1 Dublin Point Merge Irish Aviation Authority Point Merge Conference March 2015 Oslo
2 Point Merge EIDW Runway 28 implemented 13 th December 2012
3 Point Merge Systemisation Effect
4 RWY 28 Point Merge vs. RWY10
5 Point Merge EIDW Runway 10 to be implemented 2 nd April 2015
6 Point Merge Runway 10 Initially planned for implementation coincidentally with Runway 28 PM Very successful implementation on Runway 28 at Dublin Runway 28 usage 63% Runway 10 usage 30% Implementation 2 nd April 2015
7 SID & STAR Changes Point Merge system for Runway 10 New STARs Minor amendments to SIDs New RNAV IAPs New ABLIN STAR replaces LIPGO STAR on runway 28
8 New PM System Runway 10 Airspace design Prototyping various designs Try to mirror runway 28 PM Military airspace Track miles Regulatory approval IFP design Training Safety Case
9 BAMLI NEVRI ROTEV SUROX NIMAT INKUR OLAPO UPPER NORTH (UN) NORTH LOWER ABOVE NORTH FL125 (LN) SFC FL125 BOYNE BAGSO LIFFY PELIG OSGAR UPPER SOUTH (US) SOUTH LOWER ABOVE SOUTH FL125 (LS) SFC FL125 DEXEN LIPGO SUTEX OLONO BUNED VATRY BEPAN PESIT
10 STARS BAMLI NIMAT OLAPO EPIDU BOYNE APRUT DW865 DW866 ADNAL AKIVA ELBON EKREN BAGSO NEKIL ASDER RISAP OSLEX BERMO DW755 DETAX DW754 BIVDI BABON KANUS RUBAR LIPGO OSGAR DIRUM SUTEX BUNED VATRY
11
12 NORTH SECTOR SEQUENCE LEG All points along the leg have the same Constraint Level FL80 and Speed Restriction 230kts APRUT ADNAL DW865 AKIVA 6 DW NEKIL 5 ASDER RISAP 12.5 NM Total sequence leg length 30 NM approximately EIDW
13 SOUTH SECTOR SEQUENCE LEG RISAP 12.5 NM OSLEX 5 EIDW DW BERMO DW754 BIVDI BABON Total sequence leg length 24 NM approximately All points along the leg have the same Constraint Level FL70 and Speed Restriction 230kts
14 New IAPs Runway 10 NEKIL 4000 IAP commences from NEKIL RISAP 3000 GANET 3000 OSLEX 5000 IAP commences from OSLEX 14
15 EIME KANUS
16
17
18 INKUR ABLIN 1L Replaces LIPGO 1L DS706 DW705 LIFFY LAPMO DW704 SOPEP BAL SUGAD DEXEN PELIG OSGAR KEPOR PEKOK Level Constraint: AT FL70 PEKOK SORIN FL70 PEKOK FL70 SIVNA FL70 LIPGO DIRUM IRKUM Level Constraint: Not Below FL90 IRKUM FL90 SUTEX OLONO BUNED ABLIN Level Constraint: Not Above FL180 Not Below FL150 VATRY ABLIN ABLIN FL180 FL150 BADSI BEPAN 18
19 Training PM28 9 days PM days 1 day of Bookwork 1½ days of simulation Basic approach Full circuit Runway change and holding All instructors are from PM project team
20 SOME LESSONS LEARNED AND SUGGESTED BEST PRACTICES Dublin Point Merge Implementation Runway
21 R&D CONCEPT The Point Merge Concept originally aimed at increase of ATC capacity and improved sequencing; therefore sequence leg length was optimised for ATC use (i.e. accommodation of aircraft) rather than flight and fuel efficiency. 6
22 SYSTEM DESIGN Sequence leg entry points should be positioned on direct tracks from major TMA entry points to merge point on final approach shortest route to the runway. Not possible from all directions. It was necessary to publish required airspeed on the sequence leg to assure spacing between consecutive aircraft may be a compromise if significant mix of traffic types 3-in-1 rule for airspace design used to optimise CDO as far as possible fuel reduction. Both from en-route to the sequence leg and then again to merge point. Level constraints should be kept to a minimum to assist efficient CDOs and flight idle descents.
23 TRAFFIC FLOW BASED SYSTEM
24 MINIMAL LEVEL CONSTRAINTS IAS = 230kts NORTHERN SEQUENCE LEG FL80 SOUTHERN SEQUENCE LEG FL70
25 FUEL ISSUE IDENTIFICATION IAA engaged regulator, airlines, FMS manufacturers and data houses 6 months before implementation when fuel issue highlighted. In retrospect, engagement from earlier stages of the project may have identified potential fuel issues. LAPMO DIRECT TO MERGE POINT
26 ADDRESSING THE FUEL ISSUE The ANSP and its Regulator participated in Forums and Task Forces to identify potential solutions to the fuel issue. Participation of all appropriate disciplines is vital to ensure any identified solutions are feasible, cost-effective and efficient. ANSP REG FUEL FORUM AIRLINES DATA FMS
27 FUEL ISSUE AWARENESS The ANSP conducted an aggressive awareness campaign for airlines flight crew and operations departments to inform them about the flight planning and fuelling STAR but this strategy had mixed success.
