1 Ernst Potzel / Klaus Lang, DFS ACC Munich
2 Background: In order to reduce the operational impact and the arising thereby delay due to adverse weather, new alternate WX SIDs and routings will be established. Munich ACC together with DLH Classic started a trial in 2015 to reduce the impact of weather induced delay. Project objectives/ scope: 1. Reduction of weather related delay 2. Improvement of traffic load predictability 3. Reduction of ATCO workload 4. Reduction of FDS workload 5. Reduction of TWR workload 6. Reduction of AO workload The success of the project is in direct relation with the weather forecast predictability. 3
3 Participants/ stakeholders: Munich ACC Langen ACC Karlsruhe UAC (2016) Padua ACC (2016) NMOC Network Manager Operation Center (2016) DLH Deutsche Lufthansa AG, (Air Berlin, DLH City Line, in 2016) Stakeholders: DFS ENAV (2016) DLH, CLH (2016) BER (2016) other AOs, NM, ANSPs within FABEC and others. 4
4 Project planning/ project structure: JAN2015: Kick-Off to plan CDR3 Routings, using existing SIDs and new DCTs to circumnavigate plannable ATC sectors with possible capacity short fall due to adverse weather. FEB2015: Brainstorming of possibilities how to approach the new alternate routings. (DFS/DLH).Identification of new routings after agreement about the additional flying time from DLH.(DFS)Validation from DLH if the new alternate routings will meet the agreed maximum of additional flying time. MAR2015: Validation of the operational instruction process and time frame(dfs/dlh)cdm between the participating ACCs/UAC and NM about the alternate routings and the process. Test day is fixed and agreed APR/MAY2015 Briefing for all participants (DFS/DLH/NMOC) Implementation of all CDR3 routings within NMOC (DFS/NM) delayed to Validation of all CDR3 routings with NM (DFS/NMOC) delayed to 2016 JUL2015 Trial start and test day on End of trial will be Two city-pair: EDDM- EDDF and EDDM-EDDK are chosen for the trial. Five more test days are agreed on the citypair: EDDM-EDDK OCT2015 Introduction of the new Alternate WX SID and routes as part of the NM Weather Resilience Forum to all participants. 5
5 NOV 2015 Validation with NM, Feasibility within NM systems, Network Impact, Operational Procedures NOV2015-JAN2016 Review with DLH project team, CDM with Karlsruhe, Padua and Langen for all new alternate city-pair WX SID and routes. Introduction of the procedure to CLH and BER. FEB/MAR2016 Validation of all alternate WX SID and routes with NM (DFS/NMOC), Implementation in NM tools (I.e. RAD), Test day is fixed and agreed APR/MAY Trial Start until OCT2016 6
6 Action status and results: Procedures and CDM between AO and DFS worked well. Great acceptance from all partners. Process updated twice during the trial. Until end of September, several re-routes took place, planned re-route for testing purpose and actual re-route due to WX. Two new routes are available during TRA207 activation. Less weather phenomena in 2015 compared to the years before to apply the procedure for the particular airspace EDMMALB. In 2016 more flexibility is expected with additional routes in order to relax the SW part of EDMMACC in EDMMFUE sector. Final decision about the way of implementation into NM systems is expected end of 2015/early
7 EDDM-EDDK 8
8 EDDM-EDDF 9
9 Roadmap (update) First step: Trial ongoing until end of October Final analysis expected in DEC2015. Second step: Further developments are planned with other AOs (DLH City-Line, AirBerlin) including new City-Pair to the SW(e.g. LEMD, LEBL, LEBB), neccessarry full integration into NM systems (IFPS, ETFMS, CHMI), second trail in summer season Additional alternate routes to the north (2017). Third step: Development of alternate WX routings for ARR EDDM Fourth Step: Integration of Alternate WX Route Part in en-route part of FPL, geographical alternate routes - not city-pair related. 10
10 (Draft) LEBB,LEMD,LEBL LIMC 11
11 - Routes
Free Route Airspace Maastricht (FRAM)
Free Route Airspace Maastricht (FRAM) Maastricht Upper Area Control Centre Dirk De Herdt Airspace and Network Planning 24 th 25 th May 2018 MUAC implements FRA on behalf of four countries MUAC FRA is laterally
More informationHosted by General Civil Aviation Authority (GCAA)
ICAO ATFM Seminar Hosted by General Civil Aviation Authority (GCAA) DFS experience related to ATFM from an individual state point of view Integration with the Network Manager Operation Center (NMOC, former
