Doing things differently

Size: px
Start display at page:

Download "Doing things differently"

Transcription

1 Doing things differently

2 To navigate this document; click on the page names below or use the arrows in the top left corner. Doing things differently The leading ANSP Alliance that enables its members to drive better performance for Stakeholders through business collaboration.

3 Delivering a Single European Sky Doing things differently for the benefit of customers Free Route Airspace Fuel efficiency Strategic Roadmapping Driving change Common AIM solution Cost savings Datalink Efficient infrastructure Environmental performance monitoring (3Di) Environment Borealis Alliance: Business collaboration for the benefit of customers

4 Free Route Airspace Free Route Airspace is key to the delivery of fuel efficient and environmentally friendly user preferred routings from the middle of the Atlantic to the Russian border A. Fuel efficient routings B. User preferred routings C. Cost savings for customers

5 Data Link F285 F285 F195 F195 Flight Level Flight Level F95 F95 TMA TMA TMA TMA GND CTR Journey CTR GND CTR Journey CTR When Datalink is in use Datalink usage area Implementing Rule Uses Datalink services (CPDLC) only for aircraft above FL285. For many of the Borealis ANSPs, and for airspace users in Borealis members airspace, this will provide only limited benefit as a large portion of the flights are shorthaul and will only stay above FL 285 for a very short time. Borealis ANSPs approach to Datalink services Use Datalink services from the top of the departed TMA throughout the full en-route phase until entering the TMA on arrival. Coverage will be in place at the time of initiating the service. The Optimised DLK services are related to enhanced messages and usage, to be developed from 2015 to A. Improved comms in greater area B. Enhanced safety C. Greater value from investment

6 AIM Our Approach A Regional AIM Service Aeronautical Information Management (AIM) provides vital information to customers on airspace design and procedures. A. Regulatory compliance B. Cost savings C. Improved accuracy REGIONAL AIM SERVICE P ADQ Compliance P Further cost savings P Centre of Excellence A Shared System P ADQ Compliance P Cost savings DATA AIM PRODUCTION SHARED SERVICE CENTRE Do Nothing P ADQ Compliance P High investments DATA DATA DATA DATA DATA DATA DATA DATA DATA AIM PRODUCTION INDIVIDUAL S

7 Strategic Roadmapping Delivering the Single European Sky through: A. Joint procurement B. Commercial collaboration C. Supporting consistent regulation Free Route Airspace All Borealis continental ANSPs using DLK services Optimised DLK Services developed Borealis Vision Communication Data Link (CPDLC) Navigation DK/SE & IAA NEFAB SCOTTISH FIR OCEANIC LONDON FIR UK/IRE Borealis 5 & Naviair Isavia Existing Fixed Assets ANSP x9 (Existing comms projects) Decommissioning of VOR stations ANSP x9 (Planned decommissioning) Borealis Vision Existing asset depreciation/transition to Alliance-led solution Existing asset depreciation/ transition to harmonised and flexible Performance Based Navigation procedures Ongoing PBN Projects Borealis Vision Development of optimised DLK Services

8 Environment Suboptimal Track OSLO Optimised Track OSLO LONDON HEATHROW LONDON HEATHROW 3Di benchmarking environmental performance Creating a baseline for performance across the combined airspace of Borealis Members, identifying areas of inefficiency using the 3Di environmental metric - key to understanding the environmental efficiency of aircraft routings Oslo to London Heathrow A. Optimising City Pairs B. Reducing fuel burn C. Balancing capacity and environment Height (Ft) :00:00 00:09:33 00:20:14 00:34:19 00:45:03 00:55:02 01:07:54 01:17:54 01:27:55 01:37:55 01:47:55 01:57:54 02:07:55 02:17:55 Flight Time

9

Delivering Free Route Airspace for Northern Europe ~ Progress to date. Branka Subotić, Executive Director

Delivering Free Route Airspace for Northern Europe ~ Progress to date. Branka Subotić, Executive Director Delivering Free Route Airspace for Northern Europe ~ Progress to date Branka Subotić, Executive Director Page 1 Borealis Alliance March 2016 Borealis Alliance 9 ANSPs 3 FABs > 3.8M flights/year > 10400

More information

Borealis Free Route Airspace ~ Concept of Operation ~ NM User Forum 28 January 2016

Borealis Free Route Airspace ~ Concept of Operation ~ NM User Forum 28 January 2016 Borealis Free Route Airspace ~ Concept of Operation ~ NM User Forum 28 January 2016 Page 0 Borealis FRA CONOPS Nov 2015 Borealis Alliance 9 ANSPs 3 FABs 3.8M flights 10500 flights daily Avinor (Norway),

More information

9 ANSPs 3 FABs > 4M flights/year > 11,000 flights daily 39% of European traffic

9 ANSPs 3 FABs > 4M flights/year > 11,000 flights daily 39% of European traffic 9 ANSPs 3 FABs > 4M flights/year > 11,000 flights daily 39% of European traffic Industry and Free Route Airspace (FRA) Programme Commenced on 1 st January 2015 and is expected to run until 2021, when the

More information

Modernising UK Airspace 2025 Vision for Airspace Tools and Procedures. Controller Pilot Symposium 24 October 2018

Modernising UK Airspace 2025 Vision for Airspace Tools and Procedures. Controller Pilot Symposium 24 October 2018 Modernising UK Airspace 2025 Vision for Airspace Tools and Procedures Controller Pilot Symposium 24 October 2018 Our airspace Flight Information Regions London & Scottish FIRs: 1m km 2 11% of Europe s

More information

International Civil Aviation Organization. PBN Airspace Concept. Victor Hernandez

International Civil Aviation Organization. PBN Airspace Concept. Victor Hernandez International Civil Aviation Organization PBN Airspace Concept Victor Hernandez Overview Learning Objective: at the end of this presentation you should Understand principles of PBN Airspace Concept 2 Gate