28 (NOT) GETTING THE MESSAGE ACROSS It did not get full buy-in and led to some crews uplifting up to 400kgs per arrival to ensure no FMGC message was ever observed. Therefore proven fuel benefits of Point Merge not reportedly achieved by all airlines. Clearly, the extra un-needed fuel had not been carried then the benefits would have been available. The concept of Point Merge is relatively easy to grasp but fuel planning issues are complicated - therefore much ill-informed comment can contaminate the true picture. Bad press resulted from anecdotal comments made around the industry.
29 SCHADENFREUDE
30 RE-DESIGN? Re-design of the Dublin Point Merge system was considered, to be balanced between ATC requirements and those of the airlines Decided that reduction of sequence leg length was not appropriate because of consequent reduction of ATC linear holding capacity It is worth noting that, if aircraft were actually permitted to fly the short direct-to STAR, then fuelling would become less of an issue.
31 KEEP PILOTS INFORMED The ANSP should develop a robust method for providing pilots with realistic information regarding expected use of the sequence leg. This information may be enhanced by controllers giving pilots time/expected delay information derived from an appropriately-tuned arrival manager. Use of the enhanced information provided by the arrival manager could also lead to a reduction in the distance flown along the sequence leg.
32 MONITORING STILL VITAL Especially in the early days following implementation there were numerous occurrences of pilots wishing to actually fly the short flight planning and fuelling STAR, even after they had been issued with the long (ATC) STAR on first contact with Dublin ATC. This caused added RT workload and some confusion, and when introduced care must be taken to ensure aircraft do not fly the short STAR even though they have been issued with the long STAR.
33 L and X ON SAME COCKPIT CHART X L ATC ISSUE L
34 CONCLUSIONS Every location has different challenges Keep all the stakeholders well informed Keep an open mind to suggested changes Build a constructive relationship with the Regulator and. The benefits achievable are worth all the effort!
POINT MERGE A MORE EFFICIENT WAY OF SEQUENCING ARRIVALS
POINT MERGE A MORE EFFICIENT WAY OF SEQUENCING ARRIVALS Terry Symmans EUROCONTROL Experimental Centre The European Organisation for the Safety of Air Navigation Open Loop Radar Vectors Efficient and flexible
More informationIRISH AVIATION AUTHORITY DUBLIN POINT MERGE. Presented by James O Sullivan PANS-OPS & AIRSPACE INSPECTOR Irish Aviation Authority
IRISH AVIATION AUTHORITY DUBLIN POINT MERGE Presented by James O Sullivan PANS-OPS & AIRSPACE INSPECTOR Irish Aviation Authority 2012 Holding Holding Before Point Merge No Pilot anticipation of distance
More informationPBN AIRSPACE CONCEPT WORKSHOP. SIDs/STARs/HOLDS. Continuous Descent Operations (CDO) ICAO Doc 9931
International Civil Aviation Organization PBN AIRSPACE CONCEPT WORKSHOP SIDs/STARs/HOLDS Continuous Descent Operations (CDO) ICAO Doc 9931 Design in context Methodology STEPS TFC Where does the traffic
More informationMaking the World A better place to live SFO
Making the World A better place to live SFO August 2016 Emissions Reduction Roadmap Industry is strongly committed to achieve the targets Only with several lines of actions it is possible to reach 2020
More informationAtlantic Interoperability Initiative to Reduce Emissions AIRE
ICAO Colloquium on Aviation and Climate Change ICAO ICAO Colloquium Colloquium on Aviation Aviation and and Climate Climate Change Change Atlantic Interoperability Initiative to Reduce Emissions AIRE Célia
More informationFollow up to the implementation of safety and air navigation regional priorities XMAN: A CONCEPT TAKING ADVANTAGE OF ATFCM CROSS-BORDER EXCHANGES
RAAC/15-WP/28 International Civil Aviation Organization 04/12/17 ICAO South American Regional Office Fifteenth Meeting of the Civil Aviation Authorities of the SAM Region (RAAC/15) (Asuncion, Paraguay,
More informationAvinor. Southern Norway Airspace Project SNAP. Flyoperativt Forum. Per Arnt Auen, project manager. Gardermoen,
