Fort Wayne/Allen County Trails Program

Size: px
Start display at page:

Download "Fort Wayne/Allen County Trails Program"

Transcription

1 Status Report Name Contractor WO # DES # Manager Description & Status Summary Ardmore Avenue: Airport Expressway to Second Street (entrance to airport) & Extend the trail from Airport Expressway to the entrance of the Fort Wayne International Airport. Trail will be constructed on the east side of Ardmore Avenue. Trail will be part of a road improvement project financed Tax Increment Financing (TIF). is at 60% design stage and has been routed. Right of way will be needed or mile Engineering Bass Road: Hillegas to Scott Consultant: American Structurepoint? Allen County Becketts Run Trail: St Joe Center to Clinton Consultant: Design inhouse 0187R Intersection improvement project and road widening project from 2 to 3 lanes, which will include a 10 ft wide multi-use trail. The trail will be constructed in various phases from The trail will be constructed on the north side between Hillegas and Hadley Roads. It will be located on the south side between Hadley and Scott Roads. Connection to Buckner Park. First phase includes roundabouts at Hadley and Flaugh, work on two bridges and several sections of trail. Completion is June 2019 for first phase Engineering & ROW & 4.5 miles Trail along west bank of St Joe River from St Joe Center Road (where it will connect Rivergreenway) to Becketts Run Stream and then westerly along Becketts Run to Clinton. We will need easements from Concordia Lutheran Seminary and AEP, and they are both supportive. Executed a Professional Services Agreement Engineering Resources to design bridge foundation, design culverts and submit permits. Notified all adjacent neighborhoods and will be meeting several of the neighborhoods in April and May miles Engineering Bluffton Road Trail: Lower Huntington Road to West Foster Park Consultant: V S Engineering 1: Hipskind 2: Key Concrete 3: Wayne Asphalt Covington Road Trail: Hadley to Getz Consultant: In-house and Engineering Resources Cougar Trail, PH I: Swinney to USF Consultant: DLZ Contractor: and Community Regional Authority (RDA) Fort Wayne Trails, Inc Walk Fort Wayne. Segment of Poka-bache Connector. Trail on east side and sidewalk on west side. 1 is the sidewalk from 338 ft north of Lower Huntington Rd to 200 feet south of Old Trail (WO #0172N). 2 is the sidewalk (wo# 0179N) from north of Old Trail to 800 ft south of Winchester. 1 sidewalk and Ph 2 sidewalk are complete. 3 is the trail and remaining sidewalk segments. 3 is complete except for restoration work, which will be done in the spring. Completion date was extended to 5/ miles Eight to ten foot wide trail on north side from Hadley to Getz Road. Executed a Professional Services Agreement Engineering Resources, Inc to begin survey & design work for bridge crossing of Durnell Drain and for trail crossing of Flaugh Ditch and the detention pond west of Cheri Court, as well as permitting. City staff will begin survey work and then design of trail. Aqua has a sewer project proposed for the north side of Covington from Hadley to the mortuary miles Survey A 12 ft wide trail from the Rivergreenway and Yarnelle Trail at Swinney Park to the Univ of Saint Francis. Talked Norfolk Southern in late August. They want the two billboard leases left out of the appraisals. Met consultant to make changes to design plans and legal description/plat for railroad corridor. After this is completed, we'll get the corridor appraised. FWT met University of St. Francis. 2021?.82 miles ROW Page 1 of 6

2 Status Report Name Contractor WO # DES # Manager Description & Status Summary Dupont Road Trail: Coldwater to Pine Mills Consultant: In-house design 0279R 8 ft wide concrete trail on south side of road. will also include sidewalk on north side from Pine Mills Rd to strip mall. Will begin survey work and then engineering soon. This trail will fill a gap, which will create a 4.7 mile long trail along Dupont from Lima to Tonkel. Met Board Member of Pine Valley on 3/29 to discuss sidewalk at their entrance or miles Survey Dupont Road Trail: Lima to Coldwater Consultant: GAI Consultants Contractor: Phend & Brown Hanna Street: Pontiac Street to Rudisill Boulevard Consultant: In-house Contractor: Key Concrete 0113-R Road widening project that will include a 10 ft wide trail on the south side and a sidewalk on the north side. Will also include a below-grade Pufferbelly Trail crossing of Dupont Rd. Utilities are still relocating, which has delayed the start of construction. Closure of Dupont Rd is now planned for late April to mid to late August for the construction of the Pufferbelly below-grade crossing. The trail, sidewalk and below-grade crossing should be finished and open for use by November 16, Entire project completion is expected in June of miles construction Eight foot wide concrete trail on east side of Hanna from Pontiac to Oxford and west side from Oxford to Rudisill. Will connect Weisser Park; Weisser Park Elementary School; bike lanes on Rudisill; and Foster Park & Rivergreenway via Rudisill bike lanes and sidewalk. We had three bids. The lowest bid, Key Concrete, was $38,000 over the engineer's estimate. Council approval is set for late April. Completion date is 8/31/ miles Bidding Hanna St: Rudisill to Pettit Ave Consultant: In-house 0281R Eight foot wide asphalt trail on west side of Hanna. Will begin survey work in the future miles Survey Hanna Street: US 27 to Tillman Rd and Southtown Centre Consultant: design in-house 0188R Illinois Road Trail & Sidewalk: Rockhill Park to Magnavox Way Consultant: Engineering Resources Contractor: partnering Ten foot wide trail on west side of Hanna from US 27/Lafayette to Tillman Rd and Tillman Park where the trail will tie into the Rivergreenway. From the intersection of Tillman Rd and Hanna to Southtown Centre, a sidewalk will be constructed on the south side of Tillman to North Phoenix Parkway and along North Phoenix Parkway to connect to existing sidewalk at Southtown Centre. Topographical survey is finished. Design is underway. Location control route survey will begin soon. We'll meet the week of April 9th to discuss the survey and acquisition mi trail; 0.3 mi sidewalk Engineering We are examining ways to move forward this project. Had a good meeting to discuss future phases of the project. I will be discussing the project the at their 4/9 meeting.?? Engineering IPFW Pedestrian Bridge over Coliseum Blvd Consultant: Engineering Resources, Inc Contractor: Primco IPFW & Ivy Tech Pedestrian bridge over Coliseum Boulevard to link Ivy Tech and IPFW campuses. This bridge will eventually tie into the Rivergreenway when trail segments are extended. The bridge now spans Coliseum Blvd. but is not complete. Concrete deck was poured on 3/ Page 2 of 6