More information

ATNS Operations Division. Air Traffic Flow Management

ATNS Operations Division. Air Traffic Flow Management ATNS Operations Division Air Traffic Flow Management INDEX About ATNS What is Air Traffic Flow Management? Features of Air Traffic Flow Management Benefits of Air Traffic Flow Management Other services

More information

Towards the Future ATM

Towards the Future ATM Presented by Paul-Franck BIJOU, CEO of Quo Vadis, the PBN company by Airbus Towards the Future ATM ATC Guild Seminar New Delhi, Oct 20-21, 2010 Every 3 seconds in the world an Airbus aircraft takes off

More information

NEFAB Annual Report 2016

NEFAB Annual Report 2016 NEFAB Council #11/WP2 NEFAB Annual Report 2016 Version 1.0 Revision history Version Date Description/Change Author Approved 1.0 08.05.2017 LV 2 Main developments in 2016 NEFAB Strategy Implementation Plan

More information

SOUTH AFRICA PBN NEAR TERM IMPLEMENTATION PLAN PROJECT

SOUTH AFRICA PBN NEAR TERM IMPLEMENTATION PLAN PROJECT PRE-PLANNING PHASE Nomination of the State Focal Point of Contact Appointment of the South Africa PBN Project Manager and Team Define the goals and objectives of Project Define the Terms of Reference for

More information

TWELFTH AIR NAVIGATION CONFERENCE

TWELFTH AIR NAVIGATION CONFERENCE International Civil Aviation Organization 19/3/12 WORKING PAPER TWELFTH AIR NAVIGATION CONFERENCE Montréal, 19 to 30 November 2012 (Presented by the Secretariat) EXPLANATORY NOTES ON THE AGENDA ITEMS The

More information

ENVIRONMENTAL BENEFITS FROM IMPROVED OPERATIONAL MEASURES. Guido Kerkhofs Director ATM Programmes EUROCONTROL

ENVIRONMENTAL BENEFITS FROM IMPROVED OPERATIONAL MEASURES. Guido Kerkhofs Director ATM Programmes EUROCONTROL ENVIRONMENTAL BENEFITS FROM IMPROVED OPERATIONAL MEASURES Guido Kerkhofs Director ATM Programmes EUROCONTROL EUROCONTROL Air Traffic Emissions Estimates EU 27 States 2004-2006 Tonnes of CO 2 Drop Page

More information

Seychelles Civil Aviation Authority. Telecomm & Information Services Unit

Seychelles Civil Aviation Authority. Telecomm & Information Services Unit Seychelles Civil Aviation Authority Telecomm & Information Services Unit 12/15/2010 SCAA 1 WORKSHOP EXERCISE Workshop on the development of National Performance Framework 6 10 Dec 2010 10/12/2010 SCAA

More information

IMPLEMENTATION OF ADS-B BY NAV CANADA

IMPLEMENTATION OF ADS-B BY NAV CANADA IMPLEMENTATION OF ADS-B BY NAV CANADA Carole Stewart-Green Manager, ATS Regulatory Coordination ABOUT NAV CANADA Private, non-share capital company Second largest ANSP in the world 12 million aircraft

More information

NEFAB Programme Business Plan Document date: 2017/08/31 Version 1.0 NEFAB PROGRAMME BUSINESS PLAN Version 1.0

NEFAB Programme Business Plan Document date: 2017/08/31 Version 1.0 NEFAB PROGRAMME BUSINESS PLAN Version 1.0 NEFAB Programme Business Plan 2018 2022 Document date: 2017/08/31 Version 1.0 NEFAB PROGRAMME BUSINESS PLAN 2018-2022 Version 1.0 Document revision history Version Date Status Approval 1.0 08/09/2017 Approved

More information

2012 Performance Framework AFI

2012 Performance Framework AFI 2012 Performance Framework AFI Nairobi, 14-16 February 2011 Seboseso Machobane Regional Officer ATM, ESAF 1 Discussion Intro Objectives, Metrics & Outcomes ICAO Process Framework Summary 2 Global ATM Physical

More information

NEFAB Project Feasibility Study Report Operational Concept

NEFAB Project Feasibility Study Report Operational Concept NEFAB Project Feasibility Study Report Operational Concept Page 1 of 16 TABLE OF CONTENTS 1. INTRODUCTION... 4 2. AIRSPACE DESIGN... 6 2.1 ATS Routes and Free Routes 6 2.2 Sectorisation 6 2.3 Airspace

More information

ICAO EUR Region Civil/Military Cooperation Seminar/Workshop

ICAO EUR Region Civil/Military Cooperation Seminar/Workshop ICAO EUR Region Civil/Military Cooperation Seminar/Workshop ICAO Training Institute Kyiv and UkSATSE Boryspil, Ukraine, 28-31 October 2013 ICAO European and North Atlantic Office 6 November 2013 Page 1

More information

2.6% /14 Forward Plan. 4.1 Traffic Outlook. Eurocontrol STATFOR s 2013 Medium-Term Forecast for 2015

2.6% /14 Forward Plan. 4.1 Traffic Outlook. Eurocontrol STATFOR s 2013 Medium-Term Forecast for 2015 4 2013/14 Forward Plan 2.6% Eurocontrol STATFOR s 2013 Medium-Term Forecast for 2015 4.1 Traffic Outlook Traffic levels continue to be affected by a combination of the fragile economic situation in the

More information

Russian Federation ATM modernization program

Russian Federation ATM modernization program Russian Federation ATM modernization program Alexander Vedernikov Deputy Director of Federal Air Transport Agency 20-21 March, 2012, Moscow Main strategic directions of Russian Air Navigation System development

More information

PBN Performance. Based Navigation. - PBN & Airspace Concepts - ICAO PBN Seminar Introduction to PBN

PBN Performance. Based Navigation. - PBN & Airspace Concepts - ICAO PBN Seminar Introduction to PBN PBN Performance Based Navigation - PBN & Airspace Concepts - Introduction to PBN 1 Learning Objectives PBN Concept within the context of an Airspace (Operational) Concept. Introduction to PBN 2/37 Components