More informationInterFAB Cooperation: XMAN Implementing Extended Cross-Border Arrival Management. World ATM Congress Madrid, 8 March 2016
InterFAB Cooperation: XMAN Implementing Extended Cross-Border Arrival Management World ATM Congress Madrid, 8 March 2016 FABEC XMAN Project Dr Frank Zetsche, DFS Agenda Overview Traffic Flows XMAN Roadmap
More informationFABEC Operations. From a project-driven approach to continuous operational improvements
FABEC Operations From a project-driven approach to continuous operational improvements Andreas Pötzsch Chairman FABEC Operations and DFS Director En-route and Approach. Madrid, 07 March 2017 0 FABEC at
More informationNetwork Operations Performance
User Forum 2013 Network Operations Performance Operations performance in 2012 Ged Boydell Head Operational Analysis & Reporting 23 January 2013 Traffic and Capacity/Delay headlines 32000 30000 28000 26000
More informationNetwork Manager Adding value to the Network 29 September 2011
Network Manager Adding value to the Network 29 September 2011 Alain FOURNIE Head of Operational Monitoring & Reporting Directorate Network Management EUROCONTROL The European Organisation for the Safety
More informationDynamic Airspace Overview concepts, complexities, benefits and outlook
KUNDENNAME NM User Forum 2018 Dynamic Airspace Overview concepts, complexities, benefits and outlook CFSP view Agenda 01 Concepts 03 Benefits 02 Complexities & Issues 04 Outlook & Recommendations 2 Concepts
More informationSeychelles Civil Aviation Authority. Telecomm & Information Services Unit
Seychelles Civil Aviation Authority Telecomm & Information Services Unit 12/15/2010 SCAA 1 WORKSHOP EXERCISE Workshop on the development of National Performance Framework 6 10 Dec 2010 10/12/2010 SCAA
More informationPERFORMANCE REPORT CAPACITY
PERFORMANCE REPORT 2015-2019 CAPACITY December 2018 Contents Description & Analysis 3 FABEC TRAFFIC DEVELOPMENT (en-route) 4 FABEC TRAFFIC DEVELOPMENT (arrival) 5 KPI #1: En-route ATFM delay per controlled
More informationATFM delay report February Air Traffic Flow Management (ATFM) delay ATFM measures in Europe (Data source: NM statistics)
LIZ Situation and Information Centre ATFM delay report February 2018 Air Traffic Flow Management (ATFM) delay ATFM measures in Europe February 2018 February 2017 Trend 18/17 Total flights 718.307 693.565
More informationATFM delay report January Air Traffic Flow Management (ATFM) delay ATFM measures in Europe (Data source: NM statistics)
LIZ Situation and Information Centre ATFM delay report January 2018 Air Traffic Flow Management (ATFM) delay ATFM measures in Europe January 2018 January 2017 Trend 18/17 Total flights 766.330 731.128
More informationATFM delay report July Air Traffic Flow Management (ATFM) delay ATFM measures in Europe (Data source: NM statistics)
LIZ Situation and Information Centre ATFM delay report July 2018 Air Traffic Flow Management (ATFM) delay ATFM measures in Europe July 2018 July 2017 Trend 18/17 Total flights 1.083.678 1.045.361 3,7%
More informationATFM delay report November Air Traffic Flow Management (ATFM) delay ATFM measures in Europe (Data source: NM statistics)
LIZ Situation and Information Centre ATFM delay report November 2017 Air Traffic Flow Management (ATFM) delay ATFM measures in Europe November 2017 November 2016 Trend 17/16 Total flights 786.090 754.311
More informationATFM delay report February Air Traffic Flow Management (ATFM) delay ATFM measures in Europe (Data source: NM statistics)
LIZ Situation and Information Centre ATFM delay report February 2019 Air Traffic Flow Management (ATFM) delay ATFM measures in Europe February 2019 February 2018 Trend 19/18 Total flights 739.524 718.307
More informationATFM delay report April 2018
LIZ Situation and Information Centre ATFM delay report April 2018 Due to technical issues on April 3, the flight data of this day are not available. Eurocontrol is investigating the situation. A new report
More informationATFM delay report August Air Traffic Flow Management (ATFM) delay ATFM measures in Europe (Data source: NM statistics)
LIZ Situation and Information Centre ATFM delay report August 2018 Air Traffic Flow Management (ATFM) delay ATFM measures in Europe August 2018 August 2017 Trend 18/17 Total flights 1.076.340 1.039.773
More informationTowards a Global ATFM Manual. Brian Flynn Head Network Operations
Towards a Global ATFM Manual Brian Flynn Head Network Operations ATM Structure in Europe 41 States One single ATFCM System over Europe >60 En-route centres = 1750 Sectors 1348 Aircraft Operators 450 Airports