3 Status Report Name Contractor WO # DES # Manager Description & Status Summary Lake Avenue Trail Consultant: In-house Contractor: Brooks Landin Road, 2 Engineering Liberty Mills Rd: Middle Grove to Falls Drive 0168-N partnering Community New Haven partnering Walk Fort Wayne. Trail on north side of Lake Avenue from Randallia Drive to Coliseum Blvd. Trail length along Lake is 1.24 miles. Trail will be bid in phases from Right of way was cleared in March. We had 2 bidders for Beacon to Hobson. Low bid was Brooks. Their bid was about $14,000 under the engineer's estimate. Approval from City Council is expected in mid to late April. Completion date is 10/26/ Approval of 1.24 miles bids Road diet (4 lanes to 2 lanes) 8 ft wide trails on each side North River Road to Powers. has been divided into 2 phases. 1 is Powers to railroad tracks and will be constructed in is the railroad tracks to North River Rd and will be constructed immediately following and miles Engineering TIF District will generate funding for construction in Trail design is at the 50% design phase. Will begin the wetland delineation in April. Trail design is out for preliminary routing to City and County Departments and Utilities miles Engineering Main Street Bridge over Trier Ditch New Haven project New bridge over the Trier Ditch. will include an 8 ft wide trail on north side and trail will extend to Moser Park. County working on interlocal agreement New Haven. Should be bid in late fall of mile? Maplecrest Road: State Blvd to Stellhorn Rd Contractor: 12269? City will be widening this section of Maplecrest Road. An 8 ft wide trail will be included on the west side and a sidewalk on the east side. A trail will also be constructed along sections of Stellhorn to make connections to shopping and restaurants. Trail length along Maplecrest will be 7140 lineal feet. Trail length along Stellhorn will be 1260 lineal feet. 111 of 112 parcels secured. has been phased. 1 will be State to Trier and will be bid in September of will be Trier to Stellhorn and will be bid one year later miles ROW Maysville Rd: Stellhorn to Maysville Circle Consultant: Design inhouse 0276N partnering Ten foot wide trail on east side; funded TIF. Will provide connection between Maysville Rd Trail under construction in 2018 Landin Rd Trail and Rivergreenway. Will begin survey and design in near future or miles survey Page 3 of 6

4 Status Report Name Contractor WO # DES # Manager Description & Status Summary Maysville Road: Stellhorn to Meijer Dr Consultant: Butler Fairman & Seufert Contractor: Brooks Power & Energy Trail: Northwood Plaza to St. Joe Center Rd Consultant: Inhouse design 0278R partnering City will widen the roadway to five lanes where needed; where not needed, we'll have a landscaped median. Ten foot wide trail on NW side and sidewalk on the other side. funded TIF. also includes trail on south side of Stellhorn from Maysville to Wheelock (0.26 miles) and sidewalk on west side of Maysville from Stellhorn south to Marathon Gas Station to tie in existing walk. Substantial completion in fall of of storm pipe has begun miles Eight foot wide trail on north side of Stellhorn Rd from Northwood Plaza (where it will tie into future Maplecrest Rd Trail) to AEP Transmission corridor by Eicher Drive. Ten foot wide trail from Stellhorn to St. Joe Center Rd along AEP corridor. Connection shopping, restaurants, Acres' Nature Preserve, Praise Park and Y. 2021? 1.3 miles Survey Pufferbelly Trail, I Consultant: Engineering & Resources, Inc Contractor: E&B Paving (bridge) partnering FWT & RDA is on former railroad corridor just north of State Blvd to Fernhill a trail spur to Franke Park. We have been awarded Regional Cities funding to help construct this trail in Significant completion by 11/18 final completion (restoration work) by 6/16/18. Paving and concrete work are complete. Restoration work will be completed in spring. City walked the trail construction manager and design engineer on 3/28 to review the work miles Pufferbelly Trail, 1A Consultant: In-house Contractor: Crosby Excavating 0010-R Pufferbelly Trail: Ludwig Rd to Washington Center Rd Consultant: Design inhouse 0241R partnering RDA Regional Authority Twelve foot wide trail from State Boulevard to intersection of Fourth and Clinton. Will connect Science Central, Lawton Park, Headwaters Park, Downtown and Rivergreenway. We had a ground-breaking ceremony on 3/15. is progressing well. Completion date is 6/22/ miles Regional Cities funds will help build this trail. Design is 95% complete. Working on permit revisions. The right of way was cleared in March. Will bid in April miles Engineering Pufferbelly Trail: Washington Center to north of Coliseum Blvd. (Sable Drive) Consultant: Design in-house 0280R & City Utilities The Northwest Feeder Water Main will be constructed in There are potentially 16 property owners for the trail project. The trail will follow the water main alignment on only about six of those 16 properties. Dawn has talked nine of the property owners. All but one are supportive of the trail. Will begin survey & design in early 2018.? 0.95 miles Survey Page 4 of 6

5 Status Report Name Contractor WO # DES # Manager Description & Status Summary Pufferbelly Trail Right of Way Acquisition: Gump Rd to County Line Allen County and Fort Wayne Trails, Inc County secured the Good Earth Farms parcel north of Payton County Park and the Whisper Rock parcel. County secured the Stein parcel. County is close to securing Russell parcel and Indiana Trails Fund parcel. FWT and County have had several meetings the three Twin Eagles homeowners' associations. They are supportive of the trail. Along east side of Kell Rd, developer donated 100 ft of ROW, including the railroad bridge, for the future trail.? ROW Rivergreenway Realignment Consultant: design in-house 0277R Move trail from sharing Brown Street and Juliette Street to the west bank of the river. Right of way is available between Brown Street and the south side of Hale. Will need to acquire right of way from 13 properties south of Hale.? 0.37 Survey St. Joe Center Road Trail: Meijer Drive to Chiswell Run and Wheelock Rd Trail from St. Joe Center Rd to Mill Ridge Run Consultant: DLZ 0183N Six Mile Creek Trail: Southtown Centre to Tillman Rd/Lemar Drive Contractor: Brooks Wayne Community partnering Public Fort Wayne Trails, Inc Walk Fort Wayne funded TIF. Ten foot wide asphalt trail that will run along the south side of St Joe Center Road from the existing trail at Meijer Drive to the sidewalk at Chiswell Run (entrance to Arlington Park). The trail will also extend south along the west side of Wheelock Road from St. Joe Center Road to south of Jefferson Middle School, where it will end at the existing pedestrian road crossing at Mill Ridge Run. Right of way acquisition is complete. Design is nearly complete. Awaiting construction funding before bidding mile Engineering Pre-final inspection INDOT and contractor was held on 12/21. We have given the contractor a very long punchlist of items to correct. Some of the items are not correctable until warmer temperatures. Contractor will complete the punchlist items the first two weeks of April State Boulevard: Cass to Spy Run Consultant: American Structurepoint Contractor Ph 1: Brooks Road widening and straightening project that will include a sidewalk, trail and the Pufferbelly Trail bridge. Eight - ten foot wide trail will run from the Pufferbelly Trail to the Rivergreenway on the south side of State. will be bid in 2 phases (lettings in Aug of 2017 and November 2018). Western phase ( Pufferbelly Bridge) will be constructed in Utility work for 1 (Clinton to Spy Run) will go thru the winter and actual construction work will begin in the spring. Completion for 1 is November Stormwater construction on 1 ROW and begins in March & miles Page 5 of 6

