1 Avinor Southern Norway Airspace Project SNAP Flyoperativt Forum Gardermoen, Per Arnt Auen, project manager

2 SNAP 1. Background, objectives and schedule 2. Airspace organization 3. RTS results

3 Background, objectives and schedule 3

4 SNAP Background / challenges in existing airspace organization 1. Safety 1. Reported incidents (Møre, Vestlandet) 2. Recommendations from reports 3. Expected traffic growth 2. Capacity 1. Occasional constraints 2. Expected traffic growth 3. Reduce charges 1. Political requirement 2. Operators' expectations 4. Environment 1. Political requirement 5. Standardisation 1. Difference in service provision at comparable units 6. Regulatory requirements 1. Controlled airspace down to top of TIZ 2. SID/STAR at airports with IFR traffic 7. Interface to Oslo AoR 1. Non optimal interface after Oslo ASAP implementation

5 SNAP Objectives Overall objective SNAP shall implement a new airspace organization in Stavanger AoR and Bodø AoR from Ørland/Værnes TMA and southwards. Objectives 1. Increase safety level and reduce the number of incidents. 2. Increase capacity to meet expected demand up until the year Reduce aviation s negative influence on environment. 4. Increase standardisation and efficiency in ANS provision. 5. Facilitate increased revenues and/or reduced route charges.

6 SNAP schedule

7 SNAP airspace organization 7

8 SNAP Change elements Each ATCO must handle more aircraft at least equally safe and with less environmental footprints: Changed routes (SID/STAR and ATS routes) New/changed SID/STAR RWY independent TMA entry/exit points System supported conflict handling System sequencing (PMS) CDO/CCO One-way segregated routes New/changed sector boundaries Conflict areas within one sector Balanced workload Changed work methodology Sequencing by ACC Crossing arrivals/departures in TMA Less vectoring Technology CNS Arrival Manager (AMAN) Electronic handoff

9 ACC sectors Medium manning 9

10 ACC sectors High manning 10

11 SNAP «Direct to Final» design 1. RWY independent TMA entry/exit points 2. Arrivals will be sequenced by ACC 3. Sequencing in TMA by speed control or vectors 4. Continuous climb and descent (CCO/CDO) 5. No hard level constraints 6. Planned routing: STAR to Base Point (direct) 7. Most SID climb above STAR before crossing 11

12 SNAP PMS design (ENZV, ENBR, ENVA) 1. RWY independent TMA entry/exit points 2. Arrivals will be sequenced by ACC 3. PMS design allows 4 minutes on sequencing leg 4. Single sequencing legs 5. Continuous climb and descent (CCO/CDO) 6. No hard level constraints 7. Planned routing: STAR start point direct to Merge Point 8. SID climb above STAR before crossing 12/04/

13 Uniform PMS design and work methodology ENVA RWY09 (rotated) ENBR RWY35 ENZV RWY36

14 SNAP RTS results 14

15 SNAP validation European Operational Concept Validation Methodology, E-OCVM Validation team: Project Team, Airspace Designer, Airspace Design Responsible, Other Experts. Validation criteria: ICAO 11 KPA (doc 9854 Global ATM Operational Concept)

16 SNAP Real Time Simulations (RTS) Prototyping Performance

17 SNAP RTS results will we achieve our objectives? 1. Safety 1. By design 2. Increased safety levels 3. Increased controller and pilot predictability 2. Capacity 1. Reduced controller workload 2. Increased controller productivity 3. Handles expected 2030 traffic levels 3. Environment 1. Reduced greenhouse gas emissions 2. Reduced noise impact 3. Reduced fuel burn 4. Standardization and Efficiency 1. Increases standardization of service provision 2. Expected 2030 traffic levels handled by similar ATCO numbers as available on today s shift 5. Increased revenues / reduced route charges 1. Inferred from #2 and #4 above

18 Video from SNAP RTS West Coast TMA North ENBR RWY35 arrivals High-traffic High-manning 2-hours 1 minute historic plots Red - descending Purple - climbing Green - level

PBN AIRSPACE CONCEPT WORKSHOP. SIDs/STARs/HOLDS. Continuous Descent Operations (CDO) ICAO Doc 9931

PBN AIRSPACE CONCEPT WORKSHOP. SIDs/STARs/HOLDS. Continuous Descent Operations (CDO) ICAO Doc 9931 International Civil Aviation Organization PBN AIRSPACE CONCEPT WORKSHOP SIDs/STARs/HOLDS Continuous Descent Operations (CDO) ICAO Doc 9931 Design in context Methodology STEPS TFC Where does the traffic

More information

Design Airspace (Routes, Approaches and Holds) Module 11 Activity 7. European Airspace Concept Workshops for PBN Implementation

Design Airspace (Routes, Approaches and Holds) Module 11 Activity 7. European Airspace Concept Workshops for PBN Implementation Design Airspace (Routes, Approaches and Holds) Module 11 Activity 7 European Airspace Concept Workshops for PBN Implementation Design in Context TFC Where does the traffic come from? And when? RWY Which

More information

IRISH AVIATION AUTHORITY DUBLIN POINT MERGE. Presented by James O Sullivan PANS-OPS & AIRSPACE INSPECTOR Irish Aviation Authority

IRISH AVIATION AUTHORITY DUBLIN POINT MERGE. Presented by James O Sullivan PANS-OPS & AIRSPACE INSPECTOR Irish Aviation Authority IRISH AVIATION AUTHORITY DUBLIN POINT MERGE Presented by James O Sullivan PANS-OPS & AIRSPACE INSPECTOR Irish Aviation Authority 2012 Holding Holding Before Point Merge No Pilot anticipation of distance

