1 ATTACHMENT B Projects in the Five-Year Capital Improvement Program for Fiscal Years Ending GOVERNMENT CODE SECTION GENERAL PLAN CONFORMITY ANALYSIS 1 4 Orcutt GS Station 21 (Orcutt) Rebuild This project consists of the replacement of Fire Station 21 in Orcutt. The current station was built in 1967 and is inadequate to support the current staffing and operations at this station. It also does not currently meet the building requirements for fire facilities under the Essential Facilities Act of A replacement 6,800 square feet station will be constructed at the current site. 2 3 Santa Maria Valley PW Roadway Improvements Betteravia Safety Improvements 3 4 Orcutt PW Roadway Improvements Clark Avenue SRTS This project will install edge and center line rumble strips at various locations on Betteravia Road between Black Road and Main Street. Flashing beacons will also be installed as advance warning at the intersection of Black Road and Betteravia Road. The Federal Highway Safety Improvement Program (HSIP) will pay for 90% of the project cost. Measure A will cover the 10% local match. This project will enhance accessibility to Orcutt Junior High and Orcutt Academy High schools for pedestrians traveling to school from east of Highway 135 along Clark Avenue. It includes a new curb ramp and sidewalk on the south side of Clark Avenue from the Highway 135 southbound onramp to Norris Street. Funding is provided by the Federal Safe Routes to School Program (SRTS) at a rate of 90%. The remainder will be funded by Measure A. Replacement of existing infrastructure; conforms to the General Plan; necessary for Replacement and/or expansion of existing infrastructure; conforms to the General Plan; necessary for Replacement and/or expansion of existing including the Orcutt Community Plan circulation policies; necessary for

2 Page B-2 4 All Countywide PW Roadway Improvements Misc. Project Expenses 5 4 Orcutt PW Roadway Improvements Norris and Twitchell SR2S 6 1 Montecito PW Structure R&R Ashley Road Scour Countermeasures This project consists of expenses applied to several capital infrastructure projects where the parent construction project is complete but various components such as plant establishment, landscaping or other mitigation continue as required to finalize and closeout the project. Funding for these activities comes from various sources, including the Highway Bridge Program, federal and state grants and Measure A. This project will enhance accessibility to May Grisham Elementary School and Orcutt Junior High School in the town of Orcutt. It includes approximately 600 feet of sidewalk improvements for both Norris Street and Twitchell Street. Funding is provided by the State Safe Routes to School Program (SR2S) at a rate of 90%. The remainder will be funded by the North County Measure A, for alternative transportation. This project is located on Ashley Road 0.57 miles north of East Valley Road in Montecito and spans Cold Springs Creek. Over time, the creek channel has degraded, exposing the footing of this historic 1918 bridge. There is also scour at the base of the abutment walls undermining the walls and foundation. The project will repair the scour and construct scour countermeasures to reduce future deterioration. Work will be 100% reimbursable Expansion of existing infrastructure; conforms to the General Plan; necessary for Replacement and/or expansion of existing including the Orcutt Community Plan circulation policies; necessary for Renovation of existing infrastructure; conforms to the General Plan, including the Montecito Community Plan circulation policies; necessary

3 Page B Montecito PW Structure R&R Bella Vista Drive LWC Replacement 8 3 & 5 N/A PW Structure R&R Bonita School Road Bridge Replacement 9 1 Montecito PW Structure R&R East Mountain Drive LWC Replacement This project will replace the existing low water crossing (LWC) on Bella Vista Drive over Romero Creek in Montecito. A trailhead and a private driveway lie adjacent to this location. At certain times of the year, this segment of the road is submerged with water creating an inconvenience to the traveling public. The project will construct a bridge that spans this low water crossing and provides adequate water conveyance. Work will be 100% reimbursable by the Federal Highway Bridge Program This project is located on Bonita School Road over the Santa Maria River, 0.3 Miles North of State Route 166. It includes replacing the existing structurally deficient railroad flat car bridge with a longer bridge that meets current design, hydraulic and seismic standards. During flood events and periods of high flows, water overflows low points on the approach road of the bridge. The project will involve construction of a long multi-span bridge that spans across the existing levees at both ends. Work will be 100% reimbursable by the Federal Highway Bridge Program This project will replace the existing low water crossing (LWC) at East Mountain Drive over Cold Springs Creek in Montecito. A popular trailhead is located near this project. Most of the year, the road segment is submerged in water creating an inconvenience to the traveling public. This project will construct a bridge that spans the low water crossing and provides adequate water conveyance. Work will be 100% reimbursable by the Federal Highway Bridge Program infrastructure; conforms to the General Plan; necessary Replacement of existing infrastructure; conforms to the General Plan; necessary for facilities maintenance.

4 Page B Gaviota PW Structure R&R This project is located on Refugio Road over Refugio Road MP 0.3 Refugio Creek 0.3 miles north of State Route LWC Replacement 101, the first in a series of low water crossings on Refugio Road travelling east to the Santa Ynez Valley. There are existing culverts and steel grates across the crossing that accommodate water flows. However during most of the year, this segment of the road is submerged with water creating an inconvenience to the traveling public. The project will construct a bridge to span this low water crossing and provide adequate water conveyance. Work will be 100% reimbursable 11 3 Gaviota PW Structure R&R Refugio Road MP 1.8 LWC Replacement This project is located on Refugio Road over Refugio Creek 1.80 miles north of State Route 101, the second in a series of low water the Santa Ynez Valley. The existing culverts at this crossing are not sufficient to carry the flow during the rainy, winter season. Water overtopping this segment of the road causes an inconvenience to the traveling public. The project will construct a bridge to span this low water crossing and provide adequate water conveyance. Work will be 100% reimbursable

