1 Transportation Supporting Dulles Airport Committee for Dulles Economic Development and Transportation Committee July 12, 2018 Tom Biesiadny, Director Fairfax County
2 Multiple Transportation Improvements Silver Line Status Report Herndon and Innovation Center Garage Adjacent Roadway Improvements Pedestrian and Bicycle Connections Reston Metrorail Assess Group Herndon Metrorail Station Access and Mobility Study Transit Service Adjustments Improvements to Route 28 Reston Area Transportation Projects Innovation Area Transportation Project I-66 Express Lanes I-66 Construction Mitigation Future I-66 Transit Service 2
3 Phase 1 Punchlist Ongoing Old Meadow Road Realignment at Route 123 completion: End of 2018 Remaining VDOT items being addressed Work underway at Tysons stations Phase 2 Overall Project Status ~ 83% complete Highlights All stations under construction Mechanical/electrical/plumbing Stormwater facilities Pavilions; pedestrian bridges Aerial Guideway at Dulles Airport nearly finished Traction Power Substations in progress Sections of third rail have been energized Rail yard at Dulles Airport ~ 84% complete Herndon and Innovation Center garages under construction Budget - $2.778B Total Contingency - $551 M (Remaining ~$350 M)
4 Silver Line Phase 2 Garages Herndon Station 2,006 parking spaces; Cost: $44.5 M; 87% Complete Pedestrian and vehicular connections to the existing parking garage Pedestrian and bicycle amenities, including a bike room Road widening and improvements on site and on Sunrise Valley Drive New access road from Sunrise Valley Drive to the existing garage Existing garage modifications to accommodate the bridge connections from the new garage, new pedestrian path to Metro elevator, accessible parking spaces, and addition of revenue collection system Future Transit Oriented Development (TOD) on the west side 4
5 Herndon Station Garage Bridge erection and precast work completed Ongoing coordination with MWAA for construction interface on garage, Metrorail facilities, road improvements, bus and vehicular operations during construction Completion in Spring 2019 Upgrades to the existing garage follow 5
6 Silver Line Phase 2 Garages Innovation Center 2,070 spaces; Cost: $52 M; 62% complete Pedestrian and bicycle amenities Real estate exchange and development agreement with Rocks Engineering Integration with the overall site with the private development Shared infrastructure design and construction for the garage, retail, residential and office development The overall partnership project includes the design and construction of roads, stormwater management, plaza, and other amenities for the 15-acre Transit Oriented Development 6
7 Innovation Center Station Garage Precast erection underway Completion in Spring 2019 Onsite coordination and cooperation continues as MWAA is working on County parcel and Nugget is neighboring parcels and roads 7
8 Adjacent Roadway Improvements As part of the Silver Line project numerous intersections and roadways will be improved: Reston Town Center Station Sunrise Valley Drive and Reston Parkway Sunrise Valley Drive and Edmund Halley Drive Sunset Hills Road and the future Reston Town Center Station, Herndon Station Sunrise Valley Drive and Fairfax County Parkway, and Sunrise Valley Drive and the Herndon-Monroe Park-and-Ride Lot/Herndon Metrorail Station Innovation Center Station Innovation Avenue Sunrise Valley Drive Carta Way Extension 8
9 Pedestrian and Bicycle Connections Reston Metrorail Access Group Recommendation Prepared in 2 Phases Phase I (Wiehle-Reston East Station) - $20 M allocated 25 Phase I recommendations: 19 complete 1 in utility relocation and construction 1 in design 1 will be completed with Phase II 3 under discussion with developers Includes W&OD Bridge over Wiehle 9
10 Pedestrian and Bicycle Connections Reston Metrorail Access Group Phase II (Reston Town Center Station) - $25 M allocated 22 Phase II recommendations, 1 in utility relocation and construction, 5 in land acquisition, 9 in design, and 7 in project initiation or on hold, due to adjacent land development activity. 10
11 Pedestrian and Bicycle Connections Herndon Metrorail Station Access Management Study Area around Herndon and Innovation Center Metrorail Stations Multimodal challenges and possibilities around stations identified Missing links and needed pedestrian and bicycle connections $21 M allocated 14 priority projects approved 6 projects in design 2 projects being studied 6 project being initiated 11