More informationATFM delay report December Air Traffic Flow Management (ATFM) delay ATFM measures in Europe (Data source: NM statistics)
LIZ Situation and Information Centre ATFM delay report December 2018 Air Traffic Flow Management (ATFM) delay ATFM measures in Europe December 2018 December 2017 Trend 18/17 Total flights 799.102 759.600
More informationATFM delay report October Air Traffic Flow Management (ATFM) delay ATFM measures in Europe (Data source: NM statistics)
LIZ Situation and Information Centre ATFM delay report October 2018 Air Traffic Flow Management (ATFM) delay ATFM measures in Europe October 2018 October 2017 Trend 18/17 Total flights 985.198 946.694
More informationJanuary 2018 Air Traffic Activity Summary
January 2018 Air Traffic Activity Summary Jan-2018 Jan-2017 CY-2018 CY-2017 Passengers 528,947 505,421 4.7% 528,947 505,421 4.7% Passengers 537,332 515,787 4.2% 537,332 515,787 4.2% Passengers 1,066,279
More informationATFM delay report November Air Traffic Flow Management (ATFM) delay ATFM measures in Europe (Data source: NM statistics)
LIZ Situation and Information Centre ATFM delay report November 2018 Air Traffic Flow Management (ATFM) delay ATFM measures in Europe November 2018 November 2017 Trend 18/17 Total flights 819.421 786.090
More informationPOLFRA IMPLEMENTATION Progress Report FREE ROUTE AIRSPACE WORKSHOP
POLFRA IMPLEMENTATION Progress Report FREE ROUTE AIRSPACE WORKSHOP Łukasz Godlewski Polish Air Navigation Services Agency Brussels, 25.05.2018 Agenda Project ImplementationPhases Recent, Current& FutureActivities
More informationUser Forum ASM Recent Improvements. Anders HALLGREN Manager, ASM/ATFCM Procedures EUROCONTROL Network Management
User Forum 011 ASM Recent Improvements Anders HALLGREN Manager, ASM/ATFCM Procedures EUROCONTROL Network Management The European Organisa for the Safety of Air Naviga ASM Improvement Initiative ADR Improved
More informationAdvanced Flexible Use of Airspace (AFUA) Kris DELCOURTE, EUROCONTROL Davide BARDELLI, LUFTHANSA SYSTEMS
Advanced Flexible Use of Airspace (AFUA) Kris DELCOURTE, EUROCONTROL Davide BARDELLI, LUFTHANSA SYSTEMS AFUA - the partners Initial situation Airspace reservations: TSAs/TRAs Non-optimal use of large volumes
More informationDistributed Multi-Nodal ATFM Project Overview & Progress. ICAO MID ATFM/TF/1 & ICAO World Cup 2022 TF/ Sep 2018
Distributed Multi-Nodal ATFM Project Overview & Progress ICAO MID ATFM/TF/1 & ICAO World Cup 2022 TF/1 23 27 Sep 2018 Introduction DISTRIBUTED MULTI-NODAL AIR TRAFFIC FLOW MANAGEMENT What We Are Trying
More informationPERFORMANCE REPORT CAPACITY
PERFORMANCE REPORT 2015-2019 CAPACITY June 2018 Contents Description & Analysis 3 FABEC TRAFFIC DEVELOPMENT (en-route) 4 FABEC TRAFFIC DEVELOPMENT (arrival) 5 KPI #1: En-route ATFM delay per controlled
More informationFUA TEMPORARY INSTRUCTION Doc. ID : FTI/17-013
1. Introduction 1.1 The final procedures for P3 with Rolling UUP have been approved by NMB in November and inserted in the ERNIP Part 3 ASM Handbook V. 5.4 1.2 Detailed operational procedures are expected
More informationCross-border Free Route Airspace Implementation Workshop Conclusions and Recommendations
Cross-border Free Route Airspace Implementation Workshop Conclusions and Recommendations 29 30 JUN 2015 Item 1: Cross-border expansion of FRA (1) Harmonised CONOPS PMP and management structure Important
More informationUser Forum Capacity Planning with DDR2 & NEST. Thierry Champougny / Laszlo Elbert / Stephanie Vincent
User Forum 2013 Capacity Planning with DDR2 & NEST Thierry Champougny / Laszlo Elbert / Stephanie Vincent Expert Operation Planning 24/01/2013 General view Capacity Planning functions, provided by NEST
More informationFollow up to the implementation of safety and air navigation regional priorities XMAN: A CONCEPT TAKING ADVANTAGE OF ATFCM CROSS-BORDER EXCHANGES
RAAC/15-WP/28 International Civil Aviation Organization 04/12/17 ICAO South American Regional Office Fifteenth Meeting of the Civil Aviation Authorities of the SAM Region (RAAC/15) (Asuncion, Paraguay,
More informationATFM Procedure using the Bay of Bengal Cooperative ATFM System
Advanced ATM Techniques Symposium and Workshops Today s Opportunities for Saving Fuel and Reducing Emissions 4 6 November 2013, ICAO Headquarters, Montréal ATFM Procedure using the Bay of Bengal Cooperative
More informationNATS. SAIP AD3 Jersey Interface Change Stage 1 Assessment Meeting. Friday 2 nd February x NATS presenters.