5 Page B Gaviota PW Structure R&R This project is located on Refugio Road over Refugio Road MP 3.0 Refugio Creek 3.0 miles north of State Route LWC Replacement 101, the third in a series of low water crossings on Refugio Road travelling east to Santa Ynez Valley. The existing culverts at this crossing are not adequate during periods of high flows in the rainy, winter season. The roadway is often overtopped with water creating an inconvenience to the travelling public. The project will construct a bridge to span this low water crossing and provide adequate water conveyance. Work will be 100% reimbursable 13 3 Gaviota PW Structure R&R Refugio Road MP 3.1 LWC Replacement This project is located on Refugio Road over Refugio Creek 3.1 miles north of State Route 101, the fourth in a series of low water the Santa Ynez Valley. During high flows in the rainy, winter season, water overtops the roadway causing an inconvenience to the traveling public. This project will construct a bridge to span this low water crossing and provide adequate conveyance for water flow. Work will be 100% reimbursable by the Federal Highway Bridge Program

6 Page B Gaviota PW Structure R&R This project is located on Refugio Road over Refugio Road MP 3.2 Refugio Creek 3.2 miles north of State Route LWC Replacement 101, The fifth in a series of low water the Santa Ynez Valley. Existing culverts do not provide adequate conveyance during periods of high flow thus creating an inconvenience to the travelling public. The project will construct a new bridge that spans the low water crossing to address the overtopping issue. Work will be 100% reimbursable by the Federal Highway Bridge Program 15 3 Gaviota PW Structure R&R Refugio Road MP 3.3 LWC Replacement This project is located on Refugio Road over Refugio Creek 3.30 miles north of State Route 101, the last in a series of six low water the Santa Ynez Valley. During high flows in the rainy, winter season, this segment of road is submerged with water becoming an inconvenience to the travelling public. The project will construct a new bridge to span this low water crossing and address the overtopping issue. Work will be 100% reimbursable by the Federal Highway Bridge Program

7 Page B Countywide Sheriff Northern Branch The Northern Branch Jail Project is located Construction of new facilities; conforms to County Jail near the city of Santa Maria. When completed, the General Plan; necessary for departmental the facility will provide capacity to hold 376 operations. (Conformity with the General individuals, of which 32 beds are reserved in a Plan was previously determined in a separate separate housing unit for individuals with medical and mental health challenges. The review. See Case Number 08GOV ) entire jail complex is composed of several buildings estimated to be approximately 139,000 sq ft for inmate housing and ancillary support functions. The facility will be built on a ten-acre portion of a 50-acre County-owned property located at Black and Betteravia Roads. The project is estimated to be completed in May 2018.

Annual Listing of Federally Obligated Projects in Santa Barbara County Federal Fiscal Year (October 1, 2014 to September 30, 2015)

Annual Listing of Federally Obligated Projects in Santa Barbara County Federal Fiscal Year (October 1, 2014 to September 30, 2015) Annual Listing of Federally Obligated Projects in County Federal Fiscal Year 2015 (October 1, 2014 to September 30, 2015) Annual List of Projects with Federal Funding for Federal Fiscal Year 2015 Federal

More information

Flood History. Floodplain Descriptions

Flood History. Floodplain Descriptions Flood History The worst flooding in the area took place in 1966, 1969, 1971, 1995 and 1998. The storms in 1966 and 1969 caused considerable damage throughout the area due to flooding, erosion and debris

More information

Additional Economic Development Strategy submissions- Klickitat County

Additional Economic Development Strategy submissions- Klickitat County Klickitat County Transportation Improvement Projects 1 White Salmon to Hood River Bridge Final EIS, design, bridge replacement 2 Klickitat County Rural Arterials Reconstruct to all-weather roads Part of

More information

Site Location and Setting

Site Location and Setting Memorandum Date: To: From: Subject: Kristy Le, Gary Black Steve Orem Santa Teresa County Park Historic Area Traffic and Parking Study Hexagon Transportation Consultants, Inc. has completed a traffic and

More information

Appendix 4.1 L. No-Build Project Descriptions

Appendix 4.1 L. No-Build Project Descriptions Appendix 4.1 L No-Build Project Descriptions No-Build Projects New Bedford A new traffic signal system was installed and activated in early 2009 at the intersection of King s Highway and Mount Pleasant

More information

Pattullo Bridge Replacement Project

Pattullo Bridge Replacement Project Pattullo Bridge Overview This document will: Explain the challenges facing the Pattullo Bridge today Share how we propose moving forward translink.ca PAGE 1 History By Order of the Lieutenant Governor

More information

STAFF REPORT. MEETING DATE: February 7, 2008 AGENDA ITEM: 6

STAFF REPORT. MEETING DATE: February 7, 2008 AGENDA ITEM: 6 STAFF REPORT SUBJECT: RSTP& LSTP Fund Balances MEETING DATE: February 7, 2008 AGENDA ITEM: 6 RECOMMENDATION: STAFF CONTACT: Receive an update on programmed funds from the Regional Surface Transportation

More information

3529 Souris River Flood Plan (Phase MI-1)

3529 Souris River Flood Plan (Phase MI-1) Date: September 28, 2018 To: Derek Hackett, Public Information Officer From: Grant Goldader, Civil Engineering Specialist Re: Traffic Control Report for the week of 10/01/2018 3529 Souris River Flood Plan

More information

Napa County Planning Commission Board Agenda Letter

Napa County Planning Commission Board Agenda Letter Agenda Date: 7/20/2011 Agenda Placement: 10A Napa County Planning Commission Board Agenda Letter TO: FROM: Napa County Planning Commission Hillary Gitelman - Director Conservation, Development & Planning

More information

Gulf Coast MPO Obligated Projects

Gulf Coast MPO Obligated Projects Gulf Projects */ 104866/801000 STPD-9370-00(004) Dedeaux Rd. From Three Rivers Rd. to SR 605. MS $3,259,353 106448/701000 STP-8971-00(005) City of City of - widen to include three lanes on Hospital Road

More information

CITY OF PALMDALE. REPORT to the Mayor and Members of the City Council from the City Manager

CITY OF PALMDALE. REPORT to the Mayor and Members of the City Council from the City Manager CITY OF PALMDALE REPORT to the Mayor and Members of the City Council from the City Manager DATE: SUBJECT: June 4, 2014 Approval of City of Palmdale's 2014 Ten-Year Capital Improvement Plan ISSUING DEPARTMENT:

More information

Alternatives Analysis City of Newport Beach Sunset Ridge Park Project December 14, 2011

Alternatives Analysis City of Newport Beach Sunset Ridge Park Project December 14, 2011 Alternatives Analysis City of Newport Beach Sunset Ridge Park Project December 14, 2011 Alternatives Analysis for Vehicular Access: This report supplements the project s certified EIR s Alternatives Analysis.