12 Transit Service Adjustments Fairfax Connector service reconfigured as part the Silver Phase 1 implementation. Tysons Circulator service implemented; RIBS revised Service reoriented to feed Wiehle-Reston East Station $4 million in new service (annually) added Increased frequencies Service to new areas Additional late night and weekend service Additional service changes will be implemented with Phase 2 Outreach efforts beginning in Fall 2018 Service concepts to be refined during 2019 Herndon bus garage renovation nearly complete Anticipate new service and more frequent service to all three new Fairfax County stations 12
13 Improvements to Route 28 Northern Virginia Transportation Authority allocated funding to multiple projects in the Route 28 corridor with HB 2313 revenues FY 2014 priorities included two construction projects on Route 28 Widen from 6 to 8 Lanes SB (Dulles Toll Road to Route 50) completed Widen from 6 to 8 Lanes NB (McLearen Road to Dulles Toll Road) completed FY priorities included design funds for widening Route 28 from the Prince William line to New Braddock Road. Design, environmental and traffic work underway Additional funding approved on 6/14 Design build procurement to begin in late 2018 Other projects in Loudoun and Prince William Cos. 13
14 Improvements to Route 28 Remaining segment in Fairfax County north of Route 50. NVTA did not allocate funding to this project in their FY 2018 to FY 2023 program County staff will be submitting the project to the Commonwealth s SmartScale funding competition on August 1,
15 Reston Transportation Projects Since February 2014: Network analysis/prioritization completed Board adopted Funding Plan Board adopted a Comprehensive Plan realignment of Sunset Hills Road Route 7 widening (Reston to Tysons) design-build contract scheduled to be awarded on July 17 Soapstone Connector (Sunset Hills to Sunrise Valley Drive) Preliminary engineering underway Environment document nearly complete Historical assessment underway Board approved $500,000 for Sunrise Valley/Fairfax County Parkway intersection improvements - W&OD Bridge over Wiehle advancing to land acquisition by end of
16 Innovation Transportation Project Davis Drive/Rock Hill Road Extension New crossing of the Dulles Toll Road from Center for Innovative Technology to Sunrise Valley Drive 4 lanes + bike and pedestrian facilities Estimated cost: $100 M Fairfax and Loudoun have each approved $500,000 for preliminary engineering VDOT advancing preliminary engineering NVTA approved an additional $20 M for this project on June 14 Fairfax County requesting an additional $30 M through Smart Scale 16
17 I-66 Express Lanes VDOT awarded a design-build contract to Express Mobility Partners Two express lanes in each direction (Gainesville to Beltway) Construction Underway Early Deliverable: I-66/Route 28 Interchange Eliminate four traffic signals on Route 28 north of Route 29 Significantly enhance access to Dulles Airport from the south Target Date: 2020 Remainder of the project due to be completed in
18 I-66 Construction Mitigation Inside the Beltway and Outside the Beltway Route 699 (Government Center to Foggy Bottom) Implemented in December 2017 Ridership has grown from 130 per day to 305 per day, continues to increase NVTC has approved funding for Route 698 (Vienna Metrorail Station to Pentagon) Implementation plan and timing being developed Outside the Beltway Fairfax Connector Bus Fare Buy Down began May 5, 2018 All feeder routes to the Vienna Metrorail Station now $1 VDOT offering vanpool and telework incentives; County providing commuter assistance. 18
19 Future I-66 Transit Service A portion of tolls collected will support future transit service in the I- 66 corridor. Funding for additional transit service during construction Upfront capital funding for on-going service: $36.5 million On-going annual operating funding beginning in 2023 Inflationary increases; Funding continuing through 2046 Both PRTC and Fairfax Connector will be adding service Fairfax Connector service additions planned: Centreville - Tysons Centreville - Wahington DC Fairfax Center - Washington DC Westfields - Vienna Stringfellow - Vienna Stringfellow - Mark Center via Pentagon 19
20 Questions?
County of Fairfax, Virginia. Silver Line Update. Committee for Dulles March 2, Mark Canale Fairfax County Department of Transportation
Silver Line Update Committee for Dulles March 2, 2017 Mark Canale Fairfax County Department of Transportation Phase 1 Summary Old Meadow Road Realignment design work proceeding, construction to be completed
More informationSECTION 106 ACTIVITIES ANNUAL REPORT
SECTION 106 ACTIVITIES ANNUAL REPORT FOR THE YEAR ENDING DECEMBER 31, 2011 Metropolitan Washington Airports Authority 1593 Spring Hill Road, Suite 300 Vienna, Virginia 22182 JANUARY 2012 Introduction The
More informationA New Era of Transportation Solutions
A New Era of Transportation Solutions Committee for Dulles Economic Development & Transportation Committee Monica Backmon, Executive Director October 6, 2016 What does the NVTA do? Working collaboratively