More information

Aeronautical Communications: Changes Ahead - FCI

Aeronautical Communications: Changes Ahead - FCI Aeronautical Communications: Changes Ahead - FCI Aviation Electronics Europe Munich, Germany 25-26 March 2015 Nikos Fistas EUROCONTROL v 1.0 Agenda Current Status Future Communication Infrastructure (FCI)

More information

French DSNA approach to CNS rationalization & evolution

French DSNA approach to CNS rationalization & evolution French DSNA approach to CNS rationalization & evolution Jean-Marc LOSCOS Senior expert on European Programs DSNA Toulouse CONTEXT: EUROPEAN ATM MASTER PLAN 2015 AND SINGLE EUROPEAN SKY (SES) The Single

More information

Welcome to AVI AFRIQUE 2017

Welcome to AVI AFRIQUE 2017 Welcome to AVI AFRIQUE 2017 Single African sky and Functional Airspace Blocks: Improving Air Traffic Management The global ATM operational concept is fundamental framework drive ATM operational requirements,

More information

EUROPEAN COMMISSION DIRECTORATE-GENERAL FOR MOBILITY AND TRANSPORT

EUROPEAN COMMISSION DIRECTORATE-GENERAL FOR MOBILITY AND TRANSPORT EUROPEAN COMMISSION DIRECTORATE-GENERAL FOR MOBILITY AND TRANSPORT DIRECTORATE E - Air Transport E.2 - Single sky & modernisation of air traffic control Brussels, 6 April 2011 MOVE E2/EMM D(2011) 1. TITLE

More information

TWELFTH AIR NAVIGATION CONFERENCE

TWELFTH AIR NAVIGATION CONFERENCE International Civil Aviation Organization 16/5/12 WORKING PAPER TWELFTH AIR NAVIGATION CONFERENCE Montréal, 19 to 30 November 2012 Agenda Item 5: Efficient flight paths through trajectory-based operations

More information

UK Implementation of PBN

UK Implementation of PBN UK Implementation of PBN Geoff Burtenshaw Directorate of Airspace Policy UK Civil Aviation Authority 1 UK airspace context Presentation Overview Future Airspace Strategy (FAS) (FAS) Industry Implementation

More information

Air traffic services (ATS) datalink using Iris Precursor. Contextual note SESAR Solution description form for deployment planning

Air traffic services (ATS) datalink using Iris Precursor. Contextual note SESAR Solution description form for deployment planning Purpose: Release 5 SESAR Solution ID #109 Contextual note SESAR Solution description form for deployment planning This contextual note introduces a SESAR Solution with a summary of the results stemming

More information

Continuous Improvement of the Global Air Traffic Management System

Continuous Improvement of the Global Air Traffic Management System Continuous Improvement of the Global Air Traffic Management System Nancy Graham Director/Air Navigation Bureau Vince Galotti Chief/Air Traffic Management 1 Message Air traffic management contributes to

More information

Combined ASIOACG and INSPIRE Working Group Meeting, 2013 Dubai, UAE, 11 th to 14 th December 2013

Combined ASIOACG and INSPIRE Working Group Meeting, 2013 Dubai, UAE, 11 th to 14 th December 2013 IP/2 Combined ASIOACG and INSPIRE Working Group Meeting, 2013 Dubai, UAE, 11 th to 14 th December 2013 Agenda Item 2: Action Item from ASIOACG/7 Indian Ocean RNP4 (Presented by Airservices Australia) SUMMARY

More information

Benefits of CNS/ATM Implementation for the Region

Benefits of CNS/ATM Implementation for the Region Benefits of CNS/ATM Implementation for the Region IATA today www.iata.org 227 Airline Members from 143 countries accounting for 94% of total international traffic 200 partners Representation in 90 countries

More information

ENVIRONMENT ACTION PLAN

ENVIRONMENT ACTION PLAN ENVIRONMENT ACTION PLAN 2015 16 Airservices Australia 2015 This work is copyright. Apart from any use as permitted under the Copyright Act 1968, no part may be reproduced by any process without prior written

More information

Peter Sorensen Director, Europe Safety, Operations & Infrastructure To represent, lead and serve the airline industry

Peter Sorensen Director, Europe Safety, Operations & Infrastructure To represent, lead and serve the airline industry Future of ATM Peter Sorensen Director, Europe Safety, Operations & Infrastructure To represent, lead and serve the airline industry 1 1 Air Traffic Management (ATM) Management of aircraft and airspace

More information

(RN R A N V A V & & RN R P N

(RN R A N V A V & & RN R P N PBN (RNAV & RNP) 1 What is the Perfect Flight? 2 Conventional Navigation [1920s] Ground-based navigation aids (NAVAIDs) Aircraft Overfly NAVAID or Intersection Display Accuracy is a Function of Distance

More information

PROJECT: EUR/SAM CORRIDOR AIRSPACE CONCEPT

PROJECT: EUR/SAM CORRIDOR AIRSPACE CONCEPT SAT/20 WP/10 Attachement A PROJECT: EUR/SAM CORRIDOR AIRSPACE CONCEPT SAT Region PROJECT DESCRIPTION (PD) Title of the Project Starting date Ending date Meetings on The Improvement of Air Traffic Services

More information

ICAO Cyber Summit & Exhibition CLOSING REMARKS. 10 April 2017

ICAO Cyber Summit & Exhibition CLOSING REMARKS. 10 April 2017 ICAO Cyber Summit & Exhibition CLOSING REMARKS 10 April 2017 1 Definitions Cyber adjective - relating to or characteristic of the culture of computers, information technology, and virtual reality. "the

