2
|
|
- Reynard Cross
- 5 years ago
- Views:
Transcription
1 1
2 2
3 3
4 4
5
6 Why are pilots so focussed on safety? because: The pilots are always the first at an accident scene! 6
7 COUNCIL REGULATION (EEC) No 3922/91 Annex III, Subpart B 7
8 In addition to being the final safety authority of a flight, in the context of operations in or near Volcanic Clouds, the pilots have also a function as information providers. A Special AIR REPORT is frequently the first and only information about volcanic activity; and the Volcanic Activity Report specifiec by ICAO is an important source of information for the organisations that generate volcanic cloud warnings. ICAO Doc4444: Air-reports are critically important in assessing the hazards which volcanic ash clouds present to aircraft operations. It is deplorable that the reporting of volcanic activity by pilots is not as complete as desired. The fact that EASA provides a volcanic ash report form that differns from the ICAO form does not help getting the information to the right recipients. Reporting must be made easier first of all by streamlined and clear provision on what has to be reported and when; and by the provision of electronic forms that can be filled in offline and have the addresses 8
9 of the recipients included De-identification of the reports by the system must be guaranteed to foster participation. 8
10 Themanagement of aviation service providers is faced with a dilemma. They need to provide enough resources both to the production as well as to the protection to achieve a balanced outcome bertween economically viable operations and the required level of safety. 9
11 This picture is taken from the ICAO Safety Management Manual (Doc 8959). It shows that people are at the center of safety efforts and one of the most efficient means. We knowthat humans commit errors and violations every now and then (these are the holes in the Swiss Cheese). So it is of paramount importance to have sufficient defences (regulations = SOPs, training, technology) in place to avoid accidents. Five of these six layers of safety can and must be influenced by regulation The human nature however unfortunately CANNOT be changed. The system must be designed to support the strongholds of the people in all areas of responsibility from management to frontline operators AND to provide resilience for the cases where the weaknesses of the humans could lead to a failure of the safety chain! 10
12 The economic pressure existing in a competitivemarket, such as aviation, forces managments to focus on the financial aspects of their operation. Therefore we need strong safety regulations and strict oversight to protect the public from failures of safety management 11
13 Volcanic clouds clearly create a hazard for flight operations. 12
14 ICAO has set up the International Airways Volcano Watch. This diagram describes the interaction of the various stakeholders involved. 13
15 If we consider the actions and interactions in a dynamic eruption, it will look much more like this. And this is still a simplified diagram. The following slides have been taken from a presentation that I have prepared for the International Volcanic Ash Task Force. They show in simplified form the cycle of a volcanic event and the involvement of different stakeholders. 14
16 While there is no threat from volcanic activity, it is essential that everybody is prepared to deal with a sudden change in conditions. Contingency Plans must be in place and be tested regularily to ensure that they work in times where they are needed. The Standard Operating Procedures of the relevant stakeholders need to be in place, manuals and checklists available and personnel trained. 15
17 Pre-eruption IAVW, Volcano Observatories(using ground and space based detection equipment) and aircraft are monitoring and may be observing some activity. Pre-eruption activity is undetectable fromaircraft! Therefore requirements for pilots to report pre-eruption activity should be eliminated from ICAO provisions.... but the Volcano Observatory might already start the alerting process and precautionary or preparatory processes would start! At this stage, ATC and Flight Ops would only react, if an eruption is forecasted to be imminent with signigicant emission of ash into the atmosphere likely (= when a Red Alert is warranted) 16
18 With an eruption started, but not yet affecting the airspace, the alertingprocesses are started. pilot > ACC > MWO > VAAC Volcano Observatory > ACC > MWO > VAAC 17
19 With an eruption,where lava flow or a pyroclastic flow affects an airport, the relevant airport Contingency Plan is activated. A NOTAM will inform the aviation community about the conditions to be expected at the airport. Volcanic Ash Contingency Plans need to consider the consequences of airports becoming unavailable (including the effects on passengers). 18
20 When ash is emitted into the atmosphere, thingsbecome serious for aircraft en-route. Pilots will try to keep clear and need assistance from ATC. ATC will alert succeeding aircraft and the MWO! Priority for ATC is on assisting aircraft to achieve a safe operation. As this all means an increased workload, there is a need for immediate countermeasures to ensure continued functioning of the Air Traffic Services. The VAAC will collect all available information and start to compute Volcanic Ash Advisories. Aircraft enroute to the affected airspace will apply SOPs to avoid hazards. Operators will exercise their operational control over flights that can still plan alternatives. Preparations for Flight Operations in and near volcanic ash will commence at all stakeholders: information collection information processing information distribution production and distribution of SIGMETs, NOTAMs (ASHTAMs), VAAs,... Safety Risk Assessment processess will have to be started (if not already in progress)... 19
21 The game changes, once reliable and verified information becomes available in form of VAAs and VA concentration charts or other detailed, preferably graphic information. Flight operations will be planned based on existing Contingency Procedures and Safety Risk Assessments for the actual/forecasted situation. ATC will adapt their operations according to the changed demand and ATCFM will support ACCs to maintain a safe and orderly traffic flow. Within this operational (contingency) phase there is a continuous loop of information collection > processing > distribution and adaption (if necessary) and application of the contingency procedures. 20