More information

HungaroControl. More than an Air Navigation Service Provider

HungaroControl. More than an Air Navigation Service Provider HungaroControl More than an Air Navigation Service Provider Ministry of National Development Controlling Institution Industry Stakeholders DGCA National Supervisory Authority Transportation Safety Bureau

More information

Welcome to AVI AFRIQUE 2017

Welcome to AVI AFRIQUE 2017 Welcome to AVI AFRIQUE 2017 Single African sky and Functional Airspace Blocks: Improving Air Traffic Management The global ATM operational concept is fundamental framework drive ATM operational requirements,

More information

Next Generation Airspace Developments: Key Operational Trends and Enablers

Next Generation Airspace Developments: Key Operational Trends and Enablers Next Generation Airspace Developments: Key Operational Trends and Enablers ICNS 2013, Day 1 Plenary Nikos Fistas EUROCONTROL Herdon, VA, 23/04/13 Agenda Key goals of future European ATM system 4D Trajectory

More information

Making the World A better place to live SFO

Making the World A better place to live SFO Making the World A better place to live SFO August 2016 Emissions Reduction Roadmap Industry is strongly committed to achieve the targets Only with several lines of actions it is possible to reach 2020

More information

PBN and airspace concept

PBN and airspace concept PBN and airspace concept 07 10 April 2015 Global Concepts Global ATM Operational Concept Provides the ICAO vision of seamless, global ATM system Endorsed by AN Conf 11 Aircraft operate as close as possible

More information

Seychelles Civil Aviation Authority. Telecomm & Information Services Unit

Seychelles Civil Aviation Authority. Telecomm & Information Services Unit Seychelles Civil Aviation Authority Telecomm & Information Services Unit 12/15/2010 SCAA 1 WORKSHOP EXERCISE Workshop on the development of National Performance Framework 6 10 Dec 2010 10/12/2010 SCAA

More information

International Civil Aviation Organization. PBN Airspace Concept. Victor Hernandez

International Civil Aviation Organization. PBN Airspace Concept. Victor Hernandez International Civil Aviation Organization PBN Airspace Concept Victor Hernandez Overview Learning Objective: at the end of this presentation you should Understand principles of PBN Airspace Concept 2 Gate

More information

ICAO PBN GO TEAM PBN Implementation Workshop ENAC / ATM

ICAO PBN GO TEAM PBN Implementation Workshop ENAC / ATM ICAO PBN GO TEAM PBN Implementation Workshop Tunis, 24-28 February 2014 ENAC / ATM Bertrand FOUCHER 1 PERSONAL BACKGROUND ATC in Paris Charles de Gaulle ATC Supervisor in Paris Charles de Gaulle, ATC Instructor

More information

PBN Airspace Concept. ATS requirements

PBN Airspace Concept. ATS requirements INTERNATIONAL CIVIL AVIATION ORGANIZATION PBN Airspace Concept ATS requirements Victor Hernandez RO ATM/SAR ICAO North America, Central America and Caribbean Regional Office 1 Gate to Gate concept Phases

More information

Dave Allanby GM Operations SOUTH AFRICAN EXPRESS

Dave Allanby GM Operations SOUTH AFRICAN EXPRESS Dave Allanby GM Operations SOUTH AFRICAN EXPRESS World Airspace Usage World City to City - 60 000 Flights Expectations of a Single Airspace Regional Master Plan To provide a strategic view and direction

More information

2012 Performance Framework AFI

2012 Performance Framework AFI 2012 Performance Framework AFI Nairobi, 14-16 February 2011 Seboseso Machobane Regional Officer ATM, ESAF 1 Discussion Intro Objectives, Metrics & Outcomes ICAO Process Framework Summary 2 Global ATM Physical

More information

TWELFTH AIR NAVIGATION CONFERENCE

TWELFTH AIR NAVIGATION CONFERENCE International Civil Aviation Organization AN-Conf/12-WP/6 7/5/12 WORKING PAPER TWELFTH AIR NAVIGATION CONFERENCE Agenda Item 2: Aerodrome operations improving airport performance 2.2: Performance-based

More information

SWISS Proposals SJU Large Scale Demonstration Timeline Eric Nantier, Operations Research and ATM, May 2014

SWISS Proposals SJU Large Scale Demonstration Timeline Eric Nantier, Operations Research and ATM, May 2014 SWISS Proposals SJU Large Scale Demonstration Timeline 2014-2016 Eric Nantier, Operations Research and ATM, May 2014 1 Input for all projects Financial SESAR JU supports the project with 50% of the total

More information

Follow up to the implementation of safety and air navigation regional priorities XMAN: A CONCEPT TAKING ADVANTAGE OF ATFCM CROSS-BORDER EXCHANGES

Follow up to the implementation of safety and air navigation regional priorities XMAN: A CONCEPT TAKING ADVANTAGE OF ATFCM CROSS-BORDER EXCHANGES RAAC/15-WP/28 International Civil Aviation Organization 04/12/17 ICAO South American Regional Office Fifteenth Meeting of the Civil Aviation Authorities of the SAM Region (RAAC/15) (Asuncion, Paraguay,

More information

TWELFTH WORKING PAPER. AN-Conf/12-WP/137. International ICAO. developing RNAV 1.1. efficiency. and terminal In line.