More information

TRINIDAD AND TOBAGO PIARCO FIR/NATIONAL ASBU PLAN

TRINIDAD AND TOBAGO PIARCO FIR/NATIONAL ASBU PLAN TRINIDAD AND TOBAGO PIARCO FIR/NATIONAL ASBU PLAN 1 ICAO ASBU WORKSHOP ANR ROBINSON INTERNATIONAL AIRPORT RUNWAY 11 PRESENTED BY RIAAZ MOHAMMED AND ROHAN GARIB ICAO Regional NAM/CAR Workshop on the Aviation

More information

North Atlantic Initiatives

North Atlantic Initiatives North Atlantic Initiatives Monday, 17 March 2014; Session 4 (3:30 5:00) PRESENTED BY: Terry Cecil FAA International Operators Conference Tampa, FL March 17 20, 2014 Briefing Objective North Atlantic Initiatives

More information

Introducing Free Route Airspace: Summary Paper from NEFAB Customer Consultation Days Helsinki, October 21, 2014 and Oslo, October 23, 2014

Introducing Free Route Airspace: Summary Paper from NEFAB Customer Consultation Days Helsinki, October 21, 2014 and Oslo, October 23, 2014 Introducing Free Route Airspace: Summary Paper from NEFAB Customer Consultation Days Helsinki, October 21, 2014 and Oslo, October 23, 2014 NEFAB Programme Office organised customer consultation days on

More information

NAM/CAR Regional Performance-based Air Navigation Implementation Plan (RPBANIP) Luis Sanchez ICAO NACC Regional Office

NAM/CAR Regional Performance-based Air Navigation Implementation Plan (RPBANIP) Luis Sanchez ICAO NACC Regional Office NAM/CAR Regional Performance-based Air Navigation Implementation Plan (RPBANIP) Luis Sanchez ICAO NACC Regional Office Outline NAM/CAR Regional Performance-based Air Navigation Implementation Plan (RPBANIP)

More information

TWENTY-SECOND MEETING OF THE ASIA/PACIFIC AIR NAVIGATION PLANNING AND IMPLEMENTATION REGIONAL GROUP (APANPIRG/22)

TWENTY-SECOND MEETING OF THE ASIA/PACIFIC AIR NAVIGATION PLANNING AND IMPLEMENTATION REGIONAL GROUP (APANPIRG/22) INTERNATIONAL CIVIL AVIATION ORGANIZATION TWENTY-SECOND MEETING OF THE ASIA/PACIFIC AIR NAVIGATION PLANNING AND IMPLEMENTATION REGIONAL GROUP (APANPIRG/22) Bangkok, Thailand, 5-9 September 2011 Agenda

More information

THE DEVELOPMENT OF NATIONAL PERFORMANCE FRAMEWORK FOR ANS IN ERITREA Presented by Ghebreab Ghebremedhin Director ANS/AGA Division

THE DEVELOPMENT OF NATIONAL PERFORMANCE FRAMEWORK FOR ANS IN ERITREA Presented by Ghebreab Ghebremedhin Director ANS/AGA Division THE DEVELOPMENT OF NATIONAL PERFORMANCE FRAMEWORK FOR ANS IN ERITREA 2011-2015 Presented by Ghebreab Ghebremedhin Director ANS/AGA Division DEVELOPMENT OF NATIONAL PERFORMANCE FRAMEWORK FOR AIR NAVIGATION

More information

UK-Ireland FAB. Plan Final

UK-Ireland FAB. Plan Final UK-Ireland FAB Plan 2012-15 Final 31.05.12 Page Intentionally Left Blank Joint Chief Executive Forward We are pleased with the continued success and progress of the UK-Ireland FAB. Its underlying objective

More information

ATM STRATEGIC PLAN VOLUME I. Optimising Safety, Capacity, Efficiency and Environment AIRPORTS AUTHORITY OF INDIA DIRECTORATE OF AIR TRAFFIC MANAGEMENT

ATM STRATEGIC PLAN VOLUME I. Optimising Safety, Capacity, Efficiency and Environment AIRPORTS AUTHORITY OF INDIA DIRECTORATE OF AIR TRAFFIC MANAGEMENT AIRPORTS AUTHORITY OF INDIA ATM STRATEGIC PLAN VOLUME I Optimising Safety, Capacity, Efficiency and Environment DIRECTORATE OF AIR TRAFFIC MANAGEMENT Version 1 Dated April 08 Volume I Optimising Safety,

More information

INTERNATIONAL CIVIL AVIATION ORGANIZATION WESTERN AND CENTRAL AFRICAN OFFICE. Lisbon, Portugal, 19 to 20 May 2010

INTERNATIONAL CIVIL AVIATION ORGANIZATION WESTERN AND CENTRAL AFRICAN OFFICE. Lisbon, Portugal, 19 to 20 May 2010 INTERNATIONAL CIVIL AVIATION ORGANIZATION WESTERN AND CENTRAL AFRICAN OFFICE FOURTEENTH MEETING ON THE IMPROVEMENT OF AIR TRAFFIC SERVICES OVER THE SOUTH ATLANTIC (SAT/15) Lisbon, Portugal, 19 to 20 May

More information

ASIA PACIFIC Air Traffic Flow Management

ASIA PACIFIC Air Traffic Flow Management ASIA PACIFIC Air Traffic Flow Management Cross Border ATFM Seminar/Workshop Bangkok 17 th and 18 th November 2015 David Rollo Assistant Director SFO IATA Singapore rollod@iata.org APAC Growth Outline Current

More information

Single European Sky Awards Submission by the COOPANS Alliance. Short description of the project. (Required for website application)

Single European Sky Awards Submission by the COOPANS Alliance. Short description of the project. (Required for website application) Single European Sky Awards 2016 Submission by the COOPANS Alliance 27 th January 2016 Draft vfinal Short description of the project (Required for website application) The COOPANS Alliance is an international

More information

ICAO International Aviation and Environment Seminar OPERATIONAL IMPROVEMENTS. Presented by ICAO APAC RSO