Avinor Southern Norway Airspace Project SNAP Flyoperativt Forum Gardermoen, 2013-04-10 Per Arnt Auen, project manager SNAP 1. Background, objectives and schedule 2. Airspace organization 3. RTS results
More informationFASI(N) IoM/Antrim Systemisation Airspace Change Decision
Safety and Airspace Regulation Group FASI(N) IoM/Antrim Systemisation Airspace Change Decision CAP 1584 Contents Published by the Civil Aviation Authority, August 2017 Civil Aviation Authority, Aviation
More informationHoneywell.com PBN Concepts Krakow, Poland
PBN Concepts Krakow, Poland EPKK (KRK) Current Operational Environment Current Operational Environment : Runways: 07/25 8,366 ft (2550m) Approaches: ILS or LOC 25 RNAV (GNSS) 07, 25 VOR 07, 25 NDB 25 Departure
More informationImplementation challenges for Flight Procedures
Implementation challenges for Flight Procedures A Data-house perspective for comprehensive Procedure Design solution: A need today Sorin Onitiu Manager Business Affairs, Government & Military Aviation,
More informationPBN Implementation inside Italian Airspace Status update Summer 2013
PBN Implementation inside Italian Airspace Status update Summer 2013 Paris, 11-13 September 2013 enav.it Contents Tasks achieved PBN implementation schedules On going activities Further aspects Conclusions
More informationNetwork Manager Adding value to the Network 29 September 2011
Network Manager Adding value to the Network 29 September 2011 Alain FOURNIE Head of Operational Monitoring & Reporting Directorate Network Management EUROCONTROL The European Organisation for the Safety
More informationFeasibility Study into increasing the altitude of the Noise Preferential Routes (NPRs) from 3000 to 4000 feet
Feasibility Study into increasing the altitude of the Noise Preferential Routes (NPRs) from 3000 to 4000 feet Presented by: Tom Redfern Environmental Specialist 20 th January 2016 Agenda What is a Noise
More informationRNP AR RWY 16 in Vienna Schwechat (LOWW) PBN based Noise Abatement
RNP AR RWY 16 in Vienna Schwechat (LOWW) PBN based Noise Abatement Dr. Philipp Daniel Schaad Head of Instrument Flight Procedures (ATM/IFP) ICANA, Frankfurt, November 2016 DIESER TEXT DIENT DER NAVIGATION
More informationColombian PBN implementation: El Dorado case study
Colombian PBN implementation: El Dorado case study SDM WORKSHOP ON PBN 19.10.2017 XAVIER OUTTERS SME & PROJECT MANAGER NAVBLUE SAS Electronic Flight Bag Dispatch Pre-flight Airport Databases - FlySmart+
More informationDesign Airspace (Routes, Approaches and Holds) Module 11 Activity 7. European Airspace Concept Workshops for PBN Implementation
Design Airspace (Routes, Approaches and Holds) Module 11 Activity 7 European Airspace Concept Workshops for PBN Implementation Design in Context TFC Where does the traffic come from? And when? RWY Which
More informationIRELAND AERONAUTICAL INFORMATION SERVICE IRISH AVIATION AUTHORITY BALLYCASEY CROSS SHANNON CO. CLARE Tel Fax
IRELAND AERONAUTICAL INFORMATION SERVICE IRISH AVIATION AUTHORITY BALLYCASEY CROSS SHANNON CO. CLARE Tel +353 61 703750 Fax +353 61 366245 DUBLIN AIRPORT (EIDW) RUNWAY 10/28 UPGRADE PHASE 1 AND PHASE 2
More informationAir Navigation Bureau ICAO Headquarters, Montreal
Performance Based Navigation Introduction to PBN Air Navigation Bureau ICAO Headquarters, Montreal 1 Performance Based Navigation Aviation Challenges Navigation in Context Transition to PBN Implementation
More informationPJ25: AMAN Arrival Streaming
PJ25: AMAN Arrival Streaming NATS Operational Activity 2018-19 Gatwick Coupled AMAN-DMAN Gatwick XMAN Heathrow XMAN Extended Range Arrival Streaming Current Heathrow XMAN Operational Heathrow AMAN has
More informationAIR/GROUND SIMULATION OF TRAJECTORY-ORIENTED OPERATIONS WITH LIMITED DELEGATION
AIR/GROUND SIMULATION OF TRAJECTORY-ORIENTED OPERATIONS WITH LIMITED DELEGATION Thomas Prevot Todd Callantine, Jeff Homola, Paul Lee, Joey Mercer San Jose State University NASA Ames Research Center, Moffett
More informationSafety and Airspace Regulation Group
Page 1 of 11 Airspace Change Proposal - Environmental Assessment Version: 1.0/ 2016 Title of Airspace Change Proposal Change Sponsor Isle of Man/Antrim Systemisation (Revised ATS route structure over the