More informationSECTION 106 ACTIVITIES ANNUAL REPORT
SECTION 106 ACTIVITIES ANNUAL REPORT FOR THE YEAR ENDING DECEMBER 31, 2014 Metropolitan Washington Airports Authority 198 Van Buren Street, Suite 300 Herndon, Virginia 20170 JANUARY 2015 Introduction The
More informationNational Society of Professional Engineers. Charles S. Carnaggio, PE Project Director July 2, 2014
National Society of Professional Engineers Charles S. Carnaggio, PE Project Director July 2, 2014 Phase 1 Opening Date: July 26, 2014 Dulles Corridor Metrorail Project At-a-Glance Seamless integration
More informationSilver Line Rail Project Update
Silver Line Rail Project Update April 2013 Project Map 2 Silver Line, Phase 1 Service Pattern 3 Project Overview Silver Line Dulles Metrorail is a 23-mile extension of the existing Orange Line Total Project
More informationDulles Corridor Metrorail Project Update Dulles Area Transportation Association August 25, 2009
Dulles Corridor Metrorail Project Update Dulles Area Transportation Association August 25, 2009 Patty Nicoson President Dulles Corridor Rail Association Proposed Toll Rate Increase on Dulles Toll Road
More informationDulles Toll Road Rate Setting Process
Dulles Toll Road Rate Setting Process Public Hearings Slides FOR HNTB June 22, 2018 Dulles Toll Road Operations The Dulles Toll Road is a critical transportation link to the region s infrastructure. On
More informationTransform66 Transportation Management Plan: Transit & TDM Strategies
Transform66 Transportation Management Plan: Transit & TDM Strategies Commuter Connections Committee November 15, 2016 1 Transforming I-66 A short introduction. http://outside.transform66.org/meetings/video_recordings.asp
More informationNorthern Virginia District State of the District. Helen L. Cuervo, P.E. District Engineer October 18, 2017
Northern Virginia District State of the District Helen L. Cuervo, P.E. District Engineer October 18, 2017 Susan Shaw, P.E., Megaprojects Director Virginia Department of Transportation American Society
More informationReport to the Dulles Corridor Advisory Committee
Report to the Dulles Corridor Advisory Committee Information Report on Dulles Toll Road Toll Rate Adjustment Process and Tentative Schedule and Overview of Traffic and Revenue Study Update May 2018 Purpose
More informationCONTACT: Michelle T. Holland
FOR IMMEDIATE RELEASE Thursday, December 7, 2017 CONTACT: Michelle T. Holland 703-586-0487 (C) Michelle.Holland@vdot.virginia.gov Jennifer McCord 571-230-2926 Jennifer.McCord@vdot.virginia.gov 66 EXPRESS
More informationDULLES AREA HIGHLIGHTS. Gary Garczynski Commonwealth Transportation Board Northern Virginia District. Committee for Dulles August 4, 2016
DULLES AREA HIGHLIGHTS Gary Garczynski Commonwealth Transportation Board Northern Virginia District Committee for Dulles August 4, 2016 Smart Scale (formerly HB2) Overview Round 1 completed with the adoption
More informationBasic Project Information
FY 2015-16 PROJECT DESCRIPTION FORM (2C) Submitting Agency: Loudoun County Basic Project Information Project Title: Loudoun County Parkway (VA Route 607) U.S. 50 to Creighton Rd. (2C) Project Type (check
More informationNAIOP. Marcia McAllister Metropolitan Washington Airports Authority
NAIOP Marcia McAllister Metropolitan Washington Airports Authority 1 The Vision Realized Northern Virginia Today Tysons Corner is the largest employment center in the Commonwealth Larger than central business
More informationDulles Corridor Improvements. Drive to Ride
Dulles Corridor Improvements Dulles Corridor Improvements Status Update v Condition assessment of Toll Road facilities is complete v Dulles Airport Access Highway/I-495 Interchange Safety Improvements
More informationElected Officials and Media Briefing I-395 Express Lanes Northern Extension
Elected Officials and Media Briefing I-395 Express Lanes Northern Extension Updates on: I-95 Express Lanes Southern Extension Transform 66: Inside and Outside the Beltway March 31, 2016 Today s Agenda
More informationTransAction Overview. Introduction. Vision. NVTA Jurisdictions
Introduction Vision NVTA Jurisdictions In the 21 st century, Northern Virginia will develop and sustain a multimodal transportation system that enhances quality of life and supports economic growth. Investments
More informationREPORT TO THE STRATEGIC PLANNING AND DEVELOPMENT COMMITTEE
REPORT TO THE STRATEGIC PLANNING AND DEVELOPMENT COMMITTEE INFORMATION REPORT ON METROPOLITAN WASHINGTON AIRPORTS AUTHORITY SUPPORT TO REGIONAL TRANSPORTATION PLANNING EFFORTS JUNE 2013 Purpose To inform
More informationLeesburg Streets and Highways. Tom Brandon Manager, Office of Capital Projects Potomac Section