More information

Northeast Florida Regional Council. Saratoga Springs Presentation September 7, 2006

Northeast Florida Regional Council. Saratoga Springs Presentation September 7, 2006 Northeast Florida Regional Council Saratoga Springs Presentation September 7, 2006 Location Clay County, Florida SARATOGA SPRINGS 2 LandMar Founded in 1987 by Edward Burr, CEO Became an affiliate of Crescent

More information

Lafourche Parish Government REQUEST FOR QUALIFICATIONS. Landscape Architectural Services

Lafourche Parish Government REQUEST FOR QUALIFICATIONS. Landscape Architectural Services Lafourche Parish Government REQUEST FOR QUALIFICATIONS Landscape Architectural Services Bayou Lafourche Parish Multi-Use Path Feasibility Study Phase 1 And Bayou Lafourche Parish Multi-Use Path Feasibility

More information

MONTGOMERY COUNTY PLANNING DEPARTMENT THE MARYLAND-NATIONAL CAPITAL PARK AND PLANNING COMMISSION

MONTGOMERY COUNTY PLANNING DEPARTMENT THE MARYLAND-NATIONAL CAPITAL PARK AND PLANNING COMMISSION MONTGOMERY COUNTY PLANNING DEPARTMENT THE MARYLAND-NATIONAL CAPITAL PARK AND PLANNING COMMISSION MCPB Item No. Date: 6/23/2016 Lucy V. Barnsley Elementary School Addition, Mandatory Referral MR2016027

More information

Route 29 Solutions Projects

Route 29 Solutions Projects Your guide to the Route 29 Solutions Projects For full details & continued engagement please visit www.route29solutions.org The Route 29 Solutions Package is a $230 million investment into the improvement

More information

Transportation Improvement District (TID) Exercise New Castle County Unified Development Code

Transportation Improvement District (TID) Exercise New Castle County Unified Development Code Transportation Improvement District (TID) Exercise New Castle County Unified Development Code Churchmans Crossing TID How should New Castle County deploy Transportation Improvement Districts (TIDs)? Site

More information

FDOT Treasure Coast Traffic Report through

FDOT Treasure Coast Traffic Report through FDOT Treasure Coast Traffic Report 02 26 16 through 03 04 16 Kathleen Dempsey Fri 2/26/2016 2:56 PM To:Kathleen Dempsey ; 1 attachment 355 KB CR 714_Median Access Modifications.pdf;

More information

1.0 Purpose and Organization of the Community Impact Assessment Addendum

1.0 Purpose and Organization of the Community Impact Assessment Addendum Memorandum To: From: cc: Laura Prickett, Horizon Water and Environment Carie Montero, Senior Project Manager/Environmental Lead, Parsons Transportation Group Parag Mehta, Kimley Horn Date: September 24,

More information

SAN RAFAEL City Council January 20, 2015

SAN RAFAEL City Council January 20, 2015 SONOMA MARIN AREA RAIL TRANSIT SMART CENTRAL SAN RAFAEL STATUS UPDATE SAN RAFAEL City Council January 20, 2015 CENTRAL SAN RAFAEL SMART SOUTH OF PUERTO SUELLO TUNNEL 1. Active Construction 2. Construction

More information

November 21, 2012 Barbara Kelleher, (954)

November 21, 2012 Barbara Kelleher, (954) November 21, 2012 Barbara Kelleher, (954) 777-4090 barbara.kelleher@dot.state.fl.us BROWARD COUNTY TRAFFIC IMPACT REPORT November 26 to November 30, 2012 FORT LAUDERDALE -- Construction and maintenance-related

More information

Memorandum. To: From: cc: Date: November 7, Re: 1.0 Purpose and Organization of this Addendum. 2.0 Project Description

Memorandum. To: From: cc: Date: November 7, Re: 1.0 Purpose and Organization of this Addendum. 2.0 Project Description Memorandum To: From: cc: Laura Prickett, Horizon Water and Environment Analette Ochoa and Wana Chiu, WRECO Parag Mehta, Kimley Horn Date: November 7, 2017 Re: Santa Cruz Route 1 Tier I and Tier II HOV

More information

FDOT Treasure Coast Traffic Impact Report

FDOT Treasure Coast Traffic Impact Report July 22, 2016 Chuck McGinness, 954-777-4302 chuck.mcginness@dot.state.fl.us FDOT Treasure Coast Traffic Impact Report July 22 through July 29, 2016 TREASURE COAST Construction and maintenance-related lane

More information

Lake Erie Commerce Center Traffic Analysis

Lake Erie Commerce Center Traffic Analysis LOCATION: East of NYS Route 5 at Bayview Road Town of Hamburg Erie County, New York PREPARED BY: Wendel Companies 140 John James Audubon Parkway Suite 200 Amherst, New York 14228 January 2012 i ii Table

More information

FDOT Treasure Coast Traffic Impact Report March 25 through April 1, 2016

FDOT Treasure Coast Traffic Impact Report March 25 through April 1, 2016 March 25, 2016 Chuck McGinness, 954-777-4302 chuck.mcginness@dot.state.fl.us FDOT Treasure Coast Traffic Impact Report March 25 through April 1, 2016 TREASURE COAST Construction and maintenance-related

More information

IRONTON-RUSSELL BRIDGE REPLACEMENT

IRONTON-RUSSELL BRIDGE REPLACEMENT IRONTON-RUSSELL BRIDGE REPLACEMENT 2012-2016 District 9 Ohio Department of Transportation Ironton-Russell Bridge Replacement Existing Ironton-Russell Bridge Ironton-Russell Bridge Replacement Existing

More information

Georgetown-Lewes Rail/Trail Study. Rail/Trail Study: Cool Spring to Cape Henlopen State Park New Road Extension (House Resolution No.