6 Status Report Name Contractor WO # DES # Manager Description & Status Summary Summit Park, 1 Consultant: Fleis & Vandenbrink 0073N partnering Trail (1.19 miles) and sidewalk (0.6 mile) project funded TIF. will connect three mobile home parks (1300 mobile homes) existing bike and pedestrian infrastructure on Lima Road. Includes sidewalk on north side of Washington Center from Village of North Oaks Mobile Home Park to former Grand Rapids-Indiana RR corridor; 10 ft wide trail along RR corridor from Washington Center to Ludwig; 10 ft wide trail from RR corridor to intersection of Ludwig and Lima on south side of Ludwig. Seven of 8 parcels secured. Will receive an EPA grant to help make the trailhead parking lot on Ludwig a pervious surface. The Washington Center Rd sidewalk from Village of North Oaks mobile home park to the railroad corridor is out for bid. Road closure will occur starting around June 4 for 150 days for the bridge project over Spy Run Creek, which also includes sidewalk construction. Notice to Proceed was issued to Fleis & Vandenbrink for the sidewalk from the railroad corridor to Lima on the north side of Washington Center. is now 3 phases mile sidewalk; 1.19 miles trail ROW & Bidding West Hamilton Road: Ridge Crest Crossing to SR 14 Contractor: Primco Allen County The County will replace the W Hamilton Rd Bridge over the Beal-Taylor Ditch and extend the existing trail from the entrance to the Vera Cruz subdivision (Ridge Crest Crossing) to the new trail on SR 14. Utilities have been relocated. Road will be closed until the completion date. Completion date is 5/11/ miles Page 6 of 6

ADAMS BISHOP BLACKHAWK

ADAMS BISHOP BLACKHAWK ADAMS CENTRAL 222 W. Washington Street, Monroe, IN 46772 Take U.S. 24 to I-469. Turn south on I-469 and go to exit 11 (27/33). Turn left and go south through Decatur. About four miles south of Decatur

More information

Woodlan Jr./Sr. High School Direction Book for Area Schools 2012

Woodlan Jr./Sr. High School Direction Book for Area Schools 2012 Woodlan Jr./Sr. High School Direction Book for Area Schools 2012 ADAMS CENTRAL 222 W. Washington Street, Monroe, IN 46772 Take U.S. 24 west to I-469. Turn south on I-469 and go to exit 11 (27/33). Turn

More information

ONONDAGA CREEKWALK PHASE II. Public Information Meeting Series 1

ONONDAGA CREEKWALK PHASE II. Public Information Meeting Series 1 ONONDAGA CREEKWALK PHASE II Public Information Meeting Series 1 Andrew Maxwell Director, Syracuse-Onondaga County Planning Agency Owen Kerney Assistant Director for City Planning Russell Houck, PE City

More information

Auburn Trail / Ontario Pathways Trail Connector Feasibility Study Public Information Meeting Wednesday, August 22, 2012

Auburn Trail / Ontario Pathways Trail Connector Feasibility Study Public Information Meeting Wednesday, August 22, 2012 Auburn Trail / Ontario Pathways Trail Connector Feasibility Study Public Information Meeting Wednesday, August 22, 2012 Purpose of Feasibility Study Purpose Evaluate the feasibility of constructing a multiuse

More information

Carlisle Connectivity Projects Communication Plan and Project Status

Carlisle Connectivity Projects Communication Plan and Project Status Carlisle Connectivity Projects Communication Plan and Project Status Overview Communication Plan Communication Plan Communication Plan Objective The Borough staff will develop and execute timely and effective

More information

FDOT Treasure Coast Traffic Report through

FDOT Treasure Coast Traffic Report through FDOT Treasure Coast Traffic Report 02 26 16 through 03 04 16 Kathleen Dempsey Fri 2/26/2016 2:56 PM To:Kathleen Dempsey ; 1 attachment 355 KB CR 714_Median Access Modifications.pdf;

More information

THREE MILE PLAN TOWN OF SUPERIOR COLORADO

THREE MILE PLAN TOWN OF SUPERIOR COLORADO THREE MILE PLAN TOWN OF SUPERIOR COLORADO February 23, 2015 INTRODUCTION This document has been prepared by the Town of Superior, Colorado, to address the existing and proposed land uses within an approximate

More information

CITY COUNCIL AGENDA MEMORANDUM

CITY COUNCIL AGENDA MEMORANDUM To: Mayor and City Council From: Charles Ozaki, City and County Manager Prepared By: Kevin Standbridge, Deputy City and County Manager Katie Allen, City and County Engineer David Shinneman, Community Development

More information

CITY OF BROOKFIELD Capital Improvement Fund Budget

CITY OF BROOKFIELD Capital Improvement Fund Budget CITY OF BROOKFIELD Capital Improvement Fund Budget The City adopts an annual capital improvement budget, based on a five-year capital improvement program (CIP). The annual budget and CIP are prepared by

More information

EXTERNAL COMMUNICATIONS TEAM MEETING MARCH 2015

EXTERNAL COMMUNICATIONS TEAM MEETING MARCH 2015 EXTERNAL COMMUNICATIONS TEAM MEETING MARCH 2015 1 SEGMENT 1 2 THE WISHBONE Connects the TEXpress Managed Toll System to the 35Express Managed Toll System Limits: Crown Road (near Royal Lane) to Valley

More information

IPFW INTERNATIONAL ORIENTATION 2010 VISITORS GUIDE IPFW INTERNATIONAL ORIENTATION 2010 VISITORS GUIDE

IPFW INTERNATIONAL ORIENTATION 2010 VISITORS GUIDE IPFW INTERNATIONAL ORIENTATION 2010 VISITORS GUIDE IPFW INTERNATIONAL ORIENTATION 2010 VISITORS GUIDE WELCOME TO FORT WAYNE Page 2 AIRPORTS Fort Wayne International Airport 3801 W. Ferguson Rd. Fort Wayne, IN 46809 (260) 747-4146 www.flyfwa.com 12.4 miles

More information

BUILD. Update CONSTRUCTION. In this issue: FEATURED PROJECT: KENT AVENUE ARCH CONSTRUCTION AT THE SJ RIVER VIADUCT FEBRUARY 2019

BUILD. Update CONSTRUCTION. In this issue: FEATURED PROJECT: KENT AVENUE ARCH CONSTRUCTION AT THE SJ RIVER VIADUCT FEBRUARY 2019 BUILD CONSTRUCTION Update FEBRUARY 2019 In this issue: ARCH CONSTRUCTION AT THE SJ RIVER VIADUCT FEATURED PROJECT: KENT AVENUE * Featured Project KENT AVENUE CP 2-3 CONSTRUCTION UPDATE February 2019 At