NATS SAIP AD3 Jersey Interface Change Stage 1 Assessment Meeting Friday 2 nd February 2018 3x NATS presenters Agenda Revised Statement of need Background Issues and benefits arising from proposed change
More informationAIP ITALIA Servizio Informazioni Aeronautiche
PHONE: 06 81661 FAX: 06 8166 2016 E-mail: aip@enav.it Web: www.enav.it AIP ITALIA Servizio Informazioni Aeronautiche ENAV S.p.A. Via Salaria, 716 00138 Roma AIC A 14/17 21 DEC 17 AIP Italia (Servizio Informazioni
More informationAirspace User Forum 2012
Airspace User Forum 2012 Part 2: Express your needs for the B2B Web Services Bertrand BOUSQUET-HOURAT Service Deployment Coordinator Operational Specifications & Requirements Section Overall Agenda Introduction
More informationA-CDM Implementation: Burden or Blessing for ANSPs?
A-CDM Implementation: Burden or Blessing for ANSPs? CANSO report on A-CDM Download it for free at: www.canso.org/publications Basic A-CDM processes, principles and benefits for managers and operational
More informationConcept of Operations Workshop
Concept of Operations Workshop CS#2 4DPP 4D Trajectory Calculation for Purposes Bernard Rausch CS2 Project Manager 03 September 2013 On the menu today. 1. Drivers for change 2. Objectives 3. Concept 4.
More informationEuropean Network Operations Plan
Network Manager nominated by the European Commission EUROCONTROL European Network Operations Plan 2013-2015 Transition Plan for Major Projects in Europe Winter 2013/2014 Edition November 2013 DOCUMENT
More informationF r o m B O B C AT t o C r o s s - B o r d e r AT F M
F r o m B O B C AT t o C r o s s - B o r d e r AT F M IATA-ICAO Cross-Border ATFM Workshop 3 4 September 2015 Delhi, India Piyawut Tantimekabut (Toon) Air Traffic Management Network Manager Network Operations
More informationAMAN RESEARCH IN SESAR
AMAN RESEARCH IN SESAR CCA939 TAP842 AZA1480 BPA1713 Arrival MANager (AMAN) Advisories to ground in complex cross border AMAN: Time To Lose/Time To Gain (TTL/TTG) Speed Use of new avionics capabilities:
More informationICAO ATFM SEMINAR. Dubai, UAE, 14 December 2016
ICAO ATFM SEMINAR Dubai, UAE, 14 December 2016 ICAO ATFM Seminar Session 2.2: ATFM Sub-regional and Regional Solutions Brian Flynn EUROCONTROL Network Manager Directorate 12 th December 2016 Central Flow
More information2017 Overview and 2018 Outlook
2017 Overview and 2018 Outlook, Giovanni Lenti Head of Network Operation Services 24 Jan 2018 Traffic and ATFM delay 2017 vs 2016 YEAR TOTAL TRAFFIC TOTAL ATFM DELAY AVG DAILY DELAY 2017 10,605,942 flights
More informationFree Route Airspace Workshop Conclusions and Future Projects Outlook
Free Route Airspace Workshop Conclusions and Future Projects Outlook FRA Workshop EUROCONTROL HQ, Brussels 24-25 May 2018 Razvan Bucuroiu Head of Network Strategy and Development & Operations Planning
More informationIn cover a detail of new night/ week end shortest routes for overflying Sardinia Area
FLIGHT EFFICIENCY PLAN 2014 In cover a detail of new night/ week end shortest routes for overflying Sardinia Area Flight Efficiency Plan 2014 CANSO, IATA and EUROCONTROL have identified the action points
More informationPROJECT LSD IAA REMOTE TOWER. 28 th /29 th November 2018 Cranfield
PROJECT LSD 02.04 IAA REMOTE TOWER 28 th /29 th November 2018 Cranfield 2 Project Overview and Scope Trial the provision of Air Movements Control (AMC) and Surface Movement Control (SMC) for Cork and Shannon
More informationPERFORMANCE REPORT CAPACITY
PERFORMANCE REPORT 2015-2019 CAPACITY January 2019 Contents Description & Analysis 3 FABEC TRAFFIC DEVELOPMENT (en-route) 4 FABEC TRAFFIC DEVELOPMENT (arrival) 5 KPI #1: En-route ATFM delay per controlled