22 ... until it can finally be confirmed that the situation is back to normal again (GREEN alert). 21
23 As the provision of pertinent information to all players involved is key to success, a System Wide Information Management (SWIM) is to be the core of any Contingency Plan. To adress the needs of all stakeholders adequately, a well-defined CollaborativeDecision Making process must be in place. (Only a few selected stakeholders are shown on this slide as examples. In reality there are many more.) Smooth operations in difficult situations require a well prepared (contingency) plan. The information channels need to be available and open. The stakeholders will know the needs of each other and will have agreed on the processes and actions on a strategic level. This enables to focus all available resources on the current situation. ICAO s International Volcanic Ash Task Force is working to provideimproved guidance on such a strategic level. 22
24 23
25 24
26 25
27 The material that is potentiallly dangerous to aviation has a melting temperature of approximately 1250 C. 26
28 27
29 28
30 29
31 30
32 31
33 32
34 33
35 with respect to the operation of aircraft, this is what could happen Plots will have to recognise the early signs of a VA encounter SO2 smell St Elmo s fire glow at windshields or engine inlets etc and react quickly to avoid a more serious encounter with the cvolcanic cloud 34
36 When flight operation in or near volcanic clouds are contemplated, it isimportant to have the potential risk under control by a proper Safety Risk Assessment. But also the potential risk for the health of an aircraft s occupants needs to be considered! 35
37 If we compare the situation of volcanic ash with flight operation in icing condition, we find large differences. 36
38 According to ICAO Annex 6, all international commercial air transport operators should already have a Safety Management System in place. Output of SRA: mitigation measures SOPs Contingency Plans specific actions 37
39 38
40 VolcanicAsh guidanceforaircrewisclutteredthroughoutvariousdocumentsfrom1.) ICAO, 2.) the manufacturers and 3.) the operators. Moving all information available to onechapterofthemanual on Volcanicash wouldmakeitmoreaccessibletopilotsand would this way improve general knowledge about this subject among pilots. 39
41 VolcanicAsh guidanceforaircrewisclutteredthroughoutvariousdocumentsfrom1.) ICAO, 2.) the manufacturers and 3.) the operators. Moving all information available to onechapterofthemanual on Volcanicash wouldmakeitmoreaccessibletopilotsand would this way improve general knowledge about this subject among pilots. Recommendation: Centralizing currently cluttered information into one updated document would improve ready knowledge on VA operations among aircrew. 40
42 ICAO SARPs provide global harmonization butare not enforceable, although the ICAO Member States have agreed by signing the Chicago Convention to implement them. Guidance Material no matter on what level will never provide an Acceptable Level of Safety per se. It needs to be supported by mandatory regulations. 41
43 42
44 43
What are the safety regulations regarding volcanic ash and why?
International Civil Aviation Organization European and North Atlantic What are the safety regulations regarding volcanic ash and why? Atlantic Conference on Eyjafjallajökull and Aviation Keflavik, Iceland,
More informationWORKING PAPER IVATF/2-WP/21 10/6/11. International UPDATEDD ASH RELATED SUMMARY. At the 1.1. to 30. first meeting. Coordination Group to. (e.g. 1.
International Civil Aviation Organization IVATF/2-WP/21 10/6/11 WORKING PAPER INTERNATIONAL VOLCANIC ASH TASK FORCE (IVATF) SECOND MEETING Montréal, 11 to 15 July 2011 Agenda Item 5: Report of the International
More informationTerms of Reference for a rulemaking task. Requirements for Air Traffic Services (ATS)
Rulemaking Directorate Terms of Reference for a rulemaking task Requirements for Air Traffic Services (ATS) ISSUE 1 9.7.2014 Applicability Process map Affected regulations and decisions: Affected stakeholders:
More informationMEETING OF THE METEOROLOGY PANEL (METP) WORKING GROUP MOG
International Civil Aviation Organization METPWGMOG/8/SN/19 30/10/18 STUDY NOTE MEETING OF THE METEOROLOGY PANEL (METP) WORKING GROUP MOG EIGHTH MEETING Wellington, New Zealand, 12 to 14 ember 2018 Agenda
More informationAERONAUTICAL SERVICES ADVISORY MEMORANDUM (ASAM) Focal Point: ASD
Page 1 of 8 1. Introduction This advisory memorandum provides guidance to Air Traffic Service Providers in respect of flights operating in the vicinity of volcanic ash. 2. Purpose The purpose of this memorandum
More informationAnnex to Decision 2013/009/R
Annex to Decision 2013/009/R Annex to Decision 2012/017/R of the Executive Director of the Agency of 24 October 2012, on Acceptable means of compliance and guidance material to Commission Regulation (EU)
More informationEASA Safety Information Bulletin
EASA SIB No: 2010-17R4 EASA Safety Information Bulletin SIB No.: 2010-17R4 Issued: 24 May 2011 Subject: Flight in Airspace with contamination of Volcanic Ash Ref. Publications: - Manual on Volcanic Ash,
More informationCIVIL AVIATION AUTHORITY, PAKISTAN OPERATIONAL CONTROL SYSTEMS CONTENTS
CIVIL AVIATION AUTHORITY, PAKISTAN Air Navigation Order No. : 91-0004 Date : 7 th April, 2010 Issue : Two OPERATIONAL CONTROL SYSTEMS CONTENTS SECTIONS 1. Authority 2. Purpose 3. Scope 4. Operational Control
More informationFlight Operations Officer Recurrent Training Syllabus
Page 1 Course Duration: 3 days per module 24 classroom hours Proficiency Requirements - Flight Dispatch Personnel (ICAO) Proficiency requirements for flight dispatch personnel, as well as acceptable methods
More informationRequirements for acceptance of operations in Volcanic Ash Zone 2
FLUGMÁLASTJÓRN ÍSLANDS Skógarhlíð 12 105 Reykjavík Requirements for acceptance of operations in Volcanic Ash Zone 2 Applicability - All Icelandic operators with EU-OPS AOC with turbine powered aeroplanes
More informationAFI Plan Aerodromes Certification Project Workshop for ESAF Region (Nairobi, Kenya, August 2016)
AFI Plan Aerodromes Certification Project Workshop for ESAF Region (Nairobi, Kenya, 23-26 August 2016) Aerodromes Certification- ICAO Requirements Arthemon Ndikumana RO/AGA, Nairobi 08/09/2016 AFI Plan
More information(Presented SUMMARY 1.1. The fourth meeting 1.2. by the Secretary) /7 meeting. the group on 1.3 IVATF/4 2. DISCUSSION. The appendix paper 2.