Leesburg Streets and Highways Tom Brandon Manager, Office of Capital Projects Potomac Section About Leesburg Accessible 35 miles from DC On the W&OD Trail On the Potomac River 15 miles from the Appalachian
More informationAGENCY NAME TRANSPORTATION
TRANSPORTATION TRANSPORTATION AGENCY NAME Prince William County FY 2015 BUDGET CIP-TRANSPORTATION 561 Fuller Road/Fuller Heights Road Improvements Total Project Cost - $4.4 M This project will widen Fuller
More informationPublic Information Meetings. October 5, 6, 7, and 15, 2015
Public Information Meetings October 5, 6, 7, and 15, 2015 Project Map 2 Project Context Only Interstate in the Country limited to HOV only traffic during rush hours Stoplight at the end of I-66 eastbound
More informationTransportation TRANSPORTATION PROJECTS
Transportation TRANSPORTATION PROJECTS Balls Ford Road Interchange Total Project Cost $142.9M This project includes the construction of a new diverging diamond interchange at Route 234 Bypass (Prince William
More informationSilver Line Operating Plan
Customer Service and Operations Committee Information Item IV-A December 6, 2012 Silver Line Operating Plan Washington Metropolitan Area Transit Authority Board Action/Information Summary Action Information
More informationA DIALOGUE WITH THE NORTHERN VIRGINIA DISTRICT. Nicholas J. Roper, P.E. Northern Virginia District Project Development Engineer
A DIALOGUE WITH THE NORTHERN VIRGINIA DISTRICT Nicholas J. Roper, P.E. Northern Virginia District Project Development Engineer Agenda Dashboard 2019 Project Advertisements for Construction 2019 New Projects
More informationPerformance Measure Summary
Performance Measure Summary Congestion Duration = reduction in the number of hours of the day auto and transit passengers experience heavily congested travel conditions. of Delay = reduction in the number
More informationFairfax County Transportation Advisory Commission (TAC)
Fairfax County Transportation Advisory Commission (TAC) January 17, 2017 Susan Shaw, P.E., Megaprojects Director Virginia Department of Transportation Amanda Baxter, Special Projects Development Manager
More informationThe following items were handed out at the January 4, 2018 NVTC Meeting.
The following items were handed out at the January 4, 2018 NVTC Meeting. Blue Item #3D 2018 NVTC COMMITTEE AND BOARD APPOINTMENTS NVTC EXECUTIVE COMMITTEE Paul Smedberg, Chairman/WMATA Board* Matt Letourneau,
More informationEvaluation of Significant Transportation Projects in Northern Virginia Transportation District
Evaluation of Significant Transportation Projects in Northern Virginia Transportation District Fact Sheet #3 Winter 2015 Virginia Department of Transportation Update - Project Evaluation And Rating Since
More informationFuller Road/Fuller Heights Road Improvements
Transportation Fuller Road/Fuller Heights Road Improvements Total Project Cost - $4.4M This project will widen Fuller Road, which is the entrance road serving the Quantico Marine Corps Base, the Town of
More informationArlington County Board Work Session Eastbound Widening January 17, Amanda Baxter, VDOT Special Projects Development Manager
Arlington County Board Work Session Eastbound Widening January 17, 2017 Amanda Baxter, VDOT Special Projects Development Manager Program Area Map 2 Program Scope Tolling during weekdays, peak hours, peak
More informationEvaluation of Significant Transportation Projects in Northern Virginia Transportation District. HB 599 Ratings Overview NVTA - January 22, 2015
Evaluation of Significant Transportation Projects in Northern Virginia Transportation District HB 599 Ratings Overview NVTA - January 22, 2015 Study Approach NVTA and CTB nominate projects Define Project
More informationTRANSPORTATION. Reston Market Profile
Reston Market Profile TRANSPORTATION Fairfax County Background A recent TIME Magazine featured rapidly growing Fairfax County as one of four "megacounties" in the nation-suburban counties that have outgrown
More informationUpdate on Route 1 Efforts
County of Fairfax, Virginia Update on Route 1 Efforts Transportation Advisory Committee October 20, 2015 Leonard Wolfenstein, FCDOT Jane Rosenbaum, FCDOT Doug Miller, FCDOT Route 1 Corridor 16- mile section
More informationFairfax County / Washington DC Transit Bus Advertising
GET ON THE BUS! Gateway Outdoor, through its partnership with Fairfax Connector, is the exclusive provider for Transit Advertising in Fairfax County, VA. Fairfax Commuter Fleet 290 Transit Buses 1,152,87
More informationFairfax County Parkway Widening Fairfax County
Get Involved VDOT representatives will review and evaluate information received as a result of this meeting. Please fill out the comment sheet provided in this brochure if you have any comments or questions.