ICAO International Aviation and Environment Seminar OPERATIONAL IMPROVEMENTS. Presented by ICAO APAC RSO ICAO International Aviation and Environment Seminar OPERATIONAL IMPROVEMENTS Presented by ICAO APAC RSO Operations in the Context of Aviation Planning & Pre-Flight Post Landing Applicable Operational Improvements

More information

NATIONAL AIRSPACE POLICY OF NEW ZEALAND

NATIONAL AIRSPACE POLICY OF NEW ZEALAND NATIONAL AIRSPACE POLICY OF NEW ZEALAND APRIL 2012 FOREWORD TO NATIONAL AIRSPACE POLICY STATEMENT When the government issued Connecting New Zealand, its policy direction for transport in August 2011, one

More information

Follow up to the implementation of safety and air navigation regional priorities XMAN: A CONCEPT TAKING ADVANTAGE OF ATFCM CROSS-BORDER EXCHANGES

Follow up to the implementation of safety and air navigation regional priorities XMAN: A CONCEPT TAKING ADVANTAGE OF ATFCM CROSS-BORDER EXCHANGES RAAC/15-WP/28 International Civil Aviation Organization 04/12/17 ICAO South American Regional Office Fifteenth Meeting of the Civil Aviation Authorities of the SAM Region (RAAC/15) (Asuncion, Paraguay,

More information

PBN IMPLEMENTATION IN INDONESIA

PBN IMPLEMENTATION IN INDONESIA PBN IMPLEMENTATION IN INDONESIA Program For The PBN Workshop For ATC I Wayan Sudiartha Head of the Standardization and Certification Division Profile of AirNav Indonesia Establishment : o Declared by Government

More information

Implementation of PBN in Armenian airspace

Implementation of PBN in Armenian airspace Implementation of PBN in Armenian airspace PBN implementation plan, based on the specifications of the airspace of the Republic of Armenia, has been developed in accordance with Resolution A36-23, approved

More information

Bangkok, Thailand, July State PBN Plan and Status of PBN Implementation THAILAND PBN IMPLEMENTATION PLAN. (Presented by Thailand)

Bangkok, Thailand, July State PBN Plan and Status of PBN Implementation THAILAND PBN IMPLEMENTATION PLAN. (Presented by Thailand) INTERNATIONAL CIVIL AVIATION ORGANIZATION FIFTH MEETING OF THE ASIA/PACIFIC PERFROMANCE BASED NAVIGATION TASK FORCE (PBN TF/5) Bangkok, Thailand, 15 17 July 2009 Agenda Item 3: 3.1 State PBN Plan and Status

More information

Sharing the Airspace- Effectively The UK Approach to FUA

Sharing the Airspace- Effectively The UK Approach to FUA Sharing the Airspace- Effectively The UK Approach to FUA Phil Roberts Assistant Director of Airspace Policy UK Civil Aviation Authority First of all may I begin by thanking our hosts from MOLDATSA for

More information

ATFM IMPLEMENATION IN INDIA PROGRESS THROUGH COLLABORATION PRESENTED BY- AIRPORTS AUTHORITY OF INDIA

ATFM IMPLEMENATION IN INDIA PROGRESS THROUGH COLLABORATION PRESENTED BY- AIRPORTS AUTHORITY OF INDIA ATFM IMPLEMENATION IN INDIA PROGRESS THROUGH COLLABORATION PRESENTED BY- AIRPORTS AUTHORITY OF INDIA CONTENTS 1 India Civil Aviation Scenario 2 C-ATFM Concepts 3 C-ATFM Implementation 4 4 Road Value Ahead

More information

Flight Procedure Design and Cartography

Flight Procedure Design and Cartography Flight Procedure Design and Cartography ATNS Air Traffic Management Division INDEX About ATNS What is Flight Procedure Design and Cartography? Features of Flight Procedure Design and Cartography Benefits

More information

Proposed Changes to Inverness Airport s Airspace The Introduction of Controlled Airspace and Optimisation of Instrument Flight Procedures

Proposed Changes to Inverness Airport s Airspace The Introduction of Controlled Airspace and Optimisation of Instrument Flight Procedures Proposed Changes to Inverness Airport s Airspace The Introduction of Controlled Airspace and Optimisation of Instrument Flight Procedures What is an Airspace Change Proposal? It is a formal UK Civil Aviation

More information

THE DEVELOPMENT OF NATIONAL PERFORMANCE FRAMEWORK FOR AIR NAVIGATION SYSTEMS MAURITIUS

THE DEVELOPMENT OF NATIONAL PERFORMANCE FRAMEWORK FOR AIR NAVIGATION SYSTEMS MAURITIUS THE DEVELOPMENT OF NATIONAL PERFORMANCE FRAMEWORK FOR AIR NAVIGATION SYSTEMS MAURITIUS 2011-2015 Presented by Ahmed Mosaheb Chief Officer ATM MAURITIUS Characteristics of the Industry FIR- 9,000,000 sq

More information

Workshop on the Performance Enhancement of the ANS through the ICAO ASBU framework. Dakar, Senegal, September 2017 presented by Emeric Osmont

Workshop on the Performance Enhancement of the ANS through the ICAO ASBU framework. Dakar, Senegal, September 2017 presented by Emeric Osmont Workshop on the Performance Enhancement of the ANS through the ICAO ASBU framework Dakar, Senegal, 18-22 September 2017 presented by Emeric Osmont The Aviation Community Indra 2 The Aviation Community

More information

ADS-B via Low Earth Orbiting Satellites Benefits Assessment

ADS-B via Low Earth Orbiting Satellites Benefits Assessment ADS-B via Low Earth Orbiting Satellites Benefits Assessment Jeff Dawson Director, Operational Support NAM/CAR ANI/WG/1 July 2013 Aireon LLC is a joint venture between NAV CANADA and Iridium to finance,