More informationSaint Petersburg-Clearwater International Airport. Airspace & Instrument Approach Analysis
Saint Petersburg-Clearwater International Airport Airspace & Instrument Approach Analysis February 23, 2005 Jeppesen Boeing Jeppesen Government / Military Services Group Airspace Services Division AIRSPACE
More informationREGULATION No. 10/2011 ON APPROVAL OF FLIGHT PROCEDURES INCLUDING SID-s AND STAR-s. Article 1 Scope of Application
Republika e Kosovës Republika Kosovo Republic of Kosovo Autoriteti i Aviacionit Civil i Kosovës Autoritet Civilnog Vazduhoplovstva Kosova Civil Aviation Authority of Kosovo Director General of Civil Aviation
More informationFlight Trials of CDA with Time-Based Metering at Atlanta International Airport
Flight Trials of CDA with Time-Based Metering at Atlanta International Airport John-Paul Clarke, James Brooks, Liling Ren, Gaurav Nagle, and Evan McClain Georgia Institute of Technology Grady Boyce Delta
More informationThe Network Manager User Forum 2017
The Network Manager User Forum 2017 Advanced ATFM Techniques istream Neptune & Sirius 26 January, 0900-1100 Pascal Hop NMD - Network Strategy Division Cooperative Traffic Management Target times Initial
More information1. Background. 2. Summary and conclusion. 3. Flight efficiency parameters. Stockholm 04 May, 2011
Stockholm 04 May, 2011 1. Background By this document SAS want to argue against a common statement that goes: Green departures are much more fuel/emission efficient than green arrivals due to the fact
More informationWhat is an Airspace Concept? Module 5
What is an Airspace Concept? Module 5 European Airspace Concept Workshops for PBN Implementation Overview Learning Objectives: At the end of this presentation you should: Understand what the purpose of
More informationIRELAND AERONAUTICAL INFORMATION SERVICES IRISH AVIATION AUTHORITY CONTROL TOWER SHANNON AIRPORT
IRELAND AIC AERONAUTICAL INFORMATION SERVICES IRISH AVIATION AUTHORITY Nr 10/02 CONTROL TOWER SHANNON AIRPORT 31 OCT CO. CLARE Tel +353 61 471954 Fax +353 61 471965 AFTN EINNYNYX OPERATIONS AT WESTON 1.
More informationCivil Military Cooperation
Civil Military Cooperation Aon Al-Garni General Manager ATM/ANS/GACA/KSA General Authority of Civil Aviation Kingdom of Saudi Arabia 1 Preview Civil Military Cooperation 1 Peace and stability are essential
More information2012 Performance Framework AFI
2012 Performance Framework AFI Nairobi, 14-16 February 2011 Seboseso Machobane Regional Officer ATM, ESAF 1 Discussion Intro Objectives, Metrics & Outcomes ICAO Process Framework Summary 2 Global ATM Physical
More informationAustralia s Favourite Airline Group. Leading through loyalty customers, partners and community
Flight Dispatcher Virgin Australia strategic objectives Australia s Favourite Airline Group. Leading through loyalty customers, partners and community 1. Impress our customers 2. Strengthen our relationships
More informationDon-Jacques OULD FERHAT VP Airspace and Airlines Services. Airbus. PBN Safety programs
Don-Jacques OULD FERHAT VP Airspace and Airlines Services Airbus PBN Safety programs Long term cooperation with China Complex projects in China RNP AR at Kathmandu airport Cochin : First RNP APCH in India
More informationRACOON PROJECT Daniele Teotino - ENAV. RACOON Project Manager Head of SESAR JU Activity Coordination
RACOON PROJECT Daniele Teotino - ENAV RACOON Project Manager Head of SESAR JU Activity Coordination RACOON in a Nutshell SESAR JU Very Large Scale Demonstration First Italian initiative on Remote TWR solutions
More informationDANUBE FAB real-time simulation 7 November - 2 December 2011
EUROCONTROL DANUBE FAB real-time simulation 7 November - 2 December 2011 Visitor Information DANUBE FAB in context The framework for the creation and operation of a Functional Airspace Block (FAB) is laid
More informationThe pilot and airline operator s perspective on runway incursion hazards and mitigation options. Session 3 Presentation 1
The pilot and airline operator s perspective on runway incursion hazards and mitigation options Session 3 Presentation 1 Operational Hazards Workload issues during taxiing that can result in a loss of