More information

EXTERNAL COMMUNICATIONS COMMITTEE MEETING APRIL 2015

EXTERNAL COMMUNICATIONS COMMITTEE MEETING APRIL 2015 EXTERNAL COMMUNICATIONS COMMITTEE MEETING APRIL 2015 35EXPRESS PROJECT OVERVIEW 2 SEGMENT 1 3 SOUTH OF I-635 May Shift northbound mainlane traffic east in the southeast quadrant Miscellaneous frontage

More information

BUILD. In this issue: NEW AERIALS OF CONSTRUCTION NEW PROJECT IN CONSTRUCTION PAC K AG E 4. August 2018

BUILD. In this issue: NEW AERIALS OF CONSTRUCTION NEW PROJECT IN CONSTRUCTION PAC K AG E 4. August 2018 BUILD C O N ST R U C T I O N Update August 2018 In this issue: NEW AERIALS OF CONSTRUCTION NEW PROJECT IN CONSTRUCTION PAC K AG E 4 AVENUE 12 CEDAR VIADUCT A VIEW FROM ROAD 27 ABOVE HSR CONSTRUCTION FRESNO

More information

Mason Street Bike/Pedestrian Trail Project

Mason Street Bike/Pedestrian Trail Project Construction of the much-anticipated Mason Trail is underway! Mountain Constructors was awarded the contract in September but had to go through a 2- month process to obtain construction clearance permits

More information

AGENCY NAME TRANSPORTATION

AGENCY NAME TRANSPORTATION TRANSPORTATION TRANSPORTATION AGENCY NAME Prince William County FY 2015 BUDGET CIP-TRANSPORTATION 561 Fuller Road/Fuller Heights Road Improvements Total Project Cost - $4.4 M This project will widen Fuller

More information

Northeast Corridor Transportation Update

Northeast Corridor Transportation Update Northeast Corridor Transportation Update Presented by: Stuart Basham Division 10 Planning Engineer North Carolina Department of Transportation October 2, 2014 Today s presentation includes: I-485 Outer

More information

FDOT Treasure Coast Traffic Impact Report March 25 through April 1, 2016

FDOT Treasure Coast Traffic Impact Report March 25 through April 1, 2016 March 25, 2016 Chuck McGinness, 954-777-4302 chuck.mcginness@dot.state.fl.us FDOT Treasure Coast Traffic Impact Report March 25 through April 1, 2016 TREASURE COAST Construction and maintenance-related

More information

Transportation TRANSPORTATION PROJECTS

Transportation TRANSPORTATION PROJECTS Transportation TRANSPORTATION PROJECTS Balls Ford Road Interchange Total Project Cost $142.9M This project includes the construction of a new diverging diamond interchange at Route 234 Bypass (Prince William

More information

DULLES AREA HIGHLIGHTS. Gary Garczynski Commonwealth Transportation Board Northern Virginia District. Committee for Dulles August 4, 2016

DULLES AREA HIGHLIGHTS. Gary Garczynski Commonwealth Transportation Board Northern Virginia District. Committee for Dulles August 4, 2016 DULLES AREA HIGHLIGHTS Gary Garczynski Commonwealth Transportation Board Northern Virginia District Committee for Dulles August 4, 2016 Smart Scale (formerly HB2) Overview Round 1 completed with the adoption

More information

Delaware County Engineer

Delaware County Engineer 2018 Project Presentation Delaware County Engineer 2018 ASHE LUNCHEON JANUARY 30, 2018 What s New at DCEO? New County Logos and Website Redesign GIS Upgrades Drone Program Planning for the Future ROADS,

More information

DOWNLOAD OR READ : MAP OF FORT WAYNE PDF EBOOK EPUB MOBI

DOWNLOAD OR READ : MAP OF FORT WAYNE PDF EBOOK EPUB MOBI DOWNLOAD OR READ : MAP OF FORT WAYNE PDF EBOOK EPUB MOBI Page 1 Page 2 map of fort wayne map of fort wayne pdf map of fort wayne Fort Wayne Historical Scavenger Hunt. Find the architectural designs that

More information

Culpeper District. Albemarle County Monthly Report December 2011

Culpeper District. Albemarle County Monthly Report December 2011 Culpeper District Albemarle County Monthly Report Special Issues Construction Significant Accomplishments (as of 11/15/11) Georgetown Road completed on November 8. I-64 Eastbound Shadwell Exit completed

More information

State Route 8 Corridor. Northern Summit County s Path to Success

State Route 8 Corridor. Northern Summit County s Path to Success State Route 8 Corridor Northern Summit County s Path to Success Construction Guide: 2008-2009 State Route 8 corridor work description State Route 8 Corridor 10 projects $262 million With its close proximity

More information

LANCASTER CORRIDOR REDEVELOPMENT ROSEDALE STREET REDESIGN PEACH STREET RAILROAD CROSSINGS

LANCASTER CORRIDOR REDEVELOPMENT ROSEDALE STREET REDESIGN PEACH STREET RAILROAD CROSSINGS LANCASTER CORRIDOR REDEVELOPMENT ROSEDALE STREET REDESIGN PEACH STREET RAILROAD CROSSINGS Presented at the SEE Development Excellence Workshop By Councilmember Wendy Davis, City of Fort Worth March 24,

More information

Construction underway. STATUS: 229 5,190 5,419 5,305 STIP REFERENCE #FR /01/2013

Construction underway. STATUS: 229 5,190 5,419 5,305 STIP REFERENCE #FR /01/2013 FREDERICK COUNTY STATE HIGHWAY ADMINISTRATION -- Frederick County -- Line 1 PROJECT: I-7, Baltimore National Pike INTERSTATE CONSTRUCTION PROGRAM DESCRIPTION: Widen I-7 east of MD 355 to east of MD 144

More information

FDOT Treasure Coast Traffic Impact Report October 9 through October 16, 2015

FDOT Treasure Coast Traffic Impact Report October 9 through October 16, 2015 From: Kathleen Dempsey To: Kathleen Dempsey Subject: FDOT Treasure Coast Traffic Report 10 09 15 through 10 16 15 Date: Friday, October 09, 2015 2:10:36 PM Attachments: image003.png CR 714_Median Construction

More information

Transportation Supporting Dulles Airport

Transportation Supporting Dulles Airport Transportation Supporting Dulles Airport Committee for Dulles Economic Development and Transportation Committee July 12, 2018 Tom Biesiadny, Director Fairfax County Multiple Transportation Improvements

More information

April 4, 2014 Chuck McGinness, FDOT TREASURE COAST TRAFFIC REPORT April 4 through April 11, 2014

