BOEING B737 NG 2.5 This AFM is not as explicit as the previouss one, but a further analysis shows that it is equivalent, that is, it allows procedures based on radio aids even if such radio aids are inoperative, except for ILS or LOC procedures. - EMBRAER For some unclear reason, Embraer limits the execution off procedures to when the station and airborne equipment are operative.

4 SAM/IG/9-WP/ In view of the above, the Air Navigation Service Bureau (Dirección de Servicios a la Navegación Aérea) in coordination with the Secretariat of Air Security (Secretaría de Seguridad Aérea) issued circular AIC C09/12 (see the appendix to this working paper) to clarify the use of RNP systems in conventional SIDs, STARs and approach procedures. 2.8 Suggested action a) If the States deem it advisable, use this paper as a reference for approving procedures based on radio aids for aircraft that have limitations, even if the radio aids are out of service. b) It should be noted that in these cases the recommendation is to check RAIM availability at the airport of destination, since it is a pre-requisite in such cases, taking into account that FMS executes the procedure using GNSS information. c) This procedure may not be used in lieu of the LOC. - END -

5 A-1 SAM/IG/9-WP/15 APPENDIX AIC C09/12 USE OF RNP SYSTEMS IN CONVENTIONAL DEPARTURE, ARRIVAL, AND APPROACH PROCEDURES EFFECTIVE DATE: 28 FEBRUARY PURPOSE 1.1. The purpose of this circular (AIC) is to provide an operational and airworthiness guide on the suitability and use of RNP systems when applying conventional procedures based on radio aids within Colombian airspace, even if the radio aid or airborne equipment associated to the procedure is temporarily out of service, provided compliance with the MEL. This includes holding patterns, departure procedures (SIDs), arrival procedures (STARs), as well as approach procedures (NPA/PA), except for the final segment of the procedures if supported by a localiser, in which case this radio aid needs to be operative This AIC may be applied in two different scenarios: when the RNP system is used as a SUBSTITUTE MEANS of navigation and when it is used as ALTERNATE MEANS of navigation Use of the RNP system under any of the scenarios described in 1.2 DOES NOT turn the scenarios described in 1.1 into RNAV/RNP procedures; however, some operational procedures described below are similar This AIC allows greater precision when following conventional paths whose protection zones are more conservative as compared to RNAV/RNP procedures, thus attaining greater confinement of the path flown, which ensures the safety of operations, provided compliance with the procedures described in this AIC. 2. DEFINITIONS 2.1. RECEIVER AUTONOMOUS INTEGRITY MONITORING (RAIM): Technique whereby an airborne GPS receiver/processor autonomously checks the integrity of navigation signals from GPS satellites ALTERNATIVE MEANS OF NAVIGATION: It means using information from an RNP system in lieu of information from a serviceable operational radio aid (VOR, NDB, VOR/DME, NDB/DME, or COMPASS LOCATOR), whose signal is compatible with an airborne navigation equipment, which must be operational and where the pilot has no need to monitor the radio aid, provided it is thus specified in the aircraft flight manual (AFM) SUBSTITUTE MEANS OF NAVIGATION: It means using information from an RNP system rather than from an operational radio aid (VOR, NDB, VOR/DME, NDB/DME or COMPASS LOCATOR) that is out of service, whose signal is compatible with an airborne navigation equipment and which may be out of service provided it is thus stipulated in the aircraft flight manual (AFM) and is in compliance with the MEL.

6 SAM/IG/9-WP/15 A APPROPRIATE RNP SYSTEM: A system that provides on-board performance control and alert and that meets the performance requirements established for this type of operation, such as instrument flight rules, and that is suitable for the operation with the procedure to be flown in terms of the navigation performance criteria established by the UAEAC of Colombia, such as SIDs, STARs, and instrument approach procedures. 3. SCOPE 3.1. This AIC applies only to aircraft of an air operator that has been authorised by the Aviation Security Secretariat (Secretaría de Seguridad Aérea - SSA) of the UAEAC of Colombia, in its OPERATION SPECIFICATIONS, to conduct approach operations (RNP APPROACH) based on a GNSS sensor, using a multi-sensor system in accordance with circular or 009 or In order to use RNP systems as a SUBSTITUTE means of navigation pursuant to paragraph 3.1, air operators shall have a special approval from the UAEAC SSA in their OPERATION SPECIFICATIONS, in keeping with that specified in the aircraft flight manual (AFM) or its supplement The RNP system shall not be used as a substitute or alternative means of navigation when the AFM or AFM supplement specify radio aid monitoring as MANDATORY during the execution of the procedure. 4. USE OF THE RNP SYSTEM 4.1. Subject to the requirements prescribed in this AIC, flight crews may use their RNP system to determine the position or distance from a radio aid or a radio-aid defined fix, to navigate to/from a radio aid, perform a holding pattern or fly a DME arc, even when a radio aid or radio aids are required in the aeronautical chart for the execution of a procedure (for example: VOR/DME BOG REQUIRED) The RNP system may NOT be used in lieu of an LOC signal The RNP system may NOT replace lateral guidance in the VOR or NDB final approach, unless the crew is completely assured, in real time, of GPS signal integrity. 5. FLIGHT PLANNING 5.1. Operators capable of using the RNP system as an alternative and/or substitute means of navigation shall report RNP capability, GPS equipment, and RNP APPROACH navigation specification in the FPL/RPL using the corresponding suffixes It will NOT be necessary to file a new FPL when a radio aid required to navigate a SID, STAR, or approach at the departure, destination, or destination alternate aerodrome has been declared as INOPERATIVE via NOTAM Operators planning to use the RNP system as a substitute means of navigation shall consult NANU NOTAMs as well as RAIM availability before flight departure, for which they may use a valid RAIM prediction programme, or the airborne equipment, or a GNSS NOTAM published by the UAEAC of Colombia.