15/ 2/13 INTERNATIONAL AIRWAYS VOLCANO WATCH OPERATIONS GROUP (IAVWOPSG)) SEVENTH MEETING Bangkok, Thailand, 18 to 22 March 2013 Agenda Item 3: Follow-up of IAVWOPSG/6 conclusions STATUS OF FOLLOW-UP OF
More informationSafety Information Bulletin. SIB No.: R7. Issued: 24 June Flight in Airspace with Contamination of Volcanic Ash
Safety Information Bulletin SIB No.: 2010-17R7 Issued: 24 June 2015 Subject: Flight in Airspace with Contamination of Volcanic Ash Ref. Publications: - Manual on Volcanic Ash, Radioactive Material and
More informationINTERNATIONAL CIVIL AVIATION ORGANIZATION SOUTH AMERICAN REGIONAL OFFICE ICAO SOUTH AMERICAN REGION VOLCANIC ASH CONTINGENCY PLAN (VACP/SAM)
INTERNATIONAL CIVIL AVIATION ORGANIZATION SOUTH AMERICAN REGIONAL OFFICE ICAO SOUTH AMERICAN REGION VOLCANIC ASH CONTINGENCY PLAN (VACP/SAM) Version 1.1 (First Edition) August 2015 PAGE LEFT BLANK INTENTIONALLY
More informationCivil Approach Procedural Controller Military Terminal Radar Controller
AIR TRAFFIC CONTROLLER APPRENTICESHIP STANDARD Air Traffic Controller Civil Area/ Terminal Controller Civil Approach Controller Military Weapons Controller Military Area Radar Controller Civil Approach
More informationAndres Lainoja Eesti Lennuakadeemia
Andres Lainoja Eesti Lennuakadeemia In the beginning was the Word... Convention on International Civil Aviation (Doc 7300) was signed on 7 December 1944 International Civil Aviation Organization began
More informationVolcanic Ash Exercise
Volcanic Ash Exercise MET/ATM Seminar May 2017 Kazuki Ito Tokyo Volcanic Ash Advisory Center Japan Meteorological Agency Outline Volcanic Ash Exercise (VOLCEX) Background Objectives and Scope Tokyo VAAC
More informationAssessment of Flight and Duty Time Schemes Procedure
Assessment of Flight and Duty Time Schemes Procedure Purpose Fatigue is a major human factors hazard because it affects a crew member s ability to perform their tasks safely. Operator fatigue management
More informationQuality Assurance. Introduction Need for quality assurance Answer to the need of quality assurance Details on quality assurance Conclusion A B C D E
Quality Assurance 1 A B C D E Introduction Need for quality assurance Answer to the need of quality assurance Details on quality assurance Conclusion 2 1 Introduction 3 Introduction The implementation
More informationCooperative Development of Operational Safety Continuing Airworthiness Programme. COSCAP-Gulf States. Training of Airworthiness Inspectors
COSCAP- Training of Airworthiness Inspectors Part V _ STATE SAFETY OVERSIGHT SYSTEM (ICAO Doc 9734, Part I) By Nadia Konzali COSCAP-GS Project Coordinator FLIGHT PLAN 1. Civil aviation regulations; 2.
More informationTerms of Reference for a rulemaking task. Implementation of Evidence-Based Training within the European regulatory framework RMT.0696 ISSUE
Terms of Reference for a rulemaking task Implementation of Evidence-Based Training within the European regulatory framework ISSUE 1 3.9.2015 Applicability Process map Affected regulations and decisions:
More informationICAO Universal Security Audit Programme (USAP) ICAO Regional Aviation Security Audit Seminar
ICAO Universal Security Audit Programme (USAP) ICAO Regional Aviation Security Audit Seminar Critical Elements of a State s Aviation Security Oversight System Cairo, Egypt, 26 to 28 January 2015 Module
More informationThe development of the information management, in the new scenario, of airspace contamination by volcanic ash.