Georgetown-Lewes Rail/Trail Study. Rail/Trail Study: Cool Spring to Cape Henlopen State Park New Road Extension (House Resolution No. Georgetown-Lewes Rail/Trail Study Rail/Trail Study: Cool Spring to Cape Henlopen State Park New Road Extension (House Resolution No. 47) August 22, 2011 Presentation Outline Background Benefits Statewide

More information

Appendix L Technical Memorandum Aesthetics

Appendix L Technical Memorandum Aesthetics Technical Memorandum Aesthetics 1.0 AESTHETICS This section provides a discussion of the aesthetic resources in the vicinity of ARTIC. Aesthetics pertain to the elements that make a certain view pleasing

More information

State Route 8 Corridor. Northern Summit County s Path to Success

State Route 8 Corridor. Northern Summit County s Path to Success State Route 8 Corridor Northern Summit County s Path to Success Construction Guide: 2008-2009 State Route 8 corridor work description State Route 8 Corridor 10 projects $262 million With its close proximity

More information

Hudson Highlands Fjord Trail Draft Master Plan. April 29, 2015

Hudson Highlands Fjord Trail Draft Master Plan. April 29, 2015 Hudson Highlands Fjord Trail Draft Master Plan April 29, 2015 Agenda Route Overview Proposed Segment Results of Community Survey on that Segment Next Steps Municipal Endorsement Environmental Review Implementation

More information

DALLAS HORSESHOE PROJECT. Project Update including the Margaret McDermott Bridge Transportation and Trinity River Project Committee February 22, 2016

DALLAS HORSESHOE PROJECT. Project Update including the Margaret McDermott Bridge Transportation and Trinity River Project Committee February 22, 2016 DALLAS HORSESHOE PROJECT Project Update including the Margaret McDermott Bridge Transportation and Trinity River Project Committee February 22, 2016 Agenda 1. Horseshoe Project 2. Purpose and Need 3. Construction

More information

Waukee Trailhead Public Art and Amenities Project

Waukee Trailhead Public Art and Amenities Project Waukee - Trailhead Public Art and Amenities Project Sponsor Waukee Project Title Waukee Trailhead Public Art and Amenities Project Termini Description ( i.e. Park Avenue to 19th Street) NE Intersection

More information

Public Workshop Preliminary Plans Review. Projects PW 1605, 1701, & 1702

Public Workshop Preliminary Plans Review. Projects PW 1605, 1701, & 1702 Queens Mirror Circle Pedestrian Safety Improvements Quail Pond Circle Complete Street/Pedestrian Connectivity Improvements Southcot Drive Bicycle/Pedestrian Improvements Public Workshop Preliminary Plans

More information

CITY OF PALMDALE. REPORT to the Mayor and Members of the City Council from the City Manager

CITY OF PALMDALE. REPORT to the Mayor and Members of the City Council from the City Manager .. CITY OF PALMDALE REPORT to the Mayor and Members of the City Council from the City Manager DATE: SUBJECT: June 1, 2016 Approval of City of Palmdale's 2016 Ten-Year Capital Improvement Plan ISSUING DEPARTMENT:

More information

TRAFALGAR PARK. 78: p.140 W 99th St FLAT ROCK CREEK PARK. W 103rd St OVERLAND PARK. Quivira Rd. College Blvd. Shared use path. Mountain bike trail

TRAFALGAR PARK. 78: p.140 W 99th St FLAT ROCK CREEK PARK. W 103rd St OVERLAND PARK. Quivira Rd. College Blvd. Shared use path. Mountain bike trail Lenexa: overview TRAFALGAR PARK 78: p.140 As the Westport Route crosses over Lenexa's boundaries with Olathe and Overland Park several times, approximately 2.75 or 3 miles of the historic route of the

More information

Auburn Trail / Ontario Pathways Trail Connector Feasibility Study Public Information Meeting Wednesday, August 22, 2012

Auburn Trail / Ontario Pathways Trail Connector Feasibility Study Public Information Meeting Wednesday, August 22, 2012 Auburn Trail / Ontario Pathways Trail Connector Feasibility Study Public Information Meeting Wednesday, August 22, 2012 Purpose of Feasibility Study Purpose Evaluate the feasibility of constructing a multiuse

More information

FDOT Treasure Coast Traffic Impact Report June 19 through June 26, 2015

FDOT Treasure Coast Traffic Impact Report June 19 through June 26, 2015 June 19, 2015 Chuck McGinness, 954-777-4302 chuck.mcginness@dot.state.fl.us FDOT Treasure Coast Traffic Impact Report June 19 through June 26, 2015 TREASURE COAST Construction and maintenance-related lane

More information

Proposed Bicycle Lanes on Yonge Street from Queens Quay to Front Street

Proposed Bicycle Lanes on Yonge Street from Queens Quay to Front Street STAFF REPORT ACTION REQUIRED Proposed Bicycle Lanes on Yonge Street from Queens Quay to Front Street Date: March 12, 2007 To: From: Toronto and East York Community Council Director, Transportation Infrastructure

More information

Datum on benchmarks All benchmarks with a Township name and number are on 1929 datum:. All benchmarks with a four-digit number are on 1988 datum:

Datum on benchmarks All benchmarks with a Township name and number are on 1929 datum:. All benchmarks with a four-digit number are on 1988 datum: Datum on benchmarks All benchmarks with a Township name and number are on 1929 datum:. All benchmarks with a four-digit number are on 1988 datum: LAWRENCE 2 Destroyed 8/29/05 TG General coordinates: 10800E