More informationProposed Dulles Toll Road Rate Adjustments
Proposed Dulles Toll Road Rate Adjustments Dulles Corridor Advisory Committee Meeting October 5, 2012 Discussion Outline Regulatory Process for Changing Toll Rates Information Provided at Public Hearings
More informationArlington County Board Meeting Project Briefing. October 20, 2015
Arlington County Board Meeting Project Briefing October 20, 2015 Project Map 2 Project Context Only Interstate in the Country limited to HOV only traffic during rush hours Stoplight at the end of I-66
More informationTransform66: Inside the Beltway
Transform66: Inside the Beltway Result of a multi-year planning that started during the McDonnell Administration 2016 compromise reached with General Assembly Convert I-66 to express lanes from 5:30a-9:30a
More informationTier 2 Final Environmental Assessment I-66 Transit/TDM Technical Report. Appendix D. Existing Transit/TDM Provider Overviews
Tier 2 Final Environmental Assessment I-66 Transit/TDM Technical Report Appendix D FINAL MAY 2016 D. EXISTING TRANSIT/TDM PROVIDER OVERVIEWS Transit Service Providers Information about the type, frequency,
More informationMcLean Citizens Association Transportation Committee Project Briefing
McLean Citizens Association Transportation Committee Project Briefing November 10, 2015 Project Map 2 Project Context Only Interstate in the Country limited to HOV only traffic during rush hours Stoplight
More informationOur Panelists SPEAKERS MODERATOR
SPEAKERS Our Panelists Jennifer Aument, Transurban Gary Garczynski, Commonwealth Transportation Board Russ Gestl, Buchanan Partners, LLC Robert Shue, JLL MODERATOR David Birtwistle, Northern Virginia Transportation
More informationAppendix 1: Phase I Strategies
Washington Metropolitan Area Transit Authority RTSP Presentation to the Technical Advisory Group January 19, 2012 Appendix 1: Phase I Strategies Base Case Definition MWCOG 2009 Adopted CLRP (2009-2030
More informationUnderstanding Your I-66 Trip
Understanding Your I-66 Trip DETERMINING YOUR TRIP Identify the location of your most convenient entrance and then follow the map to your exit. Pricing is tracked by four gantries along the corridor. Traffic
More informationFuller/Fuller Heights Road Improvements
Fuller/Fuller Heights Road Improvements Total Project Cost - $4.4M Project Description This project will construct a mini-roundabout at the intersection of Fuller Heights Road and Old Triangle Road to
More informationI-95/395 HOV/Bus/HOT Lanes Project Overview
I-95/395 HOV/Bus/HOT Lanes Project Overview 2 I-95/395 HOV/Bus/HOT Lanes Meetings Agenda 7 p.m. to 9 p.m. Open House Information Stations and Q&A With Project Staff 7:30 p.m. and 8:30 p.m. Project Overview
More informationMetropolitan Washington Airports Authority (MWAA)
RONALD REAGAN WASHINGTON NATIONAL DULLES TOLL ROAD DULLES METRORAIL WASHINGTON DULLES INTERNATIONAL Metropolitan Washington Airports Authority (MWAA) Andrew Rountree Chief Financial Officer & Vice President
More informationBOARD OF SUPERVISORS AND VIRGINIA DEPARTMENT OF TRANSPORTATION JOINT PUBLIC HEARING
BOARD OF SUPERVISORS AND VIRGINIA DEPARTMENT OF TRANSPORTATION JOINT PUBLIC HEARING Date of Hearing: September 14, 2016 #1 SUBJECT: ELECTION DISTRICT: Proposed FY2017-FY2022 Secondary Road Six-Year Plan
More informationRECOMMENDATION TO THE DULLES CORRIDOR AND FINANCE COMMITTEES
RECOMMENDATION TO THE DULLES CORRIDOR AND FINANCE COMMITTEES Proposed Amendment to the Regulation that Establishes Toll Rates for Use of the Dulles Toll Road November 2018 Purpose To brief the Dulles Corridor
More informationDesign Public Hearing
Design Public Hearing Monday, March 7, 2016 Washington-Lee High School Cafeteria 1301 N. Stafford Street, Arlington, VA 22201 Tuesday, March 8, 2016 Eagle Ridge Middle School Cafeteria 42901 Waxpool Road,
More informationI-66 Inside the Beltway Feasibility Study
I-66 Inside the Beltway Feasibility Study Feasibility Study Study Process Context Sensitive Dialogues Corridor Assessments / Data Collection Problem Statement Refinement Concept Development Concept Evaluation
More informationNORTHERN VIRGINIA TRANSPORTATION AUTHORITY M E M O R A N D U M
NORTHERN VIRGINIA TRANSPORTATION AUTHORITY XV M E M O R A N D U M TO: FROM: Chairman Martin E. Nohe and Members Northern Virginia Transportation Authority Monica Backmon, Executive Director DATE: November
More informationMajor Projects Overview
Major Projects Overview Miami-Dade Expressway Authority February 2018 About MDX MDX operates 5 roads in Miami Dade County SR 924, SR 112, SR 836, SR 874 and SR 878 MDX Primary Source of Revenue: User Fees-Tolls
More informationNORTHERN VIRGINIA TRANSPORTATION AUTHORITY
NORTHERN VIRGINIA TRANSPORTATION AUTHORITY M E M O R A N D U M TO: FROM: Chairman Martin E. Nohe and Members Northern Virginia Transportation Authority Monica Backmon, Executive Director DATE: January
More informationCrystal City Station Improvements. Project Overview. Table 2: North Entrance. Table 1: South Entrance. 20th St. S 18th St. S.