More informationICAO PBN Symposium Montreal - October Captain Johnny Woods Head of Flight Operations & Chief Pilot
ICAO PBN Symposium Montreal - October 2012 Captain Johnny Woods Head of Flight Operations & Chief Pilot Approach Alan Stealey, in his keynote address has identified most all of the benefits of an RNP-AR
More informationFLIGHT OPERATIONS PANEL (FLTOPSP)
International Civil Aviation Organization FLTOPSP/1-WP/3 7/10/14 WORKING PAPER FLIGHT OPERATIONS PANEL (FLTOPSP) FIRST MEETING Montréal, 27 to 31 October 2014 Agenda Item 4: Active work programme items
More informationLeveraging on ATFM and A-CDM to optimise Changi Airport operations. Gan Heng General Manager, Airport Operations Changi Airport Group
Leveraging on ATFM and A-CDM to optimise Changi Airport operations Gan Heng General Manager, Airport Operations Changi Airport Group Singapore Changi Airport Quick fact sheet 4 Terminals 2 Runways 113
More informationNATS TMA Programmes. #120_AF1 LAMP Phase 1A and #119_AF1 Manchester TMA. Mark McLaren
NATS TMA Programmes #120_AF1 LAMP Phase 1A and #119_AF1 Manchester TMA Mark McLaren Pilot Common Projects (PCP) IR 716/ 2014 PCP identifies two UK TMAs and includes four airports Heathrow Gatwick Stansted
More informationCDA Continuous Descent Approach
CDA Continuous Descent Approach Pilots view Cpt. Ir. Dirk De Winter EUROCONTROL - Brussels The European Organisation for the Safety of Air Navigation CDA Pilots Perspective What? CDA is all about the ability
More informationARRIVALS REVIEW GATWICK
ARRIVALS REVIEW GATWICK BO REDEBORN GRAHAM LAKE bo@redeborn.com gc_lake@yahoo.co.uk 16-12-2015 2 THE TASK Has everything been done that is reasonably possible to alleviate the noise problems from arriving
More informationTCAS Pilot training issues
November 2011 TCAS Pilot training issues This Briefing Leaflet is based in the main on the ACAS bulletin issued by Eurocontrol in February of 2011. This Bulletin focuses on pilot training, featuring a
More informationCLEARANCE INSTRUCTION READ BACK
CLEARANCE INSTRUCTION READ BACK 1. Introduction An ATC clearance or an instruction constitutes authority for an aircraft to proceed only in so far as known air traffic is concerned and is based solely
More informationTERMS OF REFERENCE FREDERICTON AIRSPACE REVIEW
TERMS OF REFERENCE FREDERICTON AIRSPACE REVIEW NAV CANADA Level of Service & Aeronautical Studies 77 Metcalfe Street, 5th Floor Ottawa, Ontario K1P 5L6 April, 2013 The information and diagrams contained
More informationContinuous Descent? And RNAV Arrivals
Continuous Descent? And RNAV Arrivals From an ATC Perspective Presentation to: CDA Workshop GA Tech Name: Don Porter RNP Project Lead FAA, RNAV RNP Group Date: 18 April 2006 My Background 22 years Terminal
More informationCooperative traffic management
3/17/2017 Cooperative traffic management Moderated by Peter Alty, SESAR JU #SESAR 2 Cooperative Traffic Management The Airport view 8 th March 2017 Alison Bates Head of Service Transformation and Ops Efficiency
More informationAnnecy Airport IFR briefing For indication only
1 DISCLAIMER The pieces of information provided are published only for indication, and are not exhaustive. We make our best effort to keep them updated. They are a valuable complement for flight preparation
More informationPBN Airspace Concept. ATS requirements
INTERNATIONAL CIVIL AVIATION ORGANIZATION PBN Airspace Concept ATS requirements Victor Hernandez RO ATM/SAR ICAO North America, Central America and Caribbean Regional Office 1 Gate to Gate concept Phases
More informationSurveillance and Broadcast Services
Surveillance and Broadcast Services Benefits Analysis Overview August 2007 Final Investment Decision Baseline January 3, 2012 Program Status: Investment Decisions September 9, 2005 initial investment decision:
More informationBeijing, 18 h of September 2014 Pierre BACHELIER Head of ATM Programme. Cockpit Initiatives. ATC Global 2014
Beijing, 18 h of September 2014 Pierre BACHELIER Head of ATM Programme Cockpit Initiatives for ATM ATC Global 2014 Page 2 Cockpit Initiatives for ATM Airbus vision on ATM transformation Airbus position
More informationTWELFTH WORKING PAPER. AN-Conf/12-WP/137. International ICAO. developing RNAV 1.1. efficiency. and terminal In line.