More information

THREE MILE PLAN TOWN OF SUPERIOR COLORADO

THREE MILE PLAN TOWN OF SUPERIOR COLORADO THREE MILE PLAN TOWN OF SUPERIOR COLORADO February 23, 2015 INTRODUCTION This document has been prepared by the Town of Superior, Colorado, to address the existing and proposed land uses within an approximate

More information

STATE OF RHODE ISLAND AND PROVIDENCE PLANTATIONS PUBLIC UTILITIES COMMISSION

STATE OF RHODE ISLAND AND PROVIDENCE PLANTATIONS PUBLIC UTILITIES COMMISSION STATE OF RHODE ISLAND AND PROVIDENCE PLANTATIONS PUBLIC UTILITIES COMMISSION IN RE: IGUS BEARINGS, INC. : DOCKET NO. 4652 PETITION FOR A PRIVATE AT-GRADE CROSSING : REPORT AND ORDER On September 30, 2016,

More information

Abbott Rd Rehabilitation Phase II - Elmore Rd to Birch Rd

Abbott Rd Rehabilitation Phase II - Elmore Rd to Birch Rd Abbott Rd Rehabilitation Phase II - Elmore Rd to Birch Rd Project ID SOA07003 Department State of Alaska Project Type Improvement Start Date December 2017 Location Assembly: Section 4, Seats F & G, Assembly:

More information

FDOT Treasure Coast Traffic Impact Report October 9 through October 16, 2015

FDOT Treasure Coast Traffic Impact Report October 9 through October 16, 2015 From: Kathleen Dempsey To: Kathleen Dempsey Subject: FDOT Treasure Coast Traffic Report 10 09 15 through 10 16 15 Date: Friday, October 09, 2015 2:10:36 PM Attachments: image003.png CR 714_Median Construction

More information

5.1 Traffic and Transportation

5.1 Traffic and Transportation 5.1 When it opens in 2009, the Bellevue Nickel Improvement Project will increase the number of vehicles able to travel through the study area, improve travel speeds, and improve safety by reducing the

More information

April 4, 2014 Chuck McGinness, FDOT TREASURE COAST TRAFFIC REPORT April 4 through April 11, 2014

April 4, 2014 Chuck McGinness, FDOT TREASURE COAST TRAFFIC REPORT April 4 through April 11, 2014 April 4, 2014 Chuck McGinness, 954-777-4090 Chuck.McGinness@dot.state.fl.us FDOT TREASURE COAST TRAFFIC REPORT April 4 through April 11, 2014 TREASURE COAST Construction and maintenance-related lane closures

More information

Caltrans District 5. District Director s Report A quarterly publication for our transportation partners. Rosales leads Program Project Management

Caltrans District 5. District Director s Report A quarterly publication for our transportation partners. Rosales leads Program Project Management District 5 Highway 1 near Big Sur in Monterey County District Director Timothy Gubbins Provide a safe, sustainable, integrated and efficient transportation system to enhance California s economy and livability.

More information

Current Amendment or Modification. Prior Amendment or Modification. All other Amendments and Modifications

Current Amendment or Modification. Prior Amendment or Modification. All other Amendments and Modifications Individual HIGHWAYS Bridge - On State System SR46598 P-4 Region 4 Bridge - On System Pool CDOT Region 4 Bridge Federal National Highway Performance Program - - 956 483 719 719 2,877 State State Highway

More information

Hospital Link Project Project Update Winter 2018

Hospital Link Project Project Update Winter 2018 Hospital Link Project Project Update Winter 2018 General The project provides a link from Riverside Drive and the Transitway to the Hospital Link Road. Construction of the Hospital Link facility is open

More information

Trail Feasibility Study

Trail Feasibility Study VOLUSIA COUNTY MPO CITY OF NEW SMYRNA BEACH FINAL REPORT JUNE 30, 2009 Trail Feasibility Study What s inside? 1 Introduction 2 Project Purpose & Scope 3 Physical Inventory & Assessment of Right-of- Way

More information

Attachment G STREAM IMPACTS. Ridge Road Extension Alternatives Analysis

Attachment G STREAM IMPACTS. Ridge Road Extension Alternatives Analysis Attachment G STREAM IMPACTS for: Ridge Road Extension Alternatives Analysis PREPARED FOR: Pasco County Engineering Services Department PREPARED BY: NV5, INC. 6989 E. FOWLER AVENUE TAMPA, FLORIDA 33617

More information

Clackamas County Development Agency

Clackamas County Development Agency Clackamas County Development Agency Development Services Building, 150 Beavercreek Rd., Oregon City, OR 97045 www.clackamas.us/transportation/renewal 503-742-4323 The Clackamas County Board of Commissioners

More information

7272 WISCONSIN AVENUE LOCAL AREA TRANSPORTATION REVIEW

7272 WISCONSIN AVENUE LOCAL AREA TRANSPORTATION REVIEW 7272 LOCAL AREA TRANSPORTATION REVIEW AND TRANSPORTATION POLICY AREA REVIEW MONTGOMERY COUNTY, MARYLAND Submitted on behalf of Carr Properties Prepared by: Wells + Associates, Inc. Submission: July 1,

More information

ANCLOTE COASTAL TRAIL ALTERNATIVES ANALYSIS STUDY

ANCLOTE COASTAL TRAIL ALTERNATIVES ANALYSIS STUDY ANCLOTE COASTAL TRAIL ALTERNATIVES ANALYSIS STUDY PASCO COUNTY MPO JULY 2015 PROJECT OVERVIEW... INTRODUCTION EXECUTIVE SUMMARY CONTEXT... TAMPA BAY AREA, PINELLAS, & PASCO COUNTY S MULTI-USE TRAIL PLANS

More information

I-94 East Corridor Performance

I-94 East Corridor Performance Corridor Context The corridor runs 16 miles between downtown St. Paul and the Wisconsin state border. The corridor serves as an important East-West connection for the Metro area, serving the communities