April 4, 2014 Chuck McGinness, FDOT TREASURE COAST TRAFFIC REPORT April 4 through April 11, 2014 April 4, 2014 Chuck McGinness, 954-777-4090 Chuck.McGinness@dot.state.fl.us FDOT TREASURE COAST TRAFFIC REPORT April 4 through April 11, 2014 TREASURE COAST Construction and maintenance-related lane closures

More information

Palm Beach County Traffic Report July 13 through July 20, 2012

Palm Beach County Traffic Report July 13 through July 20, 2012 For Immediate Release July 13, 2012 Meredith Cruz, (561) 641-6440 mcruz@corradino.com Palm Beach County Traffic Report July 13 through July 20, 2012 Palm Beach County Palm Beach County traffic will be

More information

STAGE 2 & 3 Pavement reconstruction within viaduct footprint, pavement widening and resurfacing N/S of viaduct footprint, sidewalk

STAGE 2 & 3 Pavement reconstruction within viaduct footprint, pavement widening and resurfacing N/S of viaduct footprint, sidewalk STAGE 1 Viaduct removal, deck replacement on the River Bridge, and approach of the Chicago River Bridge north to Roscoe) Maintain local access roadways - 1 lane in each direction A signed alternate route

More information

INVESTMENT SUMMARY. RESIDENTIAL COMMERCIAL ** *

INVESTMENT SUMMARY.   RESIDENTIAL COMMERCIAL ** * 2017 Annual Report Belton Gateway Phase 2 Rendering INVESTMENT SUMMARY RESIDENTIAL 2015 2016 2017* NUMBER OF PERMITS ISSUED 18 106 101 INVESTMENT VALUE $2 Million $18 Million $20 Million COMMERCIAL 2015

More information

EXECUTIVE SUMMARY FALL Introduction. Findings

EXECUTIVE SUMMARY FALL Introduction. Findings EXECUTIVE SUMMARY FALL 2004 Introduction Trails are one of the most popular and highly desirable recreational resources in communities of all sizes throughout the country. In addition to providing a safe

More information

Fuller/Fuller Heights Road Improvements

Fuller/Fuller Heights Road Improvements Fuller/Fuller Heights Road Improvements Total Project Cost - $4.4M Project Description This project will construct a mini-roundabout at the intersection of Fuller Heights Road and Old Triangle Road to

More information

District Construction Progr am. John R. Kasich, Ohio Governor Jerry Wray, ODOT Director Steve Mary, P.E., District Deputy Director

District Construction Progr am. John R. Kasich, Ohio Governor Jerry Wray, ODOT Director Steve Mary, P.E., District Deputy Director District 8 2014 Construction Progr am Preble Greene Butler Warren Clinton Lebanon Hamilton Clermont Serving Butler, Clermont, Clinton, Greene, Hamilton, Preble and Warren Counties. John R. Kasich, Ohio

More information

Board of Park Commissioners Project Summary

Board of Park Commissioners Project Summary Board of Park Commissioners Project Summary Lawton Park Cannon Monument Restoration Project Scope of Work: Work includes but is not limited to the removal of cannon from its base, surface cleaning, corrosion

More information

RETAIL BUILDING 435 E. BRACKENRIDGE ST. & 442 E. DOUGLAS AVE., FORT WAYNE, IN FOR SALE

RETAIL BUILDING 435 E. BRACKENRIDGE ST. & 442 E. DOUGLAS AVE., FORT WAYNE, IN FOR SALE RETAIL BUILDING 435 E. BRACKENRIDGE ST. & 442 E. DOUGLAS AVE., FORT WAYNE, IN FOR SALE FEATURES: 13,840 SF available on 1.13 acres Building 1 (Brick) - 10,400 SF plus full lower level of 5,200 SF Building

More information

FDOT Treasure Coast Traffic Impact Report June 19 through June 26, 2015

FDOT Treasure Coast Traffic Impact Report June 19 through June 26, 2015 June 19, 2015 Chuck McGinness, 954-777-4302 chuck.mcginness@dot.state.fl.us FDOT Treasure Coast Traffic Impact Report June 19 through June 26, 2015 TREASURE COAST Construction and maintenance-related lane

More information

RELEASE: IMMEDIATE Oct. 6, 2017 CONTACT: Darragh Copley Frye (office) (cell)

RELEASE: IMMEDIATE Oct. 6, 2017 CONTACT: Darragh Copley Frye (office) (cell) RELEASE: IMMEDIATE Oct. 6, 2017 CONTACT: Darragh Copley Frye 540-899-4019 (office) 540-907-8409 (cell) Darragh.Frye@VDOT.Virginia.Gov VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT October 8 October 14,

More information

AND PERMITTEE DATE LOCATION OF WORK

AND PERMITTEE DATE LOCATION OF WORK 04 Aug 2003 Regulatory Branch PUBLIC NOTICE ------------- 1. Pursuant to Code of Federal Regulations 33 CFR 325.2(a)(8), the Chicago District issued permits or other approvals, withdrawals, appeals or

More information

VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT Aug , 2016

VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT Aug , 2016 RELEASE: IMMEDIATE Aug. 12, 2016 CONTACT: Kelly Hannon 540-374-3344 (office) 540-656-0321 (cell) Kelly.Hannon@VDOT.Virginia.Gov Stafford County Tina Bundy 540-899-4560 (office) 540-907-8325 (cell) Tina.Bundy@VDOT.Virginia.Gov

More information

MEMORANDUM VILLAGE OF NORTHBROOK

MEMORANDUM VILLAGE OF NORTHBROOK MEMORANDUM VILLAGE OF NORTHBROOK TO: Staff COPY: Village President & Board of Trustees Department Heads FROM: Richard Nahrstadt, Village Manager DATE: April 29, 2016 SUBJECT: STAFF BRIEFING WEEK OF April

More information

Port MacKenzie Rail Extension

Port MacKenzie Rail Extension Port MacKenzie Rail Extension Project The Matanuska-Susitna Borough (MSB) and the Alaska Railroad Corporation (ARRC) jointly propose construction and operation of a new rail line to connect the Borough

More information

Route 29 Business Replacing bridge over river and railroad in Altavista. Signed detour in place.