International Civil Aviation Organization WORKING PAPER 31/10/12 English only TWELFTH AIR NAVIGATION CONFERENCE Montréal, 19 to 30 November 2012 Agenda Item 5: Efficient flight paths through trajectory-based
More informationHosted by General Civil Aviation Authority (GCAA)
ICAO ATFM Seminar Hosted by General Civil Aviation Authority (GCAA) DFS experience related to ATFM from an individual state point of view Integration with the Network Manager Operation Center (NMOC, former
More informationUPDATE ON THE 6 IDEAS (1-4) NAV CANADA
UPDATE ON THE 6 IDEAS (1-4) THE 6 INITIATIVES 1. New approaches for night-time operations - Implemented 2. New departure procedures for night-time operations - Implemented 3. Increased downwind arrival
More informationSDM Workshop on PBN Airborne Perspective. Michael Hopp, Lufthansa Group Brussels,
Michael Hopp, Lufthansa Group Brussels, 19.10.2017 lufthansagroup.com Lufthansa Group SESAR Projects in the PBN Context 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 Prepare and Implement High
More informationInternational Civil Aviation Organization. PBN Airspace Concept. Victor Hernandez
International Civil Aviation Organization PBN Airspace Concept Victor Hernandez Overview Learning Objective: at the end of this presentation you should Understand principles of PBN Airspace Concept 2 Gate
More informationController Training Case Study Implementation of new RNP AR APCH for RWY07 (North Circuit) at HKIA
Controller Training Case Study Implementation of new RNP AR APCH for RWY07 (North Circuit) at HKIA Disclaimer This presentation is for information purposes only. It should not be relied on as the sole
More informationPBN and airspace concept
PBN and airspace concept 07 10 April 2015 Global Concepts Global ATM Operational Concept Provides the ICAO vision of seamless, global ATM system Endorsed by AN Conf 11 Aircraft operate as close as possible
More informationCase study London Heathrow & London Heathrow-Amsterdam
Case study London Heathrow & London Heathrow-Amsterdam VFE workshop Andrew Burke - Michael Glen - Sam Peeters NATS Heathrow Airport EUROCONTROL/PRU 26 November 2018 Climb & descent London Heathrow Case
More informationand the Environment Speaker: Guy Viselé External Communication Advisor ABC User Committee, February 2 nd 2009
and the Environment Speaker: Guy Viselé External Communication Advisor ABC User Committee, February 2 nd 2009 Contents Belgocontrol Environmental approach Emission management Serving today s aviation in
More informationDoing things differently
Doing things differently To navigate this document; click on the page names below or use the arrows in the top left corner. Doing things differently The leading ANSP Alliance that enables its members to
More informationRNAV Departures and STAR Operations Joint Safety Analysis and Implementation Team
and STAR Operations Joint Safety Analysis and Implementation Team Final Report Analysis and Recommendations February 12, 2015 and STAR Operations Joint Safety Analysis and Implementation Team Final Report
More informationAnalyzing & Implementing Delayed Deceleration Approaches
Analyzing & Implementing Delayed Deceleration Approaches Tom G. Reynolds, Emily Clemons & Lanie Sandberg R. John Hansman & Jacquie Thomas 12 th USA/Europe ATM Research & Development Seminar, Seattle, WA
More informationPerformance Based Navigation Implementation of Procedures
Performance Based Navigation Implementation of Procedures Dr. Daniel Schaad Head of Instrument Flight Procedures (ATM/IFP) Minsk, April 10th, 2015 DIESER TEXT DIENT DER NAVIGATION First of all thank you
More information4.1 This document outlines when a proposal for a SID Truncation may be submitted and details the submission requirements.
Safety and Airspace Regulation Group 13 May 2014 Policy Statement STANDARD INSTRUMENT DEPARTURE TRUNCATION POLICY 1 Introduction 1.1 This Policy Statement (PS) is intended to provide guidance to ANSPs
More informationPBN Implementation in the UK
PBN Implementation in the UK Geoff Burtenshaw Technical Advisor, Navigation Systems Directorate of Airspace Policy UK Civil Aviation Authority 06 October 06 October PBN TF/3 1 Presentation Overview UK
More informationFROM EXPERIENCE REPORTS TO EXPERIENCE SHARING
FROM EXPERIENCE REPORTS TO EXPERIENCE SHARING Pilots and controllers talk a lot over RT, but rarely in person. So when tensions and misunderstandings arise, these tend to remain unaddressed. In this article,
More informationUK Performance-based Navigation (PBN) Implementation Status
UK Performance-based Navigation (PBN) Implementation Status Geoff Burtenshaw Technical Advisor, Navigation Systems Directorate of Airspace Policy 1 Current Implementation of PBN in UK Airspace 2 Current
More informationFINAL REPORT BOEING B777, REGISTRATION 9V-SWH LOSS OF SEPARATION EVENT 3 JULY 2014
FINAL REPORT BOEING B777, REGISTRATION 9V-SWH LOSS OF SEPARATION EVENT 3 JULY 2014 AIB/AAI/CAS.109 Air Accident Investigation Bureau of Singapore Ministry of Transport Singapore 11 November 2015 The Air
More informationAirspace User View CRM. 17 February 2015
Airspace User View CRM 17 February 2015 Consultation ideas Awareness of all Stakeholders what do we do how do we do it and why do we do it that way how much is spent Engage on Expansion plans Investment