More information

Analysis of Zoning for Prototype Development Projects in Yamhill County

Analysis of Zoning for Prototype Development Projects in Yamhill County March 3, 2009 To: cc: From: Re: Clark Worth Eric Hovee Bruce Prenguber John Spencer Analysis of Zoning for Prototype Development Projects in Yamhill County INTRODUCTION The purpose of this memo is to determine

More information

Attachment No. 20 RRLRT No. 1. Committee. Busway Grade Crossings STATUS/DATE OF ACTION

Attachment No. 20 RRLRT No. 1. Committee. Busway Grade Crossings STATUS/DATE OF ACTION Attachment No. 20 RRLRT No. 1 TECHNICAL COMMITTEE: Railroad / Light Rail Transit Technical Committee TOPIC: Busway Grade Crossings STATUS/DATE OF ACTION RRLRT TC Draft: 06/23/2011 RRLRT TC Approval: 06/27/2014

More information

AGENCY NAME TRANSPORTATION

AGENCY NAME TRANSPORTATION TRANSPORTATION TRANSPORTATION AGENCY NAME Prince William County FY 2015 BUDGET CIP-TRANSPORTATION 561 Fuller Road/Fuller Heights Road Improvements Total Project Cost - $4.4 M This project will widen Fuller

More information

Spadina Avenue Built Form Study Preliminary Report

Spadina Avenue Built Form Study Preliminary Report STAFF REPORT ACTION REQUIRED Spadina Avenue Built Form Study Preliminary Report Date: July 9, 2014 To: From: Wards: Reference Number: Toronto and East York Community Council Director, Community Planning,

More information

Hospital Link Project Project Update September 2015

Hospital Link Project Project Update September 2015 Hospital Link Project Project Update September 2015 General The project provides a link between Riverside Drive and the Transitway to the Hospital Ring Road. This link is needed to improve transit service

More information

City of Solvang SUNNY FIELDS SPUR TRAIL STUDY

City of Solvang SUNNY FIELDS SPUR TRAIL STUDY City of Solvang SUNNY FIELDS SPUR TRAIL STUDY project description The City of Solvang, in partnership with the County of Santa Barbara Public Works Department, is developing an alignment study for a proposed

More information

Osceola County Comprehensive Plan. Capital Improvements Element Data & Analysis

Osceola County Comprehensive Plan. Capital Improvements Element Data & Analysis Osceola County Comprehensive Plan Capital Improvements Element Data & Analysis APPENDIX Osceola County Comprehensive Plan Capital Improvements Element 28-29 Annual

More information

4. Safety Concerns Potential Short and Medium-Term Improvements

4. Safety Concerns Potential Short and Medium-Term Improvements NH Route 104 Access Management Study Page 19 4. Safety Concerns Potential Short and Medium-Term Improvements Potential safety improvement strategies are listed by priority based on field observations by

More information

FEASIBILITY CRITERIA

FEASIBILITY CRITERIA This chapter describes the methodology and criteria used to evaluate the feasibility of developing trails throughout the study areas. Land availability, habitat sensitivity, roadway crossings and on-street

More information

A. From I-68 in Monongalia County, West Virginia to SR 6119 in Fayette County, Pennsylvania 1

A. From I-68 in Monongalia County, West Virginia to SR 6119 in Fayette County, Pennsylvania 1 Mon-Fayette Transportation Project A. From I-68 in Monongalia County, West Virginia to SR 6119 in Fayette County, Pennsylvania 1 The Mon/Fayette Transportation Project (MFTP) from I-68 in West Virginia

More information

This section evaluates the projected traffic operations and circulation impacts associated with the proposed upgrade and expansion of the LWRP.

This section evaluates the projected traffic operations and circulation impacts associated with the proposed upgrade and expansion of the LWRP. 4.5 TRAFFIC AND CIRCULATION This section evaluates the projected traffic operations and circulation impacts associated with the proposed upgrade and expansion of the LWRP. 4.5.1 Environmental Setting Existing

More information

Treasure Island Supplemental Information Report Addendum

Treasure Island Supplemental Information Report Addendum 1 1 1 1 0 1 0 1 0 1 Treasure Island Supplemental Information Report Addendum Introduction Purpose The purpose of this Supplemental Information Report (SIR) Addendum is to determine if the current land

More information

SOUTH INTERCHANGE AREA

SOUTH INTERCHANGE AREA Santaquin City General Plan 1 Location and Characteristics The South Interchange Area of Santaquin is located west of Interstate 15 and south of 500 South (Figure 1). It includes properties already annexed

More information

FY Regional Transportation Improvement Program Basic Project List (All Values in Thousands of Dollars) All costs in current dollars

FY Regional Transportation Improvement Program Basic Project List (All Values in Thousands of Dollars) All costs in current dollars FY2016-2020 Regional Transportation Improvement Program Basic Project List () All costs in current dollars Project Name Key # Year Project Cost 10th Avenue Bridge, Caldwell 13055 2018 $1,367 10th Avenue

More information

Michigan s Engineering Safety Program for Local Roadways

Michigan s Engineering Safety Program for Local Roadways Michigan s Engineering Safety Program for Local Roadways Local Road Safety Peer Exchange October 2018 Timothy J. Gates, Ph.D., P.E., P.T.O.E. Michigan State University Andrew Ceifetz, P.E. WSP For More

More information

Interoffice Memorandum

Interoffice Memorandum Supplemental Information Agenda Item No. 5.1 May 1, 2014 Interoffice Memorandum May 1, 2014... Date Honorable Planning Commission... To Rick Carter, PE... From Agenda Item 5.1-2014-2019 Capital Improvement