Route 29 Business Replacing bridge over river and railroad in Altavista. Signed detour in place. EASTER 2019 VDOT will lift most lane closures for holiday travel from noon Friday, April 19 until noon Tuesday, April 23. However, motorists may encounter semi-permanent work zones or travel delays in

More information

Corridor Management Committee Meeting. April 2, 2014

Corridor Management Committee Meeting. April 2, 2014 Corridor Management Committee Meeting April 2, 2014 1 Today s Topics Welcome Approval of Minutes Resolutions Response to March 26 CMC Questions Staff Recommendation on Project Scope and Budget Public Testimony

More information

IRONTON-RUSSELL BRIDGE REPLACEMENT

IRONTON-RUSSELL BRIDGE REPLACEMENT IRONTON-RUSSELL BRIDGE REPLACEMENT 2012-2016 District 9 Ohio Department of Transportation Ironton-Russell Bridge Replacement Existing Ironton-Russell Bridge Ironton-Russell Bridge Replacement Existing

More information

Fuller Road/Fuller Heights Road Improvements

Fuller Road/Fuller Heights Road Improvements Transportation Fuller Road/Fuller Heights Road Improvements Total Project Cost - $4.4M This project will widen Fuller Road, which is the entrance road serving the Quantico Marine Corps Base, the Town of

More information

Penny for Pasco Renewal. FY2014/15 thru FY2024/25

Penny for Pasco Renewal. FY2014/15 thru FY2024/25 Penny for Pasco Renewal FY2014/15 thru FY2024/25 1 Background Pasco Citizens Committee (PAC) Citizens Survey Results Coordination Activities Project Schedule Category Allocations Revenue Estimates Distribution

More information

York Region Rapid Transit Corporation. City of Vaughan Committee of the Whole June 1, 2016

York Region Rapid Transit Corporation. City of Vaughan Committee of the Whole June 1, 2016 York Region Rapid Transit Corporation City of Vaughan Committee of the Whole June 1, 2016 0 Agenda Future rapid transit projects > Yonge North Subway Extension [YNSE] > Regional Express Rail [RER] Current

More information

Exit 136 (Centreport Parkway/Stafford County) to Exit 130 (Route 3/Fredericksburg)

Exit 136 (Centreport Parkway/Stafford County) to Exit 130 (Route 3/Fredericksburg) RELEASE: IMMEDIATE Feb. 22, 2019 CONTACT: Darragh Frye 540-907-8409 (mobile) VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT Feb. 24 March 2, 2019 All work is scheduled weather permitting. Real-time information

More information

BOND PROGRAMS PROJECTS SCHEDULE AND DELIVERY

BOND PROGRAMS PROJECTS SCHEDULE AND DELIVERY BOND PROGRAMS PROJECTS SCHEDULE AND DELIVERY Presented to the City Council By the City Manager s Office May 10, 2016 1 Topics Update on Projects From Previous Bond Programs Prior to 2014 2014 Bond Program

More information

2009 Regional Solicitation Selected Projects*

2009 Regional Solicitation Selected Projects* 2009 Regional Solicitation Selected Projects* Special Federal Allocation from the MPO Mn/DOT I-494/TH169 Interchange Reconstruction $34,000,000 Surface Transportation Program - Urban Guarantee AR-09-10

More information

IMPLEMENTATION OF COMPREHENSIVE DEVELOPMENT AGREEMENT (CDA) PROJECTS:

IMPLEMENTATION OF COMPREHENSIVE DEVELOPMENT AGREEMENT (CDA) PROJECTS: IMPLEMENTATION OF COMPREHENSIVE DEVELOPMENT AGREEMENT (CDA) PROJECTS: SH 130 Project, Segments 5 & 6, Travis, Caldwell and Guadalupe counties; DFW Connector, Tarrant County; North Tarrant Express (NTE),

More information

Capital Program Delivery

Capital Program Delivery Capital Program Delivery Transportation & Public Works Department City Council FY 2013 Budget Workshop August 23, 2012 1 TPW Capital Programs 2013 Building Facilities Storm Water Management Roadway & Bridge

More information

COUNTY WIDE PROJECTS CURRENT SPLOST FUNDING

COUNTY WIDE PROJECTS CURRENT SPLOST FUNDING CAPITAL S IV - LIST Updated thru July 17, 2018 COUNTY WIDE S SP4001 911 Radio Replacement County 7,000,000 (440,000) 6,560,000 624,000 7,184,000 6,224,329 959,671 IN PROGRESS SP4002 Airport FBO 1,000,000-1,000,000-1,000,000

More information

Port MacKenzie Rail Extension

Port MacKenzie Rail Extension Port MacKenzie Rail Extension Project The Matanuska-Susitna Borough (MSB) and the Alaska Railroad Corporation (ARRC) jointly propose construction and operation of a new rail line to connect the Borough

More information

Gulf Coast MPO Obligated Projects

Gulf Coast MPO Obligated Projects Gulf Projects */ 104866/801000 STPD-9370-00(004) Dedeaux Rd. From Three Rivers Rd. to SR 605. MS $3,259,353 106448/701000 STP-8971-00(005) City of City of - widen to include three lanes on Hospital Road

More information

VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT June 12 June 18, 2016

VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT June 12 June 18, 2016 RELEASE: IMMEDIATE June 10, 2016 CONTACT: Kelly Hannon 540-374-3344 (office) 540-656-0321 (cell) Kelly.Hannon@VDOT.Virginia.Gov Tina Bundy 540-899-4560 (office) 540-907-8325 (cell) Tina.Bundy@VDOT.Virginia.Gov

More information

Northeast Quadrant Distinctive Features

Northeast Quadrant Distinctive Features NORTHEAST QUADRANT Northeast Quadrant Distinctive Features LAND USE The Northeast Quadrant includes all the area within the planning area that is east of Interstate 5 and to the north of State Route 44.

More information

Hospital Link Project Project Update September 2015

Hospital Link Project Project Update September 2015 Hospital Link Project Project Update September 2015 General The project provides a link between Riverside Drive and the Transitway to the Hospital Ring Road. This link is needed to improve transit service

More information

* Short term resurfacing projects are not included in this listing. 4T39.07 Project: Annual Rural County Sign Improvements, Genesee/Orleans Counties

* Short term resurfacing projects are not included in this listing. 4T39.07 Project: Annual Rural County Sign Improvements, Genesee/Orleans Counties New York State Department of Transportation 2008 Highway/Bridge Construction Projects * Short term resurfacing projects are not included in this listing. Genesee 4T39.07 Project: Annual Rural County Sign

More information

Item # 28. Chief Capital Management Officer Report. November 20, 2008

Item # 28. Chief Capital Management Officer Report. November 20, 2008 Item # 28 Chief Capital Management Officer Report November 20, 2008 1 Metro Gold Line Eastside Extension Project Update November 2008 6 Mile Alignment 1.7 Miles of Tunnel 8 Stations (6 At-grade & 2 Underground)

More information

State Project Reconstruction I-84

State Project Reconstruction I-84 State Project 151-273 Reconstruction I-84 Waterbury, Connecticut FROM WASHINGTON STREET TO PIERPONT ROAD I-84 Constructors J.V. Robert Turner Area Engineer Ken Fargnoli District Engineer John Dunham Assistant

More information

Interoffice Memorandum

Interoffice Memorandum Supplemental Information Agenda Item No. 5.1 May 1, 2014 Interoffice Memorandum May 1, 2014... Date Honorable Planning Commission... To Rick Carter, PE... From Agenda Item 5.1-2014-2019 Capital Improvement

More information

Expo E-News. Santa Monica s Getting Ready for Expo! Phase 2 Update Page 2. Keeping Our Community Informed