The development of the information management, in the new scenario, of airspace contamination by volcanic ash. ATM Expert Flavio Sgrò - ENAV Operational Department Workshop on Ash dispersal forecast and
More informationCERTIFICATION OF AIRPORTS UNDER THE PROVISIONS OF THE INTERNATIONAL HEALTH REGULATIONS (IHR)
COLLABORATIVE ARRANGEMENT FOR THE PREVENTION AND MANAGEMENT OF PUBLIC HEALTH EVENTS IN CIVIL AVIATION (CAPSCA) International Civil Aviation Organization CERTIFICATION OF AIRPORTS UNDER THE PROVISIONS OF
More informationCentral American Agency for Aviation Safety
Central American Agency for Aviation Safety Safety Oversight Air Navigation Services (ANS) Seminar Mexico City, May 2014 Content I. Introduction II. ANS safety oversight elements III. ANS regional safety
More informationAPPENDIX D IDENTIFICATION AND DEVELOPMENT OF AERONAUTICAL METEOROLOGY PROJECTS. Programme Title of the Project Start End
IDENTIFICATION AND DEVELOPMENT OF AERONAUTICAL METEOROLOGY PROJECTS AFI Region Project Description Programme Title of the Project Start End Aeronautical Meteorology (B0-AMET PFF Project Facilitators: ICAO
More informationFINAL REPORT OF THE USOAP CMA AUDIT OF THE CIVIL AVIATION SYSTEM OF THE KINGDOM OF NORWAY
ICAO UNIVERSAL SAFETY OVERSIGHT AUDIT PROGRAMME (USOAP) Continuous Monitoring Approach (CMA) FINAL REPORT OF THE USOAP CMA AUDIT OF THE CIVIL AVIATION SYSTEM OF THE KINGDOM OF NORWAY (16 to 20 November
More informationInternational Civil Aviation Organization REVIEW OF STATE CONTINGENCY PLANNING REQUIREMENTS. (Presented by the Secretariat) SUMMARY
BBACG/16 WP/4 31/01/05 International Civil Aviation Organization The Special Coordination Meeting for the Bay of Bengal area (SCM/BOB) and The Sixteenth Meeting of the Bay of Bengal ATS Coordination Group
More informationAsia Pacific Regional Aviation Safety Team
International Civil Aviation Organization (ICAO) Regional Aviation Safety Group (Asia & Pacific Regions) Asia Pacific Regional Aviation Safety Team GUIDANCE FOR AIR OPERATORS IN ESTABLISHING A FLIGHT SAFETY
More informationINTERNATIONAL AIRWAYS VOLCANO WATCH OPERATIONS GROUP (IAVWOPSG)
12/2/14 INTERNATIONAL AIRWAYS VOLCANO WATCH OPERATIONS GROUP (IAVWOPSG) EIGHTH MEETING Melbourne, Australia, 17 to 20 February 2014 LIST OF WORKING PAPERS AS OF 12 FEBRUARY 2014 ( the ) 1 2.1 Provisional
More informationVolcanic Ash Operations Workshop
Volcanic Ash Operations Workshop John Vincent Deputy Director for Strategic Safety European Aviation Safety Agency EASA 20 January 2011 Cologne Outline Introduction Key activities Yesterday Today Tomorrow
More informationREGIONAL CARIBBEAN CONTINGENCY PROCEDURES FOR HURRICANES
REGIONAL CARIBBEAN CONTINGENCY PROCEDURES FOR HURRICANES TABLE OF CONTENTS 1. STRATEGIC PHASE 2. PRETACTICAL PHASE 3. TACTICAL PHASE 4. AIR TRAFFIC FLOW MANAGEMENT PROCEDURES 5. AIR TRAFFIC CONTROL PROCEDURES
More informationPart 172 Air Traffic Service Organisations Certification, Amendment 2. Contents
Contents Objective... 3 Extent of consultation... 3 Summary of comments... 4 Examination of comments... 4 Insertion of amendments... 4 Effective date of rule... 4 Availability of rules... 4 Part 172 Amendments
More informationVOLCANIC ASH CONTINGENCY PLAN
EUR Doc 019 INTERNATIONAL CIVIL AVIATION ORGANIZATION VOLCANIC ASH CONTINGENCY PLAN EUR REGION Second Edition THIS DOCUMENT IS ISSUED BY THE ICAO EUR/NAT OFFICE, PARIS -2- TABLE OF CONTENTS FOREWORD 1.