More information

LUDWIG RD. SUBDIVISION PROJECT TRAFFIC IMPACT ANALYSIS

LUDWIG RD. SUBDIVISION PROJECT TRAFFIC IMPACT ANALYSIS LUDWIG RD. SUBDIVISION PROJECT TRAFFIC IMPACT ANALYSIS Prepared for Skip Coddington GSC Development, Inc PO Box 1623 Woodinville WA 9872 Prepared by 1141 NE 124 th St., #59 Kirkland, WA 9834 425.522.4118

More information

Two townships received top

Two townships received top Awards 35 TH ANNUAL ROAD AND BRIDGE SAFETY IMPROVEMENT AWARDS Townships Are Recognized for Projects That Increase Safety on Roads and Bridges Two townships were recognized during PSATS 95 th Annual Educational

More information

Current Amendment or Modification. Prior Amendment or Modification. All other Amendments and Modifications. FY TIP Project Title/Location Number

Current Amendment or Modification. Prior Amendment or Modification. All other Amendments and Modifications. FY TIP Project Title/Location Number Individual STIP ID Improvement Type Source of Funds Type/ Program TOTAL HIGHWAYS Bridge - On State System SR46598 P-4 Region 4 Bridge - On System Pool CDOT Region 4 Bridge Federal National Highway Performance

More information

Matanuska Susitna Borough Community Development Recreation Bond

Matanuska Susitna Borough Community Development Recreation Bond Matanuska Susitna Borough Community Development Recreation Bond - 2016 Palmer and Wasilla Pools Average of 144,000 patrons/yr* 32,000 Swimming lessons/yr* *Since 2012 Palmer & Wasilla Pools O The pool

More information

Latest Mile Marker Released

Latest Mile Marker Released District 5 Looking north at US 101/Los Osos Valley Road interchange in San Luis Obispo County District Director Timothy Gubbins Provide a safe, sustainable, integrated and efficient transportation system

More information

Farmington Metropolitan Planning Area Farmington Metropolitan Planning Organization Transportation Improvement Program (TIP)

Farmington Metropolitan Planning Area Farmington Metropolitan Planning Organization Transportation Improvement Program (TIP) F100090 Fed ID: F100090 Farmington MPO Rec Num: 4 Lead Agency: City of Aztec Proj East Arterial Route Phase 1B Fr: US 550 To: Legion Rd Project Desc.: Construct new road Category: Capacity Proj NMDOT Dist.:

More information

Calgary River Access Strategy Priority Sites and Proposed Funding

Calgary River Access Strategy Priority Sites and Proposed Funding Calgary River Access Strategy Priority Sites and Proposed Funding CPS2017-0103 ATTACHMENT 2 A total of $7,660,000 (Class 5 estimate) is required to implement all sites within the Calgary River Access Strategy;

More information

HARP AUTHORITY GATEWAY CENTER BOATHOUSE & CHANNEL EXTENSION TO SANTA FE AVENUE. Pueblo City Council Presentation September 17, 2018

HARP AUTHORITY GATEWAY CENTER BOATHOUSE & CHANNEL EXTENSION TO SANTA FE AVENUE. Pueblo City Council Presentation September 17, 2018 HARP AUTHORITY GATEWAY CENTER BOATHOUSE & CHANNEL EXTENSION TO SANTA FE AVENUE Pueblo City Council Presentation September 17, 2018 PROJECT: 1A HARP Expansion FUNDING 1A Ballot Issue Pueblo County : $3,000,000

More information

CAPITAL PROGRAM SUMMARY

CAPITAL PROGRAM SUMMARY 2017 2018 CAPITAL PROGRAM SUMMARY MISC A 2017 NEIGHBOURHOOD REHABILITATION Pitt River Road - Mary Hill to Kingsway Victoria Drive - Toronto to Holtby Pooley Avenue - High Pressure Watermain Culvert Replacement

More information

Report to the Strategic Development Committee

Report to the Strategic Development Committee Report to the Strategic Development Committee Request of Virginia Department of Transportation for Easements across Washington Dulles International Airport Property at Route 28 May 2016 PURPOSE Staff requests

More information

N. Central St. & W. Jackson Ave. Streetscape Projects

N. Central St. & W. Jackson Ave. Streetscape Projects N. Central St. & W. Jackson Ave. Streetscape Projects October 13, 2016 Meeting Overview North Central Street City of Knoxville KUB History & Vision Plan Timing Project Area Overview Schedule Communications

More information

Public Works designs, manages and builds more than $4 billion in construction projects across San Francisco. DOING BID ON OUR PROJECTS. JOIN THE CITY TEAM. BUSINESSwith BUILDINGS PLAYGROUNDS STREET RESURFACING

More information

Current Amendment or Modification. Prior Amendment or Modification. All other Amendments and Modifications. FY TIP Project Title/Location

Current Amendment or Modification. Prior Amendment or Modification. All other Amendments and Modifications. FY TIP Project Title/Location STIP ID HIGHWAYS Bridge - On State System SR46598 P-4 Region 4 Bridge - On System Pool CDOT Region 4 Bridge Federal National Highway Performance Program - - 956 483 719 719 2,877 State State Highway Fund

More information

TRUCKEE TAHOE AIRPORT DISTRICT BOARD OF DIRECTOR STAFF REPORT

TRUCKEE TAHOE AIRPORT DISTRICT BOARD OF DIRECTOR STAFF REPORT AGENDA ITEM: 11 TRUCKEE TAHOE AIRPORT DISTRICT BOARD OF DIRECTOR STAFF REPORT AGENDA TITLE: MEETING DATE: January 24, 2018 PREPARED BY: NTPUD Agency Partnership Opportunity, Multi-Use Trailhead Access

More information

MONTGOMERY COUNTY PUBLIC SCHOOLS BETHESDA-CHEVY CHASE MIDDLE SCHOOL #2 SAMAHA ASSOCIATES, PC

MONTGOMERY COUNTY PUBLIC SCHOOLS BETHESDA-CHEVY CHASE MIDDLE SCHOOL #2 SAMAHA ASSOCIATES, PC SITE B-CC MS #2 SITE ANALYSIS PROGRAM CONCEPT OPTIONS PRESENTED DEVELOPED CONCEPT OPTIONS 4, 5, AND 6 FEASIBILITY STUDY PLAN OPTION 1 FEASIBILITY STUDY SITE SECTION OPTION 1 FEASIBILITY STUDY SITE SECTION