More informationATM Collaboration & Data Sharing
ATM Collaboration & Data Sharing ATFM Steering Group 1 Tokyo, Japan 8-10 December 2010 Piyawut Tantimekabut (Toon) Executive Officer, Systems Engineering Airspace Management Centre AEROTHAI 1 Pre-2005
More informationThailand ATFM Operations at Sub- Regional Level
Thailand ATFM Operations at Sub- Regional Level From BOBCAT to Cross-Border ATFM ICAO Middle East ATFM Seminar 13 15 December 2016 Dubai, United Arab Emirates Piyawut Tantimekabut Air Traffic Management
More informationOperational Instruction
1. Introduction NM release 17 provides enhancements to the NM tools supporting NMOC for D-1 network impact assessment of airspace allocation. These include: - Improved data handling of operational AUP
More informationFlight Efficiency Initiative
Network Manager nominated by the European Commission EUROCONTROL Flight Efficiency Initiative Making savings through improved flight planning Flight efficiency The Network Manager is playing a pivotal
More informationPacific Project. CPWG/8 - WP/6 Appendix A
Pacific Project CPWG/8 - WP/6 Pacific Project Objective This project aims to substantially improve operational efficiency and environmental outcomes on the major air traffic flow between North America
More informationDEMORPAS Project. Final Dissemination Forum. 10th March 2016, World ATM Congress, Madrid
DEMORPAS Project Final Dissemination Forum 10th March 2016, World ATM Congress, Madrid Workshop Contents 1. Introduction to DEMORPAS Project 2. Operational environment 3. Exercises performed 4. Analysis
More informationDemand capacity balancing in a dynamic fashion. Sonke Mahlich, EUROCONTROL Experimental Centre
Demand capacity balancing in a dynamic fashion Sonke Mahlich, EUROCONTROL Experimental Centre SESAR Industrial Research to overcome the shortcomings Dynamic Demand Capacity Balancing (DCB) - Short Term
More informationATFM IMPLEMENATION IN INDIA PROGRESS THROUGH COLLABORATION PRESENTED BY- AIRPORTS AUTHORITY OF INDIA
ATFM IMPLEMENATION IN INDIA PROGRESS THROUGH COLLABORATION PRESENTED BY- AIRPORTS AUTHORITY OF INDIA CONTENTS 1 India Civil Aviation Scenario 2 C-ATFM Concepts 3 C-ATFM Implementation 4 4 Road Value Ahead
More informationWeather Management in Aviation
Weather Management in Aviation Klaus Sturm Director of Aeronautical Meteorology Deutscher Wetterdienst German National Meteorological Service MOVE-IT Management of Weather Events in the Transport Systems
More informationFlight Efficiency now: Addressing current Limitations.and taking more ownership? AO perspective
Flight Efficiency now: Addressing current Limitations.and taking more AO perspective Rory SERGISON Aer Lingus Air Traffic Services Manager 28/012015 Setting the Scene: Aer Lingus Perspective Coming off
More informationEUROCONTROL. An introduction to the EUROCONTROL Network Manager Operations Centre
EUROCONTROL An introduction to the EUROCONTROL Network Manager Operations Centre Since it started tactical operations in 1995*, the EUROCONTROL Network Manager is a key player in improving the overall
More informationThe Network Manager User Forum 2017
The Network Manager User Forum 2017 Advanced ATFM Techniques istream Neptune & Sirius 26 January, 0900-1100 Pascal Hop NMD - Network Strategy Division Cooperative Traffic Management Target times Initial
More informationPerformance Metrics for Oceanic Air Traffic Management. Moving Metrics Conference Pacific Grove, California January 29, 2004 Oceanic Metrics Team