TWELFTH WORKING PAPER. AN-Conf/12-WP/137. International ICAO. developing RNAV 1.1. efficiency. and terminal In line. International Civil Aviation Organization WORKING PAPER 31/10/12 English only TWELFTH AIR NAVIGATION CONFERENCE Montréal, 19 to 30 November 2012 Agenda Item 5: Efficient flight paths through trajectory-based

More information

Russian Federation ATM modernization program

Russian Federation ATM modernization program Russian Federation ATM modernization program Alexander Vedernikov Deputy Director of Federal Air Transport Agency 20-21 March, 2012, Moscow Main strategic directions of Russian Air Navigation System development

More information

Cooperative traffic management

Cooperative traffic management 3/17/2017 Cooperative traffic management Moderated by Peter Alty, SESAR JU #SESAR 2 Cooperative Traffic Management The Airport view 8 th March 2017 Alison Bates Head of Service Transformation and Ops Efficiency

More information

Continuous Improvement of the Global Air Traffic Management System

Continuous Improvement of the Global Air Traffic Management System Continuous Improvement of the Global Air Traffic Management System Nancy Graham Director/Air Navigation Bureau Vince Galotti Chief/Air Traffic Management 1 Message Air traffic management contributes to

More information

LETTER OF AGREEMENT BETWEEN NORWAY FIR AND SWEDEN FIR

LETTER OF AGREEMENT BETWEEN NORWAY FIR AND SWEDEN FIR 2014 LETTER OF AGREEMENT BETWEEN NORWAY FIR AND SWEDEN FIR VATSIM Scandinavia 11/12/2014 1 General 1.1 Purpose The purpose of this Letter of Agreement (LoA) is to define the coordination procedures to

More information

SID/STAR phraseology FAQ Canadian implementation April 27, 2017

SID/STAR phraseology FAQ Canadian implementation April 27, 2017 SID/STAR phraseology FAQ Canadian implementation April 27, 2017 The International Civil Aviation Organization (ICAO) has developed harmonized phraseology for Standard Instrument Departures (SIDs) and Standard

More information

SESAR Solutions. Display Options

SESAR Solutions. Display Options SESAR Solutions Outputs from the SESAR Programme R&I activities which relate to an Operational Improvement (OI) step or a small group of OI steps and its/their associated enablers, which have been designed,

More information

In order to start practical Tower controller training at Oslo Gardermoen, a student must meet the following requirements:

In order to start practical Tower controller training at Oslo Gardermoen, a student must meet the following requirements: MA Training Programme ENGM_TWR Made by: Sebastian Rekdal Chief of Training Norway Updated: 2015-01-01 January 01, 2015 Introduction This is the official VATSIM Scandinavia training programme for students

More information

Disruptive Technologies in Air Traffic Management

Disruptive Technologies in Air Traffic Management Disruptive Technologies in Air Traffic Management OCTOBER 21, 2016 www.thalesgroup.com Advanced Air Traffic Services Main themes for Thales Enhanced arrival and departure operations (PJ01) Extended Arrival

More information

TWELFTH AIR NAVIGATION CONFERENCE

TWELFTH AIR NAVIGATION CONFERENCE International Civil Aviation Organization 19/3/12 WORKING PAPER TWELFTH AIR NAVIGATION CONFERENCE Montréal, 19 to 30 November 2012 (Presented by the Secretariat) EXPLANATORY NOTES ON THE AGENDA ITEMS The

More information

Air Navigation Bureau ICAO Headquarters, Montreal

Air Navigation Bureau ICAO Headquarters, Montreal Performance Based Navigation Introduction to PBN Air Navigation Bureau ICAO Headquarters, Montreal 1 Performance Based Navigation Aviation Challenges Navigation in Context Transition to PBN Implementation

More information

and the Environment Speaker: Guy Viselé External Communication Advisor ABC User Committee, February 2 nd 2009

and the Environment Speaker: Guy Viselé External Communication Advisor ABC User Committee, February 2 nd 2009 and the Environment Speaker: Guy Viselé External Communication Advisor ABC User Committee, February 2 nd 2009 Contents Belgocontrol Environmental approach Emission management Serving today s aviation in

More information

Updates to Procedures at St. John s International Airport

Updates to Procedures at St. John s International Airport October 10, 2017 Updates to Procedures at St. John s International Airport This document provides notice of upcoming changes to instrument procedures being implemented by NAV CANADA at the St. John s International

More information

Disruptive Technologies in Air Traffic Management (ATM) - Example: flight centric operations (sectorless ATM)

Disruptive Technologies in Air Traffic Management (ATM) - Example: flight centric operations (sectorless ATM) 8th Florence Air Forum Oktober 21 th 2016 Disruptive Technologies in Air Traffic Management (ATM) - Example: flight centric operations (sectorless ATM) Ralf Bertsch Director Planning and Innovation DFS

More information

RNP OPERATIONS. We will now explain the key concepts that should not be mixed up and that are commonly not precisely understood.