More informationOVERSEAS TERRITORIES AVIATION REQUIREMENTS (OTARs)
OVERSEAS TERRITORIES AVIATION REQUIREMENTS (OTARs) Part 174 METEOROLOGICAL SERVICES FOR AVIATION Published by Air Safety Support International Ltd Air Safety Support International Limited 2017 First Issue
More informationBelgian Civil Aviation Safety Policy
Belgian Civil Aviation Safety Policy 08/10/2012 DECISION OF THE DIRECTOR-GENERAL Our reference: Brussels, LA/DG/2012-875 Rev.03 08/10/2012 Regarding: Belgian Civil Aviation Safety Policy 1 Introduction
More informationCRISIS AIREP Guidance
CRISIS AIREP Guidance Crisis AIREP Guidance Page 1 Content for the Guidance Release : [Release] Project : Project System : Software Category : Final Version : 1 Author : Dragica Stankovic Document Identification
More informationMET/SG REPORT FOR THE PREPARATION OF THE MET RELATED AFI REGIONAL AIR NAVIGATION IMPLEMENTATION ACTION PLAN
MET/SG REPORT FOR THE PREPARATION OF THE MET RELATED AFI REGIONAL AIR NAVIGATION IMPLEMENTATION ACTION PLAN 1. Introduction 1.1 The ICAO Council approved the fourth edition of the Global Air Navigation
More informationOVERSEAS TERRITORIES AVIATION REQUIREMENTS (OTARs)
OVERSEAS TERRITORIES AVIATION REQUIREMENTS (OTARs) Part 171 AERONAUTICAL TELECOMMUNICATION SERVICES Published by Air Safety Support International Ltd Air Safety Support International Limited 2005 First
More informationMET/SG/12-WP/05 REV2-23/11/14
APPENDI C: AIR NAVIGATION REPORT FORM (ANRF) (Regional and National planning for ASBU Modules). REGIONAL /NATIONAL PEROFRMANCE OBJECTIVE B0-AMET Meteorological Information Supporting Enhanced Operational
More informationPBN Operational Approval Overview
PBN Operational Approval Overview Eduardo Chacin Regional Officer Flight Safety ICAO NACC Regional Office XI ICAO-ASPA Seminar Mexico City, Mexico, 7 8 May 2013 21 May 2013 Page 1 Agenda 1. Performance-based
More informationHow IACA carriers do volcanic ash risk assessment. Erik Moyson Volcanic Ash Operations Workshop EASA, Cologne, 20 January 2011.
How IACA carriers do volcanic ash risk assessment Erik Moyson Volcanic Ash Operations Workshop EASA, Cologne, 20 January 2011 IACA carriers 1 Profile of IACA carriers original low-cost carriers high seat
More information4.6 Other Aviation Safety Matters FLAGS OF CONVENIENCE. (Presented by the Secretariat)
International Civil Aviation Organization 23/07/09 North American, Central American and Caribbean Office (NACC) Tenth Meeting of Directors of Civil Aviation of the Central Caribbean (C/CAR/DCA/10) Grand
More informationTerms of Reference for a rulemaking task
Rulemaking Directorate Terms of Reference for a rulemaking task Technical requirements and operational procedures for the provision of data for airspace users for the purpose of air navigation ISSUE 1
More informationAirport Safety Management Systems: Integrating Planning Into the Process
Airport Safety Management Systems: Integrating Planning Into the Process Kenneth Jacobs Senior Airport Planner FAA Airport Planning and Environmental Division ken.jacobs@faa.gov SMS Defined A process for
More informationORGANISER HOST LEAD SPONSOR
ORGANISER HOST LEAD SPONSOR Data Sharing and ATFM Moderator Francois Delille Director of Business and Product Strategy, ATM, Thales CANSO LATIN AMERICA AND CARIBBEAN CONFERENCE 2017 Challenges of the Air
More informationDevelopment of the Global AIM Strategy (AIM Projects)
Development of the Global AIM Strategy (AIM Projects) Roberta Luccioli ICAO AIM Technical Officer Interregional EUR/MID PANS AIM Workshop (Paris, 10-12 July 2018) Outline Status-quo: ICAO AIM provisions
More informationPreparatory Course in Business (RMIT) SIM Global Education. Bachelor of Applied Science (Aviation) (Top-Up) RMIT University, Australia
Preparatory Course in Business (RMIT) SIM Global Education Bachelor of Applied Science (Aviation) (Top-Up) RMIT University, Australia Brief Outline of Modules (Updated 18 September 2018) BUS005 MANAGING
More informationCOMMISSION REGULATION (EU) No 255/2010 of 25 March 2010 laying down common rules on air traffic flow management
L 80/10 Official Journal of the European Union 26.3.2010 COMMISSION REGULATION (EU) No 255/2010 of 25 March 2010 laying down common rules on air traffic flow management (Text with EEA relevance) THE EUROPEAN
More informationTerms of Reference for a rulemaking task
Terms of Reference for a rulemaking task Embodiment of Safety Management System (SMS) requirements into Commission Regulation (EU) 1321/2014 Phase I SMS in Part-M ISSUE 2 25.2.2016 Applicability Process
More informationAir Law and ATC Procedures Subject: AIR LAW AND ATC PROCEDURES
Air Law and ATC Procedures Subject: Classroom Instruction: YES (Workshop) Appr. # of Instruction Hrs: 3 Internal Examination: YES ITSS (online) / Offline International Law: Conventions, Agreements and
More informationSpecial Air-Reports. 29 June 2016 Japan Meteorological Agency
Special Air-Reports 29 June 2016 Japan Meteorological Agency Aircraft Observations Obligations of States Each Contracting State shall arrange, according to the provisions of this chapter, for observations
More informationCAR/SAM ELECTRONIC AIR NAVIGATION PLAN (eanp) (Presented by the Secretariat) EXECUTIVE SUMMARY
21/10/15 Twenty-sixth Directors of Civil Aviation of the Eastern Caribbean Meeting (E/CAR/DCA/26) New Orleans, United States, 1-3 December 2015 Agenda Item 6: Air Navigation Matters 6.1 GREPECAS Update
More informationNetwork Management, building on our experience of flow management and network planning.