Performance Metrics for Oceanic Air Traffic Management Moving Metrics Conference Pacific Grove, California January 29, 2004 Oceanic Metrics Team Agenda Metrics Team Michele Merkle, FAA AUA-600 Lynne Hamrick,
More informationFlight Efficiency: Addressing current Limitations.and taking more ownership? AO perspective. Rory Sergison, Aer Lingus Air Traffic Services Manager
Flight Efficiency: Addressing current Limitations.and taking more ownership? AO perspective Rory Sergison, Aer Lingus Air Traffic Services Manager 1 Setting the Scene: Aer Lingus Perspective Coming off
More informationAPPENDIX E ACTION PLAN FOR THE IMPLEMENTATION OF ATFM AT SAM AIRPORTS A: AIRPORT. Task description Start End
SAM/IG/4 Appendix E to the Report on Agenda Item 5 5-E1 APPENDIX E 1. Airport demand/capacity analysis Sep 2008 Apr 2010 1.1 Prepare ATFM survey N/A Aug 2008 Project RLA/06/901 RO Finalised 1.2 Send survey
More informationPBN Implementation inside Italian Airspace
PBN Implementation inside Italian Airspace Leonardo NICOLO Airspace and Procedures Design Department TMA, CTR & Airports Unit Responsible Brussels, March, 12-14 2014 0 CONTENTS PBN Implementation Path
More informationA FOCUS ON TACTICAL ATFM. ICAO ATFM Workshop Beijing, 29 th -30 th October 2014
A FOCUS ON TACTICAL ATFM ICAO ATFM Workshop Beijing, 29 th -30 th October 2014 2 / 22 Contents Thales has been involved in ATFM for over a decade Closely linked to ATM/ANSP; CAMU Milestone South Africa
More informationDynamic Management. of the. European Airspace Network. ADR Data Catalogue. Annex A: Supported Services
EUROCONTROL Dynamic Management of the European Airspace Network ADR Data Catalogue Annex A: Supported Services Prepared by Guido Van Laethem and Maria Scott CFMU Date 10 th June 2011 Version 0.4 EUROCONTROL
More informationHow CFSPs work. processes, requirements, difficulties. Tuesday, June 19th, 2018 CFPSG PRESENTATION FABEC SC OPS/AOG RADISSON ZURICH AIRPORT 1
How CFSPs work processes, requirements, difficulties FABEC MEETING JUNE, 19TH 2018, ZÜRICH Tuesday, June 19th, 2018 CFPSG PRESENTATION FABEC SC OPS/AOG RADISSON ZURICH AIRPORT 1 AGENDA 01 - Introduction
More informationAirspace User Forum 2012
Airspace User Forum 2012 AIS Services: EAD evolutions Guido HAESEVOETS EAD Client & Migration Manager Airspace/AIS Management European AIS base (EAD) EAD is a service provided and owned by EUROCONTROL
More informationA-CDM FOR REGIONAL AIRPORTS CONCEPT VALIDATION DOCUMENTO PÚBLICO
A-CDM FOR REGIONAL AIRPORTS CONCEPT VALIDATION 1 DOCUMENTO PÚBLICO GAMING A-CDM ALICANTE Agenda 1.INTRODUCTION TO ALICANTE AIRPORT 2.OBJECTIVES 3.CONCEPT DEFINITION (DIFFERENCES WITH CURRENT A-CDM) 4.VALIDATION
More informationCivil-Military Cooperation. Advanced Flexible Use of Airspace
Civil-Military Cooperation Advanced Flexible Use of Airspace Need for Airspace data sharing and collaboration Network Manager Military Civil Airlines Military Operational Requirements for the Use of Airspace
More informationEUROPEAN ORGANISATION FOR THE SAFETY OF AIR NAVIGATION
EUROPEAN ORGANISATION FOR THE SAFETY OF AIR NAVIGATION EUROCONTROL Edition Number : 1.0 Edition Date : 01.06.2016 Status : Released Issue Intended for : Restricted Audience DOCUMENT CHARACTERISTICS TITLE
More informationRecurrent capacity flaws: a matter of fate? Giovanni Lenti Head of Network Operations 28/01/2015
Recurrent capacity flaws: a matter of fate? Giovanni Lenti Head of Network Operations 28/01/2015 Analysing the causes En-route and airport arrival delays are recurrent in certain airspaces and airports.