RNP OPERATIONS. We will now explain the key concepts that should not be mixed up and that are commonly not precisely understood. RNP OPERATIONS 1. Introduction Planes were made as a means of transport. To successfully fly from a location A to a location B, pilots were first and foremost navigators. Originally relying on visual landmarks

More information

Implementation of the Performance-Based Air Navigation Systems for the CAR Region ICAO Regional TC Project RLA/09/801 Agenda Item 6 WP/14

Implementation of the Performance-Based Air Navigation Systems for the CAR Region ICAO Regional TC Project RLA/09/801 Agenda Item 6 WP/14 of the Performance-Based Air Navigation Systems for the CAR Region ICAO Regional TC Project RLA/09/801 Agenda Item 6 WP/14 Julio Garriga, RO/TA International Civil Aviation Organization North American,

More information

ATC Simulators. The manufacturer of

ATC Simulators. The manufacturer of ATC Simulators The manufacturer of Edda Systems AS Established in 2005, by 5 experienced ATM engineers (ex Avinor) 100% owned by the employees/founders Edda Systems AS is specialized in CNS/ATM systems,

More information

CDA Continuous Descent Approach

CDA Continuous Descent Approach CDA Continuous Descent Approach Pilots view Cpt. Ir. Dirk De Winter EUROCONTROL - Brussels The European Organisation for the Safety of Air Navigation CDA Pilots Perspective What? CDA is all about the ability

More information

LETTER OF AGREEMENT BETWEEN NORWAY FIR AND DENMARK FIR

LETTER OF AGREEMENT BETWEEN NORWAY FIR AND DENMARK FIR 2014 LETTER OF AGREEMENT BETWEEN NORWAY FIR AND DENMARK FIR VATSIM Scandinavia 11/12/2014 Version 3 1 General 1.1 Purpose The purpose of this Letter of Agreement (LoA) is to define the coordination procedures

More information

ATFM IMPLEMENATION IN INDIA PROGRESS THROUGH COLLABORATION PRESENTED BY- AIRPORTS AUTHORITY OF INDIA

ATFM IMPLEMENATION IN INDIA PROGRESS THROUGH COLLABORATION PRESENTED BY- AIRPORTS AUTHORITY OF INDIA ATFM IMPLEMENATION IN INDIA PROGRESS THROUGH COLLABORATION PRESENTED BY- AIRPORTS AUTHORITY OF INDIA CONTENTS 1 India Civil Aviation Scenario 2 C-ATFM Concepts 3 C-ATFM Implementation 4 4 Road Value Ahead

More information

ICAO Activities. IFPP work on the Manual for Continuous Descent Operations. Federal Aviation Administration

ICAO Activities. IFPP work on the Manual for Continuous Descent Operations. Federal Aviation Administration ICAO Activities IFPP work on the Manual for Continuous Descent Operations Presented to: JPDO, EWG, Ops SC Workshop NASA Ames Facility, Moffet Field, CA By: Lynn Boniface, ISI, Supporting AFS-420 Date:

More information

Packaging Tomorrow s Aviation System

Packaging Tomorrow s Aviation System International Civil Aviation Organization Second Briefing on ICAO s Aviation System Block Upgrades Issued: July 2012 The 30 000 Feet View Air traffic growth expands two-fold once every 15 years Growth

More information

Safety / Performance Criteria Agreeing Assumptions Module 10 - Activities 5 & 6

Safety / Performance Criteria Agreeing Assumptions Module 10 - Activities 5 & 6 Safety / Performance Criteria Agreeing Assumptions Module 10 - Activities 5 & 6 European Airspace Concept Workshops for PBN Implementation Why have safety and performance criteria? Measure performance

More information

Continuous Climb Operations (CCO) Manual

Continuous Climb Operations (CCO) Manual Doc 9993 AN/495 Continuous Climb Operations (CCO) Manual NOTICE TO USERS This document is an unedited advance version of an ICAO publication as approved, in principle, by the Secretary General, which is

More information

SESAR RPAS Definition Phase Results & Way Forward. Denis Koehl Senior Advisor SESAR Joint Undertaking

SESAR RPAS Definition Phase Results & Way Forward. Denis Koehl Senior Advisor SESAR Joint Undertaking SESAR RPAS Definition Phase Results & Way Forward Denis Koehl Senior Advisor SESAR Joint Undertaking Brussels - December 2 nd 2014 Content The Rationale The EC Mandate Requirements & Challenges SESAR RPAS

More information

FLIGHT STRIP MANAGEMENT - APPROACH LEVEL

FLIGHT STRIP MANAGEMENT - APPROACH LEVEL FLIGHT STRIP MANAGEMENT - APPROACH LEVEL 1. Introduction The flight strip management for ATC is an important point in order to ensure aircraft management and improve safety when controlling. In real aviation,

More information

Presented by: Trinidad and Tobago

Presented by: Trinidad and Tobago Presented by: Trinidad and Tobago November 2013 References ICAO PBN toolkit ICAO Global Air Navigation Plan (Doc 9750) ICAO PBN Manual (Doc 9613) Piarco FIR PBN Action Plan TTCAA PBN Core Implementation

More information

DMT Report. Overview for Step 1. Maturity Assessment Issue date: (OFA view) 28/01/2015

DMT Report. Overview for Step 1. Maturity Assessment Issue date: (OFA view) 28/01/2015 MAT Report References: Maturity Assessment Issue date: (OFA view) Integrated roadmap 26/11/2014 Dataset 13 - Baseline 5.0 DMT Report 26/01/2015 PIRM Result 19/09/2014 Updated Assessment in 2014 (Step1)

More information

CONTROLLED AIRSPACE CONTAINMENT POLICY

CONTROLLED AIRSPACE CONTAINMENT POLICY Safety and Airspace Regulation Group (SARG) 17 January 2014 Policy Statement 1 Overview CONTROLLED AIRSPACE CONTAINMENT POLICY 1.1 UK airspace design policy for ATS Routes, SIDs and STARs is based upon