More information

Fuller/Fuller Heights Road Improvements

Fuller/Fuller Heights Road Improvements Fuller/Fuller Heights Road Improvements Total Project Cost - $4.4M Project Description This project will construct a mini-roundabout at the intersection of Fuller Heights Road and Old Triangle Road to

More information

City of Durango 5.8 FUNDING TRAILS DEVELOPMENT

City of Durango 5.8 FUNDING TRAILS DEVELOPMENT 5.8 FUNDING TRAILS DEVELOPMENT The City has been successful in establishing dedicated local funding sources as well as applying for grants to develop the City s trail system, having received nearly $2.4

More information

As the Toronto Transit Commission (TTC) operates a transit service on Bay Street, City Council approval of this report is required.

As the Toronto Transit Commission (TTC) operates a transit service on Bay Street, City Council approval of this report is required. REPORT FOR ACTION Construction Staging Area - 81 Bay Street Date: December 11, 2017 To: Toronto and East York, Community Council From: Acting Director, Transportation Services Toronto and East York District

More information

Latest Mile Marker Released

Latest Mile Marker Released District 5 Looking north at US/101 Los Osos Valley Road interchange in San Luis Obispo County District Director Timothy Gubbins Provide a safe, sustainable, integrated and efficient transportation system

More information

Expropriation of a portion of 5795 Yonge Street for public street purposes. Government Management Committee

Expropriation of a portion of 5795 Yonge Street for public street purposes. Government Management Committee GM13.18 STAFF REPORT ACTION REQUIRED Expropriation of a portion of 5795 Yonge Street for public street purposes Date: May 25, 2016 To: From: Wards: Reference Number: Government Management Committee Chief

More information

EXTERNAL COMMUNICATIONS TEAM MEETING MARCH 2015

EXTERNAL COMMUNICATIONS TEAM MEETING MARCH 2015 EXTERNAL COMMUNICATIONS TEAM MEETING MARCH 2015 1 SEGMENT 1 2 THE WISHBONE Connects the TEXpress Managed Toll System to the 35Express Managed Toll System Limits: Crown Road (near Royal Lane) to Valley

More information

Basic Project Information

Basic Project Information FY 2015-16 PROJECT DESCRIPTION FORM (2C) Submitting Agency: Loudoun County Basic Project Information Project Title: Loudoun County Parkway (VA Route 607) U.S. 50 to Creighton Rd. (2C) Project Type (check

More information

Mason Street Bike/Pedestrian Trail Project

Mason Street Bike/Pedestrian Trail Project Construction of the much-anticipated Mason Trail is underway! Mountain Constructors was awarded the contract in September but had to go through a 2- month process to obtain construction clearance permits

More information

FY FY 2022 TRANSPORTATION IMPROVEMENT PROGRAM (TIP) North Front Range Transportation & Air Quality Planning Council

FY FY 2022 TRANSPORTATION IMPROVEMENT PROGRAM (TIP) North Front Range Transportation & Air Quality Planning Council Bridge - On State System PREVIOUS ENTRY P-4 Region 4 Bridge - On System Pool CDOT Region 4 Bridge Federal National Highway Performance Program - - 956 483 719 719 2,877 SR46598 State State Highway Fund

More information

Corridor Management Committee Meeting. April 2, 2014

Corridor Management Committee Meeting. April 2, 2014 Corridor Management Committee Meeting April 2, 2014 1 Today s Topics Welcome Approval of Minutes Resolutions Response to March 26 CMC Questions Staff Recommendation on Project Scope and Budget Public Testimony

More information

K SIGNAGE & TRAFFIC CONTROL. Table of Contents

K SIGNAGE & TRAFFIC CONTROL. Table of Contents Table of Contents K1. ACCOMMODATION OF TRAFFIC... 1 K2. MINIMUM CONSTRUCTION SIGNING... 1 K3. SUBDIVISION SIGNS... 2 K4. TRAFFIC CONTROL DEVICES... 2 K4.1 Traffic Signs Regulations... 2 K4.2 Materials...

More information

A. CONCLUSIONS OF THE FGEIS

A. CONCLUSIONS OF THE FGEIS Chapter 11: Traffic and Parking A. CONCLUSIONS OF THE FGEIS The FGEIS found that the Approved Plan will generate a substantial volume of vehicular and pedestrian activity, including an estimated 1,300

More information

LOST HILLS ROAD INTERCHANGE PROJECT CONSTRUCTION UPDATE. CALABASAS CITY COUNCIL April 26, 2017

LOST HILLS ROAD INTERCHANGE PROJECT CONSTRUCTION UPDATE. CALABASAS CITY COUNCIL April 26, 2017 LOST HILLS ROAD INTERCHANGE PROJECT CONSTRUCTION UPDATE CALABASAS CITY COUNCIL LOST HILLS ROAD INTERCHANGE PROJECT UPDATES Construction of CIDH piles for the soundwall foundation commenced on March 20

More information

Exit 148 (Quantico) to Exit 133 (Route 17/Fredericksburg)

Exit 148 (Quantico) to Exit 133 (Route 17/Fredericksburg) RELEASE: IMMEDIATE March 1, 2019 CONTACT: Darragh Frye 540-907-8409 (mobile) VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT March 3 March 9, 2019 All work is scheduled weather permitting. Real-time information

More information

Draft Concept Alternatives Analysis for the Inaugural Airport Program September 2005

Draft Concept Alternatives Analysis for the Inaugural Airport Program September 2005 Section 10 Preferred Inaugural Airport Concept 10.0 Introduction The Preferred Inaugural Airport Concept for SSA was developed by adding the preferred support/ancillary facilities selected in Section 9

More information