More information

AIM and PBN Airport Community Benefits. IAAE Saskatoon, May 2013

AIM and PBN Airport Community Benefits. IAAE Saskatoon, May 2013 AIM and PBN Airport Community Benefits IAAE Saskatoon, May 2013 1 AIM Fit for Purpose Information Chain Business Plan PBN Overview Implementation 2 AIM to IM FIT FOR PURPOSE Aeronautical Terrain and Obstacles

More information

ART Workshop Airport Capacity

ART Workshop Airport Capacity ART Workshop Airport Capacity Airport Research Bob Graham Head of Airport Research 21 st September 2016 Madrid Expectations The issues and opportunities for future research New solutions / directions for

More information

DANUBE FAB real-time simulation 7 November - 2 December 2011

DANUBE FAB real-time simulation 7 November - 2 December 2011 EUROCONTROL DANUBE FAB real-time simulation 7 November - 2 December 2011 Visitor Information DANUBE FAB in context The framework for the creation and operation of a Functional Airspace Block (FAB) is laid

More information

The Fourth ATS Coordination meeting of Bay of Bengal, Arabian Sea and Indian Ocean Region (BOBASIO/4) Kolkata, India, September, 2014.

The Fourth ATS Coordination meeting of Bay of Bengal, Arabian Sea and Indian Ocean Region (BOBASIO/4) Kolkata, India, September, 2014. The Fourth ATS Coordination meeting of Bay of Bengal, Arabian Sea and Indian Ocean Region (BOBASIO/4) Kolkata, India, 22-24 September, 2014. Agenda Item 4: Strategic ATM Plans of Participating States Upper

More information

FF-ICE A CONCEPT TO SUPPORT THE ATM SYSTEM OF THE FUTURE. Saulo Da Silva

FF-ICE A CONCEPT TO SUPPORT THE ATM SYSTEM OF THE FUTURE. Saulo Da Silva International Civil Aviation Organization SIP/2012/ASBU/Dakar-WP/19 FF-ICE A CONCEPT TO SUPPORT THE ATM SYSTEM OF THE FUTURE Saulo Da Silva Workshop on preparations for ANConf/12 ASBU methodology (Dakar,

More information

Framework Brief. Edinburgh SIDs

Framework Brief. Edinburgh SIDs Framework Brief 11-Nov-2015 CAA House Edinburgh SIDs 2 Security Statement Unclassified This presentation has been approved for public distribution and publication on the CAA website. Copyright 2015 NATS/

More information

PBN Implementation. Phil Rakena. PBN Implementation Programme Manager

PBN Implementation. Phil Rakena. PBN Implementation Programme Manager Implementation Phil Rakena Implementation Programme Manager CANSO APAC Conference - 06 th May 2017 Implementation Scope: What, Why, When? How to? o Needs / Plan o Collaborate o Educate o Regulate o Resource

More information

ICAO s Third Remotely Piloted Aircraft Systems (RPAS/3) Symposium Chengdu, Sichuan Province, China September 2018

ICAO s Third Remotely Piloted Aircraft Systems (RPAS/3) Symposium Chengdu, Sichuan Province, China September 2018 DAY 1 Monday, 10 September 2018 09:30 09:50 Welcome Remarks 09:50 10:45 Keynote Speech 10:45 11:15 Coffee Break Sponsored by: xxxx UA CATEGORIZATION responding to the rapid expansion and growth of the

More information

EFFICIENCY PFFs FOR ENROUTE, TERMINAL & COMMUNICATION UGANDA-CIVIL AVIATION AUTHORITY

EFFICIENCY PFFs FOR ENROUTE, TERMINAL & COMMUNICATION UGANDA-CIVIL AVIATION AUTHORITY EFFICIENCY PFFs FOR ENROUTE, TERMINAL & COMMUNICATION UGANDA-CIVIL AVIATION AUTHORITY INTERNATIONAL CIVIL AVIATION ORGANIZATION EASTERN AND SOUTHERN AFRICAN OFFICE WORKSHOP ON THE DEVELOPMENT OF NATIONAL

More information

Future ATM - from Asian operator's point of view

Future ATM - from Asian operator's point of view Future ATM - from Asian operator's point of view Martin Eran-Tasker Technical Director Association of Asia Pacific Airlines EIWAC2013 Tokyo, Japan 19-21 February 2013 Overview Global mobility Asia Pacific

More information

PBN, ADQ, ADQ2 IR EUROCONTROL Activities Status

PBN, ADQ, ADQ2 IR EUROCONTROL Activities Status PBN, ADQ, ADQ2 IR EUROCONTROL Activities Status Sylvie GRAND-PERRET DSS/SES Unit, EUROCONTROL ICAO EUR APV Workshop 25-27th of May 2011 The European Organisation for the Safety of Air Navigation PBN IR

More information

SAMPLE TEMPLATE APPENDIX 3.5C-1

SAMPLE TEMPLATE APPENDIX 3.5C-1 APIRG/19 Appendix 3.5 C1-C3 SAMPLE TEMPLATE APPENDIX 3.5C-1 AIR NAVIGATION REPORT FORM (ANRF) ASBU METHODOLOGY Regional and National planning for all ASBU Modules REGIONAL/NATIONAL PERFORMANCE OBJECTIVE

More information

i4d A MANUFACTURING INDUSTRY PERSPECTIVE GROUND AND AIRBORNE ASPECTS Michel Procoudine Lionel Rouchouse Thales

i4d A MANUFACTURING INDUSTRY PERSPECTIVE GROUND AND AIRBORNE ASPECTS Michel Procoudine Lionel Rouchouse Thales i4d A MANUFACTURING INDUSTRY PERSPECTIVE GROUND AND AIRBORNE ASPECTS Michel Procoudine Lionel Rouchouse Thales 1 Single European Sky ATM Research (SESAR) - Objectives Enabling EU skies to handle 3 times

More information

ATC Global 2014 EUROCONTROL WORKSHOP Towards GLOBAL ATFM 18 September Ken Mclean Director SFO IATA Singapore