More information

Real-time Simulations to Evaluate the RPAS Integration in Shared Airspace

Real-time Simulations to Evaluate the RPAS Integration in Shared Airspace Real-time Simulations to Evaluate the RPAS Integration in Shared Airspace (WP-E project ERAINT) E. Pastor M. Pérez-Batlle P. Royo R. Cuadrado C. Barrado 4 th SESAR Innovation Days Universitat Politècnica

More information

Civil and military integration in the same workspace

Civil and military integration in the same workspace Civil and military integration in the same workspace Presented by PLC 1 introduction Civilian and Military ATCOs work alongside each other in various countries and are employed in a number of different

More information

Overview of the Aviation System Block Upgrades (ASBUs) Concept and PBN

Overview of the Aviation System Block Upgrades (ASBUs) Concept and PBN Overview of the Aviation System Block Upgrades (ASBUs) Concept and PBN Vince Galotti Deputy Director, Safety Standardization & Infrastructure Air Navigation Bureau International Civil Aviation Organization

More information

Don-Jacques OULD FERHAT VP Airspace and Airlines Services. Airbus. PBN Safety programs

Don-Jacques OULD FERHAT VP Airspace and Airlines Services. Airbus. PBN Safety programs Don-Jacques OULD FERHAT VP Airspace and Airlines Services Airbus PBN Safety programs Long term cooperation with China Complex projects in China RNP AR at Kathmandu airport Cochin : First RNP APCH in India

More information

Workshop on the Performance Enhancement of the ANS through the ICAO ASBU framework. Dakar, Senegal, September 2017 presented by Emeric Osmont

Workshop on the Performance Enhancement of the ANS through the ICAO ASBU framework. Dakar, Senegal, September 2017 presented by Emeric Osmont Workshop on the Performance Enhancement of the ANS through the ICAO ASBU framework Dakar, Senegal, 18-22 September 2017 presented by Emeric Osmont The Aviation Community Indra 2 The Aviation Community

More information

Defining and Managing capacities Brian Flynn, EUROCONTROL

Defining and Managing capacities Brian Flynn, EUROCONTROL Defining and Managing capacities Brian Flynn, EUROCONTROL Some Capacity Guidelines Capacity is what you know you can handle today Capacity = safe throughput capability of an individual or small team All

More information

ATC-Wake: Integrated Air Traffic Control Wake Vortex Safety and Capacity System

ATC-Wake: Integrated Air Traffic Control Wake Vortex Safety and Capacity System ATC-Wake: Integrated Air Traffic Control Wake Vortex Safety and Capacity System L.J.P. (Lennaert) Speijker, speijker@nlr.nl WakeNet Europe, 8/9 January 2009 http://www.nlr.nl/public/hosted-sites/atc-wake

More information

ATM STRATEGIC PLAN VOLUME I. Optimising Safety, Capacity, Efficiency and Environment AIRPORTS AUTHORITY OF INDIA DIRECTORATE OF AIR TRAFFIC MANAGEMENT

ATM STRATEGIC PLAN VOLUME I. Optimising Safety, Capacity, Efficiency and Environment AIRPORTS AUTHORITY OF INDIA DIRECTORATE OF AIR TRAFFIC MANAGEMENT AIRPORTS AUTHORITY OF INDIA ATM STRATEGIC PLAN VOLUME I Optimising Safety, Capacity, Efficiency and Environment DIRECTORATE OF AIR TRAFFIC MANAGEMENT Version 1 Dated April 08 Volume I Optimising Safety,

More information

AEROTHAI Air Traffic Management Network Management Centre IATA ICAO Cross Border ATFM Workshop

AEROTHAI Air Traffic Management Network Management Centre IATA ICAO Cross Border ATFM Workshop AEROTHAI Air Traffic Management Network Management Centre IATA ICAO Cross Border ATFM Workshop 17 18 November 2015 Bangkok, Thailand Piyawut Tantimekabut (Toon) Air Traffic Management Network Manager Network

More information

Civil Military Cooperation

Civil Military Cooperation Civil Military Cooperation Aon Al-Garni General Manager ATM/ANS/GACA/KSA General Authority of Civil Aviation Kingdom of Saudi Arabia 1 Preview Civil Military Cooperation 1 Peace and stability are essential

More information

ATC Training Syllabus Philippines vacc Version 1.1 September 25, 2016

ATC Training Syllabus Philippines vacc Version 1.1 September 25, 2016 ATC Training Syllabus Philippines vacc Version 1.1 Intor Distribution and Scope This document outlines the training that will be undergone by students within the Philippines vacc and shall be used by both

More information

Home LIST OF ACRONYMS

Home LIST OF ACRONYMS LIST OF ACRONYMS 6. List of s A/G A-CDM ADS-C AF AFP/ACH AFUA AMAN ANSP AOP APCH APV ARES ASBU ASM A-SMGCS ATC ATCO ATFCM ATM ATM MP ATN ATSP AU CBA CCO CDM CDO CEF CPDLC CPs CTM CTOT DCB DCT DL DLS DMAN

More information

USE AND APPLICATION OF GNSS IN THE IMPLEMENTATION OF NAVIGATION BASED ON PERFORMANCE IN ECUADOR

USE AND APPLICATION OF GNSS IN THE IMPLEMENTATION OF NAVIGATION BASED ON PERFORMANCE IN ECUADOR BACKGROUND OF GNSS USE The guidelines for the transition to the use of the Global Navigation Satellite System GNSS in the CAR / SAM Regions were issued by ICAO at the Eleventh World Air Navigation Conference