Table 1: South Entrance Table 2: North Entrance 20th St. S 18th St. S Proposed Second Entrance Crystal Drive Existing Station Location Platform Future 4 th Track Future New Airport Connection (by others)
More informationINFORMATION PAPER TO THE STRATEGIC DEVELOPMENT COMMITTEE
INFORMATION PAPER TO THE STRATEGIC DEVELOPMENT COMMITTEE BRIEFING ON RONALD REAGAN WASHINGTON NATIONAL AND WASHINGTON DULLES INTERNATIONAL AIRPORTS CAPITAL CONSTRUCTION PROGRAM APRIL 2015 2015 Use & Lease
More informationACI LEGAL COMMITTEE MEETING
ACI LEGAL COMMITTEE MEETING MWAA S RAIL TO DULLES PROJECT: WHAT IS IT AND HOW DOES IT FIT WITH THE PRINCIPLES OF REVENUE DIVERSION PHIL SUNDERLAND MWAA GENERAL COUNSEL TWO GOALS FOR THE NEXT TEN MINUTES
More informationREAL ESTATE TRANSACTION ADVISORY SERVICES
REAL ESTATE TRANSACTION ADVISORY SERVICES Improving Performance and Value of Amtrak-owned Assets AMTRAK STATION DEVELOPMENT 1 New York Penn Station Moynihan Train Hall Philadelphia 30 th Street Station
More informationReston Association Board of Directors Meeting September 13, 2012 REVISED AGENDA Regular Meeting of the Board of Directors Thursday, September 13, 2012, 6:00 pm NOTE: Times listed for Agenda Items are estimates
More informationORANGE COUNTY TRANSPORTATION AUTHORITY. Go Local Fixed-Guideway Program History and Project Update. PowerPoint 3
ORANGE COUNTY TRANSPORTATION AUTHORITY Go Local Fixed-Guideway Program History and Project Update PowerPoint 3 Santa Ana-Garden Grove Fixed Guideway Project OCTA Board of Directors September 26, 2011 Project
More informationFigure 2: Public Transit Systems Operating in Northern Virginia Operating Statistics and Performance Indicators, FY 2004
Figure 2: Public Transit Systems Operating in Northern Virginia Operating Statistics and Performance Indicators, FY 24 Potomac and Rappahannock Transportation Commission Fairfax Connector Omni Ride Omni
More information2411 Dulles Corner Park Herndon, VA
2411 Dulles Corner Park Herndon, VA Building Highlights Award winning premier office building located in the center of Dulles Corner Minutes from Dulles International Airport, with quick access to the
More informationEXECUTIVE DIRECTOR. The Potomac Rappahannock Transportation Commission is seeking an ABOUT THE ORGANIZATION
The Potomac Rappahannock Transportation Commission is seeking an EXECUTIVE DIRECTOR ABOUT THE ORGANIZATION The Potomac Rappahannock Transportation Commission (PRTC) is a multi-jurisdictional agency that
More informationReport to the Strategic Development Committee
Report to the Strategic Development Committee Request of Virginia Department of Transportation for Easements across Washington Dulles International Airport Property at Route 28 May 2016 PURPOSE Staff requests
More informationMMHP INVESTMENT SALES OPPORTUNITY. Investment Highlights. Property Overview. Manassas Mobile Home Park & 9011 Centreville Road Manassas, VA
MMHP INVESTMENT SALES OPPORTUNITY 9009 & 9011 Centreville Road Manassas, VA Investment Highlights Centrally located, 100% leased mobile home park in the strong-performing City of Manassas, VA The 10.02-acre
More informationCapital Metropolitan Transportation Authority. Monthly Performance Report
Capital Metropolitan Transportation Authority Monthly Performance Report AUGUST 2010 Ridership Report August 23, 2010 Budget to Actual Ridership Budget Target: 2,290,590 Actual: 2,300,796 Ridership Comparison
More informationMacleod Trail Corridor Study. Welcome. Macleod Trail Corridor Study Open House. Presentation of Proposed Design Concepts
Macleod Trail Corridor Study Welcome Macleod Trail Corridor Study Open House Presentation of Proposed Design Concepts Study Purpose Develop a corridor plan for Macleod Trail that aligns with The City s:
More informationCapital Beltway HOT Lanes Project
New Travel Choices Ahead Some things can t wait for traffic Capital Beltway HOT Lanes Project Project Update August 16, 2011 Major Milestones Reached Some things can t wait for traffic Project over 75%
More informationReport to the Strategic Development Committee
Report to the Strategic Development Committee Recommendation to Approve the Request of Virginia Department of Transportation for Easements across Washington Dulles International Airport Property at Route
More informationCommittee for Dulles. June 9, Jack Potter, MWAA President & CEO
Committee for Dulles June 9, 2016 Jack Potter, MWAA President & CEO Dulles International is the Premier International Gateway to the Capital Region Dom Intl Total Mainline Airlines 10 29 37* Destinations
More information2017 TBARTA Future Regional Priority Projects Adopted by TBARTA Board, December 9, 2016