ATC Global 2014 EUROCONTROL WORKSHOP Towards GLOBAL ATFM 18 September Ken Mclean Director SFO IATA Singapore ATC Global 2014 EUROCONTROL WORKSHOP Towards GLOBAL ATFM 18 September 2014 Ken Mclean Director SFO IATA Singapore mcleank@iata.org APAC Growth Outline Current Situation Airlines and ATFM Air Traffic Flow

More information

ATFM IMPLEMENATION IN INDIA PROGRESS THROUGH COLLABORATION PRESENTED BY- AIRPORTS AUTHORITY OF INDIA

ATFM IMPLEMENATION IN INDIA PROGRESS THROUGH COLLABORATION PRESENTED BY- AIRPORTS AUTHORITY OF INDIA ATFM IMPLEMENATION IN INDIA PROGRESS THROUGH COLLABORATION PRESENTED BY- AIRPORTS AUTHORITY OF INDIA CONTENTS 1 India Civil Aviation Scenario 2 C-ATFM Concepts 3 C-ATFM Implementation 4 4 Road Value Ahead

More information

UK Performance-based Navigation (PBN) Implementation Status

UK Performance-based Navigation (PBN) Implementation Status UK Performance-based Navigation (PBN) Implementation Status Geoff Burtenshaw Technical Advisor, Navigation Systems Directorate of Airspace Policy 1 Current Implementation of PBN in UK Airspace 2 Current

More information

Presented by: Trinidad and Tobago

Presented by: Trinidad and Tobago Presented by: Trinidad and Tobago November 2013 References ICAO PBN toolkit ICAO Global Air Navigation Plan (Doc 9750) ICAO PBN Manual (Doc 9613) Piarco FIR PBN Action Plan TTCAA PBN Core Implementation

More information

S 2 BAS Space Services Benefits in Aviation Systems. 2 nd ARTES Applications Workshop April 19 th, 2012 Harwell, UK

S 2 BAS Space Services Benefits in Aviation Systems. 2 nd ARTES Applications Workshop April 19 th, 2012 Harwell, UK S 2 BAS Space Services Benefits in Aviation Systems April 19 th, 2012 Harwell, UK General Aviation and Business traffic will expand in the near future (4-6% per year. Source: Eurocontrol, 2011) Regional

More information

GHANA S ACTION PLAN ON CO 2 EMISSIONS REDUCTION ACTIVITIES

GHANA S ACTION PLAN ON CO 2 EMISSIONS REDUCTION ACTIVITIES GHANA S ACTION PLAN ON CO 2 EMISSIONS REDUCTION ACTIVITIES SECTION 1 - CONTACT AND BACKGROUND INFORMATION 1.1 Contact Information Name of the Authority : Ghana Civil Aviation Authority Point of Contact

More information

Dynamic Airspace Overview concepts, complexities, benefits and outlook

Dynamic Airspace Overview concepts, complexities, benefits and outlook KUNDENNAME NM User Forum 2018 Dynamic Airspace Overview concepts, complexities, benefits and outlook CFSP view Agenda 01 Concepts 03 Benefits 02 Complexities & Issues 04 Outlook & Recommendations 2 Concepts

More information

IATA User Requirements for Air Traffic Services (URATS) NAVIGATION. MIDANPIRG PBN SG/3 Meeting Cairo, Egypt, February 2018

IATA User Requirements for Air Traffic Services (URATS) NAVIGATION. MIDANPIRG PBN SG/3 Meeting Cairo, Egypt, February 2018 IATA User Requirements for Air Traffic Services (URATS) NAVIGATION MIDANPIRG PBN SG/3 Meeting Cairo, Egypt, 11 13 February 2018 IATA at 30,000 ft Mission to represent, lead and serve the airline industry

More information

Place image here (10 x 3.5 ) FAA NEXTGEN DATA COMM TOWER SERVICE: CPDLC DCL NEW OPERATOR INTRODUCTION HARRIS.COM #HARRISCORP

Place image here (10 x 3.5 ) FAA NEXTGEN DATA COMM TOWER SERVICE: CPDLC DCL NEW OPERATOR INTRODUCTION HARRIS.COM #HARRISCORP Place image here (10 x 3.5 ) FAA NEXTGEN DATA COMM TOWER SERVICE: CPDLC DCL NEW OPERATOR INTRODUCTION HARRIS.COM #HARRISCORP Agenda Data Comm Basics Benefits of Data Comm Departure Clearance Explanation

More information

Enhancing capacity beyond infrastrucutre

Enhancing capacity beyond infrastrucutre Enhancing capacity beyond infrastrucutre Safety The air traffic management (ATM) industry is undergoing major changes, including: New entrants to airspace drones, remote air traffic control towers and

More information

EUROCONTROL. Eric MIART Manager - Airport Operations Programme (APR)

EUROCONTROL. Eric MIART Manager - Airport Operations Programme (APR) Traffic Forecast for 20 Years Resulting Challenges for Airports Potential Solutions AIRNETH, The Hague 12 th of April 2007 EUROCONTROL Eric MIART Manager - Airport Operations Programme (APR) www.eurocontrol.int/airports

More information

EUROCONTROL approach to the execution of the PBN IR Mandate

EUROCONTROL approach to the execution of the PBN IR Mandate EUROCONTROL approach to the execution of the PBN IR Mandate Sylvie GRAND-PERRET DSS/SES Unit, EUROCONTROL ICAO EUR APV Workshop 25-27th of May 2011 The European Organisation for the Safety of Air Navigation

More information

EUROCONTROL. Centralised Services concept. Joe Sultana Director Network Manager 1 July 2013

EUROCONTROL. Centralised Services concept. Joe Sultana Director Network Manager 1 July 2013 EUROCONTROL Centralised Services concept Joe Sultana Director Network Manager 1 July 2013 EUROCONTROL Centralised Services 2 Why do we need Centralised Services? Europe needs to be competitive again! a

More information

ADS-B Implementation and Regulation Meeting for the NAM/CAR/SAM Regions 26 to 30 November 2018 Mexico City, Mexico