More information

DANUBE FAB real-time simulation 7 November - 2 December 2011

DANUBE FAB real-time simulation 7 November - 2 December 2011 EUROCONTROL DANUBE FAB real-time simulation 7 November - 2 December 2011 Visitor Information DANUBE FAB in context The framework for the creation and operation of a Functional Airspace Block (FAB) is laid

More information

Beijing, 18 h of September 2014 Pierre BACHELIER Head of ATM Programme. Cockpit Initiatives. ATC Global 2014

Beijing, 18 h of September 2014 Pierre BACHELIER Head of ATM Programme. Cockpit Initiatives. ATC Global 2014 Beijing, 18 h of September 2014 Pierre BACHELIER Head of ATM Programme Cockpit Initiatives for ATM ATC Global 2014 Page 2 Cockpit Initiatives for ATM Airbus vision on ATM transformation Airbus position

More information

ARRIVALS REVIEW GATWICK

ARRIVALS REVIEW GATWICK ARRIVALS REVIEW GATWICK BO REDEBORN GRAHAM LAKE bo@redeborn.com gc_lake@yahoo.co.uk 16-12-2015 2 THE TASK Has everything been done that is reasonably possible to alleviate the noise problems from arriving

More information

Federal Aviation Administration DCA. By: Terry Biggio, Vice President Air Traffic Services Date: June 18, Federal Aviation Administration

Federal Aviation Administration DCA. By: Terry Biggio, Vice President Air Traffic Services Date: June 18, Federal Aviation Administration DCA Presented to: Arlington County By: Terry Biggio, Vice President Air Traffic Services Date: June 18, 2015 Air Traffic Roles and Responsibilities As aviation technology advances, the FAA is putting in

More information

Dublin Point Merge Irish Aviation Authority. Point Merge Conference March 2015 Oslo

Dublin Point Merge Irish Aviation Authority. Point Merge Conference March 2015 Oslo Dublin Point Merge Irish Aviation Authority Point Merge Conference March 2015 Oslo Point Merge EIDW Runway 28 implemented 13 th December 2012 Point Merge Systemisation Effect RWY 28 Point Merge vs. RWY10

More information

The Network Manager User Forum 2017

The Network Manager User Forum 2017 The Network Manager User Forum 2017 Advanced ATFM Techniques istream Neptune & Sirius 26 January, 0900-1100 Pascal Hop NMD - Network Strategy Division Cooperative Traffic Management Target times Initial

More information

ORGANISER HOST LEAD SPONSOR

ORGANISER HOST LEAD SPONSOR ORGANISER HOST LEAD SPONSOR Data Sharing and ATFM Moderator Francois Delille Director of Business and Product Strategy, ATM, Thales CANSO LATIN AMERICA AND CARIBBEAN CONFERENCE 2017 Challenges of the Air

More information

Implementation of PBN in Armenian airspace

Implementation of PBN in Armenian airspace Implementation of PBN in Armenian airspace PBN implementation plan, based on the specifications of the airspace of the Republic of Armenia, has been developed in accordance with Resolution A36-23, approved

More information

Burlington ATCT Standard Operating Procedures

Burlington ATCT Standard Operating Procedures This air traffic control procedural document is provided for virtual air traffic control in the ZBW ARTCC of the VATSIM network only. It is not for real-world ATC use. These procedures are approved for

More information

Analysis of vertical flight efficiency during climb and descent

Analysis of vertical flight efficiency during climb and descent Analysis of vertical flight efficiency during climb and descent Technical report on the analysis of vertical flight efficiency during climb and descent Edition Number: 00-04 Edition Date: 19/01/2017 Status:

More information

THE AREA CONTROL CENTRE (CTR) POSITION

THE AREA CONTROL CENTRE (CTR) POSITION THE AREA CONTROL CENTRE (CTR) POSITION 1. Introduction The Area Control Centre (ACC) also known as en-route controller and called CTR on IVAO, has the responsibility of ensuring Air Traffic Control (ATC)

More information

Measurement of environmental benefits from the implementation of operational improvements

Measurement of environmental benefits from the implementation of operational improvements Measurement of environmental benefits from the implementation of operational improvements ICAO International Aviation and Environment Seminar 18 19 March 2015, Warsaw, Poland Sven Halle Overview KPA ASSEMBLY

More information

Aviation System Block Upgrades Module N B0-86/PIA-3

Aviation System Block Upgrades Module N B0-86/PIA-3 International Civil Aviation Organization ASBU/SIP/Mexico/2012-WP/20 E Aviation System Block Upgrades Module N B0-86/PIA-3 Improved Access to Optimum Flight Levels through Climb/Descent Procedures using

More information

PBN Implementation CAR/NAM Regions

PBN Implementation CAR/NAM Regions Regional Forum Creating More Lift PBN Implementation CAR/NAM Regions Victor Hernandez RO ATM/SAR ICAO North America, Central America and Caribbean Regional Office Project: PBN Implementation Regional Performance

More information

GENERAL OPERATING PROCEDURES FINLAND(GOP)

GENERAL OPERATING PROCEDURES FINLAND(GOP) [Nyckelord] 2013 GENERAL OPERATING PROCEDURES FINLAND(GOP) General operating procedures (GOP) ACC 1 Introduction This document includes general operating procedures for ACC in. A good understanding of

More information

Modernising UK Airspace 2025 Vision for Airspace Tools and Procedures. Controller Pilot Symposium 24 October 2018