2017 TBARTA Future Regional Priority Projects Adopted by TBARTA Board, December 9, 2016 Project numbers do not signify ranking they are for mapping identification purposes only. 1. 15th Street East The
More informationNORTHERN VIRGINIA OPPORTUNITIES. Helen Cuervo, P.E. District Engineer, Northern Virginia April 27, 2018
NORTHERN VIRGINIA OPPORTUNITIES Helen Cuervo, P.E. District Engineer, Northern Virginia April 27, 2018 VDOT s Responsibilities: Plan Design and Construct Operate and Maintain The Commonwealth s transportation
More information3 ASSESSMENT OF THE CORRIDOR
3 ASSESSMENT OF THE CORRIDOR 3.1 PHYSICAL CHARACTERISTICS OF THE CORRIDOR The 9-mile segment of I-66 from the Capital Beltway to the Theodore Roosevelt Memorial Bridge was opened to vehicular traffic in
More informationFIRST WEEK UPDATE: 66 EXPRESS LANES INSIDE THE BELTWAY Data from first four days shows faster, more reliable trips on I-66
FOR IMMEDIATE RELEASE Tuesday, December 12, 2017 CONTACT: Michelle T. Holland 703-586-0487 (C) Michelle.Holland@vdot.virginia.gov Jennifer McCord 571-230-2926 Jennifer.McCord@vdot.virginia.gov FIRST WEEK
More informationBrentsville Courthouse
46 Prince William County Proposed FY 2014-2019 Capital Improvement Program Brentsville Courthouse Existing budget will complete the jail restoration. There is no additional funding allocated to projects
More informationEXHIBIT 1. BOARD AUTHORIZATION FOR PUBLIC HEARING AND SUBSEQUENT ISSUANCE OF A JOINT DEVELOPMENT SOLICITATION
EXHIBIT 1. BOARD AUTHORIZATION FOR PUBLIC HEARING AND SUBSEQUENT ISSUANCE OF A JOINT DEVELOPMENT SOLICITATION Washington Metropolitan Area Transit Authority Board Action/Information Summary @Action O Information
More informationCHAPTER 5: Operations Plan
CHAPTER 5: Operations Plan Report Prepared by: Contents 5 OPERATIONS PLAN... 5-1 5.1 Proposed Service Changes... 5-2 5.1.1 Fiscal Year 2017... 5-2 5.1.2 Fiscal Year 2018... 5-6 5.1.3 Fiscal Year 2019...
More informationRELATED SANTA CLARA SANTA CLARA, CALIFORNIA. RELATED SANTA CLARA Santa Clara, CA
RELATED SANTA CLARA SANTA CLARA, CALIFORNIA RELATED SANTA CLARA Santa Clara, CA JUNE 2016 APPROVAL TIMELINE RELATED SANTA CLARA Santa Clara, CA 1 ACRES PARKS & OPEN SPACE (40% OF TOTAL SITE) PARCEL 3 PARK
More informationAGENDA. Discussion/Information. Adjournment. Next Meeting: May 18, :00pm NVTA Office
TECHNICAL ADVISORY COMMITTEE Wednesday, April 20, 2016, 7:00pm NVTA Office 3040 Williams Drive, Suite 200 Fairfax, Virginia 22031 AGENDA I. Call to Order/Welcome Chairman Boice II. Meeting Summary of March
More informationWhy we re here: For educational purposes only
Transportation 2050 Why we re here: For educational purposes only Transportation 2050 Bus Elements PUBLIC TRANSIT DEPARTMENT City of Phoenix Citizens Committee on the Future of Phoenix Transportation (CCFPT)
More informationRESORT AREA STRATEGIC ACTION PLAN (RASAP) STEERING COMMITTEE MEETING - APRIL 3, 2019
RESORT AREA STRATEGIC ACTION PLAN (RASAP) STEERING COMMITTEE MEETING - APRIL 3, 2019 Welcome & Introductions - Deb Zywna AGENDA FY 20 Resort CIP Proposed Projects - Kathy Warren ORDFBC Design Guidelines
More informationScore. Category. Access Aesthetics Community Resources
NO BUILD ALTERNATIVE The No Build Alternative is the do nothing option that is used for comparison to the build alternatives. The screening assumes no new facilities are constructed as part of the I-93
More informationPublic Informational Meeting
Public Informational Meeting April 17, 2007 Bow-Concord I-93 I Transportation Planning Study Bow-Concord Interstate 93 Transportation Planning Study Context Sensitive Solutions Planning Steps Screen Alternatives
More informationResolution of Support for the Ettrick Site as the Future Location of the Tri-Cities Multimodal Station
CHESTERFIELD COUNTY BOARD OF SUPERVISORS Page 1 of 3 AGENDA Meeting Date: October 28, 2015 Item Number: 8.B.1.b. Subject: Resolution of Support for the Ettrick Site as the Future Location of the Tri-Cities
More informationA retrospective look at work program counting activities since 2001 is found in Table 8, on the last page of this document. Hours of Operation
Page 2 of 20 Background TPB staff has been managing data collection along the region s HOV facilities since the late 1990's, and documenting the results, which include counts of auto occupants, vehicles
More informationCHULA VISTA DEVELOPMENT OPPORTUNITY. For Additional Information: Sean Bascom Lic#
CHULA VISTA DEVELOPMENT OPPORTUNITY For Additional Information: Sean Bascom 619.916.9179 bascom@scc1031.com Lic# 01862044 Image TAVA Third Avenue Village is the heart of Chula Vista s historic downtown.