More informationNAM/CAR Regional Safety/Air Navigation/Aviation Security Implementation Matters 5.2 Effectiveness of air navigation implementation mechanisms
06/09/17 Seventh Meeting of the North American, Central American and Caribbean Directors of Civil Aviation (NACC/DCA/07) Washington, D. C., United States, 19 21 September 2017 Agenda Item 5: NAM/CAR Regional
More informationOptimized Profile Descents A.K.A. CDA A New Concept RTCA Airspace Working Group
Optimized Profile Descents A.K.A. CDA A New Concept RTCA Presented to Environmental Working Group December 05, 2007 Outline RTCA Charter and Terms of Reference Objectives Membership and Organization Activities
More informationThe VINGA project. Henrik Ekstrand Novair Flight Operations Aerospace Technology Congress
The VINGA project Henrik Ekstrand Novair Flight Operations Aerospace Technology Congress 2016-10-11 Introduction to the VINGA project Validation and Implementation of Next Generation Airspace A Single
More informationATM STRATEGIC PLAN VOLUME I. Optimising Safety, Capacity, Efficiency and Environment AIRPORTS AUTHORITY OF INDIA DIRECTORATE OF AIR TRAFFIC MANAGEMENT
AIRPORTS AUTHORITY OF INDIA ATM STRATEGIC PLAN VOLUME I Optimising Safety, Capacity, Efficiency and Environment DIRECTORATE OF AIR TRAFFIC MANAGEMENT Version 1 Dated April 08 Volume I Optimising Safety,
More informationHOLDING STACK MANAGEMENT
1. Introduction HOLDING STACK MANAGEMENT When an air traffic controller has such an amount of traffic in his approach area that he cannot handle more traffic for a determined or non-determined period of
More informationEuropean Joint Industry CDA Action Plan
Foreword In September 2008, CANSO, IATA and EUROCONTROL signed up to a Flight Efficiency Plan that includes a specific target to increase European CDA performance and achievement. This was followed in
More informationNext Generation Airspace Developments: Key Operational Trends and Enablers
Next Generation Airspace Developments: Key Operational Trends and Enablers ICNS 2013, Day 1 Plenary Nikos Fistas EUROCONTROL Herdon, VA, 23/04/13 Agenda Key goals of future European ATM system 4D Trajectory
More informationPBN Implementation. Phil Rakena. PBN Implementation Programme Manager
Implementation Phil Rakena Implementation Programme Manager CANSO APAC Conference - 06 th May 2017 Implementation Scope: What, Why, When? How to? o Needs / Plan o Collaborate o Educate o Regulate o Resource
More informationEfficiency and Automation
Efficiency and Automation Towards higher levels of automation in Air Traffic Management HALA! Summer School Cursos de Verano Politécnica de Madrid La Granja, July 2011 Guest Lecturer: Rosa Arnaldo Universidad
More informationi4d A MANUFACTURING INDUSTRY PERSPECTIVE GROUND AND AIRBORNE ASPECTS Michel Procoudine Lionel Rouchouse Thales
i4d A MANUFACTURING INDUSTRY PERSPECTIVE GROUND AND AIRBORNE ASPECTS Michel Procoudine Lionel Rouchouse Thales 1 Single European Sky ATM Research (SESAR) - Objectives Enabling EU skies to handle 3 times
More informationAIRSPACE. Aviation Consultancy at its best. Specialist aviation support to help solve problems for airports and airport developers
AIRSPACE Enabling Excellence in Aviation Aviation Consultancy at its best. Specialist aviation support to help solve problems for airports and airport developers www.cyrrus.co.uk AIRSPACE Airspace is a
More informationUpdates to Procedures at St. John s International Airport
October 10, 2017 Updates to Procedures at St. John s International Airport This document provides notice of upcoming changes to instrument procedures being implemented by NAV CANADA at the St. John s International
More informationSeychelles Civil Aviation Authority. Telecomm & Information Services Unit
Seychelles Civil Aviation Authority Telecomm & Information Services Unit 12/15/2010 SCAA 1 WORKSHOP EXERCISE Workshop on the development of National Performance Framework 6 10 Dec 2010 10/12/2010 SCAA
More informationSafety and Airspace Regulation Group. 31 May Policy Statement STANDARD INSTRUMENT DEPARTURE TRUNCATION POLICY.
Safety and Airspace Regulation Group 31 May 2018 Policy Statement STANDARD INSTRUMENT DEPARTURE TRUNCATION POLICY 1 Introduction 1.1 This Policy Statement (PS) presents CAA policy and guidance to Air Navigation
More informationUSE OF RADAR IN THE APPROACH CONTROL SERVICE
USE OF RADAR IN THE APPROACH CONTROL SERVICE 1. Introduction The indications presented on the ATS surveillance system named radar may be used to perform the aerodrome, approach and en-route control service:
More informationATFM IMPLEMENATION IN INDIA PROGRESS THROUGH COLLABORATION PRESENTED BY- AIRPORTS AUTHORITY OF INDIA
ATFM IMPLEMENATION IN INDIA PROGRESS THROUGH COLLABORATION PRESENTED BY- AIRPORTS AUTHORITY OF INDIA CONTENTS 1 India Civil Aviation Scenario 2 C-ATFM Concepts 3 C-ATFM Implementation 4 4 Road Value Ahead
More informationAERONAUTICAL SERVICES ADVISORY MEMORANDUM (ASAM) Focal Point : Gen
Page 1 of 8 1. INTRODUCTION 1.1. This material has been prepared to provide step-by-step guidance on the application of performance-based navigation (PBN) in developing an Airspace Change Proposal (ACP).