More informationStrategic airspace capacity planning in a network under demand uncertainty (COCTA project results)
Strategic airspace capacity planning in a network under demand uncertainty (COCTA project results) Prof. Dr. Frank Fichert Worms University of Applied Sciences Joint work with: University of Belgrade (Dr
More informationCooperative traffic management
3/17/2017 Cooperative traffic management Moderated by Peter Alty, SESAR JU #SESAR 2 Cooperative Traffic Management The Airport view 8 th March 2017 Alison Bates Head of Service Transformation and Ops Efficiency
More informationAirspace Organization and Management
Airspace Organization and Management Asia and Pacific Regional Sub Office 2014 17 November 2014 Page 1 CONTENTS Concept of Flexible Use of Airspace (FUA) Flexible and adaptable airspace structure Conditional
More informationLIZ Air traffic statistics
LIZ Air traffic statistics NOV 2018 DFS Situation and Information Centre Version 05.12.2018 IFR flights in the Federal Republic of Germany IFR movements (entries, exits, overflights and domestics) in all
More informationLIZ Air traffic statistics
LIZ Air traffic statistics MAR DFS Situation and Information Centre Version 12.04. IFR flights in the Federal Republic of Germany IFR movements (entries, exits, overflights and domestics) in all control
More informationFLIGHT EFFICIENCY PLAN
FLIGHT EFFICIENCY PLAN 2016 BLUE MED FLIGHT EFFICIENCY PLAN 2016 The Flight Efficiency Plan builds on the solid foundations of the ongoing work among European Air Navigation Service Providers (ANSP) and
More informationLIZ Air traffic statistics
LIZ Air traffic statistics NOV 2017 DFS Situation and Information Centre Version 14.12.2017 IFR flights in the Federal Republic of Germany IFR movements (entries, exits, overflights and domestics) in all
More informationLIZ Air traffic statistics
LIZ Air traffic statistics OCT 2018 DFS Situation and Information Centre Version 06.11.2018 IFR flights in the Federal Republic of Germany IFR movements (entries, exits, overflights and domestics) in all
More informationPerformance Planning Operations: Environment. Bernhard Mayr, CM TF Performance, MoT Germany 20 May 2011
Performance Planning Operations: Environment Bernhard Mayr, CM TF Performance, MoT Germany 20 May 2011 1 Environment: Overview EU-wide KPI FABEC KPI/PI To Be Developed Average horizontal en-route flight
More informationLIZ Air traffic statistics
LIZ Air traffic statistics DFS Situation and Information Centre Version 06.02.2019 IFR flights in the Federal Republic of Germany IFR movements (entries, exits, overflights and domestics) in all control
More informationInformation Paper 2 SUMMARY
COSCAP North Asia Cooperative Development of Operational Safety & Continuing Airworthiness Programme 14th STEERING COMMITTEE MEETING Performance Based Navigation (PBN) Update on ICAO Asia and Pacific Regional
More informationLIZ Air traffic statistics
LIZ Air traffic statistics AUG 2018 DFS Situation and Information Centre Version 04.09.2018 IFR flights in the Federal Republic of Germany IFR movements (entries, exits, overflights and domestics) in all
More informationAIR TRAFFIC FLOW MANAGEMENT INDIA S PERSPECTIVE. Vineet Gulati GM(ATM-IPG), AAI
AIR TRAFFIC FLOW MANAGEMENT INDIA S PERSPECTIVE Vineet Gulati GM(ATM-IPG), AAI AIR TRAFFIC FLOW MANAGEMENT ATFM is a service provided with the objective to enhance the efficiency of the ATM system by,
More informationFINAL REPORT. Ref. No 547/05/ZZ. Investigation separation minima infringement CSA 689 and DLH 2JC on 1 st of November Prague December 2005
Ref. No 547/05/ZZ Copy No: 7 FINAL REPORT Investigation separation minima infringement CSA 689 and DLH 2JC on 1 st of November 2005 Prague December 2005 A) Introduction Operator: Aircraft type: Operator:
More informationEuropean Network Operations Plan
Network Manager nominated by the European Commission EUROCONTROL European Network Operations Plan 2012-2014 Transition Plan for Major Projects in Europe Winter 2012/2013 Edition October 2012 TABLE OF
More informationSTRATEGY/ACTION PLAN FOR IMPLEMENTATION OF REDUCED VERTICAL SEPARATION MINIMA IN THE AFRICA-INDIAN OCEAN REGION 22 NOVEMBER 2003
STRATEGY/ACTION PLAN FOR IMPLEMENTATION OF REDUCED VERTICAL SEPARATION MINIMA IN THE AFRICA-INDIAN OCEAN REGION 22 NOVEMBER 2003 Prepared by the APIRG RVSM Implementation Task Force AFI STRATEGY/ACTION