More informationItem # 28. Chief Capital Management Officer Report. November 20, 2008
Item # 28 Chief Capital Management Officer Report November 20, 2008 1 Metro Gold Line Eastside Extension Project Update November 2008 6 Mile Alignment 1.7 Miles of Tunnel 8 Stations (6 At-grade & 2 Underground)
More informationBusiness Item No XXX. Proposed Action That the Metropolitan Council approve the Coon Creek Regional Trail Master Plan.
Business Item No. 2015-XXX Metropolitan Parks and Open Space Commission Meeting date: July 7, 2015 For the Community Development Committee meeting of July 20, 2015 For the Metropolitan Council meeting
More informationDEMOGRAPHICS AND EXISTING SERVICE
EXECUTIVE SUMMARY The Central Corridor light-rail transit (LRT) project will open in 2014 and operate between downtown Minneapolis and downtown St. Paul, serving the University of Minnesota and University
More informationTable of Contents. List of Tables
Table of Contents 1. Introduction... 1 2. Service Recommendations... 1 A. Extend Service on Fort Belvoir to New Post Exchange/Commissary Complex... 1 B. Improve Service Frequencies on Sunday from Current
More informationEast Link Project Update. Maintenance of Traffic During Construction. April 21, 2015
East Link Project Update Maintenance of Traffic During Construction April 21, 2015 1 Agenda TFP project 242 Bellevue Way HOV Bellevue Way - Maintenance of Traffic During Construction Early Work Utilities
More informationSUPPORT THE ROUTE 58 PPTA: A Good Investment in Virginia
Project Profile: SUPPORT THE ROUTE 58 PPTA: A Good Investment in Virginia In 1989, the General Assembly established the Route 58 Corridor Development Program to enhance economic development potential across
More informationCrenshaw/LAX Transit Project Construction Update Community Meeting. November 15, 2018
Crenshaw/LAX Transit Project Construction Update Community Meeting November 15, 2018 Project Overview Walsh Shea Corridor Constructors (WSCC) Main Line & Stations Contractor Hensel Phelps Herzog (HPH)
More informationCHULA VISTA DEVELOPMENT OPPORTUNITY. For Additional Information: Sean Bascom Lic#
For Additional Information: Sean Bascom 619.916.9179 bascom@scc1031.com Lic# 01862044 CHULA VISTA DEVELOPMENT OPPORTUNITY Excellent Location Near Vibrant Third Avenue Village High Density Zoning Building
More informationNORTHERN VIRGINIA TRANSPORTATION AUTHORITY
XV NORTHERN VIRGINIA TRANSPORTATION AUTHORITY M E M O R A N D U M TO: FROM: Chairman Martin E. Nohe and Members Northern Virginia Transportation Authority Monica Backmon, Executive Director DATE: March
More information230 CHURCH AVENUE CHULA VISTA, CA 91910
Excellent Location Near Vibrant Third Avenue Village High Density Zoning Building Height up to 45 Lot size of 11,326 sqft Flat/Graded Lot Ease of Access to Utility Hookups Multiple Allowed Uses For Additional
More informationMultimodal Planning Studies
Multimodal Planning Studies Commuter Park and Ride Study Steering Committee Meeting June 6, 2013 Agenda 1. Update on Project Schedule 2. Update on Online Interactive Mapping 3. Key Themes from the Open
More informationFEASIBILITY STUDY REFINED CONCEPT 1 PROJECT A
VIRGINIA DEPARTMENT OF TRANSPORTATION I-85 / I-95 INTERCHANGE FEASIBILITY STUDY REFINED CONCEPT 1 PROJECT A Columbia Rd REFINED CONCEPT 1 PROJECT A Bellevue Rd COST: $3.3M Siege Rd Eliminate the loop ramp
More informationMount Pleasant (42, 43) and Connecticut Avenue (L1, L2) Lines Service Evaluation Study Open House Welcome! wmata.com/bus
Mount Pleasant (42, 43) and Connecticut Avenue (L1, L2) Lines Service Evaluation Study Open House Welcome! Study Overview and Timeline Phase 1: Collect and Analyze Data Project Kickoff, September 2017
More information395 Express Lanes Project Update
395 Express Lanes Project Update Key Dates Milestone Date Limited Notice to Proceed February 2017 Early Works March-June 2017 Full Notice to Proceed July 2017 Preparatory Work Summer 2017 Draft Noise Abatement