More informationStrategic airspace capacity planning in a network under demand uncertainty (COCTA project results)
Strategic airspace capacity planning in a network under demand uncertainty (COCTA project results) Prof. Dr. Frank Fichert Worms University of Applied Sciences Joint work with: University of Belgrade (Dr
More informationKeywords: Advanced Continuous Descent Approach, CDA, CORADA, RTA, Arrival Management
26 TH INTERNATIONAL CONGRESS OF THE AERONAUTICAL SCIENCES ENABLING TECHNOLOGY EVALUATION FOR EFFICIENT CONTINUOUS DESCENT APPROACHES R.J. de Muynck, L. Verhoeff, R.P.M. Verhoeven, N. de Gelder National
More informationQUIETER OPERATIONS A GUIDE FOR PILOTS AND CONTROLLERS
QUIETER OPERATIONS A GUIDE FOR PILOTS AND CONTROLLERS FOREWORD It takes a cross-industry effort to ensure that every flight happens safely and efficiently airlines, air navigation services, airport authorities,
More informationMetroAir Virtual Airlines
MetroAir Virtual Airlines NAVIGATION BASICS V 1.0 NOT FOR REAL WORLD AVIATION GETTING STARTED 2 P a g e Having a good understanding of navigation is critical when you fly online the VATSIM network. ATC
More informationNon Precision Approach (NPA) Status and Evolution
Non Precision Approach (NPA) Status and Evolution NPAs are still the scene of an important number of accidents. This statement was particularly true for Airbus during the past 12 months. That is the reason
More informationNATS. SAIP AD3 Jersey Interface Change Stage 1 Assessment Meeting. Friday 2 nd February x NATS presenters.
NATS SAIP AD3 Jersey Interface Change Stage 1 Assessment Meeting Friday 2 nd February 2018 3x NATS presenters Agenda Revised Statement of need Background Issues and benefits arising from proposed change
More informationModernising UK Airspace 2025 Vision for Airspace Tools and Procedures. Controller Pilot Symposium 24 October 2018
Modernising UK Airspace 2025 Vision for Airspace Tools and Procedures Controller Pilot Symposium 24 October 2018 Our airspace Flight Information Regions London & Scottish FIRs: 1m km 2 11% of Europe s
More informationDSNA NAVIGATION STRATEGY
DSNA NAVIGATION STRATEGY PBN & GNSS Ministère de l'écologie, du Développement durable, et de l Énergie PBN IMPLEMENTATION DRIVERS IN FRANCE ICAO directions towards PBN Improve Safety and Airspace Capacity,
More informationEuropean Aviation Safety Agency
Annexes I and II to ED Decision 2018/013/R European Aviation Safety Agency Acceptable Means of Compliance and Guidance Material to Commission Regulation (EU) No 1332/2011 and Commission Implementing Regulation
More informationB0 FRTO, B0-NOPS, B0-ASUR and B0-ACAS Implementation in the AFI and MID Regions
B0 FRTO, B0-NOPS, B0-ASUR and B0-ACAS Implementation in the AFI and MID Regions Seboseso Machobane RO ATM/SAR ICAO ESAF Regional Office, Nairobi Elie El Khoury RO ATM/SAR ICAO MID Regional Office, Cairo
More informationICAO PBN CONCEPTS, BENEFITS, AND OBJECTIVES
AFCAC/ICAO Joint Workshop Walter White ICAO PBN CONCEPTS, BENEFITS, AND OBJECTIVES 24 JUNE 2014 Airbus ProSky Corporate Presentation 29/06/2014 PERFORMANCE-BASED NAVIGATION The implementation of Performance-Based
More informationSafety Enhancement RNAV Safe Operating and Design Practices for STARs and RNAV Departures
Safety Enhancement Action: Implementers: Statement of Work: Safety Enhancement 213.5 RNAV Safe Operating and Design Practices for STARs and RNAV Departures To mitigate errors on Standard Terminal Arrival
More informationATFM IMPLEMENATION IN INDIA PROGRESS THROUGH COLLABORATION PRESENTED BY- AIRPORTS AUTHORITY OF INDIA
ATFM IMPLEMENATION IN INDIA PROGRESS THROUGH COLLABORATION PRESENTED BY- AIRPORTS AUTHORITY OF INDIA CONTENTS 1 India Civil Aviation Scenario 2 C-ATFM Concepts 3 C-ATFM Implementation 4 4 Road Value Ahead
More informationAnnecy Airport IFR briefing For indication only
1 DISCLAIMER The pieces of information provided are published only for indication, and are not exhaustive. We make our best effort to keep them updated. They are a valuable complement for flight preparation