Modernising UK Airspace 2025 Vision for Airspace Tools and Procedures. Controller Pilot Symposium 24 October 2018 Modernising UK Airspace 2025 Vision for Airspace Tools and Procedures Controller Pilot Symposium 24 October 2018 Our airspace Flight Information Regions London & Scottish FIRs: 1m km 2 11% of Europe s

More information

ENVIRONMENTAL BENEFITS FROM IMPROVED OPERATIONAL MEASURES. Guido Kerkhofs Director ATM Programmes EUROCONTROL

ENVIRONMENTAL BENEFITS FROM IMPROVED OPERATIONAL MEASURES. Guido Kerkhofs Director ATM Programmes EUROCONTROL ENVIRONMENTAL BENEFITS FROM IMPROVED OPERATIONAL MEASURES Guido Kerkhofs Director ATM Programmes EUROCONTROL EUROCONTROL Air Traffic Emissions Estimates EU 27 States 2004-2006 Tonnes of CO 2 Drop Page

More information

The VINGA project. Henrik Ekstrand Novair Flight Operations Aerospace Technology Congress

The VINGA project. Henrik Ekstrand Novair Flight Operations Aerospace Technology Congress The VINGA project Henrik Ekstrand Novair Flight Operations Aerospace Technology Congress 2016-10-11 Introduction to the VINGA project Validation and Implementation of Next Generation Airspace A Single

More information

Keywords: Time Based Operation, Arrival Management, Controlled Time of Arrival, Continuous Descent Operation

Keywords: Time Based Operation, Arrival Management, Controlled Time of Arrival, Continuous Descent Operation 28 TH INTERNATIONAL CONGRESS OF THE AERONAUTICAL SCIENCES IMPLEMENTING TIME BASED CDA OPERATIONS IN A MEDIUM-HIGH DENSITY ATM ENVIRONMENT R.J. de Muynck*, T. Bos*, A. Kuenz**, S. Törner*** *National Aerospace

More information

Near-miss between a DHC-8-311, LN-WFR, and Boeing

Near-miss between a DHC-8-311, LN-WFR, and Boeing Near-miss between a DHC-8-311, LN-WFR, and Boeing 737-800. Micro-summary: A cascading series of errors results in a near-miss. Event Date: 2004-11-29 at 1219 and 1223 Investigative Body: Accident Investigation

More information

CEM: KPIs used for the joint work between Traffic control, Airports and Airline companies

CEM: KPIs used for the joint work between Traffic control, Airports and Airline companies 1 CEM: KPIs used for the joint work between Traffic control, Airports and Airline companies ARC, Oslo, 2015-06-11 Elisabeth Celsing, Swedavia, Stockholm Arlanda Airport The company Swedavia s task To create

More information

Airspace Infringement Survey 2007

Airspace Infringement Survey 2007 Airspace Infringement Survey 2007 Vladimir Grigorov, COMPASS IS 24 January 2008, Brussels Why the survey? Occurrence reports do not enable in-depth analysis of causal and contributory factors! To ask those,

More information

International Civil Aviation Organization. The Eighth Meeting of the Performance Based Navigation Task Force (PBN TF/8)

International Civil Aviation Organization. The Eighth Meeting of the Performance Based Navigation Task Force (PBN TF/8) PBN/TF/8 IP/03 12-13/5/2011 International Civil Aviation Organization The Eighth Meeting of the Performance Based Navigation Task Force (PBN TF/8) New Delhi, India 12 13 May 2011 Agenda Item 5: State/Industry

More information

LETTER OF AGREEMENT. Between

LETTER OF AGREEMENT. Between LETTER OF AGREEMENT Between Romania vacc and Moldova vacc Bucharest FIR Chisinau FIR Effective: 01/12/2015 Version: 1.0 Purpose: The purpose of this Letter of Agreement is to define the coordination procedures

More information

Considerations for Facility Consolidation

Considerations for Facility Consolidation Considerations for Facility Consolidation ATC Guild, New Delhi, India October 21, 2010 Mimi Dobbs Overview Why consider consolidation? Co location vs Consolidation Consolidating Methodologies Areas to

More information

FF-ICE A CONCEPT TO SUPPORT THE ATM SYSTEM OF THE FUTURE. Saulo Da Silva

FF-ICE A CONCEPT TO SUPPORT THE ATM SYSTEM OF THE FUTURE. Saulo Da Silva International Civil Aviation Organization SIP/2012/ASBU/Dakar-WP/19 FF-ICE A CONCEPT TO SUPPORT THE ATM SYSTEM OF THE FUTURE Saulo Da Silva Workshop on preparations for ANConf/12 ASBU methodology (Dakar,

More information

Colombian PBN implementation: El Dorado case study

Colombian PBN implementation: El Dorado case study Colombian PBN implementation: El Dorado case study SDM WORKSHOP ON PBN 19.10.2017 XAVIER OUTTERS SME & PROJECT MANAGER NAVBLUE SAS Electronic Flight Bag Dispatch Pre-flight Airport Databases - FlySmart+

More information

(Presented by the United States)

(Presented by the United States) International Civil Aviation Organization 31/07/09 North American, Central American and Caribbean Office (NACC) Tenth Meeting of Directors of Civil Aviation of the Central Caribbean (C/CAR/DCA/10) Grand

More information

NORTH EUROPEAN FUNCTIONAL AIRSPACE BLOCK NEFAB. Socio-Economic Study. Volume 1: Main Report. August 2011 v. 3