Network Management, building on our experience of flow management and network planning. Giovanni Lenti Head of Network Operation Services The European Organisation for the Safety of Air Navigation Air
More informationWildlife Management from a Regulatory Perspective
Wildlife Management from a Regulatory Perspective Description Operators of aircraft have a reasonable expectation that any wildlife hazard which may exist at an airport they use will be managed to a level
More informationThe Future of SIGMET provision. Dr. H. Puempel Chief, Aeronautical Met Division, Applications Department WMO
The Future of SIGMET provision Dr. H. Puempel Chief, Aeronautical Met Division, Applications Department WMO 1 Role of SIGMET One, but not only factor in flight planning May influence route selection SEV
More informationICAO Policy on Assistance to Aircraft Accident Victims and their Families
Doc 9998 AN/499 ICAO Policy on Assistance to Aircraft Accident Victims and their Families Approved by the Council and published by its decision First Edition 2013 International Civil Aviation Organization
More informationCOMMISSION IMPLEMENTING REGULATION (EU)
18.10.2011 Official Journal of the European Union L 271/15 COMMISSION IMPLEMENTING REGULATION (EU) No 1034/2011 of 17 October 2011 on safety oversight in air traffic management and air navigation services
More informationForm 91 Application for Approval of an EFB System
Form 91 Application for Approval of an EFB System This form must be completed by the Flight Representative (FOR) or Operator as recorded on the current Form 20. Please refer to RP4 Guidance to Operators
More informationCOMMISSION OF THE EUROPEAN COMMUNITIES. Draft. COMMISSION REGULATION (EU) No /2010
COMMISSION OF THE EUROPEAN COMMUNITIES Brussels, XXX Draft COMMISSION REGULATION (EU) No /2010 of [ ] on safety oversight in air traffic management and air navigation services (Text with EEA relevance)
More informationThe Collection and Use of Safety Information
Page 1 of 1 1. Purpose and Scope... 2 2. Authority... 2 3. References... 2 4. Records... 2 5. Policy... 2 5.1 Context... 2 5.2 Issues Relevant to this Policy... 3 5.3 Civil Aviation Rules and Advisory
More informationICAO Universal Safety
ICAO Universal Safety Oversight Audit Programme Overview of the ICAO Universal Safety Oversight Audit Programme - USOAP - Outline The National Safety Oversight System The Universal Safety Oversight Audit
More informationaviation be globally applicable and well understood by aviation and related technical, scientific and operational communities.
Heeding Eyjafjallajökull s lessons The eruption of Iceland s Eyjafjallajökull volcano in 2010 clearly demonstrated the vulnerability of aviation to volcanic eruptions that occur in or near to high density
More informationREMOTELY PILOTED AIRCRAFT SYSTEMS SYMPOSIUM March Detect and Avoid. DI Gerhard LIPPITSCH. ICAO RPAS Panel Detect & Avoid Rapporteur
REMOTELY PILOTED AIRCRAFT SYSTEMS SYMPOSIUM 23-25 March 2015 Detect and Avoid DI Gerhard LIPPITSCH ICAO RPAS Panel Detect & Avoid Rapporteur Remotely Piloted Aircraft Systems (RPAS) Symposium, 23 25 March
More informationGENERAL ADVISORY CIRCULAR
GENERAL CIVIL AVIATION AUTHORITY OF BOTSWANA ADVISORY CIRCULAR CAAB Document GAC-002 ACCEPTABLE FLIGHT SAFETY DOCUMENTS SYSTEM GAC-002 Revision: Original August 2012 PAGE 1 Intentionally left blank GAC-002
More informationMID-SST/3-PPT/5 USOAP CMA UPDATE
MID-SST/3-PPT/5 USOAP CMA UPDATE 1 Outline 1) Critical Elements (CEs) 2) USOAP CMA Components a) Collection of Safety Information b) Determination of State Safety Risk Profile c) Prioritization and Conduct
More informationThe NAT OPS Bulletin Checklist is available at & NAT Documents, NAT Documents, then NAT Ops Bulletins.
Serial Number: 2017_003 Subject: RLatSM Phase 2 AIC Originator: NAT SPG Issued: 15 December 2017 Effective: 15 December 2017 The purpose of North Atlantic Operations Bulletin 2017-003 is to provide guidance
More informationDocument Outline. Doc Manual of Aeronautical Meteorological Practice. Twelfth Edition, 2019 INTERNATIONAL CIVIL AVIATION ORGANIZATION
Doc 8896 Manual of Aeronautical Meteorological Practice Twelfth Edition, 2019 Approved by and published under the authority of the Secretary General INTERNATIONAL CIVIL AVIATION ORGANIZATION Doc 8896
More informationTANZANIA CIVIL AVIATION AUTHORITY AIR NAVIGATION SERVICES INSPECTORATE. Title: CONSTRUCTION OF VISUAL AND INSTRUMENT FLIGHT PROCEDURES
Page 1 of 8 1. PURPOSE 1.1. This Advisory Circular provides guidance to personnel involved in construction of instrument and visual flight procedures for publication in the Aeronautical Information Publication.