ADS-B Implementation and Regulation Meeting for the NAM/CAR/SAM Regions 26 to 30 November 2018 Mexico City, Mexico ADS-B Implementation and Regulation Meeting for the NAM/CAR/SAM Regions 26 to 30 November 2018 Mexico City, Mexico INTEGRATION OF SPACE-BASED (SB ADSB) TECHNOLOGY INTO THE CANADIAN AIR NAVIGATION SYSTEM

More information

From AIS to AIM. COMSOFT AIS to AIM Lima, Peru Context and Overview Isabel Zambrano Rodriguez

From AIS to AIM. COMSOFT AIS to AIM Lima, Peru Context and Overview Isabel Zambrano Rodriguez From AIS to AIM COMSOFT AIS to AIM Lima, Peru 24-28.11.2014 Context and Overview Isabel Zambrano Rodriguez Context: Challenges to AIS Worldwide AIS throughout the world face a number of challenges : Air

More information

Air Traffic Management Services Plan

Air Traffic Management Services Plan Air Traffic Management Services Plan 2013 18 Airservices Australia 2013 This work is copyright. Apart from any use as permitted under the Copyright Act 1968, no part may be reproduced by any process without

More information

Remarks of CANSO Director General, Jeff Poole, at the CANSO Asia-Pacific Conference, 5-7 May 2014

Remarks of CANSO Director General, Jeff Poole, at the CANSO Asia-Pacific Conference, 5-7 May 2014 Remarks of CANSO Director General, Jeff Poole, at the CANSO Asia-Pacific Conference, 5-7 May 2014 Good morning and welcome to the CANSO Asia-Pacific Conference 2014 in Colombo, the capital and commercial

More information

Accra (Ghana) March SESSION 5 - Economy and airports management and navigation services

Accra (Ghana) March SESSION 5 - Economy and airports management and navigation services Accra (Ghana) 28-31 March 2017 SESSION 5 - Economy and airports management and navigation services «How can States engage the private sector and development assistance institutions for aviation infrastructure

More information

The benefits of satcom to airlines. Prepared by Helios for

The benefits of satcom to airlines. Prepared by Helios for The benefits of satcom to airlines Prepared by Helios for contents INTRODUCTION 3...What is satcom? 4..the evolution of satcom Atc benefits 5.benefits from datalink applications in oceanic ATC 6.SATCOM

More information

Civil and military integration in the same workspace

Civil and military integration in the same workspace Civil and military integration in the same workspace Presented by PLC 1 introduction Civilian and Military ATCOs work alongside each other in various countries and are employed in a number of different

More information

Overview. ETSO Workshop 2008 New Developments in Avionic. Friedhelm Runge

Overview. ETSO Workshop 2008 New Developments in Avionic. Friedhelm Runge ETSO Workshop 2008 New Developments in Avionic Friedhelm Runge Parts & Appliances Avionics PCM Dec. 2008 P&A section 1 Overview Single European Sky Communication Datalink 8.33 khz VHF Navigation ICAO PBN

More information

STRUCTURE. Arnis Muiznieks Ministry of Transport, Latvia

STRUCTURE. Arnis Muiznieks Ministry of Transport, Latvia STRUCTURE Arnis Muiznieks Ministry of Transport, Latvia Participants States: Finland Latvia Norway Estonia National Supervisory Authorities (NSAs): Lennuamet Trafi Latvijas civilās aviācijas aģentūra Luftfartstilsynet

More information

LAMP 2 - FASI(S) Network

LAMP 2 - FASI(S) Network Future Airspace Strategy Implementation South: ATS Route Network managed by NERL under London Airspace Management Programme 2 LAMP 2 - FASI(S) Network Stage 1 Assessment Meeting Friday 23 rd February 2018

More information

Overview of Worldwide Data Link Equipage Mandates

Overview of Worldwide Data Link Equipage Mandates Overview of Worldwide Data Link Equipage Mandates Wednesday, November 18, 2015 3:00 to 4:30 pm PRESENTED BY: Tom Kraft, FAA CPDLC and ADS-C Data Link Mandates (and Incentives) FAA Airborne Data Link Recording

More information

RNP OPERATIONS. We will now explain the key concepts that should not be mixed up and that are commonly not precisely understood.

RNP OPERATIONS. We will now explain the key concepts that should not be mixed up and that are commonly not precisely understood. RNP OPERATIONS 1. Introduction Planes were made as a means of transport. To successfully fly from a location A to a location B, pilots were first and foremost navigators. Originally relying on visual landmarks

More information

MIDANPIRG ATM SG/4 Meeting Amman, Jordan, 29 April 3 May 2018

MIDANPIRG ATM SG/4 Meeting Amman, Jordan, 29 April 3 May 2018 MIDANPIRG ATM SG/4 Meeting Amman, Jordan, 29 April 3 May 2018 United Arab Emirates ATM SG/4, Amman, Jordan 29 April-3 May 2018 1 Presentation Outline ATS Route improvements implemented ATS Routes planned

More information

This Bulletin may be updated, as necessary, as progress is made toward the start date for Phase 2b of the NAT DLM.

This Bulletin may be updated, as necessary, as progress is made toward the start date for Phase 2b of the NAT DLM. Serial Number: 2017_001_Rev 02 1 Subject: NAT common DLM AIC Originator: NAT SPG Issued: 19 July 2017 Effective: 21 July 2017 The purpose of North Atlantic Operations Bulletin 2017_001_Rev 02 is to provide

More information

Manual on Monitoring the Application of Performance-based Horizontal Separation Minima

Manual on Monitoring the Application of Performance-based Horizontal Separation Minima Manual on Monitoring the Application of Performance-based Horizontal Separation Minima (PBHSM Manual) Presented to: 2 nd NAT PBCS Workshop By: Christine Falk Date: 17-19 June 2015 Overview Why a PBHSM

More information