NORTH EUROPEAN FUNCTIONAL AIRSPACE BLOCK NEFAB. Socio-Economic Study. Volume 1: Main Report. August 2011 v. 3 NORTH EUROPEAN FUNCTIONAL AIRSPACE BLOCK NEFAB Socio-Economic Study Volume 1: Main Report August 2011 v. 3 1 2 Contents 1. Executive summary 4 2. Introduction 7 3. The regulatory framework 8 3.1 The SES

More information

Keywords: Advanced Continuous Descent Approach, CDA, CORADA, RTA, Arrival Management

Keywords: Advanced Continuous Descent Approach, CDA, CORADA, RTA, Arrival Management 26 TH INTERNATIONAL CONGRESS OF THE AERONAUTICAL SCIENCES ENABLING TECHNOLOGY EVALUATION FOR EFFICIENT CONTINUOUS DESCENT APPROACHES R.J. de Muynck, L. Verhoeff, R.P.M. Verhoeven, N. de Gelder National

More information

INTERNATIONAL CIVIL AVIATION ORGANIZATION WESTERN AND CENTRAL AFRICA OFFICE. Thirteenth Meeting of the FANS I/A Interoperability Team (SAT/FIT/13)

INTERNATIONAL CIVIL AVIATION ORGANIZATION WESTERN AND CENTRAL AFRICA OFFICE. Thirteenth Meeting of the FANS I/A Interoperability Team (SAT/FIT/13) INTERNATIONAL CIVIL AVIATION ORGANIZATION WESTERN AND CENTRAL AFRICA OFFICE Thirteenth Meeting of the FANS I/A Interoperability Team (SAT/FIT/13) Durban, South Africa, 4-5 June 2018 Agenda Item 4: System

More information

Lelystad Departure Route Analysis

Lelystad Departure Route Analysis Lelystad Departure Route Analysis As per an email by Ms. M. de Groot, CEO Teuge Airport in the Netherlands, dated 8 September 2017, EUROCONTROL NM OPL has been requested to analyse a design proposal for

More information

ENVIRONMENT ACTION PLAN

ENVIRONMENT ACTION PLAN ENVIRONMENT ACTION PLAN 2015 16 Airservices Australia 2015 This work is copyright. Apart from any use as permitted under the Copyright Act 1968, no part may be reproduced by any process without prior written

More information

InterFAB Cooperation: XMAN Implementing Extended Cross-Border Arrival Management. World ATM Congress Madrid, 8 March 2016

InterFAB Cooperation: XMAN Implementing Extended Cross-Border Arrival Management. World ATM Congress Madrid, 8 March 2016 InterFAB Cooperation: XMAN Implementing Extended Cross-Border Arrival Management World ATM Congress Madrid, 8 March 2016 FABEC XMAN Project Dr Frank Zetsche, DFS Agenda Overview Traffic Flows XMAN Roadmap

More information

Maastricht Upper Area. Introducing the next generation of air traffic control. New flight data processing system

Maastricht Upper Area. Introducing the next generation of air traffic control. New flight data processing system Maastricht Upper Area Control Centre Introducing the next generation of air traffic control New flight data processing system A dynamic change to managing Europe s air traffic The new flight data processing

More information

TWELFTH AIR NAVIGATION CONFERENCE

TWELFTH AIR NAVIGATION CONFERENCE International Civil Aviation Organization AN-Conf/12-WP/13 1/5/12 WORKING PAPER TWELFTH AIR NAVIGATION CONFERENCE Montréal, 19 to 30 November 2012 Agenda Item 4: Optimum capacity and efficiency through

More information

AMAN RESEARCH IN SESAR

AMAN RESEARCH IN SESAR AMAN RESEARCH IN SESAR CCA939 TAP842 AZA1480 BPA1713 Arrival MANager (AMAN) Advisories to ground in complex cross border AMAN: Time To Lose/Time To Gain (TTL/TTG) Speed Use of new avionics capabilities:

More information

Practical Experiences & ATM Workshop. ATM Requirements. Setting the Scene. Many Issues (and many solutions) This Forum s central theme MIXED MODE

Practical Experiences & ATM Workshop. ATM Requirements. Setting the Scene. Many Issues (and many solutions) This Forum s central theme MIXED MODE Practical Experiences & ATM Workshop ATM Requirements Setting the Scene Issue Many Issues (and many solutions) This Forum s central theme MIXED MODE One of the thorniest problems to solve 2 What is mixed

More information

SAMPLE TEMPLATE. Regional and National planning for ASBU Modules

SAMPLE TEMPLATE. Regional and National planning for ASBU Modules SIP/ASBU/MEXICO/2013-WP/20 SAMPLE TEMPLATE 1. AIR NAVIGATION REPORT FORM (ANRF) (This template demonstrates how ANRF to be used. The data inserted here refers to ASBU B0-CDO as an example only) Regional

More information

A Baseline for Terminal Airspace Design Assessment

A Baseline for Terminal Airspace Design Assessment A Baseline for Terminal Airspace Design Assessment Tobias Andersson Granberg Valentin Polishchuk Linköping University Billy Josefsson LFV DKSE FAB DK FIR + SE FIR Flights on Apr 30 2012 Flights on Apr

More information

Single European Sky Awards Submission by the COOPANS Alliance. Short description of the project. (Required for website application)

Single European Sky Awards Submission by the COOPANS Alliance. Short description of the project. (Required for website application) Single European Sky Awards 2016 Submission by the COOPANS Alliance 27 th January 2016 Draft vfinal Short description of the project (Required for website application) The COOPANS Alliance is an international