More informationPRO LINE FUSION INTEGRATED AVIONICS SYSTEM. Pro Line Fusion on Gulfstream G280: Your direct path to see and access more.
Pro Line Fusion on Gulfstream G280: Your direct path to see and access more. Starting with its baseline features, the Pro Line Fusion avionics in your Gulfstream PlaneView280 flight deck offer capabilities
More informationTWELFTH AIR NAVIGATION CONFERENCE
International Civil Aviation Organization 14/5/12 WORKING PAPER TWELFTH AIR NAVIGATION CONFERENCE Montréal, 19 to 30 November 2012 Agenda Item 4: Optimum Capacity and Efficiency through global collaborative
More informationSession 4. Cabin Safety Aspects in Accident Investigation
1 Session 4 Cabin Safety Aspects in Accident Investigation Overview Information specific to cabin safety Types of occurrences / ICAO templates Preparing for the investigation Self-protection at crash site
More informationAviation Safety Regulation Review - Bureau of Meteorology Submission
- Bureau of Meteorology Submission 1. PURPOSE OF SUBMISSION The Bureau of Meteorology is a major provider of meteorological services to the Australian and international aviation sector, and is making this
More informationAOP 11 Low Visibility Procedures (LVP s) (Aerodrome Operating Procedure)
AOP 11 Low Visibility Procedures (LVP s) (Aerodrome Operating Procedure) Produced by Airfield Services Document Author Operations Support Manager Contents 1 SECTION 1 - LOW VISIBILITY PROCEDURES (LVP S)...
More informationPro Line Fusion integrated avionics system. Pro Line Fusion on Embraer Legacy 450 and 500: Business-jet technology designed with tomorrow in mind.
Pro Line Fusion on Embraer Legacy 450 and 500: Business-jet technology designed with tomorrow in mind. Your Pro Line Fusion flight deck provides a broad range of baseline capabilities that maximize the
More informationVOLCANIC ASH CONTINGENCY PLAN AFRICA AND INDIAN OCEAN REGION
Draft AFI VACP, Version XX VOLCANIC ASH CONTINGENCY PLAN AFRICA AND INDIAN OCEAN REGION Proposed improvements to AFI VACP Edition XX September 2017 AFI VOLCANIC ASH CONTINGENCY PLAN TABLE OF CONTENTS FOREWORD...
More informationBasic Building Block (BBB) Framework DRAFT APRIL 2018
Basic Building Block (BBB) Framework DRAFT APRIL 2018 METEOROLOGY MET BASIC MODULES AND ELEMENTS MET AERODROME METEOROLOGICAL OFFICE METEOROLOGICAL WATCH OFFICE Flight Briefing Service Met. Observation
More informationUNITED AIRLINES LEONARD J. SALINAS FLIGHT DISPATCH 21APR2010
UNITED AIRLINES LEONARD J. SALINAS FLIGHT DISPATCH 21APR2010 Congressional Hazards Caucus Alliance B747-400 B777 B767/B757/A320/A319 CODE OF FEDERAL REGULATIONS Sec. 121.535 Responsibility for operational
More informationEASA experience in SSP/SMS. Presented by Juan MORALES Intl. Cooperation Officer Prepared by Rodrigo PRIEGO Safety Mangement Team Leader
EASA experience in SSP/SMS Presented by Juan MORALES Intl. Cooperation Officer Prepared by Rodrigo PRIEGO Safety Mangement Team Leader Contents of the Presentation What is EASA? EASA Regulations SMS and
More informationNATIONAL AIRSPACE POLICY OF NEW ZEALAND
NATIONAL AIRSPACE POLICY OF NEW ZEALAND APRIL 2012 FOREWORD TO NATIONAL AIRSPACE POLICY STATEMENT When the government issued Connecting New Zealand, its policy direction for transport in August 2011, one
More informationFLIGHT OPERATIONS PANEL (FLTOPSP)
International Civil Aviation Organization FLTOPSP/1-WP/3 7/10/14 WORKING PAPER FLIGHT OPERATIONS PANEL (FLTOPSP) FIRST MEETING Montréal, 27 to 31 October 2014 Agenda Item 4: Active work programme items
More informationSimplifying the business of flight. ARINCDirectSM FLIGHT SOLUTIONS
Simplifying the business of flight. ARINCDirectSM FLIGHT SOLUTIONS Manage your fleet with comprehensive flight solutions. Rockwell Collins is simplifying the business of flight with our ARINCDirect SM
More informationDRAFT COMMISSION REGULATION (EU) / of XXX. laying down rules and procedures for the operation of unmanned aircraft
DRAFT COMMISSION REGULATION (EU) / of XXX laying down rules and procedures for the operation of unmanned aircraft THE EUROPEAN COMMISSION, Having regard to the Treaty on the Functioning of the European
More informationNew issues raised on collision avoidance by the introduction of remotely piloted aircraft (RPA) in the ATM system
New issues raised on collision avoidance by the introduction of remotely piloted aircraft (RPA) in the ATM system Jean-Marc Loscos DSNA expert on collision avoidance and airborne surveillance EIWAC 2013