Expo E-News. Santa Monica s Getting Ready for Expo! Phase 2 Update Page 2. Keeping Our Community Informed Expo E-News Keeping Our Community Informed Winter 2014 Santa Monica s Getting Ready for Expo! Phase 2 Update Page 2 In this Issue : Page 4: Construction Update Page 6: Artist Profiles For more information

More information

LOST HILLS ROAD INTERCHANGE PROJECT CONSTRUCTION UPDATE. CALABASAS CITY COUNCIL April 26, 2017

LOST HILLS ROAD INTERCHANGE PROJECT CONSTRUCTION UPDATE. CALABASAS CITY COUNCIL April 26, 2017 LOST HILLS ROAD INTERCHANGE PROJECT CONSTRUCTION UPDATE CALABASAS CITY COUNCIL LOST HILLS ROAD INTERCHANGE PROJECT UPDATES Construction of CIDH piles for the soundwall foundation commenced on March 20

More information

Completion: August 2011 LS #321 Design LS #8

Completion: August 2011 LS #321 Design LS #8 1 CIPNumber c350406 2 c350302 3 c350902 LEGEND PERMITTING/ BIDDING CHARLOTTE COUNTY UTILITIES Burnt Store Water Reclamation Facility (Expansion to 0.75 MGD) East Port Expansion Water Reclamation Facility

More information

Blue River Trail Master Plan JSA to Town Hall June 2004

Blue River Trail Master Plan JSA to Town Hall June 2004 Blue River Trail Master Plan JSA to Town Hall June 2004 Prepared for: Silverthorne Town Council Silverthorne SPORT Committee Department of Recreation and Culture Silverthorne Public Works Silverthorne

More information

2017 TBARTA Future Regional Priority Projects Adopted by TBARTA Board, December 9, 2016

2017 TBARTA Future Regional Priority Projects Adopted by TBARTA Board, December 9, 2016 2017 TBARTA Future Regional Priority Projects Adopted by TBARTA Board, December 9, 2016 Project numbers do not signify ranking they are for mapping identification purposes only. 1. 15th Street East The

More information

Welcome to the Downtown Fort Lauderdale Neighborhood Working Group Meeting. First meeting june 17, 2010

Welcome to the Downtown Fort Lauderdale Neighborhood Working Group Meeting. First meeting june 17, 2010 Welcome to the Downtown Fort Lauderdale Neighborhood Working Group Meeting First meeting june 17, 2010 State of the Project Draft Environmental Impact Statement Study Phase This study is NOT the final

More information

Crenshaw/LAX Transit Project Construction Update Community Meeting. November 15, 2018

Crenshaw/LAX Transit Project Construction Update Community Meeting. November 15, 2018 Crenshaw/LAX Transit Project Construction Update Community Meeting November 15, 2018 Project Overview Walsh Shea Corridor Constructors (WSCC) Main Line & Stations Contractor Hensel Phelps Herzog (HPH)

More information

LONG TERM (OPERATION) IMPACTS AND POTENTIAL MITIGATION

LONG TERM (OPERATION) IMPACTS AND POTENTIAL MITIGATION 3.6 This chapter provides a project-level analysis of potential impacts to recreation sites in the study area including parks, natural areas, open spaces, trails, and playfields, as well as amenities such

More information

Exit 148 (Quantico) to Exit 133 (Route 17/Fredericksburg)

Exit 148 (Quantico) to Exit 133 (Route 17/Fredericksburg) RELEASE: IMMEDIATE March 1, 2019 CONTACT: Darragh Frye 540-907-8409 (mobile) VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT March 3 March 9, 2019 All work is scheduled weather permitting. Real-time information

More information

Additional Economic Development Strategy submissions- Klickitat County

Additional Economic Development Strategy submissions- Klickitat County Klickitat County Transportation Improvement Projects 1 White Salmon to Hood River Bridge Final EIS, design, bridge replacement 2 Klickitat County Rural Arterials Reconstruct to all-weather roads Part of

More information

Add-A-Lane Contract V. along a Section of I-95 includes 6 Bridges

Add-A-Lane Contract V. along a Section of I-95 includes 6 Bridges Newton Needham Chamber of Commerce Add-A-Lane Contract V along a Section of I-95 includes 6 Bridges Project File No. 603711 July 29, 2014 1 Agenda Project Update Overview Bid and Contract Award Schedule

More information

Guide to. Road Construction Projects

Guide to. Road Construction Projects Guide to Road Construction Projects 2018 Spring is here and so is road construction season. This year PennDOT District 11-0 will invest an estimated $208 million on 68 projects to improve, preserve or

More information

2 Construction Program

2 Construction Program 2018 C P 2018 Districtonstruction 2 Construction Program rogram district 2 Governor John Kasich ODOT Director Jerry Wray District Deputy Director Pat McColley, PE, SI 2018 Construction Program Thank you

More information

Northwest Triangle. Redevelopment Proposal. Property Acquisition, Engineering, and Demolition. December, 2005 REDEVELOPMENT AUTHORITY OF THE

Northwest Triangle. Redevelopment Proposal. Property Acquisition, Engineering, and Demolition. December, 2005 REDEVELOPMENT AUTHORITY OF THE Northwest Triangle Redevelopment Proposal Property Acquisition, Engineering, and Demolition December, 2005 REDEVELOPMENT AUTHORITY OF THE CITY OF YORK York City Redevelopment Authority 14 West Market Street,

More information

Basic Project Information

Basic Project Information FY 2015-16 PROJECT DESCRIPTION FORM (2C) Submitting Agency: Loudoun County Basic Project Information Project Title: Loudoun County Parkway (VA Route 607) U.S. 50 to Creighton Rd. (2C) Project Type (check

More information

- Countywide - Roadway Cone Zone / Lane Closure / Sidewalk Repair Schedule

- Countywide - Roadway Cone Zone / Lane Closure / Sidewalk Repair Schedule Report for Monday, September 10, 2018 through Monday, September 17, 2018 S. Perry Park Rd. (DC105) and Red Rocks Dr. Intersection Improvements Safety improvements on the S. Perry Park Road (DC 105) and

More information

Palm Beach County Traffic Report August 24 through August 31, 2012

Palm Beach County Traffic Report August 24 through August 31, 2012 For Immediate Release August 24, 2012 Meredith Cruz, (561) 641-6440 mcruz@corradino.com Palm Beach County Traffic Report August 24 through August 31, 2012 Palm Beach County Palm Beach County traffic will

More information

Update on Trinity Trails. Presented by: Richard Zavala, Director Park and Recreation Department February 7, 2017

Update on Trinity Trails. Presented by: Richard Zavala, Director Park and Recreation Department February 7, 2017 Update on Trinity Trails Presented by: Richard Zavala, Director Park and Recreation Department February 7, 2017 Overview Provide review of trail planning and development along the main stem Trinity River