More informationFeasibility Study into increasing the altitude of the Noise Preferential Routes (NPRs) from 3000 to 4000 feet
Feasibility Study into increasing the altitude of the Noise Preferential Routes (NPRs) from 3000 to 4000 feet Presented by: Tom Redfern Environmental Specialist 20 th January 2016 Agenda What is a Noise
More informationLIZ Air traffic statistics
LIZ Air traffic statistics JUN 2018 DFS Situation and Information Centre Version 04.07.2018 Please note: With AIRAC AIP Amendment 21JUN18 Frankfurt-Hahn (EDFH) belongs to Austrocontrol and therefore is
More informationATFM Update - EUROCONTROL Day 1-16h45
ATFM Update - EUROCONTROL Day 1-16h45 Brian Flynn Head Performance Forecasts Relations Network Manager Directorate EUROCONTROL A Historical perspective From CFMU to Network Manager Initial database of
More informationAirport Collaborative Decision Making Michael Hoehenberger, (Munich Airport) on behalf of ACI World
A-CDM Seminar Bahrain, 11-13 October 2015 The ACI View Airport Collaborative Decision Making Michael Hoehenberger, (Munich Airport) on behalf of ACI World SCOPE OF PRESENTATION Need for A-CDM What it is
More informationATFCM OPERATING PROCEDURES FOR FLOW MANAGEMENT POSITION
ATFCM OPERATING PROCEDURES FOR FLOW MANAGEMENT POSITION Edition N : 18.1 Edition validity date : 23 Sep 2014 http://www.eurocontrol.int 2014 The European Organisation for the Safety of Air Navigation (EUROCONTROL).
More information2.6% /14 Forward Plan. 4.1 Traffic Outlook. Eurocontrol STATFOR s 2013 Medium-Term Forecast for 2015
4 2013/14 Forward Plan 2.6% Eurocontrol STATFOR s 2013 Medium-Term Forecast for 2015 4.1 Traffic Outlook Traffic levels continue to be affected by a combination of the fragile economic situation in the
More informationThe Network Manager tasks and the ASM improvement initiative
The Network Manager tasks and the ASM improvement initiative AFUAS Workshop - 24 th June 2015 Olivier MROWICKI Programme Manager ASM/ATS/ATFCM NMD/NOM/OPL/PRO Network Vision by 2020 Free Route airspace
More informationSafety / Performance Criteria Agreeing Assumptions Module 10 - Activities 5 & 6
Safety / Performance Criteria Agreeing Assumptions Module 10 - Activities 5 & 6 European Airspace Concept Workshops for PBN Implementation Why have safety and performance criteria? Measure performance
More informationReport. Introduction. Plenary Session
Report The 18 th edition of the Network Manager User Forum was held on the 28 th & 29 th January 2015 in EUROCONTROL Headquarters, Brussels. It was attended by 230+ external visitors, from all over Europe
More informationFree Route Airspace (FRA) Application in NMOC - Guidelines
EUROCONTROL Free Route Airspace (FRA) Application in NMOC - Guidelines Version 1.0 (FRA) APPLICATION IN NMOC - GUIDELINES Edition Number : 1.0 Edition Date : 29.07.2016 Status : Released Issue Intended
More informationFlight Efficiency Plan 2012
Flight Efficiency Plan 2012 Foreword... 2 Targets and Outcomes... 3 En-route Airspace Design and Network Availability... 5 Design and Use of Terminal Areas... 8 Airport Operations... 11 Operational staff
More informationEnter here your Presentation Title 1
EXERCISE 4/ Simulation Potential Improvement Measures The European Organisation for the Safety of Air Navigation Objective Present a selection of additional improvement measures for enhanced civil-military
More informationSJC North and South Flow
SJC North and South Flow Pre and Post OAPM Date: January 2018 Phases of Flight ATCC ARTCC ATCC 2 AviationTerms VFR- Visual Flight Rules. Pilots must maneuver to avoid clouds and are responsible for their
More informationFlexible Use of Airspace. in ITALY. EUROCONTROL, 11 December 2018
Flexible Use of Airspace in ITALY EUROCONTROL, 11 December 2018 TABLE OF CONTENTS Objectives & Benefits Italian airspace layout ASM process Negotiation process (ASM level 2) Airspace management application
More informationFree Route Airspace (FRA) Application in NMOC - Guidelines
EUROCONTROL Free Route Airspace () Application in NMOC - Guidelines Version 1.1 () APPLICATION IN NMOC - GUIDELINES Edition Number : 1.1 Edition Date : 13.02.2017 Status : Released Issue Intended for :
More information