7 A-3 SAM/IG/9-WP/ For the purpose of flight planning, at least a take-off alternate or destination alternate aerodrome with an instrument approach procedure that does not require GNSS shall be available. For instance, if the airborne VOR equipment is out of service, an NDB, LOC, or ILS approach shall be available. 6. OPERATIONAL CONSIDERATIONS 6.1. The navigation database shall be current throughout the flight. If the AIRAC cycle changes during the flight, the flight crew shall ensure the precision of navigation data by comparing the electronic data with the information contained in the aeronautical charts The flight crew shall inform air traffic control of their intention and capability of using the RNP system as a substitute means of navigation of an out-of-service radio aid The flight crew shall retrieve the procedures to be flown from the navigation database. IT IS FORBIDDEN to enter routes or procedures manually using latitude/longitude, location/course or location/course/distance functionalities The flight crew shall deselect the radio aid that has been declared out of service via NOTAM from the flight management and guidance system (FMS) before starting the procedure The crew shall navigate the tracks defined in the procedure as precisely as possible with the help of the lateral deviation indicator and any other airborne display, unless authorised by ATC or in an emergency Whenever the crew uses the RNP system as a substitute means of navigation, it shall suspend the procedure upon losing GNSS signal integrity or in the event of any alarm indicating unacceptable degradation of the navigation system. 7. TRAINING 7.1. The ATC does not require specific training to issue a control clearance that includes a route, a departure procedure (SID), an arrival procedure (STAR), or an RNP-based conventional approach as a substitute or alternate means; however, it must be aware of that described in this AIC The flight crew shall be aware of both the information contained in this AIC and of the operational procedures approved for RNAV 1, 2 and RNP APPROACH navigation specifications. 8. PHRASEOLOGY 8.1. Air traffic control and the flight crew shall use the standard phraseology described in ICAO Doc 4444 (Air Traffic Management) applicable to area, approach, and aerodrome control services. This means that there is NO difference between control clearances, whether the route or authorised procedure is executed based on the area navigation equipment or on radio aid signals The flight crew shall inform ATC when capable of using the RNP system as a substitute means of navigation.

USE AND APPLICATION OF GNSS IN THE IMPLEMENTATION OF NAVIGATION BASED ON PERFORMANCE IN ECUADOR

USE AND APPLICATION OF GNSS IN THE IMPLEMENTATION OF NAVIGATION BASED ON PERFORMANCE IN ECUADOR BACKGROUND OF GNSS USE The guidelines for the transition to the use of the Global Navigation Satellite System GNSS in the CAR / SAM Regions were issued by ICAO at the Eleventh World Air Navigation Conference

More information

SUPPLEMENT A33 TO THE AIRPLANE FLIGHT MANUAL DA 40 NG. Integrated Avionics System Garmin G1000,

SUPPLEMENT A33 TO THE AIRPLANE FLIGHT MANUAL DA 40 NG. Integrated Avionics System Garmin G1000, DA 40 NG AFM Garmin G1000, P-RNAV Operation SUPPLEMENT A33 TO THE AIRPLANE FLIGHT MANUAL DA 40 NG Integrated Avionics System Garmin G1000, Doc. No. : 6.01.15-E Date of Issue : Design Change Advisory :

More information

GOVERNMENT OF INDIA OFFICE OF THE DIRECTOR GENERAL OF CIVIL AVIATION TECHNICAL CENTRE, OPP. SAFDARJUNG AIRPORT, NEW DELHI

GOVERNMENT OF INDIA OFFICE OF THE DIRECTOR GENERAL OF CIVIL AVIATION TECHNICAL CENTRE, OPP. SAFDARJUNG AIRPORT, NEW DELHI GOVERNMENT OF INDIA OFFICE OF THE DIRECTOR GENERAL OF CIVIL AVIATION TECHNICAL CENTRE, OPP. SAFDARJUNG AIRPORT, NEW DELHI - 110003 CIVIL AVIATION REQUIREMENT SECTION 8 - AIRCRAFT OPERATIONS SERIES 'S',

More information

RNP 2 JOB AID REQUEST TO CONDUCT RNP 2 OPERATIONS

RNP 2 JOB AID REQUEST TO CONDUCT RNP 2 OPERATIONS RNP 2 Job Aid SRVSOP RNP 2 JOB AID REQUEST TO CONDUCT RNP 2 OPERATIONS 1. Introduction This Job Aid was developed by the Latin American Regional Safety Oversight Cooperation System (SRVSOP) to provide

More information

FLIGHT OPERATIONS PANEL (FLTOPSP)

FLIGHT OPERATIONS PANEL (FLTOPSP) International Civil Aviation Organization FLTOPSP/1-WP/3 7/10/14 WORKING PAPER FLIGHT OPERATIONS PANEL (FLTOPSP) FIRST MEETING Montréal, 27 to 31 October 2014 Agenda Item 4: Active work programme items

More information

Approach Specifications

Approach Specifications Approach Specifications RNP Approach (RNP APCH) and Baro-VNAV Approach Specifications RNP APCH and Baro-VNAV 1 Overview Learning Objectives: At the end of this presentation, you should: Understand the

More information

PBN Syllabus Aeroplane. Learning Objective. phase Theoretical PBN concept. in ICAO Doc 9613)

PBN Syllabus Aeroplane. Learning Objective. phase Theoretical PBN concept. in ICAO Doc 9613) PBN Syllabus Aeroplane Training Topic phase Theoretical PBN concept training (as described in ICAO Doc 9613) PBN principles PBN components PBN scope Navigation specifications RNAV and RNP Navigation functional

More information

PBN Operational Approval Oceanic and Remote En Route Navigation Specifications

PBN Operational Approval Oceanic and Remote En Route Navigation Specifications PBN Operational Approval Oceanic and Remote En Route Navigation Specifications Navigation Specifications Applicable to Oceanic/Remote RNAV 10 (RNP 10) RNP 4 RNP 2 A-RNP 2 Prior Guidance Material RNP 10

More information

PBN Syllabus Helicopter. Learning Objective. phase Theoretical PBN concept. in ICAO Doc 9613)

PBN Syllabus Helicopter. Learning Objective. phase Theoretical PBN concept. in ICAO Doc 9613) PBN Syllabus Helicopter Training Topic phase Theoretical PBN concept training (as described in ICAO Doc 9613) PBN principles PBN components PBN scope Navigation specifications RNAV and RNP Navigation functional

More information

SUPPLEMENT A33 TO THE AIRPLANE FLIGHT MANUAL DA 62. Integrated Avionics System Garmin G1000 and. G1000 NXi, SBAS and P-RNAV Operation

SUPPLEMENT A33 TO THE AIRPLANE FLIGHT MANUAL DA 62. Integrated Avionics System Garmin G1000 and. G1000 NXi, SBAS and P-RNAV Operation DA 62 AFM Garmin G1000 and SUPPLEMENT A33 TO THE AIRPLANE FLIGHT MANUAL DA 62 Integrated Avionics System Garmin G1000 and G1000 NXi, SBAS and Doc. No. : 7.01.25-E Date of Issue : 01-Apr-2015 Design Change

More information

RNP OPERATIONS. We will now explain the key concepts that should not be mixed up and that are commonly not precisely understood.

RNP OPERATIONS. We will now explain the key concepts that should not be mixed up and that are commonly not precisely understood. RNP OPERATIONS 1. Introduction Planes were made as a means of transport. To successfully fly from a location A to a location B, pilots were first and foremost navigators. Originally relying on visual landmarks

More information

Nav Specs and Procedure Design Module 12 Activities 8 and 10. European Airspace Concept Workshops for PBN Implementation

Nav Specs and Procedure Design Module 12 Activities 8 and 10. European Airspace Concept Workshops for PBN Implementation Nav Specs and Procedure Design Module 12 Activities 8 and 10 European Airspace Concept Workshops for PBN Implementation Learning Objectives By the end of this presentation you should understand: The different

More information

Learning Objectives. By the end of this presentation you should understand:

Learning Objectives. By the end of this presentation you should understand: Designing Routes 1 Learning Objectives By the end of this presentation you should understand: Benefits of RNAV Considerations when designing airspace routes The basic principles behind route spacing The

More information

TWELFTH AIR NAVIGATION CONFERENCE

TWELFTH AIR NAVIGATION CONFERENCE International Civil Aviation Organization AN-Conf/12-WP/6 7/5/12 WORKING PAPER TWELFTH AIR NAVIGATION CONFERENCE Agenda Item 2: Aerodrome operations improving airport performance 2.2: Performance-based

More information

TANZANIA CIVIL AVIATION AUTHORITY AIR NAVIGATION SERVICES INSPECTORATE. Title: CONSTRUCTION OF VISUAL AND INSTRUMENT FLIGHT PROCEDURES

TANZANIA CIVIL AVIATION AUTHORITY AIR NAVIGATION SERVICES INSPECTORATE. Title: CONSTRUCTION OF VISUAL AND INSTRUMENT FLIGHT PROCEDURES Page 1 of 8 1. PURPOSE 1.1. This Advisory Circular provides guidance to personnel involved in construction of instrument and visual flight procedures for publication in the Aeronautical Information Publication.

More information

ICAO PBN CONCEPTS, BENEFITS, AND OBJECTIVES

ICAO PBN CONCEPTS, BENEFITS, AND OBJECTIVES AFCAC/ICAO Joint Workshop Walter White ICAO PBN CONCEPTS, BENEFITS, AND OBJECTIVES 24 JUNE 2014 Airbus ProSky Corporate Presentation 29/06/2014 PERFORMANCE-BASED NAVIGATION The implementation of Performance-Based

More information

PBN Operational Approval Continental En Route Navigation Specifications

PBN Operational Approval Continental En Route Navigation Specifications PBN Operational Approval Continental En Route Navigation Specifications Navigation Specifications Applicable to Continental En-route operations RNAV 5 RNAV 2 RNP 2 A-RNP RNP 0.3 2 RNAV 5 Flight Phase Navigation

More information

Implementation of air traffic flow management (ATFM) in the SAM Region REVIEW OF THE ATFM ACTION PLAN. (Presented by the Secretariat)

Implementation of air traffic flow management (ATFM) in the SAM Region REVIEW OF THE ATFM ACTION PLAN. (Presented by the Secretariat) INTERNATIONAL CIVIL AVIATION ORGANIZATION SAM/IG/10-WP/08 South American Regional Office - Regional Project RLA/06/901 05/09/12 Assistance for the Implementation of a Regional ATM System, taking into account

More information

Subject: Aircraft and Operators approval for RNP Approach (RNP APCH) Operations

Subject: Aircraft and Operators approval for RNP Approach (RNP APCH) Operations GOVERNMENT OF INDIA CIVIL AVIATION DEPARTMENT DIRECTOR GENERAL OF CIVIL AVIATION OC NO 11 OF 2014 Date: OPERATIONS CIRCULAR Subject: Aircraft and Operators approval for RNP Approach (RNP APCH) Operations

More information

Air Navigation Bureau ICAO Headquarters, Montreal

Air Navigation Bureau ICAO Headquarters, Montreal Performance Based Navigation Introduction to PBN Air Navigation Bureau ICAO Headquarters, Montreal 1 Performance Based Navigation Aviation Challenges Navigation in Context Transition to PBN Implementation

More information

Standards and procedures for performance-based navigation operations approval

Standards and procedures for performance-based navigation operations approval International Civil Aviation Organization SAM/IG/6-WP/18 South American Regional Office 07/10/10 Sixth Workshop/Meeting of the SAM Implementation Group (SAM/IG/6) - Regional Project RLA/06/901 Lima, Peru,

More information

OFFICE OF THE DIRECTOR GENERAL OF CIVIL AVIATION

OFFICE OF THE DIRECTOR GENERAL OF CIVIL AVIATION GOVERNMENT OF INDIA OFFICE OF THE DIRECTOR GENERAL OF CIVIL AVIATION TECHNICAL CENTRE, OPP. SAFDARJUNG AIRPORT, NEW DELHI - 110003 CIVIL AVIATION REQUIREMENT SECTION 8 - AIRCRAFT OPERATIONS SERIES 'O',

More information

CHAPTER 7 AEROPLANE COMMUNICATION AND NAVIGATION EQUIPMENT

CHAPTER 7 AEROPLANE COMMUNICATION AND NAVIGATION EQUIPMENT CHAP 7-1 CHAPTER 7 COMMUNICATION AND NAVIGATION EQUIPMENT 7.1 COMMUNICATION EQUIPMENT 7.1.1 An aeroplane shall be provided with radio communication equipment capable of: a) conducting two-way communication

More information

Flight Operations Inspector Manual

Flight Operations Inspector Manual 1. Purpose of the job aid APPLICATION TO CONDUCT RNP APCH OPERATIONS a) To provide information on the relevant documents. b) To provide a record of the operator application, the inspector comments and

More information

Título ponencia: Introduction to the PBN concept

Título ponencia: Introduction to the PBN concept Título ponencia: Introduction to the PBN concept Organizado por: Index Introduction Background PBN Concept PBN Operations Conclusions Introduction Subject This presentation addresses the Performance-Based

More information

RNP AR APCH Approvals: An Operator s Perspective

RNP AR APCH Approvals: An Operator s Perspective RNP AR APCH Approvals: An Operator s Perspective Presented to: ICAO Introduction to Performance Based Navigation Seminar The statements contained herein are based on good faith assumptions and provided

More information

Subject: Aircraft and Operators Approval For RNAV 10(RNP10) Operations.

Subject: Aircraft and Operators Approval For RNAV 10(RNP10) Operations. GOVERNMENT OF INDIA CIVIL AVIATION DEPARTMENT DIRECTOR GENERAL OF CIVIL AVIATION OC NO 6 OF 2014 Date: 4 TH SEPT. 2014 OPERATIONS CIRCULAR Subject: Aircraft and Operators Approval For RNAV 10(RNP10) Operations.

More information

Overview of Evolution to Performance Based Navigation. ICAO PBN Seminar Overview of Evolution to Performance Based Navigation

Overview of Evolution to Performance Based Navigation. ICAO PBN Seminar Overview of Evolution to Performance Based Navigation Overview of Evolution to Performance Based Navigation 1 Overview Learning Objectives: at the end of this presentation you should: Understand what are the two main elements of Performance Based Navigation

More information

PROCEDURES SPECIAL OPERATIONS

PROCEDURES SPECIAL OPERATIONS Intentionally left blank A318/A319/A320/A321 PRELIMINARY PAGES - TABLE OF CONTENTS PRO-SPO-51 Required Navigation Performance (RNP) General...A RNAV 10 / RNP 10... B RNAV 5 / BRNAV...C RNAV 1 RNAV 2 /

More information

RNP AR APCH Job Aid SRVSOP RNP AR APCH JOB AID OPERATOR APPLICATION TO CONDUCT RNP AR APCH OPERATIONS

RNP AR APCH Job Aid SRVSOP RNP AR APCH JOB AID OPERATOR APPLICATION TO CONDUCT RNP AR APCH OPERATIONS RNP AR APCH Job Aid SRVSOP RNP AR APCH JOB AID OPERATOR APPLICATION TO CONDUCT RNP AR APCH OPERATIONS 1. Introduction This Job Aid was developed by the Latin American Regional Safety Oversight Cooperation

More information

AERODROME OPERATING MINIMA

AERODROME OPERATING MINIMA Title: Determination of Aerodrome Operating Minima Page 1 of 8 AERODROME OPERATING MINIMA 1. PURPOSE 1.1 The purpose of this Advisory Circular is to provide methods to be adopted by operators in determining

More information

PBN Airspace Design Workshop. Area Navigation. Asia and Pacific Regional Sub-Office Beijing, China. 5 May 2016 Page 1 APAC RSO BEIJING

PBN Airspace Design Workshop. Area Navigation. Asia and Pacific Regional Sub-Office Beijing, China. 5 May 2016 Page 1 APAC RSO BEIJING PBN Airspace Design Workshop Area Navigation Asia and Pacific Regional Sub-Office Beijing, China 5 May 2016 Page 1 APAC RSO BEIJING Learning Objectives By the end of this presentation, you will be: Aware

More information

PBN Operational Approval Overview

PBN Operational Approval Overview PBN Operational Approval Overview Eduardo Chacin Regional Officer Flight Safety ICAO NACC Regional Office XI ICAO-ASPA Seminar Mexico City, Mexico, 7 8 May 2013 21 May 2013 Page 1 Agenda 1. Performance-based

More information

GOVERNMENT OF INDIA OFFICE OF DIRECTOR GENERAL OF CIVIL AVIATION

GOVERNMENT OF INDIA OFFICE OF DIRECTOR GENERAL OF CIVIL AVIATION GOVERNMENT OF INDIA OFFICE OF DIRECTOR GENERAL OF CIVIL AVIATION ANSS AC NO. 1 of 2017 31.07. 2017 Air Space and Air Navigation Services Standard ADVISORY CIRCULAR Subject: Procedures to follow in case

More information

CASAS ADVISORY PAMPHLET

CASAS ADVISORY PAMPHLET No. 18 CASAS ADVISORY PAMPHLET Subject: GUIDENCE ON THE APPROVAL OF SURINAMESE OPERATORS AND AIRCRAFT TO OPERATE UNDER INSTRUMENT FLIGHT RULES (IFR) IN EUROPEAN AIRSPACE DESIGNATED FOR BASIC AREA NAVIGATION

More information

NOTE: This guidance does not apply to RNP-1 routes and procedures planned in the U.S.

NOTE: This guidance does not apply to RNP-1 routes and procedures planned in the U.S. Subject: APPROVAL OF U.S. OPERATORS AND AIRCRAFT TO OPERATE UNDER INSTRUMENT FLIGHT RULES (IFR) IN EUROPEAN AIRSPACE DESIGNATED FOR BASIC AREA NAVIGATION (B-RNAV) AND PRECISION AREA NAVIGATION (P-RNAV)

More information

APPLICATION FOR P-RNAV/RNAV 1 OPERATIONAL APPROVAL OR RENEWAL

APPLICATION FOR P-RNAV/RNAV 1 OPERATIONAL APPROVAL OR RENEWAL SEYCHELLES CIVIL AVIATION AUTHORITY APPLICATION FOR P-RNAV/RNAV 1 OPERATIONAL APPROVAL OR RENEWAL Applicants are strongly advised to read the 'P-RNAV Notes for Completion' before completing the form. Please

More information

RNAV - RNP. July 2010

RNAV - RNP. July 2010 RNAV - RNP July 2010 July 2010 Issue 1 Page 1 of 6 1 Who Issues approval to fly in P-RNAV Airspace? a) National Authority b) Euro Control c) JAA d) ICAO 2 A Fixed Published Route is? a) Alternative / Reserve

More information

Aircraft and Operators approval for RNP 2 operations

Aircraft and Operators approval for RNP 2 operations GOVERNMENT OF INDIA CIVIL AVIATION DEPARTMENT DIRECTOR GENERAL OF CIVIL AVIATION OC NO 14 OF 2014 Date: OPERATIONS CIRCULAR Subject: Aircraft and Operators approval for RNP 2 operations 1. PURPOSE This

More information

AREA NAVIGATION RNAV- MANAGEMENT

AREA NAVIGATION RNAV- MANAGEMENT 1. Introduction AREA NAVIGATION RNAV- MANAGEMENT RNAV is an instrument-based navigation method that leads to fly from a fix (geographic point inside an airspace) to another fix directly. Contrary to conventional

More information

THIS BULLETIN REPLACES BULLETIN WHICH IS NO LONGER CURRENT AND HAS BEEN WITHDRAWN.

THIS BULLETIN REPLACES BULLETIN WHICH IS NO LONGER CURRENT AND HAS BEEN WITHDRAWN. IBAC Bulletin 16-03 THIS BULLETIN REPLACES BULLETIN 16-01 WHICH IS NO LONGER CURRENT AND HAS BEEN WITHDRAWN. Subject: Performance-based Navigation in Australian airspace - General guidance on the GNSS

More information

A Pilot s perspective

A Pilot s perspective The Challenges of Modern Approaches, from NPA/PA to 2D/3D operations airborne perspective A Pilot s perspective Stefan Fiedler IFALPA, VC German Cockpit IFALPA Position on PBN (December 2014) IFALPA welcomes

More information

Flight Safety Division Case Nr. Page 1 of 11

Flight Safety Division Case Nr. Page 1 of 11 FRD-035 Date: 08.03.2014 Version 1.2 ICELANDIC TRANSPORT AUTHORITY Application received, Date. Flight Safety Division Case Nr. Page 1 of 11 APPLICATION FOR RNP APPROACH OPERATIONAL APPROVAL OR RENEWAL

More information

INTERNATIONAL CIVIL AVIATION ORGANIZATION FIRST MEETING OF DIRECTORS OF CIVIL AVIATION OF THE CARIBBEAN REGION (CAR/DCA/1)

INTERNATIONAL CIVIL AVIATION ORGANIZATION FIRST MEETING OF DIRECTORS OF CIVIL AVIATION OF THE CARIBBEAN REGION (CAR/DCA/1) CAR DCA/1 20/09/02 INTERNATIONAL CIVIL AVIATION ORGANIZATION FIRST MEETING OF DIRECTORS OF CIVIL AVIATION OF THE CARIBBEAN REGION (CAR/DCA/1) (Grand Cayman, Cayman Islands, 8-11 October 2002) Agenda Item

More information

Date: 1/7/05. NOTE 1: This AC does not apply to RNAV routes in the Gulf of Mexico ( Q ) or Alaska VOR/DME RNAV routes ( JxxxR ).

Date: 1/7/05. NOTE 1: This AC does not apply to RNAV routes in the Gulf of Mexico ( Q ) or Alaska VOR/DME RNAV routes ( JxxxR ). - Advisory Circular Subject: U.S. TERMINAL AND EN ROUTE AREA NAVIGATION (RNAV) OPERATIONS Date: 1/7/05 Initiated by: AFS-400 AC No: 90-100 Change: 1. PURPOSE. a. This advisory circular (AC) provides operational

More information

Civil Instrument Flight Rules at Military Aerodromes or in Military Controlled Airspace

Civil Instrument Flight Rules at Military Aerodromes or in Military Controlled Airspace Federal Departement of the Environment, Transport, Energy and Communications DETEC Federal Office of Civil Aviation FOCA Safety Division - Flight Operations FOCA GM/INFO Guidance Material / Information

More information

Implementation challenges for Flight Procedures

Implementation challenges for Flight Procedures Implementation challenges for Flight Procedures A Data-house perspective for comprehensive Procedure Design solution: A need today Sorin Onitiu Manager Business Affairs, Government & Military Aviation,

More information

AUSTRALIA AERONAUTICAL INFORMATION SERVICE AIRSERVICES AUSTRALIA GPO BOX 367 CANBERRA ACT 2601 CESSATION OF NAVIGATION APPROVALS UNDER CAO 20.

AUSTRALIA AERONAUTICAL INFORMATION SERVICE AIRSERVICES AUSTRALIA GPO BOX 367 CANBERRA ACT 2601 CESSATION OF NAVIGATION APPROVALS UNDER CAO 20. TELEPHONE: 1300-306-630 (local call - Aust wide, except from mobile phone) FAX: 02 6268 5111 1. INTRODUCTION 1.1 This AIP SUP amends AIP to remove navigation approvals that are no longer able to be used

More information

Performance Based Navigation Implementation of Procedures

Performance Based Navigation Implementation of Procedures Performance Based Navigation Implementation of Procedures Dr. Daniel Schaad Head of Instrument Flight Procedures (ATM/IFP) Minsk, April 10th, 2015 DIESER TEXT DIENT DER NAVIGATION First of all thank you

More information

Honeywell.com PBN Concepts Krakow, Poland

Honeywell.com PBN Concepts Krakow, Poland PBN Concepts Krakow, Poland EPKK (KRK) Current Operational Environment Current Operational Environment : Runways: 07/25 8,366 ft (2550m) Approaches: ILS or LOC 25 RNAV (GNSS) 07, 25 VOR 07, 25 NDB 25 Departure

More information

APPLICATION FOR RNP APPROACH OPERATIONAL APPROVAL OR RENEWAL

APPLICATION FOR RNP APPROACH OPERATIONAL APPROVAL OR RENEWAL APPLICATION FOR RNP APPROACH OPERATIONAL APPROVAL OR RENEWAL Applicants are strongly advised to read the 'RNP Approach Notes for Completion' before completing the form. Please complete the form in BLOCK

More information

Effective: PERFORMANCE-BASED NAVIGATION (PBN) IN AUSTRALIA

Effective: PERFORMANCE-BASED NAVIGATION (PBN) IN AUSTRALIA AUSTRALIA AERONAUTICAL INFORMATION SERVICE AIRSERVICES AUSTRALIA GPO BOX 367, CANBERRA ACT 2601 Phone: 02 6268 4874 Email: aim.editorial@airservicesaustralia.com Effective: AERONAUTICAL INFORMATION CIRCULAR

More information

ADVISORY CIRCULAR AIRCRAFT AND OPERATORS APPROVAL FOR RNAV 5 OPERATIONS

ADVISORY CIRCULAR AIRCRAFT AND OPERATORS APPROVAL FOR RNAV 5 OPERATIONS AC 91-002 SRVSOP ADVISORY CIRCULAR AC : 91-002 DATE : 12/10/09 REVISION : 1 ISSUED BY : SRVSOP SUBJECT: AIRCRAFT AND OPERATORS APPROVAL FOR RNAV 5 OPERATIONS 1. PURPOSE This advisory circular (AC) provides

More information

GENERAL INFO NOTICE 1. BACKGROUND

GENERAL INFO NOTICE 1. BACKGROUND GENERAL INFO NOTICE 1. BACKGROUND Precision-RNAV (P-RNAV) is the natural progression from Basic RNAV (B-RNAV) which became mandatory in European Airspace in April 1998 for en-route operations. Initial

More information

European Aviation Safety Agency

European Aviation Safety Agency Annexes I and II to ED Decision 2018/013/R European Aviation Safety Agency Acceptable Means of Compliance and Guidance Material to Commission Regulation (EU) No 1332/2011 and Commission Implementing Regulation

More information

PBN Performance. Based Navigation. - PBN & Airspace Concepts - ICAO PBN Seminar Introduction to PBN

PBN Performance. Based Navigation. - PBN & Airspace Concepts - ICAO PBN Seminar Introduction to PBN PBN Performance Based Navigation - PBN & Airspace Concepts - Introduction to PBN 1 Learning Objectives PBN Concept within the context of an Airspace (Operational) Concept. Introduction to PBN 2/37 Components

More information

AMC ICAO DOC 9613 AMC 20-4 ICAO DOC 9613 TGL-10 ICAO DOC 9613 AMC AMC AMC ICAO DOC 70300

AMC ICAO DOC 9613 AMC 20-4 ICAO DOC 9613 TGL-10 ICAO DOC 9613 AMC AMC AMC ICAO DOC 70300 Application for PBN operations approval Completion of form: Application: Each relevant box should be completed with a tick ( ) or a (X). Items marked with an asterisk (*) to be completed only for first

More information

VOLUME 4 AIRCRAFT EQUIPMENT AND OPERATIONAL AUTHORIZATION CHAPTER 1 AIR NAVIGATION, COMMUNICATIONS, AND SURVEILLANCE. Section 4 Class II Navigation

VOLUME 4 AIRCRAFT EQUIPMENT AND OPERATIONAL AUTHORIZATION CHAPTER 1 AIR NAVIGATION, COMMUNICATIONS, AND SURVEILLANCE. Section 4 Class II Navigation VOLUME 4 AIRCRAFT EQUIPMENT AND OPERATIONAL AUTHORIZATION CHAPTER 1 AIR NAVIGATION, COMMUNICATIONS, AND SURVEILLANCE 4-76 GENERAL. Section 4 Class II Navigation A. Concepts, Direction, and Guidance. This

More information

SOUTH AFRICA PBN NEAR TERM IMPLEMENTATION PLAN PROJECT

SOUTH AFRICA PBN NEAR TERM IMPLEMENTATION PLAN PROJECT PRE-PLANNING PHASE Nomination of the State Focal Point of Contact Appointment of the South Africa PBN Project Manager and Team Define the goals and objectives of Project Define the Terms of Reference for

More information

CFIT-Procedure Design Considerations. Use of VNAV on Conventional. Non-Precision Approach Procedures

CFIT-Procedure Design Considerations. Use of VNAV on Conventional. Non-Precision Approach Procedures OCP-WG-WP 4.18 OBSTACLE CLEARANCE PANEL WORKING GROUP AS A WHOLE MEETING ST. PETERSBURG, RUSSIA 10-20 SEPTEMBER 1996 Agenda Item 4: PANS-OPS Implementation CFIT-Procedure Design Considerations Use of VNAV

More information

AERONAUTICAL SERVICES ADVISORY MEMORANDUM (ASAM) Focal Point: Gen

AERONAUTICAL SERVICES ADVISORY MEMORANDUM (ASAM) Focal Point: Gen Page 1 of 6 1 INTRODUCTION Each route shall be assigned a designator that is unique for that aerodrome. The designator shall be defined in accordance with Annex 11, Appendix 3. In addition, the first 4

More information

GOVERNMENT OF INDIA OFFICE OF THE DIRECTOR GENERAL OF CIVIL AVIATION TECHNICAL CENTRE, OPP SAFDARJUNG AIRPORT, NEW DELHI

GOVERNMENT OF INDIA OFFICE OF THE DIRECTOR GENERAL OF CIVIL AVIATION TECHNICAL CENTRE, OPP SAFDARJUNG AIRPORT, NEW DELHI GOVERNMENT OF INDIA OFFICE OF THE DIRECTOR GENERAL OF CIVIL AVIATION TECHNICAL CENTRE, OPP SAFDARJUNG AIRPORT, NEW DELHI CIVIL AVIATION REQUIREMENTS SECTION 8 AIRCRAFT OPERATIONS SERIES 'S', PART III ISSUE

More information

Title: PBN Operations and Licensing Requirements - Declaration for AOC Holders

Title: PBN Operations and Licensing Requirements - Declaration for AOC Holders Statement of compliance with: COMMISSION REGULATION (EU) No 965/2012 (of 5 October 2012 laying down technical requirements and administrative procedures related to air operations pursuant to Regulation

More information

Flight Evaluation and Validation of RNP AR/SAAAR Instrument Flight Procedures

Flight Evaluation and Validation of RNP AR/SAAAR Instrument Flight Procedures Flight Evaluation and Validation of RNP AR/SAAAR Instrument Flight Procedures Donald P. Pate Consultant Aviation Airspace Consulting, Inc. Edmond, OK, USA E-mail: donppate1@yahoo.com ABSTRACT With the

More information

MetroAir Virtual Airlines

MetroAir Virtual Airlines MetroAir Virtual Airlines NAVIGATION BASICS V 1.0 NOT FOR REAL WORLD AVIATION GETTING STARTED 2 P a g e Having a good understanding of navigation is critical when you fly online the VATSIM network. ATC

More information

An advisory circular may also include technical information that is relevant to the standards or requirements.

An advisory circular may also include technical information that is relevant to the standards or requirements. Advisory Circular AC91-21 RNAV 1, RNAV 2, RNP 1, RNP 2, RNP APCH and BARO VNAV Operational Approvals Revision 0.3 5 September 2016 General Civil Aviation Authority advisory circulars contain guidance and

More information

ICAO framework for LPV

ICAO framework for LPV ICAO framework for LPV Patrizio Vanni GNSS expert enav.it Torrejon, 10-10-2013 Main topics PBN framework GANP & ASBU concept PBN Manual GNSS Manual Italian experience Conclusions 2 The challenges Air Traffic

More information

Advisory Circular. File No.: Z U Issue No.: 01

Advisory Circular. File No.: Z U Issue No.: 01 Advisory Circular Subject: Requirements for the Timely Notification of Amendments to Aeronautical Information Issuing Office: Standards AC No.: 300-015 File No.: Z 5000-34 U Issue No.: 01 RDIMS No.: 12611990v5

More information

FLIGHT OPERATIONS PANEL

FLIGHT OPERATIONS PANEL International Civil Aviation Organization FLTOPSP/WG/2-WP/18 10/04/15 WORKING PAPER FLIGHT OPERATIONS PANEL WORKING GROUP MEETING SECOND MEETING Rome Italy, 4 to 8 May 2015 Agenda Item 5 : New Work Programme

More information

ADVISORY CIRCULAR SUBJECT: AIRCRAFT AND OPERATOR APPROVAL FOR RNP 1 OPERATIONS

ADVISORY CIRCULAR SUBJECT: AIRCRAFT AND OPERATOR APPROVAL FOR RNP 1 OPERATIONS AC 91-006 SRVSOP ADVISORY CIRCULAR CA : 91-006 DATE : 09/09/13 REVISION : 1 ISSUED BY : SRVSOP SUBJECT: AIRCRAFT AND OPERATOR APPROVAL FOR RNP 1 OPERATIONS 1. PURPOSE This advisory circular (AC) establishes

More information

DP-7 The need for QMS controlled processes in AIS/AIM. Presentation to QMS for AIS/MAP Service Implementation Workshop Dakar, Senegal, May 2011

DP-7 The need for QMS controlled processes in AIS/AIM. Presentation to QMS for AIS/MAP Service Implementation Workshop Dakar, Senegal, May 2011 DP-7 The need for QMS controlled processes in AIS/AIM Presentation to QMS for AIS/MAP Service Implementation Workshop Dakar, Senegal, 17 19 May 2011 Werner Kurz Director International Relations Jeppesen

More information

SUBPART C Operator certification and supervision

SUBPART C Operator certification and supervision An AOC specifies the: SUBPART C Operator certification and supervision Appendix 1 to OPS 1.175 Contents and conditions of the Air Operator Certificate (a) Name and location (principal place of business)

More information

Advisory Circular. Radius to Fix (RF) Path Terminator

Advisory Circular. Radius to Fix (RF) Path Terminator Advisory Circular Subject: Radius to Fix (RF) Path Terminator Issuing Office: Standards Document No.: AC 700-027 File Classification No.: Z 5000-34 Issue No.: 01 RDIMS No.: 7617945 V12 Effective Date:

More information

Open Questions & Collecting Lessons Learned

Open Questions & Collecting Lessons Learned Open Questions & Collecting Lessons Learned 2nd joint ICAO EUR PBN TF EUROCONTROL RAiSG meeting Rick Farnworth EUROCONTROL 12-14 March 2014 Summary Objective List of Open Questions Options for making Information

More information

EASA RNP (AR) Workshop The Landscape Working Together

EASA RNP (AR) Workshop The Landscape Working Together EASA RNP (AR) Workshop The Landscape Working Together 20 October 2010 Cologne Capt Herbert Meyer EASA Certification Flight Standards Content Aspects for Consideration Conventional versus RNP AR approaches

More information

Performance Based Navigation (PBN) Implementation Plan. The Gambia

Performance Based Navigation (PBN) Implementation Plan. The Gambia Performance Based Navigation (PBN) Implementation Plan The Gambia Version 1.0 Table of contents 1. Executive summary.. 2 2. Introduction. 2 3. The need for PBN implementation 2 4. Benifit of PBN implementation

More information

Performance Based Navigation Operational End-State 2023

Performance Based Navigation Operational End-State 2023 Performance Based Navigation Operational End-State 2023 A Regulatory View Organisation Civil Aviation Authority of New Zealand Date of this Document November 2018 Authored by: Primary Author: Ray Harvey,

More information

Saint Petersburg-Clearwater International Airport. Airspace & Instrument Approach Analysis

Saint Petersburg-Clearwater International Airport. Airspace & Instrument Approach Analysis Saint Petersburg-Clearwater International Airport Airspace & Instrument Approach Analysis February 23, 2005 Jeppesen Boeing Jeppesen Government / Military Services Group Airspace Services Division AIRSPACE

More information

Understanding Required Navigation Performance (RNP) and Area Navigation (RNAV)Operations

Understanding Required Navigation Performance (RNP) and Area Navigation (RNAV)Operations Understanding Required Navigation Performance (RNP) and Area Navigation (RNAV)Operations White Paper Doc No.: WHTP-2013-16-10 May 2018 Safely guiding pilots and their passengers worldwide for over 35 years

More information

Application Form and Compliance Checklist - OPS for NAT HLA (MNPS) Approval FORM Operator:

Application Form and Compliance Checklist - OPS for NAT HLA (MNPS) Approval FORM Operator: Application Form and Compliance Checklist - OPS for NAT HLA (MNPS) Approval FORM.965.037 Operator: Adress: E-mail: AOC No: Phone no: The relevant elements defined in the mandatory part of the Operational

More information

New generation aircraft in the instrument approach domain. Jean-Christophe Lair Airbus Test pilot 1 st Feb. 2017

New generation aircraft in the instrument approach domain. Jean-Christophe Lair Airbus Test pilot 1 st Feb. 2017 New generation aircraft in the instrument approach domain Jean-Christophe Lair Airbus Test pilot 1 st Feb. 2017 Agenda Video A little bit of history Today s situation A350 XWB solutions for final approaches

More information

CIVIL AVIATION PUBLICATION CAP 10 CPDLC

CIVIL AVIATION PUBLICATION CAP 10 CPDLC CAP 10 CPDLC INDEX This Page Intentionally Left Blank CAP 10 CPDLC INDEX Section Title Page No. 1. INTRODUCTION... 1 1.1 General... 1 1.2 Applicability... 1 1.3 Terminology... 1 1.4 References... 2 2.

More information

Guidance material AIRCRAFT AND OPERATORS APPROVAL FOR RNAV 1O OPERATIONS (DESIGNATED AND AUTHORIZED AS RNP 10)

Guidance material AIRCRAFT AND OPERATORS APPROVAL FOR RNAV 1O OPERATIONS (DESIGNATED AND AUTHORIZED AS RNP 10) Guidance material DATE : 01/11/13 REVISION : 1 ISSUED BY : EUR PBN TF SUBJECT: AIRCRAFT AND OPERATORS APPROVAL FOR RNAV 1O OPERATIONS (DESIGNATED AND AUTHORIZED AS RNP 10) 1. PURPOSE This guidance material

More information

Advisory Circular. En Route Area Navigation Operations RNAV 5 (Formerly B-RNAV) Aviation Safety Regulatory Framework Document No.

Advisory Circular. En Route Area Navigation Operations RNAV 5 (Formerly B-RNAV) Aviation Safety Regulatory Framework Document No. Advisory Circular Subject: En Route Area Navigation Operations RNAV 5 (Formerly B-RNAV) Issuing Office: PAA Sub Activity Area: File Classification No.: Civil Aviation Aviation Safety Regulatory Framework

More information

Challenges in Complex Procedure Design Validation

Challenges in Complex Procedure Design Validation Challenges in Complex Procedure Design Validation Frank Musmann, Aerodata AG ICAO Workshop Seminar Aug. 2016 Aerodata AG 1 Procedure Validation Any new or modified Instrument Flight Procedure is required

More information

Regulations & Obligations

Regulations & Obligations Regulations & Obligations Thursday, March 24, 2015 9:00 a.m. 10:00 a.m.) PRESENTED BY: John Harpool Richard White Adam Hartley International Operators Conference San Diego, CA March 21 24, 2016 Sources:

More information

Part 105. Parachuting - Operating Rules. CAA Consolidation. 15 December Published by the Civil Aviation Authority of New Zealand

Part 105. Parachuting - Operating Rules. CAA Consolidation. 15 December Published by the Civil Aviation Authority of New Zealand Part 105 CAA Consolidation 15 December 2012 Parachuting - Operating Rules Published by the Civil Aviation Authority of New Zealand DESCRIPTION Part 105 prescribes rules relating to parachute operations,

More information

Figure 3.1. Foreign Airport Assessment Aid

Figure 3.1. Foreign Airport Assessment Aid 01 oauu-t.d Foreign Airport Assessment Aid: Date of Assessment: Assessment Conducted by: Airport ICAO/IATA Identification: Hours of Operation: Figure 3.1. Foreign Airport Assessment Aid [ Airport Name:

More information

Aerodrome Safety. H.V. SUDARSHAN International Civil Aviation Organization

Aerodrome Safety. H.V. SUDARSHAN International Civil Aviation Organization NPF/SIP/2010-WP/19 Aerodrome Safety H.V. SUDARSHAN International Civil Aviation Organization Workshop on the development of National Performance Framework for Air Navigation Systems (Nairobi, 6-10 December

More information

AERONAUTICAL INFORMATION CIRCULAR 18/18

AERONAUTICAL INFORMATION CIRCULAR 18/18 NAV CANADA 19 JUL 18 AERONAUTICAL INFORMATION CIRCULAR 18/18 GUIDANCE FOR STANDARD TERMINAL ARRIVAL (STAR) PROCEDURES The guidance currently published in the Transport Canada Aeronautical Information Manual

More information

34 th Airline/ATS Safety Forum

34 th Airline/ATS Safety Forum 34 th Airline/ATS Safety Forum Colleen Kitson, Senior ATS Specialist Outline RNP1 - including Albury Future applications Workshop Background ICAO Global Air Navigation Plan specifies PBN as the highest

More information

International Civil Aviation Organization. PBN Airspace Concept. Victor Hernandez

International Civil Aviation Organization. PBN Airspace Concept. Victor Hernandez International Civil Aviation Organization PBN Airspace Concept Victor Hernandez Overview Learning Objective: at the end of this presentation you should Understand principles of PBN Airspace Concept 2 Gate

More information

Flight Procedure Design and Cartography

Flight Procedure Design and Cartography Flight Procedure Design and Cartography ATNS Air Traffic Management Division INDEX About ATNS What is Flight Procedure Design and Cartography? Features of Flight Procedure Design and Cartography Benefits

More information

REGULATION No. 10/2011 ON APPROVAL OF FLIGHT PROCEDURES INCLUDING SID-s AND STAR-s. Article 1 Scope of Application

REGULATION No. 10/2011 ON APPROVAL OF FLIGHT PROCEDURES INCLUDING SID-s AND STAR-s. Article 1 Scope of Application Republika e Kosovës Republika Kosovo Republic of Kosovo Autoriteti i Aviacionit Civil i Kosovës Autoritet Civilnog Vazduhoplovstva Kosova Civil Aviation Authority of Kosovo Director General of Civil Aviation

More information

Required Navigation Performance (RNP 10) Revision 1 18 March Related Rules This AC relates specifically to , , and

Required Navigation Performance (RNP 10) Revision 1 18 March Related Rules This AC relates specifically to , , and Advisory Circular AC91-7 Required Navigation Performance (RNP 10) Revision 1 General Civil Aviation Authority Advisory Circulars contain information about standards, practices, and procedures that the

More information

Insert new Standards, including Appendix 6, applicable from 20 November 2008, and Attachment F as follows:

Insert new Standards, including Appendix 6, applicable from 20 November 2008, and Attachment F as follows: Insert new Standards, including Appendix 6, applicable from 20 November 2008, and Attachment F as follows: 4.2.1.6 The air operator certificate shall contain at least the following information and, from

More information

PHILIPPINES ATC EXPERIENCE ON PBN 6/15/ CIVIL AVIATION AUTHORITY OF THE PHILIPPINES

PHILIPPINES ATC EXPERIENCE ON PBN 6/15/ CIVIL AVIATION AUTHORITY OF THE PHILIPPINES PHILIPPINES ATC EXPERIENCE ON PBN a Brief History Dependency to Ground Navigational Aids In June 2010, the outage of the Manila DVOR/DME and ILS system brought air traffic to a halt. The very low visibility

More information

Controller Training Case Study Implementation of new RNP AR APCH for RWY07 (North Circuit) at HKIA

Controller Training Case Study Implementation of new RNP AR APCH for RWY07 (North Circuit) at HKIA Controller Training Case Study Implementation of new RNP AR APCH for RWY07 (North Circuit) at HKIA Disclaimer This presentation is for information purposes only. It should not be relied on as the sole

More information

REQUIRED NAVIGATION PERFORMANCE / AREA NAVIGATION GUIDE

REQUIRED NAVIGATION PERFORMANCE / AREA NAVIGATION GUIDE UCTION NOVEMBER 2008-1 - TABLE OF CONTENTS 1. Introduction 2. Definitions 3. Performance Requirements 4. Functionality Requirements 5. RNP Types 6. RNP Airspace Environment and Implementation 7. Aircraft

More information

P-RNAV GENERAL INFO NOTICE. 1. Background

P-RNAV GENERAL INFO NOTICE. 1. Background GENERAL INFO NOTICE 1. Background Precision-RNAV (P-RNAV) is the natural progression from Basic RNAV (B-RNAV) which became mandatory in European airspace in April of 1998 for enroute operations. Initial

More information