More information

Progress Report for Projects of Regional Significance

Progress Report for Projects of Regional Significance Rosedale Highway facing west January 2017 What s Inside? Kern Council of Governments Progress Report for Projects of Regional Significance EDITION Status Information on: Safety & Maintenance...this section

More information

MORGAN CREEK GREENWAY Final Report APPENDICES

MORGAN CREEK GREENWAY Final Report APPENDICES APPENDICES MORGAN CREEK GREENWAY Appendix A Photos of Existing Conditions in Trail Corridor Photos of existing conditions Main trail corridor - February 2009 Photos of existing conditions south bank Morgan

More information

For Immediate Release Christine Girardin January 19, 2018 SUMTER COUNTY FLORIDA S TURNPIKE AND I-75 INTERCHANGE IMPROVEMENTS

For Immediate Release Christine Girardin January 19, 2018 SUMTER COUNTY FLORIDA S TURNPIKE AND I-75 INTERCHANGE IMPROVEMENTS TRAFFIC ADVISORY For Immediate Release Christine Girardin 407-264-3069 January 19, 2018 Central and West Central Florida Weekly Lane Closures and Work Zone Advisory OCOEE Florida s Turnpike announces lane

More information

Business Item No XXX. Proposed Action That the Metropolitan Council approve the Coon Creek Regional Trail Master Plan.

Business Item No XXX. Proposed Action That the Metropolitan Council approve the Coon Creek Regional Trail Master Plan. Business Item No. 2015-XXX Metropolitan Parks and Open Space Commission Meeting date: July 7, 2015 For the Community Development Committee meeting of July 20, 2015 For the Metropolitan Council meeting

More information

BUILD INDIANA COUNCIL Infrastructure Media Summary April 20, 2010

BUILD INDIANA COUNCIL Infrastructure Media Summary April 20, 2010 BUILD INDIANA COUNCIL Infrastructure Media Summary April 20, 2010 Public hearing held for 641 Bypass WTHI Kate Greene After nearly 10 years in the making the 641 bypass is in it's final two phases. Thursday

More information

PennDOT Interstate Work next week March 30-April 3:

PennDOT Interstate Work next week March 30-April 3: PennDOT Interstate Work next week March 30-April 3: Interstate 80 Interstate 81 DELAYS THIS WEEK: Exit 256 to the Schuylkill County line. Eastbound & Westbound. Bridge cleaning Monday (3/30), Tuesday (3/31)

More information

County of Fairfax, Virginia. Silver Line Update. Committee for Dulles March 2, Mark Canale Fairfax County Department of Transportation

County of Fairfax, Virginia. Silver Line Update. Committee for Dulles March 2, Mark Canale Fairfax County Department of Transportation Silver Line Update Committee for Dulles March 2, 2017 Mark Canale Fairfax County Department of Transportation Phase 1 Summary Old Meadow Road Realignment design work proceeding, construction to be completed

More information

N. Central St. & W. Jackson Ave. Streetscape Projects

N. Central St. & W. Jackson Ave. Streetscape Projects N. Central St. & W. Jackson Ave. Streetscape Projects October 13, 2016 Meeting Overview North Central Street City of Knoxville KUB History & Vision Plan Timing Project Area Overview Schedule Communications

More information

LPA Location Federal Funds Awarded to LPA. Fairfield Avenue, SR 101 and Oxford Pike

LPA Location Federal Funds Awarded to LPA. Fairfield Avenue, SR 101 and Oxford Pike LPA Location Federal Funds Awarded to LPA Allen County Allen County Bridge #271: South County Line Road over St Marys River $1,091,200.00 Boone County On CR 500W, approximately 750' South of Middle Jamestown

More information

City of Haslett. City of East Lansing. City of East Lansing

City of Haslett. City of East Lansing. City of East Lansing Central Park North (Nancy L. Moore Park) Lake Park North Expansion White Park Expansion #2 White Park Expansion #1 County East East Haslett East East TF87-212 Acquisition $90,000.00 Park. TF08-138 Acquisition

More information

Whittier Bridge Project

Whittier Bridge Project Amesbury / Newburyport / Salisbury Whittier Bridge / I-95 Improvement Project Original Whittier Bridge Proposed Whittier Bridges 10/21/2016 Whittier Bridge Project 1 Project Description The project limits

More information

Teltow Contracting, Inc.

Teltow Contracting, Inc. Tim Horton s we are a Sub Leonard C. Carnaghi AEW 199,395.50 201,609.52 586 791-7171 24388 Sorrentino Count Brian Clinton MI 48035 Date Started: 4-01-08 Finished 7-15-08 Work Performed: storm, water, grading

More information

SUPPORT THE ROUTE 58 PPTA: A Good Investment in Virginia

SUPPORT THE ROUTE 58 PPTA: A Good Investment in Virginia Project Profile: SUPPORT THE ROUTE 58 PPTA: A Good Investment in Virginia In 1989, the General Assembly established the Route 58 Corridor Development Program to enhance economic development potential across

More information

Section 3.6. Parklands & Recreation Areas

Section 3.6. Parklands & Recreation Areas Section 3.6: Parklands & Recreation Areas Section 3.6 Parklands & Recreation Areas 3.6 PARKLANDS AND RECREATION AREAS 3.6.1 Introduction to Analysis This section provides an overview of parklands and recreational

More information

Lawrence Loop SWOT Analysis

Lawrence Loop SWOT Analysis Alignment: D1 (Map Color: Dark Blue) Description: This alignment connects to the north end of the Burroughs Creek Trail and continues along the west side of the Railroad to 8 th Street. Strengths: - This

More information

A History of the Construction of the Radial Expressway System in Cook County

A History of the Construction of the Radial Expressway System in Cook County ILLINOIS ASSOCIATION OF STATE HIGHWAY ENGINEERS 2017 ANNUAL CONFERENCE SEPTEMBER 29, 2017 A History of the Construction of the Radial Expressway System in Cook County 1948-1964 Andrew Plummer Transportation

More information

ATTACHMENT B. Reference No.

ATTACHMENT B. Reference No. ATTACHMENT B Projects in the Five-Year Capital Improvement Program for Fiscal Years Ending 2014-2018 GOVERNMENT CODE SECTION 65402 GENERAL PLAN CONFORMITY ANALYSIS 1 4 Orcutt GS Station 21 (Orcutt) Rebuild

More information

PROGRESS REPORT WATERFRONT PROGRAM. Q (January - March) Highlights from Q1 2018

PROGRESS REPORT WATERFRONT PROGRAM. Q (January - March) Highlights from Q1 2018 WATERFRONT PROGRAM PROGRESS REPORT Q1 2018 (January - March) Highlights from Q1 2018 Advanced Pier 62 Rebuild construction including completion of Pier 62 demolition in February 2018. Prepared for the

More information