More informationParticipant Presentations (Topics of Interest to the Meeting) GASP SAFETY PERFORMANCE INDICATORS. (Presented by the Secretariat) EXECUTIVE SUMMARY
PA RAST/31 WP/03 19/02/18 Thirty First Pan America Regional Aviation Safety Team Meeting (PA RAST/31) of the Regional Aviation Safety Group Pan America (RASG PA) South Florida, United States, 20 to 22
More informationTWELFTH AIR NAVIGATION CONFERENCE DRAFT REPORT OF THE COMMITTEE ON AGENDA ITEM 4
26/11/12 TWELFTH AIR NAVIGATION CONFERENCE Montréal, 19 to 30 November 2012 DRAFT REPORT OF THE COMMITTEE ON AGENDA ITEM 4 The attached draft report on Agenda Item 4 is presented for approval by the Committee
More informationBuilding the future on lessons learned from Eyjafjallajökull
Building the future on lessons learned from Eyjafjallajökull Bo Redeborn Director Cooperative Network Design (CND), EUROCONTROL The European Organisation for the Safety of Air Navigation Two different
More informationOPERATIONS CIRCULAR 4 OF 2011
GOVERNMENT OF INDIA CIVIL AVIATION DEPARTMENT OFFICE OF DIRECTOR GENERAL OF CIVIL AVIATION NEW DELHI OPERATIONS CIRCULAR 4 OF 2011 AV. 22024/8/2010-FSD 21 st April 2011 Subject: Managing Disruptions and
More informationSeminar/Workshop on USOAP Continuous Monitoring Approach (CMA) and State Aviation Security Tools (SAST)
International Civil Aviation Organization Seminar/Workshop on USOAP Continuous Monitoring Approach (CMA) and State Aviation Security Tools (SAST) Critical Elements of a State s Safety Oversight System
More informationFCL Rulemaking update
FCL Rulemaking update EASA General Aviation meeting 31.1.2013, Cologne Helena Pietilä - FCL Rulemaking officer Your safety is our mission. Agenda Rule structure and transition periods Short introduction
More informationTerms of Reference for rulemaking task RMT Regular update of ATM/ANS rules (IR/AMC/GM)
Terms of Reference for rulemaking task Regular update of ATM/ANS rules (IR/AMC/GM) ISSUE 1 18.8.2017 Issue/rationale Rulemaking task is intended to be used to regularly update the implementing rules (IRs)
More informationIRELAND SAFETY REGULATION DIVISION
NOTICE TO AIR NAVIGATION SERVICE PROVIDERS IRELAND SAFETY REGULATION DIVISION NR S.016 ISSUE 1 DATE 03.03.10 IRISH AVIATION AUTHORITY AVIATION HOUSE HAWKINS STREET DUBLIN 2 Tel +353 1 6718655 Fax +353
More informationNew Zealand Aviation MET Symposium
New Zealand Aviation MET Symposium Wellington 0830-1700 31 August 2017 Hosted by Civil Aviation Authority of New Zealand Provisional Objective To better support the dynamism of New Zealand aviation, through
More informationGENERAL REPORT. Reduced Lateral Separation Minima RLatSM Phase 2. RLatSM Phase 3
IBAC TECHNICAL REPORT SUMMARY Subject: NAT Operations and Air Traffic Management Meeting: North Atlantic (NAT) Procedures and Operations Group Meeting 2 Reported by Tom Young POG2 took place at the ICAO
More informationII.B. Runway Incursion Avoidance
References: AC 91-73 Objectives Key Elements Elements Schedule Equipment IP s Actions SP s Actions Completion Standards The student should develop knowledge of the elements related to proper incursion
More informationRNP AR APCH Approvals: An Operator s Perspective
RNP AR APCH Approvals: An Operator s Perspective Presented to: ICAO Introduction to Performance Based Navigation Seminar The statements contained herein are based on good faith assumptions and provided
More informationforeword The Training and Flight Operations support team.
foreword This Flight Crew Training Manual is an essential tool to learn the ATR standard operating procedures. It has been conceived as the standard baseline for all ATR flight crew training. To facilitate
More informationThe Eyjafjallajökull Eruption A Systemic Perspective
The Eyjafjallajökull Eruption A Systemic Perspective 9. September 2010 Thorgeir Palsson Reykjavik University Overview» Background» What happened?» Was there an Overreaction?» Paradoxical Situations» Institutional
More informationHuman Factors in ATS. United Kingdom Overseas Territories Aviation Circular OTAC Issue 1 2 November Effective on issue
United Kingdom Overseas Territories Aviation Circular OTAC 172-7 Human Factors in ATS Issue 1 2 November 2011 Effective on issue GENERAL Overseas Territories Aviation Circulars are issued to provide advice,
More informationFrom AIS to AIM. Paul Bosman, Head of Aviation Cooperation and Strategies, EUROCONTROL
From AIS to AIM Paul Bosman, Head of Aviation Cooperation and Strategies, EUROCONTROL AIS-AIM Study Group Active from 2008-2015 Objectives Global strategy/roadmap for the transition from AIS to AIM SARPs